Cement clinker simulated firing system and method thereof
By integrating a preheating chamber, lifting chamber, cooling chamber, and conveyor chain into a simulated firing system, the problem of integrated operation of cement clinker simulated firing equipment has been solved, achieving waste heat recovery and precise temperature control, thereby improving equipment efficiency and test accuracy.
Patent Information
- Application Number
- CN202611625550.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-20
- Publication Date
- 2026-11-24
AI Technical Summary
Existing cement clinker calcination simulation equipment suffers from low integration, with independent heating, conveying, and cooling functional units, leading to energy waste and low temperature reproduction accuracy.
A simulated firing system integrating a preheating chamber, a lifting chamber, a cooling chamber, and a conveyor chain was designed. Automatic flow is achieved through the cooperation of the conveyor chain and the lifting mechanism. A controllable airflow path is constructed using multi-chamber insulated gates to realize waste heat recovery and precise temperature control.
It realizes a fully automated firing process, reduces energy consumption, improves temperature reproduction accuracy, reduces equipment footprint, and enhances test efficiency and data repeatability.
Smart Images

Figure CN123154641A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of material calcination equipment and provides a cement clinker simulation calcination system and method. Background Technology
[0002] Cement clinker calcination simulation testing is a key experimental method in cement material research and development and quality control, primarily used to reproduce the high-temperature reaction process of raw meal calcination to produce cement clinker in industrial settings. The test uses laboratory-made raw meal or industrial raw meal collected from cement plants as test samples. Containers containing the samples are placed inside a calcination system for high-temperature calcination. After calcination, the samples are cooled and then ground until all material passes through an 80μm sieve. The sieved powder is then stored in labeled ground glass vials for subsequent testing of free calcium oxide content and determination of clinker chemical composition. This simulated calcination test can rapidly evaluate the calcinability of raw meal and assess the rationality of raw material formulations, providing fundamental experimental data support for adjusting cement production process parameters and developing new raw material formulations. It plays an irreplaceable role in the field of cement raw meal calcinability testing.
[0003] Currently, most cement clinker calcination simulation equipment used in laboratories uses a split-type lifting furnace as the core calcination unit, equipped with an independent transfer and sampling mechanism and an external air-cooling system. The lifting furnace itself has an independently set high-temperature furnace chamber, relying on its own heating elements to heat and calcine the raw material specimens. Material transfer often employs an external mechanical sampling system similar to a forklift. Before calcination, this sampling mechanism sends the sample-filled bowl into the furnace chamber, and after calcination, the high-temperature bowl is removed from the furnace chamber using the same sampling mechanism. The removed high-temperature specimen is then transferred to an independent air-cooling station, where it is forced to cool by direct airflow from an external fan. The calcination station, material transfer station, and cooling station of the entire equipment are independent of each other. The specimen needs to be transferred back and forth between multiple separate equipment stations, relying on external mechanical mechanisms to coordinate the actions of the specimen in the heating, transfer, and air-cooling processes. Each process unit is arranged separately, and the heating, transitional transfer, and cooling of the specimen are performed sequentially step by step.
[0004] Existing simulated firing devices of this type have significant drawbacks in practical use. The integration of the entire system is not high, and the heating, transfer, and cooling functional units are independent of each other. The sample needs to be transferred between multiple stations. The transfer process not only increases the complexity of equipment control, but also causes a large amount of heat to be directly lost into the environment during the transfer of high-temperature samples across stations, making it impossible to recover and reuse the waste heat. There is no controllable heat-insulating airflow path between the heating chamber and the cooling chamber. The high-temperature waste heat generated during calcination cannot be used for preheating the sample to be calcined. Each test requires a large amount of electrical energy to reheat the room-temperature sample to the calcination temperature, resulting in a large amount of energy waste. Furthermore, the sample loses heat randomly during external transfer, and the furnace temperature is greatly affected by external environmental disturbances, which also has an adverse effect on the temperature reproduction accuracy of the simulated firing test. Summary of the Invention
[0005] To address the aforementioned deficiencies, the present invention aims to provide a cement clinker simulation firing system and method, thereby resolving the problems raised in the background art. The system includes:
[0006] The preheating chamber, the lifting chamber, and the cooling chamber are arranged sequentially in a horizontal direction, and a motor-driven conveyor chain is set below each chamber; the conveyor chain is equipped with a running fixture that can be driven by the conveyor chain; the top of the preheating chamber is equipped with an air chamber, the top of the lifting chamber is equipped with a transition chamber, and the top of the transition chamber is equipped with a heating chamber.
[0007] It also includes: a first lifting mechanism and a second lifting mechanism respectively located below the preheating chamber and below the lifting chamber area; a first heat insulation gate between the preheating chamber and the lifting chamber; a second heat insulation gate between the preheating chamber and the gas chamber; a third heat insulation gate between the gas chamber and the transition chamber; and a fourth heat insulation gate on the top of the heating chamber.
[0008] The preheating chamber has a first insulated door that can be opened and closed on one side, and the cooling chamber has a second insulated door on the side away from the device.
[0009] The cooling chamber is provided with an air inlet, and the interior of the cooling chamber is provided with a side air outlet. The air chamber and the heating chamber are respectively provided with a first air outlet and a second air outlet 26.
[0010] Furthermore, the system also includes a first temperature detector, a second temperature detector, and a third temperature detector, which are respectively located inside the preheating chamber, the transition chamber, and the cooling chamber.
[0011] Furthermore, one conveyor chain is provided on each side of the running direction of the running tool, and they are arranged in parallel.
[0012] The upper part of the running fixture is provided with a clamping structure for placing the material bowl, and the bottom two sides of the running fixture are respectively provided with downward extending clamping teeth, which mesh with the links of the conveyor chain.
[0013] Furthermore, the top of the lifting chamber is connected to the lower part of the transition chamber, the transition chamber is connected to the lower part of the heating chamber, and a connecting port is provided between the transition chamber and the heating chamber. When the running fixture is lifted to the connecting port, the connecting port can be closed.
[0014] Furthermore, the connection between the heating chamber and the transition chamber is equipped with a locking mechanism.
[0015] The locking mechanism is used to automatically lock the running tool in the heating chamber after it is lifted and sent into the heating chamber by the second lifting mechanism and reaches the heating working position, while sealing the material in the heating chamber.
