Air conditioner feedforward control method, device, medium and air conditioner

By acquiring the total delay time and future load curve, and combining it with the hydraulic transmission delay of the air conditioning water system, feedforward control is performed, which solves the lag problem in the traditional air conditioning control logic and achieves precise load regulation and energy consumption reduction of the air conditioning system.

CN123154448APending Publication Date: 2026-11-24TCL AIR CONDITIONER ZHONGSHAN CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611593805.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-14
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Traditional air conditioning control logic relies on feedback control, which can lead to overshooting or undershooting of indoor temperature, exhibiting significant lag.

Method used

By acquiring the total delay time and future load curve, the unsteady heat transfer model is used to predict future load demand. Combined with the hydraulic transmission delay of the air conditioning water system, feedforward control is performed to adjust the air conditioning operating parameters in advance to meet the load demand.

Benefits of technology

It enables the air conditioning system to make precise adjustments before load changes, avoiding over-adjustment and under-adjustment of indoor temperature and reducing energy consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123154448A_ABST
    Figure CN123154448A_ABST
Patent Text Reader

Abstract

This invention discloses an air conditioning feedforward control method, device, medium, and air conditioner. First, the total delay time and future load curve are acquired. The total delay time precisely quantifies the entire time required from the execution of the control command to the actuator and from the energy change resulting from the command actually beginning to affect the load change. Based on this, the future operating parameters for each future time point are solved using the load demand indicated by the future load curve as a constraint and meeting user needs as the objective, thereby transforming the control decision from feedback control to feedforward control. Finally, a control command matching the future operating parameters at the second time point is executed at the first time point, ensuring that the air conditioner's output heat exchange at the second time point precisely meets the load demand at that time, achieving precise alignment between the control command and load changes. Therefore, the system can complete proactive adjustment before the indoor temperature deviates from its actual value, fundamentally avoiding the adjustment lag caused by passively responding only after a deviation occurs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of air conditioning technology, and in particular to an air conditioning feedforward control method, device, medium, and air conditioner. Background Technology

[0002] Traditional air conditioning control logic still primarily relies on current environmental parameters (such as indoor temperature and return air temperature) as triggering conditions, essentially belonging to a typical feedback control method. In this mode, the system typically adjusts the actuators (such as valve opening and fan frequency) to change the system output only after the indoor temperature has deviated from the target value.

[0003] However, since the control action relies on a passive response after the deviation occurs, it has obvious lag and is prone to overshooting or undershooting of indoor temperature. Summary of the Invention

[0004] Therefore, it is necessary to provide air conditioning feedforward control methods, devices, media, and air conditioners to solve the problem that existing technologies have obvious lag, which easily leads to over-adjustment or under-adjustment of indoor temperature.

[0005] In a first aspect, embodiments of this application provide an air conditioning feedforward control method, the method comprising: Obtain the total delay time and future load curve; wherein, the total delay time is the time required from the execution of the control command to the time it affects the load change, and the future load curve is used to characterize the trend of load demand change over time after the current moment; Under the premise of meeting the load demand indicated by the future load curve, the target operating parameters of the air conditioner are solved with the goal of meeting the set operating parameter preferences, so as to obtain the future operating parameters corresponding to the load demand at each moment in the future load curve; At a first time, control commands matching the future operating parameters at a second time are executed so that the output heat exchange of the air conditioner at the second time meets the load demand of the future load curve at the second time; wherein, the second time is the sum of the first time and the total delay time.

[0006] In some embodiments of this application, the method for obtaining the total delay time includes: Unsteady-state heat transfer solutions are performed on the geometric and thermal properties of the building envelope to obtain the thermal delay time of the building envelope; wherein, the thermal delay time of the building envelope represents the time required for outdoor thermal disturbances to be transmitted to the indoor side through the building envelope and begin to affect load changes. Hydraulic transmission calculations are performed on the piping and flow parameters of the air conditioning water system to obtain the hydraulic transmission delay time; wherein, the hydraulic transmission delay time characterizes the time required for air conditioning water to flow from the cold / heat source side to the terminal equipment and begin to affect load changes; The thermal delay of the enclosure structure and the hydraulic transmission delay are combined to obtain the total delay time.

[0007] In some embodiments of this application, the geometric parameters include the equivalent thickness of each layer of the enclosure structure, and the thermal properties include the thermal conductivity, density, and specific heat capacity of each layer of the enclosure structure. The step of performing unsteady-state heat transfer calculations on the geometric and thermal properties of the enclosure structure to obtain the thermal delay time of the enclosure structure includes: Divide the thermal conductivity of each layer of the building envelope by the product of the density and specific heat capacity of the same layer of the building envelope to obtain the thermal diffusivity of each layer of the building envelope. An open calculation is performed on the ratio of the daily periodic angular frequency to the thermal diffusivity of each layer of the building envelope, and then multiplied by the equivalent thickness of each layer of the building envelope to obtain the phase lag angle of each layer of the building envelope. Divide the phase lag angle of each building envelope by the daily period angular frequency to obtain the thermal delay time of each building envelope. The thermal delay time of the building envelope is obtained by summing the thermal delay times of each layer of the building envelope.

[0008] In some embodiments of this application, the piping parameters include the total length of the most unfavorable loop, and the water flow parameters include the average water flow velocity within the most unfavorable loop, wherein the most unfavorable loop represents the water circulation loop from the outlet of the cold or heat source to the farthest end device. The calculation of hydraulic transmission time for the piping and flow parameters of the air conditioning water system to obtain the hydraulic transmission delay time includes: Divide the total length by the average water flow velocity to obtain the hydraulic foundation delay time. Obtain the valve actuator response time and sensor sampling delay time; The hydraulic foundation delay time, the valve actuator response time, and the sensor sampling delay time are added together to obtain the hydraulic transmission delay time.

[0009] In some embodiments of this application, the fusion of the thermal delay of the enclosure structure and the hydraulic transmission delay to obtain the total delay time includes: Divide the thermal delay of the enclosure structure by the sum of the thermal delay of the enclosure structure and the hydraulic transmission delay to obtain the first coupling coefficient; Subtracting the first coupling coefficient from the first value yields the second coupling coefficient; The total delay time is obtained by multiplying the first coupling coefficient by the thermal delay of the enclosure structure, the second coupling coefficient by the hydraulic transmission delay, and the safety margin.

