Combined steel frame advanced pre-stressed slot section flow state solidified soil pouring device and method

By using a combined steel frame pre-supported trench section fluidized solid soil grouting device, the problem of trench wall collapse caused by incomplete grouting of the combined steel frame pre-supported trench section was solved, achieving efficient, economical and environmentally friendly grouting effect, ensuring the safety of the surrounding environment and improving the reusability of the steel frame.

CN123153409APending Publication Date: 2026-11-24SHANGHAI FOUNDATION ENGINEERING GROUP CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611171730.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-04
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing technologies cannot achieve the required density for concrete pouring within the limited space of a pre-supported section of a composite steel frame, leading to the risk of trench wall collapse and impacting the safety of the surrounding environment.

Method used

A combined steel frame pre-supported trench section fluidized solidified soil injection device is adopted. Through components such as reinjection pipe, one-way valve and connecting conversion head, fluidized solidified soil is injected in a limited space. The self-compacting property of fluidized solidified soil is used to fill the gaps in the trench section and avoid collapse.

Benefits of technology

It achieves efficient, economical, and environmentally friendly grouting within a limited space, avoids trench wall collapse, ensures the safety of surrounding structures, and improves the reusability of the steel frame.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123153409A_ABST
    Figure CN123153409A_ABST
Patent Text Reader

Abstract

This invention discloses a combined steel frame pre-supported trench section fluidized solidified soil grouting device and method, including a connecting adapter, a grout pipe, a combined steel frame, a return pipe, a one-way valve, and a base plate. After the return pipe is tied to the combined steel frame, the one-way valve is installed at the bottom of the return pipe. As the combined steel frame is slowly lowered into place in the trench section, the return pipe and the grout pipe are quickly and sealed together using the connecting adapter. The grout pipe is then connected to pre-mixed fluidized solidified soil for trench section grouting. This invention provides a feasible grouting method for combined steel frame pre-supported trench sections within a limited space, ensuring dense grouting, preventing trench wall collapse, and guaranteeing the safety of surrounding pipelines, roads, and structures. Simultaneously, the new grouting method achieves high efficiency, economy, and environmental protection.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of underground space foundation pit excavation technology, specifically a method and device for injecting fluidized solidified soil into a pre-supported trench section of a combined steel frame. Background Technology

[0002] As the depth of urban underground space development in my country increases, the excavation depth and breadth also expand, significantly increasing the difficulty of controlling foundation pit deformation. The pre-support technology using a composite steel frame actively controls foundation pit deformation by applying pre-stressing forces before excavation. The pre-supported trench sections need to be poured after the composite steel frame is lowered into place to form dense trench sections.

[0003] The conventional trench section adopts the form of underwater concrete pouring, that is, a guide pipe of the same depth as the trench section is lowered, and concrete is poured from the bottom of the trench upwards using the guide pipe method. The concrete's own weight squeezes the mud, causing it to overflow from the trench opening, realizing "mud replacement" and finally forming a concrete wall.

[0004] After the pre-supported trench section is placed in the combined steel frame, the gap between the trench section and the two sides of the steel frame is limited, making it impossible to lay φ300 outer diameter grouting pipes. If the trench section is not grouted in time or the grouting is not dense, it will cause the trench wall to become unstable or collapse, causing settlement and cracking of surrounding roads, pipelines or buildings.

[0005] Among existing related patent technologies, such as the grouting construction device for the toe of a continuous underground wall disclosed in patent document (CN217027102U), the core technical solution of this patent focuses on the microscopic pipeline connection structure. It mainly uses mechanical structures such as an arc-shaped fixing plate, mounting plate, insert block, insert rod, and return spring to achieve rapid clamping and fixing of the discharge pipe and the delivery pipe. The sealing block compresses the gas in the sealing chamber, causing the airbag plate to expand, thereby sealing the pipeline interface and preventing grout waste. However, this patent cannot solve the risk of collapse during the "initial pouring period." The device in this patent is used only after the wall is formed and the concrete has hardened; it cannot intervene in or solve the immediate risk of trench wall collapse caused by insufficient compaction of the initial concrete pouring. This patent only involves the fixing of the joint between the "grouting machine discharge pipe" and the "delivery pipe" on the ground or operating platform, and does not address the layout, outer diameter, or spatial adaptability of the conduits within the underground trench section. Even with the fastest connection and best seal, the patented arc-shaped fixing and sealing device cannot change the physical outer diameter of the conduit itself, and therefore cannot solve the problem of the conduit not being able to descend. This patent is merely a passive pipe connector, lacking any functions such as flow monitoring, pressure feedback, mud replacement rate detection, or assisting concrete flow, and makes no technological contribution to improving "grouting density".

