Tunnel construction dust removal device

By designing a guide tube, air guide ring, and vortex dehydration mechanism, the problems of water mist dispersion and short range of traditional fog cannons are solved, achieving fog stream focusing and multi-stage water washing, thus improving the dust removal effect and safety in tunnel construction.

CN123153791APending Publication Date: 2026-11-24SHANXI PROVINCIAL HIGHWAY BUREAU JINCHENG BRANCH +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611562909.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-10
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Traditional fog cannons produce water mist that is easily dispersed in the short range, and the aerosols formed by the mixture of fog droplets and dust are easily inhaled by construction workers. The fog stream has poor cohesion, the dust removal range is short, and the dust suppression effect is not good.

Method used

The system employs a combination of a guide tube, a guide ring, a first guide cone, and a second guide cone to form an annular air curtain. Combined with a spiral guide vane and a vortex dehydration mechanism, it achieves mist aggregation and negative pressure suction for multi-stage water washing and dust removal.

Benefits of technology

It effectively controls the disorderly dispersion of water mist, reduces the inhalation of harmful aerosols by construction workers, improves dust removal range and purification capacity, reduces water waste, and protects the health of construction workers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123153791A_ABST
    Figure CN123153791A_ABST
Patent Text Reader

Abstract

This invention provides a dust removal device for tunnel construction, belonging to the technical field of dust removal devices. Its base is used to realize the overall movement and transportation of the device; a water mist spraying module is set on the base, connected to an external water source, used to atomize the external water and spray it directionally to the dust-laden area of ​​the tunnel; an air inlet duct is set on the base; a connecting cylinder is connected at one end to the air outlet of the air inlet duct and at the other end to the air inlet of the water mist spraying module; wherein, the air inlet duct includes a main cylinder and a secondary cylinder, the main cylinder having a semi-open structure, the open end of the main cylinder being connected to the connecting cylinder, and the main cylinder being filled with water; the secondary cylinder is a tubular structure with both ends through it, passing through the main cylinder, the outer wall of the secondary cylinder forming an annular water-air mixing chamber between the inner wall of the main cylinder, and a spiral guide vane is provided inside the water-air mixing chamber; the device can focus and rectify the sprayed mist flow, and use the guide ring to form an annular air curtain enveloping the main jet, constraining the disorderly dispersion of the near-range water mist.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of dust removal equipment technology, and more specifically, to a dust removal equipment for tunnel construction. Background Technology

[0002] During tunnel construction, excavation, blasting, and spoil transportation, a large amount of suspended dust is continuously generated. This dust disperses in the enclosed space of the tunnel, which not only endangers the health of construction workers but also reduces visibility inside the tunnel, affecting the normal operation of construction machinery and construction safety. Therefore, fog cannons have become the mainstream dust removal equipment in tunnel construction.

[0003] Traditional fog cannons used in existing tunnel construction typically employ a simple structure with a fan blowing directly onto the surface and an external atomizing nozzle. During operation, the nearby mist and fine water droplets easily disperse and diffuse, lingering in the vicinity of the cannon and the work area. Construction workers are prone to inhaling this aerosol mixture of fine mist droplets and dust directly into their bodies. On one hand, the fine water droplets carrying dust into the respiratory tract can easily cause respiratory discomfort, induce occupational diseases, and damage the respiratory health of construction workers. On the other hand, the fog flow is unrestrained, the dust suppression range is short, and the water mist cannot concentrate on covering dusty areas at the far end of the tunnel, resulting in low overall dust suppression efficiency and failing to meet the safety and environmental protection requirements for dust suppression in tunnel construction. Summary of the Invention

[0004] To address the aforementioned technical problems, this invention provides a dust suppression device for tunnel construction, which solves the technical problems of traditional fog cannons where short-range water mist is easily dispersed, fog droplets mixed with dust aerosols are easily inhaled by construction workers, fog flow has poor cohesion, and the dust suppression range is short and the dust reduction effect is poor.

[0005] The purpose and effectiveness of the tunnel construction dust removal device of the present invention are achieved by the following specific technical means: This invention provides a dust removal device for tunnel construction, comprising: The base is used to enable the overall movement and transport of the device; A water mist spraying module is installed on the base. The water mist spraying module is connected to an external water source and is used to atomize the external water source and spray it in a directional manner into the dusty area of ​​the tunnel. An air inlet duct is mounted on the base; The connecting tube has one end connected to the air outlet of the air inlet tube and the other end connected to the air inlet of the water mist spray module; The air inlet duct includes a main duct and a secondary duct. The main duct has a semi-open structure. The open end of the main duct is connected to the connecting duct. The main duct is filled with water. The auxiliary cylinder is a tubular structure that runs through both ends and is installed on the main cylinder. One end extends below the water surface inside the main cylinder, and the other end extends out of the main cylinder to form an air inlet for drawing in external dust-laden airflow. An annular water-air mixing chamber is formed between the outer wall of the auxiliary cylinder and the inner wall of the main cylinder. A spiral guide vane is provided inside the water-air mixing chamber. The spiral guide vanes are connected to the main cylinder and the auxiliary cylinder on both sides, respectively, to guide the airflow in a swirling motion while preventing water from splashing out.

[0006] In a preferred embodiment, the secondary cylinder is used to draw in external dust-laden airflow through the negative pressure generated by the water mist injection module; The secondary cylinder is equipped with multiple sets of return pipes for guiding the water in the water-air mixing chamber back to its original state; A slag discharge box is integrally formed on one side of the main cylinder for collecting the dust and waste residue that settles inside the main cylinder, and the slag discharge box is connected to the main cylinder.

[0007] As a preferred embodiment, a hinged baffle is provided at the connection between the slag discharge box and the main cylinder. The baffle has a one-way flipping structure, forming a one-way valve structure that only allows the material in the main cylinder to flow unilaterally to the slag discharge box. The main cylinder is provided with a filter hole located above the baffle. The filter hole connects the slag discharge box to the main cylinder and is equipped with a filter screen for intercepting dust and impurities.

