A shield tunnel high-risk section construction safety early warning method and system

By combining 3D laser scanning and digital twin modeling technologies with multi-source data fusion and Kalman filtering, the problems of insufficient monitoring coverage and data noise in shield tunnel construction have been solved, achieving efficient deformation early warning and safety control.

CN123153807APending Publication Date: 2026-11-24JINAN YELLOW RIVER CONSTRUCTION GROUP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611417916.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-14
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

When shield tunnels are constructed in high-risk areas, existing monitoring technologies suffer from limited coverage of discrete measuring points, poor timeliness, severe data noise interference, and a lack of fusion analysis of multi-source data. As a result, deformation identification relies on experience-based judgment, which is prone to missed or false alarms.

Method used

By employing 3D laser scanning dynamic monitoring, digital twin modeling, and multi-source data fusion analysis, and through adaptive filtering, point cloud quality assessment, and geometric constraints, continuous deformation monitoring of the entire cross section is achieved, and Kalman filtering is combined for early warning.

Benefits of technology

It enables real-time and reliable deformation monitoring and early warning of high-risk sections of shield tunnels, which can identify potential risks in advance and reduce structural damage and safety hazards.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123153807A_ABST
    Figure CN123153807A_ABST
Patent Text Reader

Abstract

This invention relates to the field of shield tunnel construction safety monitoring technology, and discloses a method and system for early warning of construction safety in high-risk sections of shield tunnels. The method dynamically acquires point cloud data of the inner surface of tunnel segments using three-dimensional laser scanning, employs adaptive filtering to remove tunneling vibration noise, and identifies three types of anomalies—lining misalignment, sealing trench distortion, and excessive ellipticity—using a geometric constraint rule base to trigger retesting. The method reconstructs the tunnel segment surface using non-uniform rational B-splines, incrementally updates it to form a digital twin model, and extracts cumulative deformation and deformation rate based on iterative nearest-point registration. A Kalman filter recursive equation is established by integrating geological, tunneling, and grouting parameters to predict the final deformation amount in advance and classify risk levels to push early warning signals. This invention realizes the transformation of tunnel segment structural deformation from discrete point sampling to continuous monitoring of the entire cross-section, improving the timeliness and reliability of construction safety management in high-risk sections.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of safety monitoring technology for shield tunnel construction, specifically to a method and system for early warning of construction safety in high-risk sections of shield tunnels. Background Technology

[0002] When shield tunnels are constructed in high-risk urban areas (such as under dense building clusters, adjacent sections of existing subway lines, or complex strata such as water-rich sand layers), the segment structure is subjected to non-uniform grout pressure during the synchronous grouting process, which can easily lead to deformation problems such as floating, sinking, and exceeding the ellipticity limit. In severe cases, this can cause segment cracking, bolt failure, or even tunnel collapse.

[0003] Currently, the deformation monitoring of shield tunnel segments mainly adopts discrete measuring point methods such as total stations and levels. The limitations of this method are: the limited coverage of discrete measuring points makes it difficult to obtain a continuous deformation field across the entire segment cross-section, easily missing the cross-section with the largest deformation or areas of local abrupt change; conventional monitoring is mostly manual periodic measurement, resulting in poor timeliness and inability to achieve real-time tracking of segment deformation during synchronous grouting, often only discovering it after deformation has exceeded limits and visible cracks have appeared in the lining; strong vibrations, high dust levels, and humidity during shield tunneling cause the point cloud data acquired by 3D laser scanning to contain a large amount of noise, and conventional filtering methods are insufficiently adaptable to construction disturbances, making it difficult to reliably extract effective deformation features from the measured data; furthermore, geological parameters, tunneling parameters, grouting parameters, and structural response data belong to different acquisition systems, lacking effective fusion analysis methods, and risk identification mainly relies on the experience judgment of on-site engineers, leading to frequent missed and false alarms.

[0004] To address the aforementioned issues, this invention integrates three-dimensional laser scanning dynamic monitoring, digital twin modeling, and multi-source data fusion analysis to form a complete technical process from data acquisition, model synchronization, deformation quantification to risk warning. Summary of the Invention

[0005] (a) Technical problems to be solved To address the shortcomings of existing technologies, this invention provides a method and system for early warning of construction safety in high-risk sections of shield tunnels. It has advantages such as adaptive noise-resistant acquisition, self-assessment of point cloud quality, full-section digital twin modeling, and advanced early warning through multi-source data fusion. It solves the problems of insufficient coverage of existing discrete point monitoring, poor timeliness of manual measurement, low reliability of point clouds due to strong construction noise, lack of fusion of multi-source data, and reliance on experience-based judgment for risk identification.

