A multi-heat-source heating system cooperative scheduling method and system

By constructing a collaborative scheduling method for multi-heat source heating systems, and combining the thermoelectric coupling constraints of cogeneration units with the heat storage and release operation of hot water storage tanks, the output plan of heat sources is optimized, which solves the problems of high operating costs and poor grid adaptability in multi-heat source heating systems, and realizes the time shifting of heating costs and the decoupling and collaborative optimization of thermoelectricity.

CN123154369APending Publication Date: 2026-11-24MANZHOULI DALAIHU THERMAL POWER CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611475573.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-21
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing multi-heat source heating systems do not fully consider the thermal-electric decoupling constraints of combined heat and power units, do not combine time-of-use electricity pricing to dynamically optimize heat source output, and do not utilize the flexibility of thermal storage devices, resulting in high operating costs, low thermal storage utilization rates, and poor grid adaptability.

Method used

A collaborative scheduling method for multi-heat source heating systems is constructed. By combining the day-ahead optimization scheduling model with heat power balance, upper and lower limits of heat source output, thermoelectric coupling constraints of cogeneration units, and heat storage and release operation constraints of hot water storage tanks, an optimal output plan is formed and continuously adjusted in actual operation to adapt to real-time changes.

Benefits of technology

Significantly reduce heating operation costs, achieve synergy between cogeneration units and grid peak shaving, improve the utilization rate of thermal storage devices, and enhance the robustness and grid adaptability of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123154369A_ABST
    Figure CN123154369A_ABST
Patent Text Reader

Abstract

This invention relates to the field of centralized heating system operation optimization technology, specifically to a method and system for collaborative scheduling of multi-heat source heating systems. The method includes the following steps: obtaining a set of basic parameters for collaborative scheduling of the multi-heat source heating system corresponding to future scheduling cycles; constructing a day-ahead optimization scheduling model based on the set of basic parameters, with the objective function of minimizing the total heating cost of the system within the future scheduling cycle; solving the day-ahead optimization scheduling model to obtain the optimal output plan for each heat source and the heat storage and release plan for hot water storage tanks at each time period, forming a day-ahead scheduling plan for the future scheduling cycle; and continuously revising the day-ahead scheduling plan based on real-time collected system operating status data and continuously updated heat load forecast data, and issuing the revision instructions for the current time period to the control systems of each heat source and hot water storage tank for execution.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of centralized heating system operation optimization technology, specifically to a collaborative scheduling method and system for multi-heat source heating systems. Background Technology

[0002] Large-scale centralized heating systems in high-altitude and cold regions typically include multiple heat sources such as combined heat and power (CHP) units, peak-shaving boilers, electric boilers, and hot water storage tanks. The heating costs of different heat sources vary significantly: CHP units have relatively low marginal heating costs, but their heat output is rigidly constrained by the power generation load, i.e., a "heat-driven power generation" model; peak-shaving boilers have higher fuel costs; and the heating costs of electric boilers are directly related to the time-of-use electricity price. Hot water storage tanks can store heat during low-price periods and release it during high-price periods, achieving cost transfer across time periods.

[0003] Currently, load allocation for multi-source heating systems mainly relies on operator experience or manual settings based on fixed priorities. For example, combined heat and power (CHP) units are given priority for heating, with the shortfall supplemented by peak-shaving boilers and electric boilers in sequence. This approach has significant shortcomings: First, the thermal-electric decoupling constraint of combined heat and power (CHP) units has not been fully considered. During the heating season, CHP units typically operate on a "heat-driven power generation" basis, resulting in a strong coupling between heat output and electrical output. When grid peak-shaving demands require CHP units to reduce their electrical output, their heat output also decreases, potentially leading to a heating shortage. Existing dispatching methods do not incorporate this thermal-electric decoupling characteristic into optimization decisions, failing to achieve coordinated optimization between grid peak-shaving and heating supply assurance.

[0004] Second, it fails to consider the time-varying characteristics of heat source costs. Time-of-use electricity pricing in the power grid varies between peak and off-peak hours, meaning that the cost of heating electric boilers during peak hours is significantly higher than during off-peak hours. A fixed priority strategy cannot dynamically adjust the output ratio of each heat source based on real-time electricity prices, resulting in poor operational economics.

[0005] Third, the flexibility of thermal storage devices has not been fully utilized. Hot water storage tanks have the ability to regulate both heat storage and heat release, and can shift heating costs over time. However, the existing scheduling methods have failed to optimize the heat storage and release strategies of thermal storage devices in conjunction with the heat source output plan, and have failed to use thermal storage devices to create conditions for thermal-electric decoupling of cogeneration units.

[0006] Chinese invention patent CN115099593A discloses an optimized scheduling method for an integrated energy system based on a thermal storage electric boiler. However, this method is geared towards an "electric-thermal integrated energy system" that includes renewable energy power generation. Its core purpose is to absorb renewable energy power by transferring electrical load to thermal load, which is fundamentally different from the centralized heating system addressed in this invention. Specifically, the prior art simplifies the heat source to "purchasing heat from the heat grid," fails to establish differentiated output models for various types of local heat sources (combined heat and power, peak-shaving boilers, and electric boilers), and does not address the rigid coupling constraint of "heat-driven power generation" for combined heat and power units, thus failing to solve the problem of insufficient heat output caused by grid peak shaving.

