By establishing a master-slave coupling relationship between the compressor and electric heating in the heat pump unit, the synchronous change of electric heating power and compressor frequency is achieved, and the electric heating is gradually unloaded after the supply air temperature stabilizes. This solves the problem of sudden temperature drop caused by electric heating control and improves system stability and energy efficiency.
Patent Information
- Application Number
- CN202611187937.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-06
- Publication Date
- 2026-11-24
AI Technical Summary
The existing electric heating control method of heat pump units causes a sudden drop in temperature, affecting the stability of compressor operation. Furthermore, the electric heating power adjustment is not related to the compressor status, resulting in low energy efficiency.
By establishing a master-slave coupling relationship between the compressor and the electric heater, the electric heater power follows the compressor's operating frequency. The system detects the air supply temperature and starts unloading when preset conditions are met. It monitors the compressor status and air supply temperature in real time and gradually reduces the electric heater power to avoid a sudden drop in temperature.
It significantly improves the operational stability and energy efficiency of the heat pump system, avoids a sudden drop in supply air temperature, and ensures a smooth transition and improved energy efficiency of the system.
Smart Images

Figure CN123154485A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of heat pump control technology, and in particular to a heat pump electric heating coupling control method, device, equipment and storage medium. Background Technology
[0002] Heat pump units use a compressor to drive a refrigerant cycle, absorbing heat from a low-temperature heat source and releasing it to the high-temperature side to achieve heating. In practical applications, when the ambient temperature is low, the unit is in the heating-up phase, or the load demand is high, electric heating is often used as a supplementary heat source to improve the heating rate and ensure the stability of the supply air temperature. Electric heating adjusts its output power through power regulating devices, offering fast response and high control precision, but its energy efficiency ratio is much lower than that of compressor heating. Minimizing the operating time and power consumption of electric heating while ensuring temperature control accuracy is a crucial direction for achieving energy savings in heat pump systems.
[0003] In existing technologies, the electric heating control of heat pump units generally employs a PID algorithm, using the deviation between the supply air temperature and the target temperature as input to independently adjust the electric heating power. The power adjustment of the electric heating is independent of the compressor's operating status. Furthermore, once the supply air temperature reaches the target temperature, the electric heating is directly shut off to save energy.
[0004] The existing heat pump electric heating coupling control method, which directly shuts off the electric heating when it meets the standard, suddenly reduces the auxiliary heat source of electric heating, causing a sharp drop in temperature and seriously affecting the operational stability of the compressor. Summary of the Invention This application provides a heat pump electric heating coupling control method, device, equipment, and storage medium, which can solve the technical problem of poor system stability in the heat pump electric heating coupling control process. By starting the unloading of electric heating when the supply air temperature meets a first preset condition, the electric heating is actively shut down when the compressor can independently maintain the supply air temperature. During the unloading process, the compressor status and supply air temperature are monitored in real time. When a second preset condition is met, the power reduction of electric heating is paused to avoid instability caused by excessive unloading leading to the supply air temperature falling below the preset temperature, thereby significantly improving the overall stability of the heat pump system operation.
[0005] In a first aspect, embodiments of this application provide a heat pump electric heating coupling control method, comprising: In response to the electric heating start command, the electric heating is turned on, and the power of the electric heating follows the operating frequency of the compressor, with the compressor as the main heat source and the electric heating as the auxiliary heat source. The supply air temperature is detected. If the supply air temperature meets the first preset condition, the unloading of the electric heater is initiated. The first preset condition includes the supply air temperature reaching the target temperature and maintaining it for a first preset time. During the unloading process, the compressor status and air supply temperature are monitored in real time. If the second preset condition is not met, the power of the electric heater is gradually reduced according to the preset step size. If the second preset condition is met, the reduction of the power of the electric heater is paused. The second preset condition includes the compressor status being in a limited frequency reduction state, the compressor status being running at the maximum frequency or the air supply temperature being lower than the preset temperature, and the preset temperature being lower than the target temperature by a preset value.
[0006] Furthermore, enabling the power of the electric heating to follow the operating frequency of the compressor includes: The compressor's current operating frequency is mapped to a frequency percentage, where the frequency percentage is the proportion of the current operating frequency to the compressor's maximum operating frequency. The power percentage of the electric heating is controlled to be synchronized with the frequency percentage, where the power percentage is the ratio of the current power of the electric heating to its rated power.
[0007] Furthermore, after pausing the reduction of electric heating power, it also includes: Entering the locked state, in the locked state, the power of the electric heating continues to follow the operating frequency of the compressor, but the power of the electric heating is limited to either decreasing or remaining unchanged; Entering the locked state is recorded as a first-type counting event, and the power of electric heating being reduced to zero is recorded as a second-type counting event. Within a preset time window, the first count corresponding to the first type of counting event and the second count corresponding to the second type of counting event are accumulated respectively.
[0008] Furthermore, after accumulating the first count corresponding to the first type of counting event and the second count corresponding to the second type of counting event, it also includes: If the first number of attempts reaches the first threshold, the first level of locking is triggered to prevent the unloading of the electric heating from starting within a preset locking time. If the second number of attempts reaches the second threshold, a second-level lockout is triggered to prevent the unloading of the electric heating from starting within a preset lockout time.
[0009] Furthermore, after triggering the first-level lockout or the second-level lockout, the following also applies: The system continuously monitors the supply air temperature. When the restart conditions are met, it generates an electric heating start command and resets the first and second counts to zero. The restart conditions include the supply air temperature being lower than the preset restart temperature for a second preset time, and the electric heating overload protection switch being closed and the supply air fan having been started for a preset duration.
[0010] Furthermore, in response to the electric heating start command, the electric heating is turned on, including: Upon receiving the electric heating start command, the blower is activated in response to the electric heating start command. After the air supply fan has been running for a preset time, the closing status of the electric heating overload protection switch is checked. If the electric heating overload protection switch is closed, the power supply circuit of the electric heater is connected to start the electric heating.
[0011] Furthermore, the first preset condition includes the rate of change of the supply air temperature exceeding a preset threshold. When the supply air temperature meets the first preset condition, the unloading of the electric heater is initiated, including: If the supply air temperature does not reach the target temperature and the rate of change of the supply air temperature exceeds the preset threshold, the unloading of the electric heater will be initiated.
[0012] In a second aspect, embodiments of this application provide a heat pump electric heating coupling control device, comprising: The electric heating start module is used to respond to the electric heating start command, start the electric heating, and make the power of the electric heating follow the operating frequency of the compressor, with the compressor as the main heat source and the electric heating as the auxiliary heat source. The unloading startup module is used to detect the air supply temperature. When the air supply temperature meets the first preset condition, the unloading of the electric heater is started. The first preset condition includes the air supply temperature reaching the target temperature and maintaining it for a first preset time. The unloading execution module is used to monitor the compressor status and air supply temperature in real time during the unloading process. If the second preset condition is not met, the power of the electric heater is gradually reduced by a preset step size. If the second preset condition is met, the reduction of the power of the electric heater is paused. The second preset condition includes the compressor status being in a limited frequency reduction state, the compressor status being running at the maximum frequency, or the air supply temperature being lower than the preset temperature. The preset temperature is lower than the target temperature by a preset value.
[0013] In a third aspect, embodiments of this application provide a heat pump electric heating coupling control device, comprising: Memory and one or more processors; Memory, used to store one or more programs; When one or more programs are executed by one or more processors, the one or more processors implement the heat pump electric heating coupling control method as described in the first aspect.
[0014] In a fourth aspect, embodiments of this application provide a storage medium for storing computer-executable instructions, which, when executed by a computer processor, are used to perform the heat pump electric heating coupling control method as described in the first aspect.
[0015] This embodiment of the application activates the electric heating in response to an electric heating start command, causing the electric heating power to follow the operating frequency of the compressor, with the compressor as the main heat source and the electric heating as an auxiliary heat source. The air supply temperature is detected, and if the air supply temperature meets a first preset condition, the electric heating is unloaded. The first preset condition includes the air supply temperature reaching a target temperature and maintaining it for a first preset time. During the unloading process, the compressor status and air supply temperature are monitored in real time. If a second preset condition is not met, the electric heating power is gradually reduced in preset steps. If the second preset condition is met, the reduction of the electric heating power is paused. The second preset condition includes the compressor status being in a limited frequency reduction state, the compressor status being running at its maximum frequency, or the air supply temperature being lower than a preset temperature, where the preset temperature is a preset value lower than the target temperature. By employing the aforementioned technical means, a master-slave coupling relationship is established between the compressor and the electric heater. The electric heater power changes synchronously with the compressor's operating frequency, ensuring that the compressor always bears the main heating load. When the supply air temperature reaches the target temperature and remains stable, the electric heater is actively and gradually unloaded, allowing it to smoothly exit once the compressor can independently maintain the supply air temperature. This avoids a sudden drop in supply air temperature caused by the direct shutdown of the electric heater, thus significantly improving the system's operational stability. During the unloading process, conditions such as the compressor's frequency reduction limit, maximum frequency operation, and supply air temperature deviation are continuously monitored. If the compressor's output capacity is insufficient or the supply air temperature shows a downward trend, the unloading is immediately suspended. This minimizes the proportion of electric heater power while ensuring stable supply air temperature, improving the overall operating energy efficiency of the heat pump unit and effectively suppressing temperature overshoot, further enhancing the overall stability of the heat pump system.