[0016] Furthermore, the heating chamber is equipped with a resistance heating wire inside, and the outer periphery of the heating chamber is covered with a heat insulation layer. The fourth heat insulation gate is located at the connection between the second air outlet 26 and the heating chamber.
[0017] Furthermore, the side air outlets are vertically arranged on the left and right sides inside the cooling chamber, and each side air outlet is either a long, narrow slit or an array of multiple ventilation holes along the vertical direction.
[0018] The above cement clinker calcination simulation system executes the following cement clinker calcination simulation method, including the following steps:
[0019] S1: Heating operation of the first piece of material;
[0020] S1.1 The operator opens the first insulation door, places the running fixture containing the A material bowl on the conveyor chain, and the running fixture is transported by the conveyor chain to the designated position in the preheating chamber. The first insulation door is then closed, and the device is in a ready state.
[0021] S1.2 The running fixture containing the A material bowl is transported by the conveyor chain to the designated position of the lifting chamber, and then directly sent by the lifting mechanism to the connection between the heating chamber and the transition chamber. The locking mechanism locks the running fixture, and the material in the A material bowl is directly fired.
[0022] S1.3, Preparation of the next material: The operator opens the first insulation door, places the running fixture containing the B material bowl on the conveyor chain, and the running fixture is transported by the conveyor chain to the designated position in the preheating chamber. The first insulation door is then closed.
[0023] S2: Enter parallel operation mode;
[0024] S2.1 The second lifting mechanism rises to the running fixture containing the A material bowl that has been fired in step S1, the locking mechanism is released, and the second lifting mechanism drives the lowering mechanism to place it on the conveyor chain.
[0025] S2.2 The conveyor chain transports the running fixture containing the B material bowl to the designated position of the lifting chamber, and the second lifting mechanism sends it to the connection between the heating chamber and the transition chamber. The locking mechanism locks the running fixture containing the B material bowl, and the material in the B material bowl is directly fired.
[0026] S2.3 Open the first insulation door, place the running fixture containing the C material bowl on the conveyor chain, and transport it to the designated position in the preheating chamber by the conveyor chain. Close the first insulation door, and the first lifting mechanism lifts the running fixture containing the C material bowl away from the conveyor chain. Then the conveyor chain drives the running fixture containing the A material bowl to the designated position in the cooling chamber.
[0027] S2.4 Start the external fan to carry out parallel operation mode of cooling, heating and preheating of the three groups of materials A, B and C at the same time;
[0028] S3: Status switch after preheating is complete; specifically, it includes the following steps:
[0029] S3.1 Switch the opening and closing states of each heat insulation gate as follows: the first and second heat insulation gates are closed, the third heat insulation gate is open, and the fourth heat insulation gate is closed; ventilate the cooling chamber;
[0030] S3.2, The well-ventilated material container is transported out;
[0031] The second insulating door is opened, and the conveyor chain moves the running fixture containing the A material bowl outside the device, where workers can unload it from the conveyor chain.
[0032] S3.3 The first lifting mechanism lowers the running fixture containing the C material bowl onto the conveyor chain, and enters the material preparation stage again, waiting for the currently heated material to be burned out.
[0033] Repeat steps S2.1 to S3.3.
[0034] Furthermore, in step S3: when the first temperature detector detects that the preheating temperature of the subsequent sample has reached the preset target preheating temperature or the highest temperature that can be preheated, the controller determines that the preheating process of the subsequent material has been completed. At this time, the system controls the switching of the air path to keep the preheated material in the C material bowl warm and to quickly dissipate heat and cool the material in the A material bowl.
[0035] Furthermore, the method also includes the following steps:
[0036] S4: When no subsequent materials need to be fired, i.e., no subsequent materials need to be preheated, the overall heat dissipation process of the actuator includes the following sub-steps:
[0037] S4.1 First, after the last group of materials is sent into the heating chamber, the materials that have been heated in the previous stage remain in the cooling chamber. At this time, the system controls the first and second heat insulation gates to open, the third heat insulation gate to close, and the fourth heat insulation gate to close, and the cooling chamber is ventilated.
[0038] S4.2 After cooling is complete, open the second insulation door and transport the material out of the device via a conveyor chain;
[0039] S4.3 After the last group of heating is completed, the locking mechanism is unlocked, and the second lifting mechanism lowers the last group of material running tool to the conveyor chain and transports it to the designated position in the cooling chamber. At this time, the system controls the first, second, and third heat insulation gates to close, and the fourth heat insulation gate to open, so that the cooling chamber can be ventilated until the internal temperature of the device drops to a safe range and then the machine stops.
[0040] Therefore, the beneficial effects of the present invention are as follows:
[0041] In summary, the cement clinker simulation firing system provided by this invention has the following significant advantages over existing technologies:
[0042] 1. A fully automated firing process with integrated functionality has been achieved.
[0043] This invention innovatively integrates the independent functional units of material preparation, preheating, heating, transfer, and cooling in traditional split equipment into a single device. Through the precise coordination of the conveyor chain and the lifting mechanism, the automatic flow and precise positioning of the running tooling between the functional compartments are achieved. The position detection and action triggering throughout the entire process are realized through a network of position sensors. This fundamentally eliminates the problems of cumbersome operation, complex control, and high dependence on manual labor caused by the need for external mechanical reciprocating transfer of samples between multiple separation stations in the prior art.
[0044] 2. Waste heat recovery and preheating have been achieved, significantly reducing energy consumption.
[0045] This invention constructs a controllable multi-mode airflow path system through the combined regulation of multiple chambers and multiple sets of insulated gates. This system can simultaneously utilize the waste heat emitted by the preceding high-temperature material during the heating and firing process to preheat the subsequent material to be calcined, effectively recovering and utilizing a large amount of waste heat that would otherwise be directly lost to the environment. The preheated sample already possesses a high initial temperature before entering the heating chamber, significantly shortening the heating time and power consumption required for subsequent heating processes. With a large number of samples, the long-term economic benefits are considerable.
[0046] 3. This invention achieves multiple airflow organization modes through different opening and closing combinations of four sets of insulated gates. Each mode corresponds to an optimized airflow path and heat exchange strategy. This allows the same device to flexibly adapt to the different requirements of airflow direction, flow rate, and heat exchange intensity in different process stages such as heating, preheating, and cooling.
