High overload steering gear potting quality detection method

By using the method of inflating the sealed detection chamber to judge the air pressure change and the method of separating the detection space chamber, the problem of accuracy in the pre-filling quality detection of high overload servo actuators is solved, and the unqualified parts can be quickly screened and located, thereby improving detection efficiency and productivity.

CN123155113APending Publication Date: 2026-11-24BEIJING MECHANICAL EQUIP INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510662616.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-05-22
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing technologies make it difficult to accurately detect the pre-filling quality of high-overload servo actuators within a sealed space, especially gas leaks and defective parts, resulting in low efficiency and high cost of subsequent maintenance.

Method used

A potting quality testing method is adopted, which judges the qualification of pre-potting sites by inflating a sealed testing chamber and judging the change of air pressure. The testing chamber is divided into multiple sub-testing spaces for detailed testing. A sealing structure is formed by using a surrounding expansion bladder and a blocking air bladder, and a load is applied to test the sealing performance of the pre-potted test piece.

Benefits of technology

The ability to quickly determine the overall pass/fail status of pre-filled test pieces improves testing efficiency, reduces the time spent finding defective parts, and enhances production pass rate and maintenance efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123155113A_ABST
    Figure CN123155113A_ABST
Patent Text Reader

Abstract

This invention relates to a method for detecting potting quality, belonging to the field of potting quality detection technology. It solves the problem in existing technologies where it is impossible to accurately locate unqualified pre-potting sites. The detection method of this invention divides the detection chamber into multiple sub-detection spaces based on the pre-potting sites. Air is injected into each independently sealed sub-detection space. When the air pressure in a sub-detection space drops, the pre-potting site corresponding to that sub-detection space is determined to be unqualified. This detection method not only detects whether the pre-potting of the pre-potted test piece is qualified, but also further locates unqualified pre-potting sites, improving the efficiency and accuracy of potting quality detection.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of potting quality testing technology, and in particular to a method for potting quality testing. Background Technology

[0002] In high-precision fields, the performance of high-overload servos directly affects the success or failure of system operation, and their importance is self-evident. However, high-overload servos often need to operate under extremely harsh conditions and withstand extraordinary overload forces, which poses a severe challenge to their stability and reliability.

[0003] To ensure stable operation of high-overload servos in complex environments, pre-filling the actuator is a crucial step. Pre-filling, as a core preparatory step before final filling, directly impacts the effectiveness of the subsequent filling process. If the pre-filling is defective, the potting compound can easily flow into the actuator during the actual filling, causing jamming of internal transmission components and ultimately rendering the servo actuator completely inoperable.

[0004] Currently, accurately detecting gas leaks within a sealed space by applying a gas load to a pre-filled servo actuator, and further precisely locating areas with substandard pre-filling, has become a key bottleneck in the field's technological development. Effectively solving this problem would provide a precise basis for refilling substandard components, significantly improving maintenance efficiency, reducing production costs, and driving technological innovation and industrial upgrading in related high-end application areas. Therefore, a breakthrough by those skilled in the art is urgently needed. Summary of the Invention

[0005] Based on the above analysis, the present invention aims to provide a potting quality testing method. This method can test the sealing performance of pre-potted high-overload servo actuators and, during the sealing test, determine which component of the servo actuator has failed the pre-potting process, providing a basis for re-potting the defective parts and thus greatly improving the potting pass rate of pre-potted high-overload servo actuators.

[0006] This invention provides a method for testing the quality of potting and sealing products, characterized by comprising the following steps:

[0007] Step 1: Place the pre-filled test piece on the testing device and form a sealed testing chamber with the testing device; the pre-filling point of the pre-filled test piece is located inside the testing chamber;

[0008] Step 2: Inflate the detection chamber. If the pre-filling of the pre-filling point of the pre-filled detection element is qualified, the air pressure in the detection chamber remains unchanged. If the pre-filling of the pre-filling point of the pre-filled detection element is unqualified, the gas in the detection chamber enters the interior of the pre-filled detection element and is released to the outside of the detection device through the pre-filled detection element, thus reducing the air pressure in the detection chamber.