[0006] (II) Technical Solution To achieve the above objectives, the present invention provides the following technical solution: a method for early warning of construction safety in high-risk sections of shield tunnels, comprising the following steps: S1: A three-dimensional laser scanning device is deployed in the high-risk section of the shield tunnel to continuously collect the original three-dimensional point cloud data of the inner surface of the tunnel segment structure at fixed time intervals during synchronous grouting construction; the vibration acceleration signal of the tunnel segment structure during the tunneling process is collected simultaneously, and the main frequency of the construction vibration is obtained by fast Fourier transform. Based on this, an adaptive filtering kernel is constructed to perform vibration anti-disturbance filtering on the original point cloud data to filter out the low-frequency drift noise introduced by the tunneling vibration; then, an outlier removal method based on local point cloud density statistics is adopted, combined with the constraint condition of the curvature continuity of the tunnel segment surface, to remove outlier noise points and flying points introduced by environmental factors, and obtain the noise-reduced point cloud data; the attitude angle and spatial position data obtained by the inertial measurement unit are used to perform spatial registration and attitude correction on the noise-reduced point cloud data; S2: Based on the tunnel structure design radius and the structural characteristics of the segment circumferential and longitudinal joints, establish a geometric constraint rule library for the point cloud data on the segment surface; taking a single ring segment as a unit, calculate the deviation distribution between the actual point cloud data and the design model ring by ring, identify and mark three types of anomalies: lining misalignment, sealing groove distortion, and cross-sectional ellipticity exceeding the limit; when any type of anomaly occurs, automatically remove the abnormal data of that ring and mark it as pending review, triggering a retest command; Extract the horizontal convergence value, vertical convergence value, and average radius offset of the entire cross section from the remaining valid point cloud data; calculate the validity score of each monitoring indicator, which comprehensively considers the proportion of valid point cloud and its distribution uniformity in the circumferential direction of the cross section; when the score is lower than the preset threshold, trigger the retest command and drive the scanning device to perform encrypted scanning of the ring. S3: Retrieve tunnel design parameters, segment information, geological survey data, and synchronous grouting construction parameters. Based on the point cloud data confirmed as valid in step S2 through reliability assessment, establish a three-dimensional geometric model of the inner surface of the segment structure using the non-uniform rational B-spline surface reconstruction method. After each subsequent scan, inject the latest point cloud data into the existing model incrementally to keep the three-dimensional model synchronized with the physical tunnel structure, forming a three-dimensional digital twin model of the segment structure. Mark the position coordinates of the segment circumferential joint, longitudinal joint, bolt handhole, and grouting hole on the model, extract the cross-sectional point cloud slices of each segment ring, and calculate the measured axial offset, ellipticity coefficient, and local flatness of each section as the basic feature vector for subsequent deformation analysis. S4: Based on the feature vectors of each cross section extracted in step S3, establish a deformation feature time series according to the ring number; use the iterative nearest point algorithm to register the point cloud slices of the same cross section at different times, calculate the cross section deformation displacement field, and extract the cross section center offset and radial deformation of each azimuth angle; subtract the deformation displacement fields of adjacent times to calculate the cross section center offset rate and radial deformation rate per unit time; combine the cumulative deformation and deformation rate of each ring, and combine the geological conditions and grouting pressure parameters to output the current safety status level of each ring; S5: Based on the safety status levels of each ring output in step S4, geological survey data, shield tunneling parameters, and synchronous grouting construction parameters are incorporated into the analysis. With cumulative deformation and deformation rate as state variables and grouting pressure and propulsion speed as external inputs, a linear state recursive equation is established. Kalman filtering is used to recursively estimate the deformation trend of each ring and predict the final deformation of the next construction stage. When the predicted value exceeds the threshold for determining the structural failure stage, the risk level is classified according to the degree of exceedance and an early warning signal is generated. The content includes the warning location, risk level, predicted final deformation, and suggested disposal measures. The early warning signal is simultaneously pushed to the shield control room, ground monitoring center, and on-site mobile terminal.

[0007] Preferably, the cutoff frequency of the adaptive filter core in step S1 is dynamically adjusted according to the change of the main frequency of tunneling vibration, and the adjustment period is consistent with the scanning period.

[0008] Preferably, the validity scoring logic in step S2 is as follows: when the percentage of valid point cloud is less than 60% or the coverage of valid point cloud in the circumferential direction of the cross section is less than 300°, the score is automatically classified as unqualified and a retest is triggered; if the retest fails to meet the standard in two consecutive tests, the system pushes a prompt that the on-site conditions do not meet the scanning requirements.

[0009] Preferably, the node vectors for the non-uniform rational B-spline surface reconstruction in step S3 are adaptively determined based on the actual distribution density of each ring point cloud, with nodes being increased in dense point cloud regions and decreased in sparse regions.

[0010] Preferably, the deformation rate in step S4 is processed by moving average filtering to remove random fluctuation noise and then the long-term trend term is extracted.