[0008] As a preferred embodiment, the main cylinder outlet end is provided with a cyclone dewatering mechanism, the cyclone dewatering mechanism comprising: A filter cylinder is rotatably connected to the main cylinder. Multiple sets of through holes are opened on the inner wall of the filter cylinder, and a water collection cavity is formed between the filter cylinder and the main cylinder. The driving blades are fixed to the inner wall of the filter cylinder in a spiral shape to create a spiral airflow within the filter cylinder. The water collection chamber is connected to the inner cavity of the main cylinder, and the water collection chamber is equipped with absorbent cotton.

[0009] As a preferred embodiment, the water mist spraying module includes: A ventilation duct is installed at one end of the connecting cylinder, and a fan is provided at the end away from the connecting cylinder; A flow guide tube is installed at the end of the air duct away from the connecting tube. An air guide ring, integrally formed on the air guide tube, is used to form an air ring that surrounds the main jet; A sealing plate is provided, wherein an atomizing chamber is formed between the guide tube and the air guide ring, and the sealing plate is installed at the opening end of the atomizing chamber; A water supply ring is installed on the outer wall of the guide tube. Multiple sets of flow channels are opened on the air guide ring and the guide tube. One end of the flow channel is connected to the water supply ring, and the other end is connected to the atomizing chamber. The atomizing chamber is provided with multiple sets of atomizing nozzles, and the multiple sets of atomizing nozzles are respectively connected to multiple sets of flow channels; The guide tube has a mist guide port, which connects the guide tube to the atomizing chamber.

[0010] As a preferred embodiment, the water mist spraying module further includes: A support box is disposed at the bottom of the base; A water pump, installed inside the support box, is used to pump external water to the water supply ring; An adjustment mechanism is provided on the top of the support box. The air duct and the guide tube are installed on the adjustment mechanism. The adjustment mechanism is used to adjust the spray angle of the device. The control module is located on the support box.

[0011] As a preferred embodiment, the air guide tube is provided with a first air guide cone, a return air ring and a second air guide cone in sequence along the air outlet direction; The return air ring is provided with an air outlet pipe, and a vortex cavity is formed between the first air guide cone, the return air ring and the guide tube, and the mist guide port is connected to the vortex cavity; An air outlet cavity is formed between the second air guide cone, the return air ring and the guide tube, and the air outlet cavity and the vortex cavity are connected through the air outlet pipe.

[0012] As a preferred embodiment, both the first and second guide cones are tapered structures, and the tips of both the first and second guide cones face the fan. The return air ring is an annular structure with an arc-shaped cross-section, with its concave side facing the first air guide cone. One end of the air outlet pipe extends axially and enters the cone body of the first air guide cone, forming an annular flow guiding gap with the inner wall of the first air guide cone. The other end of the air outlet pipe is integrally formed with the return air ring, and the connection between the two is an arc-shaped transition.

[0013] In a preferred embodiment, the atomizing nozzle atomizes the water source supplied by the water supply ring, forming a uniformly distributed water curtain within the atomizing chamber; When the fan starts working, it delivers high-speed airflow into the air duct and the guide tube. After being rectified by the first guide cone, the high-speed airflow enters the vortex cavity, creating a negative pressure inside the vortex cavity. Negative pressure draws the water curtain in the atomizing chamber into the vortex chamber through the mist guide port, and the water curtain is fully mixed with the high-speed airflow in the vortex chamber to form a wind-mist mixed airflow; The airflow of the mixed air and mist flows into the air outlet cavity through the air outlet pipe on the return air ring, and after being rectified and pressurized by the second air guide cone, it is sprayed out to the outside of the guide tube to form the main jet; At the same time, part of the edge airflow discharged from the guide tube is directed out along the guide ring, forming an annular air curtain that surrounds the main jet.

[0014] As a preferred embodiment, the atomizing chamber is provided with a drain outlet at the bottom, the base is provided with a clean water tank, the clean water tank is provided with a return water outlet, the drain outlet and the return water outlet are connected by a drain pipe, and the drain pipe is provided with a shut-off valve; The purified water tank is connected to the main cylinder via a return water pipe, and a return water pump is installed on the return water pipe.

[0015] Compared with the prior art, the present invention has the following beneficial effects: 1. This invention, through the coordinated arrangement of the guide tube, guide ring, first guide cone, and second guide cone, can focus and rectify the jet mist flow. The guide ring forms an annular air curtain that envelops the main jet, constraining the disorderly dispersion of near-range water mist and preventing fine droplets from mixing with dust aerosols and spreading in the work area. This reduces the risk of workers inhaling harmful aerosols, effectively protecting their respiratory health and lowering the risk of occupational diseases. Simultaneously, the structural coordination between the vortex cavity and the outlet cavity enhances the mixing effect of the airflow, extends the effective dust removal range, and allows the water mist to cover dusty areas at the far end of the tunnel, improving the overall dust suppression and purification capabilities.

[0016] 2. When using this device, the main and auxiliary cylinders inside the air inlet, along with spiral guide vanes, form a water-air mixing chamber. This chamber utilizes negative pressure to actively draw in dust-laden airflow and perform water washing to remove dust, achieving on-site dust adsorption and settling. Then, through a combination of a slag discharge box, a one-way hinged baffle, and a filter screen, the settled dust and slag are collected and filtered in one direction, preventing secondary dust dispersion. Furthermore, the atomization chamber, clean water tank, and circulation pipeline enable the recycling and reuse of atomized wastewater, reducing water waste. Simultaneously, the cyclone dehydration mechanism separates the airflow into water, preventing water splashing and overflow, further optimizing the tunnel working environment and enhancing the device's operational stability and environmental practicality. Attached Figure Description

[0017] Figure 1 This is a schematic diagram of the assembly structure of the invention; Figure 2 This is a schematic diagram of the air inlet duct structure of the invention; Figure 3 This is a top view of the air inlet duct of the invention; Figure 4 yes Figure 3 Sectional view of region AA in the middle; Figure 5 yes Figure 3 Sectional view of the BB region; Figure 6 This is a schematic diagram of the internal structure of the invention; Figure 7 yes Figure 6 Enlarged view of region a in the middle; Figure 8 This is a schematic diagram of the cyclone dehydration mechanism of the invention; Figure 9 This is a schematic diagram of the internal structure of the cyclone dehydration mechanism of the invention; Figure 10 This is a schematic diagram of the vortex cavity structure of the invention; Figure 11 This is a schematic diagram of the air guide ring of the invention; Figure 12 This is a schematic diagram of the structure of the first air guide cone, the return air ring, and the second air guide cone of the invention.