[0047] 4. The present invention innovatively adopts a double-sided vertically arranged side air outlet combined with an oblique air distribution design in the cooling chamber, so that the cooling airflow acts evenly on the oblique two-sided surface of the sample, forming a surrounding uniform airflow field, avoiding the problems of local overcooling and uneven temperature distribution caused by the traditional direct blowing method.
[0048] 5. This invention achieves real-time monitoring of the temperature throughout the preheating, heating, and cooling process by deploying three sets of temperature detectors. Based on multiple criteria such as temperature threshold and temperature change rate, it constructs an intelligent preheating completion judgment logic, which can accurately identify the optimal termination time of preheating. This effectively avoids the problem of sample temperature dropping due to overheating, and also avoids the problem of insufficient preheating affecting subsequent heating efficiency. It achieves optimal energy distribution while ensuring the effectiveness of preheating.
[0049] 6. The integrated design of this invention combines multiple devices that originally needed to be arranged separately into a compact box-type device, which greatly reduces the overall footprint of the equipment and also reduces the number of pipeline connections and interfaces between the devices.
[0050] 7. Because the present invention enables the sample to complete all processes from preheating to heating to cooling in a fully enclosed integrated device, it avoids the disorderly loss of a large amount of heat to the environment during the cross-station transfer process of the sample in the prior art and the interference of external environmental factors on the furnace temperature. The temperature field inside the device is more stable and controllable, thereby improving the temperature reproduction accuracy of the simulated firing test and ensuring the repeatability of the test data. Attached Figure Description
[0051] Figure 1 This is a schematic diagram of the overall structure and principle of the device;
[0052] Figure 2 This is a schematic diagram of the operating tooling structure;
[0053] Figure 3 This is a schematic diagram of the airflow direction for preheating subsequent materials during the heating and firing process.
[0054] Figure 4 A schematic diagram of the airflow direction during the process of continuing to dissipate heat from the preceding material after the subsequent material has been preheated;
[0055] Figure 5 This is a schematic diagram of the airflow direction during the overall heat dissipation process of the device after firing;
[0056] In the diagram: 11-Preheating chamber; 12-Gas chamber; 13-Lifting chamber; 14-Transition chamber; 15-Heating chamber; 16-Cooling chamber;
[0057] 21-First insulated door; 22-Second insulated door; 23-Air inlet; 24-Side air outlet; 25-First air outlet; 26-Second air outlet;
[0058] 31-First lifting mechanism; 32-Second lifting mechanism;
[0059] 41-Conveyor chain; 42-Drive motor; 43-Running fixture; 44-Clamping gear;
[0060] 51 - First temperature detector; 52 - Second temperature detector; 53 - Third temperature detector;
[0061] 61-First heat-insulating gate; 62-Second heat-insulating gate; 63-Third heat-insulating gate; 64-Fourth heat-insulating gate;
[0062] 71-Insulation layer; 72-Waste residue bag. Detailed Implementation
[0063] The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments.
[0064] It should be noted that, in the description of this invention, unless otherwise stated, "a plurality of" means two or more; the terms "upper," "lower," "left," "right," "inner," "outer," "front end," "rear end," "head," "tail," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this invention. Furthermore, the terms "first," "second," "third," etc., are used for descriptive purposes only and should not be construed as indicating or implying relative importance.
[0065] Furthermore, in the description of this invention, unless otherwise explicitly specified and limited, the terms "connected" and "linked" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.
[0066] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the invention.
[0067] See Figure 1-5 This invention provides a cement clinker simulation firing system. Its core lies in integrating all the processes involved in the cement clinker firing test—manual material preparation, preheating, firing, heat dissipation and cooling, and waste heat recovery preheating—into a single integrated device. Through the coordinated operation of various modules, the tooling for the material to be heated is automatically transferred and positioned between functional compartments. Furthermore, by combining the opening and closing of multiple sets of insulated gates, the direction and path of the internal airflow are controlled. Thus, while completing the high-temperature calcination of the material, the heat dissipation process of the preceding high-temperature material is used to preheat the subsequent material to be calcined, achieving energy saving, consumption reduction, and significantly improved test efficiency.
[0068] The cement clinker calcination simulation system mainly includes:
[0069] The preheating chamber 11, the lifting chamber 13, and the cooling chamber 16 are arranged sequentially along a horizontal direction, and a conveyor chain 41 is set below each chamber. The conveyor chain 41 is equipped with a drive motor 42 to drive its operation; the conveyor chain 41 is equipped with a running fixture 43 that can move with the conveyor chain 41; the running fixture 43 is used to carry the raw material to be heated. The top of the preheating chamber 11 is equipped with an air chamber 12, the top of the lifting chamber 13 is equipped with a transition chamber 14, and the top of the transition chamber 14 is equipped with a heating chamber 15.
[0070] It also includes: a first lifting mechanism 31 and a second lifting mechanism 32 respectively located below the preheating chamber 11 and the lifting chamber 13; and temperature detectors distributed inside each chamber, mainly a first temperature detector 51, a second temperature detector 52 and a third temperature detector 53 respectively located inside the preheating chamber 11, the transition chamber 14 and the cooling chamber 16.
[0071] It also includes: four sets of heat-insulating gates to control the airflow passage between each chamber, mainly the first heat-insulating gate 61 between the preheating chamber 11 and the lifting chamber 13, the second heat-insulating gate 62 between the preheating chamber 11 and the air chamber 12, the third heat-insulating gate 63 between the air chamber 12 and the transition chamber 14, and the fourth heat-insulating gate 64 at the top of the heating chamber 15.
[0072] The air inlet 23, the side outlet 24, the first outlet 25, and the second outlet 26 together form an airflow inlet and outlet system.
[0073] The following provides a detailed explanation of the structure of each component and their interrelationships.
[0074] As attached Figure 1 and attached Figure 2 As shown, for transport chain 41:
[0075] One conveyor chain 41 is provided on each side of the running fixture 43 in the running direction. The two conveyor chains are arranged in parallel and are supported on the bottom of the left and right sides of the running fixture 43 respectively, forming a double-sided synchronous support for the running fixture 43. Each conveyor chain 41 is a closed loop formed by several chain links hinged end to end. It is driven to rotate by a drive motor 42 through a reducer and a sprocket assembly, thereby driving the running fixture 43 on it to perform reciprocating linear motion along a preset track.