[0011] Another technical problem to be solved by the present invention is to provide a construction safety early warning system for high-risk sections of shield tunnels, including a data acquisition terminal, a cloud server, a database, a ground monitoring terminal, and a field mobile terminal; The data acquisition terminal is installed on the inner wall of the tunnel at a predetermined distance behind the segment assembly trolley, and integrates a three-dimensional laser scanning device, an inertial measurement unit, and a vibration acceleration sensor. The three-dimensional laser scanning device is used to continuously acquire raw three-dimensional point cloud data of the inner surface of the segment structure. The inertial measurement unit is used to acquire the attitude angle and spatial position of the scanning device itself. The vibration acceleration sensor is used to acquire vibration signals of the segment structure. The data acquisition terminal has a built-in data cache module, which can temporarily store scanning data when the network is interrupted and automatically re-transmit it after the network is restored. The cloud server includes a point cloud data preprocessing unit, a digital twin modeling unit, a deformation quantification analysis unit, and a risk warning unit; The point cloud data preprocessing unit is used to receive raw point cloud, vibration signal and attitude angle data, and perform adaptive filtering, outlier removal, spatial registration correction, and automatic anomaly identification and reliability assessment. The digital twin modeling unit is used to receive preprocessed point cloud data, combine design parameters and geological data, perform surface reconstruction and incremental model updates, and maintain the three-dimensional digital twin model. The deformation quantification analysis unit is used to extract cross-sectional slices and register point clouds of the digital twin model, and to calculate the cumulative deformation and deformation rate of each ring. The risk warning unit is used to perform Kalman filter recursive estimation with cumulative deformation and deformation rate as state variables and grouting pressure and propulsion speed as external inputs, to determine the risk level and output a warning signal. The database is used to store segment structure design parameters, geological survey data, shield tunneling parameters, synchronous grouting construction parameters, original point cloud data and preprocessed point cloud data, three-dimensional digital twin model snapshots, deformation time series of each ring, and historical early warning records. The data acquisition terminal communicates with the cloud server via encrypted wireless or fiber optic communication.

[0012] Preferably, the outlier removal search radius in the point cloud data preprocessing unit is set at 0.5%-1% of the segment cross-sectional radius, and the judgment threshold is set at 3 times the standard deviation of the average point cloud density within this radius.

[0013] Preferably, the risk warning unit has a built-in structural failure stage judgment threshold matrix. This matrix takes the concrete strength grade and wall thickness of the pipe segment as input variables and outputs the upper limit of cumulative deformation and the upper limit of deformation rate corresponding to different risk levels.

[0014] Preferably, the data acquisition terminal is connected to the tunnel boring machine PLC control system via an industrial Ethernet interface to acquire tunneling thrust, propulsion speed, cutterhead rotation speed and synchronous grouting pressure parameters in real time and upload them to the cloud server.

[0015] Preferably, the ground monitoring terminal is used to display the three-dimensional digital twin model and the safety status information of each ring, and supports querying detailed deformation curves and historical early warning records; the on-site mobile terminal is used to receive early warning push notifications and remind users via pop-up windows and vibration.

[0016] (III) Beneficial Effects Compared with the prior art, the present invention provides a method and system for early warning of construction safety in high-risk sections of shield tunnels, which has the following beneficial effects: 1. At the data acquisition end, the present invention adjusts the filtering parameters in real time according to the measured vibration signal. Compared with the filtering method with fixed parameters, it can more effectively remove the low-frequency drift noise introduced by tunneling vibration. Combined with outlier removal based on density statistics and curvature constraints, it can still obtain usable point cloud data of the tunnel segment surface in the high-noise environment of shield tunneling construction, providing a basic guarantee for subsequent analysis.

[0017] 2. During the data processing stage, this invention automatically identifies three typical anomalies—lining misalignment, sealing trench distortion, and excessive ellipticity—by establishing a geometric constraint rule base. It also sets up a data validity scoring and retest triggering mechanism to proactively eliminate unreliable data during processing. For cases where retesting still fails to meet standards, it pushes on-site condition prompts to avoid repeated collection of invalid data.

[0018] 3. This invention employs non-uniform rational B-splines to reconstruct the three-dimensional surface of the tunnel segment, using loops as units for incremental synchronous updates. This ensures the geometric accuracy of the model while avoiding the computational burden caused by frequent reconstruction of the entire model. The cross-sectional deformation displacement field calculation based on iterative nearest-point registration enables continuous deformation measurement across the entire cross-section, overcoming the limitation of discrete measurement point methods that easily miss local deformation peaks.

