A large-tonnage heavy-load projectile automatic loading launching device and method

The modular external-mounted automatic loading and launching device for large-tonnage heavy-duty projectiles solves the problems of high risk and low efficiency in suspended hoisting, achieving efficient and safe projectile loading, applicable to various test platforms, and reducing manufacturing costs.

CN123154701APending Publication Date: 2026-11-24CENT SOUTH UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611600632.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-16
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing large-tonnage test missile loading operations suffer from high risks, low efficiency, and weak fault tolerance during suspended hoisting. Traditional fully automated loading systems are complex in structure, costly, and cannot be rapidly promoted.

Method used

The large-tonnage heavy-load automatic loading and launching device with a modular external structure includes a drive section, loading chamber launch tube, launch section, displacement compensator, loading assembly and transport assembly. It utilizes a semi-open circular arc slide, multi-stage hydraulic cylinders and piston displacement compensator to achieve non-suspended hoisting, automatic docking and precise alignment.

Benefits of technology

It reduces the safety risks of suspended hoisting, improves filling efficiency, reduces manpower input, lowers manufacturing costs, enhances docking fault tolerance, and improves the adaptability and safety of the filling system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123154701A_ABST
    Figure CN123154701A_ABST
Patent Text Reader

Abstract

This application relates to the field of weapon system launch testing technology, providing an automatic loading and launching device and method for large-tonnage, heavy-load projectiles. The device includes a drive section, a loading chamber launch tube, a launch section, a displacement compensator, a loading assembly, and a projectile transport assembly. The drive section, loading chamber launch tube, and launch section are arranged sequentially along the launch axis. The displacement compensator is located between the drive section and the loading chamber launch tube. The loading assembly is arranged on one side of the drive section to support the projectile to be loaded. The guide rail of the projectile transport assembly is arranged perpendicular to the launch axis. A sliding seat supports the loading chamber launch tube and drives it to move laterally along the guide rail between the axis of the loading assembly and the launch axis, realizing position switching and docking. In this application, the projectile is directly placed in a semi-open arc-shaped sliding groove for support, eliminating the need for suspended hoisting operations. The projectile transport assembly realizes the overall lateral position change of the loading chamber launch tube, and works with the piston-type displacement compensator to complete repositioning and assembly error compensation, reducing manual labor intensity and improving loading safety and operational efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of weapon system launch testing technology, specifically to an automatic loading and launching device and method for large-tonnage heavy-load projectiles. Background Technology

[0002] As large-caliber weapon systems rapidly iterate towards greater power and longer range, the equipment finalization and performance verification phases require frequent live-fire tests under various conditions. The test projectiles can weigh hundreds of kilograms to several tons, and the efficiency, safety, and adaptability of the loading operations have become core bottlenecks restricting the test cycle and R&D costs.

[0003] Currently, most launch test systems still use the traditional "general-purpose lifting equipment hoisting + manual assisted docking" method for missile loading: after the missile is transported to its position, it needs to be hoisted to the front of the launch tube by a gantry crane or truck crane, where multiple operators work together to adjust its attitude to achieve coaxial alignment, and then manually or with simple devices push it into the tube. This method has significant shortcomings in handling large-tonnage missiles: First, the safety risks of hoisting are high, as large-mass missiles are prone to swaying and deflection, making it difficult to guarantee coaxial alignment accuracy, and easily causing collision damage to the missile's precision sensors, guidance components, and launch tube lining; Second, the work efficiency is low, with a single round of complete loading taking more than 1 hour and requiring at least 4 people to work together throughout, resulting in high labor and time costs; Third, the docking fault tolerance is weak, as most semi-automatic pushing mechanisms lack displacement compensation functions, making it difficult to compensate for docking jams caused by manufacturing and installation errors, and the pushing resistance of large-tonnage missiles is high, still requiring a large amount of manual intervention.

[0004] Although a few research institutions have attempted to develop fully automated loading systems, these systems mostly adopt the integrated design approach of traditional equipment, resulting in complex structures, high manufacturing costs, and the need for large-scale modifications to existing test benches. This makes them unsuitable for rapid deployment on various existing launch test platforms. Ordinary pipeline compensators can only achieve static thermal deformation compensation, lack the retraction stroke required for station switching, and cannot withstand the instantaneous recoil impact load during launch. Therefore, they cannot be directly applied to missile loading and launch operations.

[0005] Therefore, developing an automatic loading and launching device and method for large-tonnage heavy-load projectiles that does not require suspended installation, is highly versatile, and is easy to operate is of great engineering significance for improving launch test efficiency, reducing test safety risks, and shortening the development cycle of weapons and equipment. Summary of the Invention

[0006] This application aims to provide an automatic loading and launching device and method for large-tonnage heavy-load projectiles, which solves the problems of high risk, low efficiency and weak docking fault tolerance in existing large-tonnage test projectile loading operations.