[0076] The advantages of this device, which uses a dual-sided chain synchronous drive, are: on the one hand, it ensures the stability of the running tool during movement and avoids the risk of uneven load and overturning that may occur with single-sided drive; on the other hand, it leaves enough suspended space in the middle area of the bottom of the running tool, making it easy for the lifting mechanism to lift the running tool.
[0077] The running fixture 43 is a platform-type carrier that supports the sample to be calcined (usually a mortar or crucible containing raw materials).
[0078] like Figure 2 As shown, the main body of the running fixture 43 is a flat, disc-shaped or frame-shaped structure, and its upper part may be provided with a positioning groove or clamping structure for placing and fixing the material bowl. The bottom sides of the running fixture 43 are respectively provided with downward-extending locking teeth 44, which form a meshing engagement with the links of the conveyor chain 41. That is, when the running fixture 43 is placed on the conveyor chain 41, the locking teeth 44 on both sides are respectively embedded in the gaps between adjacent links of the corresponding side of the conveyor chain, or rest on the links, and are synchronously driven forward or backward as the conveyor chain 41 rotates.
[0079] It is worth noting that the bottom surface of the running fixture 43 only contacts the conveyor chain on both sides, while the middle part does not contact any fixed parts.
[0080] As attached Figure 1 As shown, for the lifting mechanism:
[0081] The first lifting mechanism 31 is located directly below the preheating chamber 11, and the second lifting mechanism 32 is located directly below the lifting chamber 13. The two lifting mechanisms have the same structure, both including a vertically arranged telescopic push rod and a support plate or fork installed on the top of the telescopic push rod. The lifting mechanism can be any of the following: hydraulic cylinder, electric push rod, or screw lifting assembly.
[0082] When it is necessary to lift a certain running tool 43 from the conveyor chain 41 and send it into the working position inside the corresponding compartment, the corresponding lifting mechanism extends upward to lift the entire running tool, so that it is lifted to the predetermined height inside the designated compartment after being freed from the support of the conveyor chain 41.
[0083] To achieve automated and precise coordination of the aforementioned conveying and lifting actions, it is conceivable that this device is equipped with multiple sets of position sensors (not shown in the figure) at key locations within the equipment. Those skilled in the art can arrange these sensors at the appropriate locations as needed. Specifically, the position sensors include, but are not limited to: photoelectric switches or proximity switches located at the entrances of each compartment along the conveyor chain path to detect whether the running fixture has reached the designated position; and limit sensors located at the upper and lower limits of the lifting mechanism's stroke to detect the lifting position of the lifting mechanism. The PLC or microcontroller controller of the control system collects signals from each position sensor in real time. When a running fixture is detected to have reached the target position, the corresponding action command is triggered. Thus, by controlling the conveyor chain 41, the lifting mechanism, and the associated position sensors, the running fixture 43 is automatically moved between various workstations, further improving efficiency.
[0084] See appendix Figure 1 As shown, the six functional compartments of this device form an integrated box-shaped structure.
[0085] The main function of the preheating chamber 11 is to use the hot air flowing back from the cooling chamber 16 to preheat the sample to be calcined, so that it reaches a certain initial temperature before entering the heating chamber 15, thereby reducing the energy consumption of subsequent heating processes.
[0086] The preheating chamber 11 has a first insulated door 21 that can be opened and closed on one side, serving as an operating port for manually loading and unloading materials. The internal cavity of the preheating chamber 11 is connected to the upper air chamber 12 cavity, and a second heat-insulating gate 62 is provided at the connection between the two to control the opening and closing of the preheating chamber 11 and the upper airflow channel.
[0087] The first temperature detector 51 inside the preheating chamber 11 is used to detect the temperature change of the sample in real time during the preheating stage.
[0088] The lifting chamber 13 is located in the lower middle part of the device. The lifting chamber 13 is a horizontally through-type chamber, its top connected to the lower part of the transition chamber 14, and its bottom connected to the running plane of the conveyor chain. The second lifting mechanism 32 is located directly below the lifting chamber 13. When the running tool is conveyed to this position, the second lifting mechanism 32 can lift the running tool upwards, pass it through the lifting chamber 13, and send it into the transition chamber 14. Simultaneously, the lifting chamber 13 is part of the airflow passageway, originating from... (See attached...) Figure 1 The airflow in the cooling chamber 16 on the right side shown can flow to the transition chamber 14 and / or the preheating chamber 11 via the lifting chamber 13.
[0089] The transition chamber 14 is located above the lifting chamber 13 and in the middle of the overall device. The transition chamber 14 is connected to the lower part of the heating chamber 15. In one embodiment, a communication port is provided between the transition chamber 14 and the heating chamber 15. When the running fixture 43 is lifted to the communication port, the communication port can be closed, which can reduce the leakage of heating temperature inside the heating chamber 15 and ensure the firing effect.
[0090] The transition chamber 14 receives the running fixture 43 that is lifted from the direction of the lifting chamber 13 and moves it to a position directly below the heating chamber 15; on the other hand, the transition chamber 14 also serves as an important channel for airflow to flow back from the cooling chamber 16 area to the heating chamber 15 area.
[0091] Preferably, a second temperature detector 52 is installed inside or in the vicinity of the transition chamber 14 to monitor the temperature after the heating and firing process is completed.
[0092] The top of the air chamber 12 is provided with a first air outlet 25. The side of the air chamber 12 is connected to the inner cavity of the transition chamber 14, and a third heat-insulating gate 63 is provided between the air chamber 12 and the transition chamber 14 to control the exhaust flow. The air chamber 12 serves as a channel for the exhaust of hot air, and the different flow paths of the gas can be controlled according to the opening and closing states of the second heat-insulating gate 62 and the third heat-insulating gate 63.
[0093] The heating chamber 15 is used for high-temperature calcination of preheated samples. Located at the top of the transition chamber 14, it is equipped with resistance heating wires or other heating devices to raise the internal temperature to the high temperature required for cement clinker calcination, typically 1200℃~1600℃. The heating chamber 15 is surrounded by a heat insulation layer 71, which can be made of high-temperature resistant materials such as refractory fiber felt, aluminum silicate insulation cotton, or multi-layer composite heat insulation board. This layer covers the four sides and top of the equipment to reduce heat loss from the heating chamber and protect surrounding components from high-temperature damage. A second air outlet 26 is located at the top of the heating chamber 15, and a fourth heat-insulating gate 64 is located at the connection between the second air outlet 26 and the heating chamber 15.
