A microseismic early warning area division method based on roadway support impact resistance

By calculating the roadway support parameters and surrounding rock parameters, and combining them with the energy flow density method, the critical distance for early warning of the roadway roof and sidewalls is determined. This solves the problem that existing technologies cannot effectively delineate microseismic early warning areas, and enables targeted early warning area delineation and rockburst monitoring.

CN123153808APending Publication Date: 2026-11-24HUANENG COAL TECH RES CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202611537799.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-30
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing technologies struggle to combine roadway support capacity with the source energy and propagation distance of microseismic events, resulting in an inability to effectively delineate targeted early warning zones, especially lacking unified early warning judgment rules under different support systems and propagation distances.

Method used

By acquiring roadway support parameters and surrounding rock parameters, the absorbable energy per unit area of ​​the support system and the initial stored elastic energy of the surrounding rock are calculated. Combined with the coal and rock mass impact energy index and safety factor, the allowable input energy flow density of the roof and sidewalls is calculated using the energy flow density method to determine the critical distance for early warning and to divide the microseismic early warning zone in three-dimensional space.

Benefits of technology

It enables precise delineation of early warning zones based on factors such as seismic source energy, location, and roadway support conditions, avoiding conflicts in overlapping areas of multiple roadways. It is applicable to early warning of single or multiple roadways and can be adjusted through historical event verification parameters and records.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123153808A_ABST
    Figure CN123153808A_ABST
Patent Text Reader

Abstract

This invention relates to a method for delineating microseismic early warning zones based on the erosion resistance of roadway support. The method involves obtaining the support parameters, surrounding rock parameters, and spatial location of at least one roadway to be evaluated, and determining the absorbable energy and allowable input energy flux density per unit area of ​​the roof and sidewall support systems. Based on the assumption of spherical propagation and concentrated reflection of seismic source energy, the critical distances to the roof and sidewalls corresponding to each source energy level are calculated, and the larger value is taken as the critical distance for early warning of that roadway. Spatial early warning zones are delineated based on these critical distances; when multiple roadway zones overlap, the early warning index of the lower source energy level is used. Whether an early warning is issued is determined based on the energy of the actual microseismic event and the shortest spatial distance from the source to the roadway. This method is applicable to mining roadways, tunneling roadways, and main roadways in mining areas, and can also be implemented when there are no actual damage records.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a method for dividing microseismic early warning zones based on the roadway support's resistance to rockburst, belonging to the field of coal mine rockburst monitoring and early warning technology. Background Technology

[0002] Coal mine longwall face roadways, tunneling roadways, and main roadways in mining areas are all susceptible to seismic disturbances. Microseismic monitoring can obtain the energy and spatial location of events, but setting uniform early warning indicators based solely on event energy and frequency is insufficient to simultaneously reflect the propagation distance from the seismic source to the roadway and the shock resistance of different support systems. Therefore, it is necessary to link the roadway support capacity with the spatial propagation of seismic energy to establish targeted spatial early warning zones for single or multiple roadways.

[0003] Existing studies on support impact resistance evaluation have employed calculation methods such as energy balance or peak velocity. For example, CN111414659B discloses a method for designing three-level energy-absorbing supports based on the balance between the impact kinetic energy of the surrounding rock and the energy absorption of the support; CN115788573A discloses a method for calculating the peak velocity of vibration and evaluating the seismic resistance of the support from the energy absorbed by the roof support, the kinetic energy and potential energy of the rock mass; CN111255492B discloses an evaluation method for calculating the critical velocity of support failure by analyzing the energy absorbed by the side support. These technologies provide a foundation for support evaluation, but it is still necessary to establish corresponding three-dimensional early warning zones and overlapping zone determination rules based on the source energy level, propagation distance, and different support capabilities of the roof and side. Summary of the Invention

[0004] To address the problems existing in the prior art, this invention proposes a method for dividing microseismic early warning zones based on the erosion resistance of roadway support.

[0005] The technical solution of the present invention is as follows: This invention proposes a method for dividing microseismic early warning zones based on the erosion resistance of roadway support, comprising the following steps: Obtain the support parameters, surrounding rock parameters, and spatial location of at least one roadway to be evaluated, and determine the absorbable energy per unit area of ​​the roadway roof and sidewall support system, respectively. Based on the surrounding rock parameters, the initial stored elastic energy of the surrounding rock corresponding to the unit area of ​​the roof or sidewall is determined. Combined with the coal and rock mass impact energy index and the preset safety factor, the allowable input energy flow density of the roof and sidewall is determined respectively. Multiple source energy levels are set up, and the energy flow density method is adopted. Based on the distribution of source energy of each source energy level on the spherical surface and the energy flow density propagating towards the roadway under the concentrated reflection effect, the critical propagation distance when the allowable input energy flow density of the roof and the sidewall is reached is calculated respectively. Under a unified distance benchmark, the larger value of the two is taken as the warning critical distance of the source energy level corresponding to the roadway. Based on the spatial location of the tunnel and the critical distance for early warning of each seismic source energy level, a corresponding three-dimensional microseismic early warning zone is divided around the tunnel. Locate the actual microseismic event and obtain its source energy, determine the corresponding source energy level, and calculate the shortest spatial distance from the source location to the center line of the corresponding roadway; use the shortest spatial distance or the distance corrected according to the roadway cross-sectional dimensions as the actual distance, and issue an early warning when the actual distance and the warning critical distance use the same distance benchmark and the actual distance is not greater than the warning critical distance.

[0006] Preferably, the roadway to be evaluated is a longwall mining face roadway, a tunneling face roadway, or a main roadway in a mining area, and the evaluation object is a single roadway or multiple roadways; the critical warning distance is calculated for each roadway separately.

[0007] Preferably, the absorbable energy per unit area of ​​the top slab or side support system is the sum of the product of the absorbable energy of a single anchor bolt and the anchor bolt density, and the product of the absorbable energy of a single anchor cable and the anchor cable density; the absorbable energy of a single anchor bolt or anchor cable is determined based on its non-anchored section length, ultimate failure tensile force, elongation rate, and bearing capacity reduction factor.

[0008] The anchor bolt density and anchor cable density are determined according to the number of corresponding components within a unit support area. Specifically, the top plate density is calculated based on the spacing and row spacing, while the side plate density is calculated based on the number of corresponding components in a single row, the wall height, and the row spacing.

[0009] Preferably, the ratio of the square of the uniaxial compressive strength of the surrounding rock to twice the elastic modulus is multiplied by the equivalent thickness of the surrounding rock involved in the failure to obtain the initial stored elastic energy per unit support area; the sum of this elastic energy and the input energy flow density is multiplied by one and the reciprocal of the impact energy index is subtracted to obtain the released energy per unit area of ​​surrounding rock after breakage.

[0010] Let the product of the preset safety factor and the released energy equal the energy that the support system can absorb per unit area, and then calculate the positive allowable input energy flow density.

[0011] Preferably, the ideal energy flow density is obtained by dividing the energy released by the seismic source by the spherical area with the propagation distance as the radius; under the conservative assumption that the energy is distributed equally in three dimensions and six directions and that the energy in the other five directions except the direction toward the roadway is reflected and concentrated toward the direction toward the roadway, six times the ideal energy flow density is taken as the energy flow density after reflection and concentration, and the critical propagation distance of the roof and sidewall is calculated.

[0012] Preferably, when the support parameters or surrounding rock parameters of the two sides are different, the critical distances of the roof, the first side and the second side are calculated separately, and the maximum value of the three is taken as the warning critical distance of the corresponding roadway under a unified distance benchmark.

[0013] Preferably, the centerline of the tunnel is represented as a three-dimensional line segment or a broken line, the shortest distance from the source location to each line segment is calculated, and the minimum value is taken as the shortest spatial distance from the source location to the centerline of the tunnel. When considering the cross-sectional dimensions of the tunnel, the centerline distance is converted into the distance to the corresponding surrounding rock surface based on the cross-sectional geometry at the location corresponding to the shortest distance, and the distance in the area boundary and early warning comparison is processed using the same conversion rules.

[0014] Preferably, the allowable input energy flow density is determined based on the support parameters and surrounding rock parameters; when there are historical microseismic events and corresponding roadway damage records, the calculation parameters and early warning boundaries are checked using the records.

[0015] Preferably, warning indicators with corresponding source energy levels are set for the warning areas of multiple roadways; when the warning areas overlap, the lowest source energy level among the warning indicators of each roadway corresponding to the same spatial location is determined as the warning indicator for that location, and a warning is issued when the actual micro-seismic event meets the warning conditions of any corresponding roadway.

[0016] The present invention has the following beneficial effects: 1. This invention determines the allowable input energy flow density by measuring the energy absorbed by the support per unit area and the energy released by the surrounding rock, and links the support's shock resistance to the spatial propagation of the seismic source energy. Based on this, the critical distance of each seismic source energy level is calculated, so that the division of the early warning area takes into account the seismic source energy, the seismic source location, and the roadway support conditions.

[0017] 2. This invention calculates the critical distances corresponding to the roof and sidewalls separately, and takes the larger value under the same distance benchmark, which is beneficial to make the warning boundary cover the dangerous impact range of the weaker parts. When multiple roadway areas overlap, a lower source energy level is used as the warning indicator to avoid conflict in the determination of the overlapping position.

[0018] 3. This invention is applicable to single tunneling roadways, main roadways in mining areas, and multiple roadways in longwall mining faces. Support parameters and surrounding rock parameters can be used to establish initial early warning boundaries, and historical microseismic events and damage records are used for verification when relevant data is available, thus not requiring roadway damage to be a prerequisite for implementing this method. Attached Figure Description

[0019] Figure 1 This is a schematic diagram of the layout of the longwall mining face in this invention; Figure 2This is a schematic diagram of the ideal propagation of vibration energy using the energy flux density method of this invention; Figure 3 This is a schematic diagram of the actual propagation of vibration energy using the energy flux density method of this invention; Figure 4 This is a schematic diagram of energy flow density propagation under the six-directional reflection concentration assumption of the present invention; Figure 5 This is a schematic diagram illustrating the critical distance for energy propagation from different energy level seismic sources to the tunnel according to the present invention. Figure 6 This is a plan view of the microseismic monitoring and early warning area division based on the impact resistance of roadway support according to the present invention. Figure 7 This is a three-dimensional diagram showing the division of microseismic monitoring and early warning areas based on the impact resistance of roadway support according to the present invention. Detailed Implementation

[0020] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0021] The step numbers in the text are used to describe the calculation process; steps involving the results of previous calculations are executed after the corresponding results are obtained.

[0022] It should be understood that the terminology used in this specification is for the purpose of describing particular embodiments only and is not intended to limit the invention. As used in this specification and the appended claims, the singular forms “a,” “an,” and “the” are intended to include the plural forms unless the context clearly indicates otherwise.

[0023] The terms “comprising” and “including” indicate the presence of the described feature, whole, step, operation, element and / or component, but do not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or collections thereof.

[0024] The term “and / or” refers to any combination of one or more of the associated listed items, as well as all possible combinations, and includes these combinations.

[0025] In some embodiments, a method for delineating microseismic early warning zones based on the erosion resistance of roadway support is proposed, comprising the following steps: Obtain the support parameters, surrounding rock parameters, and spatial location of at least one roadway to be evaluated, and determine the absorbable energy per unit area of ​​the roadway roof and sidewall support system, respectively. Based on the surrounding rock parameters, the initial stored elastic energy of the surrounding rock corresponding to the unit area of ​​the roof or sidewall is determined. Combined with the coal and rock mass impact energy index and the preset safety factor, the allowable input energy flow density of the roof and sidewall is determined respectively. Multiple source energy levels are set up, and the energy flow density method is adopted. Based on the distribution of source energy of each source energy level on the spherical surface and the energy flow density propagating towards the roadway under the concentrated reflection effect, the critical propagation distance when the allowable input energy flow density of the roof and the sidewall is reached is calculated respectively. Under a unified distance benchmark, the larger value of the two is taken as the warning critical distance of the source energy level corresponding to the roadway. Based on the spatial location of the tunnel and the critical distance for early warning of each seismic source energy level, a corresponding three-dimensional microseismic early warning zone is divided around the tunnel. Locate the actual microseismic event and obtain its source energy, determine the corresponding source energy level, and calculate the shortest spatial distance from the source location to the center line of the corresponding roadway; use the shortest spatial distance or the distance corrected according to the roadway cross-sectional dimensions as the actual distance, and issue an early warning when the actual distance and the warning critical distance use the same distance benchmark and the actual distance is not greater than the warning critical distance.

[0026] In one specific embodiment, with Figure 1 The example shown illustrates the handling of overlapping warning zones using two roadways in a longwall mining face. This arrangement does not constitute a limitation on the number or purpose of roadways; for a single tunneling face roadway or a main roadway in a mining area, the same process is used to calculate and divide the area, and there is no need to perform multi-roadway overlap handling.

[0027] This method first determines the permissible input energy flux density for the roof and sidewalls respectively, and then calculates the critical distance based on the relationship between the source energy flux density and the propagation distance. The critical distance is the boundary at which the warning threshold is reached; when the actual distance is equal to this distance, it falls within the warning range, rather than being a state where no warning is triggered.

[0028] Step S1: Obtain tunnel support parameters, surrounding rock parameters, and spatial location; Obtain the parameters of the roof and sidewall anchor bolts and cables of the roadway to be evaluated, the three-dimensional coordinates of the roadway cross-section and centerline, and the elastic modulus, uniaxial compressive strength, impact energy index, and equivalent thickness involved in failure of the corresponding surrounding rock. For roadway sections where the support or surrounding rock conditions change, calculate the corresponding parameters separately.

[0029] When historical microseismic data and corresponding roadway failure records exist, the event energy, location, and actual response can be compared to verify the calculated parameters and regional boundaries. When failure records are lacking, the initial region can be established directly based on support parameters, surrounding rock parameters, and the aforementioned conservative propagation assumption. Historical events and failure records are optional verification data.

[0030] Step S2: Determine the energy absorption capacity of the roadway roof and sidewall support system; When the roof or sidewall of a roadway per unit area is taken as the calculation object, and the anchor bolts and anchor cables together form a support system, the energy that can be absorbed is determined according to (1): (1); In equation (1), The energy that a unit area of ​​the roof or side support system can absorb is expressed in J / m². , These represent the energy absorbed by a single anchor bolt and anchor cable, respectively, in J / bolt. , These represent the density of anchor bolts and anchor cables, in units of bolts / m². Substitute the corresponding parameters for the top plate and sidewalls respectively.

[0031] For anchor bolts or anchor cables, the energy that can be absorbed is determined according to equation (2): (2); In equation (2), or The energy that a single component can absorb is expressed in J / component. This represents the length of the non-anchored section, in meters (m). The tensile force is the ultimate breaking force, expressed in N; ξ is the elongation ratio, substituted as a decimal; k is a coefficient considering construction errors, corrosion, and actual energy absorption reduction, 0 < k ≤ 1. If the tensile force is kN, the calculated result is kJ, which should be uniformly converted and substituted into equation (1). This product is an equivalent estimate of the component's absorbed energy.

[0032] The anchor bolt and anchor cable densities of the top slab and sidewalls are determined according to formula (3): (3); In equation (3), ρ is the density of the corresponding anchor rod or anchor cable, with the unit being rods / m²; , These refer to the spacing and row spacing of the corresponding components. The above lengths are all in meters (m) and represent the corresponding wall height; n is the number of components in a single row for that wall section. When recording the original dimensions in mm, first divide by 1000 to convert to meters.

[0033] The energy that can be absorbed per unit area of ​​the roof and sidewall support is obtained by equations (1) to (3). Subsequently, the critical distances of the roof and sidewall are calculated separately for the same source energy level, and the larger value is taken as the warning critical distance of the roadway under the same distance benchmark. When the parameters of the two sides are different, they are calculated separately, and the maximum value of the critical distances of the roof and the two sides is taken.

[0034] Step S3: Determine the critical distances corresponding to different energy levels using the energy flux density method; This embodiment uses the energy flux density method to delineate microseismic early warning zones. The energy flux density referred to below is the cumulative energy passing through a unit area during a microseismic event, expressed in J / m², not the power flux density per unit time.

[0035] Under the estimated condition that the stress of the surrounding rock reaches the uniaxial compressive strength, the elastic energy density of the surrounding rock per unit volume is estimated as the ratio of the square of the uniaxial compressive strength to twice the elastic modulus. To correspond to the energy absorbed by the support per unit area, multiply by the equivalent thickness h of the surrounding rock involved in the failure to obtain the initial stored elastic energy corresponding to the unit support area, as shown in equation (4): (4); In equation (4), is the initial stored elastic energy of the surrounding rock per unit support area, in J / m²; h is the equivalent thickness of the surrounding rock involved in failure, in meters, determined by the surrounding rock conditions at the corresponding location; E is the elastic modulus. For uniaxial compressive strength, both are converted to Pa and substituted. If recorded in GPa and MPa respectively, the value on the right side of equation (4) needs to be multiplied by 1000 to get the result as J / m². The top plate and the side plate use their respective parameters, and the volumetric energy is not directly converted to the area energy.

[0036] For the same unit support area of ​​surrounding rock, the initial stored elastic energy and the energy flow density of external microseismic input together constitute the total energy per unit area involved in failure, which is calculated according to equation (5): (5); In equation (5), Total energy per unit area For the initial stored elastic energy per unit area, The energy flux density input to this unit support area; all three values ​​are in units of J / m². This is obtained from back-calculation under critical conditions. To allow input energy flux density.

[0037] Using the impact energy index Characterizing the relationship between pre-peak accumulated elastic energy and post-peak consumed energy, in Under the applicable condition of >1, the energy released per unit area of ​​surrounding rock after fracturing is estimated according to formula (6): (6); In equation (6), This refers to the energy released after the surrounding rock per unit area is broken. The total energy per unit area as described in equation (5) is in J / m². This is a dimensionless impact energy index. This conversion relationship is not used for... The critical distance is calculated in reverse when ≤1.

[0038] To provide early warning before the support fails to its limit, the early warning safety factor in this embodiment is taken as 1.5, and the critical state satisfies equation (7): (7); In equation (7), and These represent the energy absorbed by the support per unit area and the energy released by the surrounding rock, respectively, in J / m²; 1.5 is the early warning safety factor, which is different from the component bearing capacity reduction factor k in equation (2). Equation (8) is obtained by back-calculation from equations (4) to (7): (8); In equation (8), Allowable input energy flux density, in J / m²; , , The meanings are the same as those in equations (1), (6), and (4), respectively. Only Only when the value is greater than 0 will the positive critical distance be calculated; if ≤0 indicates that there is no positive microseismic input margin under the current parameters. The support capacity should be marked as insufficient and the support and surrounding rock parameters should be checked. Negative values ​​should not be squared or set to zero and judged as safe.

[0039] like Figure 2 As shown, under ideal propagation conditions, after a mine earthquake occurs, the energy propagates in the form of seismic waves. Without considering energy attenuation, the energy from the seismic source is considered to propagate along a sphere. The greater the distance between the seismic source and the tunnel, the larger the corresponding spherical area, and the smaller the energy flow per unit area.

[0040] When the energy released by the earthquake source is The distance from the epicenter to the tunnel is In an ideal state, the energy flow density reaching the roadway location is determined according to equation (9): (9); In equation (9), The cumulative energy flux density for ideal propagation is expressed in J / m². The energy released by the seismic source is expressed in J; r is the propagation distance from the seismic source to the evaluation location, expressed in meters, and r > 0; π is the mathematical constant pi.

[0041] like Figure 3 As shown, the actual coal and rock mass has geological complexity, and the vibration wave may be reflected and redistributed during propagation. The actual propagation state differs from the ideal spherical propagation state.

[0042] like Figure 4As shown, a conservative approximation of equal energy distribution in six directions is adopted: the direction towards the tunnel and its opposite direction are grouped into one group, and the other two groups are the positive and negative directions orthogonal to it; spatial propagation is mapped to six equally divided solid angle regions. Assuming that the energy in the other five directions is concentrated towards the tunnel through reflection, and ignoring reflection losses and attenuation from additional paths, six times the ideal energy flux density is obtained in the target direction: (10); In equation (10), The cumulative energy flux density towards the tunnel under the assumption of concentrated reflection in six directions. These are ideal values, and the units are all J / m². The coefficient 6 is a result of the above equal distribution and concentration assumptions, and is not a universal physical upper limit that can be derived simply from the fact that space has six directions. Field applications should verify the applicability of this assumption to the main propagation and reflection conditions.

[0043] Command (11) is true: (11); In equation (11), To support the allowable input energy flux density, The input energy flux density given by the propagation model is J / m². The location determined by the equation is the critical boundary at which the warning threshold is reached.

[0044] For the preset source energy level By combining equations (9) to (11), the critical propagation distance at which each part reaches the warning threshold is obtained. : (12); In equation (12), is the critical propagation distance corresponding to the i-th source energy level, in meters; The energy source used for calculations at this energy level is expressed in J. The allowable input energy flux density for this location is expressed in J / m² and is greater than zero; i is the energy level number. Substitute the values ​​for the top plate and sidewalls respectively. After adopting the same distance benchmark, the maximum critical distance is taken as the early warning boundary of this energy level for the entire roadway.

[0045] By setting multiple source energy levels from low to high, the correspondence between energy levels and critical distances was obtained; Figure 5 Indication 10³, 10 4 10 5 10 6 J-level calculation energy level. When using discrete energy levels, the minimum calculation energy level above the actual event energy is selected, which is no lower than that energy level; when the energy exceeds the highest preset energy level, the corresponding distance or extended energy level is calculated according to the actual energy to avoid reducing the warning range by lowering the energy level.

[0046] Comparative Calculation 1: Verification using the energy balance method; The energy balance method is used in this specification as a comparative verification approach and is not intended as an independent invention that replaces the aforementioned energy flow density method. Existing technologies based on the balance between surrounding rock kinetic energy and support energy absorption are available in CN111414659B; the energy attenuation comparison model and its dimensional conventions used in this manuscript are given below.

[0047] The area energy of the support and surrounding rock sides is calculated uniformly according to equations (1) to (8), and the resulting allowable input energy flux density is: If the total energy of the seismic source is used on the propagation side, the conversion per unit support area should be clearly defined; the total energy of the seismic source cannot be directly equated with the area energy.

[0048] A power-law decay representation normalized to the reference distance is used to contrast the model, with the input energy per unit area being: (13); In equation (13), The input energy flux density at the evaluation location of the roadway is expressed in J / m². The total energy at the earthquake source is expressed in J; l represents the propagation distance. The reference distance is a positive value, and the unit is m; η > 0 is the dimensionless energy decay index; This is a coefficient used to convert the total energy from the seismic source to the energy input per unit evaluation area at a reference distance, with units in meters (m). - ², needs to be determined together with η based on the corresponding site propagation data. l / As a dimensionless ratio, dimensional distances are not directly used as arbitrary real powers.

[0049] exist η and Given that the model is applicable and the area energy propagating into the roadway reaches an allowable value, the critical distance for comparison can be obtained: (14); In equation (14), The critical distance obtained from the comparison model is in meters. The energy of the i-th energy level source; Allowable input energy flux density for the corresponding part; , The meaning and unit of η are the same as in formula (13). And when attenuation data is missing, the determined comparison distance is not output.

[0050] The above-mentioned comparison distance can be compared with the distance obtained by the energy flow density method to analyze the applicable conditions of the model; the warning area of ​​the present invention is determined by the energy flow density method in step S3.

[0051] Comparative Calculation 2: Verification using the peak velocity method for point masses; Peak velocity method is another comparative verification approach. The relevant techniques for determining the peak vibration velocity after balancing the energy absorption, kinetic energy, and potential energy of the roof are found in CN115788573A, and the relevant techniques for evaluating the energy absorption and failure velocity of the side panels are found in CN111255492B. The energy caliber per unit support area will be used uniformly below.

[0052] During a rockburst, the energy exerted on the roadway support system mainly consists of two parts: the input of seismic loads from the mine and the release of energy due to the instability of the roof strata. The input energy of the seismic loads is characterized by the particle vibration velocity propagating from the seismic source to the surrounding rock of the roadway, while the energy released due to the instability of the roof strata is estimated based on the change in gravitational potential energy corresponding to the mass and displacement of the roof rock blocks.

[0053] First, calculate the energy that the support system of the roadway roof or sidewalls can absorb according to equations (1) to (3). .

[0054] For the area of ​​support evaluation The kinetic energy per unit area of ​​the corresponding rock mass involved in the failure is calculated according to formula (15): (15); In equation (15), The energy per unit area is kinetic energy, expressed in J / m²; m represents the area under evaluation. The corresponding mass of the rock mass involved in the destruction, in kg; The support evaluation area is expressed in m²; v is the equivalent impact velocity, expressed in m / s. m and The calculation unit should correspond to the same rock mass.

[0055] For the roadway roof, the gravitational potential energy released when the roof strata slide under impact and displace due to the tensile extension of the anchor bolts also needs to be considered. The potential energy exerted on the support system by the roof rock blocks due to impact sliding is determined according to equation (16): (16); In equation (16), The potential energy released by the subsidence of the roof slab per unit area is expressed in J / m²; m represents the corresponding evaluation area. Mass of loosened and subsided rock blocks, in kg; g is taken as 9.8 m / s²; Δh is the corresponding ultimate displacement of the support structure, in m; The corresponding support evaluation area is expressed in m².

[0056] The energy exerted by the top strata on the support system is the sum of the kinetic and potential energy transmitted from the earthquake source, and is determined according to equation (17): (17); In equation (17), Energy applied per unit area of ​​the ceiling plate Kinetic energy per unit area The three values ​​represent potential energy per unit area, and their units are all J / m².

[0057] Considering a safety factor of 1.5, the top plate is constrained according to equation (18): (18); The auxiliary part is constrained according to formula (19): (19); In equations (18) and (19), Energy absorbed per unit area of ​​the corresponding roof or sidewall support, expressed in J / m². and The meaning is the same as before; 1.5 is the safety factor for comparative calculation. The critical velocity is determined when the equality holds; if the top plate... / 1.5 If the value is ≤0, there is no positive kinetic energy margin, and the positive velocity threshold is not calculated accordingly.

[0058] The peak velocity of surrounding rock particles and the equivalent impact velocity of fractured rock mass have different physical meanings. This comparative model adopts the approximate conversion that the equivalent impact velocity is twice the peak velocity, and is calculated according to formula (20); the field applicability of this conversion factor needs to be checked separately.

[0059] (20); In equation (20), v is the equivalent impact velocity. The value is the allowable peak velocity of the particle corresponding to the critical impact velocity, and the unit is m / s; 2 is the dimensionless velocity conversion factor used here.

[0060] To simultaneously represent geometric diffusion and dielectric damping, a positive reference distance is used. Using the peak velocity at a certain point as the amplitude reference, the propagation model is written as: (twenty one); In equation (21), A(r) is the peak velocity of the particle at a propagation distance r. For reference distance Peak speeds at the location, all in m / s; r and All are in m, and r ≥ >0; α is the medium damping attenuation coefficient, in meters. - ¹. This is not the velocity of the source particle at r=0; for different energy levels, corresponding values ​​need to be established based on propagation monitoring data. The correspondence between the energy level and the energy level is determined, and α is fitted.

