Large-span steel bar truss floor support device and installation method thereof

Through the coordinated design of support components, lifting mechanisms, and synchronous components, the problem of linkage adjustment in traditional floor decking support structures has been solved, achieving uniform support and stress balance for large-span floor decking, ensuring construction safety and flatness.

CN123153573APending Publication Date: 2026-11-24CSCEC STRAIT CONSTR & DEV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611190374.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-06
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Traditional floor decking support structures lack the ability to adjust in a coordinated manner, resulting in uneven support heights, which affects construction safety and floor flatness.

Method used

The system employs a coordinated approach of support components, lifting mechanisms, synchronization components, and drive components. Through gear and rack transmission, it achieves synchronized adjustment of each support point of the large-span floor deck. Furthermore, it enhances the support rigidity and accuracy through backlash-eliminating locking components and floating connection structures.

Benefits of technology

It achieves uniform support for large-span floor decking, ensuring the flatness of the floor and the stress balance of the overall support system during construction, thereby improving construction safety and support stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123153573A_ABST
    Figure CN123153573A_ABST
Patent Text Reader

Abstract

This invention relates to the field of support device technology, specifically to a prestressed support device for large-span steel truss floor slabs and its installation method. The device includes a support assembly comprising a connecting seat; a lifting mechanism comprising multiple threaded sleeves, multiple threaded rods, and a lifting plate, wherein the threaded rods are rotatably connected to the connecting seat, each threaded rod is threadedly connected to each threaded sleeve, and the threaded sleeves are fixedly connected to the bottom of the lifting plate; a synchronization assembly comprising multiple gears and a rack, the rack being disposed within the connecting seat, the gears being fixedly connected to the threaded rods, and the gears meshing with the rack; and a drive assembly for controlling the movement position of the rack. This invention, through the drive assembly, synchronization assembly, and lifting mechanism, solves the construction safety hazards caused by the lack of linkage adjustment capability in traditional floor slab support structures, resulting in uneven support heights and uneven stress distribution.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of support device technology, specifically to a prestressed support device for large-span steel truss floor slabs and its installation method. Background Technology

[0002] Large-span steel truss floor decking is a commonly used component in prefabricated building construction, widely applied in large-space steel structure building construction scenarios. During the concrete pouring and forming stage, the floor decking itself cannot fully bear its own weight and construction loads, requiring bottom support devices to provide stable support, ensuring the safety of the construction process and the accuracy of the floor decking forming. Currently, conventional adjustable support structures are mostly used on construction sites to temporarily support large-span floor decking, which can meet the vertical support requirements of the foundation and is suitable for most foundation construction scenarios of conventional span floor decking.

[0003] However, traditional floor decking support structures mostly adopt fixed-height supports or single-point independent fine-tuning supports, lacking the ability for coordinated and synchronous adjustment. In the construction of large-span projects, workers can only rely on individual support points for alignment and height fine-tuning. It is difficult to ensure that the support heights of each support point are uniform and aligned, making it difficult to form a uniform and close overall support for large-span floor decking. This can easily lead to localized stress concentration on the floor decking, which can not only cause the floor decking to flex and deform, affecting the flatness of the floor surface and the quality of structural forming after concrete pouring, but also lead to uneven stress on the overall support system, reducing support stability and posing certain safety hazards. Summary of the Invention

[0004] In view of the above-mentioned shortcomings of the existing technology, the present invention provides a prestressed support device for large-span steel truss floor slabs and its installation method, which solves the construction safety hazards such as uneven support height and uneven stress distribution caused by the lack of linkage adjustment capability in traditional floor slab support structures.

[0005] To achieve the above objectives, the present invention provides the following technical solution: A prestressed support device for large-span steel truss floor slabs includes: A support assembly is disposed on the ground of the construction floor or the top surface of the lower floor slab, and the support assembly includes a connecting seat; A lifting mechanism is mounted on a support assembly. The lifting mechanism includes multiple threaded sleeves, multiple threaded rods, and a lifting plate. The multiple threaded rods are rotatably connected to a connecting seat. Each threaded rod is threadedly connected to each threaded sleeve. The multiple threaded sleeves are fixedly connected to the bottom of the lifting plate. The threaded sleeves are evenly distributed along the length of the lifting plate. A synchronization component includes multiple gears and a rack, the rack being disposed within a connecting seat, each gear being fixedly connected to each threaded rod, and all of the multiple gears meshing with the rack; The drive assembly, which is mounted on the connector, is used to control the movement position of the rack.

