A method for step-by-step filling of a collapsed area of an ore deposit with a full-tailings filling material
By using a step-by-step backfilling method with full tailings slurry and cementitious material, the problems of boundary detection, isolation wall stability, and backfill material cost in underground collapse zone mining were solved, achieving efficient and safe ore mining and reducing engineering costs and risks.
Patent Information
- Application Number
- CN202611535040.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-30
- Publication Date
- 2026-11-24
AI Technical Summary
The mining process in the underground collapse zone faces challenges such as difficulty in boundary detection, difficulty in controlling the stability of the isolation retaining wall, high cost of backfill materials, long mining cycle, low mining rate, and ore dilution, resulting in high engineering costs and significant safety risks.
The method of step-by-step filling with tailings slurry and cementitious material is adopted. First, the tailings slurry is injected to cover the surface and gaps of the crushed ore pile to form an isolation layer. Then, cemented filling material is injected to fill the cavity and form a roadway-shaped void. Finally, the crushed ore is mined back to avoid blasting and roadway excavation.
It achieved a 100% ore recovery rate, reduced mining costs and time, decreased ore dilution, and improved safety and ecological protection.
Smart Images

Figure CN123153803A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of mining and relates to the backfilling and mining of crushed ore in underground collapse areas and the ecological safety of mining areas. Specifically, it is a method for backfilling ore in collapse areas by using full tailings backfill material in stages. Background Technology
[0002] Underground mining is affected by factors such as geological structure, blasting disturbance, ground pressure evolution, and groundwater. In fractured rock mining areas, roof collapses and sidewall collapses are prone to occur, forming loose, collapsed accumulation zones. The rock mass within these collapse zones is loose and disordered, with complex boundary morphology. This not only poses safety risks such as burial injuries and tunnel damage but also results in a large amount of residual ore resources remaining unexploited. Traditional closed-loop treatment methods lead to severe resource losses. Backfilling and recovery technology, through the construction of an artificial support system, integrates ground pressure control, disaster management, and residual ore resource recovery in collapse zones, becoming an important technical approach for managing fractured and complex mining areas.
[0003] The geological conditions of the collapse area are significantly unique, with a mixture of collapsed gangue and residual ore, well-developed fissures, and irregular spatial morphology. The mining process faces engineering challenges such as slurry leakage, instability of retaining walls, and secondary collapses. Currently, the mainstream engineering technique is isolated approach with backfill mining. First, the actual extent of the collapse area is determined through geophysical exploration and 3D laser scanning to construct a geological model. Then, retaining walls are constructed to divide the collapse area into several independent mining units. Following the principle of "reinforcement first, mining later, and backfilling while mining," the process involves segmented excavation, segmented ore extraction, and segmented cemented backfilling. The backfill material replaces the original pillars to bear the ground pressure, constraining the loose collapsed material and inhibiting further expansion of the collapse area. For some extremely fractured and collapsed areas, pre-grouting reinforcement can be used to improve the integrity of loose rock mass and reduce the risk of collapse during mining [Zhu Lei et al. Simulation test study on filling gangue slurry in collapse zone [J]. Journal of Coal Science and Technology, 2021, 46(S2):629-638].
[0004] Domestic and international scholars have conducted extensive theoretical and experimental research on backfilling and mining in collapse areas. At the material level, to address the problem of easy slurry loss in collapse areas, experiments were conducted on the proportioning of whole tailings paste and composite cementitious slurry to improve the slurry's resistance to bleeding and segregation, and to reduce slurry leakage into collapse fissures [Zhang Hongwei et al. Research and Application of Efficient Backfilling Mining Method for Gently Inclined Fractured Ore Bodies [J]. Gold Science and Technology, 2021, 29(06): 899-906]. In terms of monitoring technology, microseismic monitoring and acoustic emission methods have been used throughout the entire mining process in collapse areas to capture surrounding rock fracture signals and achieve dynamic early warning of ground pressure risks [Liu Jianpo et al. Stability Analysis of Deep Mining Ground Based on Acoustic Emission Monitoring [J]. Journal of Mining and Safety Engineering, 2013, 30(02): 243-250]. This technology has now been applied in residual ore treatment projects in various metal mines such as gold, iron, and copper, effectively improving the recovery rate of residual ore, while controlling the movement of surface rock strata, taking into account both underground safety and ecological protection of the mining area [Lang Xiaodong et al. Practice of residual ore partitioning and backfilling mining under complex void conditions [J]. Mining Technology, 2024, 24(02):45-49].
