Furnace tube machine table and operation control method thereof, Wafer processing system
By adjusting the temperature change rate based on temperature differences in the furnace tube machine, the furnace tube chamber temperature can be directly adjusted from the lowest temperature after the first batch of wafers is unloaded to the loading temperature of the second batch of wafers, solving the problem of long temperature adjustment time in batch wafer processing and improving production efficiency.
Patent Information
- Application Number
- CN202511430315.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-09-30
- Publication Date
- 2026-11-24
AI Technical Summary
When using furnace tube machines for batch wafer processing, the long interval between temperature adjustments between batches results in low production efficiency.
By determining the temperature difference between the actual minimum temperature of the furnace chamber after the first batch of wafers is unloaded and the temperature of the second batch of wafers loaded onto the wafer boat, the furnace chamber temperature is directly adjusted to the wafer boat loading temperature of the second batch of wafers using a temperature rate higher than the idle temperature rate but lower than the maximum temperature rate. The temperature is then stabilized after the wafer boat is loaded, avoiding the step of first adjusting to the standby temperature.
This effectively shortens the processing interval between batches of wafers and improves the production efficiency of the furnace tube machine.
Smart Images

Figure CN123154647A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of wafer processing technology, and more specifically to a furnace tube machine and its operation control method, and a wafer processing system. Background Technology
[0002] Because furnace tube machines can perform wafer processing in batches, their manufacturing costs are relatively low. In order to reduce product costs, semiconductor manufacturers generally prefer to use furnace tube machines for wafer processing whenever possible.
[0003] Currently, when performing batch wafer processing, furnace tube machines typically adjust and stabilize the temperature inside the furnace tube chamber at the machine's standby temperature after the previous batch is processed. Then, based on the production formula for the next batch of wafers, the temperature inside the furnace tube chamber is adjusted and stabilized at the boat loading temperature for that batch before loading the wafers. When the boat loading temperature for the next batch of wafers differs from the standby temperature, adjusting and stabilizing the temperature inside the furnace tube chamber to match the boat loading temperature for that batch takes a considerable amount of time, resulting in low production efficiency for the furnace tube machine.
[0004] Therefore, improvements are needed to at least partially address the aforementioned problems. Summary of the Invention
[0005] The summary section introduces a series of simplified concepts, which will be further explained in detail in the detailed description section. The summary section of this invention is not intended to limit the key features and essential technical features of the claimed technical solution, nor is it intended to determine the scope of protection of the claimed technical solution.
[0006] To at least partially solve the above-mentioned problems, according to a first aspect of the present invention, a method for operating a furnace tube machine is provided, comprising:
[0007] The first batch of wafers is processed based on the process formula of the first batch of wafers in the furnace chamber, while determining whether there is any pre-order processing information for the second batch of wafers.
[0008] When the reservation processing information for the second batch of wafers exists, a process recipe for the second batch of wafers is generated based on the reservation processing information for the second batch of wafers, wherein the process recipe includes the wafer boat loading temperature;
[0009] After the first batch of wafers is processed, a first temperature change rate is determined based on the first temperature difference between the actual lowest temperature of the furnace tube chamber after the first batch of wafers is unloaded and the first temperature difference between the boat loading temperature of the second batch of wafers. The first temperature change rate is greater than the idle temperature change rate of the furnace tube machine and less than or equal to the maximum temperature change rate of the furnace tube machine.
[0010] Based on the first temperature change rate, the temperature of the furnace tube chamber is adjusted from the actual minimum temperature to the crystal boat loading temperature of the second batch of wafers. The temperature is maintained while the crystal boat is loaded to transport the second batch of wafers to the furnace tube chamber. After the crystal boat is loaded, the temperature of the furnace tube chamber is controlled to be stable at the crystal boat loading temperature.
[0011] The second batch of wafers is processed based on the process formulation of the second batch of wafers.
[0012] For example, determining the first temperature change rate based on the first temperature difference between the actual lowest temperature of the furnace chamber after the first batch of wafers is unloaded and the first temperature difference between the boat loading temperature of the second batch of wafers includes:
[0013] The first shortest temperature change time is determined based on the first temperature difference using a preset algorithm;
[0014] The first temperature difference divided by the first shortest temperature change time is taken as the first temperature change rate; and / or
[0015] The step of adjusting the temperature of the furnace chamber from the actual minimum temperature to the boat loading temperature of the second batch of wafers based on the first temperature change rate includes:
[0016] Based on the first temperature difference, the first PID parameter corresponding to the first temperature difference is determined by looking up a preset lookup table.
[0017] Based on the first PID parameters, the temperature control device of the furnace tube machine is adjusted by the first PID algorithm so that the temperature of the furnace tube chamber is adjusted from the actual minimum temperature to the boat loading temperature of the second batch of wafers at the first temperature change rate.
[0018] For example, the process formulation also includes a main process temperature and a crystal boat unloading temperature;
[0019] The process formula based on the first batch of wafers within the furnace chamber is used to process the first batch of wafers, including:
[0020] The temperature of the furnace chamber is adjusted from the boat loading temperature of the first batch of wafers to the main process temperature and then kept stable. The first batch of wafers is processed at the main process temperature of the first batch of wafers.
[0021] The second temperature rate is determined based on the second temperature difference between the main process temperature of the first batch of wafers and the unloading temperature of the wafer boat of the first batch of wafers.
[0022] Based on the second temperature change rate, the temperature of the furnace chamber is adjusted from the main process temperature of the first batch of wafers to the unloading temperature of the first batch of wafers, and the wafer boat is unloaded to transport the first batch of wafers out of the furnace chamber. When the unloading of the wafer boat is completed, the temperature of the furnace chamber is the actual minimum temperature.
[0023] For example, determining the second temperature rate based on the second temperature difference between the main process temperature of the first batch of wafers and the boat unloading temperature of the first batch of wafers includes:
[0024] The second shortest temperature change time is determined based on the second temperature difference using a preset algorithm;
[0025] The result of dividing the second temperature difference by the second shortest temperature change time is taken as the second temperature change rate; and / or,
[0026] The step of adjusting the temperature of the furnace chamber from the main process temperature of the first batch of wafers to the unloading temperature of the first batch of wafers based on the second temperature change rate includes:
[0027] Based on the second temperature difference, the second PID parameter corresponding to the second temperature difference is determined by looking up a preset lookup table;
[0028] Based on the second PID parameters, the temperature control device of the furnace tube machine is adjusted by the second PID algorithm so that the temperature of the furnace tube chamber is adjusted from the main process temperature of the first batch of wafers to the unloading temperature of the first batch of wafers at the second temperature change rate.
[0029] For example, the operation control method of the furnace tube machine further includes:
[0030] When the reservation processing information for the second batch of wafers does not exist, after the processing of the first batch of wafers is completed, the third temperature change rate of the furnace tube machine is determined based on the third temperature difference between the actual minimum temperature of the furnace tube chamber after the first batch of wafers is unloaded and the standby temperature of the furnace tube machine. The third temperature change rate is greater than the idle temperature change rate and less than or equal to the maximum temperature change rate of the furnace tube machine.
[0031] Based on the third temperature change rate, the temperature of the furnace chamber is adjusted from the actual minimum temperature to the standby temperature and maintained at the standby temperature.
[0032] For example, determining the third temperature change rate of the furnace tube machine based on the third temperature difference between the actual lowest temperature of the furnace tube chamber after the first batch of wafers has been unloaded and the standby temperature of the furnace tube machine includes:
[0033] The third shortest temperature change time is determined based on the third temperature difference using a preset algorithm.
[0034] The result of dividing the third temperature difference by the third shortest temperature change time is taken as the third temperature change rate; and / or
[0035] The step of adjusting the temperature of the furnace chamber from the actual minimum temperature to the standby temperature based on the third temperature change rate includes:
[0036] Based on the third temperature difference, the third PID parameter corresponding to the third temperature difference is determined by looking up a preset lookup table.
[0037] Based on the third PID parameters, the temperature control device of the furnace tube machine is adjusted by the third PID algorithm so that the temperature of the furnace tube chamber is adjusted from the actual minimum temperature to the standby temperature at the third temperature change rate.
[0038] According to a second aspect of the present invention, a furnace tube machine is provided, comprising:
[0039] Furnace chambers are used to process the wafers located within them;
[0040] A temperature control device is used to acquire and adjust the temperature inside the furnace tube cavity;
[0041] Crystal boat;
[0042] A wafer loading and unloading device for loading wafers into and unloading wafers from the wafer boat;
[0043] A crystal boat drive device is used to carry a crystal boat and to load the crystal boat into or unload the crystal boat from the furnace tube chamber.