[0019] 4. This invention incorporates four types of data—geological, tunneling, grouting, and structural response—into the same analytical framework. It uses deformation amount and deformation rate as state variables and grouting pressure and advance speed as external inputs for Kalman filtering recursion. Compared to simply relying on threshold alarms, it can issue trend warnings one construction step ahead. The warning signal is directly associated with handling suggestions, and on-site personnel can quickly adjust construction parameters accordingly, achieving a closed loop of "monitoring-early warning-handling". Attached Figure Description

[0020] Figure 1 This is a schematic diagram of the architecture and data flow of the high-risk section construction safety early warning system for shield tunnels of the present invention; Figure 2 This is a flowchart of the method for early warning of construction safety in high-risk sections of shield tunnels according to the present invention. Detailed Implementation

[0021] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0022] Please see Figure 1-2 A method for early warning of construction safety in high-risk sections of shield tunnels, comprising the following steps: S1: A three-dimensional laser scanning device is deployed in the high-risk section of the shield tunnel to continuously collect the original three-dimensional point cloud data of the inner surface of the segment structure at fixed time intervals during the synchronous grouting construction; the vibration acceleration signal of the segment structure during the tunneling process is collected synchronously, and the main frequency of the construction vibration is obtained by fast Fourier transform. Based on this, an adaptive filter kernel is constructed to perform vibration anti-disturbance filtering on the original point cloud data to filter out the low-frequency drift noise introduced by the tunneling vibration; the cutoff frequency of the filter kernel is dynamically adjusted with the change of the main vibration frequency, and the adjustment period is consistent with the scanning period; After completing vibration filtering, when removing outliers, the search radius is set to 0.5%-1% of the segment cross-sectional radius. The average point cloud density within this radius is used as the benchmark. Points exceeding 3 times the standard deviation are considered noise and removed. Combined with the constraint of the continuity of the segment surface curvature, outlier noise points and flying points introduced by environmental factors such as dust and humidity are removed to obtain the noise-reduced point cloud data. Using the attitude angle and spatial position data obtained by the inertial measurement unit of the scanning device, spatial registration and attitude correction are performed on the noise-reduced point cloud data to eliminate the position and posture offset error generated by the scanning device during the movement of the assembly trolley.

[0023] S2: Based on the tunnel structure design radius and the structural characteristics of the segment circumferential and longitudinal joints, a geometric constraint rule library for the point cloud data on the segment surface is established; taking a single ring segment as a unit, the deviation distribution between the actual point cloud data and the design model is calculated ring by ring. When the deviation exceeds the preset allowable range, three types of anomalies are automatically identified and marked: lining misalignment, sealing groove distortion, and cross-sectional ellipticity exceeding the limit; when any type of anomaly occurs, the system automatically removes the abnormal data of that ring, marks it as pending review, and triggers a retest command for that ring. Statistical analysis is performed on the remaining valid point cloud data to extract the horizontal convergence value, vertical convergence value, and average radius offset of each cross section. The confidence interval estimation method in mathematical statistics is used to calculate the validity score of each monitoring indicator. This score comprehensively considers the proportion of valid point cloud data and its circumferential distribution uniformity across the cross section. When the proportion of valid point cloud data is less than 60% or the circumferential coverage of valid point cloud data is less than 300°, the score is automatically classified as unqualified, triggering a retest command and driving the scanning device to perform a denser scan of that ring. If the validity score fails to meet the standard in two consecutive retests, the system automatically sends a "Field conditions do not meet scanning requirements" prompt, waiting for the construction environment (such as dust concentration and vibration intensity) to improve before re-collecting data.

[0024] S3: Retrieve tunnel design parameters, segment information, geological survey data, and synchronous grouting construction parameters. Based on the point cloud data confirmed as valid through reliability assessment in step S2, establish a three-dimensional geometric model of the inner surface of the segment structure using the Non-Uniform Rational B-Spline (NURBS) surface reconstruction method. The node vector layout density is adaptively determined based on the actual distribution density of the point cloud in each ring. Nodes are densified in dense point cloud areas to ensure fitting accuracy, while nodes are reduced in sparse areas to avoid overfitting. After each subsequent scan, the latest point cloud data is incrementally injected into the existing model. Only the newly completed scanned segments are locally updated, keeping the 3D model synchronized with the physical tunnel structure and forming a 3D digital twin model of the tunnel segment structure. The incremental update takes the tunnel segment ring as the smallest unit. After a single scan, only the newly assembled 1-2 rings are updated, and existing rings are not reconstructed. The position coordinates of the segment circumferential joints, longitudinal joints, bolt handholes, and grouting holes are marked on the model. Cross-sectional point cloud slices of each segment ring are extracted, and the measured axial offset, ellipticity coefficient, and local flatness of each section are calculated as the basic feature vectors for subsequent deformation analysis.