[0005] Current technologies for backfilling and mining in collapse zones still face numerous bottlenecks. Accurate detection of hidden boundaries in collapse zones is challenging, and discrepancies exist between geological models and actual site conditions. The failure mechanism of retaining walls under the pressure of loose aggregate remains unclear. Furthermore, the high cost of backfill materials limits their adoption in small and medium-sized mines.
[0006] Due to the fractured and loose rock mass and complex geological conditions in the collapse area, the engineering cost of the mining process is relatively high, and it faces challenges such as secondary collapse of the surrounding rock, leakage of rock, and loss of backfill slurry. These challenges are mainly reflected in the following aspects: the boundary of the collapse area and the distribution of fractured rock mass are difficult to detect accurately, and the geological model has great uncertainty; the stability control of the isolation retaining wall under the fractured surrounding rock is difficult; the introduction of backfill material leads to ore dilution; the amount of backfill material used is large, resulting in high mining costs in the collapse area; and the mining cycle is long with a low recovery rate.
[0007] In summary, while existing backfilling and mining technologies in collapse areas can provide feasible solutions for residual ore recovery and geological disaster management, and also take into account resource recovery, underground disaster prevention and control, and mine ecological protection, further technological development is needed to improve the coupling of fractured surrounding rock-backfilling-granular materials, low-cost solid waste-based backfilling cementitious materials, and to inhibit ore dilution, reduce backfilling and mining costs, increase recovery rates, and reduce blasting vibrations in collapse areas. These advancements aim to ensure the safe and efficient application of crushed ore mining in collapse areas under complex mining conditions. Summary of the Invention
[0008] The purpose of this invention is to solve the above-mentioned technical problems and provide a method for mining ore in collapsed areas by step-by-step filling of full tailings backfill material, which saves mining time, reduces mining costs, eliminates the risk of further collapse in the mining area, inhibits ore dilution, makes the backfill body dense and stable, and achieves an ore recovery rate of 100%.
[0009] The technical solution includes injecting full tailings slurry into the collapsed ore pile and the roadway connected to the collapsed area. After the full tailings slurry covers the entire surface of the ore pile, the injection of filling material composed of a mixture of full tailings slurry and cementitious material is switched until all cavities in the entire collapsed area are filled. After the injected filling material solidifies to form a filling body and reaches the design strength, the collapsed ore is then mined.
[0010] Before injecting the full tailings slurry into the collapsed area, the crushed ore in the roadway and the area near the roadway entrance is first mined back using the ore extraction equipment to form a mined-out area. Then, all roadway entrances connected to the collapsed area are sealed with partition walls.
[0011] The tailings slurry is injected through a collapse zone filling pipe installed at the top of the collapse zone; the filling material is injected through a roadway filling pipe installed at the top of the collapse zone and on both sides of the roadway.
[0012] The filling pipe for the collapsed area is installed in the filling hole at the top of the collapsed area, and its opening extends into the collapsed void. Two roadway filling holes are opened on both sides of the roadway above the bottom roadway of the collapsed area in a figure-eight shape, connecting the collapsed area. The two roadway filling pipes are inserted into the roadway filling holes through the roadway above, and their openings extend into the boundary edge between the crushed ore pile and the surrounding rock on both sides above the bottom roadway opening.
[0013] The full tailings slurry injection is carried out in two stages. The first stage involves injecting full tailings slurry from the collapse zone filling pipe until it completely covers the surface of the crushed ore pile in the collapse zone, and allowing it to stand for 1-2 hours to form a full tailings layer. The second stage involves injecting full tailings slurry from the collapse zone filling pipe to continue covering the crushed ore pile, while simultaneously raising the full tailings slurry level outside the partition wall at the bottom roadway entrance, forming a full tailings area from the crushed ore pile to the outside of the partition wall at the bottom roadway entrance. When the liquid level crosses the middle of the partition wall and reaches two-thirds of the partition wall's height, the injection of filling material is switched from the roadway filling pipe. When the liquid level of the filling material covers the outlet of the roadway filling pipe, the injection is stopped, the roadway filling pipe is removed, and the roadway filling hole is sealed.