[0044] A controller, communicatively connected to the temperature control device, the wafer loading and unloading device, and the wafer boat driving device, is used to acquire wafer pre-processing information, generate wafer process recipes based on the pre-processing information, and control the temperature control device, the wafer loading and unloading device, and the wafer boat driving device to perform corresponding operations based on the process recipes, wherein the process recipes include wafer boat loading temperature;
[0045] The controller is further configured to, after the processing of the first batch of wafers is completed, determine a first temperature change rate based on the first temperature difference between the actual minimum temperature of the furnace chamber after the first batch of wafers is unloaded and the first temperature difference between the boat loading temperature of the second batch of wafers, and control the temperature control device to adjust the temperature of the furnace chamber from the actual minimum temperature to the boat loading temperature of the second batch of wafers based on the first temperature change rate, maintain the temperature and control the boat driving device to load the boat to transport the second batch of wafers to the furnace chamber;
[0046] Wherein, the first temperature change rate is greater than the idle temperature change rate of the furnace tube machine, and less than or equal to the maximum temperature change rate of the furnace tube machine.
[0047] For example, determining the first temperature change rate based on the first temperature difference between the actual lowest temperature of the furnace chamber after the first batch of wafers is unloaded and the first temperature difference between the boat loading temperature of the second batch of wafers includes:
[0048] The first shortest temperature change time is determined based on the first temperature difference using a preset algorithm;
[0049] The first temperature difference divided by the first shortest temperature change time is taken as the first temperature change rate; and / or
[0050] The step of adjusting the temperature of the furnace chamber from the actual minimum temperature to the boat loading temperature of the second batch of wafers based on the first temperature change rate includes:
[0051] Based on the first temperature difference, the first PID parameter corresponding to the first temperature difference is determined by looking up a preset lookup table.
[0052] Based on the first PID parameters, the temperature control device is adjusted using the first PID algorithm so that the temperature of the furnace chamber is adjusted from the actual minimum temperature to the boat loading temperature of the second batch of wafers at the first temperature change rate.
[0053] For example, the control device includes a main controller, a temperature controller, a wafer loading and unloading controller, a crystal boat drive controller, and a recipe controller. The temperature controller, the wafer loading and unloading controller, the crystal boat drive controller, and the recipe controller are all communicatively connected to the main controller. The temperature control device, the wafer loading and unloading device, and the crystal boat drive device are respectively communicatively connected to the temperature controller, the wafer loading and unloading controller, and the crystal boat drive controller.
[0054] The main controller is used to acquire wafer pre-processing information, generate wafer process recipes based on the pre-processing information, and transmit instructions to the temperature controller, wafer loading and unloading controller and wafer boat drive controller based on the process recipes. The temperature controller, wafer loading and unloading controller and wafer boat drive controller respectively control the temperature control device, wafer loading and unloading device and wafer boat drive device to perform corresponding operations.
[0055] The recipe controller is used to determine a first temperature change rate and transmit it to the main controller based on the first temperature difference between the actual lowest temperature of the furnace chamber after the first batch of wafers is unloaded and the first temperature difference between the boat loading temperature of the second batch of wafers after the first batch of wafers is unloaded.
[0056] The main controller transmits the first temperature change rate to the temperature controller. Based on the first temperature change rate and the process recipe, the temperature controller controls the temperature control device to adjust the temperature of the furnace chamber from the actual minimum temperature to the loading temperature of the second batch of wafers in the wafer boat and maintain the temperature. At the same time, the main controller transmits instructions to the wafer boat drive controller, which controls the wafer boat drive device to load the wafer boat to transport the second batch of wafers to the furnace chamber.
[0057] According to a third aspect of the present invention, a wafer processing system is provided, comprising a furnace tube machine and an EAP system, wherein the furnace tube machine comprises:
[0058] Furnace chambers are used to process the wafers located within them;
[0059] A temperature control device is used to acquire and adjust the temperature inside the furnace tube cavity;
[0060] Crystal boat;
[0061] A wafer loading and unloading device for loading wafers into and unloading wafers from the wafer boat;
[0062] A crystal boat drive device is used to carry a crystal boat and to load the crystal boat into or unload the crystal boat from the furnace tube chamber.
[0063] A controller, communicatively connected to the temperature control device, the wafer loading and unloading device, and the wafer boat driving device, is used to acquire wafer pre-processing information, generate wafer process recipes based on the pre-processing information, and control the temperature control device, the wafer loading and unloading device, and the wafer boat driving device to perform corresponding operations based on the process recipes, wherein the process recipes include the wafer boat loading temperature;
[0064] The EAP system includes a recipe controller, which is communicatively connected to the control device. After the processing of the first batch of wafers is completed, the recipe controller determines a first temperature change rate based on the first temperature difference between the actual minimum temperature of the furnace chamber after the first batch of wafers is unloaded and the boat loading temperature of the second batch of wafers, and transmits the result to the control device.
[0065] The controller controls the temperature control device based on the first temperature change rate to adjust the temperature of the furnace tube chamber from the actual minimum temperature to the loading temperature of the second batch of wafers on the wafer boat, and maintains the temperature. At the same time, the controller controls the wafer boat drive device to load the wafer boat to transport the second batch of wafers to the furnace tube chamber.
[0066] Wherein, the first temperature change rate is greater than the idle temperature change rate of the furnace tube machine, and less than or equal to the maximum temperature change rate of the furnace tube machine.
[0067] For example, determining the first temperature change rate based on the first temperature difference between the actual lowest temperature of the furnace chamber after the first batch of wafers is unloaded and the first temperature difference between the boat loading temperature of the second batch of wafers includes:
[0068] The first shortest temperature change time is determined based on the first temperature difference using a preset algorithm;
[0069] The first temperature difference divided by the first shortest temperature change time is taken as the first temperature change rate; and / or
[0070] The step of adjusting the temperature of the furnace chamber from the actual minimum temperature to the boat loading temperature of the second batch of wafers based on the first temperature change rate includes:
[0071] Based on the first temperature difference, the first PID parameter corresponding to the first temperature difference is determined by looking up a preset lookup table.
[0072] Based on the first PID parameters, the temperature control device is adjusted using the first PID algorithm so that the temperature of the furnace chamber is adjusted from the actual minimum temperature to the boat loading temperature of the second batch of wafers at the first temperature change rate.
[0073] According to the furnace tube machine and its operation control method and wafer processing system of the present invention, when the reservation processing information of the second batch of wafers exists, a first temperature change rate is determined based on the first temperature difference between the actual minimum temperature of the furnace tube chamber after the first batch of wafers is unloaded and the first temperature difference between the boat loading temperature of the second batch of wafers. Based on the first temperature change rate, the temperature of the furnace tube chamber is directly adjusted and stabilized from the actual minimum temperature after the first batch of wafers is processed to the boat loading temperature of the second batch of wafers. It is not necessary to first adjust and stabilize the temperature in the furnace tube chamber at the standby temperature of the furnace tube machine, and then adjust and stabilize the boat loading temperature of the second batch of wafers. This can effectively shorten the processing interval between batches of wafers and improve the efficiency of the furnace tube machine. Attached Figure Description
[0074] The following drawings, which are incorporated herein by reference and are used to understand this application, illustrate embodiments of the invention and their descriptions, thereby explaining the apparatus and principles of the invention. In the drawings,
[0075] Figure 1 This is a schematic flowchart illustrating the operation control method of a furnace tube machine according to an embodiment of this application;
[0076] Figure 2 This is a schematic diagram showing the chamber temperature of a furnace tube machine according to an embodiment of this application and the change of chamber temperature of a furnace tube machine in the prior art over time.
[0077] Figure 3 This is a schematic diagram of the structure of a furnace tube machine according to an embodiment of this application;
[0078] Figure 4 This is a schematic diagram of the structure of a wafer processing system according to an embodiment of this application.
[0079] Explanation of reference numerals in the attached figures:
[0080] 100-Furnace tube machine, 110-Furnace tube chamber, 120-Temperature control device, 130-Crystal boat, 140-Wafer loading and unloading device, 150-Crystal boat drive device, 160-Controller, 161-Main controller, 162-Temperature controller, 163-Wafer loading and unloading controller, 164-Crystal boat drive controller, 165-Formula controller, 166-Gas controller, 167-Pressure and exhaust gas controller, 170-Gas supply device, 180-Pressure and exhaust gas control device;
[0081] 200 - EAP system, 210 - Recipe controller. Detailed Implementation
[0082] The following description provides numerous specific details to offer a more thorough understanding of this application. However, it will be apparent to those skilled in the art that this application can be practiced without one or more of these details. In other instances, certain technical features well-known in the art have not been described to avoid confusion with this application.