[0025] S4: Based on the feature vectors of each cross section extracted in step S3, establish a deformation feature time series along the tunneling direction according to the ring number; use the Iterative Closest Point (ICP) algorithm to accurately register the point cloud slices of the same cross section at different times, calculate the deformation displacement field of the cross section, and extract the cross section center offset and the radial deformation at each azimuth angle of the cross section. The deformation displacement fields at adjacent time points are subtracted to calculate the cross-sectional center offset rate and radial deformation rate per unit time. The rate sequence is then filtered by moving average to remove random fluctuation noise and extract the long-term deformation trend. The latest cumulative deformation of each ring and the corresponding deformation rate are combined with the geological conditions and grouting pressure parameters at the location to output the current safety status level of each ring, which is divided into four levels according to the degree of deformation: safe, caution, warning, and danger.

[0026] S5: Based on the safety status level of each ring output in step S4, geological survey data (stratum type, overburden thickness, groundwater level, etc.), shield tunneling parameters (thrust, advance speed, cutterhead rotation speed) and synchronous grouting construction parameters (grouting pressure, grouting volume) are incorporated into the analysis; with cumulative deformation and deformation rate as state variables, and grouting pressure and advance speed as external inputs, a linear state recursive equation is established, and Kalman filtering is used to recursively estimate the deformation trend of each ring to predict the final deformation of the next construction stage; The threshold for determining the structural failure stage is determined based on the concrete strength grade and wall thickness of the tunnel segments. It is pre-calibrated through finite element analysis and stored in the system in tabular form. When the predicted value exceeds the threshold, the risk level (yellow, orange, red) is classified according to the degree of exceedance, and an early warning signal is generated. The signal includes the warning location (ring number), risk level, predicted final deformation, and suggested remedial measures (such as adjusting grouting pressure, secondary grouting, and slowing down the tunneling speed). The early warning signal is simultaneously pushed to the display screen in the tunnel boring machine control room, the ground monitoring center, and the handheld terminals of on-site management personnel.

[0027] A safety early warning system for high-risk sections of shield tunnel construction includes a data acquisition terminal 100, a cloud server 200, a database 300, a ground monitoring terminal 400, and a field mobile terminal 500. The data acquisition terminal 100 is installed on the inner wall of the tunnel at a set distance behind the segment assembly trolley. It integrates a three-dimensional laser scanning device 101, an inertial measurement unit 102, and a vibration acceleration sensor 103. The three-dimensional laser scanning device 101 is used to continuously acquire the original three-dimensional point cloud data of the inner surface of the segment structure. The inertial measurement unit 102 is used to acquire the attitude angle and spatial position of the scanning device itself. The vibration acceleration sensor 103 is used to acquire the vibration signal of the segment structure. The data acquisition terminal 100 has a built-in data cache module 104, which can temporarily store the scanning data when the network is interrupted and automatically re-transmit it after the network is restored. The terminal is connected to the shield machine PLC control system 600 through an industrial Ethernet interface to acquire parameters such as tunneling thrust, propulsion speed, cutterhead speed, and synchronous grouting pressure in real time. The cloud server 200 includes a point cloud data preprocessing unit 201, a digital twin modeling unit 202, a deformation quantification analysis unit 203, and a risk warning unit 204; The point cloud data preprocessing unit 201 receives raw point cloud data, vibration signals, and attitude angle data, and performs adaptive filtering, outlier removal, spatial registration correction, and automatic anomaly identification and reliability assessment. The digital twin modeling unit 202 receives the preprocessed point cloud data, combines design parameters and geological data, performs surface reconstruction and incremental model updates, and maintains the three-dimensional digital twin model. The deformation quantification analysis unit 203 extracts cross-sectional slices and registers point clouds on the digital twin model, and calculates the cumulative deformation and deformation rate of each ring. The risk warning unit 204 uses Kalman filtering recursive estimation with cumulative deformation and deformation rate as state variables and grouting pressure and propulsion speed as external inputs to determine the risk level and output a warning signal.

[0028] The risk warning unit 204 has a built-in structural failure stage judgment threshold matrix. This matrix is ​​calibrated according to the concrete strength grade and wall thickness of the pipe segment, and gives the upper limit of cumulative deformation and upper limit of deformation rate corresponding to each risk level. For example, common strength grades such as C50, C55, and C60 and common wall thickness combinations such as 200mm, 250mm, and 300mm can be selected for calibration respectively. Database 300 is used to store segment structure design parameters, geological survey data, shield tunneling parameters, synchronous grouting construction parameters, original point cloud data and preprocessed point cloud data, three-dimensional digital twin model snapshots, deformation time series of each ring and historical early warning records, and is organized by a three-level index of tunnel mileage station number, segment ring number and timestamp; The ground monitoring terminal 400 communicates with the cloud server 200 to display the three-dimensional digital twin model and the safety status information of each ring, and supports clicking to query detailed deformation curves and historical early warning records; The on-site mobile terminal 500 is a smartphone or a dedicated handheld device used to receive early warning push notifications and provide alerts via pop-up windows and vibration. The data acquisition terminal 100 and the cloud server 200 communicate via encrypted wireless or fiber optic communication.