[0014] After the tunnel filling holes are blocked, filling material is continuously injected from the collapse zone filling pipe until all the cavities in the collapse zone are filled to form a filling body, and then cured to the design strength.
[0015] After the backfill material has been cured to the design strength, the partition wall of the bottom roadway is removed, and the tailings in the entire tailings area are stripped and transported using shovel and ore removal equipment to form a roadway-shaped void area connecting the bottom roadway; the bonding between the backfill material and the surrounding rock around the roadway-shaped void area is detected, and it is determined whether anchor bolts need to be added to reinforce the support based on the surrounding rock conditions. If the surrounding rock conditions are uncertain, anchor bolts are added to reinforce the support.
[0016] With the help of the tunnel's hollow support, the crushed ore in the collapsed area is mined back using ore extraction equipment.
[0017] The steps for mining the collapsed ore pile are as follows: ① Using shovel and haulage equipment, the crushed ore piles in the collapsed area are shoveled and transported through the goaf in the roadway to form a new goaf; ② The crushed ore transported out by shovel is sent to the screening unit, where tailings and ore are separated.
[0018] Preferably, a step-by-step filling method is adopted to advance into the deep area of the ore pile in the collapse zone. This includes using the newly mined goaf as the cavity of the collapse zone, repeatedly injecting full tailings slurry and filling material to form a new roadway-shaped goaf for further mining of the collapsed ore pile, and finally achieving the complete mining of the ore pile.
[0019] The tailings slurry is a slurry containing 60-70 wt% solids without tailings separation.
[0020] Compared with the prior art, the present invention has the following beneficial effects: 1. The first injection of full tailings slurry covers the surface of the ore pile and seeps into the gaps between the crushed ore piles, forming a full tailings layer upon settling. This layer acts as an isolation and protective layer on the surface of the crushed ore piles. The full tailings slurry contains no cementing material and has no binding effect on the ore. Subsequent injection of cemented backfill material does not directly contact the ore, facilitating easy separation between the ore and the backfill during mining. This also prevents the cemented backfill material from seeping into the ore gaps and wasting cementing material.
[0021] 2. The second injection of tailings slurry raises the liquid level in the roadway entrance area, forming a complete tailings zone from the crushed ore pile to the outer side of the bottom roadway entrance partition wall, reserving space for the formation of a roadway-shaped void. The complete tailings zone pre-occupies the space in the roadway entrance area, and subsequent clearing of the complete tailings layer in this area will form the roadway-shaped void. The liquid level of the complete tailings slurry is controlled to two-thirds of the height of the partition wall before switching to injecting filling material. Injection is stopped when the liquid level of the filling material covers the outlet of the roadway filling pipe to avoid excessive filling of the filling material towards the roadway.
[0022] 3. Forming a tunnel-shaped void serves as a mining channel for crushed ore, saving time and cost in tunnel construction and eliminating the risk of surrounding rock loosening caused by blasting. Two tunnel filling holes are opened on both sides of the tunnel above the lowest level of the collapsed area, sloping downwards in a figure-eight pattern, connecting to the collapsed area. Two tunnel filling pipes are inserted accordingly, with their openings extending into the boundary between the crushed ore pile and the surrounding rock on both sides above the lowest level tunnel opening. Filling material, composed of a mixture of tailings slurry and anhydrous cementitious material, is injected through the filling pipes. The filling material has a lower water content and higher density than the tailings slurry. After injection, it flows along the edges of the surrounding rock on both sides of the lowest level tunnel opening, pushing the previously injected tailings slurry from the rock edge towards the center of the tunnel opening and the crushed ore pile area, forming a tunnel-shaped tailings area. The filling material is densely packed at the edge of the surrounding rock and above the tailings layer, forming a clear stratigraphic interface with the tailings layer. After the filling material solidifies to the design strength, the tailings layer in the tunnel entrance area is cleared, thus forming a tunnel-shaped void. This void directly serves as the mining channel for crushed ore, eliminating the need to excavate a separate tunnel within the filling material, thus saving construction costs and time associated with tunnel excavation.