[0010] In some embodiments of this application, the future load curve is predicted by an unsteady-state heat transfer model; Before obtaining the total delay time and future load curve, the process also includes: Obtain the historical load prediction curves predicted by the unsteady heat transfer model, and the corresponding historical load measured curves; Using the historical load prediction curve as input and the residual between the historical load prediction curve and the historical load measured curve as output, a load residual correction model is trained. After obtaining the total delay time and future load curve, the process also includes: The future load curve is input into the load residual correction model to obtain the residual correction amount; The future load curve is corrected based on the residual correction amount to obtain the corrected future load curve.

[0011] In some embodiments of this application, the step of solving for the target operating parameters of the air conditioner with the goal of satisfying the set operating parameter preferences, under the premise of satisfying the load demand indicated by the future load curve, to obtain the future operating parameters corresponding to the load demand at each moment in the future load curve, includes: Obtain indoor thermal comfort constraints and operating parameter constraints; Under the premise of meeting the load demand at each time indicated by the future load curve, the objective function is constructed with the minimum total energy consumption of air conditioning as the preferred operating parameter; Under the constraints of the indoor thermal comfort condition and the operating parameter condition, the objective function is solved to obtain the future operating parameters corresponding to the load demand at each moment in the future load curve.

[0012] Secondly, embodiments of this application also provide an air conditioning feedforward control device, the air conditioning feedforward control device comprising: The data acquisition module is used to acquire the total delay time and the future load curve; wherein, the total delay time is the time required from the execution of the control command to the time it affects the load change, and the future load curve is used to characterize the trend of load demand over time after the current moment; The parameter solving module is used to solve the target operating parameters of the air conditioner with the goal of satisfying the set operating parameter preferences, under the premise of satisfying the load demand indicated by the future load curve, so as to obtain the future operating parameters corresponding to the load demand at each moment in the future load curve. The feedforward control module is used to execute control commands that match the future operating parameters at a first time and a second time, so that the output heat exchange of the air conditioner at the second time meets the load demand of the future load curve at the second time; wherein the second time is the sum of the first time and the total delay time.

[0013] Thirdly, embodiments of this application also provide an air conditioner, which includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the computer program is executed by the processor, it implements the steps in the above-described air conditioner feedforward control method.

[0014] Fourthly, embodiments of this application also provide a computer-readable storage medium storing a computer program, which, when executed by a processor, implements the steps in the aforementioned air conditioning feedforward control method.

[0015] Fifthly, embodiments of this application also provide a computer program product or computer program, which includes computer instructions stored in a computer-readable storage medium. A processor of a computer device reads the computer instructions from the computer-readable storage medium and executes the computer instructions, causing the computer device to perform the methods provided in the various optional implementations described in embodiments of this application.

[0016] This invention provides an air conditioning feedforward control method, device, medium, and air conditioner. First, it acquires the total delay time and future load curve. The total delay time precisely quantifies the entire time required from the execution of the control command to the actuator and from the energy change resulting from the command actually beginning to affect the load change, enabling the system to accurately grasp its own hysteresis characteristics. Based on this, using the load demand indicated by the future load curve as a constraint and meeting user needs as the objective, it solves for the future operating parameters at each future time, thereby transforming the control decision from feedback control to feedforward control. Finally, it executes a control command at the first time that matches the future operating parameters at the second time, ensuring that the air conditioner's output heat exchange at the second time precisely meets the load demand at that moment, achieving precise alignment between the control command and load changes. Therefore, the system can complete proactive adjustment before the indoor temperature actually deviates, fundamentally avoiding the adjustment lag caused by passively responding after a deviation occurs, effectively suppressing over-adjustment and under-adjustment of indoor temperature, and reducing ineffective energy consumption caused by repeated over-adjustment. Attached Figure Description

[0017] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0018] in: Figure 1 This is a flowchart illustrating the air conditioning feedforward control method. Figure 2 A flowchart illustrating the process of obtaining the total delay time; Figure 3 This is a schematic diagram of the air conditioning feedforward control device. Figure 4 This is a structural block diagram of an air conditioner. Detailed Implementation

[0019] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0020] The terms "first," "second," etc., in the specification, claims, and accompanying drawings of this application are used to distinguish different objects, not to describe a specific order. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover non-exclusive inclusion. For example, a process, method, system, product, or apparatus that includes a series of steps or units is not limited to the listed steps or units, but may optionally include steps or units not listed, or may optionally include other steps or units inherent to these processes, methods, products, or apparatuses.

[0021] In this document, the term "embodiment" means that a particular feature, structure, or characteristic described in connection with an embodiment may be included in at least one embodiment of this application. The appearance of this phrase in various places throughout the specification does not necessarily refer to the same embodiment, nor is it a separate or alternative embodiment mutually exclusive with other embodiments. It will be explicitly and implicitly understood by those skilled in the art that the embodiments described herein can be combined with other embodiments.

[0022] This invention provides an air conditioning feedforward control method, apparatus, medium, and air conditioner. In some embodiments of this application, the provided air conditioning feedforward control method can be applied to an air conditioner. Specifically, the air conditioner can be applied to different scenarios, including but not limited to industrial air conditioners or household air conditioners. In some embodiments of this application, the air conditioner can be a single unit, such as a cabinet air conditioner or a wall-mounted air conditioner; in some embodiments of this application, the air conditioner can also be a central air conditioning system composed of multiple air conditioner units, such as a multi-split air conditioner, an air-cooled heat pump system, or an air conditioner with heat recovery function.

[0023] Please see Figure 1 , Figure 1 This is a flowchart illustrating an air conditioning feedforward control method provided in an embodiment of this application. Although the logical sequence is shown in the flowchart, in some cases, the steps shown or described may be performed in a different order than that shown in the figures. Specifically, the specific flow of this air conditioning feedforward control method is as follows: S101, obtain the total delay time and future load curve.

[0024] The total delay time is the time required from the execution of the control command to the impact on load changes, and the future load curve is used to characterize the trend of load demand changes over time after the current moment.

[0025] Optionally, the total delay time can be obtained in various ways. In some implementations, the total delay time can be preset and entered into the system manually based on engineering experience; in other implementations, the total delay time can be obtained through laboratory calibration before the equipment leaves the factory and then embedded in the control program.

[0026] In some embodiments of this application, such as Figure 2 As shown, the total delay time is obtained through methods S1011-S1013, as detailed below: S1011, perform unsteady-state heat transfer solution on the geometric and thermal properties of the building envelope to obtain the thermal delay time of the building envelope.

[0027] The building envelope includes, but is not limited to, walls, roofs, and floors. Geometric parameters refer to the spatial dimensional characteristics of the building envelope, while thermal properties refer to the physical characteristics exhibited by the building envelope materials during heat transfer. The building envelope thermal delay time characterizes the time required for outdoor thermal disturbances to be transferred through the building envelope to the indoor side and begin to affect load changes.