[0006] Therefore, in order to solve the above-mentioned problems of pre-supported trench grouting, a completely new method of trench grouting is required, which can solve both the grouting method in a limited space and the deformation of the surrounding environment caused by incomplete grouting. Summary of the Invention

[0007] The purpose of this invention is to provide a fluidized solidified soil grouting device and method for pre-supported ...

[0008] To achieve the above objectives, the present invention provides the following technical solution:

[0009] A combined steel frame pre-supported trench section fluidized solidified soil grouting device includes a connecting conversion head, a grout pipe, a combined steel frame, a return pipe, a one-way valve, and a base plate. After the return pipe is tied to the combined steel frame, the one-way valve is installed at the bottom of the return pipe. As the combined steel frame is slowly lowered into the trench section, the return pipe and the grout pipe are quickly and sealed together by the connecting conversion head. The grout pipe is then connected to the pre-mixed fluidized solidified soil for trench grouting.

[0010] Furthermore, the long and short pipes of the reinjection pipe are connected to the modular steel frame, and each intersection is tied with no less than one wire to prevent the reinjection pipe from falling off during the hoisting and lowering of the modular steel frame.

[0011] Furthermore, after the recharge pipe is fixed on the combined steel frame, a one-way valve is installed at the bottom of each recharge pipe. The one-way valve is connected to the recharge pipe by a threaded connection, and the one-way valve is 300~500mm away from the bottom of the trench section.

[0012] Furthermore, the connecting adapter includes a water hose, a first mounting block, a connector, a connecting block, a connecting pipe, a leak-proof ring, a second mounting block, a rotating shaft, and threads. One end of the connecting pipe has a leak-proof ring and a second mounting block, and the end of the connecting pipe away from the second mounting block has a connecting block and a first mounting block. One end of the connecting pipe has a groove, and the connecting pipe has a connector inside. The connector has a connecting block on its outer side, and a water hose at its bottom. The end of the connecting pipe away from the leak-proof ring has a rotating shaft. There are two sets of rotating shafts, which are fitted against the outer side of the second mounting block. There are also two sets of second mounting blocks, both of which are semi-circular structures and are movably connected to the first mounting block. One end of the connecting pipe has threads.

[0013] Furthermore, the connector is a hollow, non-closed cylindrical structure, and the connector is made of metal. The connector is movably connected to the connecting pipe. The connecting block is a raised structure around the outside of the connector, and the connecting block fits into the groove inside the connecting pipe. The groove inside the connecting pipe fits into the inner wall of the connecting pipe, and the cross-section of the groove is circular.

[0014] Furthermore, the leak-proof ring is made of water-swellable rubber and is fitted to the surface of the connecting pipe.

[0015] Furthermore, the one-way valve uses a high-strength black iron pipe as its main structure. Multiple slurry outlet holes are drilled on the outer shell of the black iron pipe, and a cap is provided at the bottom. The outer shell of the one-way valve is wrapped with a sealing ring to prevent external cement slurry from entering the interior of the one-way valve and causing blockage.