[0007] Therefore, there is an urgent need for a multi-heat source load optimization allocation method that comprehensively considers the real-time cost of heat sources, the thermal-electric decoupling constraints of cogeneration units, the flexibility of thermal storage devices, and future load trends. Summary of the Invention

[0008] The purpose of this invention is to provide a collaborative scheduling method for multi-heat source heating systems to solve the problems in the prior art where multi-heat source heating scheduling is not incorporated into the cogeneration and heat-power coupling constraints, cannot coordinate grid peak shaving and heating guarantee, does not combine time-of-use electricity pricing to dynamically optimize heat source output, and the heat storage device is not jointly scheduled with the heat source, resulting in high operating costs, low heat storage utilization rate, and poor grid adaptability.

[0009] To address the aforementioned problems, this invention proposes a collaborative scheduling method for multi-heat-source heating systems. The technical solution adopted is as follows: A method for coordinated scheduling of a multi-heat-source heating system includes the following steps: Step S1: Obtain the basic parameter set for the coordinated scheduling of multi-heat source heating systems corresponding to the future scheduling cycle, including heat load forecast data for each time period, heating cost parameters of each heat source, thermoelectric coupling characteristic parameters of cogeneration units, and technical parameters of hot water storage tanks; Step S2: Based on the basic parameter set of the collaborative scheduling of multi-heat source heating system, with the objective function of minimizing the total heating cost of the system in the future scheduling cycle, construct a day-ahead optimization scheduling model that includes heat power balance constraints, upper and lower limit constraints of heat source output, thermoelectric coupling constraints of cogeneration units, and heat storage and release operation constraints of hot water storage tanks. Step S3: Solve the day-ahead optimization scheduling model to obtain the optimal output plan of each heat source and the heat storage and release plan of the hot water storage tank for each time period, and form the day-ahead scheduling plan for the future scheduling cycle; Step S4: In actual operation, based on the real-time collected system operation status data and the rolling updated heat load forecast data, the day-ahead scheduling plan is rolled out at preset execution cycles, and the correction instructions for the current period are sent to the control systems of each heat source and hot water storage tank for execution.

[0010] Furthermore, the thermoelectric coupling constraint of the combined heat and power unit specifically satisfies: The heat output of a combined heat and power (CHP) unit at any given time period shall not exceed its maximum available heat output under the current power generation load. This maximum available heat output shall be determined by the thermoelectric coupling characteristic parameters of the CHP unit. At the same time, the current power generation load of the CHP unit shall be within the range of the power generation load instruction issued by the power grid dispatch center for the corresponding time period. The construction of the thermoelectric coupling constraint of the combined heat and power unit is specifically as follows: Based on the thermoelectric coupling characteristic parameters of the cogeneration unit, it is fitted into a piecewise linear function, which is then transformed into a series of linear inequality constraints.

[0011] Furthermore, the operating constraints of the hot water storage tank include: dynamic balance constraints of heat storage, upper and lower limits constraints of heat storage, upper and lower limits constraints of heat storage power and heat release power, and mutual exclusion constraints of heat storage and heat release in the same period.

[0012] Furthermore, the expression for the mutual exclusion constraint between heat storage and heat release is:

[0013] in, For time period The corresponding 0-1 binary variable, M, is a preset positive number greater than the system's maximum heat storage and release power. , Time periods The planned values ​​of heat storage power and heat release power of the hot water storage tank.

[0014] Furthermore, the objective function is:

[0015] in, , , These are combined heat and power units, peak-shaving boilers, and electric boilers during specific time periods. The planned value of heat output, Where is the duration of the time period; T is the number of time periods included in the future scheduling cycle. For the heating cost of combined heat and power units, For the heating cost of electric boilers, The heating cost of peak-shaving boilers.

[0016] Furthermore, the day-ahead scheduling plan includes: Planned thermal output and corresponding power generation load of cogeneration units for each time period; Planned heat output values ​​of peak-shaving boilers for each time period; Planned heat output values ​​of electric boilers for each time period; Planned values ​​of heat storage power and heat release power of the hot water storage tank for each time period, as well as the planned value of heat storage at the end of each time period.

[0017] Further, in step S4, the rolling correction of the day-ahead scheduling plan specifically includes: (1) At the beginning of each preset execution cycle, collect the system operation status data for the current period, including the actual output of each heat source, the actual heat storage of the hot water tank and the actual heat load, as well as the latest power generation load instructions of the cogeneration unit issued by the power grid dispatch center; (2) Based on the latest meteorological forecasts and system operation status data, the heat load forecast data for the next 4 to 8 periods are updated on a rolling basis; (3) Calculate the deviation between the actual heat load and the predicted heat load data for the current period, and correct the predicted heat load for subsequent periods according to the preset feedback correction coefficient to obtain the corrected predicted heat load. (4) Using the current system operating status data as the initial condition and the corrected heat load forecast value as input, the day-ahead optimization scheduling model is re-solved to obtain the scheduling instruction sequence for several time periods in the future scheduling cycle; (5) Extract the current time period's scheduling instruction from the scheduling instruction sequence of several time periods in the future scheduling cycle as a correction instruction and send it to the control systems of each heat source and hot water storage tank for execution.

