High strength pipe and coupling integral

By working together with the sealing inner platform, sealing layer, locking sealing lip, micro airbag and negative pressure linkage components, combined with the design of ring skeleton and grease storage micro groove, the problems of insufficient sealing reliability and vibration impact at the oil pipe coupling connection are solved, realizing adaptive sealing compensation and self-lubrication effect, and improving the service life of the coupling.

CN123154199APending Publication Date: 2026-11-24HEBEI LAIFU PIPELINE EQUIPMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611392753.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-09
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

The existing oil pipe couplings have insufficient sealing reliability and are prone to leakage due to vibration and pipeline pressure fluctuations.

Method used

The system employs a sealed inner platform, sealing layer, locking sealing lip, micro airbag, and negative pressure linkage components working in tandem, combined with a ring skeleton and grease storage micro-groove design to achieve adaptive sealing compensation; the self-lubricating structure composed of hinge rod and permeable cotton, and the combination structure of buffer pad, buffer column, and rubber pad, reduce the impact of vibration.

Benefits of technology

It improves the sealing reliability of the pipe clamp connection, reduces the risk of leakage, reduces the frictional resistance of the hinge and the impact of vibration on the locking bolt, and extends the service life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123154199A_ABST
    Figure CN123154199A_ABST
Patent Text Reader

Abstract

This invention relates to the field of integrated tubing technology, and more particularly to a high-strength integrated tubing with a clamp. This high-strength integrated tubing, through a sealing inner platform, sealing layer, and locking lip in conjunction with a micro-airbag and negative pressure linkage, can adjust the tightness of the locking lip against the outer wall of the tubing according to the internal pressure state of the pipeline. The grease reservoir micro-grooves and lubrication channels on the annular skeleton can supply grease to the sealing friction interface, reducing wear caused by repeated compression and friction on the sealing layer. The vacuum chamber provides deformation allowance for the sealing inner platform, reducing local stress concentration in the sealing layer. The limiting plate constrains the internal components, ensuring balanced force distribution across the annular seal. It can adapt to different working conditions, including high and negative pressure pipelines. Sealing force compensation is achieved through a mechanical structure, eliminating the need for manual readjustment of the locking components, improving sealing performance under fluctuating pipeline pressure, and reducing the possibility of media leakage.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of integrated tubing technology, specifically to a high-strength integrated tubing with a clamp. Summary of the Invention

[0002] The purpose of this invention is to provide a high-strength integrated hose coupling for oil pipes, which solves the problem of insufficient sealing reliability at existing hose coupling connections and easy leakage due to vibration and pipeline pressure fluctuations.

[0003] To achieve the above objectives, the present invention provides the following technical solution: a high-strength integrated hose with a connecting sleeve, an upper hose clamp, a lower hose clamp, a locking bolt, and a hinge rod. One end of the connecting sleeve is fixedly connected to the upper hose clamp. The tops of the upper and lower hose clamps are hinged together by the hinge rod, and the bottoms of the upper and lower hose clamps are locked together by the locking bolt. A buffer pad is provided between the bottoms of the upper and lower hose clamps. A sealing inner platform is fixedly provided on the inner wall of both the upper and lower hose clamps. A sealing layer is provided on the inner wall of the sealing inner platform, and a locking sealing lip is provided on the inner side of the sealing layer. A vacuum cavity is provided inside the sealing inner platform. A limiting plate is provided inside the sealing layer, and an annular skeleton is assembled on the side of the limiting plate. A grease storage micro-groove is provided inside the annular skeleton, and a lubrication channel communicating with the grease storage micro-groove is provided on the annular skeleton. A micro airbag is also provided inside the sealing layer. One side of the micro airbag contacts the surface of the sealing inner platform through the buffer cavity, and the other side of the micro airbag is connected to the locking sealing lip through a pressure relief pipe.

[0004] Furthermore, a straight frame is fixedly installed inside the buffer pad, and several buffer columns are fixedly connected to the left and right sides of the straight frame. Rubber pads are fitted to the outer ends of the buffer columns, and the rubber pads abut against the inner walls of the upper and lower pipe clamps respectively.