[0018] In the diagram, the correspondence between component names and their corresponding reference numerals is as follows: 101. Base; 102. Air inlet duct; 1021. Main duct; 1022. Secondary duct; 1023. Water-air mixing chamber; 1024. Spiral guide vane; 103. Connecting cylinder; 104. Return pipe; 105. Slag discharge box; 106. Baffle; 107. Filter screen; 201. Filter cylinder; 202. Water collection chamber; 203. Drive blade; 204. Absorbent cotton; 301. Air duct; 302. Fan; 303. Guide tube; 304. Air guide ring; 305. Sealing plate; 306. Atomizing chamber 307. Water supply ring; 308. Flow channel; 309. Atomizing nozzle; 3011. Mist guide port; 3012. Support box; 3013. Water pump; 3014. Adjustment mechanism; 3015. Control module; 3016. First air guide cone; 3017. Return air ring; 3018. Second air guide cone; 3019. Air outlet pipe; 3021. Vortex chamber; 3022. Air outlet chamber; 401. Clean water tank; 402. Drain pipe; 403. Shut-off valve; 404. Return water pipe; 405. Return water pump. Detailed Implementation

[0019] The embodiments of the present invention will be described in further detail below with reference to the accompanying drawings and examples. The following examples are used to illustrate the technical solutions of the present invention, but should not be used to limit the scope of protection of the present invention. Example

[0020] like Figures 1 to 12 As shown, the present invention provides a dust removal device for tunnel construction, comprising: Base 101 is used to realize the overall movement and transportation of the device; A water mist spraying module is installed on the base 101. The water mist spraying module is connected to an external water source and is used to atomize the external water source and spray it in a directional manner to the dusty area of ​​the tunnel. An air inlet duct 102 is mounted on a base 101; The connecting tube 103 has one end connected to the air outlet of the air inlet tube 102 and the other end connected to the air inlet of the water mist spray module; The air inlet duct 102 includes a main duct 1021 and a secondary duct 1022. The main duct 1021 has a semi-open structure. The open end of the main duct 1021 is connected to the connecting duct 103. The main duct 1021 is filled with water. The secondary cylinder 1022 is a tubular structure with both ends through it, which is installed on the main cylinder 1021. One end of it extends below the water surface inside the main cylinder 1021, and the other end extends out of the main cylinder 1021 and forms an air inlet for drawing in external dust-laden airflow. An annular water-air mixing chamber 1023 is formed between the outer wall of the secondary cylinder 1022 and the inner wall of the main cylinder 1021. A spiral guide vane 1024 is provided inside the water-air mixing chamber 1023. The spiral guide vane 1024 is connected to the main cylinder 1021 and the auxiliary cylinder 1022 on both sides, respectively, to guide the airflow in a swirling motion and at the same time prevent water from splashing and overflowing.

[0021] It should be noted that this device is used for the continuous purification of suspended dust generated during tunnel construction processes such as blasting at the tunnel face, rock breaking and excavation, and transportation of excavated soil by trucks. The entire machine can be moved and transported between different working faces in the tunnel via the base 101 with wheels. It has three core dust removal functions: active negative pressure dust collection, water-air cyclone deep washing, and directional clustered mist jet spray. It solves the technical problems of traditional mist cannons, such as disordered dispersion of water mist at close range, easy inhalation of mist droplet dust aerosol by construction workers, short dust removal range, and difficulty in covering dust at a distance. At the same time, it avoids the disadvantages of excessive humidity and water accumulation on the ground when traditional equipment is in operation.

[0022] Specifically, when the water mist spray module starts operating, it will form a continuous and stable negative pressure environment at its air inlet. This negative pressure is completely transmitted to the inner cavity of the main cylinder 1021 of the air inlet cylinder 102 through the hollow channel of the connecting cylinder 103, and then generates an inward directional suction at the air inlet of the auxiliary cylinder 1022, thereby realizing the active extraction and collection of dust-laden airflow in the tunnel, which is different from the passive dust removal method of traditional equipment that relies on the natural diffusion of dust.

[0023] After the dust-laden airflow is drawn into the secondary cylinder 1022, it is vertically conveyed downward along the axial channel of the secondary cylinder 1022 and directly flows into the water pre-filled in the main cylinder 1021 below the water surface. The airflow will break up in the water to form bubbles and slowly float to the surface. During this process, larger dust particles in the airflow will collide and be adsorbed with water molecules, and will be separated from the airflow by their own gravity and settle to the bottom of the main cylinder 1021, completing the first stage of coarse filtration and dust removal.

[0024] After rising and leaving the water surface, the airflow enters the annular water-air mixing cavity 1023 formed between the outer wall of the secondary cylinder 1022 and the inner wall of the main cylinder 1021. Under the continuous guidance of the spiral guide vane 1024, the airflow will move upward at a uniform speed in a spiral shape along the cavity wall. This spiral movement prolongs the residence time of the airflow in the air inlet duct 102, and at the same time increases the contact area between the airflow and the water film attached to the inner wall of the main cylinder 1021, so that the suspended dust with smaller particle size in the airflow can be further washed and adsorbed by water, completing the second stage of fine filtration and dust removal.

[0025] Meanwhile, the inclined blade structure of the spiral guide vane 1024 forms a physical water barrier, which can prevent water in the main cylinder 1021 from splashing and overflowing upward with the high-speed airflow, thus avoiding the reduction in dust removal effect caused by water loss. It also prevents water accumulation on the ground around the device and excessive humidity in the working environment, solving the problem of easy dispersion of water mist in the short range of traditional fog cannons.

[0026] Specifically, before use, move the device to the work area where tunnel construction dust is concentrated via the traveling wheels at the bottom of the base 101, step on the foot-operated self-locking brake on the base 101 to fix the whole machine at the work point and prevent displacement during operation; then connect the external water supply hose to the water inlet of the water mist spray module, check whether the water level in the main cylinder 1021 has reached the preset height, and ensure that the lower end of the auxiliary cylinder 1022 can be completely submerged below the water surface.