[0016] A method for injecting fluidized solidified soil into a pre-supported trench section using a combined steel frame, employing the aforementioned device, firstly... The required slurry is fed into the mixing tank, and a special solidifying agent is added to the mixing tank and mixed thoroughly. The specific gravity of the mixed fluidized solidified soil is measured. The required fluidized solidified soil is pumped into the reinjection pipe through the slurry pipe and reinjected evenly into the trench section. As the fluidized solidified soil liquid level gradually rises, a designated person measures the height of the reinjection liquid level. When the slurry liquid level and the fluidized solidified soil liquid level in the trench are about to reach the bottom of the buried short reinjection pipe, the connecting adapter is switched to the upper end of the short pipe of the reinjection pipe. The short pipe of the reinjection pipe is used for reinjection until the reinjection is completed. Finally, the connecting adapter is removed.

[0017] Furthermore, a specialized mixing tank is used to prepare the fluidized solidified soil. A slurry with a density of 1.25-1.30 is introduced into the mixing tank, along with a specialized solidifying agent. A specially designed power mixer is used to repeatedly stir the slurry in all directions for at least 5 minutes each time, ensuring the solidifying agent is fully dissolved in the slurry. Next, the density of the fluidized solidified soil in the mixing tank is measured. When the specific gravity of the fluidized solidified soil is exactly between 1.40 and 1.45, it is pumped into the trench section using a slurry pump to replace the slurry in the trench. During pumping, two long pipes are connected, and the fluidized solidified soil is gradually filled and compacted at the bottom of the trench through a one-way valve at the bottom of the long pipes. Simultaneously, the slurry at the bottom is pushed upwards. This synchronous backfilling through both pipes greatly improves the pouring efficiency. When the liquid levels of both materials approach the bottom of the short pipe, the pipes are switched to the upper joint to continue backfilling. The displaced slurry is simultaneously pumped into the mixing tank as raw material for preparing the fluidized solidified soil.

[0018] Furthermore, the self-compacting property of fluidized solidified soil relies on gravity for natural flow, and the cementing substances tightly lock the soil particles, filling all voids within the trench section, effectively reducing settlement problems caused by incomplete backfilling. After hardening, fluidized solidified soil exhibits high impermeability and rapid early strength gain, quickly providing lateral restraint.

[0019] Compared with the prior art, the present invention has the following advantages: This invention provides a feasible grouting method within a limited space for pre-supported trench sections of combined steel frames, ensuring dense grouting, preventing trench wall collapse, and guaranteeing the safety of surrounding pipelines, roads, and structures. At the same time, the new grouting method achieves high efficiency, economy, and environmental protection. Attached Figure Description

[0020] Figure 1 Schematic diagram of a combined steel frame fluidized solidified soil recharge system; Figure 2 A schematic diagram of the disassembled structure of the connector adapter; Figure 3 This is a schematic diagram of the one-way valve at the bottom of the recharge pipe; In the diagram: 1. Connecting adapter; 2. Grout pipe; 3. Fluidized solidified soil; 4. Composite steel frame; 5. Recharge pipe; 6. Diaphragm wall; 7. Check valve; 8. Base plate; 9. Water hose; 10. First mounting block; 11. Joint; 12. Connecting block; 13. Connecting pipe; 14. Leak-proof ring; 15. Second mounting block; 16. Shaft; 17. Thread; 19. Black iron pipe; 20. Grout outlet; 21. End cap. Detailed Implementation

[0021] The present invention will now be described in further detail with reference to the accompanying drawings and embodiments.

[0022] like Figures 1 to 3 As shown in the figure, the present invention provides a combined steel frame pre-supported trench section fluidized solidified soil injection device, including a connecting conversion head 1, a grout pipe 2, a combined steel frame 4, a reinjection pipe 5, a one-way valve 7, a base plate 8, a water hose 9, a first mounting block 10, a joint 11, a connecting block 12, a connecting pipe 13, a leak-proof ring 14, a second mounting block 15, a rotating shaft 16, a thread 17, a black iron pipe 19, a grout outlet 20, and a sealing head 21.

[0023] After the reinjection pipe 5 is tied to the combined steel frame 4, the one-way valve 7 is installed at the bottom of the grouting pile. As the combined steel frame 4 is slowly lowered into the trench section, the reinjection pipe 5 and the grout pipe 2 are quickly sealed and connected by the connecting conversion head 1. Then the grout pipe 2 is connected to the pre-mixed fluidized solidified soil 3 for trench grouting.