[0028] In some embodiments of this application, the geometric parameters include the equivalent thickness of each layer of the enclosure structure, and the thermal properties include the thermal conductivity, density, and specific heat capacity of each layer of the enclosure structure. In step S1011, an unsteady-state heat transfer solution is performed on the geometric and thermal properties of the enclosure structure to obtain the thermal delay time of the enclosure structure. Specifically, the following steps are executed: The thermal conductivity of each layer of the enclosure structure is divided by the product of the density and specific heat capacity of the same layer of the enclosure structure to obtain the thermal diffusivity of each layer of the enclosure structure. An open calculation is performed on the ratio of the diurnal angular frequency to the thermal diffusivity of each layer of the enclosure structure, and this ratio is multiplied by the equivalent thickness of each layer of the enclosure structure to obtain the phase lag angle of each layer of the enclosure structure. The phase lag angle of each layer of the enclosure structure is divided by the diurnal angular frequency to obtain the thermal delay time of each layer of the enclosure structure. The thermal delay times of each layer of the enclosure structure are summed to obtain the total thermal delay time of the enclosure structure.

[0029] The thermal diffusivity reflects how quickly temperature propagates within a material when subjected to temperature changes; a higher thermal diffusivity indicates faster temperature propagation. The phase lag angle characterizes the angle by which the phase of an outdoor thermal disturbance is delayed relative to the original outdoor disturbance as it traverses the building envelope.

[0030] Alternatively, to illustrate the above calculation process more clearly, an optional calculation method is given below: The thermal diffusivity of a single-layer building envelope is calculated using the following expression:

[0031] In the above formula, For the first Thermal diffusivity of the building envelope material For the first Thermal conductivity of the building envelope material, For the first The density of the building envelope material, For the first Specific heat capacity of the building envelope material. The daily angular frequency is a fixed value.

[0032] In the above formula, 86400 represents the daily angular frequency, and 86400 represents the number of seconds in a 24-hour period.

[0033] Next, the phase lag angle of the single-layer enclosure structure is calculated:

[0034] In the above formula, For the first Phase lag angle of the layered enclosure structure, For the first The equivalent thickness of the enclosure structure.

[0035] Next, the thermal delay time of a single-layer enclosure structure is calculated:

[0036] In the above formula, For the first Thermal delay time of the multilayer enclosure structure.

[0037] For an enclosure structure composed of multiple layers, the total thermal delay time is equal to the sum of the thermal delay times of each layer:

[0038] In the above formula, This refers to the thermal delay time of the building envelope.

[0039] As can be understood from the above calculations, outdoor thermal disturbances (such as diurnal temperature range variations and solar radiation intensity fluctuations) act on the outer surface of the building envelope in the form of temperature waves. When these temperature waves traverse the various layers of the building envelope, their propagation speed is slowed due to the thermal inertia of the materials (determined by density, specific heat capacity, and thermal conductivity), and their amplitude also decreases. The smaller the thermal diffusivity and the greater the thickness of the building envelope, the longer it takes for the temperature waves to traverse it. By solving for and extracting the phase lag of the temperature wave propagation, this thermal delay effect can be quantified, yielding the time required for outdoor thermal disturbances to reach the indoor side.

[0040] S1012 performs hydraulic transmission calculations on the pipe parameters and water flow parameters of the air conditioning water system to obtain the hydraulic transmission delay time.

[0041] Pipeline parameters refer to the geometric characteristics of the air conditioning water system's distribution network, while flow parameters refer to the dynamic characteristics of the air conditioning water flowing in the pipelines. The hydraulic transmission delay time characterizes the time required for air conditioning water to flow from the heat source side to the terminal equipment (such as fan coil units, air conditioning units, etc.) and begin to affect load changes.

[0042] In some embodiments of this application, the pipeline parameters include the total length of the most unfavorable loop, and the water flow parameters include the average water flow velocity within the most unfavorable loop. The most unfavorable loop represents the water circulation loop from the outlet of the cold or heat source to the farthest terminal device. This loop has the longest hydraulic transmission and distribution path, and its transmission delay time determines the response speed of the entire water system.

[0043] S1012 performs hydraulic transmission calculations on the piping and flow parameters of the air conditioning water system to obtain the hydraulic transmission delay time. Specifically, the following steps are performed: Divide the total length by the average flow velocity to obtain the hydraulic foundation delay time. Obtain the valve actuator response time and sensor sampling delay time. Add the hydraulic foundation delay time, valve actuator response time, and sensor sampling delay time together to obtain the hydraulic transmission delay time.

[0044] The hydraulic foundation delay time reflects the pure flow time required for water to travel from the outlet of the heat source to the furthest terminal equipment. The valve actuator response time refers to the time required from the control system issuing a valve opening adjustment command to the valve actually moving to its designated position. The sensor sampling delay time refers to the time required from a change in a physical quantity to the sensor completing data acquisition and uploading it to the controller.

[0045] Alternatively, to illustrate the above calculation process more clearly, an optional calculation method is given below: Calculate the average water velocity within the most unfavorable loop:

[0046] In the above formula, The average water flow velocity within the most unfavorable loop. The volumetric flow rate within the most unfavorable loop. Let be the pipe's inner diameter. Calculate the hydraulic foundation delay time:

[0047] In the above formula, For the delay time of the hydraulic foundation, This represents the total length of the most unfavorable loop. The total hydraulic transmission delay time is obtained by superimposing the valve actuator response time and the sensor sampling delay time:

[0048] In the above formula, For the delay time of hydraulic transmission, For valve actuator response time, This is the sensor sampling delay time.

[0049] As can be understood from the above calculations, the air conditioning water system is a typical fluid distribution system. Control commands adjust the cooling capacity supplied to the terminal equipment by changing the operating parameters of the heat source equipment (such as chilled water outlet temperature) or the working status of the distribution equipment (such as pump frequency and valve opening). However, there is a certain time required from the issuance of the control command to the completion of the action by the actuator (valve actuator response time), and there is also a certain time required from the change in water temperature or flow rate to the detection of this change by the sensor (sensor sampling delay time). Furthermore, the regulated air conditioning water needs to undergo a physical flow time from the heat source outlet to the farthest terminal equipment (hydraulic foundation delay time). Only by taking all three of these times into account can the entire lag process from the issuance of the control command to the actual impact on the load be fully characterized.

[0050] S1013, the thermal delay and hydraulic transmission delay of the building envelope are fused to obtain the total delay time.