[0016] The beneficial effects of the heat pump electric heating coupling control device, heat pump electric heating coupling control equipment, and storage medium provided above can be referenced to the beneficial effects of the heat pump electric heating coupling control method. Attached Figure Description
[0017] Figure 1 This is a flowchart of a heat pump electric heating coupling control method provided in an embodiment of this application; Figure 2 This is a flowchart of another heat pump electric heating coupling control method provided in the embodiments of this application; Figure 3 This is a flowchart of another heat pump electric heating coupling control method provided in the embodiments of this application; Figure 4 This is a flowchart of another heat pump electric heating coupling control method provided in the embodiments of this application; Figure 5 This is a flowchart of another heat pump electric heating coupling control method provided in the embodiments of this application; Figure 6 This is a flowchart of another heat pump electric heating coupling control method provided in the embodiments of this application; Figure 7 This is a schematic diagram of the structure of a heat pump electric heating coupling control device provided in an embodiment of this application; Figure 8 This is a schematic diagram of the structure of a heat pump electric heating coupling control device provided in an embodiment of this application. Detailed Implementation
[0018] To make the objectives, technical solutions, and advantages of this application clearer, specific embodiments of this application will be described in further detail below with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are merely for explaining this application and not for limiting it. It should also be noted that, for ease of description, only the parts relevant to this application are shown in the drawings, not all of them. Before discussing exemplary embodiments in more detail, it should be mentioned that some exemplary embodiments are described as processes or methods depicted as flowcharts. Although the flowcharts describe operations (or steps) as sequential processes, many of these operations can be performed in parallel, concurrently, or simultaneously. Furthermore, the order of the operations can be rearranged. The process can be terminated when its operation is completed, but may also have additional steps not included in the drawings. The process can correspond to a method, function, procedure, subroutine, subprogram, etc.
[0019] In existing technologies, the electric heating control of heat pump units generally employs a PID algorithm, using the deviation between the supply air temperature and the target temperature as input to independently adjust the electric heating power. The power adjustment of the electric heating is independent of the compressor's operating status. Once the supply air temperature reaches the target temperature, the electric heating is directly shut off to save energy. However, this method of directly shutting off the electric heating upon reaching the target temperature results in a sudden loss of the auxiliary heat source, causing a sharp increase in the compressor's heating load and a sudden drop in the supply air temperature. To compensate for the temperature drop, the compressor is forced to rapidly increase its frequency, leading to drastic fluctuations in the unit's operating conditions and severely impacting the compressor's operational stability. Furthermore, during the heating phase, if the supply air temperature rapidly approaches the target temperature, the PID control inherently lags. By the time the temperature overshoot is detected and the electric heating is shut off, it is too late, and the supply air temperature has already deviated significantly from the target value. Therefore, this existing coupled control method of directly shutting off the electric heating upon reaching the target temperature abruptly reduces the auxiliary heat source for the electric heating, causing a sudden drop in temperature and severely affecting the compressor's operational stability.
[0020] Based on this, the present application provides a heat pump electric heating coupling control method, apparatus, device, and storage medium. In response to an electric heating start command, the electric heating is activated, causing its power to follow the compressor's operating frequency, with the compressor as the primary heat source and the electric heating as an auxiliary heat source. The system detects the supply air temperature and, if the supply air temperature meets a first preset condition, initiates unloading of the electric heating. The first preset condition includes the supply air temperature reaching a target temperature and maintaining it for a first preset time. During unloading, the compressor status and supply air temperature are monitored in real time. If a second preset condition is not met, the power of the electric heating is gradually reduced by a preset step size. If the second preset condition is met, the reduction of the electric heating power is paused. The second preset condition includes the compressor status being in a limited frequency reduction state, the compressor status being running at its maximum frequency, or the supply air temperature being lower than a preset temperature, where the preset temperature is a preset value lower than the target temperature. By employing the aforementioned technical means, a master-slave coupling relationship is established between the compressor and the electric heater. The electric heater power changes synchronously with the compressor's operating frequency, ensuring that the compressor always bears the main heating load. When the supply air temperature reaches the target temperature and remains stable, the electric heater is actively and gradually unloaded, allowing it to smoothly exit once the compressor can independently maintain the supply air temperature. This avoids a sudden drop in supply air temperature caused by directly shutting down the electric heater, thus significantly improving system operational stability. During the unloading process, conditions such as compressor frequency reduction limits, maximum operating frequency, and supply air temperature deviation are continuously monitored. If the compressor output capacity is insufficient or the supply air temperature shows a downward trend, the unloading is immediately suspended. This minimizes the proportion of electric heater power while ensuring stable supply air temperature, improving the overall operating energy efficiency of the heat pump unit and effectively suppressing temperature overshoot. Compared with existing methods that directly shut down the electric heater, this embodiment significantly improves system stability and energy efficiency.
[0021] Figure 1 This is a flowchart illustrating a heat pump electric heating coupling control method provided in an embodiment of this application. The heat pump electric heating coupling control method provided in this embodiment can be executed by a heat pump electric heating coupling control device. This heat pump electric heating coupling control device can be implemented through software and / or hardware. The heat pump electric heating coupling control device can consist of two or more physical entities, or it can consist of a single physical entity. Generally, the heat pump electric heating coupling control device can be the central controller of a heat pump system.
[0022] The following description uses the central controller as the main body for implementing the heat pump electric heating coupling control method as an example. (Refer to...) Figure 1 The heat pump electric heating coupling control method specifically includes: S11. In response to the electric heating start command, the electric heating is turned on, so that the power of the electric heating follows the operating frequency of the compressor, with the compressor as the main heat source and the electric heating as the auxiliary heat source.
[0023] In one embodiment, during heat pump electric heating coupling control, upon receiving an electric heating start command, the electric heating is activated in response to the command, causing the electric heating power to follow the compressor's operating frequency, with the compressor as the primary heat source and the electric heating as an auxiliary heat source. The electric heating start command refers to a control signal triggered by the user, or a control signal generated by the heat pump unit's control system based on operating conditions to start the electric heater. The conditions for generating the electric heating command by the heat pump unit's control system include the supply air temperature being lower than the target temperature, the unit being in a heating or constant-temperature phase requiring additional heat, etc. The compressor operating frequency refers to the current operating speed of the compressor motor, measured in Hz (Hertz), and its value varies between the compressor's minimum and maximum operating frequencies. Electric heating power following means that the output power of the electric heating is not independently determined by the temperature deviation, but rather positively correlated with the compressor's operating frequency; the higher the compressor frequency, the higher the electric heating power; the lower the compressor frequency, the lower the electric heating power. The main heat source refers to the heat source that bears the main heating load, while the auxiliary heat source refers to the heat source that provides supplementary heat when the output capacity of the main heat source is insufficient. With the compressor as the main heat source and electric heating as the auxiliary heat source, it means that at any time of operation, the heating output of the compressor is used first, and electric heating is only used as a supplement.
[0024] For example, when the central controller determines that the electric heater needs to be activated, it generates an electric heater activation command. In response to this command, the central controller first checks the electric heater's operating status to confirm it is ready to start; then, it sends a start signal to the electric heater's power regulator to initiate operation. After activation, the central controller reads the compressor's current operating frequency in real time, determines the target power for the electric heater based on preset following rules, and sends a corresponding power control signal to the power regulator, causing the electric heater's output power to change synchronously with the compressor's operating frequency. Throughout the entire operation, the compressor's heating output always takes precedence over the electric heater's heating output; the electric heater only provides supplementary heat to compensate for any shortfall in the compressor's output capacity.
[0025] In one embodiment, assuming a high-temperature heat pump unit has a target supply air temperature of 95°C and a current supply air temperature of 60°C, the compressor operates at a frequency of 50Hz, with a maximum operating frequency of 100Hz. The central controller generates an electric heating start command, activating the electric heating. At this time, the compressor frequency percentage is 50Hz / 100Hz = 50%. According to the following rule, the electric heating power percentage is synchronously set to 50%, meaning that if the rated power of the electric heating is 10kW, the current electric heating output power is 5kW. As the supply air temperature gradually increases, the compressor frequency gradually decreases to 40Hz, and the electric heating power synchronously decreases to 40% (4kW). Throughout the entire heating process, the compressor's heating capacity consistently accounts for the majority of the total heating capacity, with the electric heating only providing auxiliary supplementary heating.
[0026] Through the aforementioned master-slave coupled power following mechanism, this embodiment establishes a positive correlation between the compressor and the electric heater, ensuring that the output power of the electric heater is no longer independent of the compressor's operating state, but rather changes synchronously with the compressor's output capacity. When the compressor's output capacity is high, the electric heater synchronously provides higher auxiliary power to accelerate heating; when the compressor's output capacity decreases, the electric heater synchronously reduces its power to avoid energy waste. Compared to the independent PID control method in existing technologies, this embodiment overcomes the technical limitation of the separation between electric heater power and compressor status, making the heating output of the heat pump unit more coordinated. The electric heater is always within a reasonable power range for auxiliary heating, effectively solving the problem of mismatched unit operating conditions caused by the existing electric heater power being independent of the compressor status, and laying a coupling foundation for the subsequent active unloading of the electric heater.
[0027] S12. Detect the air supply temperature. If the air supply temperature meets the first preset condition, start unloading the electric heater. The first preset condition includes the air supply temperature reaching the target temperature and maintaining it for a first preset time.
[0028] After the electric heating is activated in step S11, the supply air temperature is detected. If the supply air temperature meets the first preset condition, the unloading of the electric heating is initiated. The supply air temperature refers to the airflow temperature collected at the heat pump unit's outlet, which can be obtained in real time through a temperature sensor installed in the supply air duct. The target temperature is the set value of the supply air temperature that the heat pump unit expects to maintain, preset by the user or control system according to the usage scenario. The first preset condition refers to the set of temperature conditions required to trigger the unloading operation of the electric heating. For example, the first preset condition includes the supply air temperature reaching the target temperature and maintaining it for a first preset time. Maintaining the first preset time means that after the supply air temperature reaches the target temperature, it does not drop significantly for a continuous period of time, confirming that the compressor has the ability to independently maintain the supply air temperature rather than experiencing short-term fluctuations. Unloading the electric heating refers to the process of systematically reducing the output power of the electric heating, unlike directly shutting down the electric heating; unloading is performed in a gradual manner.
[0029] For example, during normal operation of the electric heater, with its power following the compressor frequency, the central controller continuously collects real-time data on the supply air temperature via a temperature sensor and compares it with the target temperature. When the supply air temperature is detected to have reached the target temperature for the first time, the central controller starts a timer and continuously monitors the supply air temperature for a subsequent first preset time period. If the supply air temperature remains within the allowable deviation range of the target temperature for the first preset time period, the first preset condition is deemed met, and the compressor is now capable of independently maintaining the supply air temperature. The central controller then initiates the unloading process for the electric heater, gradually reducing its power in preset steps.
