An assembled self-resetting pier and a construction method thereof

By using the core concrete protruding column and the socket joint, along with the cross configuration of longitudinal steel bars, and combining prestressed steel bar bundles and steel sleeves, the problems of large socket depth, insufficient tensile strength, and complex construction were solved. This enabled the pier to achieve self-resetting function and efficient construction, and improved seismic performance and assembly efficiency.

CN123153344APending Publication Date: 2026-11-24BEIJING JIAOTONG UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611234092.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-14
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

In the existing technology, the socket-type bridge piers have problems such as large socket depth, insufficient shear and pull-out bearing capacity of the joints, poor seismic ductility, complicated construction procedures, and low assembly efficiency, which cannot take into account both the seismic performance of the structure and the requirements of industrialized construction.

Method used

The system adopts an integral connection structure with core concrete protruding columns and socket joints, and longitudinal steel bars intersecting. Combined with the design of prestressed steel bar bundles and steel sleeves, it optimizes the force transmission path, provides prestress and elastic restoring force, realizes self-resetting function, and simplifies the construction process.

Benefits of technology

It significantly improves the shear and tensile bearing capacity and structural ductility of the connection nodes, reduces residual deformation after earthquakes, enhances the overall structural integrity and anti-overturning capacity, improves construction efficiency, and meets the industrialized construction needs of modern bridges that are standardized, prefabricated, and rapid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123153344A_ABST
    Figure CN123153344A_ABST
Patent Text Reader

Abstract

This invention proposes a prefabricated self-resetting bridge pier and its construction method, relating to the field of bridge engineering technology. The pier comprises: a pier body, a pier cap body, and prestressed steel reinforcement bundles. The pier body is divided into upper and lower segments connected by steel sleeves, with internal vertical pre-reserved ducts. A core concrete protruding column is located at the bottom of the lower segment. A socket joint is provided on the top surface of the pier cap to be fixed to the protruding column. Cross-lapped steel reinforcement is provided at both connection points. The steel sleeves have grouting and grout outlet holes, and the pier cap has a conduit connecting to the socket joint, with sealing bolts at the hole ends. This invention optimizes the force transmission path through the socket structure and cross-reinforcement, improving the shear and pull-out bearing capacity and ductility of the joints, avoiding bond slip and brittle failure. The through-strength prestressed bundles provide pre-stress and elastic recovery force, achieving self-resetting and reducing post-earthquake residual deformation. Simultaneously, it eliminates the need for grouting sleeves and formwork dismantling procedures, reducing on-site wet work, simplifying the construction process, improving assembly efficiency, and adapting to industrialized bridge construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of bridge engineering technology, and more specifically, to a prefabricated self-resetting bridge pier and its construction method. Background Technology

[0002] As my country's bridge construction continues to advance towards standardization, assembly, and industrialization, precast bridge piers have become an important development direction in modern bridge construction due to their advantages such as fast construction speed, less on-site wet work, stable component quality, and minimal disruption to surrounding traffic and the environment. Socket connection, as a typical technology for connecting precast bridge piers and abutments, has the outstanding characteristics of large installation alignment tolerance, simple operation, and no need for complex steel reinforcement precise positioning. It is gradually being promoted and applied in urban bridges and cross-sea projects, while also placing higher demands on the stress reliability, seismic performance, and construction efficiency of the connection nodes.

[0003] Traditional socket joint technology still faces numerous technical bottlenecks. To ensure the bending capacity and consolidation stiffness of the joint, conventional designs often require a large socket depth, resulting in a significant increase in the size and thickness of the pier cap. This increases material costs and construction difficulty, and also limits its application in large-section bridge piers. Ordinary socket joints rely heavily on interfacial bonding to transfer loads, resulting in a single force transmission path. Under cyclic loads and seismic action, they are prone to bond slip and brittle punching shear failure. The joints have weak tensile strength and energy dissipation performance, and lack effective restraint structures to fully utilize the grouting material's properties, making it difficult to meet the seismic fortification requirements of medium- to high-intensity earthquake zones.

[0004] Therefore, it is necessary to design a prefabricated self-resetting bridge pier and its construction method to solve the problems of existing technologies, such as large insertion depth, insufficient shear and pull-out bearing capacity of joints, poor seismic ductility, complicated construction procedures, low assembly efficiency, and inability to take into account both the seismic performance of the structure and the needs of industrialized construction. Summary of the Invention

[0005] In view of this, the present invention proposes a prefabricated self-resetting bridge pier and its construction method, aiming to solve the problems of existing technologies such as large insertion depth, insufficient shear and pull-out bearing capacity of nodes, poor seismic ductility, complicated construction procedures, low assembly efficiency, and inability to simultaneously meet the requirements of structural seismic performance and industrialized construction.