[0005] Furthermore, a corner block is fixedly installed at the top of the inner wall of the upper pipe clamp, and an oil storage pipe is installed inside the corner block. The bottom of the oil storage pipe is connected to a drip pipe. An installation groove is opened on the inner wall of the lower pipe clamp, and the installation groove is filled with permeable cotton. The permeable cotton is connected to the drip pipe and is in contact with the surface of the hinge rod.

[0006] Furthermore, the micro airbags and the limiting plate are arranged alternately; a sealing slider and a micro telescopic spring are also provided inside the sealing layer, and the micro telescopic spring abuts against the sealing slider.

[0007] Furthermore, the device is also equipped with a connecting pipe, a negative pressure chamber, a negative pressure slider, and a negative pressure gas storage chamber; the connecting pipe connects the negative pressure chamber to the micro airbag, the negative pressure slider is assembled inside the negative pressure chamber, and the negative pressure slider cooperates with the negative pressure gas storage chamber.

[0008] Furthermore, the grease reservoir stores grease inside, the lubrication channel is open to the sealing inner platform, the upper and lower tube clamps form an annular clamping cavity, the locking sealing lip protrudes towards the center of the annular clamping cavity, the straight skeleton is installed through the buffer pad along its thickness direction, and several sets of buffer columns are evenly arranged along the axial direction of the straight skeleton.

[0009] Compared with the prior art, the beneficial effects of the present invention are: 1. This high-strength integrated hose clamp, through the coordinated operation of the sealing inner platform, sealing layer, locking sealing lip, micro airbag, and negative pressure linkage component, can adjust the tightness of the locking sealing lip against the outer wall of the hose according to the internal pressure of the pipeline. The grease storage microgrooves and lubrication channels on the annular skeleton can supply grease to the sealing friction interface, reducing the wear caused by repeated compression and friction of the sealing layer. The vacuum chamber provides deformation margin for the sealing inner platform, reducing local stress concentration in the sealing layer. The limiting plate constrains the internal components, making the force on the annular seal more balanced. It can adapt to different working conditions of high pressure and negative pressure in the pipeline. The sealing force compensation is completed by mechanical structure, eliminating the need for manual readjustment of the locking components, improving the sealing performance under pipeline pressure fluctuation conditions, and reducing the possibility of media leakage.

[0010] 2. This high-strength integrated hose clamp features a self-lubricating structure for the hinge rod. Through the cooperation of the oil reservoir, drip pipe, and permeating cotton, continuous lubrication of the hinge rotation position is achieved. The oil reservoir contains lubricating medium, which slowly impregnates the permeating cotton. The cotton contacts the surface of the hinge rod, continuously supplying lubricating medium to the hinge rod friction pair. In the operating environment where the equipment operates, moisture and dust can easily penetrate the hinge joint. The lubricating medium forms a protective oil film on the hinge rod surface, slowing down corrosion at the hinge joint, reducing frictional resistance during hinge rod rotation, facilitating hose clamp opening and closing, and eliminating the need for frequent manual lubrication. This reduces daily maintenance, ensures smooth hose clamp opening and closing, and helps extend the service life of the hinge rotation position.

[0011] 3. This high-strength integrated hose clamp, with a buffer pad at the hose clamp connection, employs a composite structure combining a straight skeleton, buffer column, and rubber pad to absorb vibration and impact transmitted from the pipeline. During operation, the vibration load acts on the hose clamp connection face. The rubber pad receives the vibration and transmits the load to the buffer column, which dissipates the vibration energy through deformation, reducing the transmission of vibration to the locking bolt position and mitigating the preload attenuation problem caused by reciprocating vibration of the bolt thread pair. The straight skeleton provides structural support for the buffer pad, preventing excessive collapse under clamping force and maintaining the original working capacity of the buffer structure. Combined with the connecting sleeve, it reduces assembly gaps between components, optimizes the overall clamping condition of the hose clamp, improves the clamping performance under vibration, and helps enhance the stability of the hose clamp connection. Attached Figure Description

[0012] To more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0013] Figure 1 This is a schematic diagram of the overall structure of the present invention; Figure 2 This is a schematic diagram of the internal structure of the clamp of the present invention; Figure 3 for Figure 2 Enlarged schematic diagram of the structure at point A in the middle; Figure 4 This is a cross-sectional view of the pipe clamp of the present invention; Figure 5 for Figure 4 Enlarged schematic diagram of the structure at point B; Figure 6 This is a cross-sectional view of the buffer pad of the present invention.

