Method for replacing a grate plate

By using two hoisting wire ropes and coordinated control of mobile equipment on the sintering machine, the problem of difficult grate hoisting was solved, achieving efficient grate replacement, improving replacement efficiency and shortening replacement time.

CN123154649APending Publication Date: 2026-11-24新余钢铁股份有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611504644.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-24
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

In the existing technology, the single-roller grate of the sintering machine is difficult to lift and has low replacement efficiency. In particular, the obstruction of the dust removal pipe and the sealing cover makes it impossible to use a crane to pull the grate out from the rear, which limits the horizontal movement range of the grate.

Method used

The system employs the coordinated control of two hoisting wire ropes and a mobile device. The wire ropes, which are wound around both ends of the grate, are connected to the mobile device. By utilizing the cooperation of the mobile devices, the grate rotates around a single toothed roller, thereby detaching from or moving to the installation area to achieve grate replacement.

Benefits of technology

Without removing the dust collection pipes and sealing covers, the grate replacement process is simplified, replacement efficiency is improved, and replacement time is shortened.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123154649A_ABST
    Figure CN123154649A_ABST
Patent Text Reader

Abstract

This invention relates to the field of grate replacement and maintenance technology for single-roll sintering machines, specifically, to a grate lifting and replacement method. The grate lifting and replacement method provided in this embodiment can directly act on the grate to lift the old grate from below the single-toothed roller and place the new grate inside. This moves the new grate from above the single-toothed roller to below it, thus moving it to the installation area and replacing the grate. This solves the problem of difficulty in replacing grates due to obstruction by dust collection pipes and sealing covers. In this embodiment, the dust collection pipes and sealing covers do not need to be removed during grate replacement. Instead, a first and a second steel wire rope are directly connected to both ends of the grate. The first and second mobile devices are used to rotate the grate to be replaced and the grate to be installed, thereby shortening the replacement time and improving replacement efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of single-roll grate replacement and maintenance technology for sintering machines, and more specifically, to a method for lifting and replacing grate plates. Background Technology

[0002] The single-roll crushing of the sintering machine is a crucial step in the sintering process. Because the single roll is exposed to high heat, high impact, and high load for a long time, the grate used for crushing wears out quickly due to the scouring of the sintering material, resulting in a short service life. To ensure production, it will be replaced during equipment maintenance.

[0003] However, existing technologies suffer from difficulties in hoisting and low replacement efficiency. Summary of the Invention

[0004] The purpose of this invention is to provide a method for lifting and replacing a grate, which facilitates lifting and thereby improves the efficiency of grate replacement.

[0005] The embodiments of the present invention can be implemented as follows: This invention provides a method for lifting and replacing a grate plate, comprising: Weld the two lifting lugs to the two vertical plates at the tail of the sintering machine, and connect the two ends of the fixing wire rope to the two lifting lugs respectively; The first mobile device is movably connected to the fixed steel wire rope, so that the first mobile device can move along the extension direction of the fixed steel wire rope. The first lifting wire rope is wound around one end of the grate to be replaced, and the first lifting wire rope is connected to the first moving equipment; The second lifting wire rope is wound around the other end of the grate to be replaced, and the second lifting wire rope is connected to the second mobile device; The second mobile device drives the second hoisting wire rope to move upward, and the first mobile device drives the first hoisting wire rope to move downward, thereby causing the grate to be replaced to rotate so that the grate to be replaced located below the single toothed roller of the sintering machine is removed from the installation area. After the grate to be replaced is removed from the installation area, remove the grate to be replaced. The first and second lifting wire ropes are respectively wound around both ends of the grate to be installed; The second mobile device drives the second hoisting wire rope downward, and the first mobile device drives the first hoisting wire rope upward, thereby rotating the grate to be installed so that the grate to be installed can be moved to the installation area. After installing the grate to be installed in the installation area, remove the first and second hoisting wire ropes.

[0006] In an optional embodiment, the step of using a second mobile device to move a second lifting wire rope upward and using a first mobile device to move a first lifting wire rope downward, thereby causing the grate to be replaced to rotate so that the grate to be replaced located below the single-toothed roller of the sintering machine is removed from the installation area includes: When the distance between the end of the grate to be replaced connected to the second hoisting wire rope and the installation bracket is 10cm-20cm, stop using the second mobile device to drive the second hoisting wire rope upward and stop using the first mobile device to drive the first hoisting wire rope downward. The second mobile device is used to move the grate to be replaced away from the single toothed roller, thereby increasing the gap between the grate to be replaced and the single toothed roller. After the distance between the grate to be replaced and the single-toothed roller reaches the preset range, the second mobile device continues to drive the second hoisting wire rope upward, and the first mobile device continues to drive the first hoisting wire rope downward until the grate to be replaced is removed from the installation area.

[0007] In an optional implementation, the steps of continuing to use the second mobile device to move the second hoisting wire rope upward and continuing to use the first mobile device to move the first hoisting wire rope downward until the grate to be replaced is removed from the installation area include: When the grate to be replaced is in a vertical position, stop using the second mobile device to drive the second hoisting wire rope to move upward, stop using the first mobile device to drive the first hoisting wire rope to move downward, and remove the first hoisting wire rope. Continue using the second mobile device to move the second hoisting wire rope upwards until the grate to be replaced is removed from the installation area.