[0061] For the i-th source energy level, obtain the corresponding peak velocity at the reference distance. And cause it to propagate to the critical distance of contrast. The velocity at that point satisfies equation (22): (twenty two); In equation (22), A( ) represents the distance from the i-th source energy level to the critical contrast distance. Peak velocity of the particle at that time; Both are the allowable peak particle velocities for the corresponding locations, and their units are m / s.

[0062] Will Substituting into equation (21) and combining it with equation (22) to solve, the critical distance within which this comparative model is applicable can be obtained. (The missing energy levels and...) When comparing data, the velocity amplitude is not directly replaced by data containing only the total energy of the seismic source; the comparison results do not replace the warning boundary calculated in step S3.

[0063] Step S4: Divide the microseismic early warning zones for one or more roadways; like Figures 5 to 7 As shown, the energy flow density method of step S3 is used for each roadway to obtain the critical distances of the roof and sidewalls corresponding to each source energy level, and the larger value is taken to form the warning critical distance of the roadway.

[0064] The tunnel centerline is represented by a three-dimensional line segment or a broken line. For any spatial location outside the tunnel, the shortest distance to each centerline segment is calculated and the minimum value is taken. This distance is the centerline distance and is not replaced by the planar projection distance. If the surrounding rock surface is used as the evaluation location, the centerline distance is converted into the propagation distance to the corresponding surrounding rock surface according to the corresponding cross-sectional dimensions and shape. The maximum value is taken for boundary division, roof and sidewall division, and event judgment, all using a consistent distance benchmark. An envelope warning zone is formed by extending along the tunnel space according to different energy level critical distances.

[0065] For a single tunnel, the area is directly divided based on its energy level-critical distance relationship. For multiple tunnels, areas are formed separately and then superimposed. Figure 6 This is a plan view. Figure 7 This is a three-dimensional illustration. When a certain spatial location falls into the warning zones of different roadways simultaneously, the lowest value among the multiple warning energy thresholds corresponding to that location is taken, and a warning is issued when the warning conditions of any roadway are met.

[0066] The critical propagation distances of the top plate and the side plate are respectively denoted as: ,i and After being converted to the same distance benchmark, the critical distance for roadway early warning is taken as... =max( i, (i). When the two sides are asymmetrical, the maximum value of the three critical distances—the roof, the first side, and the second side—is taken. For the centerline distance method and the surrounding rock surface distance method, matching boundary data must be generated separately and they cannot be used interchangeably.

[0067] Step S5: Make an early warning judgment on actual microseismic events; During the longwall mining process, a microseismic monitoring system is used to continuously acquire microseismic events, locate these events, and obtain the energy of their seismic sources. .

[0068] Based on the actual source energy Select the corresponding calculated energy level upwards, or recalculate the critical distance based on the actual energy when the maximum preset energy level is exceeded; simultaneously calculate the shortest spatial distance from the epicenter location to the corresponding roadway centerline, and obtain the actual evaluation distance according to the cross-section correction rules used for regional division. .

[0069] An early warning is issued when equation (23) is satisfied: (twenty three); In equation (23), The evaluation distance of the corresponding tunnel for the actual event. The critical distance for early warning of the selected energy level is given in meters. and Both distances must be centerline distances or distances to the surrounding rock surface calculated according to consistent cross-section rules.

[0070] when ≤ At that time, an early warning was issued for the tunnel; when > The statement indicates that the warning threshold of this method was not reached under the propagation assumptions, parameters, and energy levels used, and does not equate to excluding other instability factors. When multiple roadways are involved, each roadway is judged individually, and a corresponding warning is output if any one of the conditions is met.

[0071] By adopting the above method, the traditional method of judging based solely on the energy magnitude of microseismic events is transformed into a regional early warning method that simultaneously considers the source energy, source location, and the actual shock resistance of the roadway support system. This allows microseismic events of the same energy level to obtain corresponding early warning judgment results under different distances from the roadway and different roadway support conditions.

[0072] The above embodiments are used to illustrate the present invention, and the scope of protection is defined by the claims.