[0051] In some embodiments of this application, the process of fusing the thermal delay of the building envelope and the hydraulic transmission delay in step S1013 to obtain the total delay time specifically involves the following steps: dividing the thermal delay of the building envelope by the sum of the thermal delay of the building envelope and the hydraulic transmission delay to obtain a first coupling coefficient. Subtracting the first coupling coefficient from the first value to obtain a second coupling coefficient. Adding the product of the first coupling coefficient and the thermal delay of the building envelope, the product of the second coupling coefficient and the hydraulic transmission delay, and the safety margin to obtain the total delay time.

[0052] The first coupling coefficient reflects the proportion of the thermal delay of the building envelope in the total system delay. The second coupling coefficient reflects the proportion of the hydraulic transmission delay in the total system delay. A safety margin is used to compensate for prediction uncertainties and model errors, ensuring that feedforward control commands reliably arrive before load changes.

[0053] Alternatively, to illustrate the above calculation process more clearly, an optional implementation is given below: First, calculate the first coupling coefficient:

[0054] In the above formula, The first coupling coefficient, For the thermal delay time of the building envelope, This is the delay time for hydraulic transmission.

[0055] Next, calculate the second coupling coefficient:

[0056] In the above formula, is the second coupling coefficient, and 'a' is the first value, which can be set to 1 or other values.

[0057] Finally, calculate the total delay time:

[0058] In the above formula, This is the total delay time. For safety margin.

[0059] The above embodiments fuse the thermal delay of the building envelope and the hydraulic transmission delay through a weighted coupling method. The coupling coefficient is obtained according to the proportion of each, and the basic delay time is calculated by weighting. Then, a safety margin for compensating for prediction and model errors is added to obtain the total delay time. This determines the execution time of the feedforward control command, ensuring that the control command reliably precedes the load change and improving the reliability of the feedforward control.

[0060] It should be noted that the weighted coupling method described above is only one optional fusion scheme in this application. In other embodiments of this application, a frequency-band processing method can also be used to synthesize the total delay time. Specifically, the outdoor thermal disturbance signal is decomposed according to frequency, and divided into low-frequency components and high-frequency components based on a preset frequency threshold. For the low-frequency component (corresponding to slowly changing weather processes, such as diurnal temperature range and seasonal temperature changes), its thermal disturbance mainly enters the room after being conducted through the building envelope, so the thermal delay time of the building envelope is taken as the total delay time. For the high-frequency component (corresponding to sudden radiation or convection disturbances, such as gusts or sudden changes in solar radiation caused by cloud cover), its thermal disturbance acts directly on the indoor side more through infiltration wind and fresh air, so the hydraulic transmission delay time is taken as the total delay time. This frequency-band processing method is suitable for application scenarios with higher requirements for response speed and the need to quickly track sudden disturbances.

[0061] In some embodiments of this application, the future load curve is predicted by an unsteady-state heat transfer model. This unsteady-state heat transfer model can be established using a thermal resistance-capacity (RC) network model or a reaction coefficient method. Specifically, an unsteady-state heat transfer model is first established based on the actual thermal parameters of the building envelope (including the thermal conductivity, density, specific heat capacity, thickness, etc. of each layer of material). Then, hourly weather forecast data (including dry-bulb temperature, wet-bulb temperature, solar radiation intensity, wind speed, etc.) for a preset future time period (e.g., the next 2 hours) is input. The model calculates the sensible and latent heat loads at each moment step by step according to a preset time step (e.g., 15 minutes). Finally, the calculation results for all moments are arranged in chronological order and accumulated to form a continuous future load curve.

[0062] In the above load calculation process, sensible heat load refers to the heat that causes changes in indoor air temperature. Its components include: heat conducted into the room through walls, heat conducted into the room through windows, heat radiated into the room through windows, and heat dissipated by internal heat sources such as occupants, equipment, and lighting. Latent heat load refers to the heat that causes changes in indoor air humidity. Its components include: the humidity load resulting from the infiltration of humid outdoor air into the room, the humidity load carried by the fresh air system introducing outdoor air, and the humidity load generated by the dissipation of moisture from occupants. The total cooling load equals the sum of sensible heat load and latent heat load.

[0063] In actual operation, there is often a certain deviation between the prediction results of a pure physical model and the actual load. This is because the actual thermal performance of the building envelope may differ from the design parameters, human behavior patterns (such as window opening habits and changes in the number of people indoors) are random, and factors such as local equipment heat dissipation and infiltration air volume are difficult to fully and accurately represent through a physical model. Therefore, this application further introduces a residual correction mechanism to compensate for the above deviations.

[0064] Specifically, before obtaining the total delay time and future load curve in step S101, the following steps are performed: The historical load prediction curve obtained by the unsteady-state heat transfer model and the corresponding historical load measured curve are obtained. Using the historical load prediction curve as input and the residual between the historical load prediction curve and the historical load measured curve as output, a load residual correction model is trained.

[0065] Optionally, the load residual correction model is implemented using a Long Short-Term Memory (LSTM) network. First, data preprocessing is performed on the acquired historical load forecast curves and corresponding historical load measured curves. Outliers are removed, missing data is filled in, and time alignment is completed to ensure that the forecast load and measured load at the same moment match. Then, the residual between the measured load and the historical load forecast curves is calculated time-by-time. For the actual measured load, For the historical predicted load output by the unsteady heat transfer model, the residual time series is obtained. Next, the historical load prediction curve is segmented into time series samples adapted for a Long Short-Term Memory (LSTM) network. The historical load prediction sequence is used as the input feature, and the corresponding residual sequence is used as the sample label. Training, validation, and test sets are then created. After preparing the dataset, an LSTM network is built, configuring the number of layers, neurons, loss function, and optimizer. Iterative training is performed based on the training set, and overfitting is suppressed based on the validation set. Finally, the model performance is evaluated using the test set. Once the metrics meet the requirements, the trained load residual correction model is saved.

[0066] After obtaining the total delay time and future load curve in step S101, the future load curve is input into the load residual correction model to obtain the residual correction amount. The future load curve is then corrected based on the residual correction amount to obtain the corrected future load curve.

[0067] Optionally, after obtaining the total delay time and the future load curve, the future load curve is formatted into a time series consistent with the training sample format, input into the trained load residual correction model, and the residual correction amount corresponding to each future time point is output. The original future load curve With residual correction By performing superposition calculations, a preliminary revised future load curve is obtained. , Next, boundary constraint verification is performed on the preliminary correction results to limit the load value to the upper and lower limits of the actual achievable load of the air conditioner, avoiding load values ​​that do not conform to physical reality. Finally, the corrected future load curve after verification is output for subsequent air conditioning feedforward control.