[0018] Furthermore, the corrected predicted heat load value is:

[0019] in, Based on the latest meteorological data, in time period For future time periods The re-predicted heat load forecast, The preset feedback correction coefficient, For time period The deviation between the actual heat load and the predicted heat load.

[0020] Furthermore, the day-ahead optimization scheduling model is a mixed-integer linear programming model, which is solved using the branch and bound method, a commercial solver, or an open-source solver.

[0021] This invention also proposes a system for implementing a collaborative scheduling method for multi-heat-source heating systems, comprising: The data acquisition module is used to obtain the basic parameter set for the coordinated scheduling of multi-heat source heating systems corresponding to future scheduling cycles, including the total heat load forecast value for each time period, heating cost parameters of each heat source, thermoelectric coupling characteristic parameters of cogeneration units, and technical parameters of hot water storage tanks; The day-ahead optimization scheduling model building module is used to construct a day-ahead optimization scheduling model based on the basic parameter set of collaborative scheduling of multi-heat source heating systems, with the objective function of minimizing the total heating cost of the system within the future scheduling cycle. This model includes constraints on heat power balance, upper and lower limits of heat source output, thermoelectric coupling constraints of cogeneration units, and heat storage and release operation constraints of hot water storage tanks. The day-ahead scheduling plan generation module is used to solve the day-ahead optimized scheduling model to obtain the optimal output plan of each heat source and the heat storage and release plan of the hot water storage tank for each time period, and to form the day-ahead scheduling plan for the future scheduling cycle. The rolling correction execution module is used to, during actual operation and within the execution cycle, to continuously correct the day-ahead scheduling plan based on real-time collected system operating status data and rolling updated heat load forecast data, and to issue correction instructions for the current period to the control systems of each heat source and hot water storage tank for execution.

[0022] Compared with the prior art, this application has the following beneficial effects: (1) Significantly reduce heating operation costs. By introducing the heating cost parameters of each heat source from the time-of-use electricity price signal, a quantitative cost basis is provided for the allocation of multiple heat source loads. The day-ahead optimization scheduling model is constructed with the goal of minimizing the total heating cost of the system within the scheduling cycle, and the operation constraints of the hot water storage tank are introduced to give the system the ability to transfer heat energy across time periods. The model is globally optimized and solved to automatically form the optimal scheduling strategy of "electric boilers prioritize heating during the low electricity price period, excess heat is stored in the hot water storage tank, and the hot water storage tank releases heat to supplement the supply during the peak electricity price period". This realizes the time shift and overall optimization of heating costs, effectively reducing the comprehensive heating cost of the system throughout the entire cycle.

[0023] (2) Achieve synergy between cogeneration units and grid peak shaving. The thermoelectric coupling constraint of "heat-driven power generation" of cogeneration units is incorporated into the optimization model. When the grid peak shaving requires a reduction in the unit's power generation load, the optimization model automatically calculates the heat output deficit and calls upon the hot water storage tank or adjusts other heat sources for compensation. Under the premise of ensuring heating safety, the grid peak shaving response capability is improved, and the grid adaptability of cogeneration units and the utilization efficiency of heat storage devices are enhanced.

[0024] (3) Improve the utilization rate of thermal storage devices. The thermal storage and release operation constraints of the hot water storage tank are incorporated into the unified optimization framework of multiple heat sources, so that it can take into account both the dual functions of "peak-valley price difference arbitrage" and "thermal-electric decoupling buffer", and the daily average number of cycles and utilization rate of thermal storage devices are significantly improved.

[0025] (4) The system is robust. A rolling optimization and feedback correction mechanism is established. Based on the real-time collected system operation status data and the rolling updated heat load prediction data, the daily scheduling plan is continuously corrected and only the execution instructions for the current period are issued. This forms a closed-loop control mechanism of status acquisition, prediction update, deviation correction, re-optimization and instruction issuance. It can effectively offset the influence of heat load prediction deviation and various real-time disturbances, and ensure that the system always operates in the optimization range. It has strong adaptability to operating conditions and operational stability. Attached Figure Description

[0026] Figure 1 This is a flowchart illustrating the collaborative scheduling method for multi-heat source heating systems according to the present invention. Detailed Implementation

[0027] The embodiments of this application are described in detail below. Examples of these embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and intended to explain this application, and should not be construed as limiting this application.

[0028] It should be noted that the terms "first," "second," etc., in the specification, claims, and accompanying drawings of this invention are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be interchanged where appropriate so that the embodiments of the invention described herein can be implemented in orders other than those illustrated or described herein. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover a non-exclusive inclusion; for example, a process, method, system, product, or apparatus that comprises a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to such processes, methods, products, or apparatus.

[0029] The following describes a method and system for coordinated scheduling of a multi-heat source heating system according to embodiments of this application, with reference to the accompanying drawings.

[0030] The following is combined with Figure 1 This application provides a detailed description of the collaborative scheduling method for multi-heat source heating systems.

[0031] The method provided by this invention is applicable to multi-source centralized heating systems comprising at least one combined heat and power unit, at least one peak-shaving boiler, at least one electric boiler, and at least one hot water storage tank. The method is implemented by running an optimization computing server deployed in the heating dispatch center, and is connected to the local control systems of each heat source (such as DCS or PLC control systems) and the hot water storage tank control system via an industrial communication network (such as industrial Ethernet).