[0014] In the diagram: 1. Upper pipe clamp; 101. Sealing inner platform; 102. Sealing layer; 103. Limiting plate; 104. Annular skeleton; 105. Grease storage micro-groove; 106. Lubrication channel; 107. Buffer chamber; 108. Micro airbag; 109. Pressure relief pipe; 110. Sealing slider; 111. Micro telescopic spring; 112. Connecting pipe; 113. Negative pressure chamber; 114. Negative pressure slider; 115. Negative pressure air storage chamber; 116. Locking sealing lip; 117. Vacuum chamber; 2. Lower pipe clamp; 3. Locking bolt; 4. Hinge rod; 401. Permeable cotton; 402. Corner block; 403. Oil storage pipe; 404. Dropper; 5. Connecting sleeve; 6. Buffer pad; 601. Straight skeleton; 602. Buffer column; 603. Rubber pad. Detailed Implementation

[0015] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0016] In this invention, unless otherwise explicitly specified and limited, the terms "installation," "connection," "linking," and "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. Those skilled in the art can understand the specific meaning of the above terms in this invention according to the specific circumstances.

[0017] Please see Figures 1-6 This invention provides a technical solution: a high-strength integrated tubing with a coupling, wherein the connecting sleeve 5 and the upper coupling 1 are integrally fixed, eliminating the need for separate assembly structures, making the tubing body and the upper part of the coupling an inseparable whole component, reducing assembly gaps from the source and reducing the number of parts that need to be connected on site. The top positions of the upper coupling 1 and the lower coupling 2 are hinged by a hinge rod 4, allowing the upper coupling 1 and the lower coupling 2 to open and close around the hinge rod 4. The lower coupling 2 can rotate and open around the hinge rod, facilitating the direct placement of the external tubing to be connected into the annular clamping cavity formed by the coupling. The lower opening and closing positions of the upper coupling 1 and the lower coupling 2 are locked and fixed by locking bolts 3. When the locking bolts are locked, the upper coupling 1 and the lower coupling 2 interlock to form a complete annular clamping cavity, forming a circumferential clamping around the outer wall of the tubing to be connected.

[0018] A buffer pad 6 is installed at the bottom joint where the upper pipe clamp 1 and the lower pipe clamp 2 interlock. The buffer pad 6 is clamped between the lower end face of the upper pipe clamp 1 and the lower end face of the lower pipe clamp 2. A straight frame 601 is installed inside the buffer pad 6, which runs through the entire buffer pad 6 and serves as the internal support base of the buffer pad 6. Multiple sets of buffer columns 602 are arranged on both sides of the straight frame 601. The buffer columns 602 extend outward along both sides of the straight frame 601. A rubber pad 603 is installed at the end of each set of buffer columns 602 away from the straight frame 601. The rubber pads 603 on both sides respectively correspond to and contact the joint end faces of the upper pipe clamp 1 and the lower pipe clamp 2. The straight frame 601 provides structural support for the buffer pad 6, preventing excessive collapse and failure of the buffer pad 6 under pressure. The buffer column 602 works in conjunction with the rubber pad 6. When the equipment operates and generates vibration and impact, the vibration is transmitted to the mating position of the upper pipe clamp 1 and the lower pipe clamp 2. The rubber pad 6 contacts the end face of the pipe clamp to receive the vibration load, and then transmits the load to the buffer column 602. The buffer column 602 deforms to absorb the vibration energy, thereby weakening the transmission of vibration to the locking bolt 3 and reducing the risk of the locking bolt 3 loosening due to reciprocating vibration. The buffer pad 6 is not just a simple rubber pad. Relying on the composite structure of the frame 601, the buffer column 602 and the rubber pad 603, it retains the buffering and vibration absorption capacity while maintaining the overall structural strength. It will not undergo permanent deformation under long-term pressure, ensuring the reliability of the pipe clamp for long-term clamping.

[0019] An angle block 402 is fixedly mounted at the top of the inner wall of the upper pipe clamp 1. The angle block 402 is a protruding mounting base inside the upper pipe clamp 1. An accommodating space is provided inside the angle block 402 for installing the oil storage pipe 403. The oil storage pipe 403 can pre-store lubricating medium. The lower end of the oil storage pipe 403 is connected to a dropper 404, which extends downward. An installation groove is provided on the inner wall of the lower pipe clamp 2. The installation groove is filled with penetrating cotton 401. The penetrating cotton 401 has capillary adsorption and oil guiding capabilities. The oil outlet end at the top of the oil storage pipe 403 extends into the installation groove and contacts the penetrating cotton 401. The lubricating medium inside the oil storage pipe 403 can slowly wet the penetrating cotton 401. The penetrating cotton 401 is positioned to fit exactly against the surface of the hinge rod 4. After being wetted, the penetrating cotton 401 can continuously apply the lubricating medium to the surface of the hinge rod 4. During the disassembly and assembly of the pipe clamp, the hinge rod 4 will continuously experience rotational friction. Under long-term working conditions, the hinge rod 4 is prone to corrosion and jamming, resulting in increased resistance to opening and closing the pipe clamp or even preventing normal disassembly and assembly. A continuous oil supply structure composed of an oil reservoir 403, a drip pipe 404, and a permeating cotton 401 eliminates the need for repeated manual lubrication. The permeating cotton 401 continuously supplies lubricating medium to the hinge rod, keeping the hinge rod 4 in a lubricated state at all times, preventing corrosion and jamming, and ensuring smooth rotation and opening / closing of the upper pipe clamp 1 and lower pipe clamp 2 around the hinge rod.

[0020] A sealing inner platform 101 is fixedly installed on the inner wall of both the upper pipe clamp 1 and the lower pipe clamp 2. The sealing inner platform 101 is arranged in a ring along the inner wall of the pipe clamp. The sealing inner platform 101 is the base that supports the entire sealing assembly. A sealing layer 117 is assembled on the inner wall of the sealing inner platform 101. The sealing layer 117 is an annular elastic sealing component. A locking sealing lip 116 is provided on the inner side of the sealing layer 117. The locking sealing lip 116 faces the center of the annular clamping cavity, that is, towards the outer wall of the clamped oil pipe. The locking sealing lip 116 can directly and tightly fit with the outer wall surface of the oil pipe to achieve the main seal. A vacuum chamber 102 is provided inside the main body of the sealing inner platform 101. The vacuum chamber 102 is a sealed cavity. The vacuum chamber 102 can improve the overall deformation adaptability of the sealing inner platform 101. When the clamping force causes slight deformation, the vacuum chamber 102 can provide deformation margin, avoid excessive rigidity of the sealing inner platform 101 causing local stress concentration in the sealing layer 117, and prevent cracking damage to the sealing layer 117.

[0021] A limiting plate 103 is fixedly installed inside the sealing layer 117. The limiting plate 103 is distributed in a ring inside the sealing layer 117, serving as a skeleton for limiting movement. A ring skeleton 104 is assembled on the inner side of the limiting plate 103. The ring skeleton 104 is also arranged circumferentially. Several grease storage micro-grooves 105 are formed inside the ring skeleton 104. The grease storage micro-grooves 105 are pre-filled with grease. Lubrication channels 106 are formed on the surface of the ring skeleton 104. The lubrication channels 106 are interconnected with the grease storage micro-grooves 105 and are open to the side facing the sealing inner platform 101. During the compression deformation of the sealing layer 117, the grease stored in the grease storage micro-grooves 105 can slowly overflow along the lubrication channels 106 and flow to the contact friction interface between the sealing layer 117 and the sealing inner platform 101. This reduces the wear caused by repeated compression and friction of the sealing layer 117, reduces the aging and wear of the sealing layer 117, and extends the service life of the sealing assembly.

[0022] Multiple sets of micro-airbags 108 are arranged inside the cavity of the sealing layer 117. The micro-airbags 108 and the limiting plate 103 are arranged in an alternating pattern. The micro-airbags 108 are inflatable and contractible sealed airbag components. One side of the micro-airbag 108 contacts the inner surface of the sealing inner platform 101 through the buffer cavity 107, and the other side of the micro-airbag 108 is connected to the pressure relief pipe 109, which is ultimately connected to the interior of the locking sealing lip 116. A sealing slider 110 is slidably mounted inside the cavity of the pressure relief pipe 109. A micro-telescopic spring 111 is arranged at the end of the sealing slider 110 near the locking sealing lip 116, and the micro-telescopic spring 111 applies an elastic pushing force to the sealing slider 110. The upper pipe clamp 1 also has a negative pressure chamber 113 and a negative pressure storage chamber 115 in its internal cavity. The negative pressure chamber 113 is slidably fitted with a negative pressure slider 114. The negative pressure chamber 113 is connected to the internal cavity of the pressure relief pipe 109 through the connecting pipe 112.

[0023] The complete sealing assembly of this device can adapt to changes in the internal pressure of the pipeline. When the internal pressure of the pipeline increases, the outer wall of the clamped oil pipe expands slightly outward, which will squeeze the locking sealing lip 116. After being compressed, the locking sealing lip 116 will transmit the pressure through the pressure relief pipe 109 to the micro airbag 108. The micro airbag 108 will change volume under pressure, and the buffer chamber 107 can provide space for the deformation of the micro airbag 108. When the pipeline is under negative pressure, the negative pressure storage chamber 115, the negative pressure chamber 113, the negative pressure slider 114, and the connecting... The pipes 112 work together. Under the influence of negative pressure, the negative pressure slider 114 is displaced, changing the internal pressure state of the pressure relief pipe 109 through the connecting pipe 112. This, combined with the miniature telescopic spring 111, drives the sealing slider 110 to slide, adjusting the internal pressure of the pressure relief pipe 109. This causes the miniature airbag 108 to inflate. After inflating, the miniature airbag 108 pushes outward to lock the sealing lip 116, ensuring that the locking sealing lip 116 remains tightly attached to the outer wall of the oil pipe. This prevents the sealing lip from detaching or the seal from failing due to negative pressure in the pipeline. The limiting plate 103 provides limiting constraints on the internal components of the annular skeleton 104 and the sealing layer 117, preventing misalignment or displacement of the internal components during repeated compression and deformation, and ensuring uniform force distribution throughout the circumference of the entire sealing assembly.

[0024] During assembly, the oil pipe joint to be connected is first placed in the annular clamping cavity formed by the upper pipe clamp 1 and the lower pipe clamp 2. Then, the lower pipe clamp 2 is rotated to close around the hinge rod, aligning and fastening the upper pipe clamp 1 and the lower pipe clamp 2. The locking bolt is then tightened to complete the locking. The locking bolt provides locking force, driving the upper pipe clamp 1 and the lower pipe clamp 2 to move closer together, squeezing the internal sealing components. The locking sealing lip 116 first adheres to the outer wall of the oil pipe, completing the initial seal. After the equipment is put into operation, the vibration generated by the whole machine will be transmitted to the pipe clamp as a whole. The straight skeleton, buffer column and rubber pad inside the buffer pad 6 work together to absorb the vibration and weaken the impact of the vibration on the locking bolt. The lubricating medium inside the oil storage pipe continuously wets the cotton through the drip tube, continuously lubricating the rotating parts of the hinge rod. Throughout the pipeline operation, the lubricating grease inside the grease storage micro-groove 105 is continuously supplied to the friction interface through the lubrication channel 106, reducing the wear of the sealing layer 117. The sealing layer 117, the micro airbag 108, and the negative pressure linkage component work together to automatically adjust the clamping force of the locking sealing lip 116 on the outer wall of the oil pipe according to the internal pressure and negative pressure state of the pipeline, so as to achieve adaptive sealing compensation.

[0025] Working principle: The clamping and locking module consists of a connecting sleeve 5, an upper pipe clamp 1, a lower pipe clamp 2, a hinge rod 4, and a locking bolt 3. The connecting sleeve and the upper pipe clamp 1 are integrally formed, eliminating the assembly gap between them and improving the overall structural strength. During pipeline assembly, the locking bolt 3 is loosened, and the lower pipe clamp 2 can rotate outward with the hinge rod 4 as the rotation fulcrum. The annular clamping cavity of the pipe clamp is opened, making it convenient for the external oil pipe connector to be directly placed into the clamping cavity without having to insert the oil pipe from the end into the pipe clamp, reducing the difficulty of on-site assembly operations. After the oil pipe connector is in place, the lower pipe clamp 2 is rotated to close, and the locking bolt is tightened. The locking bolt provides axial locking tension, pulling the lower ends of the upper pipe clamp 1 and the lower ends of the lower pipe clamp 2 together. The upper pipe clamp 1 and the lower pipe clamp 2 together hug and clamp the outer wall of the oil pipe, completing the mechanical clamping and fixing. The hinge rod serves a dual function of opening and closing rotation and hinge support, while the locking bolt provides locking preload to ensure that the hose clamp forms sufficient clamping force on the oil pipe, thereby achieving mechanical fixation of the oil pipe joint position.

[0026] The vibration damping and buffering module mainly relies on the buffer pad 6, which is located between the bolted mating surfaces of the upper pipe clamp 1 and the lower pipe clamp 2. During operation, the mechanical equipment continuously generates vibrations, which are transmitted along the oil pipe to the pipe clamps. The vibration load acts directly on the threaded joint of the locking bolts. Long-term reciprocating vibration can easily cause the bolt preload to decrease, leading to bolt loosening. Once the bolts loosen, the clamping force of the pipe clamp decreases, directly causing seal failure. When the vibration is transmitted to the mating surfaces of the upper pipe clamp 1 and the lower pipe clamp 2, the vibration load first acts on the rubber pads 603 on both sides of the buffer pad 6. The rubber pads transmit the vibration load to the buffer column 602, which undergoes elastic deformation, converting the vibration energy into deformation internal energy for dissipation and absorption. The straight frame 601 runs through the entire buffer pad 6, serving as a rigid support base, preventing the buffer pad 6 from being completely crushed by the tightening force of the locking bolts, maintaining the basic structural shape of the buffer pad 6, and avoiding the buffer pad 6 being crushed and losing its buffering capacity. Through the composite structure of the buffer pad 6, most of the vibration energy is absorbed and consumed, significantly reducing the vibration amplitude transmitted to the threaded pair of the locking bolt, significantly delaying the process of the locking bolt loosening and failure, and ensuring the stability of the pipe clamp with long-term high strength clamping.

[0027] The articulated self-lubricating module consists of a corner block 402, an oil storage pipe 403, a drip pipe 404, and a permeating cotton 401. The working environment of the articulated rod often contains moisture and dust. Without lubrication, the rotating parts are prone to corrosion. Corrosion drastically increases the rotational resistance of the articulated rod, and in severe cases, it can completely seize up, making it impossible to open the clamp and hindering subsequent pipeline disassembly and maintenance. The oil storage pipe pre-stores lubricating medium. Through capillary action, the lubricating medium continuously and slowly seeps out through the drip pipe 404, wetting the permeating cotton 401 inside the mounting groove of the lower clamp 2. The permeating cotton itself has excellent oil storage and conduction capabilities, maintaining close contact with the outer wall of the articulated rod and continuously applying the lubricating medium to the friction surface of the articulated rod. Regardless of whether the clamp is opened or closed, the permeating cotton can continuously supply lubricating medium to the articulated rod, forming a long-lasting lubrication, inhibiting corrosion, maintaining flexible rotation of the articulated rod, reducing operational resistance during later disassembly and maintenance, and extending the service life of the device.

[0028] The adaptive sealing compensation module is composed of a sealing inner platform 101, a vacuum chamber 102, a sealing layer 117, a locking sealing lip 116, a limiting plate 103, an annular skeleton 104, a grease storage micro-groove 105, a lubrication channel 106, a micro airbag 108, a buffer chamber 107, a pressure relief pipe 109, a sealing slider 110, a micro telescopic spring 111, a connecting pipe 112, a negative pressure chamber 113, a negative pressure slider 114, and a negative pressure air storage chamber 115.

[0029] After the locking bolts are tightened and the mechanical clamping is completed, the locking sealing lip 116 is compressed and tightly adheres to the outer wall of the oil pipe, forming the first sealing barrier. A vacuum chamber 102 is opened inside the sealing inner platform 101. The vacuum chamber 102 gives the sealing inner platform 101 a certain deformation adaptability. When the pipe clamp is compressed by the locking force and undergoes slight deformation, the vacuum chamber 102 can provide deformation margin, avoiding excessive rigidity of the sealing inner platform 101, which would cause excessive stress concentration in local positions of the sealing layer 117, and prevent the sealing layer 117 from tearing or cracking.

