An in-situ testing device for permeability of low permeability glutenite reservoir
By using an in-situ permeability testing device for low-permeability sandstone and conglomerate reservoirs that forms a closed testing chamber downhole, the problem of inaccurate test results after reservoir samples are removed from the formation environment has been solved, achieving a true reflection and accurate measurement of downhole permeability.
Patent Information
- Application Number
- CN202510673159.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-05-23
- Publication Date
- 2026-11-24
AI Technical Summary
In existing technologies, the permeability test results of low-permeability sandstone and conglomerate reservoirs are easily affected by changes in the structure and properties of the reservoir sample after it is removed from the underground stratum environment, leading to inaccurate test results.
A permeability in-situ testing device for low-permeability sandstone and conglomerate reservoirs is designed. A closed testing chamber is formed downhole using a central delivery pipe and a plugging unit. The gaps in the well wall are sealed by a plugging sleeve, and in-situ permeability testing is conducted using a flow meter and a pressure gauge, while maintaining the original stress state and temperature conditions of the reservoir.
It enables permeability testing under in-situ downhole conditions, accurately reflecting reservoir permeability characteristics, avoiding test result deviations caused by environmental changes, and ensuring the accuracy and reliability of test results.
Smart Images

Figure CN123153731A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of oil and gas extraction and mining technology of low-permeability sandstone-type uranium deposits, and particularly to an in-situ permeability testing device for low-permeability sandstone and conglomerate reservoirs. Background Technology
[0002] Low-permeability sandstone and conglomerate reservoirs are composed of sandstone and conglomerate with relatively low permeability, and these reservoirs are particularly important in oil and gas extraction. Before extraction, testing the permeability of low-permeability sandstone and conglomerate reservoirs can predict the primary production capacity and long-term development potential of the reservoir, and determine whether it has economic value for extraction.
[0003] Currently, to accurately measure the permeability of low-permeability sandstone and conglomerate reservoirs, specially designed testing devices are typically used to test the permeability of reservoir samples taken from underground. During the test, the reservoir sample is placed in a pressure vessel simulating formation conditions, and the resistance to the flow of gas or liquid through the sample is measured to determine its permeability. However, once these reservoir samples are removed from their original underground formation environment, their overall structure and properties change, leading to deviations in permeability test results and potentially misleading subsequent reservoir assessments and development decisions. Summary of the Invention
[0004] The purpose of this invention is to provide an in-situ permeability testing device for low-permeability sandstone and conglomerate reservoirs, which can realize in-situ downhole detection of the permeability of low-permeability sandstone and conglomerate reservoirs and truly reflect the permeability characteristics of the reservoirs.
[0005] To achieve this objective, the present invention adopts the following technical solution:
[0006] An in-situ permeability testing device for low-permeability sandstone and conglomerate reservoirs is provided, comprising:
[0007] The central delivery pipe is connected to the drill pipe;
[0008] The plugging unit includes two plugging components arranged vertically at intervals. Each plugging component includes a fixed bracket, a movable bracket, and a plugging tube. The fixed bracket is sleeved on the outer wall of the central delivery pipe, and the movable bracket is movably sleeved on the outer wall of the central delivery pipe. The plugging tube is disposed between the fixed bracket and the movable bracket and abuts against the inner wall of the well. The two movable brackets enclose a test chamber.
[0009] The blocking drive unit includes multiple blocking drive components spaced apart. Each blocking drive component includes a bidirectional hydraulic cylinder and two piston rods. The bidirectional hydraulic cylinder is connected to the central delivery pipe. The piston rods pass through the corresponding movable brackets, and the first ends of the two piston rods are movably connected to the two ends of the bidirectional hydraulic cylinder, and the second ends are connected to the two fixed brackets.
[0010] The testing unit includes a detection delivery pipe, a flow meter, and a pressure gauge. The detection delivery pipe is disposed in the testing chamber and connected to the central delivery pipe. The flow meter and the pressure gauge are both disposed in the detection delivery pipe.
[0011] As an optional solution for in-situ permeability testing of low-permeability sandstone and conglomerate reservoirs, the testing unit further includes a vertical conveying pipe, which is connected between the two movable supports and has an adjustable length. The vertical conveying pipe is connected to the detection conveying pipe and has multiple conveying holes spaced apart.
[0012] As an optional solution for in-situ permeability testing of low-permeability sandstone and conglomerate reservoirs, the plugging drive assembly further includes a first sealing valve, which is disposed between the central delivery pipe and the bidirectional hydraulic cylinder, and is used to adjust whether the bidirectional hydraulic cylinder is connected to the central delivery pipe.
[0013] As an optional solution for in-situ permeability testing of low-permeability sandstone and conglomerate reservoirs, the plugging drive assembly further includes a fixed cylinder and a first elastic element. The fixed cylinder is disposed on the side of the fixed support near the movable support, and the second end of the piston rod extends into the fixed cylinder in an adjustable manner. The first elastic element is disposed in the fixed cylinder and connected to the second end of the piston rod.