[0007] To achieve the above objectives, the first aspect of this application provides an automatic loading and launching device for large-tonnage heavy-load projectiles, including a drive section, a loading chamber launch tube, a launching section, a displacement compensator, a loading assembly, and a projectile transport assembly. The drive section, the loading chamber launch tube, and the launching section are connected sequentially along the launching axis. The displacement compensator is disposed between the drive section and the loading chamber launch tube along the launching axis and is capable of extending and retracting along the launching axis to axially retract and avoid the loading chamber launch tube when it is laterally moved and to axially press the loading chamber launch tube after it is reset. The loading chamber launch tube is detachably connected to the displacement compensator.

[0008] The loading assembly is arranged parallel to the launch axis on one side of the drive section, including a semi-open arc groove and a first drive member. The inner arc radius of the semi-open arc groove matches the outer diameter of the projectile to be loaded, and is used to place the projectile to be loaded. The first drive member is provided at one end of the semi-open arc groove, and the other end of the semi-open arc groove can be connected to the launch tube of the loading chamber. The first drive member is used to send the projectile loaded in the semi-open arc groove into the launch tube of the loading chamber. The ammunition transport assembly includes a guide rail and a sliding seat. The guide rail is perpendicular to the firing axis and is located below the loading chamber firing tube. The sliding seat is slidably mounted on the guide rail. The sliding seat is used to support the loading chamber firing tube and can drive the loading chamber firing tube to translate along the guide rail between the axis of the loading assembly and the firing axis, so that the loading chamber firing tube can dock with the semi-open arc groove or the drive section.

[0009] In one embodiment, the loading assembly further includes a push tube and a support pulley; Multiple sets of support pulleys are arranged axially at intervals on the inner arc surface of the semi-open circular arc slide. The push tube is placed inside the semi-open circular arc slide and can be supported by the support pulleys. The first driving member is connected to the push tube in a transmission manner. The first driving member sends the projectile loaded in the semi-open circular arc slide into the loading chamber launch tube through the push tube.

[0010] In one embodiment, the ammunition transport assembly further includes a second drive member; The bottom of the sliding seat is provided with a slider, and the sliding seat is slidably connected to the guide rail through the slider; The second driving member is connected to the sliding seat and is used to drive the sliding seat to translate along the guide rail.

[0011] In one embodiment, the first driving member and / or the second driving member is a multi-stage hydraulic cylinder with a graded telescopic structure.

[0012] In one embodiment, the loading assembly further includes a loading slot frame and a support base; The loading slot frame is used to support the semi-open arc-shaped slide groove, the support base is used to support the first driving member, the first driving member is hinged to the support base, and the piston rod of the first driving member is connected to the push tube.

[0013] In one embodiment, the ammunition transport assembly further includes an upper clamp and a lower clamp; The upper clamp and the lower clamp are used to align and clamp the loading chamber launch tube onto the sliding seat; An axial sliding groove is formed on the top end face of the sliding seat. The direction of the axial sliding groove is parallel to the firing axis. The lower clamp is embedded in the axial sliding groove, allowing axial sliding of the firing tube in the loading chamber.

[0014] In one embodiment, a hydraulic cylinder lateral limiting seat is provided on the guide rail, which is used to limit the extreme positions of the sliding seat at the loading station and the launching station. When the sliding seat is in the loading position, the loading chamber tube is used to dock with the semi-open arc-shaped slide groove; when the sliding seat is in the launching position, the loading chamber tube is used to dock with the drive section. In one embodiment, the bottom of the sliding seat is provided with multiple sets of vertical adjustment feet for adjusting the height of the sliding seat.

[0015] In one embodiment, the displacement compensator is a piston-type displacement compensator, which includes a compensating cylinder, a floating piston body, an end face sealing pair, and a radial sliding sealing assembly; the total working stroke of the piston-type displacement compensator is 80mm to 120mm.

[0016] The second aspect of this application provides an automatic loading method for large-tonnage, heavy-load projectiles, employing the automatic loading and launching device for large-tonnage, heavy-load projectiles described in the first aspect, comprising the following steps: S1. Remove the flange connecting bolts at both ends of the loading chamber launch tube, so that the floating piston body of the displacement compensator retracts to the drive section side, completing the retraction and eliminating axial interference; S2. The missile transport assembly drives the sliding seat to move laterally to the loading station, so that the launch tube of the loading chamber is coaxially connected with the semi-open arc slide of the loading assembly. S3. Place the projectile to be loaded into the semi-open arc slide groove. Relying on the slide groove to support the projectile, start the first driving component to drive the push tube to push axially. Push the projectile smoothly into the preset position in the loading chamber launch tube along the semi-open arc slide groove. After the projectile is pushed into place, the first driving component drives the push tube to reset. S4. After confirming that the projectile is fixed in the loading chamber launch tube, the projectile transport assembly drives the loading chamber launch tube to move laterally to the launch axis position. The displacement compensator extends and presses the flange of the loading chamber launch tube. The loading chamber launch tube achieves a slight axial floating by means of the axial sliding groove, and adaptively cooperates with the displacement compensator to complete the docking compensation. S5. Tighten the flange bolts at both ends of the loading chamber launch tube to complete the loading operation and meet the conditions for launch test.