[0030] In one embodiment, the target temperature is set to 95°C, the first preset time is set to 30 seconds, and the allowable deviation range is set to ±0.5°C. During the heating process, the supply air temperature gradually increases from 60°C, and the central controller monitors the supply air temperature in real time. When the supply air temperature reaches 95°C, the central controller starts a 30-second timer. In the next 30 seconds, the supply air temperature fluctuates between 94.7°C and 95.2°C, never exceeding the allowable deviation range of ±0.5°C. After the 30-second timer expires, the central controller determines that the compressor has the ability to independently maintain a 95°C supply air temperature, meeting the first preset condition, and then initiates the unloading of the electric heater. If the supply air temperature drops to 94°C within 30 seconds, the timer is reset to zero, and the timer restarts once the supply air temperature reaches 95°C again.
[0031] By using the unloading triggering determination based on temperature maintenance time, this embodiment confirms the compressor's independent heating capacity before starting the electric heating unloading, avoiding the problem of premature unloading leading to a drop in supply air temperature before the compressor has stabilized its output. Using stable supply air temperature as the basis for judging the compressor's independent heating capacity utilizes the inherent correlation between temperature stability and compressor output sufficiency, ensuring that the unloading triggering timing accurately matches the unit's actual heat load state. Compared to the prior art method of directly shutting off the electric heating, the unloading triggering mechanism of this embodiment significantly improves the accuracy of the unloading start-up timing and the smoothness of the system transition.
[0032] In one embodiment, the first preset condition includes the rate of change of the supply air temperature exceeding a preset threshold. If the supply air temperature has not reached the target temperature and the rate of change of the supply air temperature exceeds the preset threshold, unloading of the electric heater is initiated. Here, the rate of change of the supply air temperature refers to the amount of change in the supply air temperature per unit time, expressed in °C / s, and is obtained by calculating the difference between the temperature values at adjacent sampling times and dividing by the sampling interval. A rate of change exceeding the preset threshold indicates that the supply air temperature is rising rapidly, suggesting that it will significantly exceed the target temperature in a short period. This predictive triggering method based on temperature change trends allows unloading to be initiated before the supply air temperature actually reaches the target temperature.
[0033] For example, during the heating process, the central controller continuously calculates the rate of change of the supply air temperature. If it detects that the current supply air temperature has not yet reached the target temperature, but the rate of change of temperature has exceeded a preset threshold (e.g., greater than 0.5℃ / s), it indicates that the supply air temperature is rapidly approaching the target temperature, and at the current heating rate, the supply air temperature will significantly exceed the target temperature in a short period of time. At this time, although the supply air temperature has not reached the target temperature, the central controller still initiates the unloading of the electric heater in advance to intervene early and suppress temperature overshoot when the supply air temperature approaches the target temperature.
[0034] In one embodiment, the target temperature is 95°C, the current supply air temperature is 80°C, and the temperature change rate threshold is 0.5°C / s. The central controller detects that the supply air temperature has risen from 77.5°C to 80°C in the last 5 seconds, with a change rate of 0.5°C / s, which has reached the preset threshold. Based on the current heating rate, the supply air temperature is expected to reach 95°C in 30 seconds, and due to temperature inertia, the actual temperature will exceed 95°C. The central controller proactively unloads the electric heating when the supply air temperature reaches 80°C, gradually reducing the electric heating power in preset steps to slow down the heating rate. Ultimately, the supply air temperature stabilizes near 95°C, significantly reducing overshoot.
[0035] By using the aforementioned predictive unloading trigger based on the rate of temperature change, this embodiment can detect the risk of overshoot and initiate unloading in advance before the supply air temperature reaches the target temperature. This overcomes the limitation of existing technologies that only passively respond after temperature overshoot occurs. In scenarios with large temperature inertia (such as large drying rooms or constant temperature warehouses), the predictive unloading provided by this embodiment can suppress the rate of temperature rise in advance, allowing the supply air temperature to gradually approach the target temperature. This effectively solves the problem of large overshoot or uneven transition caused by the inherent lag in temperature regulation, further suppressing the temperature overshoot amplitude and thus significantly improving the overall stability of the heat pump system.
[0036] S13. During the unloading process, monitor the compressor status and air supply temperature in real time. If the second preset condition is not met, gradually reduce the power of the electric heater according to the preset step size. If the second preset condition is met, stop reducing the power of the electric heater. The second preset condition includes the compressor status being in a limited frequency reduction state, the compressor status being running at the maximum frequency or the air supply temperature being lower than the preset temperature, and the preset temperature being lower than the target temperature by a preset value.
[0037] After the unloading of the electric heater is initiated in S12, the compressor status and air supply temperature are monitored in real time during the unloading process. If the second preset condition is not met, the power of the electric heater is gradually reduced in preset steps; if the second preset condition is met, the reduction of the electric heater power is paused. The second preset condition includes the compressor status being in a limited frequency reduction state, the compressor status being operating at maximum frequency, or the air supply temperature being lower than a preset temperature, where the preset temperature is lower than the target temperature by a preset value. The compressor status refers to the current operating condition of the compressor, including normal operation, limited frequency reduction state, and maximum frequency operation state. The limited frequency reduction state refers to the compressor's operating state being restricted from reducing its operating frequency due to high-pressure protection, overcurrent protection, or overheat protection, at which point the compressor's heating output capacity is limited. Operating at maximum frequency means the compressor has reached its designed maximum operating frequency, and the heating output has reached its limit, making it impossible to increase the heating capacity by increasing the frequency. The preset temperature is a temperature reference value that is one preset offset value lower than the target temperature. When the air supply temperature is lower than this value, it indicates that the compressor's heating output is insufficient to maintain the target temperature. Gradually reducing power by a preset step size means reducing the power by a fixed percentage each time during the unloading process (e.g., reducing the current power by 5% each time), with a fixed interval between two reductions (e.g., 10 seconds), rather than reducing it drastically all at once or shutting it off directly.
[0038] For example, after the unloading process is initiated, the central controller enters the unloading execution phase. During the unloading process, the central controller performs two tasks simultaneously: first, it monitors the compressor status and air supply temperature in real time to determine whether any of the second preset conditions are met; second, if the second preset conditions are not met, it gradually reduces the electric heating power according to a preset step size. Specifically, before each step of reduction, it checks whether the compressor's current status is in a limited frequency reduction state, whether it has reached its maximum frequency, and whether the current air supply temperature is lower than the preset temperature (i.e., the target temperature minus the preset value). If all three conditions are not met, it indicates that the compressor's output capacity is sufficient and the air supply temperature is stable, so the power reduction for this step is executed; if any of the three conditions are met, it indicates that the compressor can no longer independently maintain the air supply temperature or that the air supply temperature has shown a downward trend, so the reduction of electric heating power is paused, and the current power remains unchanged. Through this mechanism of determining before executing each step, it is ensured that the unloading process is always carried out under the premise that the compressor's output capacity is sufficient.
[0039] In one embodiment, the target temperature is 95°C, the preset value is 2°C, and the preset temperature is 93°C. The unloading step size is 5% of the current power reduction each time, and the unloading time interval is 10 seconds. When unloading starts, the current electric heating power is 4kW (40%). First unloading step: The central controller checks that the compressor status is normal (not limited frequency reduction and not at maximum frequency), and the air supply temperature is 95.1°C (above 93°C). None of the three conditions in the second preset condition are met, so the electric heating power is reduced to 3.8kW (38%). 10 seconds later, the second unloading step: The central controller checks again. The compressor status is still normal, and the air supply temperature is 94.8°C, still above 93°C. The power reduction continues to 3.61kW (approximately 36%). This continues. Assuming that after the fourth unloading step, the air supply temperature drops to 93.5°C, and before the fifth unloading step, the central controller detects that the compressor has entered the limited frequency reduction state due to high-pressure protection, at which point the second preset condition is met, the central controller pauses the reduction of electric heating power, and the electric heating power remains at the current level and does not continue to decrease.
[0040] Through the mechanism of real-time monitoring and conditional gating (i.e., the second preset condition) during the unloading process described above, this embodiment achieves dynamic adjustment of the unloading process. Unloading continues when the compressor output capacity is sufficient to reduce energy consumption; unloading is immediately paused when the compressor output capacity is insufficient or the supply air temperature shows a downward trend, allowing the electric heater to remain at its current power level to continue auxiliary heating. This avoids excessive unloading that could cause the supply air temperature to drop below the allowable range, thus ensuring the heating stability of the heat pump system. Before each unloading step, a condition judgment (i.e., the judgment of the second preset condition) is performed to ensure that the unloading action is always based on the actual output capacity of the compressor, overcoming the technical limitation of existing technologies where the unloading of electric heaters is disconnected from the compressor state. Compared to the sudden temperature drop caused by directly shutting off the electric heater in existing technologies, the gradual unloading combined with real-time conditional gating in this embodiment makes the electric heater exit process smooth and controllable, effectively solving the problem of poor system stability during unloading, and ensuring a stable transition of supply air temperature while improving energy efficiency.
[0041] As described above, by responding to the electric heating start command and activating the electric heating with its power following the compressor's operating frequency, a master-slave coupling relationship is established between the compressor and the electric heating. This ensures that the electric heating power changes synchronously with the compressor's output capacity, and the compressor always bears the main heating load. By initiating the unloading of the electric heating when the supply air temperature meets the first preset condition, the electric heating is actively deactivated once the compressor can independently maintain the supply air temperature. By monitoring the compressor status and supply air temperature in real time during the unloading process, the reduction in electric heating power is paused when the second preset condition is met, ensuring that the unloading only continues when the compressor's output capacity is sufficient. Using these technical means, the electric heating deactivation process is transformed from a passive, direct shutdown to an active, gradual unloading, significantly improving the unit's operating energy efficiency while ensuring a smooth transition in supply air temperature.