[0014] As an optional solution for an in-situ permeability testing device for low-permeability sandstone and conglomerate reservoirs, the in-situ permeability testing device for low-permeability sandstone and conglomerate reservoirs further includes an adjustment unit, which includes adjustment components, the adjustment components comprising:
[0015] The drive mechanism is located on the side of the fixed bracket away from the movable bracket;
[0016] The gear is rotatably mounted on the fixed bracket and connected to the output end of the drive mechanism;
[0017] A rack extends vertically, is disposed on the outer wall of the central conveying pipe, and meshes with the gear.
[0018] As an optional solution for in-situ permeability testing equipment for low-permeability sandstone and conglomerate reservoirs, the adjustment unit further includes a limiting component, which includes:
[0019] A guide member is disposed on the fixed bracket, and the guide member has a guide groove, the extension direction of which is parallel to the axial direction of the gear;
[0020] A magnetic component is disposed at the end of the guide groove, and the magnetic component has a non-magnetic state and a magnetic state;
[0021] A magnetic limiting pin is movably disposed in the guide groove. In the non-magnetic state, the end of the magnetic limiting pin extends between two adjacent teeth of the gear. In the magnetic state, the magnetic limiting pin moves away from the gear under the magnetic attraction of the magnetic component.
[0022] The second elastic element is disposed in the guide groove and connected between the magnetic element and the magnetic limiting pin.
[0023] As an optional solution for in-situ permeability testing equipment for low-permeability sandstone and conglomerate reservoirs, the in-situ permeability testing equipment for low-permeability sandstone and conglomerate reservoirs further includes a cleaning unit, which includes:
[0024] The mounting bracket is located at the end of the central delivery pipe furthest from the drill pipe;
[0025] Multiple cleaning brushes are spaced apart circumferentially on the mounting frame for cleaning the inner wall of the well.
[0026] As an optional solution for in-situ permeability testing of low-permeability sandstone and conglomerate reservoirs, the low-permeability sandstone and conglomerate reservoir permeability testing device also includes a cleaning unit.
[0027] The cleaning unit includes:
[0028] The mounting bracket is located at the end of the central delivery pipe furthest from the drill pipe;
[0029] Multiple cleaning brushes are spaced apart circumferentially on the mounting frame for cleaning the inner wall of the well.
[0030] As an optional solution for in-situ permeability testing of low-permeability sandstone and conglomerate reservoirs, the cleaning unit also includes multiple reset elastic elements, each corresponding to one of the multiple cleaning brushes, and the reset elastic elements are connected to the cleaning brushes and the mounting frame.
[0031] As an optional device for in-situ testing of permeability in low-permeability sandstone and conglomerate reservoirs, the sealing tube is equipped with an arc-shaped stacked steel sheet.
[0032] The beneficial effects of this invention are:
[0033] This invention provides an in-situ permeability testing device for low-permeability sandstone and conglomerate reservoirs. Fluid is supplied to a bidirectional hydraulic cylinder via a central delivery pipe, driving a piston rod to move. This moves a movable support closer to a fixed support, simultaneously compressing a sealing rubber sleeve, causing it to deform and bulge outwards to seal the gaps in the well wall, thus creating a closed testing chamber and establishing an in-situ testing environment for the formation. Gas or liquid is then injected into a detection delivery pipe via the central delivery pipe. The flow rate in the detection delivery pipe is adjusted by a flow meter, and the pressure is adjusted by a pressure gauge to achieve in-situ permeability testing of the formation reservoir. The reservoir area of the testing chamber can be calculated based on the distance between the two sealing rubber sleeves. Combined with the reservoir infiltration flow rate per unit time, the reservoir permeability can be calculated, thus achieving in-situ permeability testing under downhole conditions. This accurately reflects the permeability characteristics of the reservoir and effectively avoids changes in structure and properties caused by environmental changes after reservoir sample extraction. By maintaining the original stress state, temperature conditions, and chemical environment of the reservoir, the high accuracy and reliability of the test results are ensured. Attached Figure Description
[0034] Figure 1 This is a schematic diagram of the structure of the in-situ permeability testing device for low-permeability sandstone and conglomerate reservoirs provided in the specific embodiments of the present invention;
[0035] Figure 2 This is a partial structural schematic diagram of the in-situ permeability testing device for low-permeability sandstone and conglomerate reservoirs provided in a specific embodiment of the present invention;
[0036] Figure 3 This is a partial structural schematic diagram of the sealing component provided in a specific embodiment of the present invention;
[0037] Figure 4 This is a partial structural schematic diagram of the test unit and drainage unit provided in a specific embodiment of the present invention;
[0038] Figure 5 This is a partial structural schematic diagram of the movable support and piston rod provided in a specific embodiment of the present invention;
[0039] Figure 6 This is a partial structural schematic diagram of the sealing tube provided in a specific embodiment of the present invention;
[0040] Figure 7 This is a partial structural schematic diagram of the blocking drive assembly provided in a specific embodiment of the present invention;
[0041] Figure 8 This is a partial structural schematic diagram of the adjustment unit provided in a specific embodiment of the present invention;
[0042] Figure 9This is a partial structural schematic diagram of the cleaning unit provided in a specific embodiment of the present invention;
[0043] Figure 10 This is a schematic diagram of the cleaning unit provided in a specific embodiment of the present invention, with the omitted portion of the structure shown.