[0024] The long and short pipes of the reinjection pipe 5 are connected to the combined steel frame 4 respectively. At each intersection, no less than 3 lead wires are used for binding to prevent the reinjection pipe 5 from falling off during the hoisting and lowering of the combined steel frame 4.

[0025] After the recharge pipe 5 is firmly fixed to the combined steel frame 4, a one-way valve 7 is installed at the bottom of each recharge pipe 5. The one-way valve 7 is connected to the recharge pipe 5 by a threaded connection, and the connection must be tightened. Check the installation position of the one-way valve 7 to ensure that the one-way valve 7 is about 300~500mm away from the bottom of the trench section.

[0026] The connection between the reinjection pipe 5 and the grout pipe 2 is made using a special connection adapter 1, which features fast and efficient connection, high sealing performance, and leak-proof characteristics.

[0027] like Figure 2 As shown, the connecting adapter 1 includes a water hose 9, a first mounting block 10, a connector 11, a connecting block 12, a connecting pipe 13, a leak-proof ring 14, a second mounting block 15, a rotating shaft 16, and a thread 17.

[0028] A leak-proof ring 14 and a second mounting block 15 are provided at one end of the outer side of the connecting pipe 13, and a connecting block 12 and a first mounting block 10 are provided at the other end of the outer side of the connecting pipe 13 away from the second mounting block 15. A groove is provided at one end of the inner side of the connecting pipe 12, and a connector 11 is provided inside the connecting pipe 12. A connecting block 12 is provided on the outer side of the connector 11, and a water hose 9 is provided at the bottom end of the connector 11.

[0029] The leak-proof ring 14 is made of water-swellable rubber and is fitted to the surface of the connecting pipe 13. A rotating shaft 16 is provided on the outer side of the connecting pipe 13 away from the leak-proof ring 14. There are two sets of rotating shafts 16, which are fitted to the outer side of the second mounting block 15. There are two sets of second mounting blocks 15, both of which are semi-arc structures and are movably connected to the first mounting block 10. A thread 17 is provided on one end inside the connecting pipe 13.

[0030] The connector 11 is a hollow, non-closed cylindrical structure and is made of metal. The connector 11 is movably connected to the connecting pipe 13.

[0031] The connecting block 12 is a raised structure around the outside of the connector, and the connecting block 12 fits into the groove inside the connecting pipe 13. The groove inside the connecting pipe 13 is fitted into the inner wall of the connecting pipe, and the cross-section of the groove is circular.

[0032] Fluidized solidified soil is made by mixing a special solidifying agent with a mud slurry with a density of 1.25 to 1.30, stirring it evenly, and then pumping it to the reinjection pipe for in-trench reinjection construction.

[0033] The connection between the recharge pipe 5 and the combined steel frame 4 is made by binding with lead wire. All contact points must be firmly bound to prevent the recharge pipe from falling off.

[0034] One-way valve 7 is pre-installed at the bottom of each reinjection pipe 5 and is lowered into the trench section together with the reinjection pipe 5.

[0035] like Figure 3 As shown, the one-way valve 7 typically uses a section of high-strength black iron pipe 19 as its main structure. Multiple slurry outlet holes 20 are drilled on the outer shell of the black iron pipe 19, and a cap 21 is provided at the bottom. The outer shell of the one-way valve 7 is wrapped with a sealing ring to prevent external cement slurry from entering the valve body and causing blockage.