[0068] The aforementioned method for obtaining future load curves involves building an unsteady-state heat transfer physical model using an RC network model or the reaction coefficient method. Based on building thermal parameters and meteorological data, future load curves containing sensible and latent heat loads are calculated. To address the prediction errors caused by uncertainties in the pure physical model due to deviations in actual building parameters, human behavior, and equipment heat dissipation, an LSTM load residual correction model is trained using historical predictions and measured load data. The residuals of the future load curves output by the physical model are compensated online, and physical boundary checks are performed. This effectively reduces the prediction bias of the physical model, resulting in a more accurate corrected future load curve, providing a more reliable input basis for air conditioning feedforward control.

[0069] S102, under the premise of meeting the load demand indicated by the future load curve, the target operating parameters of the air conditioner are solved with the goal of meeting the set operating parameter preferences, so as to obtain the future operating parameters corresponding to the load demand at each moment in the future load curve.

[0070] The preferred operating parameters may include, but are not limited to, preferences for thermal comfort, energy consumption, and noise. Specifically, thermal comfort preferences may involve maintaining indoor temperature and relative humidity within a preset comfort range to avoid excessive temperature fluctuations. Energy consumption preferences may involve ensuring that air conditioning energy consumption does not exceed a set threshold to achieve energy-saving operation. Noise preferences may involve ensuring that indoor operating noise is below a set decibel limit to avoid significant noise interference. Target operating parameters include, but are not limited to, setpoints for chilled water outlet temperature, cooling water temperature, pump frequency, fan frequency, and chiller guide vane opening.

[0071] In some embodiments of this application, S102, under the premise of satisfying the load demand indicated by the future load curve, solves for the target operating parameters of the air conditioner with the objective of satisfying the set operating parameter preferences, so as to obtain the future operating parameters corresponding to the load demand at each moment in the future load curve. Specifically, the following steps are performed: obtaining indoor thermal comfort constraints and operating parameter constraints; constructing an objective function with the minimum total energy consumption of the air conditioner as the operating parameter preference, under the premise of satisfying the load demand at each moment indicated by the future load curve; and solving the objective function under the constraints of the indoor thermal comfort constraints and operating parameter constraints to obtain the future operating parameters corresponding to the load demand at each moment in the future load curve.

[0072] Optionally, indoor thermal comfort constraints can limit indoor temperature and relative humidity to within the user-preset comfort range, while limiting the variation in indoor temperature between adjacent control times to avoid significant changes in indoor temperature within a short period. Operating parameter constraints can include the maximum and minimum adjustable limits of the air conditioning compressor's operating frequency, the adjustable range of the fan speed, the allowable opening and closing range of the electronic expansion valve, and other adjustable boundaries achievable by the equipment hardware itself. Indoor noise limit constraints can also be superimposed to prevent indoor noise levels from exceeding acceptable levels after adjusting operating parameters.

[0073] Optionally, the objective function simultaneously considers the total energy consumption of the air conditioning system and the deviation between the actual output load and the load demand, taking the minimum energy consumption and the minimum load tracking deviation as the optimization objective. The objective function expression can be:

[0074] In the above formula, This represents the target value for optimization. represent Real-time air conditioning energy consumption; represent The actual output load of the air conditioner at any time; represent Constant load demand; This is a weighting coefficient used to balance energy consumption indicators and load tracking deviation indicators; Represents the start time of optimization. This indicates the point at which the optimization process ends.

[0075] Optionally, the load demand at each moment in the future load curve can be used as a reference. Within the feasible solution space jointly defined by indoor thermal comfort constraints and operating parameter constraints, the constructed objective function is optimized to output the future operating parameters of the air conditioning system that match the corresponding load demand at each moment. This solution process belongs to a constrained optimization problem and can be performed using linear programming, nonlinear programming, dynamic programming, or intelligent optimization algorithms such as genetic algorithms and particle swarm optimization. The specific algorithm chosen depends on the mathematical expression of the air conditioning equipment performance model itself.

[0076] The above embodiments are based on the load demand at different future times, and take into account multiple constraints such as thermal comfort, hardware adjustability, and noise to carry out optimization solutions. By balancing the air conditioning energy consumption level and load tracking accuracy through weighting coefficients, the optimal future operating parameters are output while closely matching the load demand at each time. This can maintain the indoor environment in a comfortable state and fully tap the energy-saving potential of the air conditioning. It provides continuous and time-sequential parameter output for the air conditioning feedforward control, reduces frequent adjustments during air conditioning operation, and further reduces overall energy consumption.

[0077] S103, at the first time, executes control commands that match the future operating parameters at the second time, so that the output heat exchange of the air conditioner at the second time meets the load demand of the future load curve at the second time.

[0078] The first time refers to the moment when the control command is executed, i.e., the moment the control action is issued. The second time is the sum of the first time and the total delay time, i.e., the moment when the load demand corresponding to the control command actually occurs.

[0079] For example, suppose the total delay time calculated in step S101 is 30 minutes, the current time is 10:00 AM (i.e., the first time is 10:00), and the future load curve shows that the load demand at 10:30 AM (i.e., the second time is 10:30) is 100kW. Step S102 has already solved for the optimal operating parameters to meet the 100kW load demand at 10:30. Then, at 10:00 AM, the system directly executes control commands that match the operating parameters at 10:30 (e.g., setting the chilled water outlet temperature to a specific value, adjusting the water pump frequency to a specific frequency, etc.), so that the air conditioning system starts adjusting from 10:00 to the operating state required at 10:30. After a total delay time of 30 minutes, the heat exchange output at 10:30 AM exactly meets the 100kW load demand at that time.

[0080] For example, if the total delay time is 45 minutes and the current time is 2:00 PM, and the future load curve shows that the load demand at 2:45 PM is significantly lower than the current time, then the system will issue an instruction to reduce the output of the chiller or increase the set value of the chilled water outlet temperature in advance at 2:00 PM. This ensures that when the load actually decreases at 2:45 PM, the system output has already been reduced to the matching level in advance, thereby avoiding excessive cooling of the room and energy waste caused by excessive output.

[0081] In some embodiments of this application, after step S103, the actual operation feedback data of the air conditioning system at the second moment (including actual indoor temperature, actual supply and return water temperature, actual load rate, etc.) can be further collected, the deviation between the predicted value and the measured value can be calculated, and then the model parameters in the next control cycle can be rolled over based on the deviation.