[0044] In the picture:
[0045] 1. Central delivery pipe; 11. Connector;
[0046] 2. Sealing unit;
[0047] 21. Sealing components;
[0048] 211. Fixed bracket; 2110. First guide sleeve; 2111. End connecting ring; 2112. Connecting thread;
[0049] 212. Movable support; 2120. Second guide sleeve;
[0050] 213. Sealing sleeve; 2130. Sealing ring; 2131. Connecting end; 2132. End thread;
[0051] 214. Arc-shaped laminated steel sheets;
[0052] 215. Connectors;
[0053] 22. Sealing assembly; 221. Movable sealing sleeve; 222. Sealing end plate;
[0054] 3. Blocking drive unit;
[0055] 31. Blocking drive assembly; 311. Two-way hydraulic cylinder; 3110. Sealing sleeve; 3111. Connecting pipe; 312. Piston rod; 3121. Hydraulic piston; 313. First sealing valve; 314. Fixed cylinder; 315. First elastic element;
[0056] 4. Test unit; 41. Test delivery pipe; 411. Second sealing valve; 42. Flow meter; 43. Pressure gauge; 44. Vertical delivery pipe; 440. Delivery hole;
[0057] 5. Adjustment unit;
[0058] 51. Adjustment component; 511. Drive mechanism; 512. Gear; 513. Rack;
[0059] 52. Limiting component; 521. Guide component; 522. Magnetic component; 523. Magnetic limiting pin; 524. Second elastic component;
[0060] 6. Cleaning unit; 61. Mounting bracket; 610. First storage slot; 611. Support block; 6110. Second storage slot; 62. Cleaning brush; 620. Guide slope; 63. Vertical hydraulic cylinder; 631. Third sealing valve; 64. Vertical hydraulic rod; 641. Top-pressure piston; 65. Top-pressure block; 650. Top-pressure slope; 66. Reset elastic element;
[0061] 7. Drainage unit; 71. Drainage pipe; 711. Drainage inlet; 712. Drainage outlet; 72. Drainage mechanism; 73. Fourth sealing valve. Detailed Implementation
[0062] The present invention will now be described in further detail with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and not intended to limit it. Furthermore, it should be noted that, for ease of description, the accompanying drawings show only the parts relevant to the present invention, and not all of the structures.
[0063] In the description of this invention, unless otherwise explicitly specified and limited, the terms "connected," "linked," and "fixed" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.
[0064] In this invention, unless otherwise explicitly specified and limited, "above" or "below" the second feature can include direct contact between the first and second features, or contact between the first and second features through another feature between them. Furthermore, "above," "over," and "on top" of the second feature includes the first feature directly above or diagonally above the second feature, or simply indicates that the first feature is at a higher horizontal level than the second feature. "Below," "below," and "under" the second feature includes the first feature directly below or diagonally below the second feature, or simply indicates that the first feature is at a lower horizontal level than the second feature.
[0065] In the description of this embodiment, the terms "upper," "lower," "right," etc., refer to the orientation or positional relationship shown in the accompanying drawings. They are used only for ease of description and simplification of operation, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on the present invention. In addition, the terms "first" and "second" are used only for distinction in description and have no special meaning.
[0066] The technical solution of the present invention will be further described below with reference to the accompanying drawings and specific embodiments.