[0032] Step 1: Obtain the basic parameter set for the coordinated scheduling of the multi-heat source heating system corresponding to the future scheduling cycle, including the total heat load forecast value for each time period, the heating cost parameters of each heat source, the thermoelectric coupling characteristic parameters of the cogeneration unit, and the technical parameters of the hot water storage tank.

[0033] Specifically, obtain the following data for future scheduling cycles: (1) Total heat load forecast for each period Where T is the number of time periods included in the scheduling cycle. The total heat load forecast for each time period is provided by the existing heat load forecasting system. In actual engineering, it can be obtained based on historical operating data and meteorological forecast data, using existing forecasting methods such as regression analysis, time series analysis, or neural network analysis. For heating companies that do not have an automatic forecasting system, the heat load forecast for each time period can also be manually entered by operators based on experience and weather forecasts.

[0034] The future scheduling cycle length is set according to actual operational needs, typically 24 hours. The granularity of time periods is set according to system scale and scheduling accuracy requirements, generally 15 minutes or 30 minutes. or The corresponding time period lengths Δt are 0.25 hours or 0.5 hours, respectively.

[0035] (2) Heating cost parameters for each heat source: Heating costs of peak-shaving boilers The average heating cost is calculated based on the lower heating value of the fuel (coal or gas), the fuel purchase price, and the rated thermal efficiency of the boiler, with the unit being yuan / GJ. If the system includes multiple peak-shaving boilers with different efficiencies, their respective average heating costs can be calculated separately.

[0036] Heating costs of electric boilers With respect to the time-of-use electricity prices published by the power grid company and the rated electrothermal conversion efficiency of electric boilers The relevant formula is as follows:

[0037] In practical applications, the electrothermal conversion efficiency of electric boilers is usually taken as 0.95~0.99, while the electrothermal conversion efficiency of thermal storage electric boilers can be approximated as close to 1 under thermal storage conditions.

[0038] Heating costs of combined heat and power units The value is determined by fitting test data of the unit's thermodynamic characteristics. In practical applications, the electrothermal conversion efficiency of electric boilers is usually taken as 0.95~0.99, while the electrothermal conversion efficiency of thermal storage electric boilers under thermal storage conditions can be approximated as close to 1.

[0039] (3) Thermoelectric coupling characteristic parameters of the cogeneration unit, i.e., the maximum available heat output data of the cogeneration unit under different power generation loads. The thermoelectric coupling characteristic parameters of the cogeneration unit are important basic data of this invention. These parameters reflect the correspondence between the power generation load and the available heat output of the unit in the "heat-determined power" operation mode, and also reflect the operating constraint boundary of the cogeneration unit in the "heat-determined power" mode. In actual engineering, this data can be obtained from the following sources: (a) Thermal condition diagrams or thermal characteristic curves provided by the unit manufacturer; (b) On-site thermal performance test report of the unit; (c) Regression fitting results of historical operating data of the unit.

[0040] This coupling characteristic typically manifests as follows: as the power generation load decreases, the amount of steam extracted by the unit decreases, resulting in a linear or nonlinear decrease in the available heat output. Taking a typical extraction-condensing cogeneration unit as an example, its upper limit of heat output is approximately linearly positively correlated with its electrical output, which can be described by a piecewise linear function.

[0041] (4) Technical parameters of the hot water storage tank, including maximum heat storage capacity Thermal storage power Heat dissipation power Thermal storage efficiency and heat release efficiency and the initial heat storage at the start of the scheduling cycle. The parameters are obtained from the equipment nameplate or performance test results. Among these, the thermal storage efficiency... and heat release efficiency In practical engineering, a value of 0.90 to 0.98 is typically used, with the specific value determined based on the insulation performance of the hot water storage tank and the actual operating temperature difference. Initial heat storage The heat value can be obtained by converting the data monitored by the temperature sensor inside the hot water storage tank: based on the measured temperature distribution inside the tank (usually the average temperature of three points on the top, middle and bottom of the tank) and the effective volume of the tank, the current stored heat value can be calculated.

[0042] If the system contains multiple units of the same type (such as two combined heat and power units or three peak-shaving boilers), one of the following two approaches can be adopted according to actual needs: (a) Multiple devices of the same type are aggregated into one equivalent device. The upper and lower limits of the output after aggregation are the sum of the output of each individual device. The cost parameters are calculated by weighted average. (b) Establish output variables and constraints for each piece of equipment to obtain more refined scheduling results.

[0043] Method (b) yields better optimization results, but involves more decision variables and constraints, resulting in a slight increase in solution time. In practical engineering, the appropriate method can be chosen flexibly based on the system size and solution time requirements.

[0044] (5) The range of power generation load instructions for cogeneration units issued by the power grid dispatch center for each time period is as follows:

[0045] During periods of low grid load, the lower limit of this range may be set at a lower level, requiring units to perform deep peak shaving. In terms of actual communication methods, this data can be received through the grid dispatch data network, or it can be manually entered by operators into the dispatch system according to grid dispatch telephone instructions.

[0046] Step 2: Based on the basic parameter set for the collaborative scheduling of multi-heat-source heating systems, and with the objective function of minimizing the total heating cost of the system within the future scheduling cycle, a day-ahead optimization scheduling model is constructed. This model includes constraints on heat power balance, upper and lower limits of heat source output, thermoelectric coupling constraints of cogeneration units, and heat storage and release operation constraints of hot water storage tanks. The day-ahead optimization scheduling model is a mixed-integer linear programming model, solved using the branch-and-bound method, a commercial solver, or an open-source solver.

[0047] Specifically, the objective function is:

[0048] in, , , These are combined heat and power units, peak-shaving boilers, and electric boilers during specific time periods. The planned value of heat output, Where is the duration (in hours), and T is the number of durations included in the future scheduling cycle. For the heating cost of combined heat and power units, For the heating cost of electric boilers, The heating cost of peak-shaving boilers.

[0049] In one specific embodiment, the model building process is completed on the scheduling center's optimized computing server, which can be achieved in the following way: (a) Modeling by directly calling optimization toolboxes or optimization libraries (such as MATLAB's intlinprog function, Python's PuLP library or Pyomo library) in scientific computing environments such as MATLAB and Python; (b) Use a commercial modeling language (such as GAMS, AMPL) to write the model and then call the solver to solve it; (c) Use the modeling interface provided by the solver (such as the Python interface of Gurobi or the C++ interface of CPLEX) to model directly.

[0050] Regardless of the approach used, a standardized mixed-integer linear programming mathematical model is ultimately formed. The size of the model depends on the number of heat sources in the system and the number of scheduling periods. Taking a system with 3 types of heat sources, 1 hot water storage tank, and 96 scheduling periods as an example, the number of decision variables is approximately 500-800, and the number of constraints is approximately 400-600, which falls under the category of small- to medium-scale optimization problems.

[0051] Upper limit of the output variables of each heat source in the model The settings are based on the rated capacity and current availability of the equipment. If a heat source is unavailable due to maintenance or malfunction, its corresponding output limit is set to zero. Furthermore, if a heat source has an output change rate limitation (i.e., a ramp rate constraint), corresponding linear constraints can be added to the model.

[0052] The constraints for optimizing the scheduling model include: (1) Thermal power balance constraint: The sum of the output of all heat sources and the net heat release of the hot water storage tank in each time period meets the total heat load demand:

[0053] in, , Time periods The planned values ​​of heat storage power and heat release power of the hot water storage tank. , , These are combined heat and power units, peak-shaving boilers, and electric boilers during specific time periods. The planned value of thermal output.

[0054] (2) Upper and lower limits of heat source output constraints:

[0055] The upper limit of the output of each heat source is set according to the rated capacity of the equipment and its current availability (whether it is under maintenance or has a fault), while the lower limit is set according to the minimum load requirement for stable operation of the equipment.

[0056] (3) Thermoelectric coupling constraints of cogeneration units: The specific thermoelectric coupling constraints of combined heat and power units must meet: The heat output of a combined heat and power (CHP) unit at any given time period must not exceed its maximum available heat output under the current power generation load. This maximum available heat output is determined by the CHP unit's thermoelectric coupling characteristic parameters. Simultaneously, the current power generation load of the CHP unit must be within the range of the corresponding time period power generation load command issued by the power grid dispatch center, as shown in the following formula:

[0057] in, For combined heat and power units at a given power generation load The maximum available heat output is determined by the thermoelectric coupling characteristic parameters obtained in step S1. Simultaneously, the current generating load of the cogeneration unit must be within the range of the corresponding time-period generating load command issued by the grid dispatch center.

[0058] This constraint embodies the core innovation of the invention: when the power grid dispatch center requires the cogeneration unit to reduce its power generation load, its upper limit of heat output is reduced accordingly, and the heat supply gap must be filled by other heat sources or hot water storage tanks, thereby coordinating and optimizing the power grid peak-shaving demand with heat source dispatch.

[0059] The specific construction of the thermoelectric coupling constraint of the combined heat and power unit is as follows: Based on the thermoelectric coupling characteristic parameters of the cogeneration unit, they are fitted into piecewise linear functions, which are then transformed into a series of linear inequality constraints. For example, if the thermoelectric coupling characteristic parameters of the cogeneration unit are described by K linear pieces, then they are transformed into K linear constraint conditions.

[0060] (4) Constraints on the operation of hot water storage tanks: The constraints on the operation of hot water storage tanks include: dynamic balance constraints on the amount of stored heat, upper and lower limits constraints on the amount of stored heat, upper and lower limits constraints on the power of stored heat and the power of released heat, and mutual exclusion constraints on stored heat and released heat during the same period.

[0061] The dynamic equilibrium equation for heat storage corresponding to the dynamic equilibrium constraint is:

[0062] Upper and lower limits of heat storage constraints:

[0063] The lower limit of the heat storage capacity of hot water storage tanks is The upper limit of heat storage is taken as the maximum heat storage capacity. The level should be 85% to ensure safe operation of the unit and to reserve some emergency adjustment space. If the hot water storage tank has a minimum working liquid level requirement, then... The value is taken for the heat storage corresponding to the low working liquid level.