[0006] In one aspect, the present invention proposes a prefabricated self-resetting bridge pier, comprising: The pier body includes a reserved duct, an upper segment of the pier body, a bottom segment of the pier body, and a steel sleeve; the reserved duct is vertically opened on the top surface of the pier body; a core concrete protrusion is provided vertically at the bottom of the bottom segment of the pier body; the upper segment of the pier body is located directly above the bottom segment of the pier body, and the upper segment of the pier body and the bottom segment of the pier body are fixedly connected by the steel sleeve; The main body of the foundation has a slot formed on its top surface in the vertical direction; the core concrete protrusion is fixedly connected to the slot. Prestressed steel bars are vertically installed in the reserved ducts of the pier body and the abutment body. One end of the prestressed steel bar bundle is fixedly connected to the top of the pier body, and the other end of the prestressed steel bar bundle is fixedly connected to the bottom of the abutment body.

[0007] Furthermore, the bottom surface of the upper segment of the pier body is provided with several longitudinal steel bars for the upper segment of the pier body in the vertical direction; The top surface of the bottom segment of the pier body is provided with several longitudinal steel bars for the bottom segment of the pier body in the vertical direction; The longitudinal reinforcement bars of the upper segment of the pier body and the longitudinal reinforcement bars of the bottom segment of the pier body are lapped together.

[0008] Furthermore, the steel sleeve is arranged in a vertical direction; The steel sleeves are fixedly connected to the bottom of the upper segment of the pier body and the top of the bottom segment of the pier body, respectively.

[0009] Furthermore, the steel sleeve has grouting holes and grout outlet holes on its side.

[0010] Furthermore, the inner wall of the socket is provided with a plurality of longitudinal reinforcing bars around the inner wall of the socket; The side of the core concrete protrusion is provided with several longitudinal steel bars for the core concrete protrusion. The longitudinal reinforcing bars around the inner wall of the socket and the longitudinal reinforcing bars of the core concrete protrusion are interwoven.

[0011] Furthermore, it also includes: A conduit is disposed inside the main body of the bearing platform, and the conduit connects the bearing slot to the external environment.

[0012] Furthermore, the longitudinal reinforcement bars of the upper segment of the pier body and the longitudinal reinforcement bars of the bottom segment of the pier body are interwoven to form an interwoven reinforcement area.

[0013] Furthermore, it also includes: The bolt is detachably connected to the grout outlet, the grouting hole, and the end of the conduit that is in contact with the external environment.

[0014] Furthermore, the suspended ends of the longitudinal reinforcement bars of the upper segment of the pier body, the longitudinal reinforcement bars of the bottom segment of the pier body, the longitudinal reinforcement bars around the inner wall of the socket, and the longitudinal reinforcement bars of the core concrete protruding column are provided with hooks.

[0015] Compared with existing technologies, the advantages of a prefabricated self-resetting bridge pier are as follows: By employing the socket-and-groove connection between the core concrete protruding column and the bearing slot, and the overall connection structure with the cross-arrangement of longitudinal reinforcement, the force transmission path between the pier base and segments is optimized, significantly improving the shear and tensile bearing capacity and structural ductility of the connection nodes. This effectively avoids bond slippage and brittle failure that are prone to occur in traditional connection methods. The prestressed steel strands running through the pier and abutment provide overall prestress to the structure, delaying cracking in the connection zone and providing elastic recovery force under seismic loading, enabling the pier to self-reset, greatly reducing residual deformation after earthquakes, and enhancing the overall structural integrity and overturning resistance. Simultaneously, this design eliminates the need for grouting sleeve connections and additional formwork erection and dismantling procedures, allowing for greater installation alignment tolerance, less on-site wet work, significantly simplified construction processes, and significantly improved assembly efficiency, fully meeting the standardized, prefabricated, and rapid industrialized construction requirements of modern bridges.

[0016] On the other hand, the present invention proposes a construction method for a prefabricated self-resetting bridge pier, comprising: The core concrete protrusion is inserted into the socket, and the longitudinal steel bars around the inner wall of the socket and the longitudinal steel bars of the core concrete protrusion are cross-lapped. The outer side of the core concrete protrusion is used as the inner mold, and the inner wall of the socket is used as the outer mold. Grout is injected into the socket through the conduit. After the injection is completed, the conduit is sealed with bolts. The longitudinal steel bars of the upper segment of the pier body and the longitudinal steel bars of the bottom segment of the pier body are cross-lapped, and the steel sleeve is fixedly connected to the bottom of the upper segment of the pier body and the top of the bottom segment of the pier body. Using the steel sleeve as the outer mold, the grouting material is injected into the cross-reinforced area through the grouting hole. After the injection is completed, the grouting hole and the grout outlet hole are sealed with bolts. The prestressed steel bar strands are inserted into the reserved ducts, and one end of the prestressed steel bar strands is fixedly connected to the top of the pier body based on the post-tensioning method, and the other end of the prestressed steel bar strands is fixedly connected to the bottom of the pier body; the grouting material is injected into the reserved ducts.