[0009] Furthermore, it also includes step three, dividing the detection chamber into multiple sub-detection spaces according to the pre-filling sites.

[0010] Furthermore, it also includes step four, where the inflation component inflates the multiple sub-detection space chambers.

[0011] Furthermore, the sub-testing space chamber includes a first sub-testing space chamber for testing the hollow channel of the pre-filled test piece.

[0012] Furthermore, the sub-testing space chamber also includes a second sub-testing space chamber for testing the motor of the pre-filled test piece.

[0013] Furthermore, in step four, if the pre-filling of the pre-filling sites in the sub-detection space is qualified, the air pressure value in the sub-detection space remains unchanged.

[0014] Furthermore, in step four, if the pre-filling of the pre-filled site in the sub-detection space chamber is unqualified, the gas in the detection chamber enters the interior of the pre-filled detection element and is released to the outside of the detection device through the pre-filled detection element, then the gas pressure value in the sub-detection space chamber decreases.

[0015] Furthermore, in steps two and four, the inflation component inflates the detection chamber and the sub-detection space until the pressure value in the detection space reaches a predetermined pressure value, at which point inflation stops.

[0016] Furthermore, the predetermined pressure value is the maximum pressure value that the pre-filled test piece can withstand.

[0017] Furthermore, the predetermined pressure value is 0.5 MPa.

[0018] The above-mentioned potting quality testing method uses a testing device to test the potting quality; the potting quality testing device includes: a bottom support base, a support structure, an inspection chamber, an inflation component, and a testing component;

[0019] The inspection chamber includes an open-end cavity and an airtight ring; the airtight ring is used to surround the upper airtight rubber band of the pre-filled test piece, so that the cavity forms a test chamber for load testing of the motor of the pre-filled test piece; the inflation component inflates the test chamber, and the test piece is used to detect whether there is an air leakage problem in the test chamber.

[0020] The airtight ring includes a surrounding expansion bladder. The inflation component inflates the surrounding expansion bladder, and the surrounding expansion bladder surrounds the upper airtight rubber band of the pre-filled test piece, forming a first sub-inspection chamber for sealing testing of the upper airtight rubber band. The inflation component performs sealing testing on the first sub-inspection chamber, and the test piece performs sealing testing on the upper airtight rubber band of the pre-filled test piece.

[0021] When the surrounding expansion bladder encircles the upper airtight rubber band of the pre-filled test piece, the accommodating cavity forms a sealing structure for sealing test of the pre-filled test piece.

[0022] Compared with the prior art, the present invention can achieve at least one of the following beneficial effects:

[0023] (1) The potting quality testing method of the present invention sets the pre-potting point of the pre-potting test piece in a sealed test chamber, inflates the test chamber, and judges whether the pre-potting point of the pre-potting test piece is qualified by judging whether the air pressure value in the test chamber drops. The present invention can match pre-potting test pieces of different sizes, has strong versatility, and can quickly judge whether the overall pre-potting of the pre-potting test piece is qualified, and screen out pre-potting test pieces that are not qualified.

[0024] (2) The potting quality inspection method of the present invention divides the inspection chamber into multiple sub-inspection chambers according to the pre-potting sites, inflates each sub-inspection chamber, and determines whether the pre-potting sites in the sub-inspection chamber are qualified by whether the gas pressure in the sub-inspection chamber drops. When there are unqualified pre-potting sites on the pre-potted inspection piece, this method can quickly locate the unqualified pre-potting sites, greatly reducing the working time for finding unqualified sites, improving work efficiency, and increasing the productivity of producing qualified pre-potted inspection pieces.

[0025] (3) The potting quality testing method of the present invention can detect whether the pre-sealing performance of the pre-potted test piece meets the requirements for high overload resistance. By controlling the applied load through inflation, the load-bearing capacity of the pre-potted test piece can be detected. When the pre-potted test piece is detected as a non-conforming part, it can quickly determine which part of the pre-potted test piece is non-conforming and re-potted the non-conforming pre-potted test piece or replace the defective part, saving maintenance time and improving the yield of qualified pre-potted test pieces.