[0083] It should be understood that this application can be implemented in various forms and should not be construed as limited to the embodiments set forth herein. Rather, providing these embodiments will make the disclosure thorough and complete, and will fully convey the scope of this application to those skilled in the art. In the drawings, for clarity, the dimensions and relative dimensions of layers and regions may be exaggerated. The same reference numerals denote the same elements throughout.
[0084] It should be understood that although the terms first, second, third, etc., may be used to describe various elements, components, areas, layers, and / or parts, these elements, components, areas, layers, and / or parts should not be limited by these terms. These terms are only used to distinguish one element, component, area, layer, or part from another element, component, area, layer, or part. Therefore, without departing from the teachings of this application, the first element, component, area, layer, or part discussed below may be referred to as the second element, component, area, layer, or part.
[0085] Spatial relation terms such as "below," "under," "below," "under," "above," and "above" are used here for convenience to describe the relationship between one element or feature shown in the figure and other elements or features. It should be understood that, in addition to the orientation shown in the figure, spatial relation terms are intended to also include different orientations of devices in use and operation.
[0086] The terminology used herein is for the purpose of describing particular embodiments only and is not intended to limit the scope of this application. When used herein, the singular forms “a,” “an,” and “the” are also intended to include the plural forms unless the context clearly indicates otherwise. It should also be understood that the terms “comprising” and / or “including,” when used in this specification, identify the presence of the stated features, integers, steps, operations, elements, and / or components, but do not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components, and / or groups. When used herein, the term “and / or” includes any and all combinations of the associated listed items.
[0087] Embodiments of the invention are described herein with reference to cross-sectional views that serve as schematic diagrams of preferred embodiments (and intermediate structures) of this application. Thus, variations in the shown shape are contemplated due to, for example, manufacturing techniques and / or tolerances. Therefore, embodiments of this application should not be limited to the specific shapes shown herein, but include shape deviations due to, for example, manufacturing processes. Consequently, the figures are substantially schematic, and their shapes are not intended to show the actual shape of the device and are not intended to limit the scope of this application.
[0088] See attached document Figure 1 Appendix Figure 2 An exemplary description will be given of an operation control method for a furnace tube machine according to an embodiment of this application. The furnace tube machine can be used to perform processing on wafers such as thin film deposition, doping, and thermal annealing.
[0089] In this embodiment, the furnace tube machine includes at least a furnace tube chamber, a temperature control device, a wafer boat, a wafer loading / unloading device, a wafer boat drive device, and a controller. The furnace tube chamber is used to process the wafers located within it; that is, the wafers undergo processing such as thin film deposition, doping, and thermal annealing within the furnace tube chamber. The temperature control device is used to acquire and adjust the temperature within the furnace tube chamber. The wafer boat is used to carry the wafers. The wafer loading / unloading device is used to load and unload the wafers from the wafer boat. The wafer boat drive device is used to carry the wafer boat and load or unload it from the furnace tube chamber. The controller is communicatively connected to the temperature control device, the wafer loading / unloading device, and the wafer boat drive device. It acquires wafer pre-processing information, generates a wafer process recipe based on the pre-processing information, and controls the temperature control device, the wafer loading / unloading device, and the wafer boat drive device to perform corresponding operations based on the process recipe to achieve wafer processing.
[0090] See appendix Figure 1 The operation control method of this furnace tube machine includes the following steps:
[0091] S10: Process the first batch of wafers based on the process recipe of the first batch of wafers in the furnace chamber, and at the same time determine whether there is any pre-order information for the processing of the second batch of wafers.
[0092] S20: When the pre-order processing information for the second batch of wafers exists, generate the process recipe for the second batch of wafers based on the pre-order processing information for the second batch of wafers. The process recipe includes the wafer boat loading temperature.
[0093] S30: After the first batch of wafers has been processed, a first temperature change rate is determined based on the first temperature difference between the actual lowest temperature of the furnace chamber after the first batch of wafers has been unloaded and the first temperature difference between the boat loading temperature of the second batch of wafers. The first temperature change rate is greater than the idle temperature change rate of the furnace tube machine, and less than or equal to the maximum temperature change rate of the furnace tube machine.
[0094] S40: Based on the first temperature change rate, adjust the temperature of the furnace tube chamber from the actual minimum temperature to the loading temperature of the second batch of wafers in the crystal boat, maintain the temperature while loading the crystal boat to transport the second batch of wafers to the furnace tube chamber, and after the crystal boat is loaded, control the temperature of the furnace tube chamber to stabilize at the crystal boat loading temperature.
[0095] S50: Process the second batch of wafers based on the process formulation for the second batch of wafers.
[0096] According to the furnace tube machine operation control method of the present application embodiment, when the reservation processing information of the second batch of wafers exists, a first temperature change rate is determined based on the first temperature difference between the actual minimum temperature of the furnace tube chamber after the first batch of wafers is unloaded and the first temperature difference between the boat loading temperature of the second batch of wafers. Based on the first temperature change rate, the temperature of the furnace tube chamber is directly adjusted and stabilized from the actual minimum temperature after the first batch of wafers is processed to the boat loading temperature of the second batch of wafers. It is not necessary to first adjust and stabilize the temperature in the furnace tube chamber at the standby temperature of the furnace tube machine, and then adjust and stabilize the boat loading temperature of the second batch of wafers. This can effectively shorten the processing interval time between batches of wafers and improve the efficiency of the furnace tube machine.
[0097] The following provides a detailed explanation of steps S10-S40.
[0098] In step S10, the controller in the furnace tube machine acquires the pre-order processing information for the first batch of wafers, generates a process recipe for the first batch of wafers based on the pre-order processing information, and processes the first batch of wafers based on the process recipe. The processing pre-order information includes, but is not limited to, at least one of the following: wafer attributes (e.g., size, material), target process type (e.g., thermal annealing, thermal oxidation, thin film deposition, doping), process quality requirements, batch number, and batch size (number of wafers in the current batch). Workers can send processing pre-order information to the controller of the furnace tube machine directly or through other equipment or systems in the wafer semiconductor manufacturing plant, based on production needs. After acquiring the pre-order processing information for the first batch of wafers, the controller selects the production recipe corresponding to the processing pre-order information from a preset process database as the production recipe for the first batch of wafers. The production formula includes at least: temperature control parameters (including boat loading temperature, boat unloading temperature, main process temperature, heating and cooling rates, etc.), boat driving parameters (including boat loading timing, boat unloading timing, boat propulsion speed, etc.), and wafer loading and unloading parameters (including wafer pick-up position, wafer unloading position, etc.). Subsequently, the controller, based on the process formula, controls the temperature control device, wafer loading and unloading device, boat driving device, and other corresponding operations to process the first batch of wafers. In step S10, while processing the first batch of wafers based on the process formula of the first batch of wafers in the furnace chamber, the furnace chamber controller determines whether there is a reservation for processing a second batch of wafers; that is, the controller determines whether it has received a reservation for processing a second batch of wafers.
[0099] For example, see Appendix Figure 3 In the figure, the solid black line represents the chamber temperature of this embodiment, that is, the temperature change curve of the furnace chamber when the furnace tube machine is processed sequentially for the first and second batches of wafers using the operation control method of this embodiment; the dashed gray line represents the chamber temperature of the prior art, that is, the temperature change curve of the furnace chamber when the furnace tube machine is processed sequentially for the first and second batches of wafers using the conventional operation control method; T main The main process temperature is T, which is the main process temperature of the first batch of wafers in this embodiment and in the prior art; idle This is the idle temperature (standby temperature) of the furnace tube machine, which is also the boat loading temperature of the first batch of wafers in this embodiment and in the prior art; T BUL T is the unloading temperature of the first batch of wafers from the ship, that is, the unloading temperature of the first batch of wafers from the ship in this embodiment and in the prior art; BL The boat loading temperature for the second batch of wafers is T, which is also the boat loading temperature for the second batch of wafers in this embodiment and in the prior art. minThis refers to the actual lowest temperature of the first batch of wafers in this embodiment. In this embodiment, the first batch of wafers is processed based on the process recipe of the first batch of wafers in the furnace chamber, including: controlling the temperature of the furnace chamber from the boat loading temperature T of the first batch of wafers. idle Adjust to main process temperature T main After maintaining a stable temperature, the first batch of wafers is processed at the main process temperature of the first batch of wafers; based on the main process temperature T of the first batch of wafers... main And the unloading temperature T of the first batch of wafers BUL The second temperature difference is used to determine the second temperature change rate; based on the second temperature change rate, the temperature of the furnace chamber is adjusted from the main process temperature T of the first batch of wafers. main Adjust the unloading temperature T of the first batch of wafers to the boat. BUL The wafer boat is unloaded to transport the first batch of wafers out of the furnace chamber. The temperature of the furnace chamber at the time of unloading the wafer boat is the actual lowest temperature T. min The second temperature change rate can be greater than the heating and cooling rates in the process formulation (in the prior art, the temperature change rate is greater than the main process temperature T of the first batch of wafers). main Adjust the unloading temperature T of the first batch of wafers to the boat. BUL The heating and cooling rates are less than or equal to the maximum temperature change rate of the furnace tube machine.