[0064] Upper and lower limits constraints on thermal storage power and thermal release power:

[0065] The mutual exclusion constraint between heat storage and heat release during the same period is expressed as follows:

[0066] in, For time period The corresponding 0-1 binary variable, M, is a preset positive number greater than the system's maximum heat storage and release power, for example, 10. 6 In engineering implementation, the value of M should not be too large to avoid numerical stability issues. It is usually sufficient to take a value of 10 to 100 times the maximum heat storage and release power. , Time periods The planned values ​​for heat storage power and heat release power of the hot water storage tank. Heat storage and heat release cannot occur simultaneously; this is addressed by introducing 0-1 variables. accomplish, When =1, only heat storage is allowed. When =0, only heat release is allowed.

[0067] Step 3: Solve the day-ahead optimization scheduling model to obtain the optimal output plan for each heat source and the heat storage and release plan for the hot water storage tank in each time period, thus forming the day-ahead scheduling plan for the future scheduling cycle.

[0068] Specifically, the current optimization scheduling model is a mixed-integer linear programming problem, which can be solved in the following way: (1) In cases where commercial solvers are not available, the branch and bound method combined with the cutting plane method can be programmed independently. (2) Use commercial solvers such as IBM CPLEX, Gurobi, and FICO Xpress to solve the problem. These solvers have excellent performance in solving mixed integer linear programming problems. (3) Call open-source solvers such as SCIP and CBC to solve the problem, which is suitable for cost-sensitive projects.

[0069] The solution is performed on the optimization computing server deployed in the heating dispatch center. For the model size of this invention, the solution time for a single operation is generally in the range of several seconds to tens of seconds, which fully meets the time requirements of both day-ahead scheduling (allowing for tens of minutes of computation time) and intraday rolling optimization (requiring a solution time of several minutes).

[0070] After the solution is completed, the optimization computing server outputs a complete day-ahead scheduling plan, including: Planned thermal output values ​​of cogeneration units for each time period and the corresponding power generation load value ; Planned heat output values ​​of peak-shaving boilers for each time period ; Planned heat output values ​​of electric boilers for each time period ; Planned thermal storage capacity of hot water storage tanks for each time period and planned value of heat release power ), and the planned value of heat storage at the end of each period. ; To form a day-ahead scheduling plan for the next scheduling cycle (usually 24 hours).

[0071] The aforementioned scheduling plan is displayed in tabular or graphical form on the human-machine interface of the scheduling center for operators to review and confirm. Operators can manually fine-tune the optimization results based on practical experience (e.g., adjusting the upper and lower limits of a heat source's output due to temporary changes in equipment status and then resolving the problem). The system supports a working mode that combines manual intervention and automatic optimization.

[0072] During the initial or transitional phase of system operation, optimization results must be confirmed by operators before being issued for execution. Once the system is running stably and operators have developed sufficient trust in the optimization results, the computer system can automatically issue and execute the results, achieving fully automated closed-loop scheduling.

[0073] Step 4: In actual operation, based on the real-time collected system operation status data and the rolling updated heat load forecast data, the daily scheduling plan is revised on a rolling basis with a preset execution cycle as the interval, and the revision instructions for the current period are sent to the control systems of each heat source and hot water storage tank for execution.

[0074] Since there are inevitably some errors in heat load forecasting, and the actual power generation load of cogeneration units may deviate from the day-ahead plan due to changes in grid demand, an intraday rolling correction mechanism must be adopted.

[0075] Specifically, the rolling revision of the day-ahead scheduling plan includes: (1) With an execution cycle of 15 to 30 minutes, at the beginning of each execution cycle, the system operation status data for the current period is collected through the industrial communication network, including the current actual output of each heat source, the current actual heat storage and actual heat load of the hot water storage tank, and the latest power generation load instructions issued by the power grid dispatch center for the cogeneration unit; among which, the current actual heat storage of the hot water storage tank is calculated by the temperature distribution inside the tank; the actual heat load is calculated by the supply and return water temperature and flow rate of the heating pipeline network; (2) Based on the latest meteorological forecasts and system operation status data, the same forecasting method as the previous forecast is used to continuously update the heat load forecast data for the next 4 to 8 periods; (3) Calculate the deviation between the actual heat load and the predicted heat load data for the current period. ,like If the load exceeds a preset threshold (e.g., 3% of the maximum heat load), a correction mechanism is triggered; the heat load forecast value for subsequent periods is corrected according to a preset feedback correction coefficient to obtain a corrected heat load forecast value, which is used to correct the scheduling instructions for subsequent periods. (4) Using the current system operating status data as the initial condition and the corrected heat load forecast value as input, the day-ahead optimization scheduling model is solved again to obtain the scheduling instruction sequence for several time periods in the future scheduling cycle; Unlike day-ahead optimization, the optimization time domain of rolling optimization is only the next 4 to 8 time periods (rather than the entire 24 hours), so the solution speed is faster and can be completed in a few seconds; (5) Extract the scheduling instruction for the current period from the scheduling instruction sequence of several time periods in the future scheduling cycle as a correction instruction, and send it to the local control system (DCS or PLC) of each heat source and the control system of the hot water storage tank through industrial communication protocols (such as Modbus TCP, OPC UA or IEC 104).

[0076] Each local control system receives instructions through the industrial communication network and uses PID controllers or other control loops to adjust the actuators (such as boiler burners, electric boiler power regulators, and inlet and outlet valves of storage tanks) so that the actual output tracks the command value.