[0026] In this invention, the above-described technical solutions can be combined with each other to achieve more preferred combinations. Other features and advantages of this invention will be set forth in the following description, and some advantages may become apparent from the description or be learned by practicing the invention. The objects and other advantages of this invention can be realized and obtained from what is particularly pointed out in the description and drawings. Attached Figure Description

[0027] The accompanying drawings are for illustrative purposes only and are not intended to limit the invention. Throughout the drawings, the same reference numerals denote the same parts.

[0028] Figure 1 This is a flowchart of the potting quality testing method described in Example 1;

[0029] Figure 2 This is a schematic diagram of the structure of the pre-filled test piece.

[0030] Figure 3 This is one of the structural schematic diagrams of the potting quality testing device described in Example 2;

[0031] Figure 4 This is the second schematic diagram of the filling quality testing device described in Example 2;

[0032] Figure 5 This is one of the structural schematic diagrams of the telescopic push rod and airtight ring in the potting quality testing device described in Example 2;

[0033] Figure 6 This is the second schematic diagram of the structure of the telescopic push rod and the airtight ring in the potting quality testing device described in Example 2;

[0034] Figure 7 This is a schematic diagram of the inspection chamber in the potting quality testing device described in Example 3;

[0035] Figure 8 This is a schematic diagram of the space divider and cover plate in the potting quality testing device described in Example 3;

[0036] Figure 9 This is a schematic diagram of the gas filling chamber and tightening air bladder in the potting quality testing device described in Example 3.

[0037] Figure label:

[0038] 1-Pre-filled test piece; 11-Structural support; 12-Motor; 13-Power transmission assembly; 14-Hollow channel; 15-Upper airtight rubber band; 16-Lower airtight rubber band;

[0039] 2- Bottom support; 21- No. 1 choke airbag;

[0040] 3-Support structure; 31-First track; 32-Fixing groove; 33-First transmission rod; 34-First power unit;

[0041] 4-Inspection chamber; 41-Connecting assembly; 411-Connecting accessories; 412-Rack; 42-Airtight ring; 421-Surrounding expansion bladder; 4211-First airtight pressure test chamber; 42111-First temperature-sensitive remolded metal; 4212-Second airtight pressure test chamber; 42121-Second temperature-sensitive remolded metal; 4213-Third airtight pressure test chamber; 42131-Third temperature-sensitive remolded metal; 43-Retractable push rod; 431-Second blocking airbag; 432-Outer sleeve; 4321-Auxiliary power motor; 4 322-Auxiliary transmission rod; 433-Extension cylinder; 434-Shock-absorbing buffer pad; 44-Third sub-inspection chamber; 441-Upper inspection space; 442-Lower inspection space; 45-Second sub-inspection chamber; 46-First sub-inspection chamber; 47-Horizontal rod; 48-Accommodating cavity; 49-Space separator; 491-Second through hole; 492-Filling airbag; 493-Area partition grid; 410-Cover plate; 4101-Plate body; 4102-Gas filling chamber; 4103-Tightening airbag; 4104-First through hole;

[0042] 5-Inflation device connection port;

[0043] 6-Air pressure detection device. Detailed Implementation

[0044] The preferred embodiments of the present invention will now be described in detail with reference to the accompanying drawings, which constitute a part of the present invention and are used together with the embodiments of the present invention to illustrate the principles of the present invention, but are not intended to limit the scope of the present invention.

[0045] The pre-filled detection component 1 of this invention, namely the high overload servo actuator, such as... Figure 2As shown, it includes a structural support 11, a motor 12, and a power transmission assembly 13. The motors 12 are arranged in a matrix on the upper surface of the structural support 11, and the power transmission assembly 13 is disposed inside the structural support 11. A hollow channel 14 is formed at the center of the structural support 11 and the power transmission assembly 13. An upper airtight rubber band 15 is provided on the upper part of the side wall of the structural support 11, and a lower airtight rubber band 16 is provided on the lower surface of the structural support 11. The pre-filled test piece 1 has multiple pre-filled points, including the upper airtight rubber band 15, the lower airtight rubber band 16, the hollow channel 14, the wiