AI Technical Summary
When driving pipe piles in deep asphalt sand strata, problems such as increased resistance to pile sinking, deviation and tilting, pile head cracking, and equipment wear and tear are encountered. Furthermore, the unevenness of the strata leads to low construction efficiency and serious equipment wear and tear.
A load-bearing platform that can move in a set direction and a low-frequency vibration damper are adopted. The pile driving status is monitored by a detection component. The inclined slot and telescopic component ensure the smooth movement of the load-bearing platform. Combined with low-frequency vibration, friction is reduced, hammer rejection is avoided, and the bonding force around the pile is reduced.
This enabled the successful driving of pipe piles into deep asphalt sand strata, improving construction efficiency, accuracy, and safety, reducing equipment wear and tear, and minimizing fluctuations in the strength of the soil around the piles.
Smart Images

Figure CN123153401A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of civil engineering technology and relates to a piling device, and more particularly to a piling device and method for pipe piles in deep asphalt sand strata. Background Technology
[0002] With the rapid development of engineering construction, the demand for pile foundation projects with high bearing capacity and stability is increasing. The importance of driving pipe piles in deep asphalt sand strata is self-evident. Due to the high viscosity, strong cementation, and heterogeneity of asphalt sand, improper foundation treatment in this type of stratum can easily lead to safety hazards such as building settlement and tilting. Pipe piles, with their high strength and high bearing capacity, can penetrate complex asphalt sand layers, effectively transferring the upper load to the lower stable stratum, fundamentally solving the problem of insufficient foundation bearing capacity.
[0003] Driving pipe piles in deep asphalt sand strata presents several technical challenges: the high viscosity and strong cementing properties of asphalt sand can lead to a significant increase in pile sinking resistance, making the pile prone to displacement, tilting, or even pile head rupture and pile body fracture due to excessive instantaneous impact force; the presence of hard interlayers or uneven structures in the strata can cause disordered energy transfer during pile driving, resulting in "hammer rejection," which not only affects construction efficiency but may also exacerbate equipment wear due to repeated impacts; in addition, the properties of asphalt sand, which soften easily when exposed to water and shrink easily when dehydrated, can lead to fluctuations in the strength of the soil around the pile, increasing the difficulty of controlling the stability of the pile's bearing capacity. Summary of the Invention
[0004] This invention provides a piling device and method for pipe piles in deep asphalt sand strata, in order to overcome the defects of the prior art.
[0005] To achieve the above objectives, the present invention adopts the following technical solution: In a first aspect, the present invention provides a piling device for pipe piles in deep asphalt sand strata, comprising a drive assembly and a pile hammer, wherein the drive assembly drives the pile hammer to strike the pipe pile; further comprising a load-bearing platform and a support assembly; the load-bearing platform is disposed on the support assembly and placed on the top of the pipe pile; the pile hammer is located above the load-bearing platform, and the pipe pile is driven into the deep asphalt sand strata by striking the load-bearing platform, wherein the load-bearing platform moves downward along the support assembly as the pile hammer strikes.
[0006] To optimize the above technical solution, the specific measures also include: Furthermore, the support assembly is fixed around the pipe pile and the load-bearing platform, and has a plurality of slots on its inner side from top to bottom; the side of the load-bearing platform is placed in the slots and moves along the slots as the pile hammer strikes.
[0007] Furthermore, the bottom of the slot is inclined towards the pipe pile in a downward direction.
[0008] Furthermore, the load-bearing platform includes a platform body and a telescopic component; the telescopic component is disposed on the outside of the platform body, the load-bearing platform is inserted into the slot through the telescopic component, the telescopic component can extend and retract between the platform body and the bottom of the slot, and the load-bearing platform moves downward in several slots through the extension and retraction of the telescopic component.
[0009] Furthermore, the support assembly includes several fasteners; the bottom end of each fastener is fixedly inserted into the thick asphalt sand layer, and several fasteners are arranged around the pipe pile and the load-bearing platform; the slot is formed on the side wall of the fastener.
[0010] Furthermore, it also includes a low-frequency vibration damper; the low-frequency vibration damper is disposed on the load-bearing platform and / or the support assembly, and the low-frequency vibration damper is provided with an eccentric vibration component.
[0011] Furthermore, it also includes a detection component and a controller; the detection component includes a displacement detection component and an impact detection component; the displacement detection component is used to detect the vertical displacement of the pipe pile before and after each hammer blow; the impact detection component is used to detect the peak value of the hammer impact on the force transmission path of the bearing platform or the pile hammer; the controller is connected to the detection component, the low-frequency vibration damper and the drive component respectively, receives the detection data of the detection component, and controls the low-frequency vibration damper and the drive component according to the detection data of the detection component.
[0012] Furthermore, the drive assembly includes a hydraulic cylinder and a steel strand; the output end of the hydraulic cylinder is connected to the pile hammer through the steel strand, driving the pile hammer to perform hammering.
[0013] Furthermore, the piling equipment also includes a moving component; the moving component includes a pulley base, a transverse threaded rod, a motor, and a mounting frame; the pulley base is a movable base with pulleys at the bottom; the pulley base has a transverse groove, and the transverse threaded rod is disposed in the transverse groove and is rotatable; the motor can drive the transverse threaded rod to rotate; the mounting frame is bent, one end is sleeved on the transverse threaded rod and threadedly connected to the transverse threaded rod and abutting against the transverse groove, and the other end is located outside the pulley base, and the hydraulic cylinder is installed at the other end; when the motor drives the transverse threaded rod to rotate, the mounting frame moves along the transverse threaded rod.
[0014] Secondly, the present invention also provides a piling method for the aforementioned piling equipment for pipe piles in deep asphalt sand strata, comprising the following steps: S1: The controller controls the piling hammer to strike the bearing platform through the drive component; the displacement detection component detects the vertical displacement of the pipe pile before and after each hammer strike; the impact detection component detects the peak impact value of the hammer strike on the bearing platform or the force transmission path of the piling hammer; the controller calculates the penetration depth and rebound depth based on the displacement data; S2: When the average penetration depth of multiple consecutive hammer strikes is lower than a set penetration threshold and the average rebound depth is higher than a set rebound threshold, the controller determines to enter a hammer rejection warning state; S3: Enter the hammer rejection warning state. After the hammer warning state is activated, if the peak value of the hammer impact continues to rise or the penetration amount does not recover, the controller determines that it has entered the hammer refusal state; S4: After entering the hammer refusal state, the controller controls the pile hammer to pause hammering through the drive component, and then activates the low-frequency vibration damper to make the eccentric vibration component apply vibration to the pile head and pile periphery; S5: After the eccentric vibration component completes its vibration, the controller controls the pile hammer to strike the bearing platform again through the drive component, and determines whether the penetration amount is higher than the set penetration threshold and whether the rebound amount is lower than the set rebound threshold; if yes, proceed to S1; if no, proceed to S4.
[0015] The beneficial effects of this invention are as follows: This invention provides a piling device and method for pipe piles in deep asphalt sand strata. By setting a load-bearing platform that can move along a set direction, the force of the pile hammer is evenly applied to the pipe pile, thereby avoiding the phenomenon of hammer rejection during the piling process in deep asphalt sand strata and solving problems such as pipe pile deviation and tilting. Specifically, by setting a slot with an inclined groove bottom and setting a telescopic component on the outside of the load-bearing platform, the load-bearing platform can move smoothly along the set direction, i.e., the distribution direction of the slot, during the hammering process. In turn, by changing the position of the load-bearing platform, it is ensured that the pipe pile is successfully driven into the deep asphalt sand strata.
[0016] Furthermore, this invention also includes a low-frequency vibration damper, a displacement detection component, and an impact detection component. The detection results determine the pile driving status, and the low-frequency vibration damper actively reduces drag in the early stages of hammer failure, minimizing pile head cracking and equipment damage caused by continuous high-energy hammering. The low-frequency vibration damper can locally disturb the pile head and surrounding asphalt sand, reducing cemented friction and improving continuous penetration capability.
[0017] The equipment of this invention is simple and easy to operate, which can enable better construction of pipe piles in deep asphalt sand strata, and improve the efficiency, accuracy, reliability and safety of pipe pile construction in deep asphalt sand strata. Attached Figure Description
[0018] Figure 1 This is a schematic diagram of the structure of a piling equipment used for pipe piles in deep asphalt sand formations; Figure 2 This is a structural diagram of the load-bearing platform and supporting components; The labels in the attached diagram are as follows: 1. Piling hammer; 2. Supporting platform; 21. Platform body; 22. Telescopic component; 3. Support assembly; 31. Slot; 32. Fixing component; 33. Fixing rod; 41. Hydraulic cylinder; 42. Steel strand; 51. Pulley base; 52. Horizontal threaded rod; 53. Motor; 54. Mounting frame; A. Pipe pile. Detailed Implementation
[0019] The specific embodiments of the present invention will be described below with reference to the accompanying drawings.
[0020] like Figure 1 As shown, this invention provides a piling device for pipe piles in deep asphalt sand strata, including a drive assembly and a pile hammer 1. The drive assembly drives the pile hammer 1 to hammer the pipe pile A. The piling device also includes a support platform 2 and a support assembly 3. The support platform 2 is mounted on the support assembly 3 and placed on the top of the pipe pile A. The pile hammer 1 is located above the support platform 2, and by hammering the support platform 2, the pipe pile A is driven into the deep asphalt sand strata. The support platform 2 moves downward along the support assembly 3 as the pile hammer 1 strikes.
[0021] Among them, the bearing platform 2 is used to receive the force of the pile hammer 1 and transmit the force to the pipe pile A under construction. By changing the position of the bearing platform 2, the pipe pile A can be evenly driven into the deep asphalt sand layer, thereby enabling the pile driving operation to be completed smoothly and avoiding the pipe pile A from refusing to be hammered.
[0022] Specifically, the support assembly 3 is fixed around the pipe pile A and the bearing platform 2, and has several slots 31 on its inner side from top to bottom. The side of the bearing platform 2 is placed in the slots 31 and moves along the slots 31 as the pile hammer 1 strikes, that is, it moves from the upper slot 31 to the lower slot 31.
[0023] The bottom of the slot 31 is inclined towards the pipe pile A from top to bottom.
[0024] The load-bearing platform 2 includes a platform body 21 and a telescopic component 22. The telescopic component 22 is located on the outside of the platform body 21. The load-bearing platform 2 is engaged in a slot 31 via the telescopic component 22. The telescopic component 22 can extend and retract between the platform body 21 and the bottom of the slot 31. The load-bearing platform 2 moves downward in several slots 31 through the extension and retraction of the telescopic component 22. When the pile hammer 1 strikes the load-bearing platform 2, the telescopic component 22 located in the slot 31 gradually retracts under the action of the inclined bottom of the slot, and moves downward along the inclined bottom of the slot through gradual retraction. When it moves into the lower slot 31, the telescopic component 22 extends and returns to its original position. Specifically, the telescopic component 22 can be a spring.
[0025] The support assembly 3 includes several fasteners 32. The bottom end of each fastener 32 is fixedly inserted into the thick asphalt sand layer by a fixing rod 33. Several fasteners 32 are arranged around the pipe pile A and the load-bearing platform 2. A slot 31 is formed on the side wall of the fastener 32. Specifically, the fastener 32 can be a rigid structure such as a plate or a rod.
[0026] The piling equipment of the present invention uses a slot 31 with an inclined bottom and a telescopic member 22 on the outside of the bearing platform 2 to enable the bearing platform 2 to move smoothly in a set direction, i.e. the distribution direction of the slot 31, during the hammering process. In this way, by changing the position of the bearing platform 2, the pipe pile A is successfully driven into the deep asphalt sand layer.
[0027] The drive assembly includes a hydraulic cylinder 41 and a steel strand 42. The output end of the hydraulic cylinder 41 is connected to the pile hammer 1 via the steel strand 42, driving the pile hammer 1 to perform hammering. The hydraulic cylinder 41 serves as a power source, driving the pile hammer 1 through its output end, providing strong power support and making large pile operations more efficient. The steel strand 42 connects the hydraulic cylinder 41 and the pile hammer 1, allowing the pile hammer 1 to operate more effectively.
[0028] The piling equipment also includes a moving component. The moving component includes a pulley base 51, a transverse threaded rod 52, a motor 53, and a mounting frame 54. The pulley base 51 is a movable base with pulleys at the bottom. The pulley base 51 has a transverse groove, within which the transverse threaded rod 52 is disposed and can rotate. The motor 53 drives the transverse threaded rod 52 to rotate. The mounting frame 54 is bent, with one end fitted onto and threadedly connected to the transverse threaded rod 52, abutting against the transverse groove; the other end is located outside the pulley base 51, and a hydraulic cylinder 41 is mounted on the other end. When the motor 53 drives the transverse threaded rod 52 to rotate, the mounting frame 54 moves along the transverse threaded rod 52. The pulley base 51 supports and moves the piling equipment, ensuring stability and safety during the piling process. The motor 53, as a power source, moves the mounting frame 54 via the transverse threaded rod 52, thereby controlling the position of the piling hammer 1 and enabling the equipment to accommodate more pipe pile A operations. The transverse threaded rod 52 is used to move the mounting bracket 54, serving as a connection to ensure the bracket can move freely and ensure the smooth completion of piling. The mounting bracket 54, as a moving support, serves as a connection to ensure that the mounting bracket 54 can be adjusted according to the position to adapt to different working environments and operational requirements. At the same time, it serves as the load-bearing structure for the hydraulic cylinder 41 and the piling hammer 1, ensuring the stability and accuracy of the piling operation.
[0029] The piling equipment also includes a low-frequency vibration damper. The low-frequency vibration damper is mounted on the load-bearing platform 2 and / or support assembly 3, and includes an eccentric vibration component. This eccentric vibration component can be an eccentric motor 53, a hydraulic vibrator, or an electro-hydraulic vibrator, with a preferred operating frequency of 5~30 Hz and a preferred amplitude of 0.5~5 mm. The low-frequency vibration damper is used to apply low-frequency, small-amplitude vibrations to the pile head and surrounding area during the hammering interval when a hammer blow occurs, loosening the asphalt sand cement interface around the pipe pile A, thereby reducing lateral friction and local penetration resistance.
[0030] The piling equipment also includes a detection component and a controller. The detection component, located near the mounting frame 54, the fixing element 32, or the load-bearing platform 2, includes a displacement detection component and an impact detection component. The displacement detection component detects the vertical displacement of the pipe pile A before and after each hammer blow. The impact detection component detects the peak impact value along the force transmission path of the load-bearing platform 2 or the piling hammer 1. The controller is connected to the detection component, the low-frequency vibration damper, and the hydraulic cylinder 41 of the drive component, respectively. It receives the detection data from the detection component and controls the low-frequency vibration damper and the hydraulic cylinder 41 of the drive component based on the detection data.
[0031] The piling method for using piling equipment for pipe piles in deep asphalt sand formations includes the following steps: S1: The controller controls the pile hammer 1 to strike the bearing platform 2 via the drive component. The displacement detection component detects the vertical displacement of the pipe pile A before and after each hammer blow. The impact detection component detects the peak impact value of the hammer blow on the force transmission path of the bearing platform 2 or the pile hammer 1. The controller calculates the penetration and rebound based on the displacement data.
[0032] S2: When the average penetration amount of multiple consecutive hammer blows is lower than the set penetration threshold and the average rebound amount is higher than the set rebound threshold, the controller determines that it enters the hammer refusal warning state.
[0033] S3: After entering the hammer refusal warning state, if the peak value of the hammer impact continues to rise or the penetration amount does not recover, the controller determines that it has entered the hammer refusal state.
[0034] S4: After entering the hammer refusal state, the controller controls the pile hammer 1 to pause hammering through the drive component, and then starts the low-frequency vibration damper to make the eccentric vibration component apply vibration to the pile head and pile periphery.
[0035] S5: After the eccentric vibration component completes its vibration, the controller controls the pile driver 1 to strike the bearing platform 2 again via the drive component, and determines whether the penetration amount is higher than the set penetration threshold and whether the rebound amount is lower than the set rebound threshold. If yes, proceed to S1; if no, proceed to S4, that is, until the penetration amount and rebound amount recover, the low-frequency vibration damper stops working and normal hammering resumes.
[0036] In this invention, unless otherwise stated, scientific and technical terms used herein have the meanings commonly understood by those skilled in the art. Furthermore, the reagents, materials, and procedures used herein are all widely used in the relevant fields.
[0037] It should be noted that the terms such as "upper", "lower", "left", "right", "front", and "back" used in the invention are only for clarity of description and are not intended to limit the scope of the invention. Changes or adjustments to their relative relationships, without substantially altering the technical content, should also be considered within the scope of the invention.
[0038] Finally, it should be noted that the above are merely preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A piling device for pipe piles in deep asphalt sand formations, comprising a drive assembly and a pile hammer, wherein the drive assembly drives the pile hammer to strike the pipe pile, characterized in that: It also includes the load-bearing platform and support components; The load-bearing platform is mounted on the support assembly and placed on the top of the pipe pile; The pile driver is located above the support platform. By striking the support platform, the pipe pile is driven into the deep asphalt sand stratum. The support platform moves downward along the support assembly as the pile driver strikes the platform.