[0094] The cooling chamber 16 serves as a chamber for cooling and dissipating heat from the sample after high-temperature calcination. The cooling chamber 16 is equipped with an air inlet 23, and side air outlets 24 are vertically arranged on both sides inside the cooling chamber 16. External cold air enters the device through the air inlet 23 and is then blown onto the high-temperature material after calcination through the side air outlets 24 to cool it down. A second insulating door 22 is provided on the side of the cooling chamber 16 away from the device, which serves as the discharge port.
[0095] The connection between the heating chamber 15 and the transition chamber 14 is equipped with a locking mechanism.
[0096] The locking mechanism is used to automatically lock the running fixture 43 in the heating chamber 15 after it is lifted and sent into the heating chamber 15 by the second lifting mechanism 32 and reaches the heating working position, while sealing the material inside the heating chamber 15. Specifically, the locking mechanism includes locking components symmetrically arranged on both sides of the communication port and electromagnetic actuators that drive the locking components. The opening and closing actions of the locking mechanism are completely coordinated and controlled by the central controller (PLC or industrial computer) inside the system. Since the specific structure is existing technology, it will not be described in detail here.
[0097] Preferably, a third temperature detector 53 is installed inside the cooling chamber 16 to monitor the temperature change of the sample during the cooling process.
[0098] The conveyor chain 41 is located at the bottom of the interconnected preheating chamber 11, lifting chamber 13, and cooling chamber 16. The cooled equipment can be transported out via the conveyor chain.
[0099] Preferably, the bottom of the cooling chamber 16 is also provided with a waste slag bag 72 for collecting debris, dust or detached material that may be generated during the cooling process of the sample.
[0100] Preferred, such as Figure 1 As shown, the side air outlets 24 are vertically arranged on the left and right sides inside the cooling chamber 16. Each side air outlet 24 is either a long, narrow slit or an array of multiple ventilation holes along the vertical direction. Specifically, the airflow from the side air outlets 24 is directed towards the oblique sides of the sample placed on the operating fixture, that is, the airflow blows towards the side surface of the sample from both sides at a certain angle, thereby avoiding the problem of uneven temperature distribution caused by direct airflow and ensuring that the temperature of each part of the sample drops uniformly during the cooling process.
[0101] Preferably, the heat insulation layer 71 covers the outer walls and top of the heating chamber 15, forming a complete heat shield. Specifically, the heat insulation layer 71 consists of multiple layers: the inner layer is a refractory ceramic fiber blanket directly attached to the outer wall of the heating chamber; the middle layer is aluminum silicate insulation cotton, providing the main thermal resistance; and the outer layer is a protective shell made of stainless steel sheet, which both fixes the insulation layer and facilitates cleaning and maintenance. In addition, at the connection interface between the heating chamber 15 and the adjacent transition chamber 14 and cooling chamber 16, the heat insulation layer 71 extends to cover part of the connecting structure, further blocking the path of heat conduction to the outside through the metal structural components.
[0102] Preferably, the overall device is equipped with three sets of temperature detectors. The first temperature detector 51 is installed in the upper part of the inner cavity of the preheating chamber 11, with its temperature probe facing downwards and directly opposite the operating fixture position inside the preheating chamber, for real-time detection of the temperature of the sample being preheated.
[0103] Since the heat required for preheating comes from the residual heat of the preceding high-temperature material, and the temperature of the heat-dissipating material gradually decreases over time, the temperature of the subsequent preheating material exhibits a curve change characteristic of first rising and then falling or gradually slowing down. The first temperature detector 51 is used to capture the temperature curve change and provide a basis for judgment for the control logic. The second temperature detector 52 is installed in the transition chamber 14 to monitor the actual temperature of the material after heating and calcination, ensuring that the calcination temperature meets the process requirements. The third temperature detector 53 is installed inside the cooling chamber 16 to monitor the temperature change of the sample during the forced air cooling process and determine whether the cooling is sufficient.
[0104] All three temperature detectors are electrically connected to the central controller of this device. The controller adjusts the heating power, fan speed, and opening and closing status of each heat insulation gate in real time based on the temperature data fed back by each temperature detector.
[0105] Example 1
[0106] The following examples illustrate the operating status of each gate and mechanism of the equipment when the subsequent material is preheated simultaneously during the heating and firing process.
[0107] See Figure 3 When the device is in the main heating and calcination stage and simultaneously using the heat dissipation of the preceding high-temperature material to preheat the subsequent material to be calcined, there are three operating fixtures 43 in the device at the same time: one operating fixture 43 is located in the heating chamber 15 and is in the process of high-temperature calcination, which is the material being calcined; another operating fixture 43 has the next batch of raw material samples to be processed, located in the preheating chamber 11 and is in the preheating state; the last operating fixture 43 is located inside the cooling chamber 16 and is carried by the conveyor chain 41.
[0108] At this time, the opening and closing states of each heat insulation gate are as follows: the first heat insulation gate 61 is open, the second heat insulation gate 62 is open or partially open, the third heat insulation gate 63 is closed, and the fourth heat insulation gate 64 is closed.
[0109] The direction and circulation path of the airflow are as follows:
[0110] External cold air enters the device through the air inlet 23 located on the cooling chamber 16. After entering the cooling chamber 16, it flows through the internal cavity of the cooling chamber 16. At this time, there is a high-temperature sample inside the cooling chamber 16. The airflow absorbs a certain amount of heat inside the cooling chamber 16 and then flows towards the sample. Figure 3 The flow shown on the left passes through the lifting chamber 1 and the preheating chamber 11 in sequence, then enters the air chamber 12 and finally exits the device through the first air outlet 25.
[0111] During this process, the high-temperature mainstream airflow enters the interior of the preheating chamber 11, passes over the subsequent sample located in the preheating chamber 11, and transfers the heat it carries to the subsequent sample to raise its temperature, thus completing the preheating. After the heat exchange is completed, the airflow continues to rise to the top of the air chamber 12 and is finally discharged from the device from the first air outlet 25.