[0082] Specifically, this rolling correction process can be implemented using a Model Predictive Control (MPC) framework. MPC is a model-based closed-loop optimization control strategy. Its core idea is: at each sampling time, based on the current state and the system model, predict the system behavior over a future period, solve a finite-time optimization problem, and apply the first control variable in the optimization sequence to the system. This process is repeated at the next sampling time. Based on this, Kalman filtering is used to update the system's state variables using the measured error at the current time, thereby correcting relevant parameters in the next prediction time domain. These corrected parameters include, but are not limited to, the heat transfer correction coefficient for the building envelope and the hysteresis parameters of the water system.

[0083] This rolling correction mechanism enables the system to adaptively adjust model parameters under different seasons, usage intensities, and building conditions, continuously maintaining high prediction accuracy and control stability, and effectively reducing the risk of performance degradation due to parameter drift after long-term model operation.

[0084] The aforementioned air conditioning feedforward control method first acquires the total delay time and future load curve. The total delay time precisely quantifies the entire time required from the execution of the control command to the actuator and from the energy change resulting from that command actually beginning to affect the load change, enabling the system to accurately grasp its own lag characteristics. Based on this, using the load demand indicated by the future load curve as a constraint and meeting user needs as the objective, the future operating parameters for each future time point are solved, thus transforming the control decision from feedback control to feedforward control. Finally, the control command matching the future operating parameters at the second time point is executed at the first time, ensuring that the air conditioner's output heat exchange at the second time point precisely meets the load demand at that moment, achieving precise alignment between the control command and load changes. Therefore, the system can complete proactive adjustment before the indoor temperature actually deviates, fundamentally avoiding the adjustment lag caused by passively responding after a deviation occurs, effectively suppressing over-adjustment and under-adjustment of indoor temperature, and reducing ineffective energy consumption caused by repeated over-adjustment.

[0085] To facilitate better implementation of the air conditioning feedforward control method of this application, this application also provides an air conditioning feedforward control device based on the above-described air conditioning feedforward control method. The meanings of the terms used are the same as in the above-described air conditioning feedforward control method, and specific implementation details can be found in the descriptions of the method embodiments.

[0086] Please see Figure 3 , Figure 3 This is a schematic diagram of the structure of the air conditioning feedforward control device provided in the embodiments of this application, which may specifically include: The data acquisition module 301 is used to acquire the total delay time and the future load curve; wherein, the total delay time is the time required from the execution of the control command to the impact on the load change, and the future load curve is used to characterize the trend of load demand over time after the current moment; The parameter solving module 302 is used to solve the target operating parameters of the air conditioner under the premise of meeting the load demand indicated by the future load curve and with the goal of meeting the set operating parameter preferences, so as to obtain the future operating parameters corresponding to the load demand at each moment in the future load curve. The feedforward control module 303 is used to execute control commands that match the future operating parameters at the second time in the first time, so that the output heat exchange of the air conditioner at the second time meets the load demand of the future load curve at the second time; wherein the second time is the sum of the first time and the total delay time.

[0087] The aforementioned air conditioning feedforward control device uses a data acquisition module 301 to first acquire the total delay time and future load curve. The total delay time precisely quantifies the entire time required from the execution of the control command to the actuator and until the energy change generated by the command actually begins to affect the load change, enabling the system to accurately grasp its own lag characteristics. Based on this, a parameter solving module 302 uses the load demand indicated by the future load curve as a constraint and meeting user needs as the objective to solve for the future operating parameters at each future time, thus transforming the control decision from feedback control to feedforward control. The feedforward control module 303 ultimately executes a control command that matches the future operating parameters at the second time, ensuring that the air conditioner's output heat exchange at the second time precisely meets the load demand at that moment, achieving precise alignment between the control command and load changes. Therefore, the system can complete proactive adjustment before the indoor temperature deviates from its actual value, fundamentally avoiding the adjustment lag caused by passively responding after a deviation occurs, effectively suppressing over-adjustment and under-adjustment of indoor temperature, and reducing ineffective energy consumption caused by repeated over-adjustment.

[0088] In some embodiments of this application, the data acquisition module 301 is specifically used for: Unsteady-state heat transfer solutions are performed on the geometric and thermal properties of the building envelope to obtain the thermal delay time of the building envelope; wherein, the thermal delay time of the building envelope characterizes the time required for outdoor thermal disturbances to be transmitted to the indoor side through the building envelope and begin to affect load changes. Hydraulic transmission calculations are performed on the piping and flow parameters of the air conditioning water system to obtain the hydraulic transmission delay time. The hydraulic transmission delay time characterizes the time required for air conditioning water to flow from the cold / heat source side to the terminal equipment and begin to affect load changes. The thermal delay and hydraulic transmission delay of the building envelope are combined to obtain the total delay time.

[0089] In some embodiments of this application, geometric parameters include the equivalent thickness of each layer of the enclosure structure, and thermal property parameters include the thermal conductivity, density, and specific heat capacity of each layer of the enclosure structure. The data acquisition module 301 performs unsteady-state heat transfer calculations on the geometric parameters and thermal property parameters of the enclosure structure to obtain the thermal delay time of the enclosure structure, including: Divide the thermal conductivity of each layer of the building envelope by the product of the density and specific heat capacity of the same layer of the building envelope to obtain the thermal diffusivity of each layer of the building envelope. An open calculation is performed on the ratio of the daily periodic angular frequency to the thermal diffusivity of each layer of the building envelope, and then multiplied by the equivalent thickness of each layer of the building envelope to obtain the phase lag angle of each layer of the building envelope. Divide the phase lag angle of each building envelope by the daily period angular frequency to obtain the thermal delay time of each building envelope. The thermal delay time of each layer of the building envelope is summed to obtain the thermal delay time of the building envelope.

[0090] In some embodiments of this application, the piping parameters include the total length of the most unfavorable loop, and the water flow parameters include the average water flow velocity within the most unfavorable loop. The most unfavorable loop represents the water circulation loop from the outlet of the cold or heat source to the farthest terminal device. The data acquisition module 301 performs hydraulic transmission calculations on the piping parameters and water flow parameters of the air conditioning water system to obtain the hydraulic transmission delay time, including: Divide the total length by the average water flow velocity to obtain the hydraulic foundation delay time. Obtain the valve actuator response time and sensor sampling delay time; The hydraulic transmission delay time is obtained by summing the hydraulic foundation delay time, the valve actuator response time, and the sensor sampling delay time.

[0091] In some embodiments of this application, the data acquisition module 301 fuses the thermal delay and hydraulic transmission delay of the building envelope to obtain the total delay time, including: Divide the thermal delay of the building envelope by the sum of the thermal delay of the building envelope and the hydraulic transmission delay to obtain the first coupling coefficient; Subtracting the first coupling coefficient from the first value yields the second coupling coefficient; The total delay time is obtained by multiplying the first coupling coefficient by the thermal delay of the building envelope, the second coupling coefficient by the hydraulic transmission delay, and the safety margin.