[0008] In an optional embodiment, before the step of using a second mobile device to move a second lifting wire rope upward and using a first mobile device to move a first lifting wire rope downward, thereby rotating the grate to be replaced so that the grate to be replaced located below the single-toothed roller of the sintering machine is removed from the installation area, the grate replacement method further includes: The second mobile device is used to move the second hoisting wire rope toward the direction of the single toothed roller, thereby causing the grate to be replaced to detach from the mounting bracket.

[0009] In an optional embodiment, the step of using a second mobile device to drive a second lifting wire rope downwards and using a first mobile device to drive a first lifting wire rope upwards, thereby rotating the grate to be installed so that the grate to be installed moves to the installation area, includes: The second mobile device is used to move the second hoisting wire rope downwards; After the grate to be installed is located on one side of the single toothed roller, stop using the second mobile device to drive the second hoisting wire rope downward, and wrap the first hoisting wire rope around the end of the grate to be installed that is close to the installation area. Continue to use the second mobile device to move the second hoisting wire rope downwards, and continue to use the first mobile device to move the first hoisting wire rope upwards until the grate to be installed moves into the installation area and is in a vertical state; The second mobile device moves the second hoisting wire rope away from the single toothed roller, thereby installing the grate to be installed onto the mounting bracket.

[0010] In an optional embodiment, the grate is provided with two symmetrical first mounting slots and two symmetrical second mounting slots; the two first mounting slots are respectively located at both ends of the grate, and the two second mounting slots are respectively located at both ends of the grate; the distance between the axis of the first mounting slot and the axis of the grate is greater than the distance between the second mounting slot and the axis of the grate; In the case where one of the first mounting slots is engaged with the second hoisting wire rope, the second mounting slot located at the other end of the grate is engaged with the first hoisting wire rope.

[0011] In an optional embodiment, the steps of winding a first lifting wire rope around one end of the grate to be replaced and connecting the first lifting wire rope to the first mobile device, and winding a second lifting wire rope around the other end of the grate to be replaced and connecting the second lifting wire rope to the second mobile device, include: The first lifting wire rope is wound around one end of the grate to be replaced so that the first lifting wire rope is engaged with a second installation slot; The second lifting wire rope is wound around the other end of the grate to be replaced so that the second lifting wire rope is engaged with a first mounting slot.

[0012] In an optional embodiment, after the steps of winding the first lifting wire rope around one end of the grate to be replaced and connecting the first lifting wire rope to the first mobile device, the grate lifting and replacement method further includes: Move the first mobile device so that it is directly above the second mounting slot, thereby making the initial state of the first hoisting wire rope vertical.

[0013] In an optional embodiment, after the steps of wrapping the second lifting wire rope around the other end of the grate to be replaced and connecting the second lifting wire rope to the second mobile device, the grate lifting and replacement method further includes: Move the second mobile device so that it is directly above the first mounting slot, thereby making the initial state of the second hoisting wire rope vertical.

[0014] In an optional embodiment, the length of the grate is L, the shortest distance between the first mounting groove and the end of the grate is D1, and the shortest distance between the second mounting groove and the end of the grate is D2. Among them, D1 / L is 10%-12.1%, and D2 / L is 21.6%-23.7%.

[0015] The beneficial effects of the grate hoisting and replacement method provided in this embodiment of the invention include: 1. This grate replacement method can pull the old grate upward from below the single toothed roller and put the new grate downward, so that the new grate moves from above the single toothed roller to below the single toothed roller, thereby replacing the grate. This solves the problem of difficult grate replacement caused by dust removal pipes and sealing covers in the prior art.

[0016] 2. This grate replacement method can replace the grate without removing the dust removal pipes and sealing covers, shortening the replacement time and improving the replacement efficiency. Attached Figure Description

[0017] To more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings used in the embodiments will be briefly introduced below. It should be understood that the following drawings only show some embodiments of the present invention and should not be regarded as a limitation on the scope. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.

[0018] Figure 1 This is a first-view structural diagram of each piece of equipment in the grate hoisting and replacement method provided in this embodiment; Figure 2 This is a schematic diagram of the rotation of the grate to be replaced provided in this embodiment; Figure 3 This is a schematic diagram of the rotation of the grate to be installed provided in this embodiment; Figure 4 This is a structural schematic diagram of each piece of equipment in the grate hoisting and replacement method provided in this embodiment, viewed from a second perspective. Figure 5 This is a flowchart illustrating the improved grate hoisting and replacement method in this embodiment; Figure 6 for Figure 5 A flowchart illustrating step S5; Figure 7 for Figure 6 A flowchart illustrating step S53; Figure 8 for Figure 5 A flowchart illustrating step S8; Figure 9This is a schematic diagram of the structure of the grate provided in this embodiment.

[0019] Icons: 100 - grate; 100a - grate to be replaced; 100b - grate to be installed; 110 - first mounting slot; 120 - second mounting slot; 300 - first mobile device; 200 - second mobile device; 500 - first hoisting wire rope; 400 - second hoisting wire rope; 600 - single toothed roller; 700 - mounting bracket. Detailed Implementation

[0020] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. The components of the embodiments of the present invention described and shown in the accompanying drawings can generally be arranged and designed in various different configurations.

[0021] Therefore, the following detailed description of the embodiments of the invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely to illustrate selected embodiments of the invention. All other embodiments obtained by those skilled in the art based on the embodiments of the invention without inventive effort are within the scope of protection of the invention.

[0022] It should be noted that similar labels and letters in the following figures indicate similar items. Therefore, once an item is defined in one figure, it does not need to be further defined and explained in subsequent figures.