[0042] As described above, in response to the electric heating start command, the electric heating is activated, and its power follows the operating frequency of the compressor, with the compressor as the main heat source and the electric heating as an auxiliary heat source. The air supply temperature is detected, and if the air supply temperature meets a first preset condition, the unloading of the electric heating is initiated. The first preset condition includes the air supply temperature reaching the target temperature and maintaining it for a first preset time. During the unloading process, the compressor status and air supply temperature are monitored in real time. If a second preset condition is not met, the power of the electric heating is gradually reduced in preset steps. If the second preset condition is met, the reduction of the electric heating power is paused. The second preset condition includes the compressor status being in a limited frequency reduction state, the compressor status being running at the maximum frequency, or the air supply temperature being lower than a preset temperature, where the preset temperature is lower than the target temperature by a preset value. By employing the aforementioned technical means, a master-slave coupling relationship is established between the compressor and the electric heater. The electric heater power changes synchronously with the compressor's operating frequency, ensuring that the compressor always bears the main heating load. When the supply air temperature reaches the target temperature and remains stable, the electric heater is actively and gradually unloaded, allowing it to smoothly exit once the compressor can independently maintain the supply air temperature. This avoids a sudden drop in supply air temperature caused by directly shutting down the electric heater, thus significantly improving system operational stability. During the unloading process, conditions such as compressor frequency reduction limits, maximum operating frequency, and supply air temperature deviation are continuously monitored. If the compressor output capacity is insufficient or the supply air temperature shows a downward trend, the unloading is immediately suspended. This minimizes the proportion of electric heater power while ensuring stable supply air temperature, improving the overall operating energy efficiency of the heat pump unit and effectively suppressing temperature overshoot. Compared with existing methods that directly shut down the electric heater, this embodiment significantly improves system stability and energy efficiency.
[0043] Figure 2 This is a flowchart of another heat pump electric heating coupling control method provided in the embodiments of this application, referred to... Figure 2 When the electric heating is activated, the heat pump electric heating coupling control method specifically includes: S111: Receive the electric heating start command and start the air supply fan in response to the electric heating start command.
[0044] In one embodiment, during heat pump electric heating coupling control, upon receiving an electric heating start command, the air supply fan is activated in response to the command. Receiving the electric heating start command means the central controller obtains the control command to start the electric heating from its own control logic or the upper-level control system. The air supply fan is an electric fan in the heat pump unit used to deliver heated air to the target area; its function is to carry away the heat generated by the electric heater and condenser through airflow and send it into the air supply duct. Activating the air supply fan means sending a start signal to the fan motor to start its operation. Activating the air supply fan before activating the electric heating ensures that the heat generated by the electric heater during operation is promptly carried away by the airflow, preventing localized overheating of the electric heater surface that could trigger overload protection or damage the device.
[0045] For example, when the central controller determines that the electric heating needs to be turned on, it first generates an electric heating start command. Upon receiving this command, the central controller does not immediately supply power to the electric heater, but instead sends a start signal to the drive circuit of the blower. After receiving the start signal, the blower motor starts running, driving airflow over the surface of the electric heater. The central controller detects the blower's operating status feedback signal to confirm that the blower is operating normally.
[0046] In one embodiment, the central controller determines that electric heating needs to be activated when the supply air temperature is more than 5°C lower than the target temperature, and generates an electric heating activation command. Upon receiving this command, the central controller first sends a start signal to the supply air fan, which then begins operating at its rated speed, establishing a stable airflow within the supply air duct. The central controller confirms that the fan is operating normally via a fan speed feedback signal or a signal from the air pressure sensor.
[0047] By controlling the sequence of starting the fan first and then turning on the electric heater, this embodiment ensures that the electric heater always has sufficient airflow for heat dissipation during operation. This avoids the problem of local overheating and frequent triggering of overload protection due to heat accumulation in the electric heater, extends the service life of the electric heater and power regulation devices, and provides a guarantee for the normal power regulation and safe operation of the subsequent electric heater.
[0048] S112. After the preset time for starting the air supply fan, check the closed state of the electric heating overload protection switch. If the electric heating overload protection switch is in the closed state, connect the power supply circuit of the electric heater to start the electric heating.
[0049] After the aforementioned S111 starts the air supply fan, after a preset time for starting the air supply fan, the closing status of the electric heating overload protection switch is checked. If the electric heating overload protection switch is closed, the power supply circuit of the electric heater is connected to start the electric heater. The preset time for starting the air supply fan refers to the waiting time required from fan startup to airflow stabilization. This preset time is typically set based on the length of the air supply duct and the fan's startup characteristics. The electric heating overload protection switch is a protective device connected in series in the electric heater's power supply circuit. It automatically disconnects when the electric heater current exceeds the rated value or the temperature is too high, providing overload protection. Under normal operating conditions, the switch is closed to allow the electric heater to operate. If the switch is open due to overload protection, the electric heater cannot be powered even if an external control signal attempts to connect the power supply circuit. Connecting the electric heater's power supply circuit means that the central controller connects the electric heater's power supply circuit via a contactor or solid-state relay, causing the electric heater to start heating. This operation is only effective when the electric heating overload protection switch is closed.
[0050] For example, after the air supply fan starts, the central controller starts a timer, waiting for a preset duration (e.g., 30 seconds) to allow the airflow to fully build up and reach a stable state within the air supply duct. After the preset duration, the central controller checks the current status of the electric heating overload protection switch. If the electric heating overload protection switch is in a normally closable state (i.e., not triggered by overload protection and opened), the central controller connects the power supply circuit of the electric heater via a contactor or solid-state relay, and the electric heater begins to operate. If the electric heating overload protection switch is in an open state (e.g., an overload protection trigger during the last operation has not yet been restored), the central controller does not perform the closing operation and notifies maintenance personnel to check via an alarm signal.
[0051] In one embodiment, the preset duration is 30 seconds. After starting the air supply fan in step S111, the central controller begins timing. After 30 seconds, the fan speed reaches its rated value, and the airflow in the air supply duct stabilizes. The central controller detects that the electric heater overload protection switch is in the normally closed position and then connects the electric heater power supply circuit via a solid-state relay. The electric heater begins to operate at a preset initial power. Subsequently, the central controller, following the power following mechanism in step S11, makes the electric heating power follow the compressor's operating frequency.
[0052] By first detecting the status of the protection switch and then connecting the power supply circuit, this embodiment provides sufficient time for airflow to build up after the fan starts, and only connects the power supply circuit after confirming that the electric heating overload protection switch is in the normal closed state. This ensures that the heat dissipation conditions are ready when the electric heater is powered on, and avoids the safety hazards caused by forcibly supplying power when the protection switch is open. This reduces the number of abnormal power outages and restarts of the electric heater, and further improves the reliability and safety of the electric heating start-up process.
[0053] Figure 3 This is a flowchart of another heat pump electric heating coupling control method provided in the embodiments of this application, referred to... Figure 3 When performing electric heating coupling control, the heat pump electric heating coupling control method specifically includes: S113. Map the compressor’s current operating frequency to a frequency percentage, where the frequency percentage is the proportion of the current operating frequency to the compressor’s maximum operating frequency.
[0054] After the electric heating is activated in step S11, the compressor's current operating frequency is mapped to a frequency percentage, where the frequency percentage represents the ratio of the current operating frequency to the compressor's maximum operating frequency. The compressor's current operating frequency refers to the actual operating frequency of the compressor motor at the current moment, output in real-time by the variable frequency drive according to control commands. The compressor's maximum operating frequency refers to the highest operating frequency allowed by the compressor's design, representing the upper limit of the compressor's rated performance. The frequency percentage is the ratio of the current operating frequency normalized to the range of 0% to 100%, calculated as: Frequency Percentage = (Current Operating Frequency ÷ Maximum Operating Frequency) × 100%. The frequency percentage reflects the proportion of the compressor's current output capacity to its maximum output capacity and serves as the reference signal for subsequent electric heating power.
[0055] For example, the central controller reads the compressor's current operating frequency value in real time through the communication interface of the variable frequency drive, retrieves the pre-stored maximum operating frequency parameter of the compressor from the memory, and calculates the ratio of the two to obtain the frequency percentage. The frequency percentage calculation result is updated in real time and transmitted to the electric heating power control loop as a dimensionless normalized signal.
[0056] In one embodiment, the compressor's maximum operating frequency is 100Hz. The central controller reads the current operating frequency as 60Hz, so the frequency percentage = 60Hz ÷ 100Hz × 100% = 60%. When the compressor reduces its operating frequency to 40Hz, the frequency percentage is updated to 40%. When the compressor is heating at its maximum frequency of 100Hz, the frequency percentage is 100%.
[0057] Through the above-mentioned frequency-to-percentage normalization mapping, this embodiment converts the compressor operating frequency into a dimensionless percentage signal, providing a standardized reference benchmark for the following control of electric heating power. This allows compressors of different models and with different maximum frequencies to adopt a unified following algorithm, improving the versatility and portability of the control method.
[0058] S114. The power percentage of the electric heating is kept synchronized with the frequency percentage, wherein the power percentage is the ratio of the current power of the electric heating to its rated power.
[0059] After obtaining the frequency percentage in S113, the power percentage of the electric heater is synchronized with the frequency percentage. The power percentage is the ratio of the current power of the electric heater to its rated power. The power percentage of the electric heater refers to the percentage of its current actual output power to its rated power, ranging from 0% to 100%. Rated power refers to the maximum continuous output power allowed by the electric heater's design. Synchronizing the power percentage with the frequency percentage means that the central controller adjusts the conduction angle or duty cycle of the power regulator (such as a solid-state relay or thyristor power regulator) to ensure that the real-time power percentage of the electric heater is always equal to the current frequency percentage, establishing a one-to-one proportional mapping relationship between the two.
[0060] For example, the central controller uses the frequency percentage calculated in S113 as the target value for the electric heating power percentage and sends a control signal to the power regulator. The power regulator adjusts its output according to the target power percentage, for example, by changing the conduction angle of the AC power to adjust the average power of the electric heater. When the frequency percentage increases, the central controller synchronously increases the target power percentage value; when the frequency percentage decreases, the central controller synchronously decreases the target power percentage value. The two values are always kept equal.
[0061] In one embodiment, the rated power of the electric heater is 10kW. When the compressor frequency is 60Hz and the frequency percentage is 60%, the central controller sets the power percentage target value to 60%, and the power regulator adjusts the output to make the actual electric heating power 6kW. When the compressor frequency decreases to 35Hz due to the increase in air supply temperature, the frequency percentage becomes 35%, and the central controller synchronously lowers the power percentage target value to 35%, and the power regulator reduces the actual electric heating power to 3.5kW. During normal temperature regulation, the electric heating power always maintains a synchronized percentage with the compressor frequency.
[0062] Through the synchronous control of power percentage and frequency percentage described above, this embodiment achieves a precise proportional mapping between the electric heating output and the compressor output capacity, ensuring that every change in compressor frequency is reflected in the electric heating power in real time. Compared to the independent PID control method in existing technologies, this embodiment provides a direct proportional following mechanism that eliminates the lag in temperature deviation feedback, making the adjustment of electric heating power responsive to changes in compressor status. This effectively solves the power mismatch problem caused by response lag and further enhances the coupling coordination between the compressor and the electric heater.
[0063] Figure 4 This is a flowchart of another heat pump electric heating coupling control method provided in the embodiments of this application, referred to... Figure 4 The heat pump electric heating coupling control method specifically includes: S21. In response to the electric heating start command, the electric heating is turned on, so that the power of the electric heating follows the operating frequency of the compressor, with the compressor as the main heat source and the electric heating as the auxiliary heat source.
[0064] The specific implementation method of this step is the same as that of S11 mentioned above, and will not be repeated here.
[0065] S22. Detect the air supply temperature. If the air supply temperature meets the first preset condition, start unloading the electric heater. The first preset condition includes the air supply temperature reaching the target temperature and maintaining it for a first preset time.
[0066] The specific implementation method of this step is the same as that of S12 mentioned above, and will not be repeated here.
[0067] S23. During the unloading process, monitor the compressor status and air supply temperature in real time. If the second preset condition is not met, gradually reduce the power of the electric heater according to the preset step size. If the second preset condition is met, stop reducing the power of the electric heater. The second preset condition includes the compressor status being in a limited frequency reduction state, the compressor status being running at the maximum frequency or the air supply temperature being lower than the preset temperature, and the preset temperature being lower than the target temperature by a preset value.
[0068] The specific implementation method of this step is the same as that of S13 mentioned above, and will not be repeated here.
[0069] S24. Enter the locked state. In the locked state, the power of the electric heating continues to follow the operating frequency of the compressor, but the power of the electric heating is limited to either decreasing or remaining unchanged.
[0070] After pausing the reduction of electric heating power in S23, the system enters a locked state. In this locked state, the electric heating power continues to follow the compressor's operating frequency, but the power is restricted to either decreasing or remaining constant. The locked state refers to a restricted operating state entered after pausing the reduction of electric heating power. In this state, the electric heating continues to operate normally, and its power continues to follow the compressor's operating frequency; however, unlike the normal temperature regulation state, the direction of power adjustment is restricted—it can only decrease or remain constant, and cannot increase. The duration of the locked state is determined by a preset lock time parameter. After the lock time expires, the system automatically exits the locked state and resumes normal bidirectional power following.
[0071] For example, after the reduction of electric heating power is paused in S13 due to the fulfillment of the second preset condition, the central controller immediately enters a locked state. In the locked state, the central controller continues to read the compressor operating frequency in real time and calculate the target power percentage. If the calculated target power percentage is less than or equal to the current electric heating power percentage, power adjustment is performed normally to reduce the electric heating power to the target value; if the target power percentage is greater than the current electric heating power percentage, the increase request is ignored, and the electric heating power remains unchanged. This directional restriction prevents the electric heating power from immediately rebounding after being paused due to insufficient compressor capacity, thus avoiding power oscillations.
[0072] In one embodiment, the preset lockout time is 2 minutes. Assume that in the aforementioned S13, unloading is paused due to the compressor entering a frequency-limited state, at which time the electric heating power is 2kW (20%). After entering the lockout state, the compressor's frequency-limited state is lifted, and the frequency returns to 45Hz, corresponding to a frequency percentage of 45%. According to the normal following rules, the electric heating power should synchronously increase to 4.5kW, but due to the lockout state, the power increase request is limited, and the electric heating power remains unchanged at 2kW. After the 2-minute lockout time ends, the lockout state is lifted, and the electric heating resumes normal bidirectional power following.
[0073] Through the power direction limiting mechanism described above in the locked state, this embodiment sets a stable transition period for the system after the unloading is paused, preventing the "decrease and then increase" oscillation phenomenon caused by the immediate rebound of electric heating power after the compressor resumes operation. The locked state allows the electric heating to further reduce power when the compressor frequency continues to decrease, but prohibits the increase of power when the compressor frequency rebounds, thus achieving a smooth switch between the unloading process and normal adjustment.
[0074] S25. Recording the entry into the locked state is a first type of counting event, and recording the reduction of the electric heating power to zero is a second type of counting event.
[0075] After entering the locked state in S24, entering the locked state is recorded as a first-type counting event, and the reduction of the electric heating power to zero is recorded as a second-type counting event. The first-type counting event refers to each event where the system pauses unloading and enters the locked state due to meeting the second preset condition. This event indicates that the compressor experienced insufficient output capacity during unloading, and unloading was interrupted. The second-type counting event refers to each event where the electric heating power is successfully reduced to zero (i.e., completely shut off) during unloading. This event indicates that the unloading process was successfully completed, and the compressor was able to independently maintain the supply air temperature throughout this period. These two types of events correspond to two different outcomes of unloading: interruption (first type) and successful completion (second type), providing a classification basis for subsequent graded protection.
[0076] For example, the central controller maintains two event loggers during operation. Whenever the system pauses unloading and enters a locked state due to the fulfillment of a second preset condition, the count value of the first type of event is incremented by one. Whenever the electric heating power is gradually reduced to 0% during the unloading process, the count value of the second type of event is incremented by one. The records of both types of events are timestamped for cumulative statistics within subsequent time windows.
[0077] In one embodiment, a heat pump unit underwent three unloading processes during a single operation. First unloading: The compressor operated normally, the supply air temperature stabilized, and the electric heating power successfully decreased from 40% to 0%, incrementing the second type of event count by 1. Second unloading: When unloading reached 15%, the compressor entered a frequency reduction state due to high-pressure protection, the system paused unloading and entered a locked state, incrementing the first type of event count by 1. Third unloading: The compressor operated normally again, and the electric heating power successfully decreased from 20% to 0%, incrementing the second type of event count by 1. At this point, the first type of event count was accumulated to 1, and the second type of event count was accumulated to 2.
[0078] Through the aforementioned dual-event classification and recording mechanism, this embodiment distinguishes unloading results into two heterogeneous events: successful completion and interruption, establishing a quantitative perception capability for unloading behavior patterns. This classification not only records the frequency of unloading occurrences but, more importantly, distinguishes the completion quality of each unloading, providing an accurate statistical basis for subsequent graded lockout protection. Compared to simply recording the total number of unloadings, the dual-event classification in this embodiment can more accurately reflect the actual operating status of the compressor and the system stability level.
[0079] It should be noted that the first and second counts are automatically reset to zero each time the system is powered on and started, ensuring that the count statistics only reflect the unloading behavior pattern of the current operating cycle and avoid the interference of outdated data from historical operating cycles with the protection judgment of the current cycle.
[0080] S26. Within the preset time window, accumulate the first count corresponding to the first type of counting event and the second count corresponding to the second type of counting event.
[0081] After recording the first and second types of count events in S25, the first count for the first type of count event and the second count for the second type of count event are accumulated within a preset time window. The preset time window is a fixed-length sliding statistical window (e.g., 30 minutes) used to limit the effective statistical range of the count events. The sliding time window scrolls forward over time, only counting events occurring within the most recent time window. The accumulated first count refers to the sum of all first-type count events within the preset time window. The accumulated second count refers to the sum of all second-type count events within the preset time window. By using a sliding time window, the counts always reflect the recent operating status of the system, avoiding the continuous accumulation of outdated historical events from interfering with current judgments.
[0082] For example, the central controller records the occurrence time of each Type I and Type II count event. In each sampling period (or after each event), the central controller uses the current time as the end point of the window, traces back a preset time window length, and filters out all Type I and Type II count events whose occurrence time falls within that window. The counts are then used as the current first count and second count, respectively. Historical events outside the window range are not included in the statistics.
[0083] In one embodiment, the preset time window is 30 minutes. The current time is 14:30, and the central controller rewinds to the time range of 14:00-14:30. Within this time window, two first-type counting events occur (at 14:05 and 14:20 respectively), and one second-type counting event occurs (at 14:15). Therefore, the first count is 2, and the second count is 1. Five minutes later (14:35), the time window slides to 14:05-14:35. The first-type counting event at 14:05 still falls within the window, and the first count remains 2. Five minutes later (14:40), the time window slides to 14:10-14:40. The event at 14:05 slides out of the window, and the first count is updated to 1.
[0084] By employing the aforementioned cumulative statistical method using a sliding time window, this embodiment ensures that the counting results always reflect the system's operational status within a recent time period, rather than the entire historical accumulation since power-on. The sliding window automatically discards outdated events, allowing lock-up protection decisions to be based on the latest operational trends. This avoids unnecessary lock-ups caused by a small number of early events remaining in the count for an extended period, while also ensuring timely responses to frequently occurring abnormal events. This dynamic time window mechanism balances the sensitivity and accuracy of protection.
[0085] Figure 5 This is a flowchart of another heat pump electric heating coupling control method provided in the embodiments of this application, referred to... Figure 5 The heat pump electric heating coupling control method specifically includes: S27. If the first number of times reaches the first threshold, trigger the first level of lockout to prevent the unloading of electric heating from starting within a preset lockout time.
[0086] After the first count corresponding to the first type of counting event and the second count corresponding to the second type of counting event accumulated in S26, if the first count reaches the first count threshold, a first-level lockout is triggered to prevent the unloading of the electric heater from starting within a preset lockout time. The first count threshold refers to the minimum accumulated number of first-type counting events required to trigger the first-level lockout. The first-level lockout is triggered when the first count within the preset time window reaches or exceeds this threshold. The first-level lockout is a warning-level unloading prohibition state. Its corresponding triggering event is that unloading is interrupted and the system enters a locked state, indicating that the compressor frequently experiences insufficient output capacity during unloading, and the system's operating state shows an unstable trend. The preset lockout time refers to the duration of the lockout state (e.g., 4 hours). During the lockout time, even if the air supply temperature meets the first preset condition, the system will not initiate the unloading of the electric heater, and the electric heater will remain in normal temperature regulation mode.
[0087] For example, after each update of the first and second counts in S26, the central controller compares the first count with a first count threshold. If the first count reaches or exceeds the first count threshold, a first-level lockout is triggered. After triggering, the central controller sets a lockout timer. During the preset lockout time, all unloading trigger signals that meet the first preset condition are ignored, and unloading of the electric heater is prohibited. During the lockout time, the electric heater operates in normal temperature regulation mode (power follows the compressor frequency, and unloading is not performed). After the lockout timer expires, the first-level lockout is automatically released.
[0088] In one embodiment, the initial count threshold is 10 times, and the preset lockout time is 4 hours. Within a 30-minute time window, due to frequent high-pressure and overcurrent protection triggers causing the compressor to enter a frequency-limited throttling state, the first type of count event accumulates to 10 times. The central controller triggers the first-level lockout and sets a 4-hour lockout timer. During the next 4 hours, even if the supply air temperature reaches 95°C and remains at that temperature for 30 seconds, meeting the first preset condition, the system will not initiate unloading, and the electric heating will maintain its normal power adjustment mode, following the compressor frequency. After 4 hours, the lockout timer expires, and the system resumes normal unloading functionality.
[0089] Through the first-level lock-up mechanism based on the counting of the first type of events, this embodiment can automatically pause the unloading function and return to the pure follow-up adjustment mode when the compressor frequently experiences insufficient output capacity. This prevents forced unloading from exacerbating system fluctuations when the compressor is running unstablely. As a kind of early warning protection, the first-level lock-up has a relatively high threshold setting and is only triggered when the system shows a significant unstable trend. This avoids being overly sensitive and affecting normal energy-saving operation, while also intervening in time for protection when necessary, effectively extending the service life of the compressor and related electric heating components.
[0090] S28. If the second number of times reaches the second number threshold, trigger the second level of locking to prevent the unloading of the electric heating from starting within a preset locking time.
[0091] After the first count corresponding to the first type of counting event and the second count corresponding to the second type of counting event are accumulated in S26, a second-level lockout is triggered when the second count reaches the second count threshold, thereby prohibiting the unloading of the electric heater within a preset lockout time. The second count threshold refers to the minimum accumulated number of second-type counting events required to trigger the second-level lockout. The second-level lockout is a protective unloading prohibition state, and its triggering event is the successful unloading of the electric heater power to zero. This indicates that the system has frequently completed a full unloading, shutdown, and restart cycle within a short period, the electric heater has undergone multiple power-on and power-off cycles, and the AC contactor and power regulating device have been subjected to repeated electrical shocks.
[0092] For example, after each update of the first and second counts in S26, the central controller compares the second count with a second count threshold. If the second count reaches or exceeds the second count threshold, a second-level lockout is triggered. Similar to the first-level lockout, unloading of the electric heater is prohibited for a preset lockout time after triggering. The lockout time for the second-level lockout and the first-level lockout can be the same (sharing the same preset lockout time parameter) or set separately. When both lockouts are triggered simultaneously, the lockout time is cumulative; the longer of the two times can be used, or they can be timed separately.
[0093] In one embodiment, the second count threshold is 3 times, and the preset lockout time is 4 hours. Within a 30-minute time window, after the electric heater successfully unloads to zero, a restart is triggered as the supply air temperature gradually decreases over time. This process repeats three times, accumulating three second-type count events. The central controller then triggers a second-level lockout, setting a 4-hour lockout timer during which unloading is prohibited. This second-level lockout avoids repeated impacts on electrical components caused by frequent complete shutdowns and restarts of the electric heater.
[0094] Through the second-level lockout mechanism based on the second type of event counting described above, this embodiment limits the frequent complete shutdown and restart cycles of the electric heater from the perspective of protecting the lifespan of electrical components. The threshold setting for the second-level lockout is lower (compared to the first-level lockout), reflecting a more stringent protection strategy for electrical components. Even if each unloading is successfully completed, excessively frequent complete start-stop cycles will still accelerate the wear and tear on contactors and power devices. By intervening in the second-level lockout, repeated impact losses on electrical components are effectively reduced, extending the service life of the entire electrical system.
[0095] It should be noted that under special operating conditions (such as when the compressor is shut down for a long time due to failure or maintenance, or when the system relies solely on electric heating for independent heating), since the compressor is not running, the air supply temperature cannot be maintained independently by the compressor. The unloading process may be repeatedly triggered and interrupted. In this case, the graded lockout logic can quickly reach the counting threshold and trigger lockout, so that the system automatically switches to the electric heating-only control mode, avoiding system instability caused by repeated invalid restarts of the unloading logic when the compressor is unavailable.
[0096] In one embodiment, after the first-level lockout is triggered in S27 or the second-level lockout is triggered in S26, the method further includes: continuously monitoring the supply air temperature; generating an electric heating start command when the restart conditions are met; and resetting the first and second counts to zero. The restart conditions include the supply air temperature being lower than a preset restart temperature for a second preset time, and the electric heating overload protection switch being closed and the supply air fan having been running for a preset duration. The preset restart temperature is a temperature threshold value that is one preset temperature offset value lower than the target temperature. When the supply air temperature remains below this value, it indicates that heating by the compressor alone is insufficient to meet the heating demand, and the auxiliary heat source needs to be restarted. The second preset time is the shortest duration for which the supply air temperature needs to remain below the preset restart temperature, used to confirm the cooling trend rather than a short-term fluctuation. Resetting the first and second counts to zero means resetting the starting point of the counting statistics after successful electric heating restart, allowing the lockout protection mechanism to recount based on the new operating cycle. The condition of the electric heating overload protection switch being closed and the supply air fan having been running for a preset duration is consistent with the safety conditions when the electric heating is initially turned on, ensuring that the restart process meets the basic requirements for safe operation.
[0097] For example, in the locked state, the central controller continuously monitors the supply air temperature. When the supply air temperature drops below the preset restart temperature, a timer is started. If the supply air temperature remains below the preset restart temperature for a second preset time period, it further checks whether the electric heating overload protection switch is closed (not triggered by overload protection to open) and whether the supply air fan has started and is running normally before the preset time period. If both conditions are met, the central controller generates an electric heating start command, restarts the electric heating, and enters the normal temperature regulation mode (power follows the compressor frequency). At the same time, the central controller resets the first and second counts to zero, and the preset time window restarts its sliding statistics from the current moment, providing a clean starting point for a new round of unloading-lock cycles.
[0098] In one embodiment, the target temperature is 95°C, the preset restart temperature offset is 2°C (i.e., the preset restart temperature is 93°C), and the second preset time is 2 minutes. During the lockout period, the unit continues to operate primarily using the compressor as the heat source. As the ambient temperature decreases or the heat load increases, the supply air temperature gradually decreases from 95°C. When the supply air temperature drops below 93°C, the central controller starts a 2-minute timer. If the supply air temperature remains below 93°C for 2 minutes (e.g., fluctuating between 92.5°C and 92.8°C), and the electric heating overload protection switch is closed and the supply air fan has been running normally for more than a preset duration (30 seconds), the central controller generates an electric heating start command to restart the electric heating. Simultaneously, the first and second counts are reset to zero, and the time window restarts from the current moment.
[0099] Through the aforementioned multi-condition coordinated restart mechanism after lockout, this embodiment ensures that the electric heating restart is only executed when the compressor's heat is indeed insufficient and safety conditions are met, avoiding false restarts caused by instantaneous temperature fluctuations. The counter reset and time window reset after restart allow the lockout protection mechanism to reassess the system state based on the new operating cycle, preventing historical events from the previous cycle from affecting the protection judgment in the new cycle, thus achieving an adaptive balance between protection and availability.
[0100] Figure 6 This is a flowchart of another heat pump electric heating coupling control method provided in the embodiments of this application, referred to... Figure 6 The heat pump electric heating coupling control method specifically includes: S301, Begin.
[0101] The heat pump unit is powered on and started. All sensors and actuators are initialized, and the central controller enters normal operation monitoring mode. During initialization, the first and second counts are both zero, and the preset time window starts at the current moment.
[0102] It should be noted that all preset parameters involved in this embodiment, including the first preset time, preset step size, preset ratio, preset lock time, preset dead time, preset time window, first count threshold, second count threshold, preset restart temperature, second preset time, and preset duration, all support power-off memory, that is, the parameter values are not lost after the system is powered off, and are automatically restored to the previously set values when the power is restored.
[0103] S302, the electric heating power is turned on and follows the compressor frequency.
[0104] After the aforementioned S301 starts, the central controller determines that electric heating needs to be activated (the supply air temperature is lower than the target temperature by more than the allowable deviation), and executes the electric heating activation and power tracking described in S11. The electric heating power percentage changes synchronously with the compressor frequency percentage in real time. The compressor is the main heat source, and the electric heating is the auxiliary heat source. The central controller first starts the supply air fan and then connects the power supply circuit of the electric heater after a delay through the sequential control described in S111-S112. Subsequently, through the frequency percentage mapping and power percentage synchronization control described in S113-S114, the electric heating power is made to follow the compressor frequency in real time. In one embodiment, the compressor operates at 50Hz (50% frequency percentage), the electric heater provides auxiliary heating at 5kW (50% power percentage), and the supply air temperature gradually increases from 60°C.
[0105] S303, Determination of conditions for active uninstallation.
[0106] The central controller continuously monitors the air supply temperature and determines whether it meets a first preset condition, namely, whether the air supply temperature reaches the target temperature and remains at it for a first preset time, or whether the air supply temperature has not reached the target temperature but the rate of change exceeds a preset threshold. After the electric heater is activated, the air supply temperature is continuously acquired. If the air supply temperature reaches the target temperature, a first preset timer is started, and during the timer, the air supply temperature is continuously monitored to ensure it remains within the allowable deviation range. After the electric heater is activated, the rate of change of the air supply temperature is continuously calculated to determine whether it exceeds a preset threshold. If either condition is met, the process proceeds to S304; if neither condition is met, the process returns to S302 to continue normal temperature adjustment. In one embodiment, the target temperature is 95°C, and the first preset time is 30 seconds. If the air supply temperature reaches 95°C and remains at it for 30 seconds without dropping, the first preset condition is met, and the process proceeds to the unloading process.