[0036] Please see the appendix Figures 1-3 The working principle of this invention is as follows: The required slurry is input into the mixing tank 3. A special solidifying agent is added to the mixing tank 3 and thoroughly mixed with the slurry. The specific gravity of the mixed fluidized solidified soil 3 is measured. The required fluidized solidified soil 3 is pumped through the slurry pipe 2 to the reinjection pipe 5. A one-way valve 7 is connected to the bottom of the reinjection pipe 5, which acts as a one-way check valve. This device uniformly reinjects the fluidized solidified soil 3 into the trench section. As the liquid level of the fluidized solidified soil 3 gradually rises, a designated person measures the height of the reinjection liquid level. When the slurry liquid level and the fluidized solidified soil 3 liquid level in the trench are about to reach the bottom of the buried short reinjection pipe, the connecting conversion head 1 is switched to the upper end of the short pipe. The short reinjection pipe is used for reinjection until the reinjection is completed. Finally, the connecting conversion head 1 is removed.

[0037] A dedicated mixing tank is used for mixing the fluidized solidified soil. A slurry with a density of 1.25-1.30 is introduced into the tank, along with a special solidifying agent. A specially designed power mixer is used to repeatedly stir the slurry in all directions for at least 5 minutes each time, ensuring the solidifying agent is fully dissolved. The density of the fluidized solidified soil in the mixing tank is then measured. When the density is exactly between 1.40 and 1.45, the fluidized solidified soil is pumped into the trench section to replace the existing slurry. During pumping, two long pipes are connected, and the fluidized solidified soil is gradually filled and compacted at the bottom of the trench through a one-way valve at the bottom of the long pipes. Simultaneously, the slurry at the bottom is pushed upwards. This synchronous backfilling through both pipes greatly improves casting efficiency. When the liquid levels of both materials approach the bottom of the short pipe, the backfilling is continued at the upper joint of the short pipe. The displaced slurry is simultaneously pumped back into the mixing tank as raw material for mixing the fluidized solidified soil.

[0038] The self-compacting property of fluidized solidified soil 3 relies on gravity for natural flow. It tightly binds soil particles with cementing substances, filling all voids within the trench section and effectively reducing settlement problems caused by insufficient backfill compaction. After hardening, fluidized solidified soil exhibits high impermeability and rapid early strength gain, quickly providing lateral restraint. Trench sections grouted with fluidized solidified soil are more economical than those grouted with concrete. Furthermore, the composite steel frame 4 within the trench section is easier to remove during subsequent stripping, significantly improving the reuse rate of the steel frame and making it more economical and environmentally friendly.

[0039] The embodiments described above are merely preferred embodiments of the present invention and are not intended to limit the invention. Those skilled in the art can make various changes and modifications without departing from the concept and scope of the present invention. Therefore, all technical solutions obtained by equivalent substitution or equivalent transformation fall within the protection scope of the present invention.

Claims

1. A combined steel frame pre-supported trench section fluidized solidified soil injection device, characterized in that: The system includes a connecting adapter, grout pipe, combined steel frame, reinjection pipe, one-way valve, and base plate. After the reinjection pipe is tied to the combined steel frame, the one-way valve is installed at the bottom of the reinjection pipe. As the combined steel frame is slowly lowered into place in the trench section, the reinjection pipe and grout pipe are quickly and sealed together using the connecting adapter. The grout pipe is then connected to the pre-mixed fluidized solidified soil for trench grouting.

2. The combined steel frame pre-supported trench section fluidized solidified soil injection device according to claim 1, characterized in that: The long and short pipes of the reinjection pipe are connected to the modular steel frame, and each intersection is tied with no less than one wire to prevent the reinjection pipe from falling off during the hoisting and lowering of the modular steel frame.

3. The combined steel frame pre-supported trench section fluidized solidified soil injection device according to claim 1, characterized in that: After the recharge pipes are fixed to the combined steel frame, a one-way valve is installed at the bottom of each recharge pipe. The one-way valve is connected to the recharge pipe with a threaded connection, and the one-way valve is 300~500mm away from the bottom of the trench section.