[0023] In the description of this invention, it should be noted that if terms such as "upper," "lower," "inner," or "outer" are used to indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, or the orientation or positional relationship in which the product of this invention is usually placed, they are only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this invention.

[0024] Furthermore, the terms "first" and "second" are used only to distinguish descriptions and should not be interpreted as indicating or implying relative importance.

[0025] It should be noted that, where there is no conflict, the features in the embodiments of the present invention can be combined with each other.

[0026] Sintering machines are important pieces of equipment in the metallurgical industry used for sintering ores. Their main function is to sinter powdered or granular iron ore, fuel, and flux mixtures at high temperatures to form sintered ore with certain strength and metallurgical properties. The sintering process involves igniting and burning the fuel in the mixture, generating high temperatures that partially melt and bind the ore, ultimately forming porous, blocky sintered ore.

[0027] The grate plate in the sintering machine is a key component installed on the single-roll crusher. It is located at the discharge end of the sintering machine and is used to receive the hot sintered ore unloaded from the trolley at a temperature of about 800 to 950°C. It works with the rotating toothed roller to crush the ore to a qualified particle size and then sends it to the ring cooler.

[0028] Because the grate operates under harsh conditions for extended periods, it must withstand continuous thermal shock from high-temperature sintered ore, as well as mechanical wear and compression from high-hardness materials. This leads to a significantly accelerated wear rate on its working surface. In actual production, the service life of the grate is often short, requiring frequent shutdowns for replacement. To ensure the continuous and stable operation of the sintering production line, grate replacement and maintenance becomes a necessary routine operation during planned equipment overhauls.

[0029] However, the dust removal duct and sealing cover are located behind the sintering machine, which prevents the overhead crane on the roof from moving downwards. This makes it impossible to use the overhead crane to pull the grate out from the rear, limiting the horizontal movement range of the grate and making it impossible to remove the grate.

[0030] Based on the above issues, please refer to Figures 1-5 This invention provides a method for lifting and replacing a grate plate, which lifts or inserts the grate plate 100 located below the single toothed roller 600 from the gap between the single toothed roller 600 and the mounting bracket 700, thereby removing the worn old grate plate and reinstalling a new grate plate to complete the replacement of the grate plate 100.

[0031] The steps for this grate installation and replacement method include: S1: Weld the two lifting lugs to the two vertical plates at the tail of the sintering machine, and connect the two ends of the fixing wire rope to the two lifting lugs respectively.

[0032] S2: The first mobile device 300 is movably connected to the fixed wire rope, so that the first mobile device 300 can move along the extension direction of the fixed wire rope.

[0033] S3: The first hoisting wire rope 500 is wound around one end of the grate plate 100a to be replaced, and the first hoisting wire rope 500 is connected to the first mobile device 300.

[0034] S4: Wrap the second hoisting wire rope 400 around the other end of the grate 100a to be replaced, and connect the second hoisting wire rope 400 to the second mobile device 200.

[0035] S5: The second mobile device 200 drives the second hoisting wire rope 400 to move upward, and the first mobile device 300 drives the first hoisting wire rope 500 to move downward, thereby causing the grate to be replaced 100a to rotate so that the grate to be replaced 100a located below the single toothed roller 600 of the sintering machine is removed from the installation area.

[0036] S6: After the grate to be replaced 100a is removed from the installation area, remove the grate to be replaced 100a.

[0037] S7: The first hoisting wire rope 500 and the second hoisting wire rope 400 are respectively wound around the two ends of the grate plate 100b to be installed.

[0038] S8: The second mobile device 200 drives the second hoisting wire rope 400 to move downward, and the first mobile device 300 drives the first hoisting wire rope 500 to move upward, thereby causing the grate 100b to be installed to rotate so that the grate 100b to be installed moves to the installation area.

[0039] S9: After installing the grate 100b to be installed in the installation area, remove the first hoisting wire rope 500 and the second hoisting wire rope 400.

[0040] Understandably, steps S1 to S6 constitute the removal process of the old grate, the core of which is to drive the old grate to be replaced to rotate around the single-toothed roller 600 and detach it from the installation area by coordinating the control of the first mobile device 300 and the second mobile device 200; while steps S7 to S9 constitute the reinstallation process of the new grate, the core of which is to guide the new grate to be installed into the original installation area through controlled rotation and spatial displacement, and finally complete the assembly and fixation.

[0041] It should be noted that since the grate plate 100 is located at the discharge end of the sintering machine and is used to receive the crushed material, while the single toothed roller 600 is used to break the material by rotating, the grate plate 100 should be installed below the single toothed roller 600.

[0042] Mounting brackets 700 are spaced apart on the sides of the single-toothed roller 600 and connected to the grate 100 to support the grate 100. To improve stability, both ends of the grate 100 are mounted on the mounting brackets 700, thus the two sides of the single-toothed roller 600 are spaced apart from the mounting brackets 700, allowing the first lifting wire rope 500 and the second lifting wire rope 400 to extend from the gaps on both sides of the single-toothed roller 600 and wrap around the two ends of the grate 100 respectively. The mounting area is the space between the periphery of the single-toothed roller 600 and the mounting brackets 700 for accommodating the grate 100.

[0043] When removing the worn old grate (i.e., the grate to be replaced 100a), in this embodiment, the first mobile device 300 moves one end of the grate to be replaced 100a downward, and the second mobile device 200 moves the other end of the grate to be replaced 100a upward, thereby causing the grate 100 to rotate around the single-toothed roller 600, changing the grate to be replaced 100a from a horizontal state to a vertical state, and changing the position of the grate to be replaced 100a from below the single-toothed roller 600 to the side of the single-toothed roller 600. Then, the second mobile device 200 continues to move the grate to be replaced 100a until the grate to be replaced 100a is removed from the installation area.