[0107] S304, Enter the uninstallation process.
[0108] The central controller initiates the unloading process, gradually reducing the electric heating power according to the steps described in S13. Before each reduction during the unloading process, the condition determination in S305 is executed first.
[0109] S305, Uninstallation lock condition determination.
[0110] Before each unloading step, the central controller checks whether the second preset condition described in S13 is met: whether the compressor is in a frequency-limited state, whether the compressor is running at its maximum frequency, and whether the supply air temperature is lower than the preset temperature (target temperature minus the preset value). If none of the three conditions are met, S307 is executed to continue unloading; if any one condition is met, S306 is executed to pause unloading and lock. In one embodiment, before each unloading, the supply air temperature has dropped to 93.5°C, which is not yet lower than the preset temperature of 93°C, but the central controller detects that the compressor has entered a frequency-limited state due to high-pressure protection, thus meeting the second preset condition, and proceeds to S306.
[0111] S306, Stop uninstallation, lock downgrade only, no upgrade.
[0112] The central controller pauses the reduction of electric heating power and enters the locked state described in S24. In the locked state, the electric heating power continues to follow the compressor frequency but is only allowed to decrease or remain unchanged; the lock duration is a preset lock time. In one embodiment, the preset lock time is 2 minutes. After entering the locked state, the electric heating power remains at its current value (e.g., 20%). If the compressor frequency decreases, causing the target power to fall below the current value, a decrease is allowed; if the compressor frequency increases again, an increase is not allowed. After 2 minutes, the locked state is automatically released, returning to normal temperature regulation in S302.
[0113] S307, Continue uninstalling.
[0114] When S305 determines that the second preset condition is not met, the electric heating power continues to decrease according to the preset unloading step size and interval.
[0115] S308, reduce the preset percentage power at preset time intervals.
[0116] During the aforementioned S307 process of continuing unloading, the central controller reduces the current electric heating power by a preset percentage (e.g., 5%) at preset time intervals (e.g., 10 seconds). After the reduction, the process proceeds to S309 for determination. In one embodiment, the unloading time interval is 10 seconds, and the unloading percentage is 5%. The current electric heating power is 4kW (40%), which is reduced by 5% to 3.8kW (38%) after 10 seconds, and then reduced to 3.61kW (approximately 36%) after another 10 seconds, and so on.
[0117] S309. Has the power been reduced to 0%? After the aforementioned S308 completes one unloading operation, the central controller checks whether the current power of the electric heater has dropped to zero (i.e., the electric heater has been completely turned off). If it has dropped to zero, it indicates that the unloading has been successfully completed, and the second type of counting event, S311, is executed with the count L2+1; if it has not yet dropped to zero, S310 is executed to continue the determination.
[0118] S310, Is it locked? If the heater power has not yet dropped to zero as determined in step 309, the central controller checks whether the lock in step S306 was triggered during this unloading process (i.e., the unloading is paused and the system enters a locked state due to the fulfillment of the second preset condition). If the lock has been triggered, the count L1+1 of the first type of counting event in step S312 is executed; if the lock has not been triggered, the system returns to step S302 to continue normal temperature regulation and waits for the next unloading condition to be met.
[0119] S311, L2 count +1.
[0120] After the aforementioned S309 determines that the electric heating power has been successfully unloaded to zero, the second type of counting event count is incremented by one, i.e., the L2 count is incremented by 1. The central controller records the timestamp of the event and executes the lockout determination in S313.
[0121] S312, L1 count +1.
[0122] Upon determining the entry into a locked state in S310, i.e., entering a locked state during the unloading process due to the fulfillment of the second preset condition, the first type of counting event count is incremented by one, i.e., the L1 count is incremented by 1. The central controller records the timestamp of the event occurrence and executes the lockout determination in S313.
[0123] S313, is the L2 count within t_window ≥ n_lock_L2? Following S311 and S312, the central controller, using the sliding time window method described in S26, counts the cumulative number of second-type events (L2) within the current time window (t_window) and compares it with the second count threshold (n_lock_L2). If the threshold is reached or exceeded, i.e., the L2 count within t_window is ≥ n_lock_L2, S314 is executed to trigger L2 locking; otherwise, S315 is executed to continue L1 determination. In one embodiment, the second count threshold is 3 times. The cumulative number of second-type events (L2) within the 30-minute time window is 3, reaching the threshold and triggering L2 locking.
[0124] S314 and L2 are locked, and unloading is not allowed within t_lock.
[0125] When the L2 count within t_window is greater than or equal to n_lock_L2 as determined by S313, a second-level lockout, i.e., L2 lockout, is triggered. The central controller sets a lockout timer, prohibiting unloading operations on the electric heater within the preset lockout time t_lock. During the lockout period, the system operates in normal temperature regulation mode (power follows the compressor frequency, and unloading is not performed). After the timer expires, the L2 lockout is automatically released.
[0126] S315, Is the L1 count within t_window ≥ n_lock_L1? When S313 determines that the L2 count within t_window is less than n_lock_L2, the central controller, following the sliding time window method described in S26, counts the cumulative number L1 of the first type of counting events within the current time window (i.e., t_window) and compares it with the first counting threshold (n_lock_L1). If the threshold is reached or exceeded, i.e., the L1 count within t_window is ≥ n_lock_L1, S316 is executed to trigger L1 lockout; otherwise, S302 is returned to continue normal temperature regulation.
[0127] S316 and L1 are locked, and unloading is not allowed within t_lock.
[0128] When the L1 count within t_window is greater than or equal to n_lock_L1 as determined in step 315, the first level of lockout, i.e., L1 lockout, is triggered. The central controller sets a lockout timer, prohibiting the unloading operation of the electric heater within the preset lockout time t_lock. During the lockout period, if the supply air temperature drops to meet the aforementioned restart conditions, the central controller regenerates the electric heater start-up command, resets the first and second counts to zero, and returns to step S302. After the lockout timer completes its count, the lockout is released, and the system returns to step S302.
[0129] Through the complete S301-S316 integrated process described above, this embodiment organically integrates power tracking, active unloading, conditional gating, lockout protection, classification counting, graded locking, and coordinated restart into a closed-loop control system. From power tracking when electric heating is activated, to active unloading when the compressor independently maintains the temperature, to real-time conditional gating and lockout protection during the unloading process, and then to graded locking and coordinated restart based on the accumulation of dual-type events, each link progresses step by step and cooperates with each other, realizing intelligent management of the entire process of heat pump electric heating coupling control. Under the premise of ensuring stable supply air temperature and the safety of electrical components, the unit's operating energy efficiency is maximized. Under ideal operating conditions (sufficient compressor output capacity and stable supply air temperature), electric heating only provides auxiliary heating during the initial heating stage. Once the supply air temperature reaches the target temperature and remains stable, the compressor can independently maintain a constant temperature. Electric heating is completely deactivated after active unloading, and no electric heating intervention is required during long-term constant temperature operation, thus maximizing system energy efficiency.
[0130] Based on the above embodiments, Figure 7 This is a schematic diagram of a heat pump electric heating coupling control device provided in an embodiment of this application. (Reference) Figure 7 The heat pump electric heating coupling control device provided in this embodiment specifically includes: an electric heating start module 21, an unloading start module 22, and an unloading execution module 23.
[0131] Among them, the electric heating start module 21 is used to respond to the electric heating start command, start the electric heating, and make the power of the electric heating follow the operating frequency of the compressor, with the compressor as the main heat source and the electric heating as the auxiliary heat source. The unloading startup module 22 is used to detect the air supply temperature. When the air supply temperature meets the first preset condition, the unloading of the electric heater is started. The first preset condition includes the air supply temperature reaching the target temperature and maintaining it for a first preset time. The unloading execution module 23 is used to monitor the compressor status and air supply temperature in real time during the unloading process. If the second preset condition is not met, the power of the electric heating is gradually reduced by a preset step size. If the second preset condition is met, the reduction of the power of the electric heating is paused. The second preset condition includes the compressor status being in a limited frequency reduction state, the compressor status being running at the maximum frequency or the air supply temperature being lower than the preset temperature, and the preset temperature being lower than the target temperature by a preset value.
[0132] In one embodiment, the electric heating start-up module 21 includes: a frequency mapping submodule and a synchronization control submodule; The frequency mapping submodule is used to map the compressor's current operating frequency to a frequency percentage, where the frequency percentage is the proportion of the current operating frequency to the compressor's maximum operating frequency. The synchronization control submodule is used to control the power percentage of the electric heating to be synchronized with the frequency percentage, where the power percentage is the ratio of the current power of the electric heating to its rated power.
[0133] In one embodiment, the heat pump electric heating coupling control device further includes: a locking module, a recording module, and a counting module; The locking module is used to enter a locked state. In the locked state, the power of the electric heating continues to follow the operating frequency of the compressor, but the power of the electric heating is limited to either decreasing or remaining constant. The recording module is used to record entering the locked state as a first type of counting event and to record the power of electric heating being reduced to zero as a second type of counting event. The counting module is used to accumulate the first count corresponding to the first type of counting event and the second count corresponding to the second type of counting event within a preset time window.
[0134] In one embodiment, the heat pump electric heating coupling control device further includes: a primary lock-up module and a secondary lock-up module; The first-level lockout module is used to trigger the first-level lockout when the first number of times reaches the first threshold, so as to prevent the unloading of the electric heating from starting within a preset lockout time. The secondary lock-up module is used to trigger a second-level lock-up when the second number of attempts reaches the second threshold, so as to prevent the unloading of the electric heating from starting within a preset lock-up time.
[0135] In one embodiment, the heat pump electric heating coupling control device further includes: a restart module; The restart module is used to continuously monitor the supply air temperature. When the restart conditions are met, it generates an electric heating start command and resets the first and second counts to zero. The restart conditions include the supply air temperature being lower than the preset restart temperature for a second preset time, and the electric heating overload protection switch being closed and the supply air fan having been started for a preset duration.