[0100] For example, based on the master process temperature T of the first batch of wafers main And the unloading temperature T of the first batch of wafers BUL Determining the second temperature rate based on the second temperature difference includes: determining the second shortest temperature change time based on the second temperature difference using a preset algorithm; and using the result of dividing the second temperature difference by the second shortest temperature change time as the second temperature rate. For example, the preset algorithm can be a rule-based threshold algorithm, that is, establishing a correspondence between multiple second temperature difference intervals and multiple second shortest temperature change times in advance through experiments or theoretical calculations, forming a lookup table of second temperature difference intervals and second shortest temperature change times, based on the main process temperature T of the first batch of wafers. main And the unloading temperature T of the first batch of wafers BUL The second temperature difference determines its corresponding second temperature difference range, and the second shortest temperature change time for this range is determined by looking up a reference table. For example, this preset algorithm can be an empirical formula algorithm. That is, by using a large amount of experimental data on temperature differences (the temperature difference between the main process temperature and the wafer unloading temperature) and the shortest temperature change time, a mathematical model (such as a polynomial or exponential function) is used to fit the relationship between the temperature difference and the shortest temperature change time to obtain an empirical formula. Therefore, based on the main process temperature T of the first batch of wafers... main And the unloading temperature T of the first batch of wafers BULThe second temperature difference is used to calculate the corresponding second shortest temperature change time using this empirical formula. For example, this preset algorithm can also be other algorithms known to those skilled in the art; this application does not specifically limit them, as long as they can determine the second shortest temperature change time based on the second temperature difference. See Appendix. Figure 2 In existing technologies, the heating and cooling rates are typically fixed in the process formulation, starting from the main process temperature T of the first batch of wafers. main Adjust the unloading temperature T of the first batch of wafers to the boat. BUL Its processing time is relatively long; however, in this embodiment, the second temperature change rate determined in the above manner is used to reduce the temperature from the main process temperature T of the first batch of wafers. main Adjust the unloading temperature T of the first batch of wafers to the boat. BUL This can effectively shorten the heating and cooling time, thereby improving the efficiency of the furnace tube machine. At the same time, it reduces the total heat budget of the furnace tube machine, which is conducive to improving the product yield.
[0101] For example, adjusting the temperature of the furnace tube chamber from the main process temperature of the first batch of wafers to the unloading temperature of the first batch of wafers based on a second temperature change rate includes: determining a second PID parameter corresponding to the second temperature difference by looking up a preset lookup table based on the second temperature difference; and adjusting the temperature control device of the furnace tube machine based on the second PID parameter and a second PID algorithm to make the temperature of the furnace tube chamber decrease at a second temperature change rate from the main process temperature T of the first batch of wafers. main Adjust the unloading temperature T of the first batch of wafers to the boat. BUL For example, a correspondence between multiple second temperature difference intervals and multiple second PID parameters (each second PID parameter includes at least a proportional coefficient Kp, an integral coefficient Ki, and a derivative coefficient Kd) can be established in advance through experiments or theoretical calculations (the second PID parameter corresponding to the second temperature difference interval is the PID parameter that can stabilize the temperature to the target temperature fastest within that temperature interval). This forms a lookup table of second temperature difference intervals and second PID parameters. Therefore, based on the second temperature difference, the temperature difference interval to which it belongs can be determined, and the second PID parameter corresponding to that temperature difference interval can be determined by looking up the preset lookup table. The PID algorithm is known to those skilled in the art and will not be elaborated here. In the prior art, the temperature control device of the furnace tube machine is usually adjusted according to the fixed PID parameters in the process formula using a second PID algorithm to make the temperature of the furnace tube chamber rise from the main process temperature T of the first batch of wafers. main Adjust the unloading temperature T of the first batch of wafers to the boat. BUL The temperature fluctuates significantly, making it difficult to quickly reach and stabilize the unloading temperature T of the first batch of wafers. BULIn this embodiment, based on the second PID parameters determined in the above manner, the temperature control device of the furnace tube machine is adjusted by the second PID algorithm so that the temperature of the furnace tube chamber decreases from the main process temperature T of the first batch of wafers at a second temperature change rate. main Adjust the unloading temperature T of the first batch of wafers to the boat. BUL The temperature fluctuation is small, and it can quickly reach and stabilize at the unloading temperature T of the first batch of wafers. BUL This can effectively shorten the heating and cooling time, thereby improving the efficiency of the furnace tube machine and reducing the total heat budget of the furnace tube machine, which is conducive to improving the product yield.
[0102] See appendix Figure 2 In step S30, after the processing of the first batch of wafers is completed, that is, after the first batch of wafers is unloaded from the wafer boat by the wafer loading and unloading device, the actual lowest temperature T of the furnace chamber after the first batch of wafers is unloaded is obtained by the temperature control device. min Then, based on that actual lowest temperature T min The boat loading temperature T in the process formulation of the second batch of wafers BL The first temperature difference determines the first temperature change rate. This first temperature change rate is greater than the idle temperature change rate of the furnace tube machine, and less than or equal to the maximum temperature change rate of the furnace tube machine. The idle temperature change rate is the default temperature rise / fall rate of the furnace tube chamber of the furnace tube machine from an idle state to other temperatures, and is usually a constant value.
[0103] In this embodiment, the first temperature change rate is determined based on the first temperature difference between the actual minimum temperature of the furnace chamber after the first batch of wafers is unloaded and the first temperature difference between the boat loading temperature of the second batch of wafers. This includes: determining a first minimum temperature change time based on the first temperature difference using a preset algorithm, and then using the result of dividing the first temperature difference by the first minimum temperature change time as the first temperature change rate. For example, the preset algorithm can be a rule-based threshold algorithm, that is, establishing a correspondence between multiple first temperature difference intervals and multiple first minimum temperature change times in advance through experiments or theoretical calculations, forming a lookup table of first temperature difference intervals and first minimum temperature change times, based on the actual minimum temperature T. min The boat loading temperature T in the process formulation of the second batch of wafers BL The first temperature difference range to which the first temperature difference belongs is determined by looking up a reference table to determine the corresponding first shortest temperature change time. For example, this preset algorithm can be an empirical formula algorithm. That is, by using a large amount of experimental data on temperature differences (the temperature difference between the actual minimum temperature and the crystal boat loading temperature) and the shortest temperature change time, a mathematical model (such as a polynomial, exponential function, etc.) is used to fit the relationship between the temperature difference and the shortest temperature change time to obtain an empirical formula. Therefore, based on the actual minimum temperature T... minThe boat loading temperature T in the process formulation of the second batch of wafers BL The first temperature difference is used to calculate the first shortest temperature change time using this empirical formula. For example, this preset algorithm can also be other algorithms known to those skilled in the art; this application does not specifically limit them, as long as they can determine the first shortest temperature change time based on the first temperature difference. See Appendix. Figure 2 In existing technologies, after the first batch of wafers is unloaded, the temperature inside the furnace chamber is typically lowered from the actual lowest temperature T. min Adjust and stabilize at the idle temperature T of the furnace tube machine. idle Then from the idle temperature T idle Adjust and stabilize the boat loading temperature T for the second batch of wafers. BL Its time consumption is relatively long; however, in this embodiment, the first temperature change rate determined in the above manner is directly from the actual lowest temperature T. min Adjust and stabilize the boat loading temperature T for the second batch of wafers. BL This can effectively shorten the cooling time, thereby improving the efficiency of the furnace tube machine.