[0044] The step of placing the new grate (i.e., the grate 100b to be installed) is the reverse of the step of removing the worn old grate. When placing the grate 100b to be installed, in this embodiment, the first mobile device 300 is used to move one end of the grate 100b to be installed upward, and the second mobile device 200 is used to move one end of the grate 100b to be installed downward, thereby causing the grate 100b to be installed to rotate around the single toothed roller 600, so that the grate 100b to be installed changes from a vertical state to a horizontal state, and the position of the grate 100 changes from the side of the single toothed roller 600 to below the single toothed roller 600, and then moves to the installation area and is installed on the installation bracket 700.

[0045] It is worth noting that during the rotation of the grate 100a to be replaced or the grate 100b to be installed around the single toothed roller 600, a safe gap of about 1cm–3cm must always be maintained between the edge of the grate 100 and the tooth surface of the single toothed roller 600 to avoid interference or jamming between the grate and the single toothed roller during rotation, thus ensuring operational efficiency and stability.

[0046] After the grate to be replaced 100a is removed from the installation area, the first hoisting wire rope 500 and the second hoisting wire rope 400 need to be untied to remove the grate to be replaced 100a. Then, the first hoisting wire rope 500 and the second hoisting wire rope 400 are wound around the two ends of the grate to be installed 100b to replace the old grate with the new grate.

[0047] Therefore, the grate replacement method provided in this embodiment can reduce the difficulty of replacing the grate 100. The old grate is pulled out from below the single toothed roller 600, and the new grate is placed down from above the single toothed roller 600, thereby completing the replacement of the grate 100. It can also replace the grate 100 without removing the dust removal pipe and the sealing cover, thus shortening the replacement time and improving the replacement efficiency.

[0048] Understandably, the first mobile device 300 and the second mobile device 200 are located at the two ends of the grate 100, so that the first hoisting wire rope 500 and the second hoisting wire rope 400 can be wound around the two ends of the grate 100, and then the movement of the hoisting wire ropes can drive the corresponding end of the grate 100 to move.

[0049] Since the grate plate 100 is located at the unloading end of the sintering machine, one end of the grate plate 100 is close to the sintering machine body, while the other end is close to the outside. In order to avoid the grate plate 100 colliding with the sintering machine body during the hoisting process, the grate plate 100 should be taken out or put in from the side of the single toothed roller 600 that is close to the outside. Therefore, the second moving device 200 acts on the side of the grate plate 100 that is close to the outside, while the first moving device 300 acts on the side of the grate plate 100 that is close to the sintering machine body. This allows the position of the grate plate 100 to switch between the side of the single toothed roller 600 that is close to the outside and the bottom of the single toothed roller 600, thus avoiding the grate plate 100 colliding with the sintering machine body due to its proximity to the sintering machine body.

[0050] In this embodiment, the first mobile device 300 can be a hoist or a hand-operated hoist, while the second mobile device 200 can be a lifting trolley. The lifting trolley is installed on the roof to provide sufficient space to lift the grate 100, ensuring that the grate 100 can be detached from the sintering machine. The hoist is installed on the sintering machine body to assist the lifting trolley in switching the grate 100 between the side and below the single-toothed roller 600. Due to the limited space in the sintering machine, the height of the hoist is lower than the height of the lifting trolley.

[0051] Generally, the single-toothed roller 600 is relatively long, so multiple grate plates 100 are arranged below it. These grate plates 100 are spaced apart along the length of the single-toothed roller 600, with each grate plate 100 corresponding to two adjacent teeth of the single-toothed roller 600. Therefore, the grate plates 100 will not collide with the teeth of the single-toothed roller 600 during rotation. A track is provided on the roof to allow the hoisting trolley to move along it, thereby adjusting the position of the hoisting trolley according to the position of the grate plates 100 to hoist grate plates 100 at different locations.

[0052] The hoist is installed on the sintering machine, which does not have a track. Therefore, in this embodiment, a fixed steel wire rope is connected to two vertical plates opposite each other at the tail of the sintering machine, so that the hoist can move in coordination with the fixed steel wire rope. This allows the hoist to move according to the position of different grate plates 100, avoiding misalignment and collisions between grate plates 100 and adjacent grate plates 100 during the movement of the grate plates 100.

[0053] Understandably, the extension direction of the fixed wire rope is parallel to the length direction of the single-toothed roller 600, thereby enabling the hoist to move along the length direction of the single-toothed roller 600, that is, the first moving device 300 moves along the extension direction of the fixed wire rope. To facilitate the installation of the fixed wire rope, this embodiment uses a lifting lug to install the fixed wire rope on the vertical plate at the tail of the sintering machine, thereby improving the connection stability.

[0054] It should be noted that before hoisting and replacing the grate 100, all equipment must be inspected to avoid equipment failure that could prevent the replacement of the grate 100 and cause injury to workers.

[0055] Furthermore, since the grate to be replaced 100a is mounted on the mounting bracket 700, the grate to be replaced 100a needs to be moved away from the mounting bracket 700 before the first mobile device 300 and the second mobile device 200 rotate the grate to be replaced 100a.