[0136] In one embodiment, the electric heating start module 21 includes: a fan start submodule and an electric heating start submodule; The fan start submodule is used to receive the electric heating start command and start the air supply fan in response to the electric heating start command; The electric heating start-up submodule is used to detect the closed state of the electric heating overload protection switch after a preset time of starting the air supply fan. If the electric heating overload protection switch is in the closed state, the power supply circuit of the electric heater is connected to start the electric heating.
[0137] In one embodiment, the first preset condition includes the rate of change of the supply air temperature exceeding a preset threshold. Based on the aforementioned implementation, the unloading start module 22 is also used to start the unloading of the electric heater when the supply air temperature does not reach the target temperature and the rate of change of the supply air temperature exceeds a preset threshold.
[0138] The heat pump electric heating coupling control device provided in this application embodiment can be used to execute the heat pump electric heating coupling control method provided in the above embodiment, and has corresponding functions and beneficial effects.
[0139] This application provides a heat pump electric heating coupling control device, referring to... Figure 8 The heat pump electric heating coupling control device includes: a processor 31, a memory 32, a communication module 33, an input device 34, and an output device 35. The number of processors and the number of memories in the heat pump electric heating coupling control device can be one or more. The processor, memory, communication module, input device, and output device of the heat pump electric heating coupling control device can be connected via a bus or other means.
[0140] The memory 32, as a computer-readable storage medium, can be used to store software programs, computer-executable programs, and modules, such as program instructions / modules corresponding to the heat pump electric heating coupling control method described in any embodiment of this application (e.g., the electric heating start-up module, unloading start-up module, and unloading execution module in the heat pump electric heating coupling control device). The memory may primarily include a program storage area and a data storage area, wherein the program storage area may store the operating system and at least one application program required for a function; the data storage area may store data created based on the use of the device, etc. Furthermore, the memory may include high-speed random access memory and may also include non-volatile memory, such as at least one disk storage device, flash memory device, or other non-volatile solid-state storage device. In some instances, the memory may further include memory remotely located relative to the processor, and these remote memories can be connected to the device via a network. Examples of such networks include, but are not limited to, the Internet, corporate intranets, local area networks, mobile communication networks, and combinations thereof.
[0141] The communication module 33 is used for data transmission.
[0142] The processor 31 executes various functional applications and data processing of the device by running software programs, instructions and modules stored in the memory, thereby realizing the above-mentioned heat pump electric heating coupling control method.
[0143] Input device 34 can be used to receive input digital or character information, and to generate key signal inputs related to user settings and function control of the device. Output device 35 may include display devices such as a display screen.
[0144] The heat pump electric heating coupling control device provided above can be used to execute the heat pump electric heating coupling control method provided in the above embodiments, and has corresponding functions and beneficial effects.
[0145] This application embodiment also provides a storage medium for storing computer-executable instructions. When executed by a computer processor, the computer-executable instructions are used to execute a heat pump electric heating coupling control method. This method includes: responding to an electric heating start command, activating the electric heating, causing the electric heating power to follow the compressor's operating frequency, with the compressor as the primary heat source and the electric heating as an auxiliary heat source; detecting the supply air temperature, and, if the supply air temperature meets a first preset condition, initiating unloading of the electric heating, wherein the first preset condition includes the supply air temperature reaching a target temperature and maintaining it for a first preset time; during the unloading process, monitoring the compressor status and supply air temperature in real time, and, if a second preset condition is not met, gradually reducing the electric heating power by a preset step size; and, if the second preset condition is met, pausing the reduction of the electric heating power; wherein the second preset condition includes the compressor status being in a limited frequency reduction state, the compressor status being running at its maximum frequency, or the supply air temperature being lower than a preset temperature, wherein the preset temperature is lower than the target temperature by a preset value.
[0146] Storage medium – any type of memory device or storage device. The term “storage medium” is intended to include: mounting media, such as CD-ROM, floppy disk, or magnetic tape devices; computer system memory or random access memory, such as DRAM, DDR RAM, SRAM, EDO RAM, Rambus RAM, etc.; non-volatile memory, such as flash memory, magnetic media (e.g., hard disk or optical storage); registers or other similar types of memory elements, etc. Storage medium may also include other types of memory or combinations thereof. Furthermore, storage medium may reside in a first computer system in which the program is executed, or it may reside in a different second computer system connected to the first computer system via a network (such as the Internet). The second computer system can provide program instructions to the first computer for execution. The term “storage medium” can include two or more storage media residing in different locations (e.g., in different computer systems connected via a network). Storage medium may store program instructions (e.g., specifically implemented as a computer program) executable by one or more processors.
[0147] Of course, the storage medium for storing computer-executable instructions provided in the embodiments of this application is not limited to the heat pump electric heating coupling control method as described above, but can also execute related operations in the heat pump electric heating coupling control method provided in any embodiment of this application.
[0148] The heat pump electric heating coupling control device, storage medium, and heat pump electric heating coupling control equipment provided in the above embodiments can execute the heat pump electric heating coupling control method provided in any embodiment of this application. For technical details not described in detail in the above embodiments, please refer to the heat pump electric heating coupling control method provided in any embodiment of this application.
[0149] The above description is merely a preferred embodiment and the technical principles employed in this application. This application is not limited to the specific embodiments described herein, and various obvious changes, readjustments, and substitutions that can be made by those skilled in the art will not depart from the scope of protection of this application. Therefore, although this application has been described in detail through the above embodiments, this application is not limited to the above embodiments, and may include more other equivalent embodiments without departing from the concept of this application, the scope of which is determined by the scope of the claims.
Claims
1. A heat pump electric heating coupling control method, characterized in that, include: In response to the electric heating start command, the electric heating is turned on, and the power of the electric heating follows the operating frequency of the compressor, with the compressor as the main heat source and the electric heating as the auxiliary heat source; The supply air temperature is detected. If the supply air temperature meets a first preset condition, the unloading of the electric heater is initiated. The first preset condition includes the supply air temperature reaching the target temperature and maintaining it for a first preset time. During the unloading process, the compressor status and the air supply temperature are monitored in real time. If the second preset condition is not met, the power of the electric heater is gradually reduced by a preset step size. If the second preset condition is met, the reduction of the power of the electric heater is paused. The second preset condition includes the compressor status being in a limited frequency reduction state, the compressor status being running at the maximum frequency, or the air supply temperature being lower than a preset temperature, wherein the preset temperature is lower than the target temperature by a preset value.
2. The method according to claim 1, characterized in that, The method of making the power of the electric heating follow the operating frequency of the compressor includes: The current operating frequency of the compressor is mapped to a frequency percentage, where the frequency percentage is the proportion of the current operating frequency to the maximum operating frequency of the compressor. The power percentage of the electric heating is controlled to be synchronized with the frequency percentage, where the power percentage is the ratio of the current power of the electric heating to its rated power.
3. The method according to claim 1, characterized in that, After pausing the reduction of the electric heating power, the method further includes: Entering a locked state, in which the power of the electric heater continues to follow the operating frequency of the compressor, but the power of the electric heater is limited to either decreasing or remaining constant; Entering the locked state is recorded as a first type of counting event, and the power of the electric heating being reduced to zero is recorded as a second type of counting event; Within a preset time window, the first count corresponding to the first type of counting event and the second count corresponding to the second type of counting event are accumulated respectively.
4. The method according to claim 3, characterized in that, After accumulating the first count corresponding to the first type of counting event and the second count corresponding to the second type of counting event, the method further includes: If the first number of times reaches the first threshold, a first-level lockout is triggered to prevent the unloading of the electric heater from starting within a preset lockout time. If the second number of times reaches the second threshold, a second-level lockout is triggered to prevent the unloading of the electric heating from starting within the preset lockout time.
5. The method according to claim 4, characterized in that, After triggering the first-level lockout or the second-level lockout, the following is also included: The air supply temperature is continuously monitored. When the restart conditions are met, the electric heating start command is generated, and the first and second counts are cleared. The restart conditions include the air supply temperature being lower than the preset restart temperature for a second preset time, and the electric heating overload protection switch being closed and the air supply fan being started for a preset time.
6. The method according to claim 1, characterized in that, The step of activating the electric heating in response to the electric heating activation command includes: Upon receiving an electric heating start command, the blower is activated in response to the electric heating start command. After the air supply fan has been started for a preset time, the closed state of the electric heating overload protection switch is detected. If the electric heating overload protection switch is closed, the power supply circuit of the electric heater is connected to start the electric heating.
7. The method according to claim 1, characterized in that, The first preset condition includes the rate of change of the supply air temperature exceeding a preset threshold. When the supply air temperature meets the first preset condition, unloading the electric heater is initiated, including: If the supply air temperature does not reach the target temperature and the rate of change of the supply air temperature exceeds the preset threshold, the unloading of the electric heater is initiated.
8. A heat pump electric heating coupling control device, characterized in that, include: An electric heating start-up module is used to respond to an electric heating start-up command, start the electric heating, and make the power of the electric heating follow the operating frequency of the compressor, with the compressor as the main heat source and the electric heating as an auxiliary heat source; The unloading startup module is used to detect the air supply temperature. When the air supply temperature meets a first preset condition, the unloading of the electric heater is started. The first preset condition includes the air supply temperature reaching the target temperature and maintaining it for a first preset time. The unloading execution module is used to monitor the compressor status and the air supply temperature in real time during the unloading process. If the second preset condition is not met, the power of the electric heater is gradually reduced by a preset step size. If the second preset condition is met, the reduction of the power of the electric heater is paused. The second preset condition includes the compressor status being in a limited frequency reduction state, the compressor status being running at the maximum frequency, or the air supply temperature being lower than a preset temperature, wherein the preset temperature is lower than the target temperature by a preset value.
9. A heat pump electric heating coupling control device, characterized in that, include: Memory and one or more processors; The memory is used to store one or more programs; When the one or more programs are executed by the one or more processors, the one or more processors implement the method as described in any one of claims 1-7.
10. A storage medium for storing computer-executable instructions, characterized in that, The computer-executable instructions, when executed by a processor, are used to perform the method as described in any one of claims 1-7.