[0067] like Figures 1 to 10 As shown, this embodiment provides an in-situ permeability testing device for low-permeability sandstone and conglomerate reservoirs, including a central delivery pipe 1, a plugging unit 2, a plugging drive unit 3, and a testing unit 4. The central delivery pipe 1 is connected to the drill pipe and is used to deliver fluid. The plugging unit 2 includes two plugging components 21 arranged vertically at intervals. Each plugging component 21 includes a fixed support 211, a movable support 212, and a plugging sleeve 213. The fixed support 211 is sleeved on the outer wall of the central delivery pipe 1, the movable support 212 is movably sleeved on the outer wall of the central delivery pipe 1, and the plugging sleeve 213 is disposed between the fixed support 211 and the movable support 212, and abuts against the inner wall of the well. The two movable supports 212 enclose a testing chamber. The plugging drive unit 3 includes multiple plugging drive components 31 spaced apart. Each plugging drive component 31 includes a bidirectional hydraulic cylinder 311 and two piston rods 312. The bidirectional hydraulic cylinder 311 is connected to the central delivery pipe 1. The piston rods 312 pass through corresponding movable supports 212, and the first ends of the two piston rods 312 are correspondingly and movably inserted through the two ends of the bidirectional hydraulic cylinder 311. The second ends of the two piston rods 312 are correspondingly connected to two fixed supports 211. The central delivery pipe 1 delivers fluid to the bidirectional hydraulic cylinder 311, driving the two piston rods 312 to move away from each other, thereby driving the two movable supports 212 to move away from each other. That is, the movable support 212 of each plugging component 21 moves towards the fixed support 211 to compress the plugging rubber cylinder 213. The plugging rubber cylinder 213 deforms and protrudes outward to seal the gap in the well wall, so that the two movable supports 212 enclose a closed test chamber. Specifically, in this embodiment, two bidirectional hydraulic cylinders 311 are provided.
[0068] Test unit 4 includes a test delivery pipe 41, a flow meter 42, and a pressure gauge 43, such as Figure 3 As shown, the detection delivery pipe 41 is installed in the test chamber and connected to the central delivery pipe 1. A flow meter 42 and a pressure gauge 43 are both installed in the detection delivery pipe 41. Gas or liquid is supplied to the detection delivery pipe 41 through the central delivery pipe 1. The flow rate in the detection delivery pipe 41 is adjusted by the flow meter 42, and the pressure in the detection delivery pipe 41 is adjusted by the pressure gauge 43 to achieve in-situ permeability testing of the formation reservoir downhole. Simultaneously, the reservoir area of the test chamber can be calculated based on the distance between the two sealing sleeves 213. Combined with the reservoir infiltration flow rate per unit time, the reservoir permeability can be calculated, thus achieving permeability testing under in-situ downhole conditions and accurately reflecting the permeability characteristics of the reservoir.
[0069] For example, both the pressure gauge 43 and the flow meter 42 are devices already disclosed in the prior art, and their specific structures and principles are the same as those in the prior art, and will not be described in detail here. As long as the pressure gauge 43 can monitor and regulate the pressure of the fluid, and the flow meter 42 can monitor and regulate the flow rate of the fluid, it is sufficient.
[0070] Specifically, in this embodiment, referring to Figure 1 The end of the central delivery pipe 1 is provided with a connector 11 to facilitate the connection between the central delivery pipe 1 and the drill pipe and improve the connection efficiency.
[0071] Specifically, the fixed bracket 211 is provided with a first guide sleeve 2110, and the central conveying pipe 1 passes through the first guide sleeve 2110; the movable bracket 212 is provided with a second guide sleeve 2120, and the central conveying pipe 1 passes through the second guide sleeve 2120.
[0072] Optionally, refer to Figure 6 An arc-shaped layered steel sheet 214 is inserted inside the sealing tube 213. During the deformation and outward bulging of the sealing tube 213, the arc-shaped layered steel sheet 214 bends outward simultaneously to support the sealing tube 213, thereby improving the overall strength of the sealing tube 213 and ensuring its sealing performance.
[0073] Specifically, continue to refer to Figure 6 The outer wall of the sealing tube 213 is provided with multiple sealing protrusions 2130 at vertical intervals to further improve the sealing performance.
[0074] More specifically, refer to Figures 3 to 7 Both the fixed bracket 211 and the movable bracket 212 are provided with end connecting rings 2111, and the outer peripheral wall of the end connecting rings 2111 is provided with connecting threads 2112; both ends of the sealing tube 213 are provided with connecting ends 2131, and the outer peripheral wall of the connecting ends 2131 is provided with end threads 2132. The sealing assembly 21 also includes two connectors 215. One connector 215 is sleeved at the connection between the fixed bracket 211 and the sealing tube 213, and is threaded onto the end threads 2132 and the connecting threads 2112; the other connector 215 is sleeved at the connection between the movable bracket 212 and the sealing tube 213, and is threaded onto the end threads 2132 and the connecting threads 2112, so as to stably set the sealing tube 213 between the fixed bracket 211 and the movable bracket 212.
[0075] Optionally, the sealing unit 2 further includes a sealing assembly 22, which includes a movable sealing sleeve 221 and a sealing end plate 222, such as Figure 3As shown, the movable sealing sleeve 221 is located on the side of the movable support 212 facing away from the fixed support 211, that is, the movable sealing sleeve 221 is located on the side of the movable support 212 facing the test chamber; the sealing end plate 222 is embedded in the movable sealing sleeve 221 and abuts against the movable support 212, and the piston rod 312 passes through the sealing end plate 222. The above arrangement can ensure the sealing of the test chamber.