[0030] The grease reservoir 105 inside the annular skeleton 104 stores grease. Under repeated compression and deformation of the sealing layer 117, the grease inside the grease reservoir 105 overflows outward along the lubrication channel 106 and flows to the friction contact interface between the sealing layer 117 and the inner sealing platform 101, reducing the wear caused by repeated compression and friction of the sealing layer 117, reducing the aging rate of the seal, and achieving long-term self-lubrication of the sealing part. The limiting plate 103 limits and constrains the various components inside the annular skeleton 104 and the sealing layer 117, preventing the internal components from shifting circumferentially and radially during repeated compression and deformation, ensuring that the entire annular seal is subjected to uniform force and avoiding defects such as insufficient local sealing pressure.

[0031] When the pressure of the medium inside the pipeline increases, the pipe wall will expand slightly outward, and the outer wall of the pipe will squeeze the locking sealing lip 116. After the locking sealing lip 116 is compressed, the pressure is transmitted to the micro airbag 108 through the pressure relief pipe 109. The buffer chamber 107 provides space for the deformation of the micro airbag 108. After the airbag is subjected to force, it applies a back-pushing force to the locking sealing lip 116 in the opposite direction. The higher the pipeline pressure, the greater the clamping force on the locking sealing lip 116, forming a positive compensation effect of the higher the pressure, the tighter the seal, thus suppressing medium leakage under high pressure conditions.

[0032] When the pipeline is under negative pressure, the internal pressure is lower than the external environmental pressure. Ordinary sealing structures are prone to the sealing lip being drawn inward and detached from the outer wall of the oil pipe, causing sealing failure. This invention sets up a negative pressure linkage structure. The negative pressure storage chamber 115 stores gas, and the negative pressure slider 114 inside the negative pressure chamber 113 can slide according to the negative pressure state of the pipeline. The negative pressure chamber 113 is connected to the pressure relief pipe 109 through the connecting pipe 112. The miniature telescopic spring 111 continuously applies elastic thrust to the sealing slider 110. Combined with the pressure change caused by the displacement of the negative pressure slider 114, it adjusts the pressure in the cavity inside the pressure relief pipe 109, driving the miniature airbag 108 to expand. After the miniature airbag 108 expands, it pushes outward to lock the sealing lip 116, so that the locking sealing lip 116 still firmly presses against the outer wall of the oil pipe. Even when the pipeline is under negative pressure, it can still maintain a good sealing effect. The sealing slider 110 can slide inside the pressure relief pipe 109, which plays the role of pressure regulation and on / off regulation. Together with the miniature telescopic spring 111, it realizes dynamic pressure regulation, balances the internal pressure of the airbag, and avoids damage caused by excessive airbag pressure.

[0033] It should be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.

[0034] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A high-strength integrated pipe clamp oil pipe, comprising a clamping and locking mechanism, a vibration damping and buffering mechanism, a hinge lubrication mechanism and a sealing compensation mechanism, wherein the clamping and locking mechanism comprises a connecting sleeve (5), an upper pipe clamp (1), a lower pipe clamp (2), a hinge rod (4) and a locking bolt (3), wherein the connecting sleeve (5) is fixedly connected to the upper pipe clamp (1), the top ends of the upper pipe clamp (1) and the lower pipe clamp (2) are hinged by the hinge rod (4), and the bottom ends of the upper pipe clamp (1) and the lower pipe clamp (2) are locked together by the locking bolt (3), wherein the upper pipe clamp (1) and the lower pipe clamp (2) together form an annular clamping cavity for accommodating the oil pipe; The vibration damping and buffering mechanism is located at the bottom end of the upper pipe clamp (1) and the lower pipe clamp (2). The vibration damping and buffering mechanism includes a buffer pad (6), which is sandwiched between the upper pipe clamp (1) and the lower pipe clamp (2). The hinge lubrication mechanism is located on the inner side of the upper pipe clamp (1) and is arranged corresponding to the hinge rod (4). The sealing compensation mechanism is located on the inner wall of the upper pipe clamp (1) and the lower pipe clamp (2). The sealing compensation mechanism can adaptively adjust the sealing pressure on the outer wall of the oil pipe according to the change of internal pressure of the pipeline.

2. A high strength tubular coupling integral oil line as defined in claim 1, wherein, The vibration damping and buffering mechanism also includes a straight frame (601), buffer columns (602) and rubber pads (603). The straight frame (601) is located inside the buffer pad (6). The straight frame (601) is installed through the buffer pad (6) along the thickness direction. Several buffer columns (602) are installed on both sides of the straight frame (601). Rubber pads (603) are installed at the ends of the buffer columns (602). The rubber pads (603) on both sides abut against the mating end faces of the upper pipe clamp (1) and the lower pipe clamp (2), respectively.

3. A high strength tubular coupling integral oil line as defined in claim 1, wherein, The articulated lubrication mechanism includes a corner block (402), an oil storage pipe (403), a dropper (404), and a penetrating cotton (401). The corner block (402) is fixed to the top of the inner wall of the upper pipe clamp (1). The oil storage pipe (403) is installed inside the corner block (402). The lower end of the oil storage pipe (403) is connected to the dropper (404). The inner wall of the lower pipe clamp (2) is provided with an installation groove. The installation groove is filled with penetrating cotton (401). The penetrating cotton (401) is connected to the oil outlet end of the dropper (404). The penetrating cotton (401) is also in contact with the outer surface of the articulated rod (4).

4. A high strength tubular coupling integral oil line as defined in claim 1 wherein, The sealing compensation mechanism includes a sealing inner platform (101), a sealing layer (117), a locking sealing lip (116), a vacuum chamber (102), a limiting plate (103), an annular skeleton (104), a grease storage micro-groove (105), a lubrication channel (106), a micro airbag (108), a buffer chamber (107), and a pressure relief pipe (109). The sealing inner platform (101) is fixedly installed on the inner wall of the upper pipe clamp (1) and the lower pipe clamp (2). A vacuum chamber (102) is opened inside the sealing inner platform (101). The sealing layer (117) is assembled on the inner side of the sealing inner platform (101). A locking sealing lip protruding towards the center of the annular clamping cavity is provided on the inner side of the sealing layer (117). (116) A limiting plate (103) is fixed inside the sealing layer (117). A ring skeleton (104) is assembled on the side of the limiting plate (103). A grease storage micro-groove (105) is opened inside the ring skeleton (104). A lubrication channel (106) connected to the grease storage micro-groove (105) is opened in the ring skeleton (104). A micro airbag (108) is arranged inside the sealing layer (117). The micro airbag (108) and the limiting plate (103) are arranged alternately. One side of the micro airbag (108) contacts the sealing inner platform (101) through the buffer cavity (107). The other side of the micro airbag (108) is connected to the locking sealing lip (116) through the pressure relief pipe (109).

5. A high strength tubular coupling integral oil line as defined in claim 4 wherein, The sealing compensation mechanism also includes a sealing slider (110) and a miniature telescopic spring (111). The sealing slider (110) is slidably assembled inside the pressure relief pipe (109), and the miniature telescopic spring (111) is located inside the pressure relief pipe (109). One end of the miniature telescopic spring (111) abuts against the sealing slider (110).

6. A high strength tubular coupling integral oil line as defined in claim 5 wherein, The sealing compensation mechanism also includes a connecting pipe (112), a negative pressure chamber (113), a negative pressure slider (114), and a negative pressure storage chamber (115). The negative pressure chamber (113) and the negative pressure storage chamber (115) are located inside the upper pipe clamp (1). The negative pressure slider (114) is slidably assembled inside the negative pressure chamber (113). The negative pressure chamber (113) is connected to the inside of the pressure relief pipe (109) through the connecting pipe (112). The negative pressure slider (114) and the negative pressure storage chamber (115) cooperate with each other.

7. A high strength tubular coupling integral oil line as defined in claim 4 wherein, The grease reservoir (105) stores grease inside, and the lubrication channel (106) is open to the side of the sealed inner platform (101).

8. A high strength tubular coupling integral oil line as defined in claim 2 wherein, The buffer columns (602) are evenly arranged along the axial direction of the straight frame (601).