[0027] After the preparation is completed, turn on the power switch of the device, and the water mist spray module starts to work. The fan 302 inside it runs at high speed to generate negative pressure, which is transmitted to the air inlet duct 102 through the connecting cylinder 103, so that the air inlet of the auxiliary cylinder 1022 starts to actively draw in the dust-laden airflow in the tunnel. The dust-laden airflow enters the water body of the main cylinder 1021 through the auxiliary cylinder 1022. After completing the first stage of coarse dust removal, it enters the annular water-air mixing chamber 1023. Under the guidance of the spiral guide plate 1024, it undergoes swirling deep purification to remove fine particulate dust from the airflow.

[0028] After two stages of water washing and purification, the clean airflow enters the connecting cylinder 103 through the open end of the main cylinder 1021 and is smoothly transported to the water mist spraying module through the hollow channel of the connecting cylinder 103. In the water mist spraying module, the clean airflow and the atomized ultrafine water mist are fully and evenly mixed to form a wind-mist mixed airflow, which is finally directionally sprayed into the high-concentration dust-containing area in the tunnel. After the water mist fully contacts and adsorbs the suspended dust, it settles to the ground, completing the final dust suppression operation.

[0029] It should be noted that the base 101 is a movable trolley. The trolley is made of thickened steel welded together and the bottom is equipped with shock-absorbing anti-slip rubber wheels. It can pass through the common gravel roads, waterlogged potholes and gentle slopes in tunnels, buffering the impact of road bumps on the equipment. The trolley is equipped with a foot-operated self-locking brake. When stepped on, it can stably fix the whole machine at the work point and prevent it from shifting during operation.

[0030] In addition, this device can be bolted to the platform of a construction vehicle, loader or tunnel boring machine, and can move synchronously with the construction vehicle to achieve dust removal while construction is underway, thus improving the dust removal efficiency of long-distance tunnel construction.

[0031] The connecting cylinder 103 is a metal bellows with axial extension and angle adaptive adjustment functions. It can adapt to the installation distance and angle deviation between the air inlet duct 102 and the water mist spray module, and meet the multi-angle adjustment requirements of the air inlet duct 102. Both ends are sealed and fixedly connected to the air inlet duct 102 and the water mist spray module respectively, ensuring that the air passage is sealed and unobstructed, preventing air leakage, and at the same time buffering the vibration of the equipment operation and improving the structural stability.

[0032] The auxiliary cylinder 1022 is used to draw in external dust-laden airflow through the negative pressure generated by the water mist spray module; the auxiliary cylinder 1022 is equipped with multiple sets of return pipes 104 for guiding the water in the water-air mixing chamber 1023 backflow; a slag discharge box 105 is integrally formed on one side of the main cylinder 1021 for collecting the dust and waste residue that settles in the main cylinder 1021, and the slag discharge box 105 is connected to the main cylinder 1021.

[0033] Specifically, under the negative pressure generated by the water mist spray module, the secondary cylinder 1022 forms a directional suction channel, actively extracting suspended dust-laden airflow within the tunnel to achieve negative pressure dust collection. Multiple sets of return pipes 104 are evenly distributed axially along the outer wall of the secondary cylinder 1022. One end of each return pipe 104 connects to the water-air mixing chamber 1023, and the other end connects to the inner cavity of the secondary cylinder 1022, allowing splashed water from the mixing chamber to be promptly guided back to the secondary cylinder 1022. A slag discharge box 105 is integrally formed on one side of the main cylinder 1021. The inner cavity of the slag discharge box 105 connects to the bottom of the main cylinder 1021, allowing dust and waste residue settling at the bottom of the main cylinder 1021 to flow naturally with the water into the slag discharge box 105 for centralized collection. This facilitates regular cleaning, prevents dust accumulation and blockage, and ensures the stability and purification efficiency of long-term continuous operation.

[0034] A hinged baffle 106 is provided at the connection between the slag discharge box 105 and the main cylinder 1021. The baffle 106 has a one-way flipping structure, forming a one-way valve structure that only allows the material in the main cylinder 1021 to flow unilaterally to the slag discharge box 105. A filter hole is provided on the main cylinder 1021, which is located above the baffle 106. The filter hole connects the slag discharge box 105 and the main cylinder 1021. A filter screen 107 for intercepting dust and impurities is provided in the filter hole.

[0035] Specifically, the auxiliary cylinder 1022, under the negative pressure generated by the water mist spray module, acts as a suction channel to draw in external dust-laden airflow. Multiple sets of return pipes 104 are evenly arranged on the outer wall of the auxiliary cylinder 1022, connecting the water-air mixing chamber 1023 to the bottom of the main cylinder 1021, to guide splashed water back into the inner cavity of the auxiliary cylinder 1022 and maintain a stable liquid level. The main cylinder 1021 and the slag discharge box 105 share a single-piece inclined bottom surface, which slopes downwards from the main cylinder 1021 towards the slag discharge box 105, guiding dust and waste slag to collect towards the slag discharge box 105. A hinged baffle 106 is provided at the connection between the slag discharge box 105 and the main cylinder 1021. The top of the baffle 106 is hinged to the side wall of the main cylinder 1021 by a pin. It is a one-way flipping structure. Under normal conditions, the lower edge of the baffle 106 is in contact with the inclined bottom surface and sealed, forming a one-way valve structure that only allows the material in the main cylinder 1021 to flow into the slag discharge box 105. When the waste slag accumulates to a certain amount, it can push the baffle 106 to flip and open to the side of the slag discharge box 105. After the waste slag is discharged, the baffle 106 automatically resets and closes to prevent backflow. A filter hole is opened on the side wall of the main cylinder 1021 above the baffle 106, connecting the main cylinder 1021 and the slag discharge box 105. A filter screen 107 is installed in the filter hole to intercept fine dust impurities, preventing impurities from entering the slag discharge box 105 with the water, and ensuring smooth air passage and clean water quality in the system.