[0006] Furthermore, the connecting seat is also provided with a gap-eliminating locking assembly, which includes a hydraulic cylinder and a connecting frame. The hydraulic cylinder is fixedly connected to the outer wall of the connecting seat, and the connecting frame is slidably connected to the connecting seat along the length direction perpendicular to the rack. The connecting frame is slidably connected to the rack along its length direction, and the output end of the hydraulic cylinder passes through the side wall of the connecting seat and is fixedly connected to the connecting frame.

[0007] Furthermore, the drive assembly includes a drive motor, a drive screw, and a drive seat. The drive motor is fixedly connected to the connecting seat, the drive seat is slidably connected to the connecting seat along the length direction of the rack, the drive seat is disposed at the end of the rack, the drive screw is fixedly connected to the output end of the drive motor, and the drive seat is threadedly connected to the drive screw.

[0008] Furthermore, a floating component is provided between the drive assembly and the rack. The floating component includes a T-block and a T-slot. The T-block is fixedly connected to the end of the rack, and the T-slot is formed on the drive seat. The T-block is slidably connected in the T-slot, and the sliding direction of the T-block is the same as the sliding direction of the connecting frame.

[0009] Furthermore, an elastic corrugated cover is provided between the outer wall of each threaded sleeve and the top wall of the connecting seat, and the elastic corrugated cover is provided on the outside of the corresponding threaded rod.

[0010] Furthermore, the support assembly also includes multiple support rods, the top ends of which are fixedly connected to the connecting seat, and the bottom ends of which are provided with bases for abutting against the ground or the top surface of the floor slab.

[0011] Furthermore, each of the support rods has a diagonal support rod fixedly connected to both sides of its bottom.

[0012] Furthermore, an installation method for a prestressed support device for a large-span steel truss floor slab includes the following steps: Step 1: Move the support device to the preset position according to the design spacing, so that the lifting plate is aligned with the bottom of the floor deck, and the base abuts against the ground or the top surface of the lower floor deck; Step 2: Start the drive motor, which drives the drive seat to slide along the rack via the drive screw. The rack synchronously drives multiple gears to rotate, and the gears drive the threaded rod to rotate. The threaded rod drives the threaded sleeve and the lifting plate to rise synchronously. Step 3: After the lifting plate is raised to the designed support height, the drive motor stops and the current position is maintained by the self-locking of the drive screw and the drive seat thread. Step 4: Start the hydraulic cylinder to push the connecting frame so that the rack and pinion are pressed against each gear, locking the gears; Step 5: After the concrete curing meets the standards, the hydraulic cylinder reverses to release the lock, the drive motor reverses to make the rack move in the opposite direction, the gear reverses, and the threaded rod drives the threaded sleeve and the lifting plate to descend and reset synchronously, removing the support device.

[0013] The technical solution provided by this invention has the following advantages compared with the known prior art: 1. This invention utilizes the coordinated operation of a support component, a lifting mechanism, a synchronization component, and a drive component. The lifting mechanism includes multiple threaded sleeves, multiple threaded rods, and a lifting plate. The multiple threaded rods are rotatably connected to a connecting seat and threadedly connected to each threaded sleeve. Each threaded sleeve is fixed to the bottom of the lifting plate and evenly distributed along its length. The synchronization component includes multiple gears and a rack. Each gear is fixedly connected to each threaded rod and meshes with the rack. The drive component controls the rack to move along its length, causing the rack to simultaneously drive all gears to rotate synchronously. Each gear drives its corresponding threaded rod to rotate synchronously on the connecting seat, thereby driving all threaded sleeves and each point of the lifting plate to rise evenly along the axis of the threaded rods. This allows the lifting plate to fit against the bottom surface of the large-span floor slab and apply uniform support force. This structure, through a single drive source and gear and rack transmission, achieves synchronized adjustment of the support points at the bottom of the large-span floor slab, ensuring the flatness of the floor surface after concrete pouring, while improving the stress balance and construction safety of the overall support system. 2. The present invention provides a gap-eliminating locking component on the connecting seat. This component includes a hydraulic cylinder and a connecting frame. After the supporting device supports the floor deck, the hydraulic cylinder pushes the connecting frame to slide along the direction perpendicular to the length of the rack. The connecting frame drives the rack to generate a radial displacement tendency in the direction of the gears, so that the rack tightly abuts against each gear and locks each gear in the current position, thereby improving the support effect. Attached Figure Description

[0014] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0015] Figure 1 This is a schematic diagram of the overall structure of the present invention; Figure 2 This is a schematic diagram of the internal structure of the connector of the present invention; Figure 3 This is a schematic diagram of the lifting mechanism and gears of the present invention; Figure 4 This is a schematic diagram of the structure of the synchronization component and the driving component of the present invention; Figure 5 For the present invention Figure 4 Enlarged view of section A in the middle; Figure 6 This is a schematic diagram of the structure of the driving component and the floating component of the present invention; Figure 7 This is a schematic diagram of the gap-eliminating locking assembly of the present invention.

[0016] Reference numerals: 1. Support assembly; 2. Lifting mechanism; 3. Synchronization assembly; 4. Drive assembly; 5. Backlash elimination locking assembly; 6. Floating assembly; 7. Elastic corrugated cover; 11. Connecting seat; 12. Support rod; 13. Base; 14. Angled support rod; 21. Threaded sleeve; 22. Threaded rod; 23. Lifting plate; 31. Gear; 32. Rack; 41. Drive motor; 42. Drive screw; 43. Drive seat; 51. Hydraulic cylinder; 52. Connecting frame; 61. T-block; 62. T-slot. Detailed Implementation

[0017] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of the present invention. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without creative effort are within the scope of protection of the present invention.

[0018] The present invention will be further described below with reference to embodiments.

[0019] Example 1: Refer to Figures 1 to 7This invention provides a prestressed support device for large-span steel truss floor slabs. To address the technical problem of existing floor slab support devices failing to achieve synchronized adjustment of support points, resulting in inconsistent and uneven support heights for large-span floor slabs and affecting floor flatness and construction safety, this prestressed support device for large-span steel truss floor slabs includes a support assembly 1, a lifting mechanism 2, a synchronization assembly 3, and a drive assembly 4. The support assembly 1 is installed on the ground of the construction floor or the top surface of the lower floor slab, and includes a connecting seat 11. The lifting mechanism 2 is mounted on the support assembly 1 and includes multiple threaded sleeves. 21. A plurality of threaded rods 22 and a lifting plate 23, wherein the plurality of threaded rods 22 are rotatably connected to the connecting seat 11, each threaded rod 22 is threadedly connected to each threaded sleeve 21, and the plurality of threaded sleeves 21 are fixedly connected to the bottom of the lifting plate 23, and the threaded sleeves 21 are evenly distributed along the length of the lifting plate 23; the synchronization component 3 includes a plurality of gears 31 and a rack 32, the rack 32 is disposed in the connecting seat 11, each gear 31 is fixedly connected to each threaded rod 22, and the plurality of gears 31 mesh with the rack 32; the drive component 4 is disposed on the connecting seat 11 and is used to control the moving position of the rack 32.

[0020] It should be noted that when a large-span steel truss floor slab requires bottom support, the entire support device is moved to the preset support point below the construction floor slab, aligning the lifting plate 23 with the bottom of the floor slab. Then, the drive assembly 4 is activated, causing the rack 32 within the connecting seat 11 to move along its length. During this movement, the rack 32 simultaneously drives multiple meshing gears 31 to rotate synchronously. Each gear 31 drives its corresponding threaded rod 22 to rotate on the connecting seat 11. Since multiple threaded sleeves 21 are fixedly connected to the bottom of the lifting plate 23 and threadedly engaged with each threaded rod 22, the rotation of the threaded rod 22 drives the threaded sleeves 21 to rotate along the threaded rod. The threaded rod 22 rises along its axis, thereby driving the lifting plate 23 to rise smoothly. Multiple threaded rods 22 rotate synchronously under the transmission action of rack 32 and gear 31, so that each point of the lifting plate 23 rises evenly along its length. Finally, the lifting plate 23 fits against the bottom surface of the large-span floor deck and applies uniform support force. This structure can realize the linkage and synchronous adjustment of each support point, ensuring that the large-span floor deck receives uniform and stable support during construction, effectively avoiding the bending deformation of the floor deck due to local stress concentration, ensuring the flatness of the floor and the quality of structural forming after concrete pouring, and improving the stress balance and support safety of the overall support system.

[0021] Furthermore, to address the inherent meshing backlash between the transmission gears and racks in existing large, heavy-duty lifting mechanisms, which causes high-frequency settlement and swaying of the lifting plate under eccentric or impact loads, thus affecting support rigidity and positioning accuracy; and to prevent traditional backlash elimination methods from simultaneously meeting the smooth transmission requirements during installation and the rigid locking requirements during operation, often leading to accelerated gear wear or adjustment difficulties, this paper refers to... Figure 2 and Figure 7 The connecting seat 11 is also provided with a gap-eliminating locking assembly 5, which includes a hydraulic cylinder 51 and a connecting frame 52. The hydraulic cylinder 51 is fixedly connected to the outer wall of the connecting seat 11, and the connecting frame 52 is slidably connected to the connecting seat 11 along the length direction perpendicular to the rack 32. The connecting frame 52 is slidably connected to the rack 32 along its length direction. The output end of the hydraulic cylinder 51 passes through the side wall of the connecting seat 11 and is fixedly connected to the connecting frame 52.

[0022] It should be noted that during the installation of the support device, the rack 32 and each gear 31 are not initially provided with the gear backlash required to ensure smooth rotation and lubrication. Each gear 31 is in a static locked state. After the subsequent lifting mechanism 2 is installed, each gear 31 will not wobble under the locking effect formed by multiple threaded sleeves 21, multiple threaded rods 22, and a lifting plate 23. Then, the hydraulic cylinder 51 is activated to push the connecting frame 52 to move the rack 32 away from the gear 31, creating gear backlash. This ensures that the initial rotation position of each gear 31 is the same, facilitating subsequent transmission. After the drive assembly 4 moves the rack 32 to support the floor deck, the operator activates the hydraulic cylinder 51 to push the connecting frame 52, causing the rack 32 to tend to move radially towards the gear 31. This causes the rack 32 to press tightly against the gear 31, locking each gear 31 in its current position and improving the support rigidity.

[0023] Furthermore, in order to solve the technical problem of how the drive assembly 4 can precisely control the moving position of the rack 32 to achieve precise height adjustment of the lifting plate 23, refer to Figures 4 to 6 The drive assembly 4 includes a drive motor 41, a drive screw 42, and a drive seat 43. The drive motor 41 is fixedly connected to the connecting seat 11, and the drive seat 43 is slidably connected to the connecting seat 11 along the length direction of the rack 32. The drive seat 43 is located at the end of the rack 32. The drive screw 42 is fixedly connected to the output end of the drive motor 41, and the drive seat 43 is threadedly connected to the drive screw 42.

[0024] It should be noted that when the lifting plate 23 needs to be raised or lowered, the drive motor 41 is started. The drive motor 41 drives the drive screw 42 to rotate. The drive screw 42 drives the drive seat 43 to slide within the connecting seat 11 along the length of the rack 32 through threaded transmission. When the drive seat 43 moves, it drives the rack 32 to move synchronously, thereby realizing the raising and lowering action of the lifting plate 23 through the transmission of the gear 31 and the threaded rod 22. This structure uses a screw and nut transmission to precisely control the displacement of the rack 32. It has the advantages of smooth transmission, high positioning accuracy and self-locking characteristics. It can realize stepless precise adjustment of the height of the lifting plate 23 to meet the construction needs of different span floor decks for different support heights.

[0025] Furthermore, to address the technical problem that when the backlash-eliminating locking assembly 5 operates, the connecting frame 52 drives the rack 32 to move, and the drive seat 43, which is fixedly connected to the rack 32, will cause radial interference with the drive screw 42, resulting in additional bending moment and wear between the drive screw 42 and the drive seat 43, refer to... Figures 4 to 6 A floating component 6 is provided between the drive component 4 and the rack 32. The floating component 6 includes a T-block 61 and a T-slot 62. The T-block 61 is fixedly connected to the end of the rack 32, and the T-slot 62 is opened on the drive seat 43. The T-block 61 is slidably connected in the T-slot 62, and the sliding direction of the T-block 61 is the same as the sliding direction of the connecting frame 52.

[0026] It should be noted that when the hydraulic cylinder 51 pushes the connecting frame 52 to slide along the direction perpendicular to the length of the rack 32, the connecting frame 52 drives the rack 32 to move synchronously. The T-block 61, fixedly connected to the end of the rack 32, slides freely in the T-slot 62 on the drive seat 43 along the same sliding direction as the connecting frame 52. In this structure, the rack 32 and the drive seat 43 form a floating connection through the T-block 61 and the T-slot 62. The movement of the rack 32 in the direction perpendicular to its length will not exert rigid constraints on the drive seat 43. Therefore, the drive seat 43 will not have radial displacement with the rack 32, and the drive seat 43 and the drive screw 42 always maintain a good coaxial fit. This structure can effectively isolate the radial displacement generated by the rack 32 during the backlash elimination action from being transmitted to the mating part of the drive seat 43 and the drive screw 42, avoiding the drive screw 42 from bearing additional radial load, and improving the overall operational reliability and long-term stability of the device.

[0027] Furthermore, to address the technical problem that the threaded mating parts of the threaded rod 22 and threaded sleeve 21 are exposed to the construction environment, and that impurities such as concrete slurry and dust easily adhere to the thread surface, leading to accelerated wear of the threaded pair, decreased transmission accuracy, or even jamming failure, refer to... Figure 2 Each threaded sleeve 21 has an elastic corrugated cover 7 between its outer wall and the top wall of the connecting seat 11, and the elastic corrugated cover 7 covers the outside of the corresponding threaded rod 22.

[0028] It should be noted that during the lifting process of the lifting plate 23, the threaded sleeve 21 moves up and down relative to the threaded rod 22. The elastic corrugated cover 7 adapts to the lifting of the threaded sleeve 21, always covering the part of the threaded rod 22 exposed outside the connecting seat 11. The elastic corrugated cover 7 completely seals the threaded mating part of the threaded rod 22 and the threaded sleeve 21 inside its interior, effectively preventing impurities such as concrete slurry, dust particles and water vapor in the external environment from contacting the threads, thereby preventing impurities from entering the threaded mating gap and causing jamming or seizing. This ensures the lifting flexibility and transmission accuracy of the lifting mechanism 2 during long-term use, extends the service life of the device, and reduces the maintenance frequency.

[0029] Furthermore, in order to solve the technical problem of how to achieve stable placement of support component 1 under different construction floors and different ground conditions, refer to Figure 1 The support assembly 1 also includes multiple support rods 12, the top ends of which are fixedly connected to the connecting seat 11, and the bottom ends of which are provided with bases 13 for abutting the ground or the top surface of the floor slab.

[0030] It should be noted that when the support device is installed, the support assembly 1 is moved to the target support position, so that the base 13 at the bottom of the multiple support rods 12 respectively abuts against the ground of the current construction floor or the top surface of the floor slab that has been poured below. The multiple support rods 12 are distributed in a multi-point manner to stably support the connecting seat 11 and the lifting mechanism 2 above it on the construction plane. The base 13 forms a surface contact with the ground or the top surface of the floor slab, which effectively increases the support area and reduces the compressive stress on the floor slab or the ground. This structure can adapt to the support requirements of different construction floors, so that the support device can be placed stably on various construction planes, providing a stable and reliable bottom support foundation for the lifting mechanism 2, and ensuring the overall stability of the support device when bearing large-span floor slabs and construction loads.

[0031] Furthermore, in order to address the technical problem that when the support rod 12 is subjected to a large bending moment at its root, leading to lateral bending deformation or even instability and collapse, when it bears the eccentric load of the large-span floor deck transmitted by the lifting slab 23, the following measures are taken: Figure 1 Each support rod 12 has a diagonal support rod 14 fixedly connected to both sides of its bottom.

[0032] It should be noted that when the lifting plate 23 supports a large-span floor deck, the self-weight of the floor deck and the construction load are transferred to the connecting seat 11 through the lifting plate 23, threaded sleeve 21, and threaded rod 22, and then transferred to each support rod 12 by the connecting seat 11. The inclined support rods 14 are symmetrically fixed on both sides of the bottom of each support rod 12, forming a triangular support structure together with the support rods 12. This structure can effectively convert the lateral bending moment borne by the support rods 12 into the axial tension or compression of the inclined support rods 14, thereby improving the lateral displacement resistance and bending stiffness of the support rods 12, preventing the support rods 12 from undergoing lateral bending deformation or instability when subjected to eccentric loads, and ensuring the structural stability and support reliability of the support device under the uneven load of the large-span floor deck.

[0033] The working principle of this invention is as follows: First, according to the construction floor location and the span of the floor slab, multiple sets of support devices are arranged on the construction plane at the designed intervals, so that each lifting plate 23 is aligned with the support points at the bottom of the large-span floor slab; then, the power supply of the drive motor 41 is turned on, and the drive motor 41 drives the drive screw 42 to rotate. The drive screw 42 drives the rack 32 to move along the inside of the connecting seat 11 through the drive seat 43. The rack 32 simultaneously drives multiple gears 31 to rotate synchronously. Each gear 31 drives the corresponding threaded rod 22 to rotate. The threaded rod 22 drives the threaded sleeve 21 and the lifting plate 23 to rise synchronously; after the lifting plate 23 rises to the designed support height that is tightly attached to the bottom of the floor slab, the drive motor 41 stops and uses the self-locking characteristic of the screw thread to maintain the current position; then, the hydraulic cylinder 51 of the backlash elimination locking assembly 5 is activated. Hydraulic cylinder 51 pushes connecting frame 52 to drive rack 32 to press against gear 31, maintaining a constant clamping force between rack 32 and each gear 31; at this time, the support device can stably bear the load of large-span floor decking and subsequent concrete pouring, ensuring that the floor decking maintains the design elevation and flatness throughout the construction process; after the concrete above the floor decking has cured to the design strength, drive motor 41 is restarted to rotate in the opposite direction, causing rack 32 to drive gear 31 to reverse, threaded rod 22 drives threaded sleeve 21 and lifting plate 23 to descend synchronously to the initial position, releasing the support state of the large-span floor decking, and the support device can be moved out of the construction area; this support device achieves multi-point linkage synchronous lifting through a single drive source, combined with gap-eliminating locking and floating connection structure, to ensure that the large-span floor decking obtains uniform, stable and precise support during concrete pouring construction.

[0034] Example 2: Based on Example 1, referring to... Figures 1 to 7 An installation method for a prestressed support device for a large-span steel truss floor slab includes the following steps: Step 1: According to the layout plan of the construction floor, move multiple sets of support devices to the preset support points under the floor slab according to the design spacing, so that the lifting plate 23 is aligned with the bottom support position of the large span floor slab, and the base 13 at the bottom of each support rod 12 is stably abutted against the ground of the construction floor or the top surface of the lower floor slab. Step 2: Start the drive motor 41. The drive motor 41 drives the drive screw 42 to rotate. The drive screw 42 drives the drive seat 43 to slide in the connecting seat 11 along the length direction of the rack 32 through the thread transmission. The drive seat 43 drives the rack 32 to move synchronously. The rack 32 simultaneously drives multiple gears 31 to rotate synchronously. Each gear 31 drives the corresponding threaded rod 22 to rotate. Each threaded rod 22 drives each threaded sleeve 21 to rise synchronously along the axis of the threaded rod 22 through the thread transmission, thereby driving the lifting plate 23 to rise smoothly. Step 3: After the lifting plate 23 rises to the designed support height that is in close contact with the bottom of the floor deck, the drive motor 41 stops operating and uses the thread self-locking characteristic between the drive screw 42 and the drive seat 43 to maintain the current position of the lifting plate 23. Step 4: Start the hydraulic cylinder 51. The hydraulic cylinder 51 pushes the connecting frame 52 to move the rack 32 closer to the gear 31, so that the rack 32 is pressed against each gear 31 and the gear 31 is locked in the current position. Step 5: After the concrete above the floor deck reaches the design strength, start the hydraulic cylinder 51 to reverse, release the locking state of the rack 32 to each gear 31, then start the drive motor 41 to rotate in the reverse direction, so that the drive seat 43 drives the rack 32 to move in the reverse direction, the rack 32 drives each gear 31 to rotate in the reverse direction in sync, and each threaded rod 22 drives each threaded sleeve 21 and the lifting plate 23 to descend to the initial position in sync, releasing the support state of the large span floor deck, and finally moving the support device out of the construction area.

[0035] The above embodiments are only used to illustrate the technical solutions of the present invention, and are not intended to limit it. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions will not cause the essence of the corresponding technical solutions to deviate from the protection scope of the technical solutions of the embodiments of the present invention.

Claims

1. A prestressed support device for large-span steel truss floor slabs, characterized in that, include: Support component (1), the support component (1) is disposed on the ground of the construction floor or the top surface of the lower floor slab, the support component (1) includes a connecting seat (11). The lifting mechanism (2) is mounted on the support assembly (1). The lifting mechanism (2) includes multiple threaded sleeves (21), multiple threaded rods (22), and a lifting plate (23). The multiple threaded rods (22) are rotatably connected to the connecting seat (11). Each threaded rod (22) is threadedly connected to each threaded sleeve (21). The multiple threaded sleeves (21) are fixedly connected to the bottom of the lifting plate (23). The threaded sleeves (21) are evenly distributed along the length of the lifting plate (23). The synchronization component (3) includes multiple gears (31) and a rack (32), the rack (32) being disposed in the connecting seat (11), each gear (31) being fixedly connected to each threaded rod (22), and the multiple gears (31) meshing with the rack (32); The drive assembly (4), which is mounted on the connector (11), is used to control the movement position of the rack (32).

2. The prestressed support device for large-span steel truss floor slabs according to claim 1, characterized in that, The connecting seat (11) is also provided with a gap-eliminating locking assembly (5). The gap-eliminating locking assembly (5) includes a hydraulic cylinder (51) and a connecting frame (52). The hydraulic cylinder (51) is fixedly connected to the outer wall of the connecting seat (11). The connecting frame (52) is slidably connected to the connecting seat (11) along the length direction perpendicular to the rack (32). The connecting frame (52) is slidably connected to the rack (32) along its length direction. The output end of the hydraulic cylinder (51) passes through the side wall of the connecting seat (11) and is fixedly connected to the connecting frame (52).

3. The prestressed support device for large-span steel truss floor slabs according to claim 2, characterized in that, The drive assembly (4) includes a drive motor (41), a drive screw (42), and a drive seat (43). The drive motor (41) is fixedly connected to the connecting seat (11). The drive seat (43) is slidably connected to the connecting seat (11) along the length direction of the rack (32). The drive seat (43) is located at the end of the rack (32). The drive screw (42) is fixedly connected to the output end of the drive motor (41), and the drive seat (43) is threadedly connected to the drive screw (42).

4. A prestressed support device for a large-span steel truss floor slab according to claim 3, characterized in that, A floating component (6) is provided between the drive component (4) and the rack (32). The floating component (6) includes a T-block (61) and a T-slot (62). The T-block (61) is fixedly connected to the end of the rack (32). The T-slot (62) is opened on the drive seat (43). The T-block (61) is slidably connected in the T-slot (62). The sliding direction of the T-block (61) is the same as the sliding direction of the connecting frame (52).

5. A prestressed support device for a large-span steel truss floor slab according to claim 1, characterized in that, An elastic corrugated cover (7) is provided between the outer wall of each threaded sleeve (21) and the top wall of the connecting seat (11), and the elastic corrugated cover (7) is provided on the outside of the corresponding threaded rod (22).

6. The prestressed support device for a large-span steel truss floor slab according to claim 1, characterized in that, The support assembly (1) also includes a plurality of support rods (12), the top ends of which are fixedly connected to the connecting seat (11), and the bottom ends of which are provided with a base (13) for abutting the ground or the top surface of the floor slab.

7. A prestressed support device for a large-span steel truss floor slab according to claim 6, characterized in that, Each of the support rods (12) has a diagonal support rod (14) fixedly connected to both sides of its bottom.

8. An installation method for a prestressed support device for a large-span steel truss floor slab as described in any one of claims 1 to 7, characterized in that, Includes the following steps: Step 1: Move the support device to the preset position according to the design spacing, so that the lifting plate (23) is aligned with the bottom of the floor deck, and the base (13) abuts against the ground or the top surface of the lower floor deck; Step 2: Start the drive motor (41), and drive the drive seat (43) to slide along the rack (32) through the drive screw (42). The rack (32) synchronously drives multiple gears (31) to rotate. The gears (31) drive the threaded rod (22) to rotate. The threaded rod (22) drives the threaded sleeve (21) and the lifting plate (23) to rise synchronously. Step 3: After the lifting plate (23) is raised to the designed support height, the drive motor (41) stops and the current position is maintained by the self-locking of the drive screw (42) and the drive seat (43). Step 4: Start the hydraulic cylinder (51), push the connecting frame (52) to make the rack (32) press against each gear (31), and lock the gear (31); Step 5: After the concrete curing meets the standards, the hydraulic cylinder (51) moves in reverse to release the lock, the drive motor (41) reverses to make the rack (32) move in the opposite direction, the gear (31) reverses, and the threaded rod (22) drives the threaded sleeve (21) and the lifting plate (23) to descend and reset synchronously, and remove the support device.