[0017] It is understandable that the aforementioned prefabricated self-resetting bridge pier and its construction method have the same beneficial effects, which will not be elaborated here. Attached Figure Description

[0018] Various other advantages and benefits will become apparent to those skilled in the art upon reading the following detailed description of preferred embodiments. The accompanying drawings are for illustrative purposes only and are not intended to limit the invention. Furthermore, the same reference numerals denote the same parts throughout the drawings. In the drawings: Figure 1 A schematic diagram of a prestressed bridge pier with a core concrete socket provided for an embodiment of the present invention; Figure 2 This is a schematic diagram of the segmental connection structure of the bridge pier provided in an embodiment of the present invention; Figure 3 This is a schematic diagram of the socket connection structure between the pier body and the abutment body provided in an embodiment of the present invention; Figure 4 A schematic diagram of the suspended reinforcing bars in the longitudinal reinforcing bar cross reinforcement connection section provided in the embodiment of the present invention; Figure 5 A flowchart illustrating the construction method of the prefabricated self-resetting bridge pier provided in an embodiment of the present invention; In the diagram: 1 - Pier main body; 2 - Pier main body; 3 - Steel sleeve; 4 - Reserved duct; 5 - Prestressed steel bar bundle; 6 - Upper segment of pier main body; 7 - Bottom segment of pier main body; 8 - Core concrete protruding column; 9 - Longitudinal reinforcement of upper segment of pier main body; 10 - Longitudinal reinforcement of bottom segment of pier main body; 11 - Longitudinal reinforcement around the inner wall of the socket; 12 - Socket; 13 - Grouting material; 14 - Grouting hole; 15 - Grout outlet hole; 16 - Guide pipe; 17 - Bolt; 18 - Hook; 19 - Longitudinal reinforcement of core concrete protruding column. Detailed Implementation

[0019] Exemplary embodiments of the present invention will now be described in more detail with reference to the accompanying drawings. While exemplary embodiments of the present invention are shown in the drawings, it should be understood that the present invention can be implemented in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided to enable a more thorough understanding of the present invention and to fully convey the scope of the invention to those skilled in the art. It should be noted that, without conflict, the embodiments and features described herein can be combined with each other. The present invention will now be described in detail with reference to the accompanying drawings and embodiments.

[0020] Reference Figure 1-2As shown in some embodiments of this application, a prefabricated self-resetting bridge pier includes: a bridge pier body 1, a reserved channel 4, an upper segment 6 of the bridge pier body, a bottom segment 7 of the bridge pier body, and a steel sleeve 3; the reserved channel 4 is vertically opened on the top surface of the bridge pier body 1; a core concrete protrusion 8 is provided vertically at the bottom of the bottom segment 7 of the bridge pier body; the upper segment 6 of the bridge pier body is located directly above the bottom segment 7 of the bridge pier body, and the upper segment 6 and the bottom segment 7 of the bridge pier body are fixedly connected by the steel sleeve 3; a pier cap body 2, the top surface of the pier cap body 2 is vertically opened with a socket 12; the core concrete protrusion 8 is fixedly connected to the socket 12; a prestressed steel bar bundle 5 is vertically arranged in the reserved channel 4, one end of the prestressed steel bar bundle 5 is fixedly connected to the top of the bridge pier body 1, and the other end of the prestressed steel bar bundle 5 is fixedly connected to the bottom of the pier cap body 2.

[0021] Specifically, the reserved duct 4 runs vertically through the entire pier body 1 and the abutment body 2. The upper segment 6 of the pier body, the bottom segment 7 of the pier body, and the core concrete protruding column 8 are all provided with corresponding and interconnected reserved ducts 4. The prestressed steel bar bundle 5 is inserted from the reserved duct 4 on the top surface of the upper segment 6 of the pier body and extends vertically until it penetrates to the bottom of the abutment body 2. The bottom segment 7 of the pier body and the core concrete protruding column 8 are integrally cast structures.