[0077] (6) Wait for the next cycle: The system waits for the next execution cycle to arrive and repeats the above steps.

[0078] By combining the above-mentioned rolling optimization and feedback correction, a closed-loop control mechanism of "prediction-optimization-execution-feedback" is formed, which effectively eliminates the influence of prediction deviation and random disturbances, while avoiding equipment wear and shortened lifespan caused by frequent and large-scale equipment adjustments. It ensures both optimization effect and equipment operation safety.

[0079] Specifically, the corrected heat load prediction value is:

[0080] in, Based on the latest meteorological data, in time period For future time periods The re-predicted heat load forecast, The preset feedback correction coefficient (between 0 and 1, usually 0.6 to 0.8) For time period The deviation between the actual heat load and the predicted heat load.

[0081] In practical engineering applications, the rolling optimization cycle can be flexibly adjusted according to the system scale and communication conditions. For large and complex systems, the cycle can be 15 minutes; for small and simple systems, the cycle can be extended to 30 minutes or even 1 hour.

[0082] In another embodiment, (1) if the heat storage capacity of the hot water tank reaches the lower limit Furthermore, when the combined heat and power (CHP) unit is still operating at low load due to grid peak-shaving requirements, resulting in insufficient heat output, the optimization model will force the peak-shaving boiler to be activated to make up for the heat load gap, thus ensuring heating safety. In this case, the system prioritizes safety first, followed by economic efficiency.

[0083] (2) If the grid peak-shaving command changes unexpectedly (such as emergency load shedding due to grid failure) and exceeds the preset range of the previous day plan, the system will immediately trigger the emergency dispatch mode: relax the thermoelectric coupling constraint of the cogeneration unit to the actual maximum heat output corresponding to the current power generation load, and at the same time force the peak-shaving boiler to start and rise to full load at the fastest rate, and the hot water storage tank releases heat at maximum power to ensure that the user's heating is not affected.

[0084] (3) If a heat source trips due to a sudden failure, the system will automatically identify the failure status and set the upper limit of the output of the heat source to zero, re-solve the optimization model, and share the output deficit of the failed heat source with other available heat sources and hot water storage tanks, and quickly issue the adjusted instructions for execution.

[0085] This application also provides a system for implementing the above-described multi-heat-source heating system coordinated scheduling method, comprising: The data acquisition module is used to obtain the basic parameter set for the coordinated scheduling of multi-heat source heating systems corresponding to future scheduling cycles, including the total heat load forecast value for each time period, heating cost parameters of each heat source, thermoelectric coupling characteristic parameters of cogeneration units, and technical parameters of hot water storage tanks; The day-ahead optimization scheduling model building module is used to construct a day-ahead optimization scheduling model based on the basic parameter set of collaborative scheduling of multi-heat source heating systems, with the objective function of minimizing the total heating cost of the system within the future scheduling cycle. This model includes constraints on heat power balance, upper and lower limits of heat source output, thermoelectric coupling constraints of cogeneration units, and heat storage and release operation constraints of hot water storage tanks. The day-ahead scheduling plan generation module is used to solve the day-ahead optimized scheduling model to obtain the optimal output plan of each heat source and the heat storage and release plan of the hot water storage tank for each time period, and to form the day-ahead scheduling plan for the future scheduling cycle. The rolling correction execution module is used to, during actual operation and within the execution cycle, to continuously correct the day-ahead scheduling plan based on real-time collected system operating status data and rolling updated heat load forecast data, and to issue correction instructions for the current period to the control systems of each heat source and hot water storage tank for execution.

[0086] This invention can significantly reduce the overall operating cost of the heating system by making full use of the cost differences of various heat sources, the flexibility of the heat storage device, and the thermoelectric decoupling capability of the cogeneration unit, while meeting the heating load demand. At the same time, it can improve the grid peak-shaving response capability of the cogeneration unit and the safety and robustness of the system operation, and has good engineering application value.

[0087] The above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention. The scope of patent protection of the present invention shall be determined by the claims. Similarly, any equivalent structural changes made based on the description and drawings of the present invention shall also be included within the scope of protection of the present invention.

Claims

1. A multi-heat-source heat supply system cooperative scheduling method, characterized in that, Includes the following steps: Step S1: Obtain the basic parameter set for the coordinated scheduling of multi-heat source heating systems corresponding to the future scheduling cycle, including heat load forecast data for each time period, heating cost parameters of each heat source, thermoelectric coupling characteristic parameters of cogeneration units, and technical parameters of hot water storage tanks; Step S2: Based on the basic parameter set of the collaborative scheduling of multi-heat source heating system, with the objective function of minimizing the total heating cost of the system in the future scheduling cycle, construct a day-ahead optimization scheduling model that includes heat power balance constraints, upper and lower limit constraints of heat source output, thermoelectric coupling constraints of cogeneration units, and heat storage and release operation constraints of hot water storage tanks. Step S3: Solve the day-ahead optimization scheduling model to obtain the optimal output plan of each heat source and the heat storage and release plan of the hot water storage tank for each time period, and form the day-ahead scheduling plan for the future scheduling cycle; Step S4: In actual operation, based on the real-time collected system operation status data and the rolling updated heat load forecast data, the day-ahead scheduling plan is rolled out at preset execution cycles, and the correction instructions for the current period are sent to the control systems of each heat source and hot water storage tank for execution.