[0023] 4. After the roadway filling holes are sealed, cemented filling material is continuously injected into the collapse zone filling pipe to fill all cavities, forming a complete and continuous filling body. The filling body and the entire tailings layer in the roadway entrance area together constitute the collapse zone support system. After the filling body has cured to the design strength, the partition wall is removed, and the crushed ore in the collapse zone can be directly mined using the roadway opening.
[0024] 5. Determine the orientation of the roadway void area based on the distribution of crushed ore piles to achieve complete recovery of crushed ore. By adjusting the ratio of filling material injected into the two roadway filling pipes based on the distribution location of the crushed ore piles in the collapsed area, the orientation of the roadway void area is adjusted. The recovery channel extends directly to the crushed ore area along with the void, enabling complete recovery of the crushed ore in the collapsed area, with a recovery rate of up to 100%.
[0025] 6. No drilling or blasting is required during mining, saving mining time and reducing operational risks. The initial injection of tailings slurry in the staged backfilling process fills the gaps between the crushed ore, without cementing the crushed ore. This eliminates the need for drilling and blasting during later mining operations, avoiding disturbance to the backfill body and helping to maintain its integrity and stable bond with the surrounding rock. This also saves mining time and reduces operational risks.
[0026] 7. Avoid ore dilution and reduce cementitious material usage. The roadway void is formed by clearing the entire tailings layer without cementitious material. Cemented backfill material is not mixed into the mined crushed ore, which can avoid ore dilution caused by backfill material. In the step-by-step backfilling, the entire tailings slurry first fills the gaps between the ore piles and covers the surface of the ore piles, occupying part of the backfilling space in the collapse zone. The cemented backfill material is only used to fill the cavity above the collapsed crushed ore pile, forming a backfill support, which helps to reduce the amount of cementitious material used and lower the backfilling mining cost.
[0027] In summary, by using staged backfilling to mine the crushed ore in the underground collapse area, there is no need to blast the crushed ore pile; and by creating a roadway-shaped void through specially designed backfilling pipes, there is no need to blast the backfill body to open the roadway. This eliminates the impact of blasting vibrations on the collapse area, avoids damage to the junction between the backfill body and the surrounding rock, and improves the safety of mining in other areas, preventing larger-scale collapses and enhancing the overall ecological safety of the mining area. Attached Figure Description
[0028] Figure 1 This is a schematic diagram of a large collapse area (section) where a pile of collapsed ore blocks a roadway.
[0029] Figure 1-1 A schematic diagram of the collapse zone (section) of the collapsed ore pile far from the roadway.
[0030] Figure 2 This diagram illustrates the state of the mined-out area formed by the backfilling of crushed ore piles in and near the tunnel entrance.
[0031] Figure 3 A schematic diagram of the installation location of the filling pipes in the collapsed area.
[0032] Figure 4 This is a schematic diagram showing the state of the entire tailings layer and the entire tailings area after the tailings slurry is injected in two stages.
[0033] Figure 5 A schematic diagram showing the state of the entire tailings area formed by injecting full tailings backfill material.
[0034] Figure 6 This is a schematic diagram showing the state of the entire tailings area in the form of a tunnel after all the filling material has been injected.
[0035] Figure 7 for Figure 6 Enlarged view of part A.
[0036] Figure 8 for Figure 6 A schematic diagram of section A, BB direction.
[0037] Figure 9 for Figure 8 EE direction diagram.
[0038] Figure 10 A schematic diagram of the formation of a tunnel-shaped void area.
[0039] Figure 11 A schematic diagram illustrating the process of utilizing the goaf in the roadway to create a new goaf through ore stockpile mining.
[0040] Figure 12 A schematic diagram illustrating the process of continuing backfilling and mining in the newly mined-out area.
[0041] Figure 13 A schematic diagram illustrating the process of directly filling the collapsed area with full tailings slurry to form a full tailings layer.
[0042] Figure 14 A schematic diagram showing the state of the collapse area being directly filled in stages to form the filling body.
[0043] Figure 15 A schematic diagram showing the step-by-step backfilling and mining to form a mined-out area in the collapsed area.
[0044] Figure 16 This is a schematic diagram of the installation of filling pipelines in the goaf.
[0045] Figure 17 A schematic diagram showing the step-by-step backfilling and mining to form a mined-out area in a small collapse zone.
[0046] Figure 18 This is a schematic diagram showing the filling body formed after the goaf is filled.
[0047] Among them, the following are included: T1-2 collapse zone outer ore body, T2 roadway, T2-1 roadway filling hole, T3-1 full tailings layer, T3-2 full tailings area, T4-2 collapse zone, T4-3 goaf, T5-1 crushed ore pile, T6-1 collapse zone filling pipe, T6-2 roadway filling pipe, T6-3 goaf filling pipe, T7 filling body, T8 roadway goaf area, T9 partition wall, and T10 new goaf. Detailed Implementation
[0048] The method of the present invention will be further explained below with reference to the accompanying drawings: like Figure 1 As shown, the present invention is applicable to the scenario of a collapsed ore pile in an underground mine: the collapsed area T4-2 is located near the tunneling end of the roadway T2, and the collapsed area T4-2 contains a pile of collapsed ore T5-1, while the periphery of the collapsed area T4-2 is the ore body T1-2 that has not been affected by mining.
[0049] Example 1: During implementation, first determine the extent of the collapse zone T4-2 and the roadway T2 connecting to the collapse zone. For example... Figure 2As shown, in the lowest level roadway connected to the collapse zone, ore scrapping equipment is first used to mine the crushed ore in roadway T2 and the area near the roadway entrance, forming a goaf T4-3. Goaf T4-3 provides storage space for subsequent backfill slurry and exposes the boundary of the crushed ore pile T5-1 in collapse zone T4-2, facilitating observation of the slurry distribution during backfilling. Then, partition walls T9 are used to seal all roadway entrances connected to collapse zone T4-2 to prevent backfill slurry from leaking towards roadway T2. Multiple top backfilling holes are opened at the top of collapse zone T4-2, and backfilling pipes T6-1 (multiple sets can be installed) are installed to connect the cavity of collapse zone T4-2. Figure 3 As shown; on both sides of the roadway above the lowest level roadway T2 in the collapse zone T4-2, two roadway filling holes T2-1 are opened in a figure-eight shape, connecting the collapse zone T4-2. Two roadway filling pipes T6-2 are inserted accordingly. The openings of the two roadway filling pipes T6-2 extend into the boundary between the crushed ore pile T5-1 above the opening of the lowest level roadway T2 and the surrounding rock (or filling body) of the collapse zone. See [reference needed]. Figures 8-9 .like Figure 7 As shown, Figure 7 for Figure 6 Enlarged view of part A in the middle; as shown Figure 8 As shown, Figure 8 for Figure 6 Schematic diagram of the BB section of part A in the middle; as shown Figure 9 As shown, Figure 9 for Figure 8 Schematic diagram of cross-section along the EE direction. As can be seen from the enlarged view and cross-section, the tunnel filling hole T2-1 is set in a figure-eight shape with a narrow inner side and a wide outer side along the axial direction of the tunnel T2 and is inclined downward. After the tunnel filling pipe T6-2 is inserted into the tunnel filling hole T2-1, the pipe opening extends into the edge of the boundary between the collapsed area T4-2 crushed ore pile T5-1 and the surrounding rock. The two pipe openings are respectively facing the boundary area between the crushed ore pile T5-1 and the surrounding rock on both sides above the bottom tunnel opening.
[0050] like Figure 4 As shown, during backfilling, the tailings slurry is first injected into the collapse zone T4-2 through the backfilling pipe T6-1. The first injection continues until the tailings slurry completely covers the surface of the crushed ore pile T5-1. After standing for 1-2 hours, the bleeding process of the tailings slurry is basically completed, and the solid particles in the tailings slurry settle naturally, forming a tailings layer T3-1 on the surface of the crushed ore pile T5-1. The tailings slurry used is tailings slurry with a solid content of 60-70 wt% without tailings separation. The tailings slurry does not contain cementing material and has no cementing effect on the ore in the crushed ore pile T5-1. After the tailings slurry seeps into the gaps of the crushed ore pile T5-1, it separates the ore surface from the subsequently injected cementing backfill material, making it easier for the ore to be stripped from the backfill during mining.
[0051] After the first injection, the tailings slurry continues to be injected into the collapse zone T4-2 through the collapse zone filling pipe T6-1. The second injection of tailings slurry continues to cover the crushed ore pile T5-1 and gradually raises the slurry level outside the partition wall T9 at the bottom roadway T2. When the slurry level crosses the middle of partition wall T9 and reaches two-thirds of the height of partition wall T9, a complete tailings zone T3-2 is formed, extending from the crushed ore pile T5-1 to the outside of the partition wall T9 at the bottom roadway T2. The complete tailings zone T3-2 at the roadway entrance covers the entire tailings layer T3-1. Figure 5 As shown. Stop injecting filling material through the T6-1 filling pipe in the collapsed area and switch to injecting filling material through the T6-2 filling pipe in the roadway.
[0052] The filling material injected through the tunnel filling pipe T6-2 is cemented filling material, formed by mixing whole tailings slurry with anhydrous cementitious material. The cemented filling material has a lower water content and a higher density than the whole tailings slurry. The cemented filling material is injected from the edges of the surrounding rock on both sides of the bottom tunnel entrance, flowing from the edges towards the tunnel entrance area, pushing the whole tailings slurry in the whole tailings area T3-2 from the edges of the surrounding rock towards the center of the tunnel entrance and the crushed ore pile area T5-1. When the filling material level covers the outlet of the tunnel filling pipe T6-2, the cemented filling material flows to the surface of the previously injected whole tailings layer T3-1 in that area, injection stops, the tunnel filling pipe T6-2 is removed, and the tunnel filling hole T2-1 is sealed.
[0053] like Figure 5 As shown, after the backfill hole T2-1 in the roadway is sealed, backfill material containing cementitious material is continuously injected through the backfill pipe T6-1 in the collapsed area. The backfill material fills all the cavities in the collapsed area T4-2, forming backfill body T7. At the same time, backfill body T7 occupies the goaf T4-3. After the backfill body T7 has been cured to the design strength, backfill body T7, together with the surrounding rock of the collapsed area and roadway T2, constitutes the support system of the collapsed area T4-2, providing support for the crushed ore pile T5-1 in the collapsed area T4-2.
[0054] like Figure 10 As shown, after the backfill T7 has reached its designed strength, the partition wall T9 of the lowest roadway T2 is removed, and the entire tailings area at the roadway entrance is cleared to form a roadway-shaped empty area T8. Tailings stripping and mining are then carried out on the crushed ore pile T5-1 within the collapsed area T4-2. The mining steps are as follows: ① Using the isolation support formed by the filling body T7, the tailings of the entire tailings area T3-2 in the collapse zone T4-2 were shoveled and transported by ore-moving equipment, and then the entire tailings layer T3-1 was stripped and transported out. ② After the tailings in the T3-2 tailings area are transported out, clear the area to form a tunnel-shaped void T8 that connects to the bottom tunnel T2. The tunnel-shaped void T8 is supported by the filling body T7. Check the bonding between the filling body T7 and the surrounding rock around the tunnel-shaped void T8. Determine whether to add anchor bolts to strengthen the support based on the surrounding rock conditions. If the surrounding rock conditions are uncertain, add anchor bolts to strengthen the support. ③ The ore crushing pile T5-1 is shoveled and transported through the goaf T8 roadway to the screening unit. The space formed after shoveling and transporting is the new goaf T10. ④ The transported ore is screened through a screening unit to separate tailings and ore. The separated tailings can be reused to prepare whole tailings slurry, thus achieving recycling.
[0055] Example 2: like Figure 11 As shown, in step ③ of Example 1, if the volume of the ore pile in the collapse area is small (the length and width of the collapse area are less than 10 meters), it can be mined in one go; if the volume of the ore pile in the collapse area is large, it can be supported by the isolation of the tunnel void T8, and the filling can be carried out in stages to advance into the deep area of the collapse area T4-2, gradually forming a new mining void T10.
[0056] like Figure 12 As shown, an opening is made from the roadway T2 above the new goaf T10 to the top of the new goaf T10, and a goaf filling pipe T6-3 is installed. Following the scheme of Example 1, the deep ore pile T5-1 within the collapsed area T4-2 is sequentially mined until all collapsed ore piles are mined. During the step-by-step filling process, as mentioned above, each mining step involves injecting full tailings slurry into the new goaf T10 twice to form a full tailings layer T3-1 and a full tailings area T3-2. Then, cemented filling material is injected into the new goaf T10 twice to form a filling body T7, creating a new roadway-shaped goaf for mining. The mining path is determined based on the distribution location of the ore pile T5-1. The roadway-shaped goaf T8 gradually extends as mining progresses.
[0057] Example 3: For large-scale collapse areas (length and width greater than 10 meters), direct step-by-step backfilling and mining are carried out.
[0058] like Figure 13 As shown, once an underground collapse occurs, after determining the extent of the collapse zone T4-2, all roadways T2 connected to the collapse zone T4-2 are located to determine the lowest-level roadway. For example... Figure 14As shown, all connecting tunnels are sealed with partition walls T9. Multiple top filling holes (one can be made) are opened at the top of the collapsed area T4-2, and multiple sets of collapsed area filling pipes T6-1 are installed to connect the cavity of collapsed area T4-2. After the partition wall T9 reaches its designed curing strength, filling material is injected in stages through the collapsed area filling pipes T6-1 until the entire collapsed area T4-2 is filled, as shown. Figure 15 As shown, the injection method is the same as in Example 1.
[0059] After the backfill reaches its designed curing strength, a large and stable backfill support is formed. The partition wall is removed, and the crushed ore pile T5-1 is mined to create the goaf T4-3. Figure 14 As shown.
[0060] Due to the large size of the collapse area (length and width greater than 10 meters), the remaining collapsed ore fragments need to be mined again by using the T4-3 goaf as a backfilling method to form a roadway-shaped goaf.
[0061] For the goaf T4-3, in accordance with Example 1, holes are drilled to install the goaf filling pipe T6-3 and the roadway filling pipe T6-2, as follows: Figure 16 As shown, the drilling, installation, and subsequent mining methods are the same as in Example 1.
[0062] Example 4: For small collapse areas (length and width less than 10 meters), direct step-by-step backfilling and single-stage mining are used.
[0063] like Figure 13 As shown, for a small collapse zone, after determining the extent of collapse zone T4-2, all roadways T2 connected to collapse zone T4-2 are located, the lowest-level roadway T2 is determined, and the collapsed ore fragments block the entrance of the bottom roadway in the collapse zone. For example... Figure 14 As shown, all connecting tunnels are sealed with partition walls T9. Multiple top filling holes (one can be made) are opened at the top of the collapsed area T4-2, and multiple sets of collapsed area filling pipes T6-1 are installed to connect the cavity of collapsed area T4-2. After the partition wall T9 reaches its designed curing strength, filling material is injected in stages through the collapsed area filling pipes T6-1 until the entire collapsed area T4-2 is filled, as shown. Figure 15 As shown, the injection method is the same as in Example 1.
[0064] After the backfill reaches its designed curing strength, a large and stable backfill support is formed. The partition wall is removed, and with the support of the backfill, the crushed ore pile T5-1 is mined in one go, forming the goaf T4-3 of the entire collapse zone. Figure 17 As shown, the mined-out area was then filled with filling material containing cementitious material to complete the mining and filling of the collapsed area, achieving a 100% recovery rate. Figure 18 As shown.
Claims
1. A method for mining ore from a collapsed area using a step-by-step backfilling system with full tailings backfill material, comprising a collapsed pile of crushed ore and a roadway connected to the collapsed area, characterized in that, Full tailings slurry is injected into the crushed ore pile in the collapsed area. After the full tailings slurry covers the entire surface of the crushed ore pile, the injection of filling material composed of a mixture of full tailings slurry and cementitious material is switched until all cavities in the entire collapsed area are filled. After the injected filling material solidifies to form a filling body and reaches the design strength, the collapsed crushed ore is then mined.
2. The method for mining ore in a collapsed area using staged backfilling of full tailings as described in claim 1, characterized in that, Before injecting the full tailings slurry into the collapsed area, the crushed ore in the roadway and the area near the roadway entrance is first mined back using the ore extraction equipment to form a mined-out area. Then, all roadway entrances connected to the collapsed area are sealed with partition walls.
3. The method for mining ore in a collapsed area using staged backfilling of full tailings as described in claim 2, characterized in that, The tailings slurry is injected through a collapse zone filling pipe installed at the top of the collapse zone; the filling material is injected through a roadway filling pipe installed at the top of the collapse zone and on both sides of the roadway.
4. The method for mining ore in a collapsed area using staged backfilling of full tailings as described in claim 3, characterized in that, The filling pipe for the collapsed area is installed in the filling hole at the top of the collapsed area, and its opening extends into the collapsed void. Two roadway filling holes are opened on both sides of the roadway above the bottom roadway of the collapsed area in a figure-eight shape, connecting the collapsed area. The two roadway filling pipes are inserted into the roadway filling holes through the roadway above, and their openings extend into the boundary edge between the crushed ore pile and the surrounding rock on both sides above the bottom roadway opening.
5. The method for mining ore in a collapsed area using staged backfilling of full tailings as described in claim 4, characterized in that, The full tailings slurry injection is carried out in two stages. The first stage involves injecting full tailings slurry from the collapse zone filling pipe until it completely covers the surface of the crushed ore pile in the collapse zone, and allowing it to stand for 1-2 hours to form a full tailings layer. The second stage involves injecting full tailings slurry from the collapse zone filling pipe to continue covering the crushed ore pile, while simultaneously raising the full tailings slurry level outside the partition wall at the bottom roadway entrance, forming a full tailings area from the crushed ore pile to the outside of the partition wall at the bottom roadway entrance. When the liquid level crosses the middle of the partition wall and reaches two-thirds of the partition wall's height, the injection of filling material is switched from the roadway filling pipe. When the liquid level of the filling material covers the outlet of the roadway filling pipe, the injection is stopped, the roadway filling pipe is removed, and the roadway filling hole is sealed.
6. The method for mining ore in a collapsed area using staged backfilling of full tailings as described in claim 5, characterized in that, After the tunnel filling holes are blocked, filling material is continuously injected from the collapse zone filling pipe until all the cavities in the collapse zone are filled to form a filling body, and then cured to the design strength.
7. The method for mining ore in a collapsed area using staged backfilling of full tailings as described in claim 6, characterized in that, After the backfill material has been cured to the design strength, the partition wall of the bottom roadway is removed, and the tailings in the entire tailings area are stripped and transported using shovel and ore removal equipment to form a roadway-shaped void area connecting the bottom roadway; the bonding between the backfill material and the surrounding rock around the roadway-shaped void area is detected, and it is determined whether anchor bolts need to be added to reinforce the support based on the surrounding rock conditions. If the surrounding rock conditions are uncertain, anchor bolts are added to reinforce the support.
8. The method for mining ore in a collapsed area using staged backfilling of full tailings as described in claim 7, characterized in that, With the help of the tunnel's hollow support, the crushed ore in the collapsed area is mined back using ore extraction equipment.
9. The method for mining ore in a collapsed area using staged backfilling of full tailings as described in claim 8, characterized in that, The steps for mining the collapsed ore pile are as follows: ① Using shovel and haulage equipment, the crushed ore piles in the collapsed area are shoveled and transported through the goaf in the roadway to form a new goaf; ② The crushed ore transported out by shovel is sent to the screening unit, where tailings and ore are separated.
10. The method for mining ore in a collapsed area using staged backfilling of full tailings as described in claim 9, characterized in that, The method of step-by-step filling is adopted to advance into the deep area of the crushed ore pile in the collapse zone. This includes using the newly mined goaf as the cavity of the collapse zone, repeatedly injecting full tailings slurry and filling material to form a new roadway-shaped goaf for further mining of the collapsed crushed ore pile, and finally achieving the complete mining of the crushed ore pile.