[0022] Understandably, the core overall structure of the prefabricated self-resetting pier was constructed. Through the socket-slot cooperation between the core concrete protruding column 8 and the socket 12, the on-site positioning and docking of the pier body 1 and the pier cap body 2 can be completed quickly, significantly reducing the accuracy requirements for assembly and alignment. The installation tolerance is significantly better than that of the traditional grouting sleeve connection method. The segmented pier body 1 consists of the upper segment 6 and the bottom segment 7 of the pier body, which is fully compatible with the industrialized construction mode of factory prefabrication and on-site assembly. The component production quality is stable and controllable, while reducing the lifting weight and construction difficulty of individual components. The prestressed steel reinforcement bundles 5, arranged along the reserved duct 4, can apply uniform vertical preload to the overall structure through post-tensioning, ensuring that the segment splice interface and the pier bottom socket interface are always under compression. This effectively delays concrete cracking in the connection area and improves the structure's impermeability and overall stiffness. Under seismic cyclic loading, the prestressed steel reinforcement bundles 5 can provide continuous elastic restoring force, driving the pier to return to its initial position after large deformation, achieving self-resetting function, significantly reducing residual deformation after earthquakes, and lowering the cost and difficulty of post-earthquake repair. Combined with the segmental connection structure of the steel sleeve 3, it can simultaneously achieve the dual functions of structural constraint and construction formwork, improving the stress performance of the joints while simplifying construction procedures. The overall scheme fully meets the industrialized construction needs of modern bridges, which emphasizes standardization, prefabrication, and rapid assembly.

[0023] Reference Figure 2As shown, in some embodiments of this application, the bottom surface of the upper segment 6 of the pier body is provided with a plurality of longitudinal steel bars 9 of the upper segment 6 of the pier body in the vertical direction; the top surface of the bottom segment 7 of the pier body is provided with a plurality of longitudinal steel bars 10 of the bottom segment 7 of the pier body in the vertical direction; the longitudinal steel bars 9 of the upper segment 7 of the pier body and the longitudinal steel bars 10 of the bottom segment 7 of the pier body are lapped together.

[0024] Specifically, the longitudinal steel bars 9 in the upper segment of the pier body and the longitudinal steel bars 10 in the bottom segment of the pier body are the same in number. Both are evenly arranged along the circumference of the cross section of the corresponding segment, and the overlapping area is set at the splice joint of the two segments.

[0025] Understandably, the use of a cross-lapped structure between the longitudinal reinforcement bars 9 in the upper segment of the pier body and the longitudinal reinforcement bars 10 in the bottom segment of the pier body optimizes the stress path between pier segments from the perspective of force transmission mechanism, breaking through the performance and construction limitations of traditional reinforcement connection methods. Compared with the high requirements of precise alignment of each reinforcement bar in traditional grouting sleeve connection, the cross-lapped structure significantly reduces the alignment accuracy requirements of segment hoisting, significantly increases the installation error tolerance, and greatly improves the speed and efficiency of on-site assembly. In terms of stress performance, the cross-laid longitudinal reinforcement bars can form a synergistic force transmission system with the subsequently injected grout. The stress of the upper segment's longitudinal reinforcement bars gradually diffuses into the surrounding grout through bonding, forming a uniform stress diffusion field. Then, the lower segment's longitudinal reinforcement bars bear the stress from the stress field of the grout, realizing indirect lapped force transmission between reinforcement bars, effectively avoiding bond slip failure that is prone to occur in single-interface force transmission. The stress fields of multiple intersecting steel bars superimpose to form a continuous and stable force transmission medium in the connection area, effectively dispersing local stress concentration and significantly improving the shear and tensile bearing capacity of the segmental connection node. At the same time, it endows the connection node with good deformation capacity and structural ductility, effectively avoiding brittle pull-out failure under seismic cyclic loads, and ensuring that the node still has stable and reliable force transmission performance under large deformation conditions.

[0026] Reference Figure 1-2 As shown, in some embodiments of this application, the steel sleeve 3 is arranged in a vertical direction; the steel sleeve 3 is fixedly connected to the bottom of the upper segment 6 of the pier body and the top of the bottom segment 7 of the pier body.

[0027] Specifically, the steel sleeve 3 is sleeved on the outer wall surface of the bottom of the upper segment 6 of the pier body and the top of the bottom segment 7 of the pier body. The axial length of the steel sleeve 3 can completely cover the cross reinforcement area formed by the longitudinal reinforcement 9 of the upper segment of the pier body and the longitudinal reinforcement 10 of the bottom segment of the pier body.