[0092] In some embodiments of this application, the future load curve is predicted by an unsteady-state heat transfer model; Before the data acquisition module 301 acquires the total delay time and future load curve, it is also used for: Obtain the historical load prediction curves obtained from the unsteady heat transfer model, and the corresponding historical load measured curves; Using historical load forecast curves as input and the residuals between historical load forecast curves and historical load measured curves as output, a load residual correction model is trained. After acquiring the total delay time and future load curve, the data acquisition module 301 is also used for: Input the future load curve into the load residual correction model to obtain the residual correction amount; The future load curve is corrected based on the residual correction amount to obtain the corrected future load curve.

[0093] In some embodiments of this application, the parameter solving module 302, under the premise of satisfying the load demand indicated by the future load curve, solves for the target operating parameters of the air conditioner with the goal of satisfying the set operating parameter preferences, so as to obtain the future operating parameters corresponding to the load demand at each moment in the future load curve, including: Obtain indoor thermal comfort constraints and operating parameter constraints; Under the premise of meeting the load demand at each time indicated by the future load curve, the objective function is constructed with the minimum total energy consumption of air conditioning as the preferred operating parameter. Under the constraints of indoor thermal comfort and operating parameters, the objective function is solved to obtain the future operating parameters corresponding to the load demand at each moment in the future load curve.

[0094] In addition, this application also provides an air conditioner, such as Figure 4 As shown, it illustrates the structural diagram of the air conditioner involved in this application, specifically: The air conditioner may include components such as a processor 401 with one or more processing cores, a memory 402 with one or more computer-readable storage media, a power supply 403, and an input unit 404. Those skilled in the art will understand that... Figure 4 The air conditioner structure shown does not constitute a limitation on the air conditioner and may include more or fewer components than shown, or combine certain components, or have different component arrangements. Wherein: The processor 401 is the control center of the air conditioner. It connects to various parts of the air conditioner via various interfaces and lines. By running or executing software programs and / or modules stored in the memory 402, and by calling data stored in the memory 402, it performs various functions and processes data, thereby providing overall monitoring of the air conditioner. Optionally, the processor 401 may include one or more processing cores; preferably, the processor 401 may integrate an application processor and a modem processor, wherein the application processor mainly handles the operating system, user interface, and applications, and the modem processor mainly handles wireless communication. It is understood that the modem processor may not be integrated into the processor 401.

[0095] The memory 402 can be used to store software programs and modules. The processor 401 executes various functional applications and data processing by running the software programs and modules stored in the memory 402. The memory 402 may mainly include a program storage area and a data storage area. The program storage area may store the operating system, at least one application program required for a function, etc.; the data storage area may store data created based on the use of the air conditioner, etc. In addition, the memory 402 may include high-speed random access memory, and may also include non-volatile memory, such as at least one disk storage device, flash memory device, or other volatile solid-state storage device. Accordingly, the memory 402 may also include a memory controller to provide the processor 401 with access to the memory 402.

[0096] The air conditioner also includes a power supply 403 that supplies power to the various components. Preferably, the power supply 403 can be logically connected to the processor 401 through a power management system, thereby enabling functions such as charging, discharging, and power consumption management through the power management system. The power supply 403 may also include one or more DC or AC power supplies, recharging systems, power equipment debugging circuits, power converters or inverters, power status indicators, and other arbitrary components.

[0097] The air conditioner may also include an input unit 404, which can be used to receive input digital or character information, and generate keyboard, mouse, joystick, optical or trackball signal inputs related to user settings and function control.

[0098] Although not shown, the air conditioner may also include a display unit, etc., which will not be described in detail here. Specifically, in this embodiment, the processor 401 in the air conditioner will load the executable files corresponding to the processes of one or more application programs into the memory 402 according to the following instructions, and the processor 401 will run the application programs stored in the memory 402 to realize the steps in any of the air conditioner feedforward control methods provided in this application embodiment: obtaining the total delay time and the future load curve; wherein, the total delay time is the time required from the execution of the control instruction to the influence of the load change, and the future load curve is used to characterize the trend of load demand change over time after the current moment; under the premise of satisfying the load demand indicated by the future load curve, the target operating parameters of the air conditioner are solved with the goal of satisfying the set operating parameter preferences to obtain the future operating parameters corresponding to the load demand at each moment in the future load curve; at the first time, the control instruction matching the future operating parameters at the second time is executed so that the output heat exchange of the air conditioner at the second time satisfies the load demand of the future load curve at the second time; wherein, the second time is the sum of the first time and the total delay time.

[0099] In the above embodiment, the total delay time and future load curve are first obtained. The total delay time precisely quantifies the entire time required from the execution of the control command to the actuator and from the energy change generated by the command actually beginning to affect the load change, enabling the system to accurately grasp its own hysteresis characteristics. Based on this, the future operating parameters at each future time are solved using the load demand indicated by the future load curve as a constraint and meeting user needs as the objective, thereby transforming the control decision from feedback control to feedforward control. Finally, the control command matching the future operating parameters at the second time is executed at the first time, so that the output heat exchange of the air conditioner at the second time exactly meets the load demand at that time, achieving precise alignment between the control command and load changes. As a result, the system can complete the advance adjustment before the indoor temperature actually deviates, fundamentally avoiding the adjustment lag caused by passively responding after the deviation occurs, effectively suppressing the overshoot and undershoot of indoor temperature, and reducing the ineffective energy consumption caused by repeated overshoot.

[0100] For details on the implementation of each of the above operations, please refer to the previous examples, which will not be repeated here.

[0101] Those skilled in the art will understand that all or part of the steps in the various methods of the above embodiments can be performed by instructions, or by instructions controlling related hardware. These instructions can be stored in a computer-readable storage medium and loaded and executed by a processor.

[0102] Therefore, this application provides a computer-readable storage medium storing a computer program that can be loaded by a processor to execute the steps of any of the air conditioning feedforward control methods provided in this application.

[0103] For details on the implementation of each of the above operations, please refer to the previous examples, which will not be repeated here.

[0104] The computer-readable storage medium may include: read-only memory (ROM), random access memory (RAM), disk or optical disk, etc.

[0105] Since the instructions stored in the computer-readable storage medium can execute the steps in any of the air conditioning feedforward control methods provided in this application, the beneficial effects that any of the air conditioning feedforward control methods provided in this application can achieve can be realized, as detailed in the preceding embodiments, and will not be repeated here.