Claims

1. A method for dividing microseismic early warning zones based on the erosion resistance of roadway support, characterized in that, Includes the following steps: Obtain the support parameters, surrounding rock parameters, and spatial location of at least one roadway to be evaluated, and determine the absorbable energy per unit area of ​​the roadway roof and sidewall support system, respectively. Based on the surrounding rock parameters, the initial stored elastic energy of the surrounding rock corresponding to the unit area of ​​the roof or sidewall is determined. Combined with the coal and rock mass impact energy index and the preset safety factor, the allowable input energy flow density of the roof and sidewall is determined respectively. Multiple source energy levels are set up, and the energy flow density method is adopted. Based on the distribution of source energy of each source energy level on the spherical surface and the energy flow density propagating towards the roadway under the concentrated reflection effect, the critical propagation distance when the allowable input energy flow density of the roof and the sidewall is reached is calculated respectively. Under a unified distance benchmark, the larger value of the two is taken as the warning critical distance of the source energy level corresponding to the roadway. Based on the spatial location of the tunnel and the critical distance for early warning of each seismic source energy level, a corresponding three-dimensional microseismic early warning zone is divided around the tunnel. Locate the actual microseismic event and obtain its source energy, determine the corresponding source energy level, and calculate the shortest spatial distance from the source location to the center line of the corresponding roadway; use the shortest spatial distance or the distance corrected according to the roadway cross-sectional dimensions as the actual distance, and issue an early warning when the actual distance and the warning critical distance use the same distance benchmark and the actual distance is not greater than the warning critical distance.

2. The method according to claim 1, characterized in that, The roadways to be evaluated are longwall mining roadways, tunneling roadways, or main roadways in mining areas. The evaluation targets are single roadways or multiple roadways; the critical warning distance is calculated for each roadway separately.

3. The method according to claim 1, characterized in that, The absorbable energy per unit area of ​​the top or side support system is the sum of the product of the absorbable energy of a single anchor bolt and the anchor bolt density, and the product of the absorbable energy of a single anchor cable and the anchor cable density. The absorbable energy of a single anchor bolt or anchor cable is determined based on its non-anchored section length, ultimate failure tensile force, elongation rate, and bearing capacity reduction factor. The anchor bolt density and anchor cable density are determined according to the number of corresponding components within a unit support area. Specifically, the top plate density is calculated based on the spacing and row spacing, while the side plate density is calculated based on the number of corresponding components in a single row, the wall height, and the row spacing.

4. The method according to claim 1, characterized in that, Multiply the ratio of the square of the uniaxial compressive strength of the surrounding rock to twice the elastic modulus by the equivalent thickness of the surrounding rock involved in the failure to obtain the initial stored elastic energy per unit support area; multiply the sum of this elastic energy and the input energy flow density by one and subtract the reciprocal of the impact energy exponent to obtain the released energy per unit area of ​​surrounding rock after fracture. Let the product of the preset safety factor and the released energy equal the energy that the support system can absorb per unit area, and then calculate the positive allowable input energy flow density.

5. The method according to claim 1, characterized in that, The ideal energy flow density is obtained by dividing the energy released from the seismic source by the area of ​​a sphere with the propagation distance as its radius. Under the conservative assumption that the energy is distributed equally in three dimensions and six directions and that the energy in the five directions other than the direction toward the roadway is concentrated by reflection to the direction toward the roadway, six times the ideal energy flow density is taken as the energy flow density after reflection and concentration, and the critical propagation distance of the roof and sidewalls is calculated.

6. The method according to claim 1, characterized in that, When the support parameters or surrounding rock parameters of the two sides are different, the critical distances of the roof, the first side and the second side are calculated separately, and the maximum value of the three is taken as the warning critical distance of the corresponding roadway under a unified distance benchmark.

7. The method according to claim 1, characterized in that, The centerline of the tunnel is represented as a three-dimensional line segment or a broken line. The shortest distance from the source location to each line segment is calculated and the minimum value is taken as the shortest spatial distance from the source location to the centerline of the tunnel. When considering the cross-sectional dimensions of the tunnel, the centerline distance is converted into the distance to the corresponding surrounding rock surface based on the cross-sectional geometry at the location corresponding to the shortest distance, and the distance in the area boundary and early warning comparison is processed using the same conversion rules.

8. The method according to claim 1, characterized in that, The allowable input energy flow density is determined based on the support parameters and surrounding rock parameters; when there are historical microseismic events and corresponding roadway damage records, the calculation parameters and early warning boundaries are checked using the records.

9. The method according to claim 1, characterized in that, Early warning indicators with corresponding source energy levels are set for the early warning areas of multiple roadways. When the early warning areas overlap, the lowest source energy level among the early warning indicators of each roadway corresponding to the same spatial location is determined as the early warning indicator for that location. An early warning is issued when an actual microseismic event meets the early warning conditions of any corresponding roadway.

Citation Information

Patent Citations

  • A method for evaluating the performance of roadway sidewall anchor wire mesh support

    CN111255492B

  • A design method for three-level energy absorption support of rock burst tunnel in coal mine

    CN111414659B

  • Method for evaluating anti-vibration capability of roadway roof support system

    CN115788573A