[0017] Compared with the prior art, this application has the following beneficial effects: (1) This mechanism adopts a modular external structure. The loading component and the ammunition transport component have their own independent bases and are directly fixed to the test bench foundation. They can be detached and connected with the original drive section and launch section. There is no need to carry out large-scale modification of the existing launch test bench. The disassembly and transportation are convenient. It is compatible with multiple existing test platforms. The manufacturing cost is significantly lower than that of the integrated fully automatic loading system.

[0018] (2) The loading assembly is equipped with a semi-open arc chute to support the large area of ​​the projectile. The projectile is placed directly in the chute, abandoning the traditional suspended hoisting operation mode and eliminating the safety hazards of swaying and collision damage to the projectile sensors and guidance components during the hoisting of large-tonnage projectiles. Support pulleys are set at the bottom of the chute to convert sliding friction into rolling friction, which greatly reduces the resistance of heavy-load pushing and avoids cylinder overload and pushing jamming.

[0019] (3) The ammunition transport assembly drives the launch tube of the loading chamber to move laterally, realizing the switching between the loading station and the launch station; the axial sliding slot provides a small degree of axial floating freedom for the launch tube of the loading chamber, and the hydraulic cylinder axial limit seat counteracts the huge reaction force of the push operation. The vertical adjustment support foot compensates for the foundation installation error, taking into account heavy load bearing, alignment accuracy and structural rigidity.

[0020] (4) The specially designed displacement compensator differs from ordinary pipeline compensators, with a total working stroke of 80-120mm. It is divided into retraction stroke and buffer compensation stroke, and simultaneously realizes four functions: work position switching and relocation, installation and manufacturing error compensation, launch heat deformation absorption, and recoil impact buffer isolation. Under the launch condition, it dissipates impact energy, blocks the rigid transmission of impact, reduces the risk of flange loosening, structural fatigue, and platform fastener loosening, and improves the cycle service life of the entire equipment. The comparison before and after compensation shows that the floating docking mode can control the circumferential clamping force deviation of the sealing surface within 5%, and the additional thermal stress caused by thermal expansion is close to zero.

[0021] (5) The whole machine hydraulic control system realizes closed-loop programmed control, distinguishes independent hydraulic circuits for pushing, lateral movement, and displacement compensation, and supports fully automatic, semi-automatic, and manual inching modes; key nodes of pushing and docking are automatically buffered at low speed, and have overload protection, self-locking pressure holding upon arrival, and fault alarm functions. Taking a 2-ton heavy-load test projectile as the test object, the total time for a single round of complete operation is no more than 45 minutes, and the number of operators is reduced from 4 in the traditional mode to 2, which greatly reduces manpower input and improves test loading efficiency. Attached Figure Description

[0022] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0023] Figure 1 This is a schematic diagram of the structure of the automatic loading and launching device for large-tonnage heavy-load projectiles according to an embodiment of this application; Figure 2 for Figure 1 A schematic diagram of a large-tonnage, heavy-load automatic loading and launching device during loading. Figure 3 for Figure 2 Top view; Figure 4 for Figure 2 The front view; Figure 5 This is a schematic diagram of the loading component in an embodiment of this application; Figure 6 for Figure 5 AA section view; Figure 7 This is a schematic diagram of the assembly of the ammunition transport assembly and the loading chamber launch tube in an embodiment of this application; Figure 8 for Figure 7 The front view; Figure 9 for Figure 8 AA section view; Figure 10 for Figure 8 BB cross-sectional view.

[0024] 1. Loading assembly: 101. Loading slot frame; 102. Semi-open arc-shaped slide rail; 103. Push tube; 104. Support pulley; 105. First drive component; 106. Push cylinder pin; 107. Push cylinder tail hinge; 108. Support seat; 109. Push cylinder front mounting plate; 2. Ammunition transport assembly: 201. Upper clamp; 202. Lower clamp; 203. Sliding seat; 204. 205. Front pin of the transverse drive cylinder; 206. Second drive component; 207. Tail pin of the transverse drive cylinder; 208. Tail hinge of the cylinder; 209. Lateral limit seat of the cylinder; 210. Guide rail; 211. Slider; 212. Axial sliding groove; 213. Axial limit seat of the cylinder; 214. Vertical adjustment support; 3. Loading chamber launch tube; 4. Displacement compensator; 5. Drive section; 6. Launch section. Detailed Implementation

[0025] To facilitate understanding of this application, the following description will be more comprehensive and detailed in conjunction with the accompanying drawings and preferred embodiments, but the scope of protection of this application is not limited to the following specific embodiments.