[0028] Understandably, the steel sleeve 3, installed vertically, achieves a fixed connection between the upper segment 6 and the bottom segment 7 of the pier body. This structure serves as both a stress constraint and a construction template, simultaneously improving the stress performance and construction efficiency of the joint. In terms of stress, the steel sleeve 3, fitted onto the outside of the segment connection area, effectively forms a ring constraint on the internally injected grout, limiting the lateral expansion and deformation of the grout during stress. This places the grout under triaxial compression, significantly improving its compressive strength and ultimate strain capacity, thereby enhancing the overall load-bearing capacity and structural ductility of the connection joint and preventing brittle failure. In terms of construction, the steel sleeve 3 can directly serve as a permanent outer formwork for grouting operations in the segment connection area, eliminating the need for additional on-site formwork erection and dismantling. This completely eliminates the entire process of formwork processing, erection, reinforcement, and dismantling, significantly reducing on-site work and construction time. Meanwhile, the steel sleeve 3 can provide guidance and positioning for segment docking during hoisting, further reducing the alignment difficulty of segment assembly, improving installation accuracy and construction efficiency. Its factory prefabrication also ensures the stability of component dimensional accuracy and structural quality.

[0029] It is understandable that the main body 1 of the bridge pier is not limited to being divided into two segments, but can also be divided into multiple segments, with multiple segments being fixedly connected by longitudinal steel bars and steel sleeves 3.

[0030] Reference Figure 2 As shown, in some embodiments of this application, the steel sleeve 3 has a grouting hole 14 and a grout outlet hole 15 on its side.

[0031] Specifically, the grouting hole 14 and the grout outlet hole 15 are distributed vertically along the axial direction of the steel sleeve 3. The grouting hole 14 is opened on the lower side wall of the steel sleeve 3, and the grout outlet hole 15 is opened on the upper side wall of the steel sleeve 3. Both are connected to the internal cavity of the steel sleeve 3.

[0032] Understandably, the grouting holes 14 and grout outlet holes 15 on the side of the steel sleeve 3 provide standardized grouting and venting channels for the grouting operation in the segment connection area, effectively ensuring the operability of the grouting construction and the forming quality of the connection node. Conventional sleeve grouting connections require separate external grouting pipelines, which are complex in construction procedures and prone to grout leakage. However, by directly integrating the grouting holes 14 and grout outlet holes 15 on the side wall of the steel sleeve 3, there is no need to add additional grouting channel components, simplifying the types of components and on-site construction steps. During construction, the operation method of feeding grout through the lower grouting holes 14 and venting grout through the upper grout outlet holes 15 allows the grout to gradually fill from the bottom of the connection area upwards, smoothly expelling air in the area and effectively avoiding quality defects such as voids and incomplete compaction during grouting. At the same time, the grout discharge status through the grout outlet holes 15 can be used to visually judge the fullness of grouting, making construction quality control convenient and reliable. In addition, the integrated duct design can ensure the integrity of the steel sleeve 3 structure, avoid the impact of external pipelines on the appearance and durability of the structure in the later stage, and the duct can be directly sealed after grouting. The operation is simple and efficient, and it is fully adapted to the needs of rapid construction of prefabricated bridges.

[0033] Reference Figure 3 As shown, in some embodiments of this application, the inner wall of the socket 12 is provided with a plurality of longitudinal reinforcing bars 11 around the inner wall of the socket; the side of the core concrete protrusion 8 is provided with a plurality of longitudinal reinforcing bars 19 of the core concrete protrusion; the longitudinal reinforcing bars 11 around the inner wall of the socket and the longitudinal reinforcing bars 19 of the core concrete protrusion are intersected.

[0034] Specifically, the number of longitudinal steel bars 11 around the inner wall of the socket is the same as that of the longitudinal steel bars 19 of the core concrete protrusion. The two are evenly arranged along the inner circumference of the socket 12 and the side wall of the core concrete protrusion 8, respectively. After the core concrete protrusion 8 is inserted into the socket 12, the two types of longitudinal steel bars form a cross-lapped state.

[0035] Understandably, the construction method of lapping the longitudinal reinforcing bars 11 around the inner wall of the socket with the longitudinal reinforcing bars 19 of the core concrete protruding column significantly enhances the force transmission performance of the pier bottom socket joint, compensating for the performance shortcomings of traditional smooth socket connections. Traditional socket connections rely mainly on interfacial bonding force to transfer loads, resulting in a single force transmission path. Under cyclic loads, this makes them prone to interfacial slippage and punching shear failure. In contrast, the lapped longitudinal reinforcing bars form a synergistic force-bearing system with the grout, providing multiple force transmission paths for the pier bottom joint: horizontal shear force can be jointly borne by the interfacial friction of the core concrete protruding column and the dowel resistance of the lapped reinforcing bars, while pull-out force is borne by the bond anchorage effect of the lapped reinforcing bars in the grout. The lapped arrangement effectively increases the effective anchorage length of the reinforcing bars, significantly improving the tensile pull-out bearing capacity of the joint. This structure effectively disperses local stress at the pier bottom interface, avoiding brittle failure caused by stress concentration, significantly improving the structural ductility and seismic performance of the pier bottom joint, and ensuring that the load-bearing capacity and deformation capacity of the socket joint match the overall performance of the pier body. Meanwhile, the alignment requirements for cross-lap joints are much lower than those for sleeve connections, and can be completed simultaneously with the insertion action of the core concrete protruding column 8, without adding extra construction procedures or operational difficulties.

[0036] Reference Figure 3 As shown, in some embodiments of this application, it further includes: a conduit 16; the conduit 16 is disposed inside the support body 2, and the conduit 16 connects the support slot 12 and the external environment.

[0037] Specifically, the conduit 16 is embedded in the foundation body 2 in a horizontal direction. One end of the conduit 16 is connected to the lower side wall of the socket 12, and the other end extends to the outer surface of the foundation body 2, forming an injection channel that connects the socket 12 with the external environment.

[0038] Understandably, the conduit 16, which connects the socket 12 to the external environment within the main body 2 of the pier cap, provides a pre-embedded grouting channel for the grouting operation at the pier bottom socket joint. This effectively simplifies the construction process of the pier bottom connection and ensures the quality of grouting. Traditional socket joint grouting requires an external grouting pipe to be inserted into the connection gap, which limits the working space and easily leads to uneven grouting and poor air venting. However, the conduit 16, pre-embedded within the main body 2 of the pier cap, can directly connect to the lower area of ​​the socket 12. During construction, grout can be injected directly from the external interface without the need for additional grouting equipment, significantly reducing the difficulty of on-site operations. With the outer wall of the core concrete protruding column 8 serving as the inner formwork and the inner wall of the socket 12 serving as the outer formwork, a closed grouting cavity can be formed without the need for additional formwork support, completely eliminating the process of formwork support and removal, and significantly reducing the amount of wet work on site. After the grouting material enters the bottom of the socket 12 through the guide pipe 16, it gradually fills upwards, which can smoothly expel the air in the cavity, effectively avoid quality defects such as hollowness and insufficient density, and improve the stress uniformity and structural reliability of the connection node at the bottom of the pier; the pre-embedded guide pipe design also ensures the integrity of the pier cap structure and will not have an adverse effect on the stress performance of the pier cap.

[0039] Reference Figure 2 As shown, in some embodiments of this application, the longitudinal steel bars 9 of the upper segment of the pier body and the longitudinal steel bars 10 of the bottom segment of the pier body are interwoven to form an interwoven reinforcement area.

[0040] Specifically, the cross-reinforcement area is located at the splice joint between the upper segment 6 and the bottom segment 7 of the pier body, and the cross lap length of the two types of longitudinal steel bars meets the structural dimension requirements for anchorage force transmission.

[0041] Understandably, clearly defining the cross-reinforcement area as formed by the lapped joints of the longitudinal reinforcement bars 9 in the upper segment of the pier body and the longitudinal reinforcement bars 10 in the bottom segment of the pier body clearly defines the core force transmission area of ​​the segmental connection. This ensures the stability of the joint's stress performance and provides a clear operational boundary for on-site construction. The cross-reinforcement area is the core carrier for stress transfer between segments. Within this area, the two types of longitudinal reinforcement bars form a collaborative working system with the grouting material. The stress in the reinforcement bars is fully diffused and transferred within this area through bonding, ensuring that the load-bearing capacity of the connection joint is not lower than that of the pier segment itself, achieving the equal strength design goal of the segmental connection. Clearly defining the scope of the cross-reinforcement area allows for precise control of the coverage length of the steel sleeve and the filling range of the grouting operation, avoiding performance defects caused by insufficient grouting and preventing material waste caused by excessive grouting, making construction quality control more targeted. Meanwhile, the regular cross-reinforced areas can make the grouting material more uniformly stressed and the stress diffusion more complete, effectively avoiding early cracking and brittle failure caused by local stress concentration, ensuring that the connection nodes have stable force transmission performance and good deformation ductility under static load and seismic cyclic load, and improving the overall reliability and durability of segmental connection.

[0042] Reference Figure 1 As shown, in some embodiments of this application, it further includes: bolt 17; bolt 17 is detachably connected to the grout outlet 15 and the grouting hole 14, as well as the end of the conduit 16 that is in contact with the external environment.

[0043] Specifically, the specifications of the bolts 17 are adapted to the specifications of the grouting hole 14, the grout outlet hole 15, and the outer opening of the guide tube 16. After the grouting material 13 is injected, the bolts 17 can be screwed into each hole to achieve sealing.

[0044] Understandably, the detachable connection of bolts 17 to the grouting holes 14, grout outlet 15, and the outer end of the guide tube 16 provides a reliable sealing solution for each grouting opening, simultaneously improving the quality and economy of grouting construction. After grouting, timely sealing of each opening with bolts 17 prevents grout from flowing out before solidification, maintains stable pressure within the grouting cavity, ensures the compactness of the grout filling, and avoids quality defects such as insufficient joint strength and hollow areas caused by grout leakage. The detachable connection allows bolts 17 to be reused, significantly reducing construction material costs compared to traditional disposable sealing materials, aligning with the concept of green construction. Simultaneously, bolt sealing is simple and quick, requiring no complex sealing procedures, adapting to the pace of rapid on-site construction, and effectively shortening the time for each process. After sealing, it effectively isolates external moisture and debris from entering the connection area, preventing corrosion of internal reinforcing steel and grout, and improving the long-term durability of the connection joint. In addition, the standardized bolts can be used to seal all holes, reducing the types of components on site, facilitating construction management and material allocation, and further improving the efficiency of construction organization.

[0045] Reference Figure 4 As shown, in some embodiments of this application, the suspended ends of the longitudinal steel bars 9 of the upper segment of the pier body, the longitudinal steel bars 10 of the bottom segment of the pier body, the longitudinal steel bars 11 around the inner wall of the socket, and the longitudinal steel bars 19 of the core concrete protruding column are provided with hooks 18.

[0046] Specifically, the hooks 18 are arranged facing the interior of the corresponding connection area, and all hooks 18 are embedded inside the grouting material 13 of the corresponding connection area.

[0047] Understandably, installing hooks 18 at the suspended ends of various longitudinal reinforcing bars enhances the bond and anchorage performance between the reinforcing bars and the grout through mechanical anchoring, further improving the tensile strength and structural reliability of the connection joint. Compared to plain round straight reinforcing bars that rely solely on surface bond for anchorage, the end hooks 18 create a mechanical anchorage effect. When the reinforcing bar is under tension, the hook portion exerts local pressure on the surrounding grout, forming a multi-layered anchorage force transmission mechanism of "bond anchorage + end pressure," significantly improving the anchorage efficiency of the reinforcing bar and effectively reducing the risk of pull-out failure. The hook structure can improve anchorage performance without increasing the lap length of the reinforcing bars, which is beneficial for reducing the overall size of the connection area and optimizing the structural design. Under seismic cyclic loading, the mechanical anchorage effect of the hooks can effectively offset the damage to the bond interface caused by repeated tensile and compressive loads, avoiding slippage failure caused by bond degradation, ensuring that the joint still has stable force transmission capacity under large deformation cyclic loading, and improving the ductility and seismic performance of the connection joint. Meanwhile, the hooks can be directly processed in the factory prefabrication stage, without the need for additional on-site work, and will not increase the procedures and difficulty of on-site construction, making them suitable for the industrialized production mode of prefabricated components.

[0048] Reference Figure 5 As shown, in some embodiments of this application, a construction method for a prefabricated self-resetting bridge pier is also provided, including: The core concrete protrusion is inserted into the socket, and the longitudinal steel bars around the inner wall of the socket and the longitudinal steel bars of the core concrete protrusion are cross-lapped. The outer side of the core concrete protrusion is used as the inner mold, and the inner wall of the socket is used as the outer mold. Grout is injected into the socket through the conduit. After the injection is completed, the conduit is sealed with bolts. The longitudinal steel bars of the upper segment of the pier body and the longitudinal steel bars of the bottom segment of the pier body are cross-lapped, and the steel sleeve is fixedly connected to the bottom of the upper segment of the pier body and the top of the bottom segment of the pier body. Using the steel sleeve as the outer mold, the grouting material is injected into the cross-reinforced area through the grouting hole. After the injection is completed, the grouting hole and the grout outlet hole are sealed with bolts. The prestressed steel bar strands are inserted into the reserved ducts, and one end of the prestressed steel bar strands is fixedly connected to the top of the pier body based on the post-tensioning method, and the other end of the prestressed steel bar strands is fixedly connected to the bottom of the bearing slot; the grouting material is injected into the reserved ducts.

[0049] It is understandable that the aforementioned prefabricated self-resetting bridge pier and its construction method have the same beneficial effects, which will not be elaborated here.

[0050] It should be noted that: Numerous specific details are set forth in the specification provided herein. However, it will be understood that embodiments of this application may be practiced without these specific details. In some instances, well-known structures and techniques have not been shown in detail so as not to obscure the understanding of this specification.