[0056] Therefore, before step S5, the second mobile device 200 is used to drive the second hoisting wire rope 400 to move towards the direction of the single toothed roller 600 so that the grate to be replaced 100a moves in the horizontal direction, thereby causing the grate to be replaced 100a to detach from the mounting bracket 700.

[0057] Further, please refer to Figure 6 In this embodiment, S5: The second mobile device 200 drives the second hoisting wire rope 400 to move upward, and the first mobile device 300 drives the first hoisting wire rope 500 to move downward, thereby causing the grate plate 100a to be replaced to rotate so that the grate plate 100a located below the single toothed roller 600 of the sintering machine is removed from the installation area. This specifically includes the following steps: S51: When the distance between the end of the grate 100a to be replaced and the second hoisting wire rope 400 and the mounting bracket 700 is 3cm-10cm, stop using the second mobile device 200 to drive the second hoisting wire rope 400 to move upward and stop using the first mobile device 300 to drive the first hoisting wire rope 500 to move downward.

[0058] S52: The second mobile device 200 drives the grate plate 100a to be replaced to move away from the single toothed roller 600, thereby increasing the gap between the grate plate 100a to be replaced and the single toothed roller 600.

[0059] S53: After the distance between the grate plate 100a to be replaced and the single toothed roller 600 reaches the preset range, the second mobile device 200 continues to drive the second hoisting wire rope 400 to move upward, and the first mobile device 300 continues to drive the first hoisting wire rope 500 to move downward, until the grate plate 100a to be replaced is removed from the installation area.

[0060] It should be noted that during the process of the second mobile device 200 driving one end of the grate 100a to be replaced to move upward, the rotation of the grate 100a to be replaced causes the distance between it and the single toothed roller 600 to shorten. When the distance between the grate 100a to be replaced and the mounting bracket 700 is 10cm-20cm, the distance between the grate 100a to be replaced and the single toothed roller 600 reaches the critical value. If the grate 100a to be replaced continues to rotate, it will collide with the single toothed roller 600. Therefore, when the vertical distance between the upward-moving end of the grate 100a to be replaced and the mounting frame is 3cm-10cm, it is necessary to stop driving its rotation first, and then drive the grate 100 to move horizontally in the direction of the original single-tooth roller 600 to increase the distance between the grate 100 and the single-tooth roller 600. Finally, continue to drive the grate 100 to rotate, so as to avoid collision between the grate 100a to be replaced and the single-tooth roller 600 during the process of removing the grate 100a to be replaced, which would affect the replacement efficiency.

[0061] Once the distance between the grate 100a to be replaced and the single-toothed roller 600 reaches the preset range (1cm-3cm as mentioned above), it can effectively prevent the grate 100a to be replaced from colliding with the single-toothed roller 600 during rotation. Therefore, after the second mobile device 200 drives the grate 100a to be replaced to move horizontally, the distance between the grate 100a to be replaced and the single-toothed roller 600 can be measured using existing ranging equipment. This distance should be the shortest distance between the two. If the distance is within the preset range, the first mobile device 300 and the second mobile device 200 continue to rotate the grate 100a to be replaced.

[0062] It should be noted that this embodiment applies to a 360M² sintering machine. The total length of the grate plate 100 of the 360M² sintering machine is 3700mm, the length of the grate plate drop frame is 235mm, the total length of the single-sided wear-resistant layer is 1318mm, the length of the high-section wear-resistant layer is 400mm, the length of the low-section wear-resistant layer is 460mm, the length of the inner low section (the center of the grate plate 100) is 321mm, the thickness is 240mm, and the total mass is 1682KG.

[0063] Therefore, in this embodiment, the preset range is greater than 190mm. After the shortest distance is greater than 190mm, the grate 100a to be replaced will continue to rotate and will not collide with the single toothed roller 600.

[0064] Based on the foregoing, please refer to... Figure 7 In this embodiment, S53: Continue to use the second mobile device 200 to drive the second hoisting wire rope 400 upward, and continue to use the first mobile device 300 to drive the first hoisting wire rope 500 downward, until the grate to be replaced 100a is removed from the installation area. Specifically, this includes the following steps: S531: When the grate to be replaced 100a is in a vertical position, stop using the second mobile device 200 to drive the second hoisting wire rope 400 to move upward, stop using the first mobile device 300 to drive the first hoisting wire rope 500 to move downward, and remove the first hoisting wire rope 500.

[0065] S532: Continue to use the second mobile device 200 to drive the second hoisting wire rope 400 upward until the grate to be replaced 100a is removed from the installation area.

[0066] Understandably, when the end of the grate 100a to be replaced rotates to the lowest point, the first lifting wire rope 500 needs to be loosened to avoid indirectly pulling the first lifting wire rope 500 during the process of the second mobile device 200 continuously lifting the grate 100a to be replaced, which would cause the bottom of the first lifting wire rope 500 and the single toothed roller 600 to rub against each other, resulting in wear of the first lifting wire rope 500 and the single toothed roller 600.

[0067] Specifically, in this embodiment, when the grate to be replaced 100a is in a vertical state, the end of the grate to be replaced 100a connected to the first hoisting wire rope 500 is at the lowest point. Therefore, when the grate to be replaced 100a is in a vertical state, the first hoisting wire rope 500 is released, so that the first hoisting wire rope 500 and the grate to be replaced 100a are separated.

[0068] Subsequently, the second mobile device 200 is used to move the grate 100a to be replaced upward so that it is removed from the installation area, making it easier for workers to remove the grate 100a to be replaced.

[0069] Further, please refer to Figure 8 In this embodiment, S8: The second mobile device 200 drives the second lifting wire rope 400 downward, and the first mobile device 300 drives the first lifting wire rope 500 upward, thereby causing the grate 100b to be installed to rotate so that the grate 100b to be installed moves to the installation area. This specifically includes the following steps: S81: The second mobile device 200 drives the second hoisting wire rope 400 to move downward.

[0070] S82: After the grate 100b to be installed is located on one side of the single toothed roller 600, stop using the second mobile device 200 to drive the second hoisting wire rope 400 downward, and wrap the first hoisting wire rope 500 around the end of the grate 100b to be installed near the installation area.

[0071] S83: Continue to use the second mobile device 200 to drive the second hoisting wire rope 400 downward, and continue to use the first mobile device 300 to drive the first hoisting wire rope 500 upward until the grate 100b to be installed moves into the installation area and is in a vertical state.

[0072] S84: The second mobile device 200 drives the second hoisting wire rope 400 to move away from the single toothed roller 600, thereby installing the grate plate 100b to be installed on the mounting bracket 700.

[0073] Understandably, the step of placing the grate 100b to be installed is the reverse of the step of removing the grate 100a to be replaced. Therefore, after the first wire rope is wound around one end of the grate 100b to be installed, the first mobile device 300 drives the grate 100b to be installed downward so that its other end extends into the gap between the single-tooth roller 600 and the mounting bracket 700. When the other end of the grate 100b to be installed reaches the lowest point during the rotation of the grate 100a to be replaced, the second lifting wire rope 400 is inserted from another gap so that the second lifting wire rope 400 is wound around the other end of the grate 100b to be installed. Then, the first mobile device 300 and the second mobile device 200 are used to rotate the grate 100b to be installed, so that it becomes horizontal.

[0074] After the grate 100b to be installed is turned into a horizontal state, there is still a certain distance between the grate 100b to be installed and the mounting bracket 700. Therefore, the second mobile device 200 is used to move the grate 100b to be installed away from the single toothed roller 600, that is, closer to the mounting bracket 700, so that the grate 100b to be installed is moved onto the mounting bracket 700, thereby fixing the grate 100 and completing the entire replacement process.

[0075] Further, please refer to Figures 1-5 as well as Figure 9 According to the grate plate hoisting and replacement method provided in this embodiment, the grate plate 100 in this embodiment is provided with a first mounting groove 110 for connecting and cooperating with the second hoisting wire rope 400, and a second mounting groove 120 for connecting and cooperating with the first hoisting wire rope 500.

[0076] In this embodiment, the grate 100 has a symmetrical structure along its central axis; correspondingly, the two first mounting grooves 110 and the two second mounting grooves 120 provided on the grate 100 are also symmetrically arranged, with the two first mounting grooves 110 located at both ends of the grate 100 and the two second mounting grooves 120 located at both ends of the grate 100.

[0077] It should be noted that because some parts of the sintering machine are close to the single toothed roller 600, when installing and fixing the wire rope, it is necessary to pass over these parts and use the hanging wall to install and fix the wire rope. Therefore, there are some parts between the first mobile device 300 and the single toothed roller 600 support, while there are no other parts between the second mobile device 200 and the single toothed roller 600. Therefore, the distance between the first mobile device 300 and the single toothed roller 600 is greater than the distance between the second mobile devices 200.

[0078] After the first hoisting wire rope 500 and the second hoisting wire rope 400 are connected to the first mobile device 300 and the second mobile device 200 respectively, the distance between the first hoisting wire rope 500 and the single-toothed roller 600 is greater than the distance between the second hoisting wire rope 400 and the single-toothed roller 600.

[0079] To facilitate the connection of the second lifting wire rope 400 to the first mounting groove 110 and the first lifting wire rope 500 to the second mounting groove 120, the distance between the axis of the first mounting groove 110 and the axis of the grate plate 100 should be greater than the distance between the axis of the second mounting groove 120 and the axis of the grate plate 100. That is, the axes of the two second mounting grooves 120 are located between the two first mounting grooves 110, so that the first mounting groove 110 can be adapted to the first lifting wire rope 500 and the second mounting groove 120 can be adapted to the second lifting wire rope 400.

[0080] It should be noted that after the first hoisting wire rope 500 and the second hoisting wire rope 400 are connected to the first mobile device 300 and the second mobile device 200 respectively, the first hoisting wire rope 500 and the second hoisting wire rope 400 will naturally fall down, so the first hoisting wire rope 500 and the second hoisting wire rope 400 are both vertical.

[0081] To facilitate the engagement of the second lifting wire rope 400 with the first mounting slot 110 and the first lifting wire rope 500 with the second mounting slot 120, it is necessary to move the first mobile device 300 and the second mobile device 200 so that the first mobile device 300 is directly above the second mounting slot 120 and the second mobile device 200 is directly above the first mounting slot 110. This ensures that the first lifting wire rope 500 and the second lifting wire rope 400 remain vertical in their initial state after being wound around the replacement grate 100, avoiding misalignment between the mobile devices and the mounting slots, which would increase the difficulty of connection and affect work efficiency.

[0082] Therefore, after step S3, the grate hoisting and replacement method provided in this embodiment further includes moving the first mobile device 300 so that it is positioned directly above the second mounting slot 120, thereby ensuring that the initial state of the first hoisting wire rope 500 is vertical. After step S4, the method further includes moving the second mobile device 200 so that it is positioned directly above the first mounting slot 110, thereby ensuring that the initial state of the second hoisting wire rope 400 is vertical.

[0083] Therefore, this embodiment can avoid the initial state of the hoisting wire rope being tilted, reduce the stress on the hoisting wire rope, ensure the rotation direction of the grate 100, and avoid collision between the grate 100 and adjacent grate 100 caused by oblique hoisting.

[0084] As described above, the first hoisting wire rope 500 and the second hoisting wire rope 400 are respectively wound around the two ends of the grate plate 100. Therefore, the first hoisting wire rope 500 is only engaged with one second mounting groove 120, and the second hoisting wire rope 400 is only engaged with one first mounting groove 110. The first mounting groove 110 and the second mounting groove 120 that connect the two are located at the two ends of the grate plate 100, respectively.

[0085] Therefore, steps S3 and S4 specifically include the following steps: The first hoisting wire rope 500 is wound around one end of the grate 100a to be replaced, so that the first hoisting wire rope 500 is engaged with a second mounting groove 120.

[0086] The second lifting wire rope 400 is wound around the other end of the grate 100a to be replaced, so that the second lifting wire rope 400 is engaged with a first mounting groove 110.

[0087] Furthermore, in this embodiment, the length of the grate 100 is L, the shortest distance between the first mounting groove 110 and the end of the grate 100 is D1, and the shortest distance between the second mounting groove 120 and the end of the grate 100 is D2; wherein, D1 / L is 10%-12.1%, and D2 / L is 21.6%-23.7%.

[0088] Specifically, in this embodiment, the length L of the grate 100 is 3.7m, therefore D1=370mm-450mm, D2=800mm-880mm.

[0089] Therefore, during the process of rotating the grate 100 using the first mobile device 300 and the second mobile device 200, the first hoisting wire rope 500 and the second hoisting wire rope 400 can provide more stable support for the grate 100, ensuring that the hoisting of the grate 100 is more stable.

[0090] It should be noted that in this embodiment, a chamfer is provided on the side of the grate plate 100 to form a first mounting groove 110 and a second mounting groove 120. The bottom of both the first mounting groove 110 and the second mounting groove 120 is arc-shaped with a radius of 15mm, in order to reduce stress, avoid stress concentration, and improve the service life of the hoisting wire rope.

[0091] In summary, the lifting and replacement method for the grate 100 provided in this embodiment can directly act on the grate 100 to lift the old grate from below the single-toothed roller 600 and place the new grate in, so that the new grate moves from above the single-toothed roller 600 to below the single-toothed roller 600, thereby moving the new grate to the installation area and realizing the replacement of the grate 100. This solves the problem of difficulty in replacing the grate 100 due to the obstruction of dust removal pipes and sealing covers.

[0092] In this embodiment, the dust removal pipe and sealing cover do not need to be removed during the replacement of the grate 100. Instead, the first and second steel wire ropes are directly connected to the two ends of the grate 100. The first mobile device 300 and the second mobile device 200 are used to rotate the grate 100a to be replaced and the grate 100b to be installed, so that the grate 100a to be replaced is removed from the installation area and the grate 100b to be installed is moved to the installation area. Compared with the prior art, the replacement time is shorter, thereby improving the replacement efficiency.

[0093] The above description is merely a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in the present invention should be included within the scope of protection of the present invention.

Claims

1. A method for hoisting and replacing a grate plate, characterized in that, include: Two lifting lugs are welded to two vertical plates at the tail of the sintering machine, and the two ends of the fixing wire rope are connected to the two lifting lugs respectively. The first mobile device (300) is movably connected to the fixed wire rope, so that the first mobile device (300) can move along the extension direction of the fixed wire rope; The first hoisting wire rope (500) is wound around one end of the grate to be replaced (100a), and the first hoisting wire rope (500) is connected to the first mobile device (300); The second hoisting wire rope (400) is wound around the other end of the grate to be replaced (100a), and the second hoisting wire rope (400) is connected to the second mobile device (200); The second mobile device (200) drives the second hoisting wire rope (400) to move upward, and the first mobile device (300) drives the first hoisting wire rope (500) to move downward, thereby causing the grate to be replaced (100a) to rotate so that the grate to be replaced (100a) located below the single toothed roller (600) of the sintering machine is removed from the installation area; After the grate to be replaced is removed from the installation area, the grate to be replaced (100a) is removed. The first hoisting wire rope (500) and the second hoisting wire rope (400) are respectively wound around both ends of the grate plate (100b) to be installed; The second mobile device (200) drives the second hoisting wire rope (400) to move downward, and the first mobile device (300) drives the first hoisting wire rope (500) to move upward, thereby causing the grate to be installed (100b) to rotate so that the grate to be installed (100b) moves to the installation area. After the grate to be installed is installed in the installation area, the first hoisting wire rope (500) and the second hoisting wire rope (400) are removed.

2. The method for lifting and replacing the grate plate according to claim 1, characterized in that, The steps of using the second mobile device (200) to drive the second hoisting wire rope (400) upward and using the first mobile device (300) to drive the first hoisting wire rope (500) downward, thereby causing the grate to be replaced (100a) to rotate so that the grate to be replaced (100a) located below the single toothed roller (600) of the sintering machine is removed from the installation area include: When the distance between the end of the grate to be replaced (100a) connected to the second hoisting wire rope (400) and the mounting bracket (700) in the vertical direction is 3cm-10cm, stop using the second mobile device (200) to drive the second hoisting wire rope (400) to move upward, and stop using the first mobile device (300) to drive the first hoisting wire rope (500) to move downward; The second mobile device (200) drives the grate to be replaced (100a) to move away from the single toothed roller (600), thereby increasing the gap between the grate to be replaced (100a) and the single toothed roller (600); After the distance between the grate to be replaced (100a) and the single toothed roller (600) reaches a preset range, the second mobile device (200) continues to drive the second hoisting wire rope (400) to move upward, and the first mobile device (300) continues to drive the first hoisting wire rope (500) to move downward until the grate to be replaced (100a) leaves the installation area.