[0026] Unless otherwise defined, all technical terms used herein have the same meaning as commonly understood by those skilled in the art. The technical terms used herein are for the purpose of describing particular embodiments only and are not intended to limit the scope of this application.

[0027] Please see Figures 1 to 10 This embodiment discloses an automatic loading and launching device for large-tonnage heavy-load projectiles. This device is mainly used for loading and launching test projectiles weighing hundreds of kilograms to several tons. The overall device adopts an external mounting configuration, eliminating the need for structural modifications to the original launching system's drive section 5 and launching section 6. The device comprises a drive section 5, a loading chamber launching tube 3, a launching section 6, a displacement compensator 4, a loading assembly 1, and a projectile transport assembly 2. The drive section 5, loading chamber launching tube 3, and launching section 6 are sequentially connected along the launching axis, forming a through channel for projectile launching. The displacement compensator 4 is located between the output end of the drive section 5 and the left flange of the loading chamber launching tube 3. The loading chamber launching tube 3 and the displacement compensator 4 are detachably connected by a flange. The flange's mating surface has a stop for radial positioning to ensure the coaxiality of the loading chamber launching tube 3 and the displacement compensator 4.

[0028] The loading assembly 1 is arranged parallel to the launch axis on the side of the drive section 5, serving as an independent loading station. The loading assembly 1 includes a semi-open arc-shaped chute 102, a first drive component 105, a projectile pusher tube 103, a support pulley 104, a loading slot frame 101, and a support base 108. The loading slot frame 101 is fixedly installed on the test bench foundation as a base. The semi-open arc-shaped chute 102 is fixedly mounted on the upper part of the loading slot frame 101. The inner arc surface contour of the semi-open arc-shaped chute 102 matches the outer diameter of the projectile to be loaded, forming a large-area arc surface contact support for the projectile. The projectile can be directly placed inside the chute without the need for lifting equipment to suspend it. The inner wall of the chute can be treated with wear-resistant and low-friction treatment, which reduces frictional resistance during the pushing process and prevents scratches on the precision coating on the outer surface of the projectile.

[0029] The inner cavity of the semi-open arc-shaped chute 102 is axially spaced with multiple sets of support pulleys 104, which are fixed to the bottom of the chute. The projectile pushing tube 103 is placed inside the semi-open arc-shaped chute 102. The lower tube wall of the projectile pushing tube 103 is supported by multiple sets of support pulleys 104, which converts the sliding friction of the projectile pushing operation into rolling friction, thereby reducing the running resistance during the pushing of large-tonnage projectiles and preventing the first drive component 105 from overload and jamming. A support seat 108 is provided at the tail of the loading assembly 1. The first drive component 105 is hinged to the support seat 108. The hinge structure can absorb the small angular deviation generated during the projectile pushing operation and prevent the piston rod of the first drive component 105 from being damaged by radial off-center load. The front end of the piston rod of the first drive component 105 is connected to the tail of the projectile pushing tube 103. The first drive component 105 outputs axial power to drive the projectile pushing tube 103 to make linear reciprocating motion inside the chute. The front end of the push tube 103 is adapted to the tail end face of the projectile to be loaded, and it is in close contact with the tail end face of the projectile during the pushing process to avoid the projectile being subjected to off-center load. The end of the semi-open arc groove 102 away from the first drive member 105 can be coaxially connected with the loading chamber launch tube 3. When the first drive member 105 extends, the push tube 103 pushes the test projectile placed in the groove, and smoothly pushes the projectile into the cylinder of the loading chamber launch tube 3. In this embodiment, the first driving component 105 is a multi-stage hydraulic cylinder with a graded telescopic structure. Preferably, it is a two-stage hydraulic cylinder for pushing the projectile. This two-stage hydraulic cylinder is positioned axially along the projectile body at the tail end of the loading slot frame 101. The tail end of its cylinder is hinged to a rear hinge seat 107 via a push-push cylinder pin 106. The rear hinge seat 107 is fixedly mounted on a support base 108. The front end of the cylinder piston rod is rigidly connected to the tail end of the push-push tube 103 via a front mounting plate 109. The first driving component 105, with its graded telescopic structure, provides a long-stroke pushing capability within a limited installation space, smoothly and uniformly pushing the projectile into the loading chamber launch tube 3. Depending on the actual length specifications of the test projectile, it can also be flexibly replaced with a single-stage or multi-stage hydraulic cylinder to adapt to the loading requirements of projectiles of different sizes, exhibiting good versatility.

[0030] The projectile transport assembly 2 is located below the launch tube 3 in the loading chamber. The projectile transport assembly 2 includes a guide rail 209, a sliding seat 203, a second drive component 205, a slider 210, an upper clamp 201, a lower clamp 202, a hydraulic cylinder lateral limit seat 208, and a vertical adjustment support leg 213. The guide rail 209 is fixedly laid on the test bench foundation perpendicular to the launch axis, forming a guide reference for lateral movement. The slider 210 is mounted on the bottom of the sliding seat 203. The slider 210 and the guide rail 209 are precisely matched to form a guide motion pair. The sliding seat 203 can move stably in a lateral straight line along the guide rail 209 with the help of the slider 210. The second driving component 205 forms a transmission connection with the sliding seat 203. In this embodiment, the second driving component 205 also adopts a multi-stage telescopic cylinder, preferably a two-stage driving cylinder. The two-stage driving cylinder is arranged along the guide rail 209. The front end of its piston rod is hinged to the side wall of the sliding seat 203 through the front pin 204 of the transverse driving cylinder, and the rear end of the cylinder is hinged to the rear hinge seat 207 of the cylinder through the rear pin 206 of the transverse driving cylinder. The two-stage telescopic cylinder structure can provide sufficient transverse stroke within the limited installation space to meet the displacement requirements of the work position switching. According to the actual specifications and transverse distance requirements of the loading chamber launch tube 3, it can also be flexibly replaced with a single-stage cylinder or a multi-stage cylinder to adapt to the layout of different test platforms. By hinged to the fixed base and the side wall of the sliding seat 203 at both ends of the cylinder, the driving force is provided for the transverse movement of the sliding seat 203, which drives the sliding seat 203 to reciprocate between the two work positions of the loading component 1 axis position and the launch axis position.

[0031] An upper clamp 201 and a lower clamp 202 are configured above the sliding seat 203. The upper clamp 201 and the lower clamp 202, when engaged, form a ring-shaped clamping structure. High-strength fastening bolts clamp the outer circumference of the loading chamber launch tube 3, completely transferring the heavy load of the loading chamber launch tube 3 to the lower sliding seat 203. A wear-resistant pad can be added to the inner side of the clamp that contacts the tube body, on the one hand to compensate for the outer diameter tolerance of the tube body during manufacturing, and on the other hand to prevent the rigid clamping from scratching the outer surface of the tube body. An axial sliding groove 211 is opened on the top end face of the sliding seat 203. The direction of the axial sliding groove 211 is parallel to the firing axis. The bottom of the lower clamp 202 is embedded in the axial sliding groove 211, thereby allowing the loading chamber launch tube 3 clamped by the clamp to have a slight degree of freedom to slide along the firing axis. During subsequent docking operations, this axial sliding degree of freedom can work in conjunction with the floating action of the displacement compensator 4 to adaptively offset the axial misalignment caused by assembly and manufacturing errors, and prevent rigid docking from generating huge assembly stress.

[0032] Along the guide rail 209, lateral cylinder limit seats 208 are arranged, corresponding to the two extreme positions of the loading and launching positions, forming a mechanical hard limit structure. When the sliding seat 203 reaches the extreme position of the station, the sliding seat 203 abuts against the lateral cylinder limit seats 208, thereby limiting the maximum lateral stroke of the sliding seat 203, preventing the sliding seat 203 from overtraveling and derailing, and ensuring the positioning accuracy after the station switching is completed. A set of axial cylinder limit seats 212 is also provided on the base, arranged on the side near the drive section 5. During the push operation, it abuts against the axial end face of the support seat, offsetting the push reaction force, preventing the support seat from axially moving, and ensuring the positional stability of the pushing process. Multiple sets of vertical adjustment feet 213 are symmetrically arranged on both sides of the bottom of the sliding seat 203. The vertical adjustment feet 213 adopt a threaded adjustment structure. After the sliding seat 203 moves laterally into the locked position, the vertical adjustment feet 213 are rotated and adjusted so that the lower end of the feet supports the test bench foundation. This distributes the heavy load of the cylinder borne by the guide rail 209 and the slider 210. At the same time, the overall horizontal height of the sliding seat 203 can be finely adjusted to compensate for the unevenness of the test bench foundation and improve the structural rigidity and vibration and impact resistance of the entire projectile transport assembly 2.