2. The piling equipment for pipe piles in deep asphalt sand formations according to claim 1, characterized in that: The support assembly is fixed around the pipe pile and the bearing platform, and has several slots on its inner side from top to bottom; the side of the bearing platform is placed in the slots and moves along the slots as the pile hammer strikes.
3. The piling equipment for pipe piles in deep asphalt sand formations according to claim 2, characterized in that: The bottom of the slot is inclined towards the pipe pile from top to bottom.
4. The piling equipment for pipe piles in deep asphalt sand formations according to claim 3, characterized in that: The load-bearing platform includes a platform body and a telescopic component; The telescopic component is disposed on the outside of the platform body. The load-bearing platform is inserted into the slot through the telescopic component. The telescopic component can extend and retract between the platform body and the bottom of the slot. The load-bearing platform moves downward in several slots through the extension and retraction of the telescopic component.
5. The piling equipment for pipe piles in deep asphalt sand formations according to claim 2, characterized in that: The support assembly includes several fasteners; The bottom end of the fastener is fixedly inserted into the thick asphalt sand layer, and several of the fasteners are arranged around the pipe pile and the load-bearing platform; the slot is formed on the side wall of the fastener.
6. The piling equipment for pipe piles in deep asphalt sand formations according to claim 1, characterized in that: It also includes low-frequency vibration dampers; The low-frequency vibration damper is mounted on the load-bearing platform and / or the support assembly, and the low-frequency vibration damper is equipped with an eccentric vibration component.
7. The piling equipment for pipe piles in deep asphalt sand formations according to claim 6, characterized in that: It also includes detection components and controllers; The detection assembly includes a displacement detection component and an impact detection component; The displacement detection component is used to detect the vertical displacement of the pipe pile before and after each hammer blow; The impact detection component is used to detect the peak value of the hammer impact on the force transmission path of the load-bearing platform or the pile driver. The controller is connected to the detection component, the low-frequency vibration damper, and the drive component, respectively, receives the detection data from the detection component, and controls the low-frequency vibration damper and the drive component according to the detection data from the detection component.
8. The piling equipment for pipe piles in deep asphalt sand formations according to claim 1, characterized in that: The drive assembly includes a hydraulic cylinder and a steel strand; the output end of the hydraulic cylinder is connected to the pile hammer through the steel strand, driving the pile hammer to perform hammering.
9. The piling equipment for pipe piles in deep asphalt sand formations according to claim 1, characterized in that: The piling equipment also includes a moving component; The moving component includes a pulley base, a transverse threaded rod, a motor, and a mounting bracket; The pulley base is a movable base with pulleys at the bottom; The pulley base has a transverse groove, and the transverse threaded rod is disposed in the transverse groove and is capable of rotation; The motor can drive the transverse threaded rod to rotate; The mounting bracket is bent, with one end sleeved on the transverse threaded rod and threadedly connected to the transverse threaded rod, and abutting against the transverse groove; the other end is located outside the pulley base, and the hydraulic cylinder is installed at the other end. When the motor drives the transverse threaded rod to rotate, the mounting bracket moves along the transverse threaded rod.
10. The piling method for the piling equipment used for pipe piles in deep asphalt sand formations as described in claim 7, characterized in that: Includes the following steps: S1: The controller controls the pile hammer to strike the bearing platform through the drive component; the displacement detection component detects the vertical displacement of the pipe pile before and after each hammering; the impact detection component detects the peak value of the hammering impact on the bearing platform or the force transmission path of the pile hammer; the controller calculates the penetration amount and rebound amount based on the displacement data; S2: When the average penetration amount of multiple consecutive hammer blows is lower than the set penetration threshold and the average rebound amount is higher than the set rebound threshold, the controller determines that it enters the hammer refusal warning state. S3: After entering the hammer rejection warning state, if the hammer impact peak continues to rise or the penetration amount continues to fail to recover, the controller determines that it has entered the hammer rejection state. S4: After entering the hammer-rejection state, the controller controls the pile hammer to pause hammering through the drive component, and then starts the low-frequency vibration damper to make the eccentric vibration component apply vibration to the pile head and pile periphery; S5: After the eccentric vibration component completes its vibration, the controller controls the pile hammer to strike the load-bearing platform again through the drive component, and determines whether the penetration amount is higher than the set penetration threshold and whether the rebound amount is lower than the set rebound threshold; if yes, proceed to S1; if no, proceed to S4.