[0104] For example, adjusting the temperature of the furnace tube chamber from the actual minimum temperature to the boat loading temperature of the second batch of wafers based on a first temperature change rate includes: determining a first PID parameter corresponding to the first temperature difference by looking up a preset lookup table based on the first temperature difference; and adjusting the temperature control device of the furnace tube machine based on the first PID parameter using a first PID algorithm, so that the temperature of the furnace tube chamber decreases from the actual minimum temperature T at a first temperature change rate. min Adjust the boat loading temperature T to the second batch of wafers BL For example, a correspondence between multiple first temperature difference intervals and multiple first PID parameters (each first PID parameter includes at least a proportional coefficient Kp, an integral coefficient Ki, and a derivative coefficient Kd) can be established in advance through experiments or theoretical calculations (the first PID parameter corresponding to the first temperature difference interval is the PID parameter that can make the temperature stabilize at the target temperature the fastest within that temperature interval). This forms a lookup table of first temperature difference intervals and first PID parameters. Therefore, based on the first temperature difference, the temperature difference interval to which it belongs can be determined, and the first PID parameter corresponding to that temperature difference interval can be determined by looking up the preset lookup table. The PID algorithm is known to those skilled in the art and will not be elaborated here. In the prior art, the temperature control device of the furnace tube machine is usually adjusted according to the fixed PID parameters in the process formula using a first PID algorithm to adjust the temperature of the furnace tube chamber from the actual lowest temperature and stabilize it at the idle temperature T. idle The boat loading temperature T of the second batch of wafers BLThe temperature fluctuates significantly and is difficult to reach and stabilize quickly. However, in this embodiment, based on the first PID parameters determined in the above manner, the temperature control device of the furnace tube machine is adjusted using a first PID algorithm to ensure that the temperature of the furnace tube chamber changes from the actual lowest temperature T at a first temperature variation rate. min Adjust the boat loading temperature T to the second batch of wafers BL The temperature fluctuation is small, and it can quickly reach and stabilize the boat loading temperature T for the second batch of wafers. BL This can effectively shorten the cooling time, thereby improving the efficiency of the furnace tube machine.
[0105] See appendix Figure 2 In step S40, the controller controls the temperature control device in the furnace tube machine to adjust the temperature of the furnace tube chamber from the actual lowest temperature T based on the first temperature change rate. min Adjust the boat loading temperature T to the second batch of wafers BL and maintain at the crystal boat loading temperature T BL During this process, the controller, based on the process recipe of the second batch of wafers, controls the wafer loading and unloading device to load the second batch of wafers onto the wafer boat, and maintains the temperature in the chamber at the wafer boat loading temperature T. BL Simultaneously, a crystal boat is loaded to transport the second batch of wafers to the furnace chamber. After the crystal boat is loaded, the temperature of the furnace chamber is controlled to stabilize at the crystal boat loading temperature so that the wafers entering the furnace chamber are heated evenly. After stabilizing for a preset time, the subsequent step S50 is performed.
[0106] In step S50, the second batch of wafers can be processed in the same way as the first batch of wafers using the process recipe, and will not be described again here.
[0107] For example, the operation control method of the furnace tube machine further includes: when the reservation processing information for the second batch of wafers does not exist (i.e., when the controller does not receive the reservation processing information for the second batch of wafers in step S10), after the processing of the first batch of wafers is completed, a third temperature change rate of the furnace tube machine is determined based on the third temperature difference between the actual minimum temperature of the furnace tube chamber after the first batch of wafers is unloaded and the standby temperature of the furnace tube machine. The third temperature change rate is greater than the idle temperature change rate and less than or equal to the maximum temperature change rate of the furnace tube machine. Then, based on the third temperature change rate, the temperature of the furnace tube chamber is adjusted from the actual minimum temperature to the standby temperature and maintained at the standby temperature. This reduces energy consumption and allows the furnace tube machine to be adjusted to a suitable temperature for wafer processing as soon as the corresponding process recipe is received upon receiving subsequent reservation processing information.
[0108] For example, based on the third temperature difference between the actual minimum temperature of the furnace chamber after the first batch of wafers is unloaded and the standby temperature of the furnace tube machine, the third temperature change rate of the furnace tube machine is determined, including: determining the third shortest temperature change time based on the third temperature difference using a preset algorithm; and using the result of dividing the third temperature difference by the third shortest temperature change time as the third temperature change rate. For example, the preset algorithm can be a rule-based threshold algorithm, that is, establishing a correspondence between multiple third temperature difference intervals and multiple third shortest temperature change times in advance through experiments or theoretical calculations, forming a lookup table of third temperature difference intervals and third shortest temperature change times, determining the third temperature difference interval to which the actual minimum temperature and the standby temperature belong based on the third temperature difference, and determining the third shortest temperature change time corresponding to the third temperature difference interval by looking up the lookup table. For example, the preset algorithm can be an empirical formula algorithm. That is, by using a large amount of experimental data on temperature differences (the temperature difference between the main process temperature and the unloading temperature of the crystal boat) and the shortest temperature change time, a mathematical model (such as a polynomial, exponential function, etc.) is used to fit the relationship between the temperature difference and the shortest temperature change time to obtain an empirical formula. Thus, based on the third temperature difference between the actual minimum temperature and the standby temperature, the corresponding third shortest temperature change time can be calculated using this empirical formula. For example, the preset algorithm can also be other algorithms known to those skilled in the art. This application does not specifically limit them, as long as they can determine the third shortest temperature change time based on the third temperature difference. In the prior art, the temperature is usually adjusted from the actual minimum temperature to the standby temperature at a fixed heating and cooling rate in the process formula, which takes a relatively long time. However, in this embodiment, the temperature is adjusted from the actual minimum temperature to the standby temperature at the third temperature change rate determined by the above method, which can effectively shorten the heating and cooling time and thus improve the efficiency of the furnace tube machine.
[0109] For example, adjusting the temperature of the furnace tube chamber from the actual minimum temperature to the standby temperature based on the third temperature change rate includes: determining the third PID parameter corresponding to the third temperature difference by looking up a preset lookup table based on the third temperature difference; and adjusting the temperature control device of the furnace tube machine according to the third PID parameter using a third PID algorithm, so that the temperature of the furnace tube chamber is adjusted from the actual minimum temperature to the standby temperature at the third temperature change rate. For example, a correspondence between multiple third temperature difference intervals and multiple third PID parameters (each third PID parameter includes at least a proportional coefficient Kp, an integral coefficient Ki, and a derivative coefficient Kd) can be established in advance through experiments or theoretical calculations (the third PID parameter corresponding to the third temperature difference interval is the PID parameter that can make the temperature stabilize at the target temperature the fastest under that temperature interval), forming a lookup table of third temperature difference intervals and third PID parameters. Thus, based on the third temperature difference, the temperature difference interval to which it belongs can be determined, and the third PID parameter corresponding to that temperature difference interval can be determined by looking up the preset lookup table. The PID algorithm is an algorithm known to those skilled in the art and will not be described in detail here. In existing technologies, the temperature control device of the furnace tube machine is typically adjusted using a third PID algorithm based on fixed PID parameters in the process formula to adjust the temperature of the furnace tube chamber from the actual minimum temperature to the standby temperature. This results in significant temperature fluctuations and makes it difficult to quickly reach and stabilize the standby temperature. In this embodiment, however, the temperature control device of the furnace tube machine is adjusted using a third PID algorithm based on the third PID parameters determined in the above manner. This allows the temperature of the furnace tube chamber to be adjusted from the actual minimum temperature to the standby temperature at a third temperature change rate. This results in smaller temperature fluctuations, allows for rapid reaching and stabilization of the standby temperature, effectively shortens the heating and cooling time, and thus improves the efficiency of the furnace tube machine.
[0110] See attached document Figure 3 An exemplary description of a furnace tube machine according to an embodiment of this application will be provided. The furnace tube machine includes: a furnace tube chamber 110, a temperature control device 120, a wafer boat 130, a wafer loading and unloading device 140, a wafer boat driving device 150, and a controller 160.
[0111] The furnace chamber 110 is used to process the wafer located therein. Exemplarily, the furnace chamber 110 can be a quartz chamber.
[0112] Temperature control device 120 is used to acquire and adjust the temperature inside furnace tube chamber 110. For example, temperature control device 120 may include a heater surrounding the outside of furnace tube chamber 110, a power controller connected to the heater (for adjusting the heating power of the heater to adjust the temperature inside furnace tube chamber 110), and a temperature sensor (e.g., thermocouple) disposed inside furnace tube chamber 110.
[0113] The wafer carrier 130 is used to load wafers. For example, the wafer carrier 130 may include multiple support rings with evenly distributed slots, each slot being used to hold one wafer.
[0114] The wafer loading and unloading device 140 is used to load wafers into and unload wafers from the wafer boat 130. Exemplarily, the wafer loading and unloading device 140 may include a wafer identification system (for identifying wafer information), a robotic arm, and an end effector connected to the robotic arm (for gripping and placing wafers).
[0115] The crystal boat drive device 150 is used to carry the crystal boat 130 and to load or unload the crystal boat 130 into or from the furnace tube chamber 110. Exemplarily, the crystal boat drive device 150 may include a crystal boat support platform (for carrying the crystal boat 130), a drive system (for driving the crystal boat support platform to move to achieve loading and unloading of the crystal boat 130), and a position sensor (for detecting the position of the crystal boat support platform in real time to ensure that the crystal boat 130 is loaded and unloaded in place).