[0076] Specifically, the two ends of the bidirectional hydraulic cylinder 311 are respectively connected to two sealing end plates 222, combined with Figure 4 The end of the bidirectional hydraulic cylinder 311 is provided with a sealing sleeve 3110, which is embedded in the sealing end plate 222, and the piston rod 312 is movably inserted into the sealing sleeve 3110.
[0077] Optionally, the sealing drive assembly 31 also includes a first sealing valve 313, such as Figure 3 As shown, the first sealing valve 313 is located between the central delivery pipe 1 and the bidirectional hydraulic cylinder 311, and is used to adjust whether the bidirectional hydraulic cylinder 311 is connected to the central delivery pipe 1. Specifically, after the sealing rubber sleeve 213 deforms and protrudes to seal the gap in the well wall, closing the first sealing valve 313 ensures that the pressure inside the bidirectional hydraulic cylinder 311 remains stable, thereby ensuring the stability of the two sealing rubber sleeves 213. Exemplarily, the first sealing valve 313 also has an existing structure, and its specific structure and principle refer to the prior art, which will not be described in detail here. Preferably, the first sealing valve 313 is a solenoid valve for remote control.
[0078] Specifically, each bidirectional hydraulic cylinder 311 is connected to the central delivery pipe 1 through a connecting pipe 3111, and each connecting pipe 3111 is equipped with a first sealing valve 313.
[0079] More specifically, such as Figure 5 As shown, each piston rod 312 is provided with a hydraulic piston 3121 at its end. The hydraulic piston 3121 is in close contact with the inner wall of the bidirectional hydraulic cylinder 311 to reduce the lateral load on the piston rod 312 and avoid bending or uneven wear.
[0080] Optionally, the blocking drive assembly 31 further includes a fixed cylinder 314 and a first elastic element 315, such as Figure 7As shown, the fixed cylinder 314 is disposed on the side of the fixed bracket 211 facing the movable bracket 212, and the second end of the piston rod 312 extends into the fixed cylinder 314 in an adjustable position; the first elastic element 315 is disposed inside the fixed cylinder 314 and connected to the second end of the piston rod 312. With this configuration, during the deformation and outward protrusion of the sealing rubber sleeve 213, the first elastic element 315 deforms under the compression of the piston rod 312; when the test is completed, the first sealing valve 313 is opened, and under the elastic action of the first elastic element 315, the piston rod 312 can be pushed back to its original position, thereby driving the sealing rubber sleeve 213 to reset, facilitating the movement of the testing device within the well.
[0081] Specifically, in this embodiment, the first elastic element 315 is a spring, which has good elasticity and is easy to obtain, economical and durable.
[0082] Optionally, refer to Figure 3 A second sealing valve 411 is provided on the detection delivery pipe 41. Before the test begins, when it is necessary to drive the sealing sleeve 213 to deform and bulge outward, the second sealing valve 411 can be closed, allowing all the fluid in the central delivery pipe 1 to be sent to the bidirectional hydraulic cylinder 311. After sealing is completed, the first sealing valve 313 is closed, and the second sealing valve 411 is opened, allowing the fluid to be sent to the test chamber through the detection delivery pipe 41. Exemplarily, the second sealing valve 411 also has an existing structure, and its specific structure and principle refer to the prior art, which will not be described in detail here. Preferably, the second sealing valve 411 is a solenoid valve for remote control.
[0083] Optionally, such as Figure 2 As shown, the test unit 4 also includes a vertical delivery pipe 44, which is connected between two movable supports 212. The length of the vertical delivery pipe 44 is adjustable. The vertical delivery pipe 44 is connected to the detection delivery pipe 41, and the vertical delivery pipe 44 is provided with multiple delivery holes 440 spaced apart. The above configuration can improve the efficiency of the detection delivery pipe 41 in delivering fluid into the test chamber. At the same time, the multiple delivery holes 440 can improve the uniformity of fluid delivery into the test chamber.
[0084] Specifically, in this embodiment, four vertical conveying pipes 44 are provided; in other embodiments, the number of vertical conveying pipes 44 can be set as needed, and no specific limitation is made here.
[0085] Optionally, the in-situ permeability testing device for low-permeability sandstone and conglomerate reservoirs also includes an adjustment unit 5, which comprises an adjustment component 51. (Refer to...) Figure 3 and Figure 8The adjustment assembly 51 includes a drive mechanism 511, a gear 512, and a rack 513. The drive mechanism 511 is located on the side of the fixed bracket 211 away from the movable bracket 212. The gear 512 is rotatably mounted on the fixed bracket 211 and connected to the output end of the drive mechanism 511. The rack 513 extends vertically, is located on the outer wall of the central delivery pipe 1, and meshes with the gear 512. Driven by the drive mechanism 511, the gear 512 rotates around its own axis. Combined with the meshing action of the gear 512 and the rack 513, this causes the fixed bracket 211 to move vertically relative to the central delivery pipe 1, thereby adjusting the position of the fixed bracket 211 on the outer wall of the central delivery pipe 1. Simultaneously, the distance between the two fixed brackets 211 can be adjusted to change the position of the test chamber as needed, making it more flexible and convenient to use. For example, the drive mechanism 511 is a motor commonly used in the art.