[0106] The above provides a detailed description of an air conditioning feedforward control method, device, air conditioner, and computer-readable storage medium provided in this application. Specific examples have been used to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only for the purpose of helping to understand the method and core ideas of the present invention. At the same time, for those skilled in the art, there will be changes in the specific implementation methods and application scope based on the ideas of the present invention. Therefore, the content of this specification should not be construed as a limitation of the present invention.

Claims

1. An air conditioning feedforward control method, characterized in that, The method includes: Obtain the total delay time and future load curve; wherein, the total delay time is the time required from the execution of the control command to the time it affects the load change, and the future load curve is used to characterize the trend of load demand change over time after the current moment; Under the premise of meeting the load demand indicated by the future load curve, the target operating parameters of the air conditioner are solved with the goal of meeting the set operating parameter preferences, so as to obtain the future operating parameters corresponding to the load demand at each moment in the future load curve; At a first time, control commands matching the future operating parameters at a second time are executed so that the output heat exchange of the air conditioner at the second time meets the load demand of the future load curve at the second time; wherein, the second time is the sum of the first time and the total delay time.

2. The air conditioning feedforward control method according to claim 1, characterized in that, The methods for obtaining the total delay time include: Unsteady-state heat transfer solutions are performed on the geometric and thermal properties of the building envelope to obtain the thermal delay time of the building envelope; wherein, the thermal delay time of the building envelope represents the time required for outdoor thermal disturbances to be transmitted to the indoor side through the building envelope and begin to affect load changes. Hydraulic transmission calculations are performed on the piping and flow parameters of the air conditioning water system to obtain the hydraulic transmission delay time; wherein, the hydraulic transmission delay time characterizes the time required for air conditioning water to flow from the cold / heat source side to the terminal equipment and begin to affect load changes; The thermal delay of the enclosure structure and the hydraulic transmission delay are combined to obtain the total delay time.

3. The air conditioning feedforward control method according to claim 2, characterized in that, The geometric parameters include the equivalent thickness of each layer of the enclosure structure, and the thermal properties include the thermal conductivity, density, and specific heat capacity of each layer of the enclosure structure. The unsteady-state heat transfer solution of the geometric and thermal properties of the enclosure structure to obtain the thermal delay time of the enclosure structure includes: Divide the thermal conductivity of each layer of the building envelope by the product of the density and specific heat capacity of the same layer of the building envelope to obtain the thermal diffusivity of each layer of the building envelope. An open calculation is performed on the ratio of the daily periodic angular frequency to the thermal diffusivity of each layer of the building envelope, and then multiplied by the equivalent thickness of each layer of the building envelope to obtain the phase lag angle of each layer of the building envelope. Divide the phase lag angle of each building envelope by the daily period angular frequency to obtain the thermal delay time of each building envelope. The thermal delay time of the building envelope is obtained by summing the thermal delay times of each layer of the building envelope.

4. The air conditioning feedforward control method according to claim 2, characterized in that, The pipeline parameters include the total length of the most unfavorable loop, and the water flow parameters include the average water flow velocity within the most unfavorable loop. The most unfavorable loop represents the water circulation loop from the outlet of the cold or heat source to the farthest terminal device. The calculation of hydraulic transmission time for the piping and flow parameters of the air conditioning water system to obtain the hydraulic transmission delay time includes: Divide the total length by the average water flow velocity to obtain the hydraulic foundation delay time. Obtain the valve actuator response time and sensor sampling delay time; The hydraulic foundation delay time, the valve actuator response time, and the sensor sampling delay time are added together to obtain the hydraulic transmission delay time.

5. The air conditioning feedforward control method according to claim 2, characterized in that, The process of fusing the thermal delay of the enclosure structure and the hydraulic transmission delay to obtain the total delay time includes: Divide the thermal delay of the enclosure structure by the sum of the thermal delay of the enclosure structure and the hydraulic transmission delay to obtain the first coupling coefficient; Subtracting the first coupling coefficient from the first value yields the second coupling coefficient; The total delay time is obtained by multiplying the first coupling coefficient by the thermal delay of the enclosure structure, the second coupling coefficient by the hydraulic transmission delay, and the safety margin.

6. The air conditioning feedforward control method according to claim 1, characterized in that, The future load curve is predicted by an unsteady heat transfer model; Before obtaining the total delay time and future load curve, the process also includes: Obtain the historical load prediction curves predicted by the unsteady heat transfer model, and the corresponding historical load measured curves; Using the historical load prediction curve as input and the residual between the historical load prediction curve and the historical load measured curve as output, a load residual correction model is trained. After obtaining the total delay time and future load curve, the process also includes: The future load curve is input into the load residual correction model to obtain the residual correction amount; The future load curve is corrected based on the residual correction amount to obtain the corrected future load curve.

7. The air conditioning feedforward control method according to claim 1, characterized in that, The process of solving for the target operating parameters of the air conditioner, with the aim of satisfying the set operating parameter preferences, under the premise of meeting the load demand indicated by the future load curve, to obtain the future operating parameters corresponding to the load demand at each moment in the future load curve, includes: Obtain indoor thermal comfort constraints and operating parameter constraints; Under the premise of meeting the load demand at each time indicated by the future load curve, the objective function is constructed with the minimum total energy consumption of air conditioning as the preferred operating parameter; Under the constraints of the indoor thermal comfort condition and the operating parameter condition, the objective function is solved to obtain the future operating parameters corresponding to the load demand at each moment in the future load curve.

8. An air conditioning feedforward control device, characterized in that, The air conditioning feedforward control device includes: The data acquisition module is used to acquire the total delay time and the future load curve; wherein, the total delay time is the time required from the execution of the control command to the time it affects the load change, and the future load curve is used to characterize the trend of load demand over time after the current moment; The parameter solving module is used to solve the target operating parameters of the air conditioner with the goal of satisfying the set operating parameter preferences, under the premise of satisfying the load demand indicated by the future load curve, so as to obtain the future operating parameters corresponding to the load demand at each moment in the future load curve. The feedforward control module is used to execute control commands that match the future operating parameters at a first time and a second time, so that the output heat exchange of the air conditioner at the second time meets the load demand of the future load curve at the second time; wherein the second time is the sum of the first time and the total delay time.

9. A computer-readable storage medium, characterized in that, The device stores a computer program that, when executed by a processor, causes the processor to perform the steps of the method as described in any one of claims 1 to 7.

10. An air conditioner, characterized in that, It includes a memory and a processor, the memory storing a computer program that, when executed by the processor, causes the processor to perform the steps of the method as described in any one of claims 1 to 7.