3. The method for lifting and replacing the grate plate according to claim 2, characterized in that, The steps of continuing to use the second mobile device (200) to drive the second hoisting wire rope (400) upward, and continuing to use the first mobile device (300) to drive the first hoisting wire rope (500) downward until the grate to be replaced (100a) is removed from the installation area include: When the grate to be replaced (100a) is in a vertical state, stop using the second mobile device (200) to drive the second hoisting wire rope (400) to move upward, stop using the first mobile device (300) to drive the first hoisting wire rope (500) to move downward, and remove the first hoisting wire rope (500). Continue to use the second mobile device (200) to drive the second hoisting wire rope (400) upward until the grate to be replaced (100a) is removed from the installation area.

4. The method for lifting and replacing the grate plate according to claim 1, characterized in that, Before the step of using the second mobile device (200) to drive the second hoisting wire rope (400) upward and using the first mobile device (300) to drive the first hoisting wire rope (500) downward, thereby causing the grate to be replaced (100a) to rotate so that the grate to be replaced located below the single toothed roller (600) of the sintering machine is removed from the installation area, the grate hoisting and replacement method further includes: The second moving device (200) drives the second hoisting wire rope (400) to move toward the single toothed roller (600), thereby causing the grate to be replaced (100a) to detach from the mounting bracket (700).

5. The method for hoisting and replacing the grate plate according to claim 1, characterized in that, The steps of using the second mobile device (200) to drive the second hoisting wire rope (400) downward and using the first mobile device (300) to drive the first hoisting wire rope (500) upward, thereby causing the grate to be installed (100b) to rotate and move the grate to be installed (100b) to the installation area include: The second moving device (200) drives the second hoisting wire rope (400) to move downward; After the grate to be installed (100b) is located on one side of the single toothed roller (600), the second hoisting wire rope (400) is stopped from moving downward using the second mobile device (200), and the first hoisting wire rope (500) is wrapped around the end of the grate to be installed (100b) near the installation area. Continue to use the second mobile device (200) to drive the second hoisting wire rope (400) downward, and continue to use the first mobile device (300) to drive the first hoisting wire rope (500) upward until the grate to be installed (100b) moves into the installation area and is in a vertical state; The second mobile device (200) drives the second hoisting wire rope (400) to move away from the single toothed roller (600), thereby installing the grate plate (100b) to be installed on the mounting bracket (700).

6. The method for lifting and replacing the grate plate according to any one of claims 1-5, characterized in that, The grate (100) is provided with two symmetrical first mounting grooves (110) and two symmetrical second mounting grooves (120); the two first mounting grooves (110) are respectively located at both ends of the grate (100), and the two second mounting grooves (120) are respectively located at both ends of the grate (100); the distance between the axis of the first mounting groove (110) and the axis of the grate (100) is greater than the distance between the second mounting groove (120) and the axis of the grate (100); With one of the first mounting slots (110) engaged with the second hoisting wire rope (400), the second mounting slot (120) located at the other end of the grate (100) is engaged with the first hoisting wire rope (500).

7. The method for lifting and replacing the grate plate according to claim 6, characterized in that, The steps of winding the first lifting wire rope (500) around one end of the grate to be replaced (100a) and connecting the first lifting wire rope (500) to the first mobile device (300), and the steps of winding the second lifting wire rope (400) around the other end of the grate to be replaced (100a) and connecting the second lifting wire rope (400) to the second mobile device (200) include: The first hoisting wire rope (500) is wound around one end of the grate to be replaced (100a) so that the first hoisting wire rope (500) is engaged in a second mounting slot (120). The second lifting wire rope (400) is wound around the other end of the grate (100a) to be replaced, so that the second lifting wire rope (400) is engaged with one of the first mounting slots (110).

8. The method for lifting and replacing the grate plate according to claim 6, characterized in that, After the steps of winding the first hoisting wire rope (500) around one end of the grate (100a) to be replaced and connecting the first hoisting wire rope (500) to the first mobile device (300), the grate hoisting and replacement method further includes: Move the first mobile device (300) so that it is directly above the second mounting slot (120), thereby making the initial state of the first hoisting wire rope (500) vertical.

9. The method for lifting and replacing the grate plate according to claim 6, characterized in that, After the steps of winding the second hoisting wire rope (400) around the other end of the grate to be replaced (100a) and connecting the second hoisting wire rope (400) to the second mobile device (200), the grate hoisting and replacement method further includes: Move the second mobile device (200) so that it is directly above the first mounting slot (110), thereby making the initial state of the second hoisting wire rope (400) vertical.

10. The method for hoisting and replacing the grate plate according to claim 6, characterized in that, The length of the grate (100) is L, the shortest distance between the first mounting groove (110) and the end of the grate (100) is D1, and the shortest distance between the second mounting groove (120) and the end of the grate (100) is D2; Among them, D1 / L is 10%-12.1%, and D2 / L is 21.6%-23.7%.