[0029] The technical solution of this invention will be described in detail below with reference to specific engineering application scenarios. The basic implementation process of the safety early warning method for high-risk sections of shield tunnels provided by this invention is as follows: After identifying the high-risk section, a data acquisition terminal 100 is installed approximately 5-8 meters behind the segment assembly trolley. The scanning frequency is set according to the risk level: generally 1 scan / minute for high-risk sections, and 0.5 scans / minute for extremely high-risk sections. Once synchronous grouting begins, the system automatically starts continuous scanning until grouting of that section is completed and deformation stabilizes.

[0030] Each scan acquires raw point cloud data, along with synchronously recorded vibration signals and attitude angle data, which are then uploaded to the cloud server 200. The point cloud data preprocessing unit 201 first performs a Fourier transform on the vibration signal to obtain the dominant frequency of the current tunneling vibration. Based on this, it sets the cutoff frequency of the filter kernel and filters the point cloud data. Then, based on the point cloud density distribution, isolated outliers are removed—the normal point cloud density on the shield tunnel segment surface is relatively uniform, while the density of flying points and noise points is significantly lower in some areas; setting the search radius and density threshold allows for effective identification. Finally, the attitude angle data is used to unify the point cloud to the tunnel design coordinate system for correction.

[0031] After preprocessing, the system compares the point cloud of a single ring with the design model and calculates the deviation of each point. If the height difference of the point cloud on both sides of the circumferential joint of a certain ring segment exceeds 5mm, it is judged as lining misalignment; if the point cloud depth at the sealing groove location deviates from the design value by more than 1mm, it is judged as sealing groove distortion; if the difference between the major and minor axes of the fitted ellipse of the cross section exceeds the design allowable value, it is judged as ellipticity exceeding the limit. If any anomaly occurs, the data of that ring is marked, and the terminal is instructed to retest the ring. If two consecutive retests still fail to meet the standards, the system prompts "the site conditions do not meet the scanning requirements" and re-collects data after the environment is improved.

[0032] The valid point cloud obtained from the reliability assessment is entered into the digital twin modeling unit 202. Taking a single ring as an example, all valid points on the inner surface of the ring are extracted, nodes are set along the circumferential and axial directions, and surface fitting is performed using non-uniform rational B-splines to obtain the geometric model of the ring. When new ring data arrives, only the newly assembled rings 1-2 are fitted, while the existing model remains unchanged.

[0033] The deformation quantification analysis unit 203 processes the multiple scan data for each ring. The point cloud from the first scan (before or at the beginning of grouting) is used as the baseline state. Subsequent scans' point clouds are iteratively registered with this baseline to obtain the displacement field. Thirty-six azimuth angles are uniformly taken along the circumferential direction, and the radial displacement of each azimuth angle is extracted to form a radial deformation curve. The deformation difference between two adjacent scans divided by the time interval gives the average deformation rate within that time period.

[0034] In risk warning unit 204, cumulative deformation and deformation rate are used as state variables, and grouting pressure and advancement speed are used as external inputs. A linear state recursive equation is established and Kalman filtered to predict the final deformation within the next 1-2 rings of construction time. The threshold is predetermined by finite element analysis. For example, for C50 segments with a wall thickness of 300mm, a cumulative convergence deformation exceeding 20mm is a yellow warning, exceeding 25mm is an orange warning, and exceeding 30mm is a red warning. The corresponding deformation rate thresholds are 2mm / h, 3mm / h, and 4mm / h, respectively.

[0035] Example 1: Crossing a high-risk section of a densely built-up area A subway tunnel section in a certain city passes under an old residential area. The tunnel overburden thickness is 8-12m, and the strata consist of alternating layers of silty clay and sand, with a risk level of Level 1. After the system was started in this section, during the grouting process of a certain ring, the horizontal convergence rate was monitored to continuously increase, reaching approximately 2-3 mm / h about 10 minutes after the start of grouting, with a cumulative convergence value of approximately 15mm, triggering a yellow alert. Based on the alert's recommendations, the grouting pressure was increased from 0.35MPa to 0.42MPa and maintained at a stable pressure for about 2 minutes. Subsequently, the rate gradually decreased to approximately 1mm / h, and the final convergence value stabilized at around 17mm, without further escalation.