[0116] The controller 160 is communicatively connected to the temperature control device 120, the wafer loading / unloading device 140, and the wafer boat driving device 150. It acquires wafer pre-processing information, generates a wafer process recipe based on the pre-processing information, and controls the temperature control device 120, wafer loading / unloading device 140, and wafer boat driving device 150 to perform corresponding operations based on the process recipe. The process recipe includes the wafer boat loading temperature. For example, the pre-processing information includes, but is not limited to, at least one of the following: wafer attributes (e.g., size, material), target process type (e.g., thermal annealing, thermal oxidation, thin film deposition, doping), process quality requirements, batch number, and batch size (number of wafers in the current batch). After acquiring the pre-processing information for the first batch of wafers, the controller 160 selects the production recipe corresponding to the pre-processing information from a preset process database as the production recipe for that batch of wafers. The production formula should include at least the following: temperature control parameters (including boat loading temperature, boat unloading temperature, main process temperature, heating and cooling rates, etc.), boat driving parameters (including boat loading timing, boat unloading timing, boat propulsion speed, etc.), and wafer loading and unloading parameters (including wafer pick-up position, wafer unloading position, etc.).
[0117] The controller 160 is also used to determine a first temperature change rate based on the first temperature difference between the actual minimum temperature of the furnace chamber 110 after the first batch of wafers has been unloaded and the boat loading temperature of the second batch of wafers, after the first batch of wafers has been processed. Based on the first temperature change rate, the controller 120 adjusts the temperature of the furnace chamber 110 from the actual minimum temperature to the boat loading temperature of the second batch of wafers, maintains the temperature, and simultaneously controls the boat drive device 150 to load the boat 130 to transport the second batch of wafers to the furnace chamber 110. The first temperature change rate is greater than the idle temperature change rate of the furnace chamber and less than or equal to the maximum temperature change rate of the furnace chamber. Specific details of the above steps can be found in the embodiments of the operation control method described above, and will not be repeated here.
[0118] See appendix Figure 3 In this embodiment, the control device 160 includes a main controller 161, a temperature controller 162, a wafer loading / unloading controller 163, a wafer boat drive controller 164, and a recipe controller 165. The temperature controller 162, wafer loading / unloading controller 163, wafer boat drive controller 164, and recipe controller 165 are all communicatively connected to the main controller 161. The temperature control device 120, wafer loading / unloading device 140, and wafer boat drive device 150 are communicatively connected to the temperature controller 162, wafer loading / unloading controller 163, and wafer boat drive controller 164, respectively. The main controller 161, temperature controller 162, wafer loading / unloading controller 163, wafer boat drive controller 164, and recipe controller 165 can all be devices with computational control capabilities, such as microcontrollers or programmable logic controllers.
[0119] The main controller 161 is used to acquire wafer pre-processing information, generate wafer process recipes based on the pre-processing information, and transmit instructions to the temperature controller 162, wafer loading and unloading controller 163 and wafer boat drive controller 164 based on the process recipes. The temperature controller 162, wafer loading and unloading controller 163 and wafer boat drive controller 164 respectively control the temperature control device 120, wafer loading and unloading device 140 and wafer boat drive device 150 to perform corresponding operations.
[0120] The recipe controller 165, after the first batch of wafers has been processed, determines a first temperature change rate based on the first temperature difference between the actual minimum temperature of the furnace chamber 110 after the first batch of wafers has been unloaded and the first temperature difference between the boat loading temperature of the second batch of wafers. This first temperature change rate is then transmitted to the main controller 161. The main controller 161 transmits the first temperature change rate to the temperature controller 162. Based on the first temperature change rate and the process recipe, the temperature controller 162 controls the temperature control device 120 to adjust the temperature of the furnace chamber 110 from the actual minimum temperature to the boat loading temperature of the second batch of wafers, maintaining the temperature. Simultaneously, the main controller 161 transmits a command to the boat drive controller 164, which controls the boat drive device 150 to load the boat 130 to transport the second batch of wafers to the furnace chamber 110. Specific details of the above steps can be found in the embodiments of the operation control method described above, and will not be repeated here.
[0121] Furthermore, the recipe controller 165 is also used to determine a second temperature change rate based on the second temperature difference between the main process temperature of the first batch of wafers and the unloading temperature of the first batch of wafers from the boat, and transmit this rate to the main controller 161. The main controller 161 transmits the second temperature change rate to the temperature controller 162, which adjusts the temperature of the furnace chamber 110 from the main process temperature of the first batch of wafers to the unloading temperature of the first batch of wafers from the boat. Simultaneously, the main controller 161 transmits a command to the boat drive controller 164, which controls the boat drive device 150 to unload the boat 130 to transport the first batch of wafers out of the furnace chamber 110. Specific details of the above steps can be found in the embodiments of the operation control method described above, and will not be repeated here.
[0122] Furthermore, the recipe controller 165 is also used to determine the third temperature change rate of the furnace tube machine after the processing of the first batch of wafers is completed, based on the third temperature difference between the actual minimum temperature of the furnace tube chamber 110 after the unloading of the first batch of wafers and the standby temperature of the furnace tube machine, when the reservation processing information for the second batch of wafers is not available. This third temperature change rate is then transmitted to the main controller 161. The main controller 161 transmits the third temperature change rate to the temperature controller 162, which adjusts the temperature of the furnace tube chamber 110 from the actual minimum temperature to the standby temperature based on the third temperature change rate and maintains it at the standby temperature. Specific details of the above steps can be found in the embodiments of the operation control method described above, and will not be repeated here.
[0123] For the machine system in this application embodiment, the main controller 161, temperature controller 162, wafer loading and unloading controller 163, and crystal boat drive controller 164 are all components included in the existing furnace tube machine. Only one recipe controller 165 needs to be added to realize the aforementioned operation control method. The modification cost is low and it is easy to implement.
[0124] See appendix Figure 3 In this embodiment, the furnace tube machine also includes a gas supply device 170 and a pressure and exhaust gas control device 180. The gas process device is used to supply the process gas required for processing to the reaction chamber, and the pressure and exhaust gas control device 180 is used to control the pressure in the reaction chamber and discharge the exhaust gas generated during processing. The controller 160 also includes a gas controller 166 and a pressure and exhaust gas controller 167 that are communicatively connected to the main controller 161. The process formula also includes gas parameters and pressure and exhaust gas control parameters. The main controller 161 is used to transmit commands to the gas controller 166 and the pressure and exhaust gas controller 167 according to the process formula. The gas controller 166 and the pressure and exhaust gas controller 167 respectively control the gas supply device 170 and the pressure and exhaust gas control device 180 to perform corresponding operations.
[0125] See attached document Figure 4 An exemplary description of a wafer processing system according to an embodiment of this application will be provided. The wafer processing system includes a furnace tube machine 100 and an EAP (Equipment Automation Program) system 200.
[0126] The furnace tube machine 100 includes a furnace tube chamber 110, a temperature control device 120, a wafer boat 130, a wafer loading / unloading device 140, a wafer boat drive device 150, and a controller 160. The furnace tube chamber 110, temperature control device 120, wafer boat 130, wafer loading / unloading device 140, and wafer boat drive device 150 are the same as in the aforementioned furnace tube machine embodiment, and will not be repeated here. The controller 160 is communicatively connected to the temperature control device 120, wafer loading / unloading device 140, and wafer boat drive device 150. It is used to acquire wafer pre-processing information, generate a wafer process recipe based on the pre-processing information, and control the temperature control device 120, wafer loading / unloading device 140, and wafer boat drive device 150 to perform corresponding operations based on the process recipe. The process recipe includes the wafer boat loading temperature. For example, the processing reservation information includes, but is not limited to, at least one of the following: wafer attributes (e.g., size, material, etc.), target process type (e.g., thermal annealing, thermal oxidation, thin film deposition, doping, etc.), process quality requirements, batch number, and batch size (number of wafers in the current batch). After obtaining the processing reservation information for a batch of wafers, the controller 160 selects the production recipe corresponding to the processing reservation information from a preset process database as the production recipe for that batch of wafers based on the processing reservation information. The production recipe includes at least: temperature control parameters (including boat loading temperature, boat unloading temperature, main process temperature, heating and cooling rates, etc.), boat driving parameters (including boat loading timing, boat unloading timing, boat propulsion speed, etc.), and wafer loading and unloading parameters (including wafer pick-up position, wafer unloading position, etc.). In this embodiment, the controller 160 may include a main controller 161, a temperature controller 162, a wafer loading and unloading controller 163, and a boat driving controller 164, but does not include the aforementioned recipe controller 165.