[0036] like Figures 6 to 9 As shown, the outlet end of the main cylinder 1021 is provided with a cyclone dewatering mechanism, which includes: a filter cylinder 201, which is rotatably connected to the main cylinder 1021. The inner wall of the filter cylinder 201 has multiple sets of through holes, and a water collection cavity 202 is formed between the filter cylinder 201 and the main cylinder 1021; a driving vane 203, which is fixed in a spiral shape to the inner wall of the filter cylinder 201 to make the airflow form a spiral airflow in the filter cylinder 201; and the water collection cavity 202 is connected to the inner cavity of the main cylinder 1021, and water-absorbing cotton 204 is provided in the water collection cavity 202.

[0037] Specifically, a vortex dehydration mechanism is provided at the outlet end of the main cylinder 1021 to perform secondary purification and air-water separation on the water-washed airflow, preventing dust-laden airflow from entering the water mist spray module, avoiding contamination of the clean mist sprayed at the rear end, and reducing the final dust removal effect. The mechanism includes a filter cylinder 201, a drive vane 203, and a water collection chamber 202. The filter cylinder 201 is coaxially fixed to the outlet end of the main cylinder 1021, and multiple sets of through holes are opened in the circumferential direction on the inner wall. The outer wall of the filter cylinder 201 and the inner wall of the main cylinder 1021 enclose the water collection chamber 202. The drive vane 203 is fixed in a spiral shape to the inner wall of the filter cylinder 201, forcing the airflow to form a stable vortex. The water collection chamber 202 is connected to the inner cavity of the filter cylinder 201 through the through holes, and water-absorbing cotton 204 is provided in the cavity. After being washed, the airflow enters the filter cartridge 201 and is swirled by the driving blades 203. The fine dust and droplets remaining in the airflow are thrown against the cartridge wall by centrifugal force and enter the water collection chamber 202 through the through holes, where they are absorbed and trapped by the absorbent cotton 204. The purified airflow flows out from the center of the filter cartridge 201 and is then transported to the water mist spraying module through the connecting tube 103. This prevents the turbid airflow from contaminating the downstream mist flow and ensures the purity and dust removal efficiency of the sprayed mist flow.

[0038] like Figure 6 , Figures 10 to 12 As shown, the water mist spraying module includes: The ventilation duct 301 is installed at one end of the connecting tube 103, and the fan 302 is provided at the end away from the connecting tube 103; The guide tube 303 is installed at the end of the air duct 301 away from the connecting tube 103; The air guide ring 304 is integrally formed on the air guide tube 303 and is used to form an air ring that surrounds the main jet. A sealing plate 305 is used to form an atomizing chamber 306 between the flow guide tube 303 and the air guide ring 304. The sealing plate 305 is installed at the open end of the atomizing chamber 306. A water supply ring 307 is installed on the outer wall of the guide tube 303. Multiple sets of flow channels 308 are opened on the air guide ring 304 and the guide tube 303. One end of the flow channel 308 is connected to the water supply ring 307, and the other end is connected to the atomizing chamber 306. The atomizing chamber 306 is provided with multiple sets of atomizing nozzles 309, and the multiple sets of atomizing nozzles 309 are respectively connected to multiple sets of flow channels 308; A mist guide port 3011 is provided on the guide tube 303, which connects the guide tube 303 to the atomizing chamber 306.

[0039] Understandably, the water mist jet module generates a directional high-speed airflow through the fan 302, which, combined with the water supply system, achieves high-pressure atomization and focused jetting, forming a main jet and an outer air ring. This ensures atomization quality while avoiding mist dispersion, turbid air pollution, and range attenuation. The air duct 301 serves as the main support structure, with one end connected to the connecting cylinder 103 and the other end fitted with the fan 302, providing a stable channel for airflow delivery. The guide cylinder 303 is fixed to the air outlet end of the air duct 301, forming a double-layer air duct structure together with the integrally formed air guide ring 304. The guide cylinder 303 and the air guide ring 304... Atomizing chamber 306 is formed between 04. The outer opening of atomizing chamber 306 is sealed by sealing plate 305 to ensure stable atomizing pressure. Water supply ring 307 is assembled on the outer wall of guide tube 303. Through multiple sets of flow channels 308 opened on guide tube 303 and air guide ring 304, external water source is evenly delivered to multiple sets of atomizing nozzles 309 in atomizing chamber 306. After high-pressure water is atomized by atomizing nozzles 309, a uniform mist field is formed in atomizing chamber 306. A mist guide port 3011 is opened on the side wall of guide tube 303 to connect atomizing chamber 306 with the central channel of guide tube 303. The high-speed airflow generated by the operation of the fan 302 enters the guide tube 303 through the air duct 301. Part of the airflow carries the droplets in the atomization chamber 306 out through the mist guide port 3011 to form the central main jet; the other part of the airflow flows out along the gap between the guide tube 303 and the air guide ring 304 to form an annular air curtain that surrounds the main jet. The air curtain can constrain the diffusion of the main jet and extend the range, while isolating the external turbid airflow from mixing in, ensuring the cleanliness of the sprayed mist and achieving directional dust suppression.

[0040] The water mist spraying module also includes: Support box 3012 is located at the bottom of base 101; Water pump 3013 is installed in support box 3012 and is used to pump external water source to water supply ring 307; An adjustment mechanism 3014 is located on the top of the support box 3012. The air duct 301 and the guide tube 303 are mounted on the adjustment mechanism 3014. The adjustment mechanism 3014 is used to adjust the spray angle of the device. The control module 3015 is mounted on the support box 3012.

[0041] Understandably, a support box 3012 is installed at the bottom of the base 101 as an integrated mounting carrier for the water pump 3013, the regulating mechanism 3014, and the control module 3015. The water pump 3013 is installed inside the support box 3012 in a sealed manner. Its water inlet is connected to an external water source pipeline through a quick connector, and its water outlet is connected to a water supply ring 307 through a pressure-resistant pipeline. This allows the external water source to be pressurized and stably delivered to each atomizing nozzle 309, ensuring uniform and stable atomization effect and meeting the dust suppression requirements under different working conditions.