[0036] Example 2: Crossing an Existing Metro Line in an Extremely High-Risk Section In a real-world project, a shield tunnel section laterally crossed an existing operational tunnel with a clearance of approximately 3 meters, posing a particularly high-risk risk. During grouting of a certain ring, the system used Kalman filtering to recursively estimate and predict that the final uplift of that ring would reach near the red warning threshold, while the deformation rate had been accelerating for several consecutive scanning cycles. The system issued a red warning, recommending an immediate halt to tunneling and secondary grouting of that ring. After adopting the recommendation on-site, the final uplift of the ring was controlled to approximately 24 mm. Subsequent verification of automated monitoring data from the adjacent existing tunnel showed that the structural displacement of the existing tunnel during construction did not exceed 2 mm, and operational safety was not affected.

[0037] In summary, this invention achieves continuous full-section monitoring and early warning of segment deformation by organically combining three-dimensional laser scanning dynamic monitoring, digital twin incremental modeling, and multi-source data Kalman filtering prediction, providing a reliable safety management method for synchronous grouting construction in high-risk sections of shield tunnels.

[0038] It should be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.

[0039] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A method for early warning of construction safety in high-risk sections of shield tunnels, characterized in that, Includes the following steps: S1: Deploy a three-dimensional laser scanning device in the high-risk section of the shield tunnel and continuously collect the original three-dimensional point cloud data of the inner surface of the segment structure at fixed time intervals during the synchronous grouting construction. Vibration acceleration signals of the tunnel segment structure were simultaneously acquired during tunneling. The dominant frequency of the construction vibration was obtained through Fast Fourier Transform. Based on this, an adaptive filter kernel was constructed to perform vibration anti-disturbance filtering on the original point cloud data, filtering out low-frequency drift noise introduced by tunneling vibration. Then, an outlier removal method based on local point cloud density statistics was adopted, combined with the constraint condition of the curvature continuity of the tunnel segment surface, to remove outlier noise points and flying points introduced by environmental factors, resulting in noise-reduced point cloud data. Spatial registration and attitude correction were performed on the noise-reduced point cloud data using attitude angle and spatial position data obtained by the inertial measurement unit. S2: Based on the tunnel structure design radius and the structural characteristics of the segment circumferential and longitudinal joints, establish a geometric constraint rule library for the point cloud data on the segment surface; Taking a single ring segment as the unit, the deviation distribution between the actual point cloud data and the design model is calculated ring by ring, and three types of anomalies are identified and marked: lining misalignment, sealing groove distortion, and cross-sectional ellipticity exceeding the limit. When any type of anomaly occurs, the abnormal data in that loop is automatically removed and marked as pending review, triggering a retest command; Extract the horizontal convergence value, vertical convergence value, and average radius offset of the entire cross section from the remaining valid point cloud data; calculate the validity score of each monitoring indicator, which comprehensively considers the proportion of valid point cloud and its distribution uniformity in the circumferential direction of the cross section; when the score is lower than the preset threshold, trigger the retest command and drive the scanning device to perform encrypted scanning of the ring. S3: Retrieve tunnel design parameters, segment information, geological survey data, and synchronous grouting construction parameters. Based on the point cloud data confirmed as valid in step S2 through reliability assessment, establish a three-dimensional geometric model of the inner surface of the segment structure using the non-uniform rational B-spline surface reconstruction method. After each subsequent scan, inject the latest point cloud data into the existing model incrementally to keep the three-dimensional model synchronized with the physical tunnel structure, forming a three-dimensional digital twin model of the segment structure. Mark the position coordinates of the segment circumferential joint, longitudinal joint, bolt handhole, and grouting hole on the model, extract the cross-sectional point cloud slices of each segment ring, and calculate the measured axial offset, ellipticity coefficient, and local flatness of each section as the basic feature vector for subsequent deformation analysis. S4: Based on the cross-sectional feature vectors extracted in step S3, establish a deformation feature time series according to the ring number; The iterative nearest point algorithm is used to register point cloud slices of the same cross section at different times, calculate the cross section deformation displacement field, and extract the cross section center offset and radial deformation at each azimuth angle. The deformation displacement fields at adjacent times are subtracted to calculate the cross section center offset rate and radial deformation rate per unit time. The cumulative deformation and deformation rate of each ring are combined with geological conditions and grouting pressure parameters to output the current safety status level of each ring. S5: Based on the safety status level of each ring output in step S4, geological survey data, shield tunneling parameters and synchronous grouting construction parameters are included in the analysis. The cumulative deformation and deformation rate are used as state variables, and the grouting pressure and propulsion speed are used as external inputs. A linear state recursive equation is established, and Kalman filtering is used to recursively estimate the deformation trend of each ring to predict the final deformation of the next construction stage. When the predicted value exceeds the threshold for determining the structural failure stage, the risk level is classified according to the degree of exceeding the limit and an early warning signal is generated. The content includes the warning location, risk level, predicted final deformation amount and recommended disposal measures. The early warning signal is simultaneously pushed to the shield tunnel control room, the ground monitoring center, and the on-site mobile terminal.

2. The method for early warning of construction safety in high-risk sections of shield tunnels according to claim 1, characterized in that, The cutoff frequency of the adaptive filter core in step S1 is dynamically adjusted according to the change of the main frequency of tunneling vibration, and the adjustment period is consistent with the scanning period.

3. The method for early warning of construction safety in high-risk sections of shield tunnels according to claim 1, characterized in that, The validity scoring logic in step S2 is as follows: when the percentage of valid point cloud is less than 60% or the coverage of valid point cloud in the circumferential direction of the cross section is less than 300°, the score is automatically classified as unqualified and a retest is triggered. If the test fails to meet the standard twice in a row, the system will send a message indicating that the on-site conditions do not meet the scanning requirements.

4. The method for early warning of construction safety in high-risk sections of shield tunnels according to claim 1, characterized in that, In step S3, the node vectors for the non-uniform rational B-spline surface reconstruction are adaptively determined based on the actual distribution density of each ring point cloud. The nodes are increased in dense point cloud regions and decreased in sparse regions.

5. The method for early warning of construction safety in high-risk sections of shield tunnels according to claim 1, characterized in that, The deformation rate described in step S4 is processed by moving average filtering to remove random fluctuation noise and then the long-term trend term is extracted.

6. A safety early warning system for high-risk sections of shield tunnel construction, characterized in that, It includes a data acquisition terminal (100), a cloud server (200), a database (300), a ground monitoring terminal (400), and a field mobile terminal (500). The data acquisition terminal (100) is installed on the inner wall of the tunnel at a set distance behind the segment assembly trolley, and integrates a three-dimensional laser scanning device (101), an inertial measurement unit (102), and a vibration acceleration sensor (103). The three-dimensional laser scanning device (101) is used to continuously acquire the original three-dimensional point cloud data of the inner surface of the segment structure. The inertial measurement unit (102) is used to acquire the attitude angle and spatial position of the scanning device itself. The vibration acceleration sensor (103) is used to acquire the vibration signal of the segment structure. The data acquisition terminal (100) has a built-in data cache module (104), which can temporarily store the scanning data when the network is interrupted and automatically re-transmit it after the network is restored. The cloud server (200) includes a point cloud data preprocessing unit (201), a digital twin modeling unit (202), a deformation quantification analysis unit (203), and a risk warning unit (204). The point cloud data preprocessing unit (201) is used to receive raw point cloud, vibration signal and attitude angle data, and perform adaptive filtering, outlier removal, spatial registration correction, and automatic anomaly identification and reliability assessment. The digital twin modeling unit (202) is used to receive preprocessed point cloud data, combine design parameters and geological data, perform surface reconstruction and incremental model updates, and maintain the three-dimensional digital twin model. The deformation quantification analysis unit (203) is used to extract cross-sectional slices and register point clouds of the digital twin model, and to calculate the cumulative deformation and deformation rate of each ring. The risk warning unit (204) is used to perform Kalman filter recursive estimation with cumulative deformation and deformation rate as state variables and grouting pressure and propulsion speed as external inputs, determine the risk level and output a warning signal; The database (300) is used to store segment structure design parameters, geological survey data, shield tunneling parameters, synchronous grouting construction parameters, original point cloud data and preprocessed point cloud data, three-dimensional digital twin model snapshots, deformation time series of each ring and historical early warning records; The data acquisition terminal (100) and the cloud server (200) communicate via encrypted wireless communication or fiber optic communication.

7. A safety early warning system for high-risk sections of shield tunnel construction according to claim 6, characterized in that, The outlier removal search radius in the point cloud data preprocessing unit (201) is set at 0.5%-1% of the cross-sectional radius of the pipe segment, and the judgment threshold is set at 3 times the standard deviation of the average point cloud density within this radius.

8. A safety early warning system for high-risk sections of shield tunnel construction according to claim 6, characterized in that, The risk warning unit (204) has a built-in structural failure stage judgment threshold matrix. The matrix takes the concrete strength grade and wall thickness of the pipe segment as input variables and outputs the upper limit of cumulative deformation and the upper limit of deformation rate corresponding to different risk levels.

9. A safety early warning system for high-risk sections of shield tunnel construction according to claim 6, characterized in that, The data acquisition terminal (100) is connected to the shield machine PLC control system (600) through an industrial Ethernet interface to acquire tunneling thrust, propulsion speed, cutterhead rotation speed and synchronous grouting pressure parameters in real time and upload them to the cloud server.

10. A safety early warning system for high-risk sections of shield tunnel construction according to claim 6, characterized in that, The ground monitoring terminal (400) is used to display the three-dimensional digital twin model and the safety status information of each ring, and supports querying detailed deformation curves and historical early warning records; the on-site mobile terminal (500) is used to receive early warning push notifications and remind users via pop-up windows and vibration.