A carrying device for a tunneling machine to cross a karst cave and a construction method
By designing a multi-stage telescopic longitudinal spanning beam and a follow-up telescopic load-bearing slipper, the problem of bottom stratum support continuity when the tunnel boring machine passes through the underlying karst cave was solved, realizing a stable load-bearing path for the tunnel boring machine to pass through the karst cave and reducing the risk of attitude deviation.
Patent Information
- Application Number
- CN202611590924.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-14
- Publication Date
- 2026-11-24
AI Technical Summary
When a tunnel boring machine (TBM) passes through a large underlying karst cave, the continuity of the underlying stratum support decreases, making it prone to sinking and attitude deviation. Conventional external load-bearing beams, brackets, and tracks are difficult to use to enter the karst cave area with the TBM and form a continuous load-bearing path without affecting the normal tunneling of the TBM.
The structure employs a multi-stage telescopic longitudinal spanning beam, a segmented beam top bearing guide surface, a telescopic near-end bearing seat, and a telescopic far-end anchoring assembly to form a structure that can be retracted and expanded. As the tunnel boring machine enters the karst cave area, a stable spanning bearing path is gradually established, and the load is gradually transferred through the follow-up telescopic bearing slipper.
Without expanding the outer contour of the tunnel boring machine's normal tunneling, a reliable crossing bearing path is formed, reducing the risks of sinking, pitching deviation, and rolling of the tunnel boring machine during the support system conversion process, and ensuring that the tunnel boring machine passes through the karst cave stably.
Smart Images

Figure CN123153757A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of tunnel boring machine technology, specifically to a support device and construction method for a tunnel boring machine crossing a karst cave. Background Technology
[0002] During tunnel boring machine (TBM) excavation in karst formations, it may encounter situations where the main body of a karst cave is located below the tunnel excavation outline, and the top of the karst cave intrudes into the TBM excavation outline, or the rock strata between the top of the karst cave and the bottom of the shield are thin and, after pretreatment, form a free space for the deployment of load-bearing components. When the span of the underlying karst cave is large, the bottom bearing conditions are unclear, or it is not suitable to use overall backfilling, the continuous bottom support that the TBM originally relied on to form from the strata will be interrupted in the karst cave area. The TBM is heavy and is also subjected to the combined effects of cutterhead reaction force, propulsion reaction force, and attitude adjustment load during the excavation process. After the continuity of the bottom support is reduced, problems such as sinking, head tilting, lateral displacement, and rolling are likely to occur. Especially during the process of the TBM transitioning from normal strata support to karst cave crossing, if a stable and continuous temporary bearing path cannot be established, it may also lead to sudden changes in the shield's attitude, affecting the cutterhead excavation direction and the subsequent segment assembly accuracy.
[0003] Existing methods for tunnel boring machines (TBMs) to pass through stations or special sections typically rely on working shafts, stations, underground excavation spaces, or pre-formed brackets, rails, and support beams for load-bearing. However, for large underlying karst caves that are only gradually revealed as the cutterhead advances, there are still intact strata in front of the TBM. If large-sized guide rails, brackets, or integral load-bearing beams that protrude downwards are installed on the outside of the shield for a long period of time, these structures are likely to exceed the normal tunneling envelope of the TBM. Not only will they be difficult to pass through the intact strata in front of the TBM, but they may also interfere with the shield shell, tail seal, and segment assembly space. At the same time, large rigid load-bearing beams themselves are difficult to store and transport as a whole in the limited internal space of the shield.
[0004] Therefore, how to enable the load-bearing components to reach the karst area with the tunnel boring machine (TBM) without expanding the outer contour of the TBM's normal tunneling, and to form a reliable crossing load-bearing path in the free space exposed by the cutterhead, while enabling the TBM to stably pass through the underlying karst along this load-bearing path, has become a technical problem that needs to be solved. Summary of the Invention
[0005] The purpose of this application is to provide a support device and construction method for a tunnel boring machine (TBM) crossing a karst cave, in order to solve the problems in the prior art where the continuity of the bottom stratum support is reduced when the TBM passes through a large underlying karst cave, making it prone to sinking and attitude deviation. At the same time, conventional external support beams, brackets and tracks are difficult to enter the karst cave area with the TBM and form a continuous support path without affecting the normal tunneling of the TBM.
[0006] To achieve the above objectives, this application provides the following technical solution:
[0007] A load-bearing device for a tunnel boring machine (TBM) crossing a karst cave includes a shield body. The shield body is equipped with a beam housing and deployment assembly, which is connected to a multi-stage telescopic longitudinal crossing beam capable of expanding outwards. The top of the multi-stage telescopic longitudinal crossing beam has a segmented beam-top load-bearing guide surface that expands and contracts with the beam body. Telescopic near-end bearing seats and telescopic far-end anchoring components are respectively installed at both ends of the multi-stage telescopic longitudinal crossing beam. A follow-up telescopic load-bearing slipper is movably installed at the lower part of the shield body. After the multi-stage telescopic longitudinal crossing beam is deployed, it can form a load-bearing relationship with stable parts on both sides of the karst cave through the telescopic near-end bearing seats and telescopic far-end anchoring components, and remain fixed relative to the stratum. The follow-up telescopic load-bearing slipper can extend and be supported on the segmented beam-top load-bearing guide surface. When the shield body moves forward, it drives the follow-up telescopic load-bearing slipper to move along the fixed multi-stage telescopic longitudinal crossing beam, thereby establishing a crossing load-bearing path where the stable parts on both sides of the karst cave bear the main load when the load-bearing conditions at the bottom of the karst cave are unclear.
[0008] Furthermore, the beam housing and deployment components are located inside the shield body or at the material supply position connected to the shield body. The multi-stage telescopic longitudinal spanning beam, segmented beam top bearing guide surface, telescopic near-end bearing seat, and telescopic far-end anchoring components can be retracted and housed within the outer contour of the shield body when not in operation. This allows the newly added bearing components to pass through the complete strata ahead with the tunnel boring machine and then unfold to the outside of the shield body after the cutterhead gradually exposes the underlying free space, thereby reducing the impact of the bearing components on the normal tunneling envelope of the tunnel boring machine.
[0009] Furthermore, the multi-stage telescopic longitudinal spanning beam is composed of multiple beam sections that slide and fit together sequentially along the length direction. Adjacent beam sections can expand and contract relative to each other along the shield tunneling direction and maintain partial overlap after reaching the unfolded position. The locking relationship between the overlapping parts of adjacent beam sections restricts further axial movement between the beam sections, allowing adjacent beam sections to transfer the load-bearing capacity through the overlapping area. Thus, while meeting the length requirements, an overall load-bearing beam spanning the underlying karst cave is formed.
[0010] Furthermore, at least two multi-stage telescopic longitudinal spanning beams are arranged side by side along the transverse direction of the shield body, so that the load transmitted by the tunnel boring machine to the spanning load-bearing system can be distributed along the transverse direction of the shield body and supported by multiple load-bearing positions, thereby reducing the degree of concentrated load borne by a single spanning beam.
[0011] Furthermore, the segmented beam top bearing guide surfaces are respectively set on the top of each beam section of the multi-level telescopic longitudinal span beam, and can be expanded and retracted synchronously with the corresponding beam section. Adjacent segmented beam top bearing guide surfaces form a continuous or nearly continuous bearing guide path through overlapping, staggered connection or sliding coverage, so that the multi-level telescopic longitudinal span beam forms a working surface for the moving telescopic bearing slipper while it is unfolding, thereby reducing the need for laying additional independent long-distance guide structures.
[0012] Furthermore, the telescopic near-end bearing seat is set at the end of the multi-stage telescopic longitudinal crossing beam near the excavated area, and can extend to form a support or fixation relationship with the near-end stable part. The telescopic far-end anchoring component is set at the end of the multi-stage telescopic longitudinal crossing beam away from the excavated area, and can extend to form a pressure-bearing or anchoring relationship with the far-end stable rock mass. This allows the multi-stage telescopic longitudinal crossing beam to be transformed from a storage component transported with the tunnel boring machine into a crossing bearing component that is relatively fixed to the strata after deployment.
[0013] Furthermore, multiple follow-up telescopic load-bearing slippers are provided, which are distributed along the length and width of the shield body and can extend and retract independently. When the tunnel boring machine transitions from normal ground support to cross-beam support, the support relationship can be established sequentially through multiple follow-up telescopic load-bearing slippers, realizing the gradual transfer of the shield load. At the same time, by adjusting the extension amount of the follow-up telescopic load-bearing slippers at different positions, the support height and load ratio at different positions of the shield body can be changed, thereby adjusting the pitch and roll attitude of the shield body.
[0014] Furthermore, in the retracted state, the outer bearing surface of the follow-up telescopic bearing slipper is located inside or flush with the outer surface of the shield body. After the corresponding shield body part enters the under-lying free space, the follow-up telescopic bearing slipper extends downward and slides or rolls with the segmented beam top bearing guide surface, so that the follow-up telescopic bearing slipper will not form a structure that protrudes from the outside of the shield body for a long time during the normal tunneling stage, and establishes a moving bearing relationship between the shield body and the fixed crossing beam during the crossing stage.
[0015] A method for constructing a tunnel boring machine (TBM) across a karst cave involves first detecting and determining the extent, water pressure, and stable locations on both sides of the cave along the TBM's excavation direction. While the TBM is primarily supported by stable ground near its end, the cutterhead gradually exposes the underlying free space. A multi-stage telescopic longitudinal crossing beam is then pushed into the free space using a beam-mounted deployment assembly, extending and locking it stage by stage. This allows the segmented beam top bearing guide surface to unfold synchronously with each beam segment. Next, the telescopic near-end bearing seats and telescopic far-end anchoring assemblies establish bearing relationships with the stable locations on both sides of the underlying karst cave, respectively. The multi-stage telescopic longitudinal crossing beam is then preloaded or subjected to bearing... The load is checked and kept fixed relative to the stratum. As the tunnel boring machine (TBM) continues to move forward, the corresponding telescopic bearing slippers extend sequentially and support the segmented beam top bearing guide surface, so that the load of the TBM gradually transfers from the near-end stable stratum to the multi-stage telescopic longitudinal crossing beam. As the TBM continues to move forward, the telescopic bearing slippers move with the shield body and move relative to the fixed multi-stage telescopic longitudinal crossing beam. After the TBM gradually enters the far-end stable stratum, the load borne by each telescopic bearing slipper is reduced sequentially and it is retracted, thereby completing the continuous transition of the TBM from near-end stratum support, crossing beam support to far-end stratum support.
[0016] The technical solution provided in this application has the following advantages compared with the prior art:
[0017] 1. This application sets the multi-stage telescopic longitudinal spanning beam, the segmented beam top bearing guide surface, the telescopic near-end bearing seat, and the telescopic far-end anchoring assembly into a structure that can be retracted and deployed. This allows the bearing components to remain within the outer contour of the shield during the normal tunneling phase of the tunnel boring machine, and to be deployed after the cutterhead gradually exposes the underlying free space. The multi-stage telescopic longitudinal spanning beam extends step by step through multiple beam sections to obtain a working length that matches the span of the karst cave. The segmented beam top bearing guide surface deploys simultaneously with each stage of the beam section, thus eliminating the need for the entire long rigid bearing beam or independent long-distance track to protrude outside the shield for a long time. This reduces the impact of the newly added bearing components on the normal tunneling of the tunnel while forming a karst cave crossing bearing path.
[0018] 2. This application uses a telescopic near-end bearing seat and a telescopic far-end anchoring assembly to keep the deployed multi-stage telescopic longitudinal crossing beam fixed relative to the stratum. Multiple follow-up telescopic bearing slippers set at the bottom of the shield gradually transfer the shield load to the fixed multi-stage telescopic longitudinal crossing beam. When the tunnel boring machine moves forward, the follow-up telescopic bearing slippers move with the shield and slide or roll along the segmented beam top bearing guide surface, so that the shield load can be transferred to the stable parts on both sides of the karst cave through the multi-stage telescopic longitudinal crossing beam, reducing the dependence on the bearing conditions at the bottom of the karst cave. At the same time, the multiple follow-up telescopic bearing slippers can be loaded and unloaded in stages, and the support state of different positions of the shield can be adjusted by different extension amounts, thereby reducing the risk of sudden sinking, pitching deviation and rolling of the tunnel boring machine during the support system conversion process. Attached Figure Description
[0019] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0020] Figure 1 This is a schematic diagram of the overall longitudinal structure of the tunnel boring machine crossing the underlying karst cave in accordance with the embodiments of this application;
[0021] Figure 2 This is a schematic diagram illustrating the storage and deployment process of the telescopic load-bearing components in this application;
[0022] Figure 3 This is a schematic diagram showing the interaction between the adaptive telescopic load-bearing slipper and the multi-stage telescopic longitudinal spanning beam in this application;
[0023] Figure 4 This is a flowchart illustrating the method for tunnel boring machine (TBM) construction across a karst cave in this application.
[0024] Explanation of icon numbers:
[0025] 1. Tunnel boring machine; 2. Cutterhead; 3. Shield body; 4. Segment; 5. Beam housing and deployment assembly; 6. Multi-stage telescopic longitudinal spanning beam; 7. Segmented beam top bearing guide surface; 8. Telescopic near-end bearing seat; 9. Telescopic far-end anchoring assembly; 10. Follow-up telescopic bearing slipper. Detailed Implementation
[0026] To make the objectives, technical solutions, and advantages of the embodiments of this application clearer, the technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of this application. All other embodiments obtained by those skilled in the art based on the embodiments of this application without creative effort are within the scope of protection of this application.
[0027] The present application will be further described below with reference to embodiments.
[0028] Example 1:
[0029] Reference Figures 1 to 3 This first embodiment of the present application provides a support device for a tunnel boring machine (TBM) to cross a karst cave, including a TBM 1. A cutterhead 2 is provided at the front of the TBM 1, and a shield body 3 is provided behind the cutterhead 2. The rear of the shield body 3 is used for assembling tunnel segments 4. A beam receiving and deployment assembly 5 is provided inside the shield body 3 or at a location connected to the interior of the shield body 3. The beam receiving and deployment assembly 5 is used to receive multi-stage telescopic longitudinal crossing beams 6 during the normal tunneling phase of the TBM 1, and to push the multi-stage telescopic longitudinal crossing beams 6 towards the lower front of the shield body 3 after the cutterhead 2 gradually reveals the free space below the shield body 3. The beam receiving and deployment assembly 5 can be a box-type receiving compartment or a receiving and output structure formed by a combination of a material rack and a pushing mechanism. The pushing power can be a hydraulic drive structure or a mechanical drive structure adapted to the internal power system of the TBM 1, so that the multi-stage telescopic longitudinal crossing beams 6 can be kept received during the normal tunneling phase and output when it is necessary to cross the underlying karst cave.
[0030] In this embodiment, the beam housing and deployment assembly 5 is arranged in the lower region inside the shield body 3, with its beam output direction facing the front and lower part of the shield body 3. During the normal tunneling process of the tunnel boring machine 1, the multi-stage telescopic longitudinal crossing beam 6 remains in a retracted state and is housed inside the beam housing and deployment assembly 5. When the cutterhead 2 exposes the lower free space that meets the deployment requirements, the multi-stage telescopic longitudinal crossing beam 6 is pushed along the predetermined output direction by the pushing mechanism inside the beam housing and deployment assembly 5, so that the multi-stage telescopic longitudinal crossing beam 6 gradually enters the free space in front and lower part of the shield body 3. After the multi-stage telescopic longitudinal crossing beam 6 completes its output, its effective working length is increased by the relative expansion and contraction of each beam section until both ends of the multi-stage telescopic longitudinal crossing beam 6 reach the predetermined stable bearing positions.
[0031] The multi-stage telescopic longitudinal span beam 6 is composed of multiple beam sections that can move relatively along the length direction. In the retracted state, each beam section is arranged by interlocking or stacking with each other, so that the retracted length of the multi-stage telescopic longitudinal span beam 6 is less than its working length after unfolding. The multi-stage telescopic longitudinal span beam 6 can be a sleeve box beam or a nested truss beam. The cross-sectional dimensions of each beam section are adapted to the corresponding retracted space from the outside to the inside. The adjacent beam sections retain the matching space required for normal telescopic movement. After each beam section extends to the predetermined position, the beam sections are restricted from continuing to move relatively by mechanical locking, hydraulic locking, or a combination of mechanical locking and hydraulic locking, so that multiple beam sections form a longitudinal span beam with overall force.
[0032] In this embodiment, adjacent beam sections are connected by sliding sleeves to achieve telescopic connection. Corresponding locking holes are provided in the overlapping area of the sleeves of adjacent beam sections. When the beam section extends to the predetermined position along the length direction, the locking holes of the adjacent beam sections correspond to each other. By inserting the mechanical locking pin that matches the locking hole into the corresponding locking hole, the axial relative movement between the adjacent beam sections is restricted. When the beam body bears the vertical load transmitted by the shield machine 1, the adjacent beam sections form a mutual support relationship through the overlapping area of the sleeves and use the mechanical locking pin to maintain the extended position, so that the multi-stage telescopic longitudinal span beam 6 forms an integral force-bearing structure.
[0033] The number of beam sections at each level and the effective extension length of each beam section are determined based on the actual spanning distance of the underlying karst cave along the shield tunneling direction. The effective working length of the multi-stage telescopic longitudinal spanning beam 6 after full deployment should be able to cross the area where ground support needs to be lost, and the near and far ends of the beam should reach positions where a stable bearing relationship can be established. The overall dimensions of each beam section after being retracted should be compatible with the internal storage space of the shield 3 or the storage space connected to the shield 3. The cross-sectional dimensions, splicing length, locking position, and allowable deflection of each beam section are determined based on the design load transmitted by the shield machine 1 to the corresponding spanning beam during the spanning stage, so that each beam section can form an integral beam that meets the bearing requirements after being deployed and locked.
[0034] In this embodiment, at least two multi-stage telescopic longitudinal crossing beams 6 are arranged side by side along the transverse direction of the shield body 3. The multiple multi-stage telescopic longitudinal crossing beams 6 extend along the tunneling direction of the tunnel boring machine 1 and correspond to different bearing areas at the bottom of the shield body 3. When the tunnel boring machine 1 crosses the underlying karst cave, multiple follow-up telescopic bearing slippers 10 can transfer the load of the shield body 3 to the corresponding multi-stage telescopic longitudinal crossing beams 6, so that the load of the tunnel boring machine 1 is distributed laterally to multiple bearing positions. When the specifications and bearing requirements of the tunnel boring machine 1 change, the number of multi-stage telescopic longitudinal crossing beams 6 can be determined according to the available space inside the shield body 3 and the load distribution requirements of the crossing stage.
[0035] The top of each beam segment of the multi-stage telescopic longitudinal span beam 6 is provided with a segmented beam top bearing guide surface 7. Each beam segment has a corresponding bearing guide area. Each segmented beam top bearing guide surface 7 expands synchronously with the extension of the corresponding beam segment and retracts synchronously with the retraction of the corresponding beam segment. Each segmented beam top bearing guide surface 7 can be formed by a wear-resistant plate fixed to the top of the beam segment, or by a low-friction lining or roller rail surface. The adjacent segments of the segmented beam top bearing guide surface 7 are transitioned by overlapping, staggered connection or sliding coverage, so that after the multi-stage telescopic longitudinal span beam 6 is fully expanded, each segmented beam top bearing guide surface 7 can form a continuous or nearly continuous bearing guide path along the length of the beam.
[0036] When setting up the segmented beam top bearing guide surface 7, it should be ensured that it can withstand the local contact load transmitted by the follow-up expansion bearing slipper 10 under working conditions. The connection position of adjacent guide areas should avoid forming obvious protrusions that hinder the normal passage of the follow-up expansion bearing slipper 10. When an overlapping structure is adopted, the adjacent guide surfaces have areas that overlap each other along the movement direction of the slipper. When a staggered sequential connection structure is adopted, the height difference between adjacent guide surfaces is controlled within the range that the follow-up expansion bearing slipper 10 can pass smoothly. When a sliding cover structure is adopted, a section of guide surface can move relative to the adjacent guide surface with the expansion and contraction of the corresponding beam section to adapt to the change in the adjacent position relationship during the expansion and contraction of the beam section.
[0037] A telescopic near-end bearing seat 8 is provided at the near end of the multi-stage telescopic longitudinal crossing beam 6. The telescopic near-end bearing seat 8 remains retracted when the multi-stage telescopic longitudinal crossing beam 6 is in the retracted state and is located within the outer contour of the shield body 3 along with the multi-stage telescopic longitudinal crossing beam 6. After the multi-stage telescopic longitudinal crossing beam 6 is deployed into place, the telescopic near-end bearing seat 8 extends towards the near-end stable part, so that its bearing end contacts the near-end stable rock mass or the stable bearing area formed by reinforcement. The telescopic near-end bearing seat 8 can adopt a hydraulic telescopic structure, a screw telescopic structure or a mechanical sleeve locking structure. The extended telescopic near-end bearing seat 8 is used to bear the support reaction force generated at the near end of the multi-stage telescopic longitudinal crossing beam 6 and transfer the corresponding load to the near-end stable part.
[0038] The distal end of the multi-stage telescopic longitudinal crossing beam 6 is equipped with a telescopic distal anchoring component 9. During the retraction and deployment of the multi-stage telescopic longitudinal crossing beam 6, the telescopic distal anchoring component 9 maintains a retracted state adapted to the beam body. When the distal end of the multi-stage telescopic longitudinal crossing beam 6 reaches the predetermined stable area, the telescopic distal anchoring component 9 extends into the distal stable rock mass and forms a pressure-bearing or anchoring connection with the distal stable rock mass. The telescopic distal anchoring component 9 can form a pressure-bearing connection with the intact rock mass directly using a pressure-bearing head, or it can form an anchoring position in the rock mass using a telescopic drill anchor arm, or it can use an anchor rod or grouting anchoring structure to improve the pull-out resistance and anti-sliding capacity of the distal connection. The specific connection form is determined according to the integrity, bearing capacity and stress state of the distal stable rock mass and the end of the crossing beam, so that the distal end of the multi-stage telescopic longitudinal crossing beam 6 remains stable during the crossing of the tunnel boring machine 1.
[0039] After the telescopic near-end bearing seat 8 and the telescopic far-end anchoring component 9 complete the bearing connection, the multi-stage telescopic longitudinal crossing beam 6 forms a two-end bearing structure spanning the underlying karst cave. While the tunnel boring machine 1 is still mainly supported by the stable stratum near the end, at least one follower telescopic bearing slipper 10 near the front of the shield body 3 is controlled to extend downward and contact the segmented beam top bearing guide surface 7. By gradually increasing the extension of the corresponding follower telescopic bearing slipper 10, a portion of the load of the tunnel boring machine 1 is gradually transferred to the multi-stage telescopic longitudinal crossing beam 6 to preload the multi-stage telescopic longitudinal crossing beam 6. During the preloading process, the locking status of each beam section, the beam deflection, the support status of the telescopic near-end bearing seat 8, and the fixing status of the telescopic far-end anchoring component 9 are checked. When no abnormal retraction occurs in each beam section, the beam deformation is within the design allowable range, and no displacement affecting the bearing stability occurs at the near-end and far-end connection positions, the multi-stage telescopic longitudinal crossing beam 6 enters the shield crossing bearing state.
[0040] After the multi-stage telescopic longitudinal crossing beam 6 enters the crossing load-bearing state, the pushing end of the control beam housing deployment component 5 is retracted, so that the pushing end is separated from the multi-stage telescopic longitudinal crossing beam 6 and the load-bearing contact is released, thereby releasing the force transmission relationship used to push and position the beam during the deployment process. After that, the multi-stage telescopic longitudinal crossing beam 6 is fixed relative to the stable strata on both sides through the telescopic near-end bearing seat 8 and the telescopic far-end anchoring component 9. When the shield machine 1 continues to move forward, the multi-stage telescopic longitudinal crossing beam 6 no longer moves forward synchronously with the shield body 3, thus forming a crossing load-bearing path with a relatively fixed position.
[0041] Multiple telescopic bearing slippers 10 are provided in the structural reinforcement area at the bottom of the shield body 3. The telescopic bearing slippers 10 can retract inward and extend outward relative to the shield body 3. When the tunnel boring machine 1 is tunneling normally and the corresponding shield body part is still in the complete stratum support area, the telescopic bearing slippers 10 remain in the retracted state. The bearing surface on the outside of the telescopic bearing slippers 10 is located inside the outer surface of the shield body 3 or flush with the outer surface of the shield body 3, thereby avoiding the formation of interference structures protruding outside the shield body 3 during the tunnel boring machine 1 passing through the complete stratum.
[0042] When the corresponding shield body section enters the exposed free space under the cutterhead 2, the corresponding follow-up telescopic bearing slipper 10 extends downward until the bearing end of the follow-up telescopic bearing slipper 10 contacts the segmented beam top bearing guide surface 7. The follow-up telescopic bearing slipper 10 can be telescopically extended using a hydraulic drive structure, or it can use other drive forms that can independently control the extension position. The bearing end of the follow-up telescopic bearing slipper 10 can be a sliding contact structure, allowing the bearing end to slide along the segmented beam top bearing guide surface 7, or it can be a rolling contact structure, allowing the bearing end to roll along the segmented beam top bearing guide surface 7. The extension stroke of the follow-up telescopic bearing slipper 10 should be able to cover the working distance formed between the shield body 3 and the segmented beam top bearing guide surface 7 during the crossing stage.
[0043] Multiple telescopic bearing slippers 10 are distributed along the length and width of the shield body 3. The multiple telescopic bearing slippers 10 arranged along the length direction are used to gradually change the bearing state of the shield body 3 at the front and rear positions as the tunnel boring machine 1 enters and leaves the underlying karst cave. The multiple telescopic bearing slippers 10 arranged along the width direction are used to adjust the support state of the left and right sides of the shield body 3 respectively. Each telescopic bearing slipper 10 can extend and retract independently or in groups, so that the tunnel boring machine 1 can form multiple adjustable bearing points during the crossing process.
[0044] During operation, the multi-stage telescopic longitudinal spanning beam 6 unfolds within the free space exposed by the cutterhead 2, and establishes a bearing relationship with the stable parts on both sides of the karst cave through the telescopic near-end bearing seat 8 and the telescopic far-end anchoring component 9. After preloading or bearing test, the pushing end of the beam body receiving and deployment component 5 is retracted to keep the multi-stage telescopic longitudinal spanning beam 6 fixed relative to the stratum. Multiple follow-up telescopic bearing slippers 10 then extend sequentially according to the position of the shield body 3 entering the free space and are supported on the segmented beam top bearing guide surface 7. When the tunnel boring machine 1 moves forward, the multi-stage telescopic longitudinal spanning beam 6 remains fixed, and the follow-up telescopic bearing slippers 10 move with the shield body 3 along the segmented beam top bearing guide surface 7.
[0045] Example 2:
[0046] Reference Figures 2 to 3This is the second embodiment of the present application. Based on embodiment 1, this embodiment further illustrates the treatment of the load-bearing structure after the tunnel boring machine 1 has completely passed through the underlying karst cave and the design relationship between the various structures under different engineering conditions. The remaining structures and the tunnel boring machine crossing process are the same as in embodiment 1.
[0047] After the tunnel boring machine 1 and the tail shield have completely passed through the underlying karst area, the multi-stage telescopic longitudinal crossing beam 6 is further processed according to the subsequent load-bearing requirements of the crossing section. The multi-stage telescopic longitudinal crossing beam 6 can remain in the deployed state and remain in the underlying karst area. The telescopic near-end bearing seat 8 and the telescopic far-end anchoring assembly 9 continue to maintain load-bearing connection with the stable parts on both sides. Local grouting or filling can be carried out between the segment 4 and the multi-stage telescopic longitudinal crossing beam 6, so that the multi-stage telescopic longitudinal crossing beam 6, the stable parts on both sides, the filling area, and the assembled segment 4 together form the subsequent load-bearing system of the crossing section.
[0048] In different shield tunneling projects, the number of beam sections, total unfolded length, cross-sectional dimensions of each beam section, effective splicing length of adjacent beam sections, locking strength, and allowable deflection of the multi-stage telescopic longitudinal spanning beam 6 are designed based on the overall mass of the shield machine 1, the available storage space inside the shield body 3, the actual span distance of the underlying karst cave along the excavation direction, and the positions of the stable parts at both ends. The effective working length after unfolding should be able to allow the telescopic near-end bearing seat 8 and the telescopic far-end anchoring assembly 9 to reach positions that meet the bearing requirements. The multi-stage telescopic longitudinal spanning beam 6 after retraction should be able to enter the interior of the shield body 3 or be stored in a location connected to the interior of the shield body 3.
[0049] The bearing capacity of the multi-stage telescopic longitudinal crossing beam 6 is determined according to the maximum design load that the shield machine 1 needs to bear by the crossing beam during the crossing stage. When two or more multi-stage telescopic longitudinal crossing beams 6 are set, the design load distribution between each crossing beam is determined according to the position of multiple follow-up telescopic bearing slippers 10 and the center of gravity position of the shield machine 1. The allowable bearing capacity of a single multi-stage telescopic longitudinal crossing beam 6 should not be lower than the design load generated by its corresponding bearing area under the most unfavorable crossing state. The bending deformation of the beam is checked in combination with the splicing position between each beam section and the crossing span.
[0050] In the structural design of the multi-stage telescopic longitudinal span beam 6, the effective span length required by the beam is first determined based on the unsupported length of the underlying karst cave along the excavation direction and the positions of the stable bearing parts at both ends. Then, the closing length and number of sleeves of each beam section are determined based on the internal storage space of the shield body 3. Based on the design load of the span stage of the shield machine 1, the arrangement of multiple follow-up telescopic bearing slippers 10, and the load distribution relationship between each span beam, the bending resistance of the section of each beam section, the local bearing capacity of the beam section sleeve area, the anti-slip capacity of the beam section locking position, and the deflection of the overall beam are checked to ensure that the multi-stage telescopic longitudinal span beam 6 can maintain a stable bearing relationship under the most unfavorable load conditions.
[0051] The allowable bearing capacity of the telescopic near-end bearing seat 8 and the contact range with the near-end stable part are determined based on the design support reaction force generated at the near end of the multi-stage telescopic longitudinal crossing beam 6, so that the near-end stable part will not experience local damage or significant settlement that affects the bearing safety under the design load. The compressive strength, pull-out strength and anti-sliding strength of the telescopic far-end anchoring component 9 are determined based on the far-end support reaction force and the horizontal action that may occur during the crossing process. When the integrity of the far-end rock mass cannot meet the direct bearing requirements, the far-end area is reinforced as necessary before the anchoring connection is established.
[0052] The number and arrangement of the follow-up telescopic load-bearing slippers 10 are determined based on the overall mass of the tunnel boring machine 1, the structural reinforcement area of the shield body 3, and the number of support points required for the crossing stage. The allowable load of each follow-up telescopic load-bearing slipper 10 should match the bearing capacity of the corresponding multi-stage telescopic longitudinal crossing beam 6. Multiple follow-up telescopic load-bearing slippers 10 can jointly bear the load that the tunnel boring machine 1 needs to transfer to the multi-stage telescopic longitudinal crossing beam 6 during the crossing stage, and reserve working margin for load adjustment and attitude adjustment at different positions. The maximum extension stroke of the follow-up telescopic load-bearing slipper 10 should be able to cover the working distance that may occur between the bottom of the shield body 3 and the segmented beam top bearing guide surface 7.
[0053] For water-rich or pressurized karst caves, necessary water-stopping, pressure-relieving, and drainage treatments are carried out in the karst cave area before the deployment of the multi-stage telescopic longitudinal crossing beam 6, so that the position of the load-bearing component is under pressure conditions that can carry out the crossing operation. The position of the beam body output from the inside of the shield body 3 to the outside can be set with appropriate local sealing measures according to the sealing and pressure control conditions of the shield machine 1 itself. The local sealing measures are used to reduce the impact of the beam body deployment process on the internal construction environment of the shield body 3. The overall water pressure of the karst cave and the groundwater channel are still controlled by water hazard control measures adapted to the actual geological conditions.
[0054] When there are rock masses on both sides of the karst cave that can form a stable bearing relationship, and the unfolded length, bearing capacity and deformation of the multi-stage telescopic longitudinal crossing beam 6 can meet the crossing requirements, the bearing method of this embodiment can be adopted. When there are no stable rock masses at the far end that can establish a reliable pressure or anchorage relationship, the karst cave as a whole is in an unstable state, the water pressure cannot meet the crossing construction requirements, or the available space inside the shield 3 is insufficient to accommodate the multi-stage telescopic longitudinal crossing beam 6 that can meet the crossing length and bearing requirements, other suitable karst cave treatment and shield tunneling methods should be adopted according to the corresponding engineering conditions.
[0055] Example 3:
[0056] Reference Figure 4 This is the third embodiment of the present application. This embodiment provides a construction method for a tunnel boring machine to cross a karst cave. This construction method uses the load-bearing device in Embodiments 1 and 2 for construction.
[0057] Before construction, the underlying karst caves in front of the tunnel boring machine 1 are first detected in advance to determine the distribution range of the underlying karst caves along the tunnel boring direction, the positional relationship between the top of the karst cave and the bottom of the shield body 3, the water pressure in the karst cave, and the stability of the rock mass on both sides of the karst cave. Based on the detection results, the near-end stable part for establishing the bearing relationship of the telescopic near-end bearing seat 8 and the far-end stable part for establishing the pressure-bearing or anchoring relationship of the telescopic far-end anchoring component 9 are determined. When the bearing conditions of the near-end stable part or the far-end stable part cannot meet the requirements of the crossing construction, the necessary rock mass reinforcement is carried out before the tunnel boring machine 1 reaches the corresponding position. When there is groundwater or water pressure in the underlying karst cave, the corresponding water-stopping, pressure-relieving or drainage treatment is carried out before the bearing device is deployed.
[0058] After completing the preliminary treatment, the tunnel boring machine 1 is controlled to advance towards the underlying karst cave. When the tunnel boring machine 1 approaches the underlying karst cave, the advancing speed is reduced so that the tunnel boring machine 1 is still mainly supported by the stable stratum near the karst cave. The machine continues to excavate through the cutterhead 2, so that the lower part of the cutterhead 2 gradually exposes the free space located in front of and below the shield body 3. During this stage, the shield body 3 is not allowed to enter the area at the bottom where it loses the support of the stratum. This ensures that the tunnel boring machine 1 maintains a stable stratum support state before the multi-stage telescopic longitudinal crossing beam 6 is deployed.
[0059] Once the free space exposed at the bottom of the cutterhead 2 can meet the deployment requirements of the multi-stage telescopic longitudinal spanning beam 6, the multi-stage telescopic longitudinal spanning beam 6, which is in a retracted state, is output downward and forward from inside the shield body 3 through the beam body housing and deployment component 5. This allows the multi-stage telescopic longitudinal spanning beam 6 to enter the free space exposed by the cutterhead 2. Each beam section extends in a predetermined order, and after each beam section reaches the corresponding unfolding position, it is locked and the extension of the next beam section continues to be controlled. The segmented beam top bearing guide surface 7 unfolds synchronously with each beam section, so that the multi-stage telescopic longitudinal spanning beam 6 gradually forms a longitudinal bearing structure that spans the underlying karst cave.
[0060] Once the far end of the multi-stage telescopic longitudinal span beam 6 reaches the far-end stable position, the beam body is stopped from extending further. The telescopic near-end bearing seat 8 is controlled to extend from the near end of the multi-stage telescopic longitudinal span beam 6 towards the near-end stable position, so that the telescopic near-end bearing seat 8 forms a stable support relationship with the near-end stable rock mass or the reinforced near-end bearing area. Then, the telescopic far-end anchoring component 9 is controlled to extend from the far end of the multi-stage telescopic longitudinal span beam 6 towards the far-end stable rock mass, so that the telescopic far-end anchoring component 9 forms a pressure-bearing or anchoring connection with the far-end stable rock mass, thereby enabling both ends of the multi-stage telescopic longitudinal span beam 6 to obtain stable bearing capacity.
[0061] After the load-bearing connection at both ends is completed, while the tunnel boring machine 1 is still mainly supported by the stable stratum near the end, at least one follower telescopic load-bearing slipper 10 near the front of the shield body 3 is controlled to extend downward and contact the segmented beam top load-bearing guide surface 7. By gradually increasing the extension of the corresponding follower telescopic load-bearing slipper 10, a part of the load of the tunnel boring machine 1 is gradually transferred to the multi-stage telescopic longitudinal crossing beam 6 to preload or test the load-bearing capacity of the multi-stage telescopic longitudinal crossing beam 6. During the preloading process, the locking status of each beam segment, beam deflection, support status of the telescopic near-end bearing seat 8, and fixation status of the telescopic far-end anchoring component 9 are checked. After confirming that the multi-stage telescopic longitudinal crossing beam 6 and its load-bearing structures at both ends can meet the design load-bearing requirements of the tunnel boring machine 1 during the crossing process, the pushing end of the beam body receiving and deployment component 5 is controlled to retract, so that the pushing end is separated from the load-bearing contact of the multi-stage telescopic longitudinal crossing beam 6, so that the multi-stage telescopic longitudinal crossing beam 6 remains fixed relative to the stratum during the subsequent tunnel crossing process.
[0062] After the multi-stage telescopic longitudinal crossing beam 6 is fixed, the shield machine 1 continues to advance forward. As the front of the shield body 3 gradually enters the lower free space, the follow-up telescopic load-bearing slipper 10, located at the front of the shield body 3 and corresponding to the multi-stage telescopic longitudinal crossing beam 6, first extends downward, so that the follow-up telescopic load-bearing slipper 10 establishes contact with the segmented beam top load-bearing guide surface 7. After the follow-up telescopic load-bearing slipper 10 is in stable contact with the segmented beam top load-bearing guide surface 7, the load borne by the follow-up telescopic load-bearing slipper 10 is gradually increased, so that part of the shield machine 1 load originally borne by the near-end stable stratum is transferred to the multi-stage telescopic longitudinal crossing beam 6.
[0063] As the tunnel boring machine 1 continues to advance, the length of the shield body 3 entering the underlying free space gradually increases. According to the order in which the shield body 3 enters the free space, the follow-up telescopic bearing slippers 10 at the subsequent positions extend in sequence and establish a support relationship with the segmented beam top bearing guide surface 7. Through the sequential contact and graded loading of multiple follow-up telescopic bearing slippers 10, the load of the tunnel boring machine 1 is gradually transformed from the near-end stable stratum support to the multi-stage telescopic longitudinal crossing beam 6 support, so as to avoid the sudden interruption of the bottom support when the shield body 3 enters the underlying free space.
[0064] After the tunnel boring machine 1 enters the main crossing stage, the multi-stage telescopic longitudinal crossing beam 6 remains fixed relative to the stable strata on both sides of the karst cave. Multiple follow-up telescopic bearing slippers 10 move along the tunnel boring direction with the shield body 3 and slide or roll relative to the segmented beam top bearing guide surface 7. The load generated by the tunnel boring machine 1 is transferred from the shield body 3 to the follow-up telescopic bearing slippers 10, and then to the multi-stage telescopic longitudinal crossing beam 6 through the segmented beam top bearing guide surface 7. It is then transferred to the stable parts on both sides of the underlying karst cave through the telescopic near-end bearing seat 8 and the telescopic far-end anchoring assembly 9, so that the tunnel boring machine 1 can pass through the underlying karst cave along the fixed crossing beam without relying on the formation of a continuous bearing surface at the bottom of the underlying karst cave.
[0065] In this embodiment, the pitch and roll attitude of the tunnel boring machine 1 can be obtained through the existing attitude measurement system of the tunnel boring machine. When the follow-up telescopic bearing slipper 10 adopts the hydraulic drive method, the thrust of the corresponding slipper can be determined according to the working pressure of the corresponding hydraulic drive circuit and the effective pressure area of the hydraulic actuator. The position state of the slipper can be determined according to the extension stroke of the hydraulic actuator. During the process of the tunnel boring machine 1 crossing the underlying karst cave, by adjusting the extension amount of the follow-up telescopic bearing slipper 10 at different positions, the front and rear positions of the shield body 3 and the support state of the left and right sides can be changed, so that the shield body 3 is kept within the predetermined attitude allowable range.
[0066] During the movement of the tunnel boring machine 1 along the multi-stage telescopic longitudinal crossing beam 6, the attitude of the shield body 3 is detected. When the shield body 3 experiences pitch changes, the extension amount of multiple follower telescopic bearing slippers 10 distributed along the length direction of the shield body 3 is adjusted. The pitch attitude is adjusted by changing the support height and load ratio at different positions before and after the shield body 3. When the shield body 3 exhibits a roll tendency or the support status on the left and right sides is inconsistent, the extension amount of the follower telescopic bearing slippers 10 distributed along the width direction of the shield body 3 is adjusted, so that the support height and load distribution on the left and right sides of the shield body 3 change accordingly. Thus, the pitch and roll attitude of the tunnel boring machine 1 is adjusted during the crossing process.
[0067] After the cutterhead 2 enters the stable stratum at the far end of the underlying karst cave, the front of the shield body 3 gradually regains support from the stable stratum. At this time, the bearing state of both ends of the multi-stage telescopic longitudinal crossing beam 6 is maintained, and the load borne by the corresponding follow-up telescopic bearing slipper 10 at the front of the shield body 3 is gradually reduced. When the front of the shield body 3 has been reliably supported by the stable stratum at the far end, the corresponding follow-up telescopic bearing slipper 10 is retracted into the outer contour of the shield body 3. As the tunnel boring machine 1 continues to advance, according to the order in which the shield body 3 regains support from the stable stratum at the far end, the load borne by the subsequent follow-up telescopic bearing slipper 10 is reduced and retracted in turn, so that the load of the tunnel boring machine 1 is gradually transferred from the multi-stage telescopic longitudinal crossing beam 6 back to the stable stratum at the far end.
[0068] Once the tunnel boring machine 1 and the tail shield have completely passed through the underlying karst cave area, and the corresponding segment 4 has been assembled, the load-bearing connection between the telescopic near-end bearing seat 8 and the telescopic far-end anchoring assembly 9 and the stable parts on both sides is maintained, so that the multi-stage telescopic longitudinal crossing beam 6 continues to remain in the underlying karst cave area. According to the subsequent load-bearing requirements of the crossing section, local grouting or filling can be carried out between the segment 4 and the multi-stage telescopic longitudinal crossing beam 6, so that the multi-stage telescopic longitudinal crossing beam 6, the stable parts on both sides, the filling area, and the assembled segment 4 together form the subsequent load-bearing system of the crossing section.
[0069] The working principle of this application is as follows:
[0070] While the tunnel boring machine 1 still has stable ground support at the near end, a multi-stage telescopic longitudinal crossing beam 6 is pre-deployed in the underlying free space already exposed by the cutterhead 2. Then, through the telescopic near-end bearing seat 8 and the telescopic far-end anchoring assembly 9, the multi-stage telescopic longitudinal crossing beam 6 forms a load-bearing structure fixed relative to the ground. As the tunnel boring machine 1 gradually enters the underlying free space, multiple follow-up telescopic load-bearing slippers 10 extend in sequence and gradually transfer the load of the tunnel boring machine 1 to the multi-stage telescopic longitudinal crossing beam 6. As the tunnel boring machine 1 continues to advance, the multi-stage telescopic longitudinal crossing beam 6 remains fixed, and the follow-up telescopic load-bearing slippers 10 move along the segmented beam top load-bearing guide surface 7 with the shield body 3. After the tunnel boring machine 1 enters the stable ground at the far end, multiple follow-up telescopic load-bearing slippers 10 unload and retract in sequence, thereby completing the continuous transition of the tunnel boring machine 1 from near-end ground support, crossing beam support to far-end ground support.
[0071] The above embodiments are only used to illustrate the technical solutions of this application, and are not intended to limit them. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions will not cause the essence of the corresponding technical solutions to deviate from the protection scope of the technical solutions of the embodiments of this application.
Claims
1. A load bearing device for a tunneling machine to cross a cave, comprising a shield body (3), characterized in that: The shield body (3) is provided with a beam housing and deployment assembly (5), which is connected to a multi-stage telescopic longitudinal cross beam (6) that can expand outward from the shield body (3). The top of the multi-stage telescopic longitudinal cross beam (6) is provided with a segmented beam top bearing guide surface (7) that expands and contracts with it. The near end of the multi-stage telescopic longitudinal cross beam (6) is provided with a telescopic near end bearing seat (8), and the far end is provided with a telescopic far end anchoring assembly (9). The lower part of the shield body (3) is spaced along the length of the shield body. Multiple telescopic bearing slippers (10) can extend downwards from the shield body (3) and be supported on the segmented beam top bearing guide surface (7). After the multi-level telescopic longitudinal cross beam (6) is deployed, it establishes a bearing relationship with the stable parts on both sides of the karst cave through the telescopic near-end bearing seat (8) and the telescopic far-end anchoring component (9) and remains fixed relative to the stratum, so that multiple telescopic bearing slippers (10) can move along the segmented beam top bearing guide surface (7) with the shield body (3).
2. The load bearing device for a tunneling machine to cross a cave of claim 1, wherein: The beam housing and deployment assembly (5) is located in the lower part of the shield body (3). The output side of the beam housing and deployment assembly (5) faces the front and lower part of the shield body (3). The multi-level telescopic longitudinal cross beam (6), the segmented beam top bearing guide surface (7), the telescopic near end bearing seat (8) and the telescopic far end anchoring assembly (9) are stored within the outer contour of the shield body (3) in the non-working state. In the working state, they can be deployed to the free space formed in the front and lower part of the shield body (3) through the beam housing and deployment assembly (5).
3. A support device for a tunnel boring machine crossing a karst cave according to claim 2, characterized in that: The multi-stage telescopic longitudinal span beam (6) includes multiple beam sections that slide and fit together sequentially along the length direction. Adjacent beam sections can extend and retract relative to each other along the length direction of the shield body (3) and maintain partial overlap after unfolding. The overlapping part of the adjacent beam sections is provided with a locking part for restricting the axial relative movement of the beam sections, so that multiple beam sections form an integral load-bearing beam that jointly bears the vertical load after unfolding and locking.
4. A support device for a tunnel boring machine crossing a karst cave according to claim 3, characterized in that: The multi-stage telescopic longitudinal crossing beam (6) is provided with at least two beams, and the at least two multi-stage telescopic longitudinal crossing beams (6) are arranged side by side along the transverse direction of the shield body (3).
5. A support device for a tunnel boring machine crossing a karst cave according to claim 3, characterized in that: The segmented beam top bearing guide surface (7) is respectively set on the top of each beam section of the multi-level telescopic longitudinal span beam (6). Each segmented beam top bearing guide surface (7) expands and contracts synchronously with the corresponding beam section. Adjacent segmented beam top bearing guide surfaces (7) form an overlapping relationship that can slide relative to each other along the expansion and contraction direction of the beam section. After the multi-level telescopic longitudinal span beam (6) is unfolded, it forms a bearing guide path for the follow-up telescopic bearing slipper (10) to move continuously.
6. A support device for a tunnel boring machine crossing a karst cave according to claim 1, characterized in that: The telescopic near-end bearing seat (8) is set at one end of the multi-stage telescopic longitudinal crossing beam (6) near the excavated area and can extend into the near-end stable rock mass, so that its bearing end forms a pressure-bearing support relationship with the near-end stable rock mass. The telescopic far-end anchoring component (9) is set at one end of the multi-stage telescopic longitudinal crossing beam (6) away from the excavated area and can extend into the far-end stable rock mass, so that its bearing end forms a pressure-bearing connection with the far-end stable rock mass, so as to support the multi-stage telescopic longitudinal crossing beam (6) after it is deployed through the stable rock masses at both ends.
7. A support device for a tunnel boring machine crossing a karst cave according to claim 1, characterized in that: Multiple follow-up telescopic load-bearing slippers (10) are provided. The multiple follow-up telescopic load-bearing slippers (10) are distributed along the length and width directions of the shield body (3) and can be telescopic to adjust the load transmitted by the shield body (3) to the multi-level telescopic longitudinal cross beam (6) and the attitude of the shield body (3).
8. A support device for a tunnel boring machine crossing a karst cave according to claim 7, characterized in that: The outer bearing surface of the retracted bearing slipper (10) is located inside or flush with the outer surface of the shield (3), and slides or rolls with the segmented beam top bearing guide surface (7) in the extended state.
9. A method for constructing a tunnel boring machine across a karst cave, employing the load-bearing device described in any one of claims 1 to 8, characterized in that, Includes the following steps: S1. Conduct advance detection of the underlying karst caves in the tunneling direction of the shield machine (1) to determine the distribution range of the underlying karst caves, the free space required for beam deployment, and the stable bearing parts on both sides of the karst caves. S2. While the tunnel boring machine (1) is still mainly supported by the near-end stable stratum, control the cutterhead (2) to gradually expose the underlying free space. After confirming that the free space meets the requirements for the multi-level telescopic longitudinal crossing beam (6) to unfold and reach the far-end stable bearing part, push the multi-level telescopic longitudinal crossing beam (6) into the free space through the beam body storage and deployment component (5), and control the beam sections of each level to extend and lock in sequence, so that the segmented beam top bearing guide surface (7) unfolds synchronously. S3. Control the extension of the telescopic near-end bearing seat (8) and the telescopic far-end anchoring component (9) respectively, so that the two ends of the multi-stage telescopic longitudinal crossing beam (6) establish a bearing relationship with the stable bearing parts on both sides of the karst cave, and keep the multi-stage telescopic longitudinal crossing beam (6) fixed relative to the stratum. S4. Control the extension of the sliding shoe (10) at the corresponding position of the lower part of the shield (3) and contact the segmented beam top bearing guide surface (7) to preload the multi-level telescopic longitudinal crossing beam (6). After confirming that the beam and the bearing relationship at both ends meet the construction requirements, release the deployment force transmission relationship between the beam housing deployment component (5) and the multi-level telescopic longitudinal crossing beam (6). S5. Control the tunnel boring machine (1) to continue to advance, so that multiple follow-up telescopic load-bearing slippers (10) extend in sequence and are loaded in stages as the shield body (3) enters the free space, so that the load of the tunnel boring machine (1) is gradually transferred to the multi-stage telescopic longitudinal spanning beam (6), and at the same time, the follow-up telescopic load-bearing slippers (10) move along the segmented beam top load-bearing guide surface (7) with the shield body (3); S6. When the tunnel boring machine (1) enters the stable stratum at the far end of the karst cave, the load borne by the corresponding follow-up telescopic bearing slipper (10) is reduced and retracted in sequence according to the order in which each part of the shield body (3) regains the support of the stable stratum.
10. A construction method for a tunnel boring machine crossing a karst cave according to claim 9, characterized in that: In step S4, the follow-up telescopic bearing slipper (10) at the front of the shield (3) is gradually extended and the load on the segmented beam top bearing guide surface (7) is increased. The multi-level telescopic longitudinal span beam (6) is preloaded, and the locking status of each beam section, beam deflection, support status of the telescopic near end bearing seat (8) and connection status of the telescopic far end anchoring component (9) are checked. After confirming that the beam section has not retracted abnormally, the beam deflection is within the design allowable range and the bearing connection at both ends remains stable, the deployment force transmission relationship between the beam storage deployment component (5) and the multi-level telescopic longitudinal span beam (6) is released. In step S5, the pitch and roll attitude of the shield (3) is adjusted by adjusting the extension amount of the follow-up telescopic bearing slipper (10) distributed along the length and width directions of the shield (3).