[0086] Specifically, in this embodiment, each fixed bracket 211 is provided with an adjustment component 51; in other embodiments, only one of the fixed brackets 211 may be provided with an adjustment component 51.
[0087] Furthermore, the adjustment unit 5 also includes a limiting component 52, continuing to refer to... Figure 8 The limiting component 52 includes a guide 521, a magnetic component 522, a magnetic limiting pin 523, and a second elastic component 524. The guide 521 is disposed on the fixed bracket 211 and has a guide groove, the extension direction of which is parallel to the axial direction of the gear 512. The magnetic component 522 is disposed at the end of the guide groove and has a magnetic state and a non-magnetic state. The magnetic limiting pin 523 is movably disposed within the guide groove. When the magnetic component 522 is in the non-magnetic state, the magnetic... The end of the limiting pin 523 extends between two adjacent teeth of the gear 512 to restrict the rotation of the gear 512, improve the stability of the fixed bracket 211, and prevent the fixed bracket 211 from moving relative to the outer wall of the central conveying pipe 1. When the magnetic component 522 is in a magnetic state, the magnetic limiting pin 523 moves away from the gear 512 under the magnetic attraction of the magnetic component 522, that is, the magnetic limiting pin 523 disengages from the two adjacent teeth of the gear 512, releasing the limitation on the gear 512.
[0088] The second elastic element 524 is disposed in the guide groove and connected between the magnetic element 522 and the magnetic limiting pin 523. During the process of the magnetic element 522 switching from a non-magnetic state to a magnetic state, the magnetic limiting pin 523 is attracted to move, which will compress the second elastic element 524, causing the second elastic element 524 to accumulate elastic potential energy. When the magnetic element 522 switches from a magnetic state to a non-magnetic state, the second elastic element 524 restores its deformation, releases the accumulated elastic potential energy, and pushes the magnetic limiting pin 523 into the space between two adjacent teeth of the gear 512. At the same time, under the elastic force of the second elastic element 524, the magnetic limiting pin 523 can be prevented from disengaging from the space between two adjacent teeth of the gear 512 under external force disturbance, which helps to improve the stability of the magnetic limiting pin 523.
[0089] Specifically, the magnetic component 522 is an electromagnet commonly used in the field, which is magnetic when energized and non-magnetic when de-energized; the second elastic component 524 is a commonly used spring, which is readily available and economical.
[0090] Optionally, the in-situ permeability testing device for low-permeability sandstone and conglomerate reservoirs also includes a cleaning unit 6. (Refer to...) Figure 9 The cleaning unit 6 includes a mounting frame 61 and multiple cleaning brushes 62. The mounting frame 61 is located at the end of the central delivery pipe 1 furthest from the drill pipe; the multiple cleaning brushes 62 are spaced apart circumferentially on the mounting frame 61 for cleaning the inner wall of the well. This arrangement allows the entire device to rotate before testing, driven by the rotation of the drill pipe, to clean the inner wall of the test section, preventing adhering mud and other debris from affecting subsequent testing and further improving the accuracy and reliability of the test results.
[0091] Specifically, continue to refer to Figure 9 The mounting bracket 61 has multiple first storage slots 610 spaced apart. Each storage slot has a support block 611 embedded in it. Each support block 611 has a second storage slot 6110. Each second storage slot 6110 has a cleaning brush 62 embedded in it.
[0092] Furthermore, referring to Figure 9 and Figure 10The cleaning unit 6 also includes a vertical hydraulic cylinder 63, a vertical hydraulic rod 64, and a top pressure block 65. The vertical hydraulic cylinder 63 is mounted on the mounting bracket 61 and connected to the central delivery pipe 1. The first end of the vertical hydraulic rod 64 is adjustablely positioned through the vertical hydraulic cylinder 63. The top pressure block 65 is fitted onto the vertical hydraulic cylinder 63 and connected to the second end of the vertical hydraulic rod 64. The outer peripheral wall of the top pressure block 65 is provided with a top pressure inclined surface 650, and each cleaning brush 62 is provided with a guide inclined surface 620, which abuts against the top pressure inclined surface 650. With the above configuration, fluid is delivered into the vertical hydraulic cylinder 63 through the central delivery pipe 1, which can drive the vertical hydraulic rod 64 to move. When the first end of the vertical hydraulic rod 64 moves within the vertical hydraulic cylinder 63, it can simultaneously drive the vertical movement of the top pressure block 65. Under the contact between the top pressure inclined surface 650 and the guide wire inclined surface, multiple cleaning brushes 62 can be driven to move along the radial direction of the well, so as to ensure that the cleaning brushes 62 can contact the inner wall of the well, thereby ensuring the smooth progress of subsequent cleaning.