[0033] The displacement compensator 4 is a piston-type displacement compensator, which includes a compensation cylinder, a floating piston body, an end face sealing pair, and a radial sliding sealing assembly. The total working stroke of the piston-type displacement compensator 4 is set to 80mm-120mm; the retraction stroke for station switching is 50mm-70mm, and the buffer compensation stroke for error compensation, thermal deformation absorption, and impact buffering is 30mm-50mm. The radial sliding sealing assembly adopts a high-pressure self-tightening sealing structure, which can withstand a maximum firing dynamic pressure of 200MPa. Before the loading chamber launch tube 3 needs to be moved laterally to the loading station, the floating piston body retracts to the drive section 5, completing the flange stop retraction and eliminating axial structural interference during the lateral movement of the loading chamber launch tube 3; when the loading chamber launch tube 3 returns to the firing axis station for docking, the floating piston body extends to push the end face sealing pair to press the flange of the loading chamber launch tube 3, and cooperates with the slight sliding of the loading chamber launch tube 3 in the axial sliding groove 211 to achieve floating docking without additional stress. Under launch test conditions, the thermal expansion displacement generated during launch can be absorbed by the floating piston action; the instantaneous recoil impact load during launch acts on the compensation cylinder, and the floating piston slides within the buffer compensation stroke, relying on the throttling damping of the sealing component to dissipate the impact energy, preventing the impact load from being directly transmitted to the launch tube 3 in the loading chamber and the test bench, thus reducing the risk of flange loosening, structural fatigue, and loosening of bench fasteners. This piston-type displacement compensator 4 differs from ordinary pipeline compensators, simultaneously taking into account multiple functions such as work position clearance, assembly error compensation, thermal deformation absorption, and impact buffering.

[0034] The drive section 5 is fixedly installed on the left end of the launch axis and integrates the launch power unit inside. Its right end is connected to the launch tube 3 of the loading chamber through the displacement compensator 4, providing a stable power input for the launch of the projectile.

[0035] The launch section 6 is coaxially fixed at the right end of the launch axis and forms a continuous, coaxial, and complete launch channel after docking with the launch tube 3 of the loading chamber, providing precise guidance and trajectory extension for the projectile as it leaves the barrel.

[0036] In this embodiment, all hydraulic actuators are uniformly driven and controlled by a hydraulic control system. This system provides stable pressure output to all hydraulic actuators and achieves fully automated operation of the loading process through programmed control logic, ensuring smooth operation, precise alignment, and safe operation under heavy-duty conditions. The hydraulic system should adopt a modular integrated design, mainly consisting of five parts: The hydraulic power unit, including an oil tank, drive motor, high-pressure plunger pump, and cooling and filtering components, provides a stable high-pressure oil source for the system. The integrated valve unit is divided into three independent circuits according to function: push, lateral movement, and displacement compensation. Each circuit is equipped with a solenoid directional valve, speed control valve, overflow valve, and hydraulic check valve to control the direction of cylinder movement and running speed, and also has overload protection and self-locking function. The detection and feedback unit is equipped with pressure sensors in each loop, displacement sensors in each cylinder, and travel limit switches at both ends of the guide rail 209 to collect pressure, travel, and position signals in real time, forming a closed-loop control. The central control unit, with a PLC as its core, has a built-in standard filling procedure program; it is equipped with a remote control console that supports three operation modes: fully automatic, semi-automatic, and manual jog. It can display operating parameters in real time and output fault alarms. The actuator includes a first drive component 105, a second drive component 205, and a displacement compensation drive cylinder. Except for the displacement compensation drive cylinder, it mainly uses a double-acting heavy-duty hydraulic cylinder. The two-stage telescopic structure can meet the long stroke drive requirements within a limited installation space.

[0037] The main functions of the hydraulic control system include: (1) Built-in standard loading logic, which can automatically complete the entire process of displacement compensation retraction, station lateral movement, push loading, station reset, and sealing and pressing in sequence with one key trigger. The action is smooth and the system stops automatically when in position, which greatly improves loading efficiency; (2) Stable speed regulation and buffering, which realizes stepless adjustment of cylinder speed through speed regulating valve. Key nodes such as push loading and station docking are automatically switched to low-speed feed to avoid the impact of starting and stopping large tonnage loads, prevent damage to precision parts of the projectile and scratches on the sealing surface, and ensure that the transfer and docking process is stable and without shaking; (3) Safety overload protection, which monitors the circuit pressure in real time and automatically stops and alarms when abnormalities such as push loading jamming and docking overload occur; (4) Position self-locking and pressure holding, which automatically locks the oil circuit after the cylinder is in position, locks the position of the station, and resists the reaction force of push loading and vibration load.

[0038] This embodiment also discloses an automatic loading method for large-tonnage heavy-load projectiles, which uses the aforementioned automatic loading and launching device for large-tonnage heavy-load projectiles. The specific operation steps are as follows.