[0051] Furthermore, those skilled in the art will understand that although some embodiments described herein include certain features included in other embodiments but not others, combinations of features from different embodiments are meant to be within the scope of this application and form different embodiments.

[0052] The above description is merely a preferred embodiment of this application, but the scope of protection of this application is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the technical scope disclosed in this application should be included within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.

Claims

1. A fabricated self-centering bridge pier, characterized by, include: The pier body includes a reserved duct, an upper segment of the pier body, a bottom segment of the pier body, and a steel sleeve; the reserved duct is vertically opened on the top surface of the pier body; a core concrete protrusion is provided vertically at the bottom of the bottom segment of the pier body; the upper segment of the pier body is located directly above the bottom segment of the pier body, and the upper segment of the pier body and the bottom segment of the pier body are fixedly connected by the steel sleeve; The main body of the foundation has a slot formed on its top surface in the vertical direction; the core concrete protrusion is fixedly connected to the slot. Prestressed steel bars are vertically installed in the reserved ducts of the pier body and the abutment body. One end of the prestressed steel bar bundle is fixedly connected to the top of the pier body, and the other end of the prestressed steel bar bundle is fixedly connected to the bottom of the abutment body.

2. The prefabricated self-resetting bridge pier according to claim 1, characterized in that, The bottom surface of the upper segment of the pier body is provided with several longitudinal steel bars of the upper segment of the pier body in the vertical direction; The top surface of the bottom segment of the pier body is provided with several longitudinal steel bars for the bottom segment of the pier body in the vertical direction; The longitudinal reinforcement bars of the upper segment of the pier body and the longitudinal reinforcement bars of the bottom segment of the pier body are lapped together.

3. A prefabricated self-resetting bridge pier according to claim 2, characterized in that, The steel sleeve is installed in the vertical direction; The steel sleeves are fixedly connected to the bottom of the upper segment of the pier body and the top of the bottom segment of the pier body, respectively.

4. A prefabricated self-resetting bridge pier according to claim 3, characterized in that, The steel sleeve has grouting holes and grout outlet holes on its side.

5. A prefabricated self-resetting bridge pier according to claim 4, characterized in that, The inner wall of the socket is provided with several longitudinal steel bars around the inner wall of the socket. The side of the core concrete protrusion is provided with several longitudinal steel bars for the core concrete protrusion. The longitudinal reinforcing bars around the inner wall of the socket and the longitudinal reinforcing bars of the core concrete protrusion are interwoven.

6. The fabricated self-centering bridge pier of claim 5, wherein, Also includes: A conduit is disposed inside the main body of the bearing platform, and the conduit connects the bearing slot to the external environment.

7. A prefabricated self-resetting bridge pier according to claim 6, characterized in that, The longitudinal reinforcement bars of the upper segment of the pier body and the longitudinal reinforcement bars of the bottom segment of the pier body are interwoven to form an interwoven reinforcement area.

8. The fabricated self-centering bridge pier of claim 7, wherein, Also includes: The bolt is detachably connected to the grout outlet, the grouting hole, and the end of the conduit that is in contact with the external environment.

9. A prefabricated self-resetting bridge pier according to claim 8, characterized in that, The suspended ends of the longitudinal reinforcement bars of the upper segment of the pier body, the longitudinal reinforcement bars of the bottom segment of the pier body, the longitudinal reinforcement bars around the inner wall of the bearing slot, and the longitudinal reinforcement bars of the core concrete protruding column are provided with hooks.

10. A construction method of an assembled self-centering bridge pier, characterized in that, An assembled self-resetting bridge pier according to any one of claims 1-9, comprising: The core concrete protrusion is inserted into the socket, and the longitudinal steel bars around the inner wall of the socket and the longitudinal steel bars of the core concrete protrusion are cross-lapped. The outer side of the core concrete protrusion is used as the inner mold, and the inner wall of the socket is used as the outer mold. Grout is injected into the socket through the conduit. After the injection is completed, the conduit is sealed with bolts. The longitudinal steel bars of the upper segment of the pier body and the longitudinal steel bars of the bottom segment of the pier body are cross-lapped, and the steel sleeve is fixedly connected to the bottom of the upper segment of the pier body and the top of the bottom segment of the pier body. Using the steel sleeve as the outer mold, the grouting material is injected into the cross-reinforced area through the grouting hole. After the injection is completed, the grouting hole and the grout outlet hole are sealed with bolts. The prestressed steel bar strands are inserted into the reserved ducts, and one end of the prestressed steel bar strands is fixedly connected to the top of the pier body based on the post-tensioning method, and the other end of the prestressed steel bar strands is fixedly connected to the bottom of the pier body; the grouting material is injected into the reserved ducts.