[0093] In other words, the cleaning brush 62 has a cleaning state where it extends out of the second storage groove 6110 and a stored state where it is stored in the second storage groove 6110. Driven by the vertical hydraulic rod 64, multiple cleaning brushes 62 can extend out of the second storage groove 6110 simultaneously.
[0094] Specifically, a third sealing valve 631 is provided at the connection between the vertical hydraulic cylinder 63 and the central delivery pipe 1. When it is necessary to clean the inner wall of the well, the third sealing valve 631 is opened to allow fluid to enter the vertical hydraulic cylinder 63. For example, the third sealing valve 631 is also preferably a solenoid valve for easy remote control. In addition, a top-pressure piston 641 is provided at the end of the vertical hydraulic rod 64. The fluid flowing through the central delivery pipe 1 into the vertical hydraulic cylinder 63 pushes the top-pressure piston 641 to drive the vertical hydraulic rod 64 to move.
[0095] More specifically, the vertical hydraulic cylinder 63 is detachably connected to the central delivery pipe 1 via a threaded sleeve structure, facilitating assembly and disassembly.
[0096] Furthermore, the cleaning unit 6 also includes multiple reset elastic elements 66, each corresponding to a single cleaning brush 62. The reset elastic elements 66 are connected to the cleaning brush 62 and the mounting bracket 61. With this configuration, after cleaning is completed, the elastic force of the reset elastic elements 66 can drive the cleaning brush 62 to move away from the borehole wall, causing the cleaning brush 62 to detach from the borehole wall. Specifically, the reset elastic element 66 is a horizontal spring.
[0097] Specifically, in this embodiment, a third storage groove is provided on the support block 611. The third storage groove is connected to the second storage groove 6110. The reset elastic member 66 is disposed in the third storage groove and abuts against one side of the cleaning brush 62. At the same time, one end of the reset elastic member 66 is connected to the side wall of the third storage groove, and the other end is connected to the cleaning brush 62.
[0098] Optionally, the in-situ permeability testing device for low-permeability sandstone and conglomerate reservoirs also includes a drainage unit 7. When the device is used in a well containing fluid, the fluid in the testing chamber can be drained through the drainage unit 7, thus broadening its applicability.
[0099] like Figure 4 As shown, the drainage unit 7 includes a drainage pipe 71, a drainage mechanism 72, and a fourth sealing valve 73. A movable support 212 located on the bottom side is provided with a drainage inlet 711. The drainage pipe 71 is mounted on the movable support 212 and connected to the drainage inlet 711. A drainage outlet 712 is provided at the end of the drainage pipe 71 away from the movable support 212. The drainage mechanism 72 and the fourth sealing valve 73 are both located on the drainage pipe 71. Under the suction action of the drainage mechanism 72, the liquid in the test chamber enters the drainage pipe 71 through the drainage inlet 711 and is discharged through the drainage outlet 712. After the liquid in the test chamber has been completely drawn out, the fourth sealing valve 73 is closed to ensure the airtightness of the test chamber.
[0100] For example, the drainage mechanism 72 is a water pump commonly used in the art; the fourth sealing valve 73 is preferably a solenoid valve for remote control.
[0101] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the implementation of the present invention. Those skilled in the art will be able to make various obvious changes, readjustments, and substitutions without departing from the scope of protection of the present invention. It is neither necessary nor possible to exhaustively describe all embodiments here. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the scope of protection of the claims of the present invention.
Claims
1. An in-situ permeability testing device for low-permeability sandstone and conglomerate reservoirs, characterized in that, include: The central delivery pipe (1) is connected to the drill pipe; The sealing unit (2) includes two sealing components (21) arranged vertically at intervals. Each sealing component (21) includes a fixed bracket (211), a movable bracket (212), and a sealing rubber tube (213). The fixed bracket (211) is sleeved on the outer wall of the central delivery pipe (1), and the movable bracket (212) is movably sleeved on the outer wall of the central delivery pipe (1). The sealing rubber tube (213) is disposed between the fixed bracket (211) and the movable bracket (212) and abuts against the inner wall of the well. The two movable brackets (212) enclose a test chamber. The blocking drive unit (3) includes a plurality of blocking drive components (31) arranged at intervals. Each blocking drive component (31) includes a bidirectional hydraulic cylinder (311) and two piston rods (312). The bidirectional hydraulic cylinder (311) is connected to the central delivery pipe (1). The piston rods (312) pass through the corresponding movable brackets (212). The first ends of the two piston rods (312) are movably inserted through the two ends of the bidirectional hydraulic cylinder (311) in a one-to-one correspondence, and the second ends are connected to the two fixed brackets (211) in a one-to-one correspondence. The test unit (4) includes a test delivery pipe (41), a flow meter (42) and a pressure gauge (43). The test delivery pipe (41) is located in the test chamber and is connected to the central delivery pipe (1). The flow meter (42) and the pressure gauge (43) are both located in the test delivery pipe (41).