[0127] The EAP system 200 includes a recipe controller 210, which is communicatively connected to a controller 160 (specifically, it can be communicatively connected to a main controller 161). After the processing of the first batch of wafers is completed, the recipe controller 210 determines a first temperature change rate based on the first temperature difference between the actual minimum temperature of the furnace chamber 110 after the first batch of wafers is unloaded and the boat loading temperature of the second batch of wafers, and transmits this rate to the controller 160. The controller 160, based on the first temperature change rate, controls the temperature control device 120 to adjust the temperature of the furnace chamber 110 from the actual minimum temperature to the boat loading temperature of the second batch of wafers, maintaining the temperature. Simultaneously, the controller 160 controls the boat drive device 150 to load the boat 130 to transport the second batch of wafers to the furnace chamber 110. The first temperature change rate is greater than the idle temperature change rate of the furnace platform 100 and less than or equal to the maximum temperature change rate of the furnace platform 100. Specific details of the above steps can be found in the previous embodiment of the operation control method, and will not be repeated here. The recipe controller 210 can be a device with computational control capabilities, such as a microcontroller or a programmable logic controller.
[0128] Furthermore, the recipe controller 210 is also used to determine a second temperature change rate based on the second temperature difference between the main process temperature of the first batch of wafers and the unloading temperature of the first batch of wafers from the boat, and transmit this rate to the main controller 161. The main controller 161 transmits the second temperature change rate to the temperature controller 162, which adjusts the temperature of the furnace chamber 110 from the main process temperature of the first batch of wafers to the unloading temperature of the first batch of wafers from the boat. Simultaneously, the main controller 161 transmits a command to the boat drive controller 164, which controls the boat drive device 150 to unload the boat 130 to transport the first batch of wafers out of the furnace chamber 110. Specific details of the above steps can be found in the embodiments of the operation control method described above, and will not be repeated here.
[0129] Furthermore, when the reservation processing information for the second batch of wafers is unavailable, after the processing of the first batch of wafers is completed, the recipe controller 210 determines a third temperature change rate for the furnace tube machine 100 based on a third temperature difference between the actual minimum temperature of the furnace tube chamber 110 after the unloading of the first batch of wafers and the standby temperature of the furnace tube machine 100, and transmits this rate to the main controller 161. The main controller 161 transmits the third temperature change rate to the temperature controller 162, which adjusts the temperature of the furnace tube chamber 110 from the actual minimum temperature to the standby temperature based on the third temperature change rate and maintains it at the standby temperature. Specific details of the above steps can be found in the embodiments of the operation control method described above, and will not be repeated here.
[0130] For the wafer processing system of this application embodiment, the aforementioned operation control method can be implemented simply by adding a recipe controller 210 to the EAP system 200, which has low modification costs and is easy to implement. Furthermore, since the EAP system 200 can communicate with multiple furnace tube machines 100 simultaneously, adding a recipe controller 210 to the EAP system 200 can control multiple furnace tube machines 100 to implement the aforementioned operation control method. Compared to the solution of setting a recipe controller 165 in each furnace tube machine 100, the cost and modification difficulty are lower.
[0131] Although exemplary embodiments have been described herein with reference to the accompanying drawings, it should be understood that the above exemplary embodiments are merely illustrative and are not intended to limit the scope of this application. Various changes and modifications can be made therein by those skilled in the art without departing from the scope and spirit of this application. All such changes and modifications are intended to be included within the scope of this application as claimed in the appended claims.
[0132] Those skilled in the art will recognize that the units and algorithm steps of the various examples described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are implemented in hardware or software depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementation should not be considered beyond the scope of this application.
[0133] In the several embodiments provided in this application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are merely illustrative. For instance, the division of units is only a logical functional division, and in actual implementation, there may be other division methods. For example, multiple units or components may be combined or integrated into another device, or some features may be ignored or not executed.
[0134] Numerous specific details are set forth in the specification provided herein. However, it will be understood that embodiments of this application may be practiced without these specific details. In some instances, well-known methods, structures, and techniques have not been shown in detail so as not to obscure the understanding of this specification.
[0135] Similarly, it should be understood that, in order to streamline this application and aid in understanding one or more of the various inventive aspects, features of this application may sometimes be grouped together in a single embodiment, figure, or description thereof in the description of exemplary embodiments of this application. However, this approach should not be construed as reflecting an intention that the claimed application requires more features than are expressly recited in each claim. Rather, as reflected in the corresponding claims, its inventive point lies in solving the corresponding technical problem with features fewer than all features of a single disclosed embodiment. Therefore, the claims following the detailed description are hereby expressly incorporated into that detailed description, wherein each claim itself is a separate embodiment of this application.
[0136] Those skilled in the art will understand that, apart from the mutual exclusion of features, all features disclosed in this specification (including the accompanying claims, abstract, and drawings) and all processes or elements of any method or apparatus so disclosed can be combined in any combination. Unless otherwise expressly stated, each feature disclosed in this specification (including the accompanying claims, abstract, and drawings) may be replaced by an alternative feature serving the same, equivalent, or similar purpose.
[0137] Furthermore, those skilled in the art will understand that although some embodiments described herein include certain features but not others included in other embodiments, combinations of features from different embodiments are intended to be within the scope of this application and form different embodiments. For example, in the claims, any one of the claimed embodiments can be used in any combination.
[0138] It should be noted that the above embodiments are illustrative of this application and not restrictive of this application, and that those skilled in the art can devise alternative embodiments without departing from the scope of the appended claims.
Claims
1. A method for controlling the operation of a furnace tube machine, characterized in that, include: The first batch of wafers is processed based on the process formula of the first batch of wafers in the furnace chamber, while determining whether there is any pre-order processing information for the second batch of wafers. When the reservation processing information for the second batch of wafers exists, a process recipe for the second batch of wafers is generated based on the reservation processing information for the second batch of wafers, wherein the process recipe includes the wafer boat loading temperature; After the first batch of wafers is processed, a first temperature change rate is determined based on the first temperature difference between the actual lowest temperature of the furnace tube chamber after the first batch of wafers is unloaded and the first temperature difference between the boat loading temperature of the second batch of wafers. The first temperature change rate is greater than the idle temperature change rate of the furnace tube machine and less than or equal to the maximum temperature change rate of the furnace tube machine. Based on the first temperature change rate, the temperature of the furnace tube chamber is adjusted from the actual minimum temperature to the crystal boat loading temperature of the second batch of wafers. The temperature is maintained while the crystal boat is loaded to transport the second batch of wafers to the furnace tube chamber. After the crystal boat is loaded, the temperature of the furnace tube chamber is controlled to be stable at the crystal boat loading temperature. The second batch of wafers is processed based on the process formulation of the second batch of wafers.
2. The operation control method according to claim 1, characterized in that, The determination of the first temperature change rate based on the first temperature difference between the actual lowest temperature of the furnace chamber after the first batch of wafers is unloaded and the first temperature difference between the second batch of wafers and the boat loading temperature includes: The first shortest temperature change time is determined based on the first temperature difference using a preset algorithm; The first temperature difference divided by the first shortest temperature change time is taken as the first temperature change rate; and / or The step of adjusting the temperature of the furnace chamber from the actual minimum temperature to the boat loading temperature of the second batch of wafers based on the first temperature change rate includes: Based on the first temperature difference, the first PID parameter corresponding to the first temperature difference is determined by looking up a preset lookup table. Based on the first PID parameters, the temperature control device of the furnace tube machine is adjusted by the first PID algorithm so that the temperature of the furnace tube chamber is adjusted from the actual minimum temperature to the boat loading temperature of the second batch of wafers at the first temperature change rate.
3. The operation control method according to claim 1, characterized in that, The process formulation also includes the main process temperature and the crystal boat unloading temperature; The process formula based on the first batch of wafers within the furnace chamber is used to process the first batch of wafers, including: The temperature of the furnace chamber is adjusted from the boat loading temperature of the first batch of wafers to the main process temperature and then kept stable. The first batch of wafers is processed at the main process temperature of the first batch of wafers. The second temperature rate is determined based on the second temperature difference between the main process temperature of the first batch of wafers and the unloading temperature of the wafer boat of the first batch of wafers. Based on the second temperature change rate, the temperature of the furnace chamber is adjusted from the main process temperature of the first batch of wafers to the unloading temperature of the first batch of wafers, and the wafer boat is unloaded to transport the first batch of wafers out of the furnace chamber. When the unloading of the wafer boat is completed, the temperature of the furnace chamber is the actual minimum temperature.