2. The method of claim 1, wherein The thermoelectric coupling constraint of the cogeneration unit specifically satisfies: The heat output of a combined heat and power (CHP) unit at any given time period shall not exceed its maximum available heat output under the current power generation load. This maximum available heat output shall be determined by the thermoelectric coupling characteristic parameters of the CHP unit. At the same time, the current power generation load of the CHP unit shall be within the range of the power generation load instruction issued by the power grid dispatch center for the corresponding time period. The construction of the thermoelectric coupling constraint of the combined heat and power unit is specifically as follows: Based on the thermoelectric coupling characteristic parameters of the cogeneration unit, it is fitted into a piecewise linear function, which is then transformed into a series of linear inequality constraints.

3. The method of claim 1, wherein, The constraints on the operation of the hot water storage tank include: dynamic balance constraints on the amount of stored heat, upper and lower limits constraints on the amount of stored heat, upper and lower limits constraints on the power of stored heat and the power of released heat, and mutual exclusion constraints on stored heat and released heat during the same period.

4. The method of claim 3, wherein, The expression for the mutual exclusion constraint between heat storage and heat release is: wherein, is a time period is a corresponding 0-1 binary variable, and M is a preset positive number greater than the maximum heat storage power of the system, , is a time period is a heat storage power plan value and a heat release power plan value of the thermal storage water tank.

5. The method of claim 1, wherein, The objective function is: wherein, , , are the heat output planning values of the combined heat and power unit, the peak shaving boiler and the electric boiler in the time period , is the time period length, T is the number of time periods contained in the future dispatch period, is the heat supply cost of the combined heat and power unit, is the heat supply cost of the electric boiler, is the heat supply cost of the peak shaving boiler.

6. The method of claim 1, wherein, The day-ahead scheduling plan includes: Planned thermal output and corresponding power generation load of cogeneration units for each time period; Planned heat output values ​​of peak-shaving boilers for each time period; Planned heat output values ​​of electric boilers for each time period; Planned values ​​of heat storage power and heat release power of the hot water storage tank for each time period, as well as the planned value of heat storage at the end of each time period.

7. The method of claim 1, wherein, In step S4, the rolling correction of the day-ahead scheduling plan specifically includes: (1) At the beginning of each preset execution cycle, collect the system operation status data for the current period, including the actual output of each heat source, the actual heat storage of the hot water tank and the actual heat load, as well as the latest power generation load instructions of the cogeneration unit issued by the power grid dispatch center; (2) Based on the latest meteorological forecasts and system operation status data, the heat load forecast data for the next 4 to 8 periods are updated on a rolling basis; (3) Calculate the deviation between the actual heat load and the predicted heat load data for the current period, and correct the predicted heat load for subsequent periods according to the preset feedback correction coefficient to obtain the corrected predicted heat load. (4) taking the current period system operation state data as the initial condition, taking the corrected heat load prediction value as the input, re-solving the day-ahead optimal scheduling model to obtain the scheduling instruction sequence of several periods in the future scheduling period; (5) extracting the scheduling instruction of the current period from the scheduling instruction sequence of several periods in the future scheduling period as the correction instruction, and issuing it to each heat source and thermal storage tank control system for execution.

8. The method of claim 7, wherein, The corrected heat load prediction value is: wherein, is a heat load prediction value based on the latest weather data at the time period is a heat load prediction value based on the latest weather data at the time period is a re-predicted heat load prediction value, is a preset feedback correction coefficient, is a time period is a deviation of the actual heat load at the time from the heat load prediction value. 9.The method of claim 1, wherein, The day-ahead optimal scheduling model is a mixed integer linear programming model, which is solved by branch and bound method, or by commercial solver or open source solver.

10. A multi-heat-source heat supply system cooperative scheduling system, characterized by, It comprises: The data acquisition module is used to obtain the multi-heat source heating system cooperative scheduling basic parameter set corresponding to the future scheduling period, including the total heat load prediction value of each period, the heat supply cost parameter of each heat source, the heat and electricity coupling characteristic parameter of the cogeneration unit and the technical parameter of the thermal storage tank; The day-ahead optimal scheduling model establishment module is used to construct the day-ahead optimal scheduling model containing the heat power balance constraint, the upper and lower limit constraint of the heat source output, the heat and electricity coupling constraint of the cogeneration unit and the heat storage and release operation constraint of the thermal storage tank based on the multi-heat source heating system cooperative scheduling basic parameter set, taking the minimum total heat supply cost of the future scheduling period as the objective function; The day-ahead scheduling plan generation module is used to solve the day-ahead optimal scheduling model to obtain the optimal output plan of each heat source and the heat storage and release plan of the thermal storage tank in each period, forming the day-ahead scheduling plan of the future scheduling period; The rolling correction execution module is used to rollingly correct the day-ahead scheduling plan based on the real-time collected system operation state data and the rolling updated heat load prediction data in the actual operation, and issue the correction instruction of the current period to each heat source and thermal storage tank control system for execution.

Citation Information

Patent Citations

  • Comprehensive energy system optimal scheduling method and device based on heat storage electric boiler

    CN115099593A