Static pressure pile final pressure control method

By implementing graded attenuation calibration, graded preloading compaction, segmented progressive final pressure, and dynamic reloading cycle for static pressure piles, the problems of inertial impact and single acceptance indicators in the final pressure control of static pressure piles have been solved, and the final pressure quality has been quantified and the bearing capacity has been improved.

CN123153403APending Publication Date: 2026-11-24CHINA CONSTR SECOND ENG BUREAU LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611304376.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-26
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing static pressure pile final pressure control methods have problems such as empirical final pressure value, inertial impact, fixed pressure stabilization time, fixed number of re-pressure times, and single acceptance indicators. These problems result in insufficient utilization of pile end resistance, large potential for post-construction settlement, and the inability to quantify the final pressure quality.

Method used

By calibrating the final pressure attenuation in stages for the test piles, setting a set of final pressure control thresholds, and performing graded pre-loading and compaction at the pile ends of the engineering piles, the final pressure is progressively increased in stages, and dynamic graded re-pressing cycles are carried out. Finally, a multi-index joint acceptance judgment is performed to ensure the quality of the final pressure.

Benefits of technology

It significantly improved the bearing capacity of single piles and the first-time pass rate of final compaction, shortened the final compaction time, reduced the risk of post-construction settlement, and improved the quantifiability of final compaction quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123153403A_ABST
    Figure CN123153403A_ABST
Patent Text Reader

Abstract

This invention discloses a method for controlling the final pressure of static pressure piles, relating to the field of pile foundation construction technology. The method includes: calibrating the final pressure attenuation of test piles in stages to obtain characteristic parameters of the final pressure; setting a final pressure control threshold group based on these characteristic parameters; performing graded pre-compaction of the pile tip on the engineering piles; performing segmented progressive final pressure at a gradually decreasing pile driving speed; correcting the stabilization time or final pressure value according to segmented judgment logic; performing dynamic graded re-pressure cycles with a progressively decreasing unloading ratio, and determining the termination of re-pressure based on the re-pressure penetration and pile driving force attenuation rate; performing final pressure connection to pile driving and re-pressure compensation after pile driving; and conducting multi-index joint acceptance judgment of the final pressure results. This invention can eliminate the inertial impact and disturbance of the bearing layer top surface near the final pressure value, distinguish between elastic attenuation and creep of the pile tip soil, dynamically determine the number of re-pressure cycles and unloading ratio, improve the single pile bearing capacity and the first-time pass rate of final pressure, and shorten the final pressure time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of pile foundation construction technology, and in particular to a method for controlling the final pressure of static pressure piles. Background Technology

[0002] Static pressure piles are piles driven into the foundation using static pressure. The final pressure stage refers to the process after the pile tip approaches and enters the bearing stratum, the driving force reaches the final pressure value, and the process of stabilization and re-pressure is completed until the final pressure is determined to be over. The quality of the final pressure directly determines the extent to which the pile tip resistance is utilized and the bearing capacity of a single pile.

[0003] Existing static pressure pile final pressure control methods typically employ a dual control approach of pile tip elevation and final pressure: the final pressure value is determined empirically based on the pile length, for example, 1.5 to 2.0 times the characteristic value of the vertical bearing capacity of a single pile; after the pile tip reaches near the design elevation, the pressure is maintained for a fixed duration; unloading and re-pressurization are performed at fixed intervals; and the acceptance of the final pressure is based on the pile top elevation or the final pressure meeting the standard.

[0004] However, this method has the following drawbacks: First, the final pressure value is empirically based and applied uniformly, failing to establish a correspondence with actual pile test measurements, which can easily lead to under-pressure (insufficient bearing capacity, large post-construction settlement) or over-pressure (pile damage, disturbance of the bearing layer). Second, the same pile driving speed is used throughout the final pressure process, and inertial impact occurs near the final pressure value, causing false penetration and distorted final pressure readings, making it easy for "false pass" judgments to occur. Third, the fixed and single-segment stabilization time cannot distinguish between the instantaneous elastic decay and creep decay of the soil at the pile tip, and weak bearing layers can easily be masked by short-term stabilization and misjudged as stable; moreover, the pile driving force decay is not monitored during the stabilization period, resulting in missed detection of soil creep and weak interlayers at the pile tip, leading to significant potential post-construction settlement risks. Furthermore, the fixed number of re-compression cycles, peak re-compression values, and unloading ratio resulted in insufficient release of elastic rebound, inflated re-compression penetration, and a coexistence of insufficient and excessive re-compression, wasting construction time and damaging the pile body. The lack of pre-compaction procedures before the pile tip enters the bearing stratum meant that the remodeled disturbance zone on the top surface of the bearing stratum was not compacted before final compression, reducing the pile tip resistance. Simultaneously, the lack of final compression connection and re-compression compensation during the pile driving stage led to insufficient effective final pressure due to elastic deformation loss in the driving section. Finally, the final compression acceptance criteria were singular, the final compression quality could not be quantified, and the bearing capacity of the engineering piles was inconsistent. Summary of the Invention

[0005] The main objective of this invention is to propose a method for controlling the final pressure of static pressure piles, which aims to solve the problems of distorted final pressure determination, disturbance of bearing stratum, redundancy or insufficiency of secondary pressure, and insufficient effective final pressure of static pressure piles.

[0006] To achieve the above objectives, the present invention proposes a method for controlling the final pressure of static piles, the method comprising: The final pressure attenuation of the test piles was calibrated by graded determination to obtain the characteristic parameters of the final pressure of the test piles. Based on the final pressure characteristic parameters of the test pile, a final pressure control threshold group is set; The piles were pre-compacted in stages at the pile tip to ensure that the pile tip entered the bearing layer and met the pre-compacting criteria. The final compaction starting elevation was recorded. The final pressure of the engineering piles is achieved by progressively increasing the pile driving force to the final pressure value with a gradually decreasing pile driving speed in each stage. Under the final pressure value, the engineering pile is stabilized in segments to obtain the attenuation rate of the first segment pile driving force and the attenuation rate of the second segment pile driving force, and the stabilization time correction or final pressure value correction is performed according to the segment judgment logic. The engineering piles are subjected to dynamic graded re-pressure cycles, with the unloading ratio decreasing in each cycle, and the termination of re-pressure is determined based on the re-pressure penetration and the pile driving force attenuation rate. The engineering piles are subjected to final pressure during pile driving and subsequent pressure compensation. The final pressure result is subject to joint acceptance and judgment based on multiple indicators.

[0007] In one embodiment, the step of performing final pressure graded attenuation calibration on the test pile to obtain the final pressure characteristic parameters of the test pile includes: Drive the test piles to the design elevation; A static load test was conducted on the tested piles to obtain the ultimate vertical bearing capacity of a single pile; Record the final pressure value during the final pressure stabilization period of the test pile; During the final pressure stabilization period of the test pile, the pile driving force is recorded according to the first pressure stabilization level and the second pressure stabilization level, and the pile driving force attenuation rate of the first pile driving force and the pile driving force attenuation rate of the second pile driving force are obtained. The final pressure value multiplier is calculated based on the final pressure value and the characteristic value of the vertical bearing capacity of a single pile.

[0008] In one embodiment, the step of recording the pile driving force according to the first stage pressure stabilization level and the second stage pressure stabilization level during the final pressure stabilization period of the test pile, and obtaining the pile driving force attenuation rate of the first stage and the pile driving force attenuation rate of the second stage, includes: Maintain the final pressure value for 3-5 seconds at the first stage of pressure stabilization, and record the initial pile driving force and the final pile driving force of the first stage. Maintain the final pressure value for 5-10 seconds at the secondary pressure stabilization level, and record the initial pile driving force and the final pile driving force of the secondary stage. Calculate the attenuation rate of the first-segment pile driving force based on the initial pile driving force and the final pile driving force of the first segment; The attenuation rate of the secondary pile driving force is calculated based on the initial pile driving force and the final pile driving force of the secondary segment.

[0009] In one embodiment, the step of performing graded preloading and compaction of the pile tip to allow the pile tip to enter the bearing stratum and meet the preloading and compaction criteria, and recording the final compaction starting reference elevation, includes: When the pile tip is 0.5 to 1.0 m from the top surface of the bearing stratum, reduce the pile driving speed to 0.3 to 0.5 m / min; After the pile tip contacts the top surface of the bearing stratum, the first preload, the second preload and the third preload are applied in sequence, and each preload is stabilized. When the pile driving force attenuation rate during a certain level of preloading stabilization is not greater than the preloading compaction attenuation threshold, the preloading compaction of that level is deemed complete. After each stage of preloading and compaction is completed, the elevation of the pile end is recorded as the final compaction starting reference elevation.

[0010] In one embodiment, after the pile tip contacts the top surface of the bearing stratum, a first preload, a second preload, and a third preload are applied sequentially, and the step of stabilizing each preload level includes: Apply the first pre-pressure to 0.35 to 0.45 times the final pressure value and stabilize the pressure for 3 to 5 seconds; Apply the second pre-pressure to 0.45 to 0.55 times the final pressure value and stabilize the pressure for 3 to 5 seconds; Apply the third pre-pressure to 0.55 to 0.65 times the final pressure value and stabilize the pressure for 4 to 6 seconds; The pre-compression attenuation threshold is 3%.

[0011] In one embodiment, before the step of performing graded preloading and compaction of the pile tip to allow the pile tip to enter the bearing stratum and meet the preloading and compaction judgment conditions, and recording the final pressure starting reference elevation, the static pressure pile final pressure control method further includes: During the test pile driving process, the driving force is recorded for each unit depth of the pile penetration, forming a driving force record that varies with the penetration depth. The top surface of the first depth interval of the sudden increase segment in pile driving force in the pile driving force record is determined as the elevation of the top surface of the bearing layer; The preloading and compaction starting section of the engineering pile is determined based on the elevation of the top surface of the bearing stratum.

[0012] In one embodiment, the step of determining the top surface of the first depth interval of the sudden increase segment in pile driving force in the pile driving force record as the elevation of the top surface of the bearing layer includes: The pile penetration depth is divided into multiple equal depth intervals; Calculate the average pile driving force for each of the aforementioned depth intervals; The top surface of the first depth interval where the average pile driving force exceeds 1.2 to 1.5 times the average pile driving force of the adjacent previous depth interval is determined as the top surface elevation of the bearing layer.

[0013] In one embodiment, the step of progressively increasing the pile driving force to the final pressure value by gradually decreasing the pile driving speed in each stage includes: First pressurization stage: The pile driving force is increased to 0.8 times the final pressure value at a pile driving speed of 0.6 to 1.0 m / min; Second pressurization stage: The pile driving force is increased to 0.92 times the final pressure value at a pile driving speed of 0.3 to 0.5 m / min; The third pressurization stage: the pile driving force is increased to the final pressure value at a pile driving speed of no more than 0.2 m / min; Record the pile driving force and pile top penetration in each pressurized section.

[0014] In one embodiment, the step of performing segmented pressure stabilization on the engineering pile under the final pressure value, obtaining the attenuation rate of the first segment pile driving force and the attenuation rate of the second segment pile driving force, and performing pressure stabilization duration correction or final pressure value correction according to the segmented determination logic includes: Obtain the pile top penetration depth of the second pressurized section. When the pile top penetration depth of the second pressurized section is greater than 5 mm, increase the final pressure value by 5% to 10%. Under the corrected final pressure value, the first stage of pressure stabilization was carried out, and the attenuation rate of the first stage pile driving force was calculated. When the attenuation rate of the first stage pile driving force is greater than the attenuation threshold of the first stage, the first stage stabilization time is extended and the first stage stabilization is repeated. Under the corrected final pressure value, the secondary stage pressure stabilization was carried out, and the secondary stage pile driving force attenuation rate was calculated. When the attenuation rate of the secondary pile driving force is greater than the attenuation threshold of the secondary stage, the final pressure value is increased by 5% to 10%, and the segmented pressure stabilization is performed again with the revised final pressure value. The attenuation threshold for the first segment is 5%, and the attenuation threshold for the second segment is 3%.

[0015] In one embodiment, the step of dynamically graded reloading cycles for the engineering piles, gradually reducing the unloading ratio, and determining the termination of reloading based on the reloading penetration and pile driving force attenuation rate includes: Unload the pile driving force to the unloading pressure of this round, pause, and then repressurize to the final pressure value to obtain the repressurization penetration and repressurization stabilization attenuation rate of this round of repressurization. When the repressurization penetration amount is greater than the penetration amount threshold or the repressurization stabilization attenuation rate is greater than the repressurization attenuation threshold, the unloading pressure of the next round of repressurization is reduced and the pause time of the next round of repressurization is extended, and the dynamic graded repressurization cycle is repeated. The repressing process is terminated when the repressing penetration amount of two consecutive repressing cycles is not greater than the penetration amount threshold and the repressing stabilization attenuation rate is not greater than the repressing attenuation threshold. The unloading pressure of the first round of repressurization is 0.25 times the final pressure value, the unloading pressure of the second round of repressurization is 0.2 times the final pressure value, the unloading pressure of the third round of repressurization is 0.15 times the final pressure value, the penetration threshold is 2 mm, and the repressurization attenuation threshold is 5%.

[0016] The technical solution of this invention obtains the final pressure characteristic parameters corresponding to the test pile through graded attenuation calibration, eliminates the disturbance zone on the top surface of the bearing layer through graded preloading and compaction, eliminates the inertial impact of the near final pressure value through segmented progressive final pressure, distinguishes between the elastic compaction and creep conditions of the pile tip soil through segmented pressure stabilization and automatically corrects the final pressure value, makes the number of reloading cycles and the unloading ratio adaptive with the bearing layer properties through dynamic graded reloading cycles, ensures the effective final pressure through reloading compensation after pile driving, and makes the final pressure quality quantifiable through multi-index joint acceptance, thereby significantly improving the single pile bearing capacity and the first-time pass rate of final pressure, and shortening the final pressure time. Attached Figure Description

[0017] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on the structures shown in these drawings without creative effort.

[0018] Figure 1 This is a flowchart illustrating an embodiment of the static pressure pile final pressure control method provided by the present invention.

[0019] The realization of the objective, functional features and advantages of the present invention will be further explained in conjunction with the embodiments and with reference to the accompanying drawings. Detailed Implementation

[0020] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of the present invention.

[0021] It should be noted that if the embodiments of the present invention involve directional indicators (such as up, down, left, right, front, back, etc.), the directional indicators are only used to explain the relative positional relationship and movement of the components in a specific posture. If the specific posture changes, the directional indicators will also change accordingly.

[0022] Furthermore, if the embodiments of this invention involve descriptions such as "first" or "second," these descriptions are for descriptive purposes only and should not be construed as indicating or implying their relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined with "first" or "second" may explicitly or implicitly include at least one of those features. Additionally, the use of "and / or" or "and / or" throughout the text includes three parallel solutions. For example, "A and / or B" includes solution A, solution B, or a solution where both A and B are satisfied simultaneously. Furthermore, the technical solutions of the various embodiments can be combined with each other, but this must be based on the ability of those skilled in the art to implement them. When the combination of technical solutions is contradictory or impossible to implement, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection claimed by this invention.

[0023] To address the aforementioned technical problems, this invention proposes a method for controlling the final pressure of static pressure piles.

[0024] Please see Figure 1 In one embodiment of the present invention, the static pile final pressure control method includes: S10, perform final pressure graded attenuation calibration on the test pile, and obtain the final pressure characteristic parameters of the test pile; S20, Based on the final pressure characteristic parameters of the test pile, set the final pressure control threshold group; S30, perform graded preloading and compaction of the pile tip to make the pile tip enter the bearing layer and meet the preloading and compaction judgment conditions, and record the final compaction starting reference elevation. S40 involves progressively increasing the final pressure of the engineering piles in stages, with the pile driving speed decreasing in each stage to gradually increase the pile driving force to the final pressure value. S50, under the final pressure value, the engineering pile is stabilized in segments to obtain the attenuation rate of the first segment pile driving force and the attenuation rate of the second segment pile driving force, and the stabilization time correction or final pressure value correction is performed according to the segment judgment logic. S60, dynamic graded re-pressure cycle is performed on the engineering piles, the unloading ratio is reduced round by round, and the re-pressure termination is determined based on the re-pressure penetration and pile driving force attenuation rate. S70, performs final pressure connection and subsequent pressure compensation for engineering piles; S80, a multi-indicator joint acceptance judgment is made on the final pressure result.

[0025] For ease of understanding, the following explains some key terms in this embodiment: Static pressure piles are piles that are driven into the foundation by static pressure.

[0026] The final pressure stage refers to the process after the pile tip approaches and enters the bearing stratum, the pile driving force reaches the final pressure value and completes stabilization and re-pressure, until the final pressure is determined to be over.

[0027] Test piles are piles that are driven into the ground before formal pile driving construction to calibrate the final pressure parameters; engineering piles are piles that are formally constructed.

[0028] The final pressure value Pf refers to the target peak value of the pile driving force increasing in the final pressure stage; the initial pressure preload P0 refers to the initial pile driving force of the segmented progressive final pressure, which is taken as 0.6 times the final pressure value.

[0029] The pile driving force attenuation rate η refers to the percentage difference between the initial pile driving force and the final pile driving force in the stabilization section relative to the initial pile driving force; the first-stage pile driving force attenuation rate η1 and the second-stage pile driving force attenuation rate η2 refer to the pile driving force attenuation rates calculated during the first-stage stabilization and second-stage stabilization periods, respectively.

[0030] The bearing stratum top elevation refers to the elevation of the bearing stratum top surface determined by the abrupt change in pile driving force with penetration depth; the final pressure starting reference elevation refers to the pile end elevation recorded after the completion of graded preloading and compaction, which serves as the reference for measuring the penetration volume in the final pressure stage.

[0031] The pre-compaction attenuation threshold refers to the limit value of the pile driving force attenuation rate used to determine the completion of a certain level of pre-compaction.

[0032] Segmented progressive final pressure refers to the process of gradually increasing the pile driving force to the final pressure value by progressively decreasing the pile driving speed in segments; segmented pressure stabilization refers to the pressure stabilization process carried out separately for the first segment and the next segment under the final pressure value.

[0033] The unloading ratio refers to the ratio of the pile driving force after re-pressure unloading to the final pressure value Pf; the re-pressure penetration refers to the vertical displacement of the pile top relative to the starting position of re-pressure during the re-pressure process; the re-pressure stabilization attenuation rate refers to the attenuation rate of the pile driving force during the stabilization period after re-pressure to the final pressure value.

[0034] Dynamic graded repressurization cycle refers to a multi-round unloading and repressurization cycle with a progressively decreasing unloading ratio and a progressively extended pause time.

[0035] Piling refers to the process of pressing the top of the pile to the design elevation when the top of the pile is below the ground level; final pressing after pile driving refers to the pressure stabilization and connection process after the pile is driven to the design elevation; and re-pressurization compensation after pile driving refers to the compensation process of unloading and re-pressurizing to the final pressure value after the pile driving is completed.

[0036] Multi-indicator joint acceptance judgment refers to the process of jointly judging the final pressure qualification by using multiple indicators such as pile top elevation, pile tip depth into bearing layer, final pressure value, re-pressure penetration volume, and pile driving force attenuation rate.

[0037] This embodiment provides a method for controlling the final pressure of static pressure piles.

[0038] First, the method includes calibrating the final pressure attenuation of the test piles to obtain the characteristic parameters of the final pressure. Specifically, the test piles are driven to the design elevation, and the final pressure value, as well as the driving force at the first and second pressure stabilization levels, are recorded during the final pressure stage. The attenuation rates of the first and second pressure stabilization levels are obtained. Then, a static load test is conducted on the test piles to obtain the ultimate vertical bearing capacity of a single pile. The final pressure multiplier is calculated based on the final pressure value and the characteristic value of the vertical bearing capacity of the single pile. The ultimate vertical bearing capacity of the single pile, the final pressure value, the final pressure multiplier, the attenuation rate of the first and second pressure stabilization levels together constitute the characteristic parameters of the final pressure of the test piles.

[0039] It should be noted that the data collection for the final pressure stabilization of the test piles occurs during the final pressure stage near the design elevation during the pile driving process, while the static load test is conducted separately after the pile driving is completed and the specified rest period has elapsed. The two tests are sequential in time, but the data collection does not interfere with each other.

[0040] Furthermore, based on the final pressure characteristic parameters of the test piles, a set of final pressure control thresholds is set. For example, the final pressure value Pf and the initial preload P0 are determined according to the final pressure value multiplier and the pile length classification; the first preload, second preload, and third preload are set to 0.35~0.45 times Pf, 0.45~0.55 times Pf, and 0.55~0.65 times Pf, respectively, with exemplary values ​​of 0.4Pf, 0.5Pf, and 0.6Pf, and a preload compaction attenuation threshold of 3%; the pile driving speed in the first pressurization section is set to 0.6~1.0 m / min, and the pile driving speed in the second pressurization section is set to 0.3~0.5 m / min. The pile driving speed in the third pressurization section is no more than 0.2 m / min, and the boundary pressure is 0.8 Pf and 0.92 Pf. The first stage pressure stabilization time, the second stage pressure stabilization time, the first stage attenuation threshold of 5% and the second stage attenuation threshold of 3% are set. The re-pressure unloading ratio sequence is set to 0.25 / 0.20 / 0.15, the re-pressure pause time sequence is 3s / 4s / 5s, the re-pressure stabilization time can be taken as the first stage pressure stabilization time or 3~5s, the re-pressure penetration threshold is 2mm, the re-pressure attenuation threshold is 5%, and the re-pressure penetration threshold after pile driving is 3mm.

[0041] Subsequently, the piles were subjected to graded preloading and compaction at the pile tip to ensure that the pile tip entered the bearing stratum and met the preloading and compaction criteria. The starting elevation of the final compaction was recorded. Specifically, when the pile tip was 0.5–1.0 m from the top surface of the bearing stratum, the pile driving speed was reduced to 0.3–0.5 m / min. After the pile tip contacted the top surface of the bearing stratum, the first, second, and third preloads were applied sequentially, and each preload was stabilized. When the pile driving force attenuation rate during the stabilization of a certain preload was not greater than the preloading and compaction attenuation threshold, the preloading and compaction of that level was considered complete. After all three levels of preloading and compaction were completed, the pile tip elevation was recorded as the starting elevation of the final compaction.

[0042] Based on this, the engineering piles are subjected to segmented progressive final pressing, with the pile pressing force gradually increasing to the final pressure value at a progressively decreasing pile pressing speed. For example, in the first pressing stage, the pile pressing force is increased to 0.8 times the final pressure value at a pile pressing speed of 0.6–1.0 m / min; in the second pressing stage, the pile pressing force is increased to 0.92 times the final pressure value at a pile pressing speed of 0.3–0.5 m / min; and in the third pressing stage, the pile pressing force is increased to the final pressure value at a pile pressing speed not exceeding 0.2 m / min. The pile pressing force and pile top penetration are recorded in each pressing stage.

[0043] After the pile driving force reaches the final pressure value, the engineering pile is subjected to segmented pressure stabilization at the final pressure value. The attenuation rate of the first segment pile driving force and the attenuation rate of the second segment pile driving force are obtained, and the stabilization time or the final pressure value is corrected according to the segment judgment logic. Specifically, the pile top penetration of the second pressurization segment is obtained. When it is greater than 5mm, the final pressure value is increased by 5% to 10%. The first segment pressure stabilization is performed at the corrected final pressure value, and the attenuation rate of the first segment pile driving force is calculated. When the attenuation rate of the first segment pile driving force is greater than the attenuation threshold of the first segment, the first segment pressure stabilization time is extended and the first segment pressure stabilization is repeated. The second segment pressure stabilization is performed at the corrected final pressure value, and the attenuation rate of the second segment pile driving force is calculated. When the attenuation rate of the second segment pile driving force is greater than the attenuation threshold of the second segment, the final pressure value is increased by another 5% to 10%, and the pile driving force is increased to the corrected final pressure value before the segmented pressure stabilization is repeated.

[0044] It should be noted that when the final pressure value is corrected during the segmented progressive final pressure process, the boundary pressure of each pressurization segment can be re-determined according to the corrected final pressure value; when the correction range is small, the original boundary pressure can be maintained and the target pressure of the third pressurization segment can be adjusted to the corrected final pressure value.

[0045] Simultaneously, dynamic graded re-pressing cycles are implemented for the engineering piles, with the unloading ratio decreasing round by round. The termination of re-pressing is determined based on the re-pressing penetration and the pile driving force attenuation rate. Specifically, the pile driving force is unloaded to the unloading pressure of the current round, paused, and then re-pressurized to the final pressure value. The re-pressing penetration and re-pressing stabilization attenuation rate of the current round are obtained. When the re-pressing penetration exceeds the penetration threshold or the re-pressing stabilization attenuation rate exceeds the re-pressing attenuation threshold, the unloading pressure of the next round of re-pressing is reduced, and the pause time of the next round of re-pressing is extended. The dynamic graded re-pressing cycle is repeated until the re-pressing penetration of two consecutive rounds does not exceed the penetration threshold and the re-pressing stabilization attenuation rate does not exceed the re-pressing attenuation threshold, at which point the re-pressing is terminated.

[0046] It should be noted that if the termination condition is not met after three rounds of repressurization, the final unloading ratio and pause time can be maintained to continue repressurization, or the on-site technical supervisor can determine to increase the number of repressurization rounds or adjust the final pressure value according to the actual situation.

[0047] After the re-pressing is terminated, the engineering piles are subjected to final pressing and subsequent re-pressing compensation. For example, after the pile is driven to the design elevation, the driving force is maintained at 0.8 to 0.9 times the final pressure value for 4 seconds. After the pile is driven, the driving equipment is removed to restore the driving point to the top of the engineering pile. Then, the driving force is unloaded to 0.3 times the final pressure value, paused for 2 seconds, and then re-pressurized to the final pressure value. The penetration depth of the re-pressing is recorded. If the penetration depth of the re-pressing is not greater than 3 mm, the compensation is deemed qualified; otherwise, an additional round of re-pressing is applied.

[0048] Finally, the final pressure result is subject to joint acceptance and judgment based on multiple indicators. For example, the final pressure is deemed qualified when the pile top elevation deviation is not greater than 50mm, the pile tip penetration depth into the bearing layer is not less than the design value, the measured final pressure value reaches the corrected final pressure value, the penetration amount of the last round of re-pressure is not greater than 2mm, the attenuation rate of the secondary pile driving force is not greater than 3%, and the penetration amount of the re-pressure after pile driving is not greater than 3mm.

[0049] It should be noted that for engineering piles that have not undergone pile driving, the penetration rate after pile driving is not included in the joint acceptance assessment.

[0050] The technical solution provided by this invention has the following beneficial effects: First, by pre-detecting the top surface of the bearing stratum and performing graded pre-compaction, the reshaping disturbance zone of the top surface of the bearing stratum is reduced, and false penetration in the final compaction stage is reduced, so that the pile end resistance is more fully stimulated; Second, by using three-speed, three-stage progressive final compaction, the inertial impact of the near-final pressure value is reduced, and the softness or hardness of the bearing stratum is judged by the pile driving force and pile top penetration volume recorded segment by segment. Soft bearing strata automatically increase the final pressure value, reducing the risk of under-compression; Third, by calculating the attenuation rate of the first and second stages of pile driving force and determining the segment threshold, the elastic compaction and creep of the pile end soil are distinguished. Furthermore, the automatic correction of the final pressure value under creep conditions helps reduce post-construction settlement; fourth, through dynamic graded re-pressing cycles with progressively decreasing unloading ratios and progressively increasing pauses, the elastic rebound of the pile body and pile tip soil is fully released, the re-pressing penetration is closer to plastic penetration, and the number of re-pressing cycles adapts to the bearing stratum properties, reducing ineffective re-pressing; fifth, re-pressing compensation after pile driving reduces the elastic deformation loss of the pile driving section, ensuring the effective final pressure at the pile tip; sixth, the final pressure quality can be quantified through multi-index joint acceptance, which helps improve the single pile bearing capacity and the first-time pass rate of final pressure, and shortens the final pressure time.

[0051] In an embodiment of the present invention, the step of performing final pressure graded attenuation calibration on the test pile and obtaining the final pressure characteristic parameters of the test pile includes: S11, drive the test pile to the design elevation, and record the final pressure value and the pile driving force under the first and second stage pressure stabilization levels during the final stage of pile driving, and obtain the first stage pile driving force attenuation rate and the second stage pile driving force attenuation rate. S12, A static load test is performed on the test pile to obtain the ultimate vertical bearing capacity of a single pile; S13. Calculate the final pressure value multiplier based on the final pressure value and the characteristic value of the vertical bearing capacity of a single pile.

[0052] Specifically, driving test piles to the design elevation refers to statically pressing the test piles to the design pile tip elevation before formal pile driving construction. This ensures the pile tip enters the design bearing layer, providing a pile tip stress state similar to or the same as that of the engineering piles for calibrating the final pressure characteristic parameters. The test pile type is the same as that of the engineering piles, and the driving process of the test piles is carried out according to the same pile driving speed and final pressure control procedure as the engineering piles to ensure the transferability of the calibration results to the engineering piles.

[0053] Recording the final pressure value during the final pressure stabilization period of a test pile refers to the process of gradually increasing the pile driving force to the target peak value of the final pressure stage and maintaining stable pressure before the test pile is driven to the design elevation. The stable value of the pile driving force applied to the pile top during this stabilization period is recorded as the final pressure value. The final pressure value reflects the pile driving force level corresponding to achieving the design bearing depth and maintaining stability at the pile tip.

[0054] During the final pressure stabilization period of the test pile, the pile driving force is recorded according to the first and second stabilization levels, and the attenuation rate of the first and second pile driving forces is obtained. This means dividing the final pressure stabilization process of the test pile into two time-connected stabilization stages: the initial and final pile driving forces for each stage, and calculating the attenuation rate for each stage. The attenuation rate of the first pile driving force mainly reflects the instantaneous elastic decay characteristics of the soil at the pile tip after compression, while the attenuation rate of the second pile driving force mainly reflects the creep characteristics of the soil at the pile tip under continuous load. Both provide a grading benchmark for subsequent segmented pressure stabilization determination of engineering piles.

[0055] The static load test conducted on the test pile to obtain the ultimate vertical bearing capacity of a single pile involves applying vertical loads to the top of the test pile in stages after the pile has been driven and a specified rest period has elapsed. The settlement at the pile top under each load stage is recorded, and the ultimate vertical bearing capacity of the single pile is determined based on the relationship between load and settlement. The ultimate vertical bearing capacity of a single pile is used to establish a correspondence with the final pressure value and is an important basis for assessing whether the final pressure value is sufficient.

[0056] The final pressure value multiplier is calculated based on the final pressure value and the characteristic value of the vertical bearing capacity of a single pile. This involves dividing the final pressure value by the characteristic value of the vertical bearing capacity of a single pile to obtain a dimensionless multiplier. The final pressure value multiplier establishes a quantitative correspondence between the final pressure value and the design bearing capacity, transforming the setting of the final pressure value for engineering piles from empirically determined values ​​to calibrated values ​​based on actual pile test measurements.

[0057] Through the above technical solution, this embodiment decomposes the calibration process of test piles into three orderly steps: final pile pressure data acquisition, static load testing, and multiplier calculation. This ensures that the final pressure characteristic parameters obtained from the calibration simultaneously cover the pile tip bearing capacity, pile driving force level, the correspondence between pile driving force and design bearing capacity, and the time response characteristics of the soil at the pile tip. These parameters provide quantifiable inputs for subsequent final pressure control threshold group setting, avoiding under- or over-pressure caused by relying solely on pile length experience, and thus improving the reliability of final pressure determination.

[0058] In an embodiment of the present invention, the step of recording the pile driving force according to the first stage pressure stabilization level and the second stage pressure stabilization level during the final pressure stabilization period of the test pile, and obtaining the pile driving force attenuation rate of the first stage and the pile driving force attenuation rate of the second stage includes: S141, maintain the final pressure value for 3-5 seconds at the first stage of pressure stabilization, and record the initial pile driving force and the final pile driving force of the first stage. S142, maintain the final pressure value for 5 to 10 seconds at the secondary pressure stabilization level, and record the initial pile driving force and the final pile driving force of the secondary stage. S143, Calculate the attenuation rate of the first-segment pile driving force based on the initial pile driving force and the final pile driving force of the first segment; S144, Calculate the attenuation rate of the secondary pile driving force based on the initial pile driving force and the final pile driving force of the secondary segment.

[0059] Specifically, maintaining the final pressure value for 3-5 seconds during the first stage of pressure stabilization, and recording the initial and final pile driving forces of the first stage, means that the duration of the first stage of pressure stabilization is 3-5 seconds. This duration mainly covers the instantaneous elastic decay process of the soil at the pile tip after being compressed. The initial pile driving force is the pile driving force at the moment of entering the first stage of pressure stabilization, and the final pile driving force is the pile driving force at the moment of ending the first stage of pressure stabilization. The difference between the two is the amount of pile driving force decay during the first stage of pressure stabilization.

[0060] Maintaining the final pressure value at the secondary pressure stabilization level for 5–10 seconds, and recording the initial and final pile driving forces of the secondary stage, means that the duration of the secondary pressure stabilization is 5–10 seconds, and the secondary pressure stabilization is sequential with the primary pressure stabilization in time. The initial pile driving force of the secondary stage is the same as the final pile driving force of the primary stage. The duration of the secondary pressure stabilization is longer than that of the primary pressure stabilization, which is used to more fully expose the creep decay characteristics of the soil at the pile tip under continuous load, and to avoid the weak bearing layer being masked by short-term pressure stabilization.

[0061] The initial pile driving force attenuation rate is calculated based on the initial and final pile driving forces of the first stage. This is calculated by dividing the attenuation of the pile driving force during the initial stabilization period by the initial pile driving force of the first stage, and expressing it as a percentage. Similarly, the attenuation rate of the pile driving force in the second stage is calculated by dividing the attenuation of the pile driving force during the second stage stabilization period by the initial pile driving force of the second stage.

[0062] Through the above technical solution, this embodiment divides the final pressure stabilization process of the test pile into a first segment and a second segment with different durations and sequential time connections, and calculates the pile driving force attenuation rate for each segment. The first segment, with its short duration, captures the instantaneous elastic attenuation of the soil at the pile tip, while the second segment, with its long duration, exposes the creep attenuation of the soil at the pile tip. The two segments complement each other on the time scale, enabling the calibration results to distinguish between the two different types of pile tip soil responses: elastic compaction and creep. This graded attenuation calibration provides a dual-segment scale for the segmented pressure stabilization determination of engineering piles, giving clear segmented basis for subsequent corrections to the stabilization duration and final pressure value, which is beneficial for improving the ability to identify weak bearing layers and creeping soil layers.

[0063] In an embodiment of the present invention, the step of performing graded preloading and compaction of the pile tip to allow the pile tip to enter the bearing layer and meet the preloading and compaction determination conditions, and recording the final compaction starting reference elevation includes: S31, when the pile tip is 0.5 to 1.0 m from the top surface of the bearing stratum, reduce the pile driving speed to 0.3 to 0.5 m / min; S32, after the pile end contacts the top surface of the bearing layer, the first preload, the second preload and the third preload are applied in sequence, and each level of preload is stabilized. S33, when the pile driving force attenuation rate during a certain level of preloading stabilization is not greater than the preloading compaction attenuation threshold, the preloading compaction of that level is deemed complete. S34. After the three-stage preloading and compaction is completed, the elevation of the pile end is recorded as the final compaction starting reference elevation.

[0064] Specifically, when the pile tip is 0.5–1.0 m from the top surface of the bearing stratum, the pile driving speed is reduced to 0.3–0.5 m / min. This means that when the pile tip is close to the top surface of the bearing stratum, the pile driving speed is reduced from the conventional pile driving speed to a slower speed in advance. The elevation of the top surface of the bearing stratum is determined in advance by observing the sudden change in pile driving force during the test pile driving process. The timing of the speed reduction is chosen within the range of 0.5–1.0 m from the top surface of the bearing stratum, which ensures that the pile tip enters the bearing stratum at a controlled slow speed while avoiding premature speed reduction that would affect construction efficiency. The slow driving speed of 0.3–0.5 m / min keeps the disturbance of the pile tip to the top surface of the bearing stratum within a small range, providing a contact interface that is not severely remodeled for subsequent staged preloading and compaction.

[0065] After the pile tip contacts the top surface of the bearing stratum, a first preload, a second preload, and a third preload are applied sequentially. Each preload level is stabilized separately. This means that at the instant the pile tip enters the top surface of the bearing stratum, a three-level progressively increasing preload is applied to the pile tip for a short period of time. The three levels of preload are applied progressively from low to high, and each level of preload is maintained for a certain duration. This allows the soil at the pile tip to be compacted in stages under progressively increasing compressive stress, avoiding secondary disturbance to the top surface of the bearing stratum caused by a single high pressure.

[0066] When the pile driving force attenuation rate during the stabilization period of a certain level of preloading is not greater than the preloading compaction attenuation threshold, the preloading compaction of that level is considered complete. This means that the pile driving force attenuation rate during the stabilization period of that level of preloading is used as the criterion for completion of compaction. The pile driving force attenuation rate reflects the degree of compaction of the soil at the pile tip under preloading: the larger the attenuation rate, the softer the soil at the pile tip and the insufficient compaction; when the attenuation rate is not greater than the preloading compaction attenuation threshold, it means that the soil at the pile tip under that level of preloading has been basically compacted and stabilized, and the next level of preloading can be upgraded. If the attenuation rate of a certain level is greater than the threshold, the stabilization period of that level is extended and reassessed until the standard is met.

[0067] After each stage of preloading and compaction is completed, the recorded elevation of the pile tip is taken as the final compaction starting reference elevation. This means that the pile tip elevation at the completion of the third stage of preloading and compaction is used as the benchmark for measuring the penetration volume in the final compaction stage. The final compaction starting reference elevation corresponds to the contact state of the bearing stratum where the pile tip has been sufficiently compacted. Subsequently, the pile top penetration volume recorded during the segmented progressive final compaction and segmented stabilization periods is based on this elevation, thereby eliminating the interference of the penetration volume in the preloading and compaction stage on the determination of the final compaction penetration.

[0068] Through the above technical solution, this embodiment implements deceleration control before the pile tip enters the bearing stratum, and implements three-stage progressive preloading after entering the bearing stratum, with the completion of compaction determined by the progressive attenuation rate. Staged preloading and compaction reduces the remodeling zone formed on the top surface of the bearing stratum due to pile driving disturbance, allowing the pile tip to achieve a relatively stable compacted contact state before entering the final compaction stage. This reduces false penetration in the final compaction stage and improves the reliability of the final pressure reading. Simultaneously, the recording of the initial benchmark elevation for final compaction provides a unified benchmark for measuring the penetration amount in the final compaction stage, avoiding confusion between preloading penetration and final compaction penetration, thereby improving the accuracy of final pressure determination and creating conditions for the activation of pile tip resistance.

[0069] In an embodiment of the present invention, after the pile end contacts the top surface of the bearing stratum, a first preload, a second preload, and a third preload are applied sequentially, and the step of stabilizing each level of preload includes: S321, apply the first pre-pressure to 0.35~0.45 times the final pressure value, and stabilize the pressure for 3~5 seconds; S322, apply the second pre-pressure to 0.45~0.55 times the final pressure value, and stabilize the pressure for 3~5 seconds; S323, apply the third pre-pressure to 0.55~0.65 times the final pressure value, and stabilize the pressure for 4~6 seconds; The pre-compression attenuation threshold is 3%.

[0070] Specifically, applying the first preload to 0.35 to 0.45 times the final pressure value and stabilizing it for 3 to 5 seconds constitutes the first stage of preload compaction. The first preload is less than half the final pressure value; its function is to initially compact the soil at the pile tip that has just contacted the top surface of the bearing stratum, while simultaneously detecting the softness of the soil at the pile tip. The short-term stabilization of 3 to 5 seconds is sufficient to obtain the pile driving force attenuation rate under the first stage of preload, providing a basis for determining whether to upgrade to the second stage.

[0071] Apply the second preload to 0.45 to 0.55 times the final pressure value and stabilize for 3 to 5 seconds; this constitutes the second stage of preload compaction. The second preload is further increased based on the first preload to achieve deeper compaction of the soil at the pile tip. The upper limit of each preload level does not exceed the bearing capacity determined by the previous stage of pressure stabilization, ensuring that pressure is transmitted step by step and deformation converges step by step.

[0072] Applying the third preload to 0.55-0.65 times the final pressure value and stabilizing it for 4-6 seconds constitutes the third stage of preload compaction. This third preload is connected to the initial pile driving force (initial preload force 0.6 times the final pressure value) of the segmented progressive final pressure, ensuring a smooth transition in pressure level between the preload compaction stage and the final pressure application stage, avoiding pressure abrupt changes that could impact the soil at the pile tip. The third-stage stabilization time of 4-6 seconds is slightly longer than the first two stages, used to confirm the compaction stability of the soil at the pile tip near the initial preload force level.

[0073] The preloading compaction attenuation threshold of 3% refers to a uniform 3% limit for determining the attenuation rate of pile driving force during the stabilization period of each level of preloading. When the pile driving force attenuation rate is no greater than 3%, the preloading compaction for that level is considered complete; if it is greater than 3%, the stabilization period for that level is extended and a new determination is made. Using 3% as a uniform threshold ensures consistent completion criteria for the three levels of preloading compaction, guaranteeing the horizontal comparability of the preloading compaction determination results.

[0074] Through the above technical solution, this embodiment uses the final pressure value as a benchmark and decomposes the pre-compaction into three progressively increasing pre-pressure levels of 0.35~0.45 times, 0.45~0.55 times, and 0.55~0.65 times, each accompanied by a pressure stabilization duration of 3~5s, 3~5s, and 4~6s, and a uniform 3% attenuation threshold. The three levels of pre-pressure maintain a fixed ratio to the final pressure value, with the highest level connecting with the initial pre-tightening force. This ensures that the pre-compaction stage not only completes the graded compaction of the bearing layer's top surface but also provides a continuous loading path for the segmented progressive final pressure. The step-by-step judgment mechanism ensures that each level of pre-pressure is upgraded only after the measured attenuation rate has stabilized, reducing the problem of insufficient compaction of the bearing layer's disturbed area due to single-level pressure stabilization. This, in turn, helps improve the initial compaction degree at the pile end entering the final pressure stage and the reliability of the final pressure determination.

[0075] In an embodiment of the present invention, before the step of performing graded preloading and compaction of the pile tip to allow the pile tip to enter the bearing layer and meet the preloading and compaction determination conditions, and recording the final pressure starting reference elevation, the static pressure pile final pressure control method further includes: S301, During the test pile driving process, the pile driving force is recorded for each unit depth of pile penetration, forming a record of pile driving force that varies with the penetration depth. S302, the top surface of the first depth interval of the sudden increase segment of pile driving force in the pile driving force record is determined as the elevation of the top surface of the bearing layer; S303, Determine the preloading and compaction starting section of the engineering pile based on the elevation of the top surface of the bearing layer.

[0076] Specifically, during the test pile driving process, the pile driving force is recorded at each unit depth of penetration, forming a pile driving force record that varies with penetration depth. This means that during the static driving of the test pile, the pile driving force value is recorded at fixed unit depth intervals (e.g., every 1m of penetration), thus forming a pile driving force record that varies with penetration depth. This record reflects the variation of pile side and end resistance with penetration depth and is the original basis for identifying the top surface of the bearing stratum. The smaller the unit depth interval, the higher the depth resolution of the pile driving force record.

[0077] The top surface of the first depth interval of the sudden increase in pile driving force in the pile driving force record is determined as the top surface elevation of the bearing stratum. This means searching the pile driving force record along the penetration depth direction to find the depth interval where the pile driving force shows a significant sudden increase relative to the adjacent previous depth interval, and determining the elevation corresponding to the top surface of this interval as the top surface elevation of the bearing stratum. The appearance of the sudden increase in pile driving force indicates that the pile tip has begun to be driven into the bearing stratum with significantly increased stiffness; therefore, its top surface is the top surface of the bearing stratum.

[0078] Determining the preloading and compaction starting section of the engineering pile based on the elevation of the top surface of the bearing stratum means defining the range of the preloading and compaction starting section upwards from the elevation of the top surface of the bearing stratum, that is, the position interval between 0.5 and 1.0 m from the pile tip to the top surface of the bearing stratum. Determining the preloading and compaction starting section allows for the triggering of deceleration and staged preloading operations when the engineering pile is driven into this interval, ensuring an accurate and reliable spatial correspondence between the preloading and compaction process and the top surface of the bearing stratum.

[0079] Through the above technical solution, this embodiment, before staged preloading and compaction, first uses the record of changes in pile driving force with penetration depth during the test pile driving process to determine the elevation of the top surface of the bearing stratum and identify the starting section of preloading and compaction. This pre-detection process eliminates the reliance on design elevation or experience-based judgment for the preloading and compaction of engineering piles, instead using the measured characteristics of sudden increases in pile driving force to pinpoint the actual spatial location of the top surface of the bearing stratum. This reduces the misalignment of the starting position of preloading and compaction caused by undulations in the top surface of the bearing stratum, and provides clear triggering conditions for the timing of the deceleration and application of preload during staged preloading and compaction, thereby improving the adaptability of the entire final compaction control process to geological conditions.

[0080] In an embodiment of the present invention, the step of determining the top surface of the first depth interval of the sudden increase segment of pile driving force in the pile driving force record as the elevation of the top surface of the bearing layer includes: S3021 divides the pile penetration depth into multiple equal depth intervals; S3022, Calculate the average pile driving force for each depth interval; S3023, the top surface of the first depth interval where the average pile driving force exceeds 1.2 to 1.5 times the average pile driving force of the adjacent previous depth interval is determined as the top surface elevation of the bearing layer.

[0081] Specifically, dividing the pile penetration depth into multiple equal depth intervals means dividing the penetration depth range of the test pile from the ground surface to the pile tip into several consecutive depth intervals with the same depth. This equal depth division provides a unified benchmark for comparing the average pile driving force of adjacent intervals, avoiding distortion in pile driving force comparisons caused by inconsistent interval lengths.

[0082] Calculating the average pile driving force for each depth interval involves averaging the recorded pile driving force values ​​within each depth interval, using this average value to represent the pile driving force level for that depth interval. Averaging reduces instantaneous fluctuations in the pile driving force records, ensuring that the sudden increase in pile driving force caused by the pile tip entering the bearing stratum is stably represented at the interval scale.

[0083] The top surface of the first depth interval where the average pile driving force exceeds the average pile driving force of the adjacent previous depth interval by 1.2 to 1.5 times is determined as the top surface elevation of the bearing stratum. This means comparing the average pile driving force of adjacent depth intervals one by one from the ground surface towards the pile tip, and identifying the first depth interval that meets the condition of "the average pile driving force of the current interval exceeding the average pile driving force of the previous interval by 1.2 to 1.5 times" as the pile driving force surge segment, and using the top surface elevation of this interval as the top surface elevation of the bearing stratum. The determination factor of 1.2 to 1.5 times is used to distinguish between a significant surge in pile driving force caused by the pile tip entering the bearing stratum and a normal gradual change in pile side resistance with increasing depth: when the factor is less than 1.2, a normal gradual increase may be misjudged as the top surface of the bearing stratum; when the factor is greater than 1.5, strata with indistinct pile driving force surge characteristics may be missed. Using the first interval that meets the condition ensures that the determination result is the top surface of the bearing stratum that appears first along the penetration depth direction.

[0084] Through the above technical solution, this embodiment transforms the identification of the top surface of the bearing stratum into a recalcible and verifiable quantitative judgment process through three progressive steps: dividing the stratum into equal-depth intervals, calculating the average pile driving force within each interval, and determining a sudden increase of 1.2 to 1.5 times between adjacent intervals. This judgment method does not rely on prior assumptions about the design geological profile, but directly locates the top surface of the bearing stratum based on the measured pile driving force response during the test pile driving process. It has adaptive capabilities to actual working conditions such as undulations and inclinations of the top surface of the bearing stratum, thus providing a spatial basis for determining the initial section of pre-compaction and triggering the graded pre-compaction process.

[0085] In an embodiment of the present invention, the step of progressively increasing the pile driving force to the final pressure value by gradually decreasing the pile driving speed in stages includes: S41, First pressurization stage: The pile driving force is increased to 0.8 times the final pressure value at a pile driving speed of 0.6 to 1.0 m / min; S42, Second pressurization stage: The pile driving force is increased to 0.92 times the final pressure value at a pile driving speed of 0.3 to 0.5 m / min; S43, Third pressurization stage: The pile driving force is increased to the final pressure value at a pile driving speed of no more than 0.2 m / min; S44, record the pile driving force and pile top penetration in each pressurized section.

[0086] Specifically, in the first pressurization stage, the pile driving force is increased to 0.8 times the final pressure value at a pile driving speed of 0.6–1.0 m / min. This means that starting from the initial preload (0.6 times the final pressure value), the pile driving force is increased to 0.8 times the final pressure value at a pile driving speed of 0.6–1.0 m / min. The first pressurization stage is located in the low-pressure zone of the final pressure, and the pile driving force level is relatively low. Therefore, the fastest pile driving speed among the three stages is used to ensure final pressure efficiency. The target pile driving force for the first pressurization stage is 0.8 times the final pressure value, which constitutes the initial pressure for subsequent pressurization stages.

[0087] The second pressurization stage increases the pile driving force to 0.92 times the final pressure value at a pile driving speed of 0.3–0.5 m / min. This means starting from 0.8 times the final pressure value, the pile driving speed is reduced to 0.3–0.5 m / min, and the pile driving force is increased to 0.92 times the final pressure value. The second pressurization stage is in the medium-high pressure zone of the final pressure, where the pile driving force is close to the level where the pile end resistance is fully activated. The first reduction in the pile driving speed is used to suppress the inertial impact accompanying the rapid increase in pile driving force. At the same time, the pile top penetration in the second pressurization stage is used to determine the hardness of the bearing stratum.

[0088] The third pressurization stage increases the pile driving force to the final pressure value at a pile driving speed of no more than 0.2 m / min. This means starting from 0.92 times the final pressure value, further reducing the pile driving speed to no more than 0.2 m / min, and then gradually increasing the pile driving force to the final pressure value. The third pressurization stage is located in the high-pressure zone of the final pressure, and the pile driving speed is reduced to the lowest value among the three stages, so that the pile driving force reaches the final pressure value in a near-static manner, reducing the influence of inertial impact on the final pressure reading and penetration record.

[0089] Recording the pile driving force and pile top penetration in each pressurization section means simultaneously recording the pile driving force and pile top penetration during the advancement of the three pressurization sections, forming a data pair of pile driving force and pile top penetration for each pressurization section. This data pair is the basis for the early warning judgment of the penetration in the second pressurization section and the traceability of the final pressing quality.

[0090] Through the above technical solution, this embodiment divides the final pressurization process into three pressurization sections according to the pressure range, and gradually decreases the pile driving speed along the pressurization direction: 0.6–1.0 m / min, 0.3–0.5 m / min, and no more than 0.2 m / min. The gradual decrease in pile driving speed and the gradual increase in pile driving force work in opposite directions, maintaining efficiency in the low-pressure zone and ensuring relatively stable loading in the high-pressure zone. This reduces inertial impact and false penetration near the final pressure value, making the final pressure value and the penetration amount in the final pressurization section more reflective of the pile end resistance state. Simultaneously, the three-section boundary pressures of 0.8 times and 0.92 times the final pressure value provide a fixed data acquisition window for the second pressurization section penetration warning judgment, ensuring that the determination of the bearing stratum's hardness is carried out within a unified pressure range, thus improving the lateral consistency of the judgment.

[0091] In an embodiment of the present invention, the step of performing segmented pressure stabilization on the engineering pile under the final pressure value, obtaining the attenuation rate of the first segment pile driving force and the attenuation rate of the second segment pile driving force, and performing pressure stabilization duration correction or final pressure value correction according to the segmented determination logic includes: S51, obtain the pile top penetration of the second pressurized section. When the pile top penetration of the second pressurized section is greater than 5mm, increase the final pressure value by 5% to 10%. S52, under the corrected final pressure value, the first stage of pressure stabilization is carried out, and the attenuation rate of the first stage pile driving force is calculated; S53, when the attenuation rate of the first stage pile driving force is greater than the attenuation threshold of the first stage, the first stage stabilization time is extended and the first stage stabilization is repeated. S54, under the corrected final pressure value, perform secondary pressure stabilization and calculate the secondary pile driving force attenuation rate; S55, when the attenuation rate of the secondary pile driving force is greater than the attenuation threshold of the secondary stage, the final pressure value is increased by 5% to 10%, and the pile driving force is increased to the corrected final pressure value before the segmented pressure stabilization is performed again. The attenuation threshold for the first segment is 5%, and the attenuation threshold for the second segment is 3%.

[0092] Specifically, the pile top penetration depth of the second pressurized section is obtained. When the pile top penetration depth of the second pressurized section is greater than 5 mm, the final pressure value is increased by 5% to 10%. This means that after the segmented progressive final pressure is completed and before entering the segmented stabilization phase, the pile top penetration depth recorded in the second pressurized section is retrieved and used as an early warning indicator of the softness or hardness of the bearing layer. The second pressurized section is located in the medium-high pressure zone where the pile driving force is about to reach the final pressure value. If the pile top penetration depth in this zone is greater than 5 mm, it indicates that the soil at the pile tip is still undergoing significant plastic penetration when approaching the final pressure level, meaning that the bearing layer is relatively soft and the originally set final pressure value may not be sufficient to make the pile tip reach a stable bearing state. In this case, the final pressure value is increased by 5% to 10% to match the final pressure value with the actual stiffness of the bearing layer. When the pile top penetration depth is not greater than 5 mm, the final pressure value remains unchanged.

[0093] The initial pressure stabilization is performed under the corrected final pressure value, and the initial pile driving force attenuation rate is calculated. This means that the initial pressure stabilization is carried out using the corrected final pressure value as the peak pressure, the initial pile driving force and the final pile driving force of the initial stage are recorded, and the initial pile driving force attenuation rate is calculated. The initial pressure stabilization time is executed according to the shortest duration set in the final pressure control threshold group. The initial pile driving force attenuation rate mainly reflects the instantaneous elastic attenuation of the soil at the pile tip under the action of the final pressure.

[0094] When the initial pile driving force attenuation rate exceeds the initial attenuation threshold, extending the initial stabilization time and restarting the initial stabilization process means comparing the initial pile driving force attenuation rate with the initial attenuation threshold of 5%. If the initial pile driving force attenuation rate is greater than 5%, it indicates that the instantaneous compaction of the soil at the pile tip under the final pressure is insufficient. In this case, extending the initial stabilization time by 3-5 seconds and restarting the initial stabilization process allows the soil at the pile tip to complete instantaneous compaction within the extended stabilization time. After restarting stabilization, if the initial pile driving force attenuation rate is no greater than 5%, proceed to the second stage of stabilization. If the initial pile driving force attenuation rate is no greater than 5%, proceed directly to the second stage of stabilization.

[0095] Secondary pressure stabilization is performed under the corrected final pressure value, and the pile driving force attenuation rate of the secondary stage is calculated. This means that the pile driving force at the end of the first stage of pressure stabilization is taken as the starting pile driving force of the secondary stage, and the corrected final pressure value is used as the peak value of the stabilization for the secondary stage. The pile driving force at the end of the secondary stage is recorded, and the pile driving force attenuation rate of the secondary stage is calculated. The duration of the secondary stage of pressure stabilization is longer than that of the first stage of pressure stabilization, which is used to expose the creep attenuation of the soil at the pile tip under continuous load.

[0096] When the attenuation rate of the secondary pile driving force exceeds the secondary attenuation threshold, the final pressure value is increased by 5% to 10%, and the pile driving force is gradually increased to the revised final pressure value before the segmented pressure stabilization is repeated. This means comparing the attenuation rate of the secondary pile driving force with the secondary attenuation threshold of 3%. When the attenuation rate of the secondary pile driving force exceeds 3%, it indicates that the soil at the pile tip is still undergoing significant creep attenuation under continuous load, meaning that the soil at the pile tip exhibits creep characteristics. The original final pressure value may not be sufficient to maintain long-term stability at the pile tip. In this case, the final pressure value is increased by 5% to 10%, and the pile driving force is gradually increased to the revised final pressure value before the segmented pressure stabilization is repeated until the attenuation rates of the first and secondary pile driving forces are not greater than their respective thresholds.

[0097] The first-stage attenuation threshold is 5%, and the second-stage attenuation threshold is 3%. The first-stage attenuation threshold is greater than the second-stage attenuation threshold, reflecting the engineering reality that the instantaneous elastic attenuation corresponding to the first-stage voltage stabilization is usually greater than the creep attenuation corresponding to the second-stage voltage stabilization. A more stringent 3% threshold is used for the second stage to improve the sensitivity of creep condition identification.

[0098] Through the above technical solution, this embodiment constructs a closed-loop judgment logic in segmented pressure stabilization: "Penetration volume early warning - final pressure value primary correction - first-segment attenuation judgment - stabilization duration correction - second-segment attenuation judgment - final pressure value secondary correction - re-segmented pressure stabilization". The penetration volume early warning for the second pressurization segment identifies the bearing layer as being relatively soft before pressure stabilization; the separate calculation of the attenuation rates for the first and second segments separately judges the instantaneous elastic attenuation and creep attenuation of the pile tip soil at different time scales and performs targeted corrections with different thresholds. This judgment logic automatically adjusts the final pressure value and stabilization duration according to the measured response of the pile tip soil, reducing the risk of weak bearing layers and creeping soil layers being masked by fixed parameters, and helping to ensure the long-term stability of the pile tip bearing state after final pressure.

[0099] In an embodiment of the present invention, the step of performing dynamic graded re-pressure cycles on the engineering piles, gradually reducing the unloading ratio, and determining the termination of re-pressure based on the re-pressure penetration and the pile driving force attenuation rate includes: S61, unload the pile driving force to the unloading pressure of this round, pause, and then repressurize to the final pressure value to obtain the repressurization penetration and repressurization stabilization attenuation rate of this round of repressurization. S62, when the repressurization penetration amount is greater than the penetration amount threshold or the repressurization stabilization attenuation rate is greater than the repressurization attenuation threshold, the unloading pressure of the next round of repressurization is reduced and the pause time of the next round of repressurization is extended, and the dynamic graded repressurization cycle is repeated. S63, until the penetration amount of the repressing in two consecutive rounds is not greater than the penetration amount threshold, and the repressing stabilization attenuation rate is not greater than the repressing attenuation threshold, then terminate the repressing. The unloading pressure of the first round of repressurization is 0.25 times the final pressure value, the unloading pressure of the second round of repressurization is 0.2 times the final pressure value, the unloading pressure of the third round of repressurization is 0.15 times the final pressure value, the penetration threshold is 2 mm, and the repressurization attenuation threshold is 5%.

[0100] Specifically, unloading the pile driving force to the unloading pressure of this round, pausing, and then repressurizing to the final pressure value, obtaining the repressurization penetration and repressurization stabilization attenuation rate of this round of repressurization, means that each round of repressurization is performed in the sequence of "unloading—pausing—repressurization—stabilization recording". Unloading causes elastic rebound of the pile body and the soil at the pile tip; pausing provides a time window for the release of elastic rebound; then repressurizing to the final pressure value, and recording the pile top penetration during the repressurization process as the repressurization penetration; after repressurizing to the final pressure value, maintaining pressure stabilization for a short period of time, the stabilization time can be the initial stabilization time or 3-5 seconds, and recording the pile driving force attenuation rate during the stabilization period as the repressurization stabilization attenuation rate. The repressurization penetration reflects the plastic penetration that occurs at the pile tip when reloading after unloading and rebounding, and the repressurization stabilization attenuation rate reflects the degree of compaction and stability of the soil at the pile tip after repressurization.

[0101] When the penetration depth exceeds the penetration threshold or the pressure attenuation rate exceeds the pressure attenuation threshold, the unloading pressure of the next round of pressure is reduced and the pause time of the next round of pressure is extended. The dynamic graded pressure cycle is repeated. This means that the penetration depth threshold of 2mm and the pressure attenuation threshold of 5% are used as dual criteria. If either criterion is not met, the current round of pressure is considered not to have converged. If it has not converged, the unloading pressure of the next round of pressure is reduced by one level and the pause time is extended by one level before the pressure cycle is repeated. Reducing the unloading pressure allows for a more complete release of elastic rebound after the next unloading, and extending the pause time makes the rebound tend to stabilize, thereby reducing the contribution of elastic rebound to the penetration depth of the pressure, and making the penetration depth of the pressure gradually approach that of pure plastic penetration.

[0102] The re-pressing process terminates when the penetration depth of two consecutive re-pressing cycles is no greater than the penetration depth threshold and the re-pressing stabilization attenuation rate is no greater than the re-pressing attenuation threshold. This means that the re-pressing process ends when both indicators are met simultaneously in two consecutive cycles. Meeting the standard in a single cycle cannot rule out occasional fluctuations in the soil response at the pile tip; only two consecutive cycles of meeting the standard can confirm that the penetration depth and pile driving force at the pile tip have converged under the final pressure. At this point, the re-pressing process terminates, and no further cycles are performed.

[0103] The unloading pressure for the first round of compaction is 0.25 times the final pressure value, the unloading pressure for the second round of compaction is 0.2 times the final pressure value, and the unloading pressure for the third round of compaction is 0.15 times the final pressure value. This means that the unloading ratio of the three rounds of compaction decreases successively by 0.25, 0.20, and 0.15, respectively, while the pause times increase successively by 3s, 4s, and 5s. The lower limit of the unloading ratio decrease sequence, 0.15 times the final pressure value, ensures that the rebound is fully released while keeping the pile tip under constant pressure, preventing the soil at the pile tip from losing the established compacted state due to excessive unloading.

[0104] Through the above technical solution, this embodiment uses a cyclical timing sequence of "unloading—pause—re-pressurization—pressure stabilization recording" with a progressively decreasing unloading ratio of 0.25→0.20→0.15 and a progressively increasing pause of 3s→4s→5s. The re-pressurization termination condition is that both the re-pressurization penetration of 2mm and the re-pressurization stabilization attenuation rate of 5% are achieved for two consecutive rounds. This allows the number of re-pressurization rounds to adaptively determine the soil properties at the pile tip. Compared to fixed-number re-pressurization, this dynamic graded re-pressurization cycle terminates re-pressurization earlier when the pile tip soil is dense and converges quickly, reducing ineffective re-pressurization and wasted construction time. When the pile tip soil is soft and converges slowly, it automatically increases the number of re-pressurization rounds and increases the rebound release depth to ensure sufficient re-pressurization. The re-pressurization penetration is closer to plastic penetration due to the progressively decreasing elastic rebound, allowing the final pressure determination to be based on the quantitative basis of plastic penetration convergence at the pile tip, which is beneficial for improving the consistency between the final pressure quality and the bearing capacity of the engineering pile.

[0105] In an embodiment of the present invention, the step of setting a final pressure control threshold group based on the final pressure characteristic parameters of the test pile includes: S21, Based on the final pressure value multiplier, the multiplier value K is determined in combination with the pile length grading, and the final pressure value Pf and the initial pressure preload P0 are set. S22, set the three-level pre-pressure and pre-pressure compaction attenuation threshold; S23 sets the three-stage pile driving speed and boundary pressure for segmented progressive final pressure; S24, set the first stage stabilization time, the second stage stabilization time, the first stage attenuation threshold, and the second stage attenuation threshold; S25, set the re-pressure unloading ratio sequence, re-pressure pause time sequence, re-pressure stabilization time, re-pressure penetration threshold, re-pressure attenuation threshold and re-pressure penetration threshold after pile driving.

[0106] Specifically, based on the final pressure value multiplier, the multiplier value K is determined according to the pile length classification, and the final pressure value Pf and the initial preload P0 are set. This means that the multiplier value K is appropriately adjusted based on the final pressure value multiplier obtained from the actual test pile, combined with the pile length classification, and the final pressure value Pf = K is taken. The characteristic value of the vertical bearing capacity of a single pile is Ra; the initial preload P0 is taken as 0.6Pf. The value of K is related to the pile length: 1.7~1.9 for short piles and 1.6~1.7 for medium-long piles. Short piles have a small proportion of side resistance and a large proportion of end resistance, so a larger K is used to ensure end bearing capacity; a smaller K is used for medium-long piles to avoid overpressure. It should be noted that the value of K can be selected near the multiple of the measured final pressure value of the test pile to maintain basic consistency with the test pile results, while also being rounded or fine-tuned according to pile length. The final pressure value Pf and the initial preload P0 constitute the pressure boundary of the final pressure section.

[0107] Setting three levels of pre-pressure and pre-pressure compaction attenuation threshold means setting the first pre-pressure to 0.35~0.45 times Pf, the second pre-pressure to 0.45~0.55 times Pf, and the third pre-pressure to 0.55~0.65 times Pf. Examples of values ​​are 0.4Pf, 0.5Pf, and 0.6Pf, and the pre-pressure compaction attenuation threshold is 3%.

[0108] Setting the three-stage pile driving speed and boundary pressure for the segmented progressive final pressure means setting the pile driving speed of the first stage to 0.6-1.0 m / min, the pile driving speed of the second stage to 0.3-0.5 m / min, the pile driving speed of the third stage to no more than 0.2 m / min, and the boundary pressures to 0.8 Pf and 0.92 Pf.

[0109] The initial stabilization time, the second stabilization time, the initial attenuation threshold, and the second attenuation threshold are set as follows: when the final pressure value Pf is greater than 3000kN, the initial stabilization time is 3s and the second stabilization time is 5s; when the final pressure value Pf is not greater than 3000kN, or when the bearing layer at the pile tip is a soft plastic to hard plastic soil layer, the initial stabilization time is 5s and the second stabilization time is 10s; the initial attenuation threshold is 5% and the second attenuation threshold is 3%.

[0110] Setting the re-pressure unloading ratio sequence, re-pressure pause time sequence, re-pressure stabilization time, re-pressure penetration threshold, re-pressure attenuation threshold, and re-pressure penetration threshold after pile driving refers to setting the re-pressure unloading ratio sequence to 0.25, 0.20, and 0.15, the re-pressure pause time sequence to 3s, 4s, and 5s, the re-pressure stabilization time to be the initial stabilization time or 3-5s, the re-pressure penetration threshold to 2mm, the re-pressure attenuation threshold to 5%, and the re-pressure penetration threshold after pile driving to 3mm.

[0111] Through the above technical solution, this embodiment centrally sets the operating parameters and judgment thresholds required for final pressure control before final pressure construction, forming a threshold group covering the entire process of pre-compression, segmented progressive final pressure, segmented pressure stabilization, dynamic graded re-compression, pile driving compensation, and acceptance judgment. The final pressure value in the threshold group is derived from test pile calibration and combined with pile length grading adjustments. The pre-pressure, boundary pressure, and unloading ratio at each level are all determined according to the final pressure value at a fixed ratio. The pressure stabilization time and threshold are set according to the pressure level and bearing layer characteristics, making the parameters of the entire final pressure control process interconnected and self-contained. The setting of this threshold group ensures that the triggering conditions and judgment criteria for each process are clear before construction, reducing the uncertainty of temporary parameter values ​​during construction and helping to ensure the consistency and reproducibility of final pressure control.

[0112] In an embodiment of the present invention, the steps of performing final pressure connection and subsequent pressure compensation for the engineering piles include: S71, when the pile top is below the ground level, drive the pile to press the pile top to the design elevation; S72, after driving the pile to the design elevation, maintain a driving force of 0.8 to 0.9 times the final pressure value for 4 seconds; S73. After the pile driving is completed, first remove the pile driving equipment to restore the pile driving point to the top of the engineering pile, then unload the pile driving force to 0.3 times the final pressure value, pause for 2 seconds, re-pressurize to the final pressure value, and record the re-pressurization penetration amount after pile driving. S74, when the penetration depth of the pile driving after re-pressure is greater than 3mm, an additional round of pile driving after re-pressure is added; when the penetration depth of the pile driving after re-pressure is not greater than 3mm, the pile driving after re-pressure compensation is deemed qualified.

[0113] Specifically, when the pile top is below ground level, pile driving is performed to press the pile top to the design elevation. This means that when the design pile top elevation is below ground level and the pile driving operation cannot directly act on the pile top, pile driving is used to press the pile top to the design elevation. The pile driving process is carried out under the bearing condition that the pile end has passed the final and secondary pressing acceptance tests. Its purpose is to complete the positioning of the pile top elevation, rather than to establish the pile end bearing capacity. Therefore, the pile driving section adopts a pile driving force control method that is connected with the final pressing.

[0114] After the pile is driven to the design elevation, a driving force of 0.8 to 0.9 times the final pressure value is maintained for 4 seconds. This means that at the instant the pile top reaches the design elevation, the driving force is not immediately unloaded, but maintained at 0.8 to 0.9 times the final pressure value for 4 seconds. This stabilization level is lower than the final pressure value, which is sufficient to maintain the dense contact state established at the pile end, while avoiding excessive pressure on the pile driving section that could cause damage to the pile body. The 4-second stabilization period is used to confirm that the pile top elevation remains stable under pressure.

[0115] After pile driving completion, the pile driving equipment is first removed to restore the pile pressing action point to the top of the engineering pile, then the pile pressing force is unloaded to 0.3 times the final pressure value, paused for 2s, re-pressed to the final pressure value, and the re-penetration after pile driving is recorded. This refers to performing a round of re-pressing after pile driving after the pile driving operation is completed and the pile driving equipment is removed. Unloading to 0.3 times the final pressure value and pausing for 2s allows the elastic deformation accumulated during the pile driving process to be released; then re-pressing to the final pressure value is performed, and the pile top penetration during the re-pressing process is recorded. This re-pressing is used to compensate for the elastic deformation loss of the pile driving section, ensuring that the pile end is finally in a compacted bearing state corresponding to the final pressure value.

[0116] When the re-penetration after pile driving is greater than 3mm, an additional round of re-pressing after pile driving is added; when the re-penetration after pile driving is not greater than 3mm, the re-pressing compensation after pile driving is judged to be qualified. This refers to taking 3mm as the threshold for the re-penetration after pile driving for judgment. A re-penetration after pile driving greater than 3mm indicates that the elastic deformation loss of the pile driving section has not been fully compensated, and the bearing state of the pile end is reduced, so an additional round of re-pressing after pile driving is required; when it is not greater than 3mm, the compensation is judged to be qualified, and the acceptance judgment is entered.

[0117] Through the above technical solution, this embodiment incorporates the pile driving process into the final pressure control system, and executes the connection between pile driving and final pressure as well as the re-pressing compensation after pile driving according to the sequence of "pile driving in place - connection pressure stabilization - unloading release - re-pressing compensation - penetration judgment". The connection pressure stabilization at 0.8~0.9 times the final pressure value maintains the bearing state established at the pile end, the unloading to 0.3 times the final pressure value and the 2s pause release the elastic deformation of the pile driving section, and the re-pressing to the final pressure value directly compensates for the elastic deformation loss, and the adequacy of compensation is quantitatively judged with the 3mm penetration threshold. This process reduces the reduction of the effective final pressure by the pile driving section, so that the engineering piles with the pile top below the ground and the engineering piles with the pile top exposed obtain a relatively consistent pile end bearing state, which is beneficial to improving the single pile bearing capacity and final pressure pass rate of the pile-driven engineering piles.

[0118] In the embodiment of the present invention, the steps of performing multi-index joint acceptance judgment on the final pressure result include: S81, judging whether the pile top elevation deviation is not greater than 50mm; S82, judging whether the depth of the pile end entering the bearing stratum is not less than the design value; S83, judging whether the measured final pressure value reaches the corrected final pressure value, and whether the final round of re-pressing penetration is not greater than 2mm; S84, judging whether the attenuation rate of the secondary section pile pressing force is not greater than 3%, and whether the re-penetration after pile driving is not greater than 3mm if pile driving is performed; S85, when all the above indicators are met, the final pressure is judged to be qualified.

[0119] Specifically, determining whether the pile top elevation deviation is no greater than 50mm means comparing the measured pile top elevation with the designed pile top elevation; if the absolute value of the difference is no greater than 50mm, the indicator passes. The pile top elevation deviation directly reflects the positioning accuracy of the pile driving and installation, and is a fundamental indicator for final compaction acceptance.

[0120] Determining whether the depth of the pile tip entering the bearing stratum is not less than the design value involves calculating the actual depth of the pile tip entering the bearing stratum based on the final pile tip elevation and the final pile tip elevation, and comparing it with the design-required depth. If the actual depth is not less than the design value, this indicator passes, confirming that the pile tip has entered the bearing stratum to a sufficient depth to ensure the end resistance is effectively utilized.

[0121] Determining whether the measured final pressure value reaches the corrected final pressure value, and whether the penetration depth of the final round of re-pressing is no greater than 2mm, involves comparing the peak pile driving force actually reached during the final pressing process with the corrected final pressure value, and simultaneously comparing the penetration depth of the final round of re-pressing at the end of the re-pressing process with 2mm. A measured final pressure value reaching the corrected final pressure value indicates sufficient final pressing; a penetration depth of no more than 2mm during the final round of re-pressing indicates that the plastic penetration at the pile tip has converged.

[0122] Determining whether the attenuation rate of the secondary pile driving force is no greater than 3%, and whether, if pile driving was performed, the penetration depth after pile driving is no greater than 3 mm, involves comparing the attenuation rate of the secondary pile driving force under segmented pressure stabilization with the secondary attenuation threshold of 3% to confirm that there is no creep in the soil at the pile tip. For engineering piles that underwent pile driving, the penetration depth after pile driving is compared with 3 mm to confirm that the elastic deformation loss of the driven section has been compensated. It should be noted that for engineering piles that did not undergo pile driving, the penetration depth after pile driving is not included in the acceptance judgment.

[0123] When all the above indicators are met, the final pressure is deemed qualified. This means that the final pressure is deemed qualified only when all the above indicators are met simultaneously. If any indicator is not met, the process is returned to the corresponding process for correction or additional pressure until all indicators are met.

[0124] Through the above technical solution, this embodiment uses the simultaneous achievement of six indicators—pile top elevation, pile tip depth into the bearing stratum, final pressure value, final round of re-pressure penetration, secondary pile driving force attenuation rate, and post-pile driving re-pressure penetration—as the final pressure qualification condition, making the final pressure quality quantifiable and traceable. Compared with the conventional practice of accepting only a single indicator such as pile top elevation or final pressure, this joint acceptance reduces the risk of missed judgments due to insufficient pile tip bearing capacity even when a single indicator meets the standard. It helps to reduce the dispersion of the bearing capacity of engineering piles and ensures the consistency and reliability of pile quality.

[0125] The following two more specific examples will provide a more in-depth explanation of the above technical solution: Example 1 In the pile foundation construction of a certain building site, prestressed concrete pipe piles were designed, with a designed pile length of 18m and a single pile vertical bearing capacity characteristic value Ra=2200kN. The bearing stratum at the pile tip is strongly weathered granite, the designed pile tip elevation is -17.50m, and the designed pile tip penetration depth into the bearing stratum is 1.0m. To address issues such as under- or over-pressure caused by empirically determined final pressure values, the masking of soil creep at the pile tip by fixed pressure stabilization, and ineffective re-pressure due to fixed re-pressure cycles, the construction team adopted this method.

[0126] First, during the test pile driving process, the pile driving force was recorded for every 1m of penetration: the average pile driving force was 1750kN in the 14-15m range, 1820kN in the 15-16m range, and 2660kN in the 16-17m range. The ratio of the average pile driving force in the 16-17m range to that in the 15-16m range was 1.46, falling within the 1.2-1.5 times judgment range, and the top elevation of the bearing stratum was determined to be -16.00m. Based on this, the starting section for pre-compacting the engineering pile was determined to be 0.8m from the pile tip to the top surface of the bearing stratum (elevation -15.20m).

[0127] Secondly, the final pressure attenuation was calibrated for the three test piles: the final pressure value of 3800 kN was recorded during the final pressure stage when the test pile was driven to the design elevation; during the final pressure stabilization period, the pile force decreased from 3800 kN to 3705 kN within the first 3 seconds, with an attenuation rate of 2.5%; and within the second 5 seconds, the pile force decreased from 3705 kN to 3640 kN, with an attenuation rate of 1.8%. Subsequently, the vertical ultimate bearing capacity of a single pile, Qu = 4400 kN, was measured by static load test, and the final pressure value multiplier K0 = 3800 / 2200 = 1.73 was calculated.

[0128] Subsequently, based on the characteristic parameters of the final pressure of the test pile, a final pressure control threshold group was set: for a pile length of 18m as a medium-length pile, the multiple value K=1.7 was taken, and the final pressure value Pf=1.7. 2200 = 3740 kN; Initial preload P0 = 0.6 3740 = 2244kN; the three-stage preload is 1500kN, 1870kN, and 2244kN; the preload compaction attenuation threshold is 3%; the three-stage pile driving speeds are 0.8m / min, 0.4m / min, and 0.2m / min; since Pf = 3740kN is greater than 3000kN, the first stage stabilization time is 3s and the second stage stabilization time is 5s; the first stage attenuation threshold is 5% and the second stage attenuation threshold is 3%; the re-pressure unloading ratio sequence is 0.25 / 0.20 / 0.15, the pause time sequence is 3s / 4s / 5s, and the re-pressure stabilization time is the first stage stabilization time of 3s; the re-pressure penetration threshold is 2mm and the re-pressure attenuation threshold is 5%; the re-pressure penetration threshold after pile driving is 3mm.

[0129] Next, the pile tip preloading and compaction were carried out: when the pile tip was 0.8m from the top surface of the bearing stratum (elevation -15.20m), the pile driving speed was reduced to 0.4m / min; after the pile tip contacted the top surface of the bearing stratum (elevation -16.00m), three levels of preload were applied in sequence: 1500kN, 1870kN, and 2244kN, and each was stabilized for 3-4s. The pile driving force attenuation rates were 1.9%, 1.7%, and 1.6%, respectively, all not exceeding 3%. The preloading and compaction were completed, and the final starting reference elevation of the compaction was recorded as -16.00m.

[0130] Then, the engineering piles are subjected to segmented progressive final pressure: in the first pressure stage, the pile driving force is increased from 2244kN to 2992kN (0.8Pf) at a pile driving speed of 0.8m / min, with a pile top penetration of 2.0mm; in the second pressure stage, the pile driving force is increased from 2992kN to 3441kN (0.92Pf) at a pile driving speed of 0.4m / min, with a pile top penetration of 3.1mm, not exceeding 5mm, and the final pressure value is not corrected; in the third pressure stage, the pile driving force is increased from 3441kN to 3740kN (Pf) at a pile driving speed of 0.2m / min, with a pile top penetration of 1.6mm.

[0131] After the pile driving force reaches the final pressure value, segmented pressure stabilization is performed: The first segment stabilizes for 3 seconds, during which the pile driving force decreases from 3740 kN to 3480 kN, with a decrease rate of 6.9%, exceeding the first segment decrease threshold of 5%. This indicates that the instantaneous compaction of the soil at the pile tip is insufficient, so the first segment stabilization time is extended by 3 to 6 seconds and the first segment stabilization is repeated. After the repeated stabilization, the pile driving force decreases from 3740 kN to 3692 kN, with a decrease rate of 1.3%, not exceeding 5%, thus passing the test. The second segment stabilizes for 5 seconds, during which the pile driving force decreases from 3692 kN to 3644 kN, with a decrease rate of 1.3%, not exceeding 3%, indicating that the bearing layer at the pile tip is stable and without creep.

[0132] Subsequently, a dynamic graded re-pressure cycle was conducted: In the first round, the load was unloaded to 0.25Pf=935kN, paused for 3 seconds, and the pile top rebounded by 3mm. The load was then re-pressured to 3740kN, with a re-pressure penetration of 1.6mm, not exceeding 2mm. After 3 seconds of re-pressure stabilization, the pile driving force attenuation rate was 2.7%, not exceeding 5%, meeting the standard. In the second round, the load was unloaded to 0.20Pf=748kN, paused for 4 seconds, and then re-pressured to 3740kN. The re-pressure penetration was 1.1mm, not exceeding 2mm. After 3 seconds of re-pressure stabilization, the pile driving force attenuation rate was 2.3%, not exceeding 5%, meeting the standard. After two consecutive rounds of achieving the dual-indicator standard, the re-pressure was terminated, for a total of 2 rounds.

[0133] Next, pile follower connection final pressing and post-following recompression compensation are performed: the pile needs to be followed for 1.5 m; after following to the design elevation of -17.50 m, a pile pressing force of 3000 kN (approximately 0.8 Pf) is maintained for 4 s; after pile following is completed, the pile follower equipment is moved out to restore the pile pressing action point to the pile top, the pile pressing force is unloaded to 1122 kN (0.3 Pf), the process is paused for 2 s, and then re-pressed to 3740 kN; the post-following recompression penetration is 1.5 mm, which is not greater than 3 mm, indicating qualified compensation.

[0134] Finally, multi-index joint acceptance judgment is performed: the pile top elevation is -17.50 m with a deviation of 0 mm, which is not greater than 50 mm; the pile end enters the bearing layer to a depth of 1.50 m, which is not less than the design value of 1.0 m; the measured final pressure value reaches 3740 kN; the final round recompression penetration is 1.1 mm, which is not greater than 2 mm; the second-stage pile pressing force attenuation rate is 1.3%, which is not greater than 3%; the post-following recompression penetration is 1.5 mm, which is not greater than 3 mm. All indicators are satisfied, and the final pressing is judged to be qualified.

[0135] Example 2 In the pile foundation construction of a municipal road and bridge project, prestressed concrete pipe piles are designed with a design pile length of 12 m, and the characteristic value of vertical bearing capacity of a single pile is Ra=1500 kN. The pile end bearing layer is hard plastic residual soil, the design pile end elevation is -9.60 m, and the design required depth of the pile end entering the bearing layer is 0.8 m. The soil quality of the bearing layer in this site is relatively soft and has creep characteristics. The traditional fixed-parameter final pressing control is prone to insufficient pressing and post-construction settlement. The construction team adopted this method.

[0136] First, pre-detection of the top surface of the bearing layer is performed: during the pile sinking process of the test pile, the ratio of the average pile pressing force in the 8-9 m interval to that in the 7-8 m interval is 1.35, which falls within the 1.2-1.5 times judgment interval. It is judged that the elevation of the top surface of the bearing layer is -8.70 m, and the pre-compaction densification starting section of the engineering pile is determined to be at a position 0.6 m from the top surface of the bearing layer at the pile end.

[0137] Second, graded attenuation calibration of test pile final pressing is performed: the final pressure values of 3 test piles recorded during the final pressing stage of sinking to the design elevation are 2800 kN; within the first 5 s, the pile pressing force attenuates from 2800 kN to 2691 kN, with a first-stage pile pressing force attenuation rate of 3.9%; within the next 10 s, it attenuates from 2691 kN to 2567 kN, with a second-stage pile pressing force attenuation rate of 4.6%. Subsequently, a static load test is conducted to measure the vertical ultimate bearing capacity of a single pile Qu=2800 kN, and the final pressure value multiple coefficient K0=2800 / 1500=1.87 is calculated.

[0138] Then, the final pressing control threshold group is set: a pile length of 12 m is classified as a short pile, so the multiple value K=1.9 is selected, and the final pressure value Pf=1.9 1500 = 2850kN; initial preload P0 = 1710kN; three-stage preloads are 1140kN, 1425kN, and 1710kN; three-stage pile driving speeds are 0.6m / min, 0.35m / min, and 0.2m / min; since the bearing stratum at the pile tip is hard plastic residual soil, the first stage stabilization time is 5s and the second stage is 10s; the secondary stabilization time is the first stage stabilization time of 5s; the remaining thresholds are the same as in Example 1.

[0139] Next, the pile tip preloading and compaction were carried out in stages: when the pile tip was 0.6m away from the top surface of the bearing stratum, the pile driving speed was reduced to 0.35m / min; after the pile tip contacted the top surface of the bearing stratum (elevation -8.70m), three levels of preload were applied in sequence: 1140kN, 1425kN and 1710kN, and each was stabilized for 4-5s. The pile driving force attenuation rates were 2.6%, 2.9% and 3.0% respectively, all not exceeding 3%. The preloading and compaction were completed, and the final starting reference elevation of the compaction was recorded as -8.70m.

[0140] Then, the final pressure was increased in stages: in the first stage, the pile driving speed was increased from 1710kN to 2280kN (0.8Pf) at 0.6m / min, with a pile penetration of 3.8mm; in the second stage, the pile driving speed was increased from 2280kN to 2622kN (0.92Pf) at 0.35m / min, with a pile penetration of 6.5mm, which is greater than 5mm. Therefore, the bearing layer was determined to be relatively soft, and the final pressure value was increased by 8% to 3078kN, which was then taken as 3080kN; in the third stage, the pile driving speed was increased from 2622kN to 3080kN at 0.2m / min, with a pile penetration of 2.0mm. It should be noted that, due to the small correction range of the final pressure value, the starting point of the third pressurization stage is still 2622kN, which corresponds to 0.92 times the original final pressure value. The boundary pressure was not recalculated, and only the target peak value was adjusted to the corrected 3080kN.

[0141] Subsequently, segmented pressure stabilization was performed: In the first segment, pressure stabilization lasted 5 seconds, during which the pile driving force decreased from 3080 kN to 2982 kN, with a decrease rate of 3.2%, not exceeding 5%, thus passing the test; in the second segment, pressure stabilization lasted 10 seconds, during which the pile driving force decreased from 2982 kN to 2821 kN, with a decrease rate of 5.4%, exceeding 3%, indicating creep in the soil at the pile tip. The final pressure value was then increased by 7% to 3296 kN, resulting in a final value of 3300 kN. Pressure was then increased to 3300 kN at a driving speed not exceeding 0.2 m / min, and then segmented pressure stabilization was performed again: In the first segment, pressure decreased from 3300 kN to 3230 kN within 5 seconds, with a decrease rate of 2.1%, not exceeding 5%, thus passing the test; in the second segment, pressure decreased from 3230 kN to 3185 kN within 10 seconds, with a decrease rate of 1.4%, not exceeding 3%, thus passing the test.

[0142] Subsequently, a dynamic graded re-pressing cycle is performed (the final pressure value is set to 3300 kN): In the first round, the pressure is unloaded to 0.25Pf = 825 kN, held for 3 s, and re-pressed to 3300 kN. The re-pressing penetration is 2.4 mm, which is greater than 2 mm and fails to meet the standard, so the unloading ratio for the next round is reduced and the holding time is extended. In the second round, the pressure is unloaded to 0.20Pf = 660 kN, held for 4 s, and re-pressed to 3300 kN. The re-pressing penetration is 1.7 mm, which is not greater than 2 mm. After 5 s of re-pressing pressure stabilization, the pile pressing force attenuation rate is 4.9%, which is not greater than 5%, meeting the standard. In the third round, the pressure is unloaded to 0.15Pf = 495 kN, held for 5 s, and re-pressed to 3300 kN. The re-pressing penetration is 1.4 mm, which is not greater than 2 mm. After 5 s of re-pressing pressure stabilization, the pile pressing force attenuation rate is 4.5%, which is not greater than 5%, meeting the standard. Since two consecutive rounds meet both indicators, the re-pressing is terminated, with a total of 3 rounds.

[0143] The pile top of this pile is located above the ground, so no pile sending is required. The steps of connecting final pressing with pile sending and re-pressing compensation after pile sending are skipped, and the multi-indicator joint acceptance judgment is directly carried out: The pile top elevation reaches the design elevation, with a deviation of +15 mm, which is not greater than 50 mm; the pile tip enters the bearing layer to a depth of 0.90 m, which is not less than the design value of 0.8 m; the measured final pressure value reaches the corrected 3300 kN; the re-pressing penetration of the last round is 1.4 mm, which is not greater than 2 mm; the pile pressing force attenuation rate of the next section is 1.4%, which is not greater than 3%; the re-pressing penetration indicator after pile sending does not participate in the judgment. It is judged that the final pressing is qualified.

[0144] In the second example, the penetration warning of the second pressing section (6.5 mm is greater than 5 mm) triggers the first correction of the final pressure value, the pile pressing force attenuation rate of the next section exceeds the limit (5.4% is greater than 3%) triggers the second correction of the final pressure value, and the first round of re-pressing penetration exceeds the limit (2.4 mm is greater than 2 mm) triggers the re-pressing cycle adjustment of decreasing the unloading ratio and extending the holding time, which reflects the adaptive ability of the segmented judgment logic and cycle correction mechanism of this method to the soft creep bearing layer.

[0145] The above descriptions are merely exemplary embodiments of the present invention and do not limit the scope of protection of the present invention. Any equivalent structural transformations made using the contents of the specification and accompanying drawings of the present invention, or direct / indirect applications in other related technical fields, are included in the scope of protection of the present invention.

Claims

1. A method for controlling the final pressure of a static pressure pile, characterized in that, The method for controlling the final pressure of static piles includes: The final pressure attenuation of the test piles was calibrated by graded determination to obtain the characteristic parameters of the final pressure of the test piles. Based on the final pressure characteristic parameters of the test pile, a final pressure control threshold group is set; The piles were pre-compacted in stages at the pile tip to ensure that the pile tip entered the bearing layer and met the pre-compacting criteria. The final compaction starting elevation was recorded. The final pressure of the engineering piles is achieved by progressively increasing the pile driving force to the final pressure value with a gradually decreasing pile driving speed in each stage. Under the final pressure value, the engineering pile is stabilized in segments to obtain the attenuation rate of the first segment pile driving force and the attenuation rate of the second segment pile driving force, and the stabilization time correction or final pressure value correction is performed according to the segment judgment logic. The engineering piles are subjected to dynamic graded re-pressure cycles, with the unloading ratio decreasing in each cycle, and the termination of re-pressure is determined based on the re-pressure penetration and the pile driving force attenuation rate. The engineering piles are subjected to final pressure during pile driving and subsequent pressure compensation. The final pressure result is subject to joint acceptance and judgment based on multiple indicators.

2. The static pressure pile final pressure control method as described in claim 1, characterized in that, The step of performing final pressure graded attenuation calibration on the test piles to obtain the characteristic parameters of the final pressure of the test piles includes: Drive the test piles to the design elevation; A static load test was conducted on the tested piles to obtain the ultimate vertical bearing capacity of a single pile; Record the final pressure value during the final pressure stabilization period of the test pile; During the final pressure stabilization period of the test pile, the pile driving force is recorded according to the first pressure stabilization level and the second pressure stabilization level, and the pile driving force attenuation rate of the first pile driving force and the pile driving force attenuation rate of the second pile driving force are obtained. The final pressure value multiplier is calculated based on the final pressure value and the characteristic value of the vertical bearing capacity of a single pile.

3. The static pile final pressure control method as described in claim 2, characterized in that, The steps of recording the pile driving force according to the first stage pressure stabilization level and the second stage pressure stabilization level during the final pressure stabilization period of the test pile, and obtaining the pile driving force attenuation rate of the first stage pile driving force and the pile driving force attenuation rate of the second stage pile driving force include: Maintain the final pressure value for 3-5 seconds at the first stage of pressure stabilization, and record the initial pile driving force and the final pile driving force of the first stage. Maintain the final pressure value for 5-10 seconds at the secondary pressure stabilization level, and record the initial pile driving force and the final pile driving force of the secondary stage. Calculate the attenuation rate of the first-segment pile driving force based on the initial pile driving force and the final pile driving force of the first segment; The attenuation rate of the secondary pile driving force is calculated based on the initial pile driving force and the final pile driving force of the secondary segment.

4. The static pressure pile final pressure control method as described in claim 1, characterized in that, The steps of performing graded preloading and compaction of the pile ends to ensure that the pile ends enter the bearing layer and meet the preloading and compaction criteria, and recording the final compaction starting reference elevation, include: When the pile tip is 0.5 to 1.0 m from the top surface of the bearing stratum, reduce the pile driving speed to 0.3 to 0.5 m / min; After the pile tip contacts the top surface of the bearing stratum, the first preload, the second preload and the third preload are applied in sequence, and each preload is stabilized. When the pile driving force attenuation rate during a certain level of preloading stabilization is not greater than the preloading compaction attenuation threshold, the preloading compaction of that level is deemed complete. After each stage of preloading and compaction is completed, the elevation of the pile end is recorded as the final compaction starting reference elevation.

5. The static pile final pressure control method as described in claim 4, characterized in that, After the pile end contacts the top surface of the bearing stratum, a first preload, a second preload, and a third preload are applied sequentially, and the steps for stabilizing each level of preload include: Apply the first pre-pressure to 0.35 to 0.45 times the final pressure value and stabilize the pressure for 3 to 5 seconds; Apply the second pre-pressure to 0.45 to 0.55 times the final pressure value and stabilize the pressure for 3 to 5 seconds; Apply the third pre-pressure to 0.55 to 0.65 times the final pressure value and stabilize the pressure for 4 to 6 seconds; The pre-compression attenuation threshold is 3%.

6. The static pile final pressure control method according to any one of claims 1 to 5, characterized in that, Before the steps of performing graded preloading and compaction of the pile tip to allow the pile tip to enter the bearing stratum and meet the preloading and compaction judgment conditions, and recording the final pressure starting reference elevation, the static pressure pile final pressure control method further includes: During the test pile driving process, the driving force is recorded for each unit depth of the pile penetration, forming a driving force record that varies with the penetration depth. The top surface of the first depth interval of the sudden increase segment in pile driving force in the pile driving force record is determined as the elevation of the top surface of the bearing layer; The preloading and compaction starting section of the engineering pile is determined based on the elevation of the top surface of the bearing stratum.

7. The static pressure pile final pressure control method as described in claim 6, characterized in that, The step of determining the top surface of the first depth interval of the sudden increase segment in pile driving force in the pile driving force record as the elevation of the top surface of the bearing layer includes: The pile penetration depth is divided into multiple equal depth intervals; Calculate the average pile driving force for each of the aforementioned depth intervals; The top surface of the first depth interval where the average pile driving force exceeds 1.2 to 1.5 times the average pile driving force of the adjacent previous depth interval is determined as the top surface elevation of the bearing layer.

8. The method for controlling the final pressure of a static pile as described in claim 4, characterized in that, The step of progressively increasing the pile driving force to the final pressure value by gradually decreasing the pile driving speed in each stage includes: First pressurization stage: The pile driving force is increased to 0.8 times the final pressure value at a pile driving speed of 0.6 to 1.0 m / min; Second pressurization stage: The pile driving force is increased to 0.92 times the final pressure value at a pile driving speed of 0.3 to 0.5 m / min; The third pressurization stage: the pile driving force is increased to the final pressure value at a pile driving speed of no more than 0.2 m / min; Record the pile driving force and pile top penetration in each pressurized section.

9. The static pressure pile final pressure control method as described in claim 8, characterized in that, The steps of performing segmented pressure stabilization on the engineering piles under the final pressure value, obtaining the attenuation rate of the first segment pile driving force and the attenuation rate of the second segment pile driving force, and performing pressure stabilization duration correction or final pressure value correction according to the segmented determination logic include: Obtain the pile top penetration depth of the second pressurized section. When the pile top penetration depth of the second pressurized section is greater than 5 mm, increase the final pressure value by 5% to 10%. Under the corrected final pressure value, the first stage of pressure stabilization was carried out, and the attenuation rate of the first stage pile driving force was calculated. When the attenuation rate of the first stage pile driving force is greater than the attenuation threshold of the first stage, the first stage stabilization time is extended and the first stage stabilization is repeated. Under the corrected final pressure value, the secondary stage pressure stabilization was carried out, and the secondary stage pile driving force attenuation rate was calculated. When the attenuation rate of the secondary pile driving force is greater than the attenuation threshold of the secondary stage, the final pressure value is increased by 5% to 10%, and the segmented pressure stabilization is performed again with the revised final pressure value. The attenuation threshold for the first segment is 5%, and the attenuation threshold for the second segment is 3%.

10. The static pressure pile final pressure control method as described in claim 9, characterized in that, The steps of dynamically graded reloading cycles for engineering piles, gradually reducing the unloading ratio, and determining the termination of reloading based on the reloading penetration and pile driving force attenuation rate include: Unload the pile driving force to the unloading pressure of this round, pause, and then repressurize to the final pressure value to obtain the repressurization penetration and repressurization stabilization attenuation rate of this round of repressurization. When the repressurization penetration amount is greater than the penetration amount threshold or the repressurization stabilization attenuation rate is greater than the repressurization attenuation threshold, the unloading pressure of the next round of repressurization is reduced and the pause time of the next round of repressurization is extended, and the dynamic graded repressurization cycle is repeated. The repressing process is terminated when the repressing penetration amount of two consecutive repressing cycles is not greater than the penetration amount threshold and the repressing stabilization attenuation rate is not greater than the repressing attenuation threshold. The unloading pressure of the first round of repressurization is 0.25 times the final pressure value, the unloading pressure of the second round of repressurization is 0.2 times the final pressure value, the unloading pressure of the third round of repressurization is 0.15 times the final pressure value, the penetration threshold is 2 mm, and the repressurization attenuation threshold is 5%.