[0112] In this state, the first temperature detector 51 continuously monitors the preheating temperature of the subsequent sample in the preheating chamber, and the third temperature detector 53 monitors the calcination temperature in the heating chamber. The system controls the wind speed and its opening and closing based on the changes in these two temperatures. When the temperature of the subsequent preheating material inside the preheating chamber 11 reaches the maximum preheating temperature, preheating stops. At this time, the first and second heat insulation gates are closed to keep the preheating material sealed and insulated, while the third heat insulation gate 63 is opened, and the wind speed is appropriately increased to allow the cooling material inside the cooling chamber 16 to cool down more quickly. Throughout the entire process, the heating of the material inside the heating chamber 15 is not affected. The preheating, heat dissipation, and heating processes of the three sets of materials are completed simultaneously, greatly improving energy utilization and time efficiency.
[0113] After the heat dissipation is completed, the first lifting mechanism 31 can lift the running fixture 43 inside the preheating chamber 11, and the conveyor chain 41 will send the cooled material out through the second insulating door 22. Then, the heated material is sent to the cooling chamber 16, the preheated material is sent to the heating chamber 15, and then new material is manually placed in the preheating chamber 11. The second round of heating, heat dissipation, and preheating process is then carried out.
[0114] The functional effect achieved by the device in this embodiment is as follows: while the previous sample in the heating chamber 15 is being calcined at high temperature, the room temperature airflow entering from the air inlet 23 absorbs the residual heat of the previous sample and forms a warm airflow to effectively preheat the subsequent sample in the preheating chamber 11, realizing the parallel operation mode of "heating, preheating and heat dissipation at the same time", making full use of thermal energy.
[0115] Example 2
[0116] Based on the above embodiment 1, see Figure 4 This embodiment describes a transitional operating state where the subsequent material has been preheated in the preheating chamber 11 and the preceding high-temperature material, which has been calcined in the heating chamber 15, needs to be cooled.
[0117] At this point, the subsequent sample located in the preheating chamber 11 has reached the target preheating temperature or the preheating temperature that can be reached as detected by the temperature sensor, and the preheating process cannot continue; while the preceding sample located in the cooling chamber 16 is still in a relatively high temperature state.
[0118] At this time, the opening and closing status of each heat insulation gate is adjusted as follows: the first heat insulation gate 61 and the second heat insulation gate 62 are closed, the third heat insulation gate 63 is open, and the fourth heat insulation gate 64 is closed.
[0119] The airflow direction is as follows: external cold air still enters the cooling chamber 16 through the air inlet 23, flows to the left after passing through the cooling chamber 16, passes through the lifting chamber 13 and the transition chamber 14, enters the air chamber 12 through the third heat insulation gate 63, and finally exits through the first air outlet 25, thereby achieving efficient cooling and heat dissipation for the previous sample. In this state, the third temperature detector 53 focuses on monitoring the temperature change of the material inside the cooling chamber.
[0120] The functional effect achieved by the device in this embodiment is that the airflow path switches from the previous preheating state to heat dissipation priority, and concentrates the cold air resources to perform directional strong cooling on the high-temperature sample that has been calcined and preheated the subsequent materials, thereby improving the heat dissipation efficiency and shortening the cooling time required for the sample to drop from the peak calcination temperature to the safe removal temperature.
[0121] Example 3
[0122] See Figure 5 This embodiment describes the operating state where the sample in the heating chamber 15 has been calcined and there is no subsequent sample, requiring comprehensive heat dissipation of the entire device.
[0123] At this time, the opening and closing status of each heat insulation gate is as follows: the first heat insulation gate 61, the second heat insulation gate 62, and the third heat insulation gate 63 are all closed, and the fourth heat insulation gate 64 is open.
[0124] The airflow direction and circulation path are as follows: external cold air enters the cooling chamber 16 in large quantities from the air inlet 23, is blown out through the side air outlet 24 inside the cooling chamber 16, and then flows unobstructed to the left through the transition chamber 14, the lifting chamber 13 and the preheating chamber 11 in sequence, and is finally discharged completely from the second air outlet 26, cooling and dissipating heat on the furnace wall of the heating chamber until the internal temperature of the device drops to a safe range and then the machine is shut down.
[0125] Based on the above new system, the present invention provides a cement clinker simulation firing system and method, comprising the following steps:
[0126] S1: Heating operation of the first piece of material;
[0127] S1.1 The operator opens the first insulating door 21, places the running fixture 43 containing the A material bowl on the conveyor chain 41, and the running fixture 43 is transported by the conveyor chain 41 to the designated position in the preheating chamber 11. The first insulating door 21 is then closed. At this time, the device is in the ready state.
[0128] S1.2 The running fixture 43 containing the A material bowl is transported by the conveyor chain 41 to the designated position of the lifting chamber 13, and is directly sent by the lifting mechanism to the connection between the heating chamber 15 and the transition chamber 14. The locking mechanism locks the running fixture 43, and the material in the A material bowl is directly fired.
[0129] S1.3 Preparation of the next material: The operator opens the first insulating door 21, places the running fixture 43 containing the B material bowl on the conveyor chain 41, and the running fixture 43 is transported by the conveyor chain 41 to the designated position of the preheating chamber 11. The first insulating door 21 is closed, and the first lifting mechanism 31 lifts the running fixture 43 containing the B material bowl away from the conveyor chain 41.
[0130] S2: Enter parallel operation mode, i.e., the operation mode described in Example 1;
[0131] S2.1 After the material being heated is fired, the second lifting mechanism 32 is raised to the running fixture 43 containing the A material bowl that has been fired in step S1. The locking mechanism is released, and the second lifting mechanism 32 drives the lowering to place the running fixture 43 on the conveyor chain 41.
[0132] S2.2 The first lifting mechanism 31 lowers the running fixture 43 containing the B material bowl onto the conveyor chain 41, which then transports it to a designated position in the lifting chamber 13. The second lifting mechanism then delivers it to the connection point between the heating chamber 15 and the transition chamber 14. A locking mechanism locks the running fixture 43 containing the B material bowl in place, allowing for direct firing of the material inside the bowl. This rapid delivery of the B material bowl into the heating chamber 15 prevents heat loss and further saves energy.
[0133] S2.3 Open the first insulating door 21, place the running fixture 43 containing the C material bowl on the conveyor chain 41, and transport it to the designated position in the preheating chamber 11 by the conveyor chain 41. Close the first insulating door 21, and the first lifting mechanism 31 lifts the running fixture 43 containing the C material bowl away from the conveyor chain 41. Then the conveyor chain 41 drives the running fixture 43 containing the A material bowl to the designated position in the cooling chamber 16.