4. The combined steel frame pre-supported trench section fluidized solidified soil injection device according to claim 1, characterized in that: The adapter includes a water hose, a first mounting block, a connector, a connecting block, a connecting pipe, a leak-proof ring, a second mounting block, a rotating shaft, and threads. One end of the connecting pipe has a leak-proof ring and a second mounting block, while the end of the connecting pipe furthest from the second mounting block has both a connecting block and a first mounting block. One end of the connecting pipe has a groove, and the connecting pipe has a connector inside. The connector has a connecting block on its outer side, and a water hose at its bottom. Two sets of rotating shafts are located on the outer side of the connecting pipe furthest from the leak-proof ring. These two sets of rotating shafts are fitted against the outer side of the second mounting block. There are also two sets of second mounting blocks, both of which are semi-circular structures and are movably connected to the first mounting block. One end of the connecting pipe has threads.

5. The combined steel frame pre-supported trench section fluidized solidified soil injection device according to claim 4, characterized in that: The connector is a hollow, non-closed cylindrical structure made of metal, and is movably connected to the connecting pipe. The connecting block is a raised structure around the outside of the connector, and fits into the groove inside the connecting pipe. The groove inside the connecting pipe fits into the inner wall of the connecting pipe, and the cross-section of the groove is circular.

6. The combined steel frame pre-supported trench section fluidized solidified soil injection device according to claim 4, characterized in that: The leak-proof ring is made of water-swellable rubber and is fitted to the surface of the connecting pipe.

7. The combined steel frame pre-supported trench section fluidized solidified soil injection device according to claim 1, characterized in that: The one-way valve uses a high-strength black iron pipe as its main structure. Multiple slurry outlet holes are drilled on the outer shell of the black iron pipe, and a cap is provided at the bottom. The outer shell of the one-way valve is wrapped with a sealing ring to prevent external cement slurry from entering the interior of the one-way valve and causing blockage.

8. A method for injecting fluidized solidified soil into a pre-supported trench section of a combined steel frame, using the apparatus described in any one of claims 1-7, characterized in that: First, the required slurry is fed into the mixing tank. A special solidifying agent is added to the mixing tank and thoroughly mixed with the slurry. The specific gravity of the mixed fluidized solidified soil is measured. The required fluidized solidified soil is then pumped into the reinjection pipe through the slurry pipe. The fluidized solidified soil is then evenly reinjected into the trench section. As the fluidized solidified soil level gradually rises, a designated person measures the height of the reinjection liquid level. When the slurry level and the fluidized solidified soil level in the trench are about to reach the bottom of the buried short reinjection pipe, the connecting adapter is switched to the upper end of the short reinjection pipe. The short reinjection pipe is then used for reinjection until the reinjection is completed. Finally, the connecting adapter is removed.

9. The method according to claim 8, characterized in that: A special mixing tank is used to mix the fluidized solidified soil. A slurry with a density of 1.25~1.30 is input into the mixing tank, and a special solidifying agent is added. A specially designed power mixer is used to repeatedly stir the slurry up, down, left, and right for at least 5 minutes each time to ensure the solidifying agent is fully dissolved in the slurry. Next, the density of the fluidized solidified soil in the mixing tank is measured. When the specific gravity of the fluidized solidified soil is exactly between 1.40 and 1.45, a slurry pump is used to pump the fluidized solidified soil into the trench section to replace the slurry in the trench. During pumping, the long pipes of the two return pipes are connected first. The one-way valve at the bottom of the long pipe outputs the fluidized solidified soil to gradually fill and compact the bottom of the trench, while simultaneously pushing the slurry upwards. The synchronous return of the two long pipes greatly improves the pouring efficiency. When the liquid levels of the two materials are close to the bottom of the short return pipe, the connection is changed to the upper joint of the short return pipe to continue the return process. The displaced slurry is simultaneously pumped into the mixing tank as raw material for mixing the fluidized solidified soil.

10. The method according to claim 8, characterized in that: The self-compacting property of fluidized solidified soil relies on gravity to flow naturally. It tightly locks soil particles through cementing substances, filling all voids in the trench section. This can effectively reduce settlement problems caused by incomplete backfilling. After hardening, fluidized solidified soil has high impermeability and rapid early strength growth, which can quickly provide lateral restraint.

Citation Information

Patent Citations

  • Underground diaphragm wall toe post-grouting construction device

    CN217027102U