[0039] S1. Pre-operation preparation: Disassemble the flange connecting bolts at both ends of the loading chamber launch tube 3, and release the rigid flange connection between the loading chamber launch tube 3 and the displacement compensator 4 and the launch section 6; control the floating piston body of the piston-type displacement compensator 4 to retract towards the drive section 5, complete the retraction action, so that the docking stop is completely disengaged, and eliminate the axial interference during the subsequent lateral movement of the loading chamber launch tube 3.

[0040] S2. The second drive component 205 of the ammunition transport assembly 2 outputs power to drive the sliding seat 203 to move laterally along the guide rail 209. The sliding seat 203 drives the ammunition chamber launch tube 3, which is held by the clamp, to move together to the loading position corresponding to the loading assembly 1. The sliding seat 203 abuts against the hydraulic cylinder lateral limit seat 208 to achieve mechanical limit and complete the position positioning. At this time, the cylinder axis of the ammunition chamber launch tube 3 is coaxially aligned with the axis of the semi-open arc slide groove 102 of the loading assembly 1.

[0041] S3. The large-tonnage test projectile to be loaded is directly placed into the semi-open circular arc chute 102. The projectile is supported by the inner arc surface of the chute, and no lifting equipment is required for suspension and hoisting throughout the process. A projectile pushing command is issued, activating the first drive unit 105. The first drive unit 105 pushes the projectile pushing tube 103 along the axial direction of the chute, until the pushing tube 103 contacts the tail of the projectile, smoothly pushing the projectile into the preset internal position of the loading chamber launch tube 3. During the pushing operation, the pushing speed can be controlled by hydraulic speed regulation to avoid heavy-load start-stop impacts. After the displacement detection confirms that the projectile is in place, the first drive unit 105 retracts in the reverse direction, driving the pushing tube 103 back to the initial position of the loading assembly 1.

[0042] S4. After the operator confirms that the projectile is reliably confined inside the loading chamber launch tube 3 and there is no risk of movement, the second drive component 205 of the projectile transport assembly 2 reverses its movement, causing the sliding seat 203, along with the loading chamber launch tube 3, to laterally reset and move back to the launch axis position. When approaching the launch position, a low-speed feed can be switched until the sliding seat 203 abuts against the hydraulic cylinder lateral limit seat 208 to complete the position locking. The control piston displacement compensator 4 extends, pushing the end face sealing pair to press against the left end flange of the loading chamber launch tube 3. The loading chamber launch tube 3, with the help of the lower clamp 202 and the axial sliding groove 211, generates a small axial floating displacement, adaptively cooperating with the piston displacement compensator 4 to complete the docking compensation and release the additional stress caused by assembly misalignment.

[0043] S5. The operator uses a torque wrench to tighten the flange bolts at both ends of the loading chamber launch tube 3 according to the diagonal tightening process; after the flange connection and sealing are in place, the entire loading operation is completed, the device enters the launch preparation state, and subsequent launch tests can be carried out.

[0044] Using a 2-ton test missile and a 500mm caliber launch system as the test subjects, the entire operation process, including missile placement, loading, station reset, and flange tightening, can be completed in less than 45 minutes per round. Only two operators are required to complete all procedures. Compared to traditional hoisting and loading methods, this significantly reduces manpower and eliminates the risk of collision damage from suspended hoisting. Under launch conditions, the piston-type displacement compensator absorbs the thermal expansion displacement of the cylinder, reducing the additional thermal stress caused by thermal expansion to near zero. Simultaneously, it dissipates recoil impact energy, effectively protecting the missile's precision components, the cylinder flange connection structure, and the test bench.

[0045] The above are merely preferred embodiments of this application. It should be noted that this application is not limited to the above embodiments. For those skilled in the art, several improvements and modifications can be made without departing from the principles of this application. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this application should also be considered within the scope of protection of this application.

Claims

1. An automatic loading and launching device for large-tonnage, heavy-load projectiles, characterized in that, The device includes a drive section, a loading chamber launch tube, a launch section, a displacement compensator, a loading assembly, and a projectile transport assembly. The drive section, the loading chamber launch tube, and the launch section are connected sequentially along the launch axis. The displacement compensator is disposed between the drive section and the loading chamber launch tube along the launch axis and can extend and retract along the launch axis to axially retract and avoid the loading chamber launch tube when it is laterally moved and to axially press the loading chamber launch tube after it is reset. The loading chamber launch tube and the displacement compensator are detachably connected. The loading assembly is arranged parallel to the launch axis on one side of the drive section, including a semi-open arc groove and a first drive member. The inner arc radius of the semi-open arc groove matches the outer diameter of the projectile to be loaded, and is used to place the projectile to be loaded. The first drive member is provided at one end of the semi-open arc groove, and the other end of the semi-open arc groove can be connected to the launch tube of the loading chamber. The first drive member is used to send the projectile loaded in the semi-open arc groove into the launch tube of the loading chamber. The ammunition transport assembly includes a guide rail and a sliding seat. The guide rail is perpendicular to the firing axis and is located below the loading chamber firing tube. The sliding seat is slidably mounted on the guide rail. The sliding seat is used to support the loading chamber firing tube and can drive the loading chamber firing tube to translate along the guide rail between the axis of the loading assembly and the firing axis, so that the loading chamber firing tube can dock with the semi-open arc groove or the drive section.

