Middle strip belt open ditch template assembly and middle strip belt open ditch and water collecting well integrated construction method

By adopting a construction method that combines segmented steel formwork components and positioning clamps with integrated formwork components for median strip open ditches and integrated water collection wells, the problems of insufficient rigidity and poor precision in traditional median strip open ditch construction have been solved, achieving efficient and reliable drainage system construction and improving construction quality and efficiency.

CN123153473APending Publication Date: 2026-11-24SHANDONG LUQIAO GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611517758.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-29
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Traditional open ditch construction with median strips suffers from problems such as insufficient rigidity, easy bulging and deformation of formwork, low turnover rate, and poor processing precision at joints, leading to common quality defects such as poor drainage, grout leakage, and structural seepage.

Method used

The central section open ditch template assembly is composed of multiple open ditch segmented steel formwork components and positioning clamps, combined with the independent integral steel formwork assembly of the sump well. Through bolt connection and precise verification of positioning clamps, the construction accuracy and rigidity are ensured, and stainless steel cladding is used to improve the surface smoothness.

Benefits of technology

It significantly improved construction quality and efficiency, ensured the integrity and waterproof performance of the drainage system, reduced formwork wear, improved construction accuracy and appearance quality, and reduced the risk of water damage during operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123153473A_ABST
    Figure CN123153473A_ABST
Patent Text Reader

Abstract

This invention relates to the field of open ditch construction technology, and particularly to a formwork assembly for an open ditch with a median strip and an integrated construction method for the open ditch and sump. It addresses the shortcomings of existing technologies, such as insufficient rigidity, easy bulging and deformation, and limited reuse. By employing multiple segmented steel formwork assemblies for the open ditch and using positioning clamps for positioning, the overall rigidity is significantly improved, preventing deformation and formwork displacement during pouring and allowing for multiple reuses. The main components include: multiple segmented steel formwork assemblies for the open ditch; an independent integrated steel formwork assembly for the sump, comprising two C-shaped steel formwork assemblies distributed laterally, each C-shaped steel formwork assembly including two sump steel formwork templates distributed laterally; and multiple positioning clamps, each positioning clamp including a laterally distributed positioning beam, on which two sets of clamp assemblies are fitted, each clamp assembly including two positioning plates located on the left and right outer sides of the single-sided wall steel formwork assembly of the open ditch.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of open ditch construction technology, and in particular to a formwork assembly for an open ditch with a median strip and an integrated construction method for the open ditch with a median strip and a collection well. Background Technology

[0002] The silty soil of the Yellow River alluvial plain has poor soil stability, making highways susceptible to water damage from rainfall. In superelevation sections, water runoff is concentrated and discharged from one side, with the median strip ditch being the core drainage system. Its construction quality directly determines drainage efficiency and long-term roadbed stability. Insufficient construction precision can easily lead to poor road surface drainage and rainwater seepage into the median strip fill. Poor alignment control on curved sections can also cause drainage blockages under extreme rainfall conditions, exacerbating the risk of water damage.

[0003] Traditional open ditch construction with median strips often uses bamboo plywood or plastic steel sheet formwork, which generally suffers from insufficient rigidity, easy bulging and deformation, and low turnover rate. After repeated use, the surface becomes rough and fuzzy, which seriously affects the appearance quality of the concrete. In addition, the processing precision at the connection between the open ditch and the collection well is poor, and the assembly gap is large, which easily leads to common quality problems such as grout leakage and structural water seepage. Summary of the Invention

[0004] This invention provides a formwork assembly for a centrally located open ditch and an integrated construction method for the centrally located open ditch and water collection well. It solves the defects of existing technologies, such as insufficient rigidity, easy bulging and deformation, and low number of reuses. By using multiple open ditch segmented steel formwork assemblies and positioning them with positioning clamps, the overall rigidity is greatly improved, making it less prone to deformation and displacement during the pouring process, and enabling multiple reuses.

[0005] This invention is achieved through the following technical solution: A type of open ditch template assembly with a central dividing strip, comprising: Multiple open ditch segmented steel formwork components, each comprising two left-right distributed open ditch single-side wall steel formwork components, each comprising two left-right distributed side wall steel formwork panels. The independent integral steel formwork assembly for the water collection well includes two C-shaped steel formwork assemblies distributed on the left and right, wherein the C-shaped steel formwork assembly includes two water collection well steel formwork assemblies distributed on the left and right. Multiple positioning clamps, each including a positioning beam distributed laterally on the left and right sides, and two sets of clamping assemblies fitted on the positioning beams, each clamping assembly including two positioning plates located on the left and right outer sides of the steel formwork assembly of the single side wall of the open ditch.

[0006] Furthermore, in the same open ditch single-side wall steel formwork assembly, the inner surfaces of both side wall steel formworks are provided with stainless steel facing.

[0007] Furthermore, the top of the positioning plate is provided with a sleeve, which is slidably fitted onto the positioning beam.

[0008] Furthermore, the cross-section of the positioning beam is square, and the positioning beam is provided with a number of elongated insertion holes with evenly distributed gaps along its length. When the two positioning plates of the clamping assembly are set on the left and right outer sides of the steel formwork assembly of the open ditch single-side wall, an insert plate is detachably inserted into the elongated insertion hole located on the outside of the sleeve and overlapping with the sleeve. The insert plate has a wedge-shaped surface on one side near the sleeve.

[0009] Furthermore, the thickness of the stainless steel veneer is 1-2 mm.

[0010] Furthermore, the independent integral steel formwork assembly of the water collection well and the segmented steel formwork assembly of the open ditch are detachably connected by bolts.

[0011] A method for integrated construction of a median strip open ditch and a collection well, using the aforementioned median strip open ditch formwork assembly for integrated construction of the median strip open ditch and collection well, includes the following steps: S10. Measure and lay out the lines to determine the center line of the open ditch and the location of the well. S20, Excavate the foundation of the open ditch; S30. Concrete is poured at the base of the open ditch to form the bottom slab of the open ditch; S40. Install multiple open ditch segmented steel formwork and initially fix them; S50. Install the independent integral steel formwork assembly for the water collection well, so that the front and rear ends of the independent integral steel formwork assembly for the water collection well are connected to the segmented steel formwork of the open ditch. S60. Install positioning clamps on the steel formwork of each open ditch segment. The two positioning plates of each clamp assembly are located on the left and right outer sides of the open ditch single-side wall steel formwork assembly, respectively. Check the spacing between the two open ditch single-side wall steel formwork assemblies and the spacing and alignment of the two side wall steel formworks in the same open ditch single-side wall steel formwork assembly. S70. Pour concrete and compact it in layers using vibration. S80, after reaching the required strength, remove from the mold for cleaning and reuse.

[0012] Furthermore, in step S70, before pouring concrete, a release agent is applied to the template surfaces of the side wall steel template and the water collection well steel template.

[0013] Furthermore, in step S70, after pouring the concrete, the top surface of the poured concrete is leveled and smoothed to ensure drainage slope.

[0014] The beneficial effects achieved by this invention compared with the prior art are as follows: 1. Multiple segmented steel formwork components for open ditches are used and positioned with positioning clamps, which greatly improves the overall rigidity, making it less prone to deformation and displacement during pouring, and allowing for multiple reuses. A single set of clamp components can fix the steel formwork component of one side wall of the open ditch, accurately controlling the thickness of the side wall and avoiding uneven wall width. Two sets of clamp components can lock the relative distance between the two side walls to ensure uniform cross-sectional dimensions of the open ditch. The integrated construction method of the centrally located open ditch and water collection well of this invention significantly improves construction efficiency. The modular assembly of the formwork reduces the time for single installation, dismantling, and adjustment by 35% compared to traditional methods, with a particularly noticeable improvement in alignment control efficiency. It also boasts high durability and reusability; the steel formwork system can be repeatedly reused with a low loss rate, greatly reducing the frequency of formwork replacement. 2. Develop an independent, integrated steel formwork assembly for the sump well, connecting the front and rear ends of the assembly to the segmented steel formwork of the open ditch. This design ensures the integrity of the concrete pouring, eliminates the risk of leakage at the joints from the source, and improves the waterproof performance and appearance integrity of the structure. 3. The template adopts a composite structure of "3mm steel template + 1mm stainless steel cladding". Compared with traditional bamboo plywood and plastic steel board, the overall rigidity is greatly improved, and it is not easy to deform and run away during the pouring process. The stainless steel cladding has a high degree of smoothness, and the concrete surface is flat and smooth after molding, which can reduce the later grinding process. Moreover, it can still maintain the surface integrity after repeated use, solving the problem of the appearance quality of traditional templates dropping sharply after multiple uses. 4. The top of the positioning plate is provided with a sleeve, which is slidably fitted on the positioning beam. The relative position of the positioning plate can be changed by sliding the sleeve, supporting stepless adjustment to adapt to different cross-sectional specifications, and greatly improving the straightness of the open ditch and construction accuracy. Attached Figure Description

[0015] Figure 1 This is a three-dimensional schematic diagram of the median strip open ditch template assembly described in this invention; Figure 2 This is a schematic diagram showing the cooperation between the positioning plate and the side wall steel formwork described in this invention; Figure 3 This is a schematic diagram of the open ditch pouring in the median strip as described in this invention; Figure 4 This is a diagram showing the usage status of the median strip open ditch template assembly described in this invention; In the diagram: 1. Steel formwork assembly for one side wall of open ditch; 11. Steel formwork for side wall; 2. C-shaped steel formwork assembly; 21. Steel formwork for sump well; 3. Positioning beam; 31. Positioning plate; 32. Sleeve; 33. Long insertion hole; 4. Stainless steel cladding; 5. Insert plate. Detailed Implementation

[0016] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of this application.

[0017] In the description of the invention, it should be understood that the terms "front", "rear", "up", "down", "left", "right", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing the invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limiting the invention.

[0018] Example 1 For construction purposes, a centrally located open ditch with a water collection well is to be poured, such as... Figure 1-2 As shown, this embodiment discloses a centrally located open ditch formwork assembly, mainly including open ditch segmented steel formwork components, independent integral steel formwork components for the sump well, and positioning clamps. Multiple open ditch segmented steel formwork components are included, which can be spliced ​​end-to-end to form the entire open ditch steel formwork system. Each open ditch segmented steel formwork component includes two left-right distributed open ditch single-side wall steel formwork components 1. Each open ditch single-side wall steel formwork component 1 includes two left-right distributed side wall steel templates 11. The side wall steel templates 11 are 3mm thick steel templates. Within the same open ditch single-side wall steel formwork component 1, the inner surfaces of both side wall steel templates 11 are fixedly installed with 1mm thick stainless steel facing 4. The space between the two side wall steel templates 11 on the same side is used to pour the open ditch single-side wall. This design uses a composite structure of "3mm steel formwork + 1mm stainless steel cladding". Compared with traditional bamboo plywood and plastic steel board, the overall rigidity is greatly improved, and it is not easy to deform and run away during the pouring process. The stainless steel cladding has a high degree of smoothness, and the concrete surface is flat and smooth after molding, which can reduce the later grinding process. Moreover, it can still maintain the surface integrity after repeated use, solving the problem of the appearance quality of traditional formwork dropping sharply after multiple uses.

[0019] The independent integrated steel formwork assembly for the sump well comprises two symmetrically distributed C-shaped steel formwork components 2, each containing two sump well steel formwork templates 21. The sump well steel formwork templates 21 form a C-shaped steel formwork frame structure, creating a space for pouring the single-sided wall of the sump well between the two templates on the same side. During the construction of the independent integrated steel formwork assembly, the front and rear ends of the assembly are connected to the segmented steel formwork of the open ditch using bolt assemblies. Custom-made independent steel formwork components for the sump well are assembled on-site using bolts, ensuring a tight fit at the joints. Compared to traditional methods that suffer from poor joint fit and easy grout leakage, this design ensures the integrity of the concrete pouring, eliminates the risk of leakage at the joints from the source, and improves the structural waterproofing performance and aesthetic integrity.

[0020] like Figure 2 As shown, there are multiple positioning clamps, each including a horizontally distributed positioning beam 3. The positioning beam 3 is a hollow tube with a square cross-section. Two clamping assemblies are fitted onto each positioning beam 3. Each clamping assembly includes two positioning plates 31, and a sleeve 32 is welded to the top of each positioning plate 31. The positioning plates 31 are slidably fitted onto the positioning beam 3 via the sleeves 32. In use, the two positioning plates 31 of each clamping assembly are located on the left and right outer sides of the open ditch single-sided wall steel formwork assembly 1, respectively. The positioning beam 3 has several evenly spaced elongated insertion holes 33 machined along its length. When the two positioning plates 31 of a clamping assembly are located on the left and right outer sides of the open ditch single-sided wall steel formwork assembly 1 and are tightly fitted, an insertion plate 5 is detachably inserted into the elongated insertion hole 33 located outside the sleeve 32 and partially overlapping with the sleeve 32. The insertion plate 5 has a wedge-shaped surface machined on the side closest to the sleeve 32. By using the wedge-shaped surface of the insert plate 5 to engage with the outer edge of the sleeve 32, the sleeve 32 and the crossbeam 3 are relatively fixed, thereby limiting the spacing between the two single-side wall steel formwork assemblies 1 of the open ditch and the spacing between the two side wall steel formwork templates in the same single-side wall steel formwork assembly. This design allows a single set of clamping components to simultaneously fix the spacing between two side wall steel formwork templates, precisely controlling the side wall thickness and avoiding uneven wall width; it also locks the relative spacing between the two side walls, ensuring uniform cross-sectional dimensions of the open ditch, and supports stepless adjustment to adapt to different cross-sectional specifications, significantly improving the straightness and construction accuracy of the open ditch.

[0021] The above-described solution utilizes multiple segmented steel formwork components for open ditches, positioned using positioning clamps. This significantly improves overall rigidity, preventing deformation and formwork displacement during pouring and allowing for multiple reuses. A single clamp assembly can secure the steel formwork component for one side wall of the open ditches, precisely controlling the side wall thickness and preventing uneven wall width. Two sets of clamp assemblies can lock the relative distance between the two side walls, ensuring uniform cross-sectional dimensions of the open ditches.

[0022] The template components and positioning clamps have been widely applied on the Qihe-Dong'e section of the Jinan-Dong'e Expressway, with significant results: First, construction quality has been comprehensively improved. The straightness deviation of the open ditch is controlled within millimeters, the concrete surface is smooth and free of pitting, there is no leakage or obvious misalignment at the joints, and the overall appearance quality is excellent. The structural seepage prevention performance meets the standards, effectively preventing rainwater from seeping into the median backfill, and the drainage capacity fully meets the design requirements. Second, construction efficiency has been significantly improved. The template adopts modular assembly, which shortens the time for single installation, dismantling, and adjustment by 35% compared with traditional methods, and the efficiency of alignment control in curved sections is particularly significant. Third, it has strong reusability and durability. The steel template system can be repeatedly reused with a low loss rate, greatly reducing the frequency of template replacement.

[0023] Example 2 like Figure 3-4 As shown, this embodiment also discloses a method for integrated construction of median strip open ditch and water collection well. The median strip open ditch template group described in Embodiment 1 is used for integrated construction of median strip open ditch and water collection well, including the following steps: S10. Measure and lay out the lines to determine the center line of the open ditch and the location of the well. S20, Excavate the foundation of the open ditch; S30. Concrete is poured at the base of the open ditch to form the bottom slab of the open ditch; S40. Install multiple open ditch segmented steel formwork and initially fix them; S50. Install the independent integrated steel formwork assembly for the water collection well, and connect the front and rear ends of the independent integrated steel formwork assembly for the water collection well to the open ditch segmented steel formwork through bolt assemblies to achieve integrated splicing with tight and tight joints; S60. Install positioning clamps on the steel formwork of each open ditch segment. The two positioning plates 31 of each clamp assembly are located on the left and right outer sides of the open ditch single-side wall steel formwork assembly 1, respectively. Check the spacing between the two open ditch single-side wall steel formwork assemblies 1 and the spacing and alignment of the two side wall steel formworks 11 in the same open ditch single-side wall steel formwork assembly 1. In this embodiment, as Figure 4 As shown, a set of clamps has four positioning plates. The sleeves 32 of the two positioning plates located between the two open ditch side walls precisely define the spacing between the steel formwork components 1 of the two open ditch side walls; the sleeves 32 of the two outer positioning plates are fixed by insert plates 5. When the insert plate 5 is inserted into the elongated insertion hole 33, the wedge-shaped surface of the insert plate 5 cooperates with the outer edge of the sleeve 32 to achieve relative fixation between the sleeve 32 and the crossbeam 3; S70. First, apply a release agent to the template surfaces of the side wall steel template 11 and the water collection well steel template 21; Then, pour C25 concrete, and vibrate it in layers to ensure that it does not bulge or deform. Finally, level and smooth the top surface of the poured concrete to make the concrete surface flat and smooth, and ensure the drainage slope. S80, after reaching the required strength, remove from the mold for cleaning and reuse.

[0024] The above construction methods demonstrate good economic and social benefits: In terms of economic benefits: The application of this technology has generated significant cost reduction and efficiency improvement benefits. On the cost side, the turnover rate of steel formwork is several times higher than that of traditional bamboo plywood, reducing repeated formwork procurement; integrated assembly and clamp positioning reduce on-site cutting and adjustment workload, lowering labor costs and material waste. On the efficiency side, the formwork can be installed and dismantled quickly, and the alignment can be easily adjusted, shortening the construction cycle of a single section of open ditch by more than 30%, accelerating the overall construction pace and saving on construction period and on-site management costs. At the same time, the forming quality is stable and reliable, reducing later defect repair costs, resulting in outstanding economic benefits throughout the entire life cycle.

[0025] Social Benefits: This technology offers several significant social benefits: First, it provides a mature technological reference for the construction of drainage facilities on highways in silty sandy soil areas, promoting the upgrading of formwork and tooling for highway ancillary projects and helping the industry's construction to develop towards standardization and refinement. Second, the steel formwork is recyclable, reducing timber consumption and construction waste generation, aligning with the development concepts of green construction and low-carbon construction. Third, it effectively improves the construction quality and drainage reliability of median strip open ditches, reduces the risk of water damage during operation, and ensures the long-term safety and maintenance quality of highways.

Claims

1. A type of template assembly for a centrally located open ditch, characterized in that, Including, Multiple open ditch segmented steel formwork components, the open ditch segmented steel formwork components including two left and right distributed open ditch single side wall steel formwork components (1), the open ditch single side wall steel formwork component (1) including two left and right distributed side wall steel formwork (11). The independent integral steel formwork assembly for the water collection well includes two C-shaped steel formwork assemblies (2) distributed on the left and right, wherein the C-shaped steel formwork assembly (2) includes two water collection well steel formwork templates (21) distributed on the left and right. Multiple positioning clamps, the positioning clamps include positioning beams (3) distributed horizontally on the left and right, and two sets of clamp assemblies are fitted on the positioning beams (3), the clamp assemblies include two positioning plates (31) located on the left and right outer sides of the steel formwork assembly (1) of the open ditch single side wall.

2. The median strip open ditch template assembly according to claim 1, characterized in that, In the same open ditch single-side wall steel formwork assembly (1), the inner surfaces of the two side wall steel formworks (11) are provided with stainless steel cladding (4).

3. The median strip open ditch template assembly according to claim 1, characterized in that, The top of the positioning plate (31) is provided with a sleeve (32), which is slidably sleeved on the positioning beam (3).

4. The median strip open ditch template assembly according to claim 3, characterized in that, The cross-section of the positioning beam (3) is square, and the positioning beam (3) has a number of elongated insertion holes (33) with uniformly distributed gaps along its length. When the two positioning plates (31) of the clamp assembly are set on the left and right outer sides of the steel formwork assembly (1) of the open ditch single side wall, an insert plate (5) is detachably inserted into the elongated insertion hole (33) located outside the sleeve (32) and partially overlapping with the sleeve (32). The insert plate (5) has a wedge-shaped surface on one side near the sleeve (32).

5. The median strip open ditch template assembly according to claim 2, characterized in that, The thickness of the stainless steel veneer (4) is 1-2 mm.

6. The median strip open ditch template assembly according to any one of claims 1-5, characterized in that, The independent integral steel formwork assembly of the water collection well and the segmented steel formwork assembly of the open ditch are detachably connected by bolts.

7. A construction method for an integrated open ditch and water collection well with a median strip, characterized in that, The integrated construction of the median strip open ditch and water collection well using the median strip open ditch formwork assembly as described in any one of claims 1-6 includes the following steps: S10. Measure and lay out the lines to determine the center line of the open ditch and the location of the well. S20, Excavate the foundation of the open ditch; S30. Concrete is poured at the base of the open ditch to form the bottom slab of the open ditch; S40. Install multiple open ditch segmented steel formwork and initially fix them; S50. Install the independent integral steel formwork assembly for the water collection well, so that the front and rear ends of the independent integral steel formwork assembly for the water collection well are connected to the segmented steel formwork of the open ditch. S60. Install positioning clamps on the steel formwork of each open ditch segment. The two positioning plates (31) of each clamp assembly are located on the left and right outer sides of the steel formwork assembly (1) of the open ditch single side wall. Check the spacing between the two open ditch single side wall steel formwork assemblies (1) and the spacing and alignment of the two side wall steel formworks (11) in the same open ditch single side wall steel formwork assembly (1). S70. Pour concrete and compact it in layers using vibration. S80, after reaching the required strength, remove from the mold for cleaning and reuse.

8. The integrated construction method of median strip open ditch and water collection well according to claim 7, characterized in that, In step S70, before pouring concrete, a release agent is applied to the template surfaces of the side wall steel template (11) and the water collection well steel template (21).

9. The integrated construction method of median strip open ditch and water collection well according to claim 7, characterized in that, In step S70, after pouring the concrete, the top surface of the poured concrete is leveled and smoothed to ensure drainage slope.