[0134] S2.4 Start the external fan to carry out parallel operation mode of cooling, heating and preheating of the three groups of materials A, B and C at the same time.
[0135] S3: Status switch after preheating is complete;
[0136] When the first temperature detector 51 detects that the preheating temperature of the subsequent sample has reached the preset target preheating temperature, or the highest temperature that can be preheated, the controller determines that the preheating process of the subsequent material has been completed. At this time, the system controls the switching of the air path to keep the preheated material in the C container warm, and to rapidly dissipate heat and cool the material in the A container.
[0137] Specifically, it includes the following steps:
[0138] S3.1 Switch the opening and closing states of each heat insulation gate as follows: the first heat insulation gate 61 and the second heat insulation gate 62 are closed, the third heat insulation gate 63 is open, and the fourth heat insulation gate 64 is closed.
[0139] The airflow direction is as follows: external cold air still enters the cooling chamber 16 through the air inlet 23, flows to the left after passing through the cooling chamber 16, passes through the lifting chamber 13 and the transition chamber 14, enters the air chamber 12 through the third heat insulation gate 63, and finally exits through the first air outlet 25, thereby achieving efficient cooling and heat dissipation for the previous sample. In this state, the third temperature detector 53 focuses on monitoring the temperature change of the material inside the cooling chamber.
[0140] As a result, the airflow path switches from the previous preheating state to heat dissipation priority, concentrating cold air resources to perform directional strong cooling on the high-temperature sample that has been calcined and preheated the subsequent materials, thereby improving heat dissipation efficiency and shortening the cooling time required for the sample to drop from the peak calcination temperature to the safe removal temperature.
[0141] S3.2, The well-ventilated material container is transported out;
[0142] Open the second insulating door 22, and the conveyor chain 41 will move the running fixture 43 containing the A material bowl outside the device, so that the staff can unload the conveyor chain 41.
[0143] S3.3, the first lifting mechanism 31 lowers the running fixture 43 containing the C material bowl onto the conveyor chain 41, and enters the material preparation stage again, waiting for the currently heated material to be fired. Repeat steps S2.1 to this step S3.3.
[0144] S4: When no subsequent materials need to be fired, i.e., no subsequent materials need to be preheated, the overall heat dissipation process of the actuator includes the following sub-steps:
[0145] S4.1 First, after the last batch of materials is sent into the heating chamber 15, the previously heated materials remain in the cooling chamber 16. At this time, the system controls each gate to enter (see Appendix). Figure 3 As shown in the diagram, it is worth noting that this is the second-to-last group of materials being cooled, while another group of materials is still being heated and fired.
[0146] At this time, the system controls the first heat insulation gate 61 and the second heat insulation gate 62 to open, the third heat insulation gate 63 to close, and the fourth heat insulation gate 64 to close.
[0147] The direction and circulation path of the airflow are as follows:
[0148] External cold air enters the device through the air inlet 23 located on the cooling chamber 16. After entering the cooling chamber 16, the airflow flows through the internal chamber of the cooling chamber 16. After absorbing a certain amount of heat in the cooling chamber 16, the airflow passes through the lifting chamber 1 and the preheating chamber 11 in sequence, and then enters the air chamber 12. Finally, it is discharged from the device through the first air outlet 25, thereby directly cooling and dissipating heat from the heated material.
[0149] S4.2 After cooling is complete, open the second insulation door 22 and transport the material out of the device via the conveyor chain 41.
[0150] S4.3 After the last group of materials is heated, the locking mechanism unlocks, and the second lifting mechanism 32 lowers the last group of materials' running fixture 43 to the conveyor chain 41, transporting it to the designated position in the cooling chamber 16. At this time, the system controls each gate to enter (see appendix). Figure 5 The state shown;
[0151] At this time, the system controls the first heat insulation gate 61, the second heat insulation gate 62, and the third heat insulation gate 63 to close, while the fourth heat insulation gate 64 is opened.
[0152] At this time, a large amount of cold air from the air inlet 23 enters the cooling chamber 16. The air is blown out through the side air outlet 24 inside the cooling chamber 16, and then flows through the lifting chamber 13, the transition chamber 14 and the preheating chamber 11 in sequence. Finally, it is completely discharged from the second air outlet 26 to cool and dissipate heat on the last material and the furnace wall of the heating chamber 15 until the internal temperature of the device drops to a safe range and then the machine is shut down.
[0153] Of course, the present invention may have other various embodiments. Without departing from the spirit and essence of the present invention, those skilled in the art can make various corresponding changes and modifications according to the present invention, but these corresponding changes and modifications should all fall within the protection scope of the appended claims.
Claims
1. A cement clinker simulation firing system, characterized in that, include: A preheating chamber (11), an lifting chamber (13), and a cooling chamber (16) are arranged sequentially along the horizontal direction, and a conveyor chain (41) driven by a motor is set below each chamber; a running fixture (43) that can be driven by the conveyor chain (41) is mounted on the conveyor chain (41); an air chamber (12) is provided on the top of the preheating chamber (11), a transition chamber (14) is provided on the top of the lifting chamber (13), and a heating chamber (15) is provided on the top of the transition chamber (14); It also includes: a first lifting mechanism (31) and a second lifting mechanism (32) respectively located below the preheating chamber (11) and below the lifting chamber (13); a first heat insulation gate (61) between the preheating chamber (11) and the lifting chamber (13); a second heat insulation gate (62) between the preheating chamber (11) and the gas chamber (12); a third heat insulation gate (63) between the gas chamber (12) and the transition chamber (14); and a fourth heat insulation gate (64) at the top of the heating chamber (15). The preheating chamber (11) is provided with a first insulated door (21) that can be opened and closed on one side, and the cooling chamber (16) is provided with a second insulated door (22) on the side away from the device. The cooling chamber (16) is provided with an air inlet (23), and the cooling chamber (16) is provided with a side air outlet (24). The air chamber (12) and the heating chamber are respectively provided with a first air outlet (25) and a second air outlet (26).
2. The cement clinker simulation firing system according to claim 1, characterized in that, Also includes: A first temperature detector (51), a second temperature detector (52), and a third temperature detector (53) are respectively installed inside the preheating chamber (11), the transition chamber (14), and the cooling chamber (16).
3. The cement clinker simulation firing system according to claim 1, characterized in that, The conveyor chain (41) is provided on each side of the running direction of the running tool (43) and is arranged in parallel. The upper part of the running fixture (43) is provided with a clamping structure for placing the material bowl, and the bottom sides of the running fixture (43) are respectively provided with downward extending clamping teeth (44), which mesh with the links of the conveyor chain (41).
4. The cement clinker simulation firing system according to claim 1, characterized in that, The top of the lifting chamber (13) is connected to the lower part of the transition chamber (14), the transition chamber (14) is connected to the lower part of the heating chamber (15), and a communication port is provided between the transition chamber (14) and the heating chamber (15). When the running tool (43) is lifted to the communication port, the communication port can be closed.
5. The cement clinker simulation firing system according to claim 4, characterized in that, The connection between the heating chamber (15) and the transition chamber (14) is provided with a locking mechanism. The locking mechanism is used to automatically lock the running fixture (43) in the heating chamber (15) after the running fixture (43) is lifted and sent into the heating chamber (15) by the second lifting mechanism (32) and reaches the heating working position, and at the same time seal the material in the heating chamber (15).
6. The cement clinker simulation firing system according to claim 1, characterized in that, The heating chamber (15) is equipped with a resistance heating wire inside, and the heating chamber (15) is covered with a heat insulation layer (71) on its outer periphery. The fourth heat insulation gate (64) is located at the connection between the second air outlet 26 and the heating chamber (15).
7. The cement clinker simulation firing system according to claim 1, characterized in that, The side air outlets (24) are vertically arranged on the left and right sides inside the cooling chamber (16). Each side air outlet (24) is a long strip-shaped slit or a series of ventilation holes arranged in an array along the vertical direction.
8. The cement clinker simulation firing system according to any one of claims 1 to 7, characterized in that, Perform the following cement clinker simulation firing method, including the following steps: S1: Heating operation of the first piece of material; S1.1 The operator opens the first insulation door (21), places the running fixture (43) containing the A material bowl on the conveyor chain (41), and the running fixture (43) is transported by the conveyor chain (41) to the designated position of the preheating chamber (11). The first insulation door (21) is closed, and the device is in the ready state. S1.2 The running fixture (43) containing the A material bowl is transported by the conveyor chain (41) to the designated position of the lifting chamber (13), and is directly sent by the lifting mechanism to the connection between the heating chamber (15) and the transition chamber (14). The locking mechanism locks the running fixture (43) and directly fires the material in the A material bowl. S1.3, Preparation of the next material: The operator opens the first insulation door (21), places the running fixture (43) containing the B material bowl on the conveyor chain (41), and the running fixture (43) is transported by the conveyor chain (41) to the designated position of the preheating chamber (11), and closes the first insulation door (21). S2: Enter parallel operation mode; S2.1 The second lifting mechanism (32) is raised to the running fixture (43) containing the A material bowl that has been fired in step S1. The locking mechanism is released, and the second lifting mechanism (32) is driven to descend and place it on the conveyor chain (41). S2.2 The conveyor chain (41) transports the running fixture (43) containing the B material bowl to the designated position of the lifting chamber (13), and the second lifting mechanism sends it to the connection between the heating chamber (15) and the transition chamber (14). The locking mechanism locks the running fixture (43) containing the B material bowl, and the material in the B material bowl is directly fired. S2.3 Open the first insulation door (21), place the running fixture (43) containing the C material bowl on the conveyor chain (41), and transport it to the designated position of the preheating chamber (11) by the conveyor chain (41). Close the first insulation door (21), and the first lifting mechanism (31) lifts the running fixture (43) containing the C material bowl away from the conveyor chain (41). Then the conveyor chain (41) drives the running fixture (43) containing the A material bowl to the designated position of the cooling chamber (16). S2.4 Start the external fan to carry out parallel operation mode of cooling, heating and preheating of the three groups of materials A, B and C at the same time; S3: Status switch after preheating is complete; specifically, it includes the following steps: S3.1 Switch each heat insulation gate to the following opening and closing states: the first heat insulation gate (61) and the second heat insulation gate (62) are closed, the third heat insulation gate (63) is open, and the fourth heat insulation gate (64) is closed; the cooling chamber (16) is ventilated; S3.2, The well-ventilated material container is transported out; Open the second insulating door (22), and the conveyor chain (41) will drive the running fixture (43) containing the A material bowl to move out of the device. The staff can then unload the conveyor chain (41). S3.3 The first lifting mechanism (31) lowers the running fixture (43) containing the C material bowl onto the conveyor chain (41) and enters the material preparation stage again, waiting for the currently heated material to be burned. Repeat steps S2.1 to S3.
3.
9. The cement clinker simulation firing system according to claim 8, characterized in that, In step S3: when the first temperature detector (51) detects that the preheating temperature of the subsequent sample has reached the preset target preheating temperature or the highest temperature that can be preheated, the controller determines that the preheating process of the subsequent material has been completed. At this time, the system controls the switching of the gas path to keep the preheated material in the C material bowl warm and to quickly dissipate heat and cool down the material in the A material bowl.
10. The cement clinker simulation firing system according to claim 1, characterized in that, It also includes the following steps: S4: When no subsequent materials need to be fired, i.e., no subsequent materials need to be preheated, the overall heat dissipation process of the actuator includes the following sub-steps: S4.1 First, after the last group of materials is sent into the heating chamber (15), the materials that have been heated in the previous step remain in the cooling chamber (16). At this time, the system controls the first heat insulation gate (61) and the second heat insulation gate (62) to open, the third heat insulation gate (63) to close, the fourth heat insulation gate (64) to close, and the cooling chamber (16) to be ventilated. S4.2 After cooling is complete, open the second insulation door (22) and transport the material out of the device via the conveyor chain (41); S4.3 After the last group of heating is completed, the locking mechanism is unlocked, and the second lifting mechanism (32) lowers the last group of material running tool (43) to the conveyor chain (41) and transports it to the designated position of the cooling chamber (16). At this time, the system controls the first heat insulation gate (61), the second heat insulation gate (62), and the third heat insulation gate (63) to close, and the fourth heat insulation gate (64) to open. The cooling chamber (16) is ventilated until the internal temperature of the device drops to a safe range and then the machine stops.