4. The operation control method according to claim 3, characterized in that, The determination of the second temperature rate based on the second temperature difference between the main process temperature of the first batch of wafers and the unloading temperature of the wafer boat of the first batch of wafers includes: The second shortest temperature change time is determined based on the second temperature difference using a preset algorithm; The result of dividing the second temperature difference by the second shortest temperature change time is taken as the second temperature change rate; and / or, The step of adjusting the temperature of the furnace chamber from the main process temperature of the first batch of wafers to the unloading temperature of the first batch of wafers based on the second temperature change rate includes: Based on the second temperature difference, the second PID parameter corresponding to the second temperature difference is determined by looking up a preset lookup table; Based on the second PID parameters, the temperature control device of the furnace tube machine is adjusted by the second PID algorithm so that the temperature of the furnace tube chamber is adjusted from the main process temperature of the first batch of wafers to the unloading temperature of the first batch of wafers at the second temperature change rate.
5. The operation control method according to claim 1, characterized in that, The operation control method of the furnace tube machine also includes: When the reservation processing information for the second batch of wafers does not exist, after the processing of the first batch of wafers is completed, the third temperature change rate of the furnace tube machine is determined based on the third temperature difference between the actual minimum temperature of the furnace tube chamber after the first batch of wafers is unloaded and the standby temperature of the furnace tube machine. The third temperature change rate is greater than the idle temperature change rate and less than or equal to the maximum temperature change rate of the furnace tube machine. Based on the third temperature change rate, the temperature of the furnace chamber is adjusted from the actual minimum temperature to the standby temperature and maintained at the standby temperature.
6. The operation control method according to claim 5, characterized in that, The method of determining the third temperature variation rate of the furnace tube equipment based on the third temperature difference between the actual minimum temperature of the furnace tube chamber after the first batch of wafers has been unloaded and the standby temperature of the furnace tube equipment includes: The third shortest temperature change time is determined based on the third temperature difference using a preset algorithm. The result of dividing the third temperature difference by the third shortest temperature change time is taken as the third temperature change rate; and / or The step of adjusting the temperature of the furnace chamber from the actual minimum temperature to the standby temperature based on the third temperature change rate includes: Based on the third temperature difference, the third PID parameter corresponding to the third temperature difference is determined by looking up a preset lookup table. Based on the third PID parameters, the temperature control device of the furnace tube machine is adjusted by the third PID algorithm so that the temperature of the furnace tube chamber is adjusted from the actual minimum temperature to the standby temperature at the third temperature change rate.
7. A furnace tube machine, characterized in that, include: Furnace chambers are used to process the wafers located within them; A temperature control device is used to acquire and adjust the temperature inside the furnace tube cavity; Crystal boat; A wafer loading and unloading device for loading wafers into and unloading wafers from the wafer boat; A crystal boat drive device is used to carry a crystal boat and to load the crystal boat into or unload the crystal boat from the furnace tube chamber. A controller, communicatively connected to the temperature control device, the wafer loading and unloading device, and the wafer boat driving device, is used to acquire wafer pre-processing information, generate wafer process recipes based on the pre-processing information, and control the temperature control device, the wafer loading and unloading device, and the wafer boat driving device to perform corresponding operations based on the process recipes, wherein the process recipes include wafer boat loading temperature; The controller is further configured to, after the processing of the first batch of wafers is completed, determine a first temperature change rate based on the first temperature difference between the actual minimum temperature of the furnace chamber after the first batch of wafers is unloaded and the first temperature difference between the boat loading temperature of the second batch of wafers, and control the temperature control device to adjust the temperature of the furnace chamber from the actual minimum temperature to the boat loading temperature of the second batch of wafers based on the first temperature change rate, maintain the temperature and control the boat driving device to load the boat to transport the second batch of wafers to the furnace chamber; Wherein, the first temperature change rate is greater than the idle temperature change rate of the furnace tube machine, and less than or equal to the maximum temperature change rate of the furnace tube machine.
8. The furnace tube machine according to claim 7, characterized in that, The determination of the first temperature change rate based on the first temperature difference between the actual lowest temperature of the furnace chamber after the first batch of wafers is unloaded and the first temperature difference between the second batch of wafers and the boat loading temperature includes: The first shortest temperature change time is determined based on the first temperature difference using a preset algorithm; The first temperature difference divided by the first shortest temperature change time is taken as the first temperature change rate; and / or The step of adjusting the temperature of the furnace chamber from the actual minimum temperature to the boat loading temperature of the second batch of wafers based on the first temperature change rate includes: Based on the first temperature difference, the first PID parameter corresponding to the first temperature difference is determined by looking up a preset lookup table. Based on the first PID parameters, the temperature control device is adjusted using the first PID algorithm so that the temperature of the furnace chamber is adjusted from the actual minimum temperature to the boat loading temperature of the second batch of wafers at the first temperature change rate.
9. The furnace tube machine according to claim 7, characterized in that, The control device includes a main controller, a temperature controller, a wafer loading and unloading controller, a crystal boat drive controller, and a recipe controller. The temperature controller, the wafer loading and unloading controller, the crystal boat drive controller, and the recipe controller are all communicatively connected to the main controller. The temperature control device, the wafer loading and unloading device, and the crystal boat drive device are respectively communicatively connected to the temperature controller, the wafer loading and unloading controller, and the crystal boat drive controller. The main controller is used to acquire wafer pre-processing information, generate wafer process recipes based on the pre-processing information, and transmit instructions to the temperature controller, wafer loading and unloading controller and wafer boat drive controller based on the process recipes. The temperature controller, wafer loading and unloading controller and wafer boat drive controller respectively control the temperature control device, wafer loading and unloading device and wafer boat drive device to perform corresponding operations. The recipe controller is used to determine a first temperature change rate and transmit it to the main controller based on the first temperature difference between the actual lowest temperature of the furnace chamber after the first batch of wafers is unloaded and the first temperature difference between the boat loading temperature of the second batch of wafers after the first batch of wafers is unloaded. The main controller transmits the first temperature change rate to the temperature controller. Based on the first temperature change rate and the process recipe, the temperature controller controls the temperature control device to adjust the temperature of the furnace chamber from the actual minimum temperature to the loading temperature of the second batch of wafers in the wafer boat and maintain the temperature. At the same time, the main controller transmits instructions to the wafer boat drive controller, which controls the wafer boat drive device to load the wafer boat to transport the second batch of wafers to the furnace chamber.
10. A wafer processing system, comprising a furnace tube machine and an EAP system, characterized in that, The furnace tube machine includes: Furnace chambers are used to process the wafers located within them; A temperature control device is used to acquire and adjust the temperature inside the furnace tube cavity; Crystal boat; A wafer loading and unloading device for loading wafers into and unloading wafers from the wafer boat; A crystal boat drive device is used to carry a crystal boat and to load the crystal boat into or unload the crystal boat from the furnace tube chamber. A controller, communicatively connected to the temperature control device, the wafer loading and unloading device, and the wafer boat driving device, is used to acquire wafer pre-processing information, generate wafer process recipes based on the pre-processing information, and control the temperature control device, the wafer loading and unloading device, and the wafer boat driving device to perform corresponding operations based on the process recipes, wherein the process recipes include the wafer boat loading temperature; The EAP system includes a recipe controller, which is communicatively connected to the control device. After the processing of the first batch of wafers is completed, the recipe controller determines a first temperature change rate based on the first temperature difference between the actual minimum temperature of the furnace chamber after the first batch of wafers is unloaded and the boat loading temperature of the second batch of wafers, and transmits the result to the control device. The controller controls the temperature control device based on the first temperature change rate to adjust the temperature of the furnace tube chamber from the actual minimum temperature to the loading temperature of the second batch of wafers on the wafer boat, and maintains the temperature. At the same time, the controller controls the wafer boat drive device to load the wafer boat to transport the second batch of wafers to the furnace tube chamber. Wherein, the first temperature change rate is greater than the idle temperature change rate of the furnace tube machine, and less than or equal to the maximum temperature change rate of the furnace tube machine.
11. The wafer processing system according to claim 10, characterized in that, The determination of the first temperature change rate based on the first temperature difference between the actual lowest temperature of the furnace chamber after the first batch of wafers is unloaded and the first temperature difference between the second batch of wafers and the boat loading temperature includes: The first shortest temperature change time is determined based on the first temperature difference using a preset algorithm; The first temperature difference divided by the first shortest temperature change time is taken as the first temperature change rate; and / or The step of adjusting the temperature of the furnace chamber from the actual minimum temperature to the boat loading temperature of the second batch of wafers based on the first temperature change rate includes: Based on the first temperature difference, the first PID parameter corresponding to the first temperature difference is determined by looking up a preset lookup table. Based on the first PID parameters, the temperature control device is adjusted using the first PID algorithm so that the temperature of the furnace chamber is adjusted from the actual minimum temperature to the boat loading temperature of the second batch of wafers at the first temperature change rate.