2. The automatic loading and launching device for large-tonnage heavy-load projectiles according to claim 1, characterized in that, The loading assembly also includes a push tube and a support pulley; Multiple sets of support pulleys are arranged axially at intervals on the inner arc surface of the semi-open circular arc slide. The push tube is placed inside the semi-open circular arc slide and can be supported by the support pulleys. The first driving member is connected to the push tube in a transmission manner. The first driving member sends the projectile loaded in the semi-open circular arc slide into the loading chamber launch tube through the push tube.

3. The automatic loading and launching device for large-tonnage heavy-load projectiles according to claim 1, characterized in that, The ammunition transport assembly also includes a second drive component; The bottom of the sliding seat is provided with a slider, and the sliding seat is slidably connected to the guide rail through the slider; The second driving member is connected to the sliding seat and is used to drive the sliding seat to translate along the guide rail.

4. The automatic loading and launching device for large-tonnage heavy-load projectiles according to claim 3, characterized in that, The first driving component and / or the second driving component are multi-stage hydraulic cylinders with a graded telescopic structure.

5. The automatic loading and launching device for large-tonnage heavy-load projectiles according to claim 4, characterized in that, The loading assembly also includes a loading slot frame and a support base; The loading slot frame is used to support the semi-open arc-shaped slide groove, the support base is used to support the first driving member, the first driving member is hinged to the support base, and the piston rod of the first driving member is connected to the push tube.

6. The automatic loading and launching device for large-tonnage heavy-load projectiles according to claim 1, characterized in that, The ammunition transport assembly also includes an upper clamp and a lower clamp; The upper clamp and the lower clamp are used to align and clamp the loading chamber launch tube onto the sliding seat; An axial sliding groove is formed on the top end face of the sliding seat. The direction of the axial sliding groove is parallel to the firing axis. The lower clamp is embedded in the axial sliding groove, allowing axial sliding of the firing tube in the loading chamber.

7. The automatic loading and launching device for large-tonnage heavy-load projectiles according to claim 1, characterized in that, The guide rail is provided with a hydraulic cylinder lateral limit seat, which is used to limit the extreme positions of the sliding seat at the loading station and the launching station. When the sliding seat is in the loading position, the loading chamber tube is used to dock with the semi-open arc groove; when the sliding seat is in the launching position, the loading chamber launching tube is used to dock with the drive section.

8. The automatic loading and launching device for large-tonnage heavy-load projectiles according to claim 1, characterized in that, The bottom of the sliding seat is provided with multiple sets of vertical adjustment feet for adjusting the height of the sliding seat.

9. The automatic loading and launching device for large-tonnage heavy-load projectiles according to claim 1, characterized in that, The displacement compensator is a piston-type displacement compensator, which includes a compensating cylinder, a floating piston body, an end face sealing pair, and a radial sliding sealing assembly; the total working stroke of the piston-type displacement compensator is 80mm to 120mm.

10. An automatic loading method for large-tonnage, heavy-load projectiles, characterized in that, The automatic loading and launching device for large-tonnage heavy-load projectiles as described in any one of claims 1-9 includes the following steps: S1. Remove the flange connecting bolts at both ends of the loading chamber launch tube, so that the floating piston body of the displacement compensator retracts to the drive section side, completing the retraction and eliminating axial interference; S2. The missile transport assembly drives the sliding seat to move laterally to the loading station, so that the launch tube of the loading chamber is coaxially connected with the semi-open arc slide of the loading assembly. S3. Place the projectile to be loaded into the semi-open arc slide groove. Relying on the slide groove to support the projectile, start the first driving component to drive the push tube to push axially. Push the projectile smoothly into the preset position in the loading chamber launch tube along the semi-open arc slide groove. After the projectile is pushed into place, the first driving component drives the push tube to reset. S4. After confirming that the projectile is fixed in the loading chamber launch tube, the projectile transport assembly drives the loading chamber launch tube to move laterally to the launch axis position. The displacement compensator extends and presses the flange of the loading chamber launch tube. The loading chamber launch tube achieves a slight axial floating by means of the axial sliding groove, and adaptively cooperates with the displacement compensator to complete the docking compensation. S5. Tighten the flange bolts at both ends of the loading chamber launch tube to complete the loading operation and meet the conditions for launch test.