[0042] The support box 3012 is equipped with an adjustment mechanism 3014 on its top. This mechanism consists of a rotating table, a fixed base, and an electric push rod. The rotating table is installed on the top surface of the support box 3012 and can be adjusted horizontally. The fixed base is rigidly fixed to the top surface of the rotating table. The air duct 301 is hinged to the upper part of the fixed base through a horizontal rotating shaft. The two ends of the electric push rod are respectively hinged to the side wall of the fixed base and the outer wall of the guide tube 303. The extension and retraction of the electric push rod drives the guide tube 303 and the air duct 301 to rotate around the horizontal rotating shaft, realizing continuous pitch angle adjustment of the water mist spray module. Combined with the horizontal rotation function of the rotating table, it can cover dust sources in different areas such as the tunnel face, arch, and side walls, realizing full-section, no-dead-angle directional dust removal.

[0043] The control module 3015 includes a control box and an operation panel. The operation panel is installed on one side of the support box 3012. The operation panel can be a 7-inch industrial touch screen all-in-one machine, used for displaying equipment operating parameters, manual operation control, and fault alarm prompts. The control box is located inside the support box 3012. The control box can be an industrial computer, used to realize the logic control and safety protection of the fan 302, water pump 3013, and regulating mechanism 3014.

[0044] Inside the airflow guide tube 303, a first airflow guide cone 3016, a return air ring 3017, and a second airflow guide cone 3018 are arranged sequentially along the airflow direction. The return air ring 3017 is provided with an air outlet pipe 3019, and a vortex cavity 3021 is formed between the first air guide cone 3016, the return air ring 3017 and the guide tube 303. The mist guide port 3011 is connected to the vortex cavity 3021. An air outlet cavity 3022 is formed between the second air guide cone 3018, the return air ring 3017 and the guide tube 303. The air outlet cavity 3022 and the vortex cavity 3021 are connected through the air outlet pipe 3019.

[0045] Understandably, the first guide cone 3016, the return air ring 3017, and the second guide cone 3018 are coaxially arranged inside the guide tube 303 along the airflow direction, forming a three-stage air duct structure to achieve full mixing and directional spraying of the atomized air. The tip of the first guide cone 3016 faces the air inlet side, forming a gradually expanding air duct with the inner wall of the guide tube 303; the return air ring 3017 is vertically fixed to the inner wall of the guide tube 303, and together with the first guide cone 3016 and the inner wall of the guide tube 303, they enclose a vortex cavity 3021. The mist guide port 3011 is evenly opened in the circumferential direction at the corresponding position of the vortex cavity 3021, connecting the atomizing cavity 306 and the vortex cavity 3021. The tip of the second guide cone 3018 faces the air outlet side and forms a gradually narrowing air duct with the inner wall of the guide tube 303; the return air ring 3017, together with the second guide cone 3018 and the inner wall of the guide tube 303, forms the air outlet cavity 3022; multiple sets of axial air outlet pipes 3019 are evenly arranged along the circumference of the return air ring 3017, connecting the vortex cavity 3021 and the air outlet cavity 3022.

[0046] The high-speed axial airflow generated by the fan 302 enters the guide tube 303 and is guided by the first guide cone 3016 to diffuse outwards, forming a stable annular swirling field within the vortex cavity 3021. The mist droplets generated by the atomizing chamber 306 enter the vortex cavity 3021 through the mist guide port 3011, where they undergo shearing, collision, and mixing with the swirling airflow to form a uniform two-phase flow of gas and mist. The mixed two-phase flow of gas and mist enters the outlet cavity 3022 through the outlet pipe 3019 on the return air ring 3017, where it accelerates and converges within the gradually narrowing air duct. After being rectified by the second guide cone 3018, it forms a high-speed central main jet that is ejected. Simultaneously, some airflow flows out along the annular gap between the guide tube 303 and the guide ring 304, forming an annular air curtain that surrounds the main jet. This curtain suppresses the radial diffusion of the main jet, extends its effective range, and isolates it from the mixing of external dust-laden airflow, ensuring the purity of the mist and its dust-reducing effect.

[0047] Both the first guide cone 3016 and the second guide cone 3018 are tapered structures, and the tips of both the first guide cone 3016 and the second guide cone 3018 face the fan 302. The return air ring 3017 is an annular structure with an arc-shaped cross-section, and its concave side faces the first air guide cone 3016. One end of the outlet pipe 3019 extends axially and enters the cone body of the first air guide cone 3016, forming an annular flow guiding gap between it and the inner wall of the cone body of the first air guide cone 3016. The other end of the outlet pipe 3019 is integrally formed with the return air ring 3017, and the connection between the two is an arc-shaped transition.

[0048] Specifically, both the first guide cone 3016 and the second guide cone 3018 adopt a tapered conical structure, with the cone tips facing the fan 302, enabling continuous and smooth airflow guidance and rectification. The return air ring 3017 adopts an arc-shaped annular structure, with its concave side facing the first guide cone 3016, which can guide the airflow and reduce flow resistance. One end of the outlet pipe 3019 extends axially and enters the cone body of the first guide cone 3016, forming an annular guiding gap between it and the inner wall of the first guide cone 3016; the other end of the outlet pipe 3019 is integrally formed with the return air ring 3017, and the connection between the two adopts an arc transition to avoid the generation of local eddies and pressure loss.

[0049] The high-speed axial airflow generated by the fan 302 enters the guide tube 303 and is first divided by the first guide cone 3016. Part of the airflow diffuses outward along the conical surface of the first guide cone 3016 and enters the vortex cavity 3021 under the guidance of the arc-shaped return air ring 3017 to form a stable vortex. The other part of the airflow directly enters the outlet duct 3019 through the annular guide gap. The mist droplets generated by the atomizing chamber 306 enter the vortex cavity 3021 through the mist guide port 3011 and are fully mixed with the swirling airflow to form a uniform gas-mist two-phase flow. The mixed gas-mist two-phase flow and the high-speed airflow entering through the annular guide gap merge and accelerate in the outlet duct 3019 and enter the outlet cavity 3022 together. Inside the air outlet cavity 3022, the airflow is rectified and focused by the second guide cone 3018 to form a high-speed and stable central main jet. At the same time, the peripheral airflow flows out along the annular gap between the guide tube 303 and the guide ring 304 to form an annular air curtain, realizing the long-distance spraying of the mist and the isolation from the external turbid airflow.

[0050] After the atomizing nozzle 309 atomizes the water source supplied by the water supply ring 307, it forms a uniformly distributed water curtain in the atomizing chamber 306. When the fan 302 starts working, it delivers high-speed airflow into the air duct 301 and the guide tube 303. After being rectified by the first guide cone 3016, the high-speed airflow enters the vortex cavity 3021, causing a negative pressure to be formed in the vortex cavity 3021. Negative pressure draws the water curtain in the atomizing chamber 306 into the vortex chamber 3021 through the mist guide port 3011. The water curtain and the high-speed airflow in the vortex chamber 3021 are fully mixed to form a wind-mist mixed airflow. The airflow of the mixed air and fog flows into the air outlet cavity 3022 through the air outlet pipe 3019 on the return air ring 3017, and after being rectified and pressurized by the second air guide cone 3018, it is ejected out of the guide tube 303 to form the main jet. At the same time, part of the edge airflow discharged from the guide tube 303 is directed out along the guide ring 304, forming an annular air curtain that surrounds the main jet.

[0051] It should be noted that the device adopts a negative pressure ejector-type aerosol mixing principle. Compared with the traditional forced air supply mixing method, it can achieve full and uniform mixing of water curtain and airflow, improving atomization uniformity and mist flow stability. After the high-speed airflow is rectified and accelerated by the first guide cone 3016, a stable negative pressure field is formed in the vortex cavity 3021, which can uniformly draw the water curtain in the atomization cavity 306 into the vortex cavity 3021, avoiding the problems of uneven droplet distribution and excessively high local concentration in the traditional structure. The arc-shaped cross-section return air ring 3017 can guide the airflow to form a smooth vortex in the vortex cavity 3021, reducing flow resistance and energy loss. The annular guide gap formed by the outlet pipe 3019 extending into the first guide cone 3016 allows some high-speed airflow to directly enter the outlet pipe 3019, merge with the air-mist mixed airflow and accelerate, further increasing the main jet outlet velocity. The second guide cone 3018 rectifies and pressurizes the air-mist mixed airflow, making the airflow form a concentrated and stable main jet, extending the mist flow range. Meanwhile, the edge airflow guided by the air guide ring 304 forms an annular air curtain that surrounds the main jet, which can not only constrain the radial diffusion of the main jet, but also prevent external dust-laden airflow from mixing into the main jet, ensuring the purity of the mist flow and preventing the back-end water mist spraying module from being contaminated.

[0052] The bottom of the atomizing chamber 306 is provided with a drain outlet, the base 101 is provided with a clean water tank 401, the clean water tank 401 is provided with a return water outlet, the drain outlet and the return water outlet are connected through a drain pipe 402, and the drain pipe 402 is provided with a shut-off valve 403. The clean water tank 401 is connected to the main cylinder 1021 through the return water pipe 404, and the return water pipe 404 is equipped with a return water pump 405.

[0053] Specifically, a drain outlet is located at the lowest point of the atomizing chamber 306. A purified water tank 401 is integrated and installed on the base 101. A return water outlet is located at the top of the purified water tank 401. The drain outlet and the return water outlet are connected by a drain pipe 402. A shut-off valve 403 is connected in series on the drain pipe 402 to control the opening and closing of the drainage path. The purified water tank 401 is connected to the main cylinder 1021 by a return water pipe 404. A return water pump 405 is installed on the return water pipe 404 to transport the recycled water in the purified water tank 401 back to the main cylinder 1021 for recycling.

[0054] When un-atomized or un-carried water accumulates in the atomizing chamber 306, it gathers under gravity at the drain outlet at the bottom of the chamber. After the shut-off valve 403 is opened, the water flows through the drain pipe 402 and back into the clean water tank 401 for temporary storage. When the recycled water in the clean water tank 401 reaches the set level, the return water pump 405 is activated to pressurize the water in the tank and transport it to the main cylinder 1021, where it re-participates in the atomization dust suppression process. This water circulation structure can recycle and utilize un-atomized or un-carried water generated during the atomization process, improving water resource utilization, and is especially suitable for operating environments where water resources are inconvenient, such as tunnels.

[0055] The above description is merely a preferred embodiment of the present invention and is not intended to limit the invention. Various modifications and variations can be made to the present invention by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.

Claims

1. A tunnel construction dust removal device characterized by comprising: include: The base (101) is used to realize the overall movement and transportation of the device; A water mist spraying module is installed on the base (101). The water mist spraying module is connected to an external water source and is used to atomize the external water source and spray it in a directional manner to the dusty area of ​​the tunnel. An air inlet duct (102) is disposed on the base (101); The connecting tube (103) has one end connected to the air outlet of the air inlet tube (102) and the other end connected to the air inlet of the water mist spray module; The air inlet duct (102) includes a main duct (1021) and a secondary duct (1022). The main duct (1021) has a semi-open structure. The open end of the main duct (1021) is connected to the connecting duct (103). The main duct (1021) is filled with water. The secondary cylinder (1022) is a tubular structure with both ends through it, which is installed on the main cylinder (1021). One end of the secondary cylinder (1022) extends below the water surface inside the main cylinder (1021), and the other end extends out of the main cylinder (1021) to form an air inlet for drawing in external dust-laden airflow. An annular water-air mixing chamber (1023) is formed between the outer wall of the secondary cylinder (1022) and the inner wall of the main cylinder (1021). A spiral guide vane (1024) is provided inside the water-air mixing chamber (1023). The spiral guide vane (1024) is connected to the main cylinder (1021) and the auxiliary cylinder (1022) on both sides respectively, and is used to guide the airflow in a swirling manner while preventing water from splashing out.

2. The dust removal device for tunnel construction according to claim 1, characterized in that: The secondary cylinder (1022) is used to draw in external dust-laden airflow through the negative pressure generated by the water mist injection module; The secondary cylinder (1022) is provided with multiple sets of return pipes (104) for diverting the water in the water-air mixing chamber (1023) backflow. The main cylinder (1021) has an integrally formed slag discharge box (105) on one side for collecting the dust and waste residue that settles inside the main cylinder (1021), and the slag discharge box (105) is connected to the main cylinder (1021).

3. The dust removal device for tunnel construction according to claim 2, characterized in that: The slag discharge box (105) is connected to the main cylinder (1021) by a hinged baffle (106). The baffle (106) is a one-way flipping structure, forming a one-way valve structure that only allows the material in the main cylinder (1021) to flow unilaterally to the slag discharge box (105). The main cylinder (1021) is provided with a filter hole, which is located above the baffle (106). The filter hole connects the slag discharge box (105) with the main cylinder (1021). The filter hole is provided with a filter screen (107) for intercepting dust and impurities.

4. The tunnel construction dust removal device according to claim 1, characterized in that, The main cylinder (1021) is provided with a cyclone dewatering mechanism at its outlet end, the cyclone dewatering mechanism comprising: The filter cylinder (201) is rotatably connected to the main cylinder (1021). The inner wall of the filter cylinder (201) has multiple sets of through holes, and a water collection cavity (202) is formed between the filter cylinder (201) and the main cylinder (1021). A drive vane (203) is fixed in a spiral shape to the inner wall of the filter cylinder (201) to form a spiral airflow within the filter cylinder (201); The water collection chamber (202) is connected to the inner cavity of the main cylinder (1021), and the water collection chamber (202) is provided with absorbent cotton (204).

5. The dust removal device for tunnel construction according to claim 1, characterized in that, The water mist spraying module includes: A ventilation duct (301) is installed at one end of the connecting cylinder (103), and a fan (302) is provided at the end away from the connecting cylinder (103). A guide tube (303) is installed at the end of the air duct (301) away from the connecting tube (103); The air guide ring (304) is integrally formed on the air guide tube (303) and is used to form an air ring that wraps around the main jet; A sealing plate (305) is provided, and an atomizing chamber (306) is formed between the flow guide tube (303) and the air guide ring (304). The sealing plate (305) is installed at the opening end of the atomizing chamber (306). A water supply ring (307) is installed on the outer wall of the guide tube (303). Multiple flow channels (308) are opened on the air guide ring (304) and the guide tube (303). One end of the flow channel (308) is connected to the water supply ring (307), and the other end is connected to the atomizing chamber (306). The atomizing chamber (306) is provided with multiple sets of atomizing nozzles (309), and the multiple sets of atomizing nozzles (309) are respectively connected to multiple sets of flow channels (308); The guide tube (303) is provided with a mist guide port (3011), which connects the guide tube (303) and the atomizing chamber (306).

6. The dust removal device for tunnel construction according to claim 5, characterized in that, The water mist spraying module also includes: A support box (3012) is disposed at the bottom of the base (101); A water pump (3013) is installed inside the support box (3012) and is used to pump external water to the water supply ring (307); An adjustment mechanism (3014) is provided on the top of the support box (3012). The air duct (301) and the guide tube (303) are installed on the adjustment mechanism (3014). The adjustment mechanism (3014) is used to adjust the spray angle of the device. The control module (3015) is disposed on the support box (3012).

7. A dust removal device for tunnel construction according to claim 6, characterized in that: The air guide tube (303) is provided with a first air guide cone (3016), a return air ring (3017) and a second air guide cone (3018) in sequence along the air outlet direction. The return air ring (3017) is provided with an air outlet pipe (3019), and a vortex cavity (3021) is formed between the first air guide cone (3016), the return air ring (3017) and the guide tube (303), and the mist guide port (3011) is connected to the vortex cavity (3021); An air outlet cavity (3022) is formed between the second air guide cone (3018), the return air ring (3017) and the guide tube (303), and the air outlet cavity (3022) and the vortex cavity (3021) are connected through the air outlet pipe (3019).

8. A dust removal device for tunnel construction according to claim 7, characterized in that: Both the first guide cone (3016) and the second guide cone (3018) are tapered structures, and the tips of the first guide cone (3016) and the second guide cone (3018) are facing the fan (302). The return air ring (3017) is an annular structure with an arc-shaped cross-section, and its concave side faces the first air guide cone (3016). One end of the air outlet pipe (3019) extends axially and enters the cone body of the first air guide cone (3016), forming an annular flow guiding gap between it and the inner wall of the cone body of the first air guide cone (3016). The other end of the air outlet pipe (3019) is integrally formed with the return air ring (3017), and the connection between the two is an arc-shaped transition.

9. A dust removal device for tunnel construction according to claim 8, characterized in that: The atomizing nozzle (309) atomizes the water source supplied by the water supply ring (307) and forms a uniformly distributed water curtain in the atomizing chamber (306); When the fan (302) starts working, it delivers high-speed airflow into the air duct (301) and the guide tube (303). The high-speed airflow enters the vortex cavity (3021) after being rectified by the first guide cone (3016), so that a negative pressure is formed in the vortex cavity (3021). The negative pressure draws the water curtain in the atomizing chamber (306) into the vortex chamber (3021) through the mist guide (3011), and the water curtain and the high-speed airflow in the vortex chamber (3021) are fully mixed to form a wind-mist mixed airflow; The airflow of the air-mist mixture flows into the air outlet cavity (3022) through the air outlet pipe (3019) on the return air ring (3017), and after being rectified and pressurized by the second air guide cone (3018), it is ejected to the outside of the guide tube (303) to form the main jet; At the same time, part of the edge airflow discharged from the guide tube (303) is directed out along the guide ring (304) to form an annular wind curtain that wraps around the main jet.

10. A dust removal device for tunnel construction according to claim 9, characterized in that: The atomizing chamber (306) is provided with a drain outlet at the bottom, and a clean water tank (401) is provided on the base (101). The clean water tank (401) is provided with a return water outlet, and the drain outlet and the return water outlet are connected through a drain pipe (402). A shut-off valve (403) is provided on the drain pipe (402). The water tank (401) is connected to the main cylinder (1021) through a return water pipe (404), and a return water pump (405) is provided on the return water pipe (404).