2. The in-situ permeability testing device for low-permeability sandstone and conglomerate reservoirs according to claim 1, characterized in that, The test unit (4) also includes a vertical conveying pipe (44), which is connected between the two movable supports (212) and the length of the vertical conveying pipe (44) is adjustable. The vertical conveying pipe (44) is connected to the detection conveying pipe (41) and the vertical conveying pipe (44) is provided with a plurality of conveying holes (440) spaced apart.
3. The in-situ permeability testing device for low-permeability sandstone and conglomerate reservoirs according to claim 1, characterized in that, The blocking drive assembly (31) further includes a first sealing valve (313), which is disposed between the central delivery pipe (1) and the bidirectional hydraulic cylinder (311) for adjusting whether the bidirectional hydraulic cylinder (311) is connected to the central delivery pipe (1).
4. The in-situ permeability testing device for low-permeability sandstone and conglomerate reservoirs according to claim 1, characterized in that, The blocking drive assembly (31) further includes a fixed cylinder (314) and a first elastic element (315). The fixed cylinder (314) is disposed on the side of the fixed bracket (211) near the movable bracket (212). The second end of the piston rod (312) is adjustablely inserted into the fixed cylinder (314). The first elastic element (315) is disposed in the fixed cylinder (314) and connected to the second end of the piston rod (312).
5. The in-situ permeability testing device for low-permeability sandstone and conglomerate reservoirs according to claim 1, characterized in that, The in-situ permeability testing device for low-permeability sandstone and conglomerate reservoirs further includes an adjustment unit (5), which includes an adjustment component (51). The adjustment component (51) includes: The drive mechanism (511) is located on the side of the fixed bracket (211) away from the movable bracket (212); The gear (512) is rotatably mounted on the fixed bracket (211) and connected to the output end of the drive mechanism (511); A rack (513) extends vertically, is disposed on the outer wall of the central conveying pipe (1), and meshes with the gear (512).
6. The in-situ permeability testing device for low-permeability sandstone and conglomerate reservoirs according to claim 5, characterized in that, The adjustment unit (5) further includes a limiting component (52), the limiting component (52) comprising: A guide member (521) is provided on the fixed bracket (211). The guide member (521) has a guide groove, and the extension direction of the guide groove is parallel to the axial direction of the gear (512). A magnetic component (522) is disposed at the end of the guide groove, and the magnetic component (522) has a non-magnetic state and a magnetic state; A magnetic limiting pin (523) is movably disposed in the guide groove. In the non-magnetic state, the end of the magnetic limiting pin (523) extends between two adjacent teeth of the gear (512). In the magnetic state, the magnetic limiting pin (523) moves away from the gear (512) under the magnetic attraction of the magnetic component (522). The second elastic element (524) is disposed in the guide groove and connected between the magnetic element (522) and the magnetic limiting pin (523).
7. The in-situ permeability testing device for low-permeability sandstone and conglomerate reservoirs according to claim 1, characterized in that, The in-situ permeability testing device for low-permeability sandstone and conglomerate reservoirs also includes a cleaning unit (6), which comprises: Mounting bracket (61) is located at one end of the central delivery pipe (1) away from the drill rod; Multiple cleaning brushes (62) are spaced apart circumferentially on the mounting frame (61) for cleaning the inner wall of the well.
8. The in-situ permeability testing device for low-permeability sandstone and conglomerate reservoirs according to claim 7, characterized in that, The cleaning unit (6) further includes: A vertical hydraulic cylinder (63) is mounted on the mounting bracket (61) and connected to the central delivery pipe (1); A vertical hydraulic rod (64) has its first end adjustablely inserted into the vertical hydraulic cylinder (63); A top pressure block (65) is sleeved on the vertical hydraulic cylinder (63) and connected to the second end of the vertical hydraulic rod (64). The outer peripheral wall of the top pressure block (65) is provided with a top pressure inclined surface (650). Each of the cleaning brushes (62) is provided with a guide inclined surface (620), and the guide inclined surface (620) abuts against the top pressure inclined surface (650).
9. The in-situ permeability testing device for low-permeability sandstone and conglomerate reservoirs according to claim 8, characterized in that, The cleaning unit (6) further includes a plurality of reset elastic elements (66), each of which corresponds to a plurality of cleaning brushes (62). The reset elastic elements (66) are connected to the cleaning brushes (62) and the mounting bracket (61).
10. The in-situ permeability testing device for low-permeability sandstone and conglomerate reservoirs according to any one of claims 1-9, characterized in that, The sealing rubber tube (213) is equipped with an arc-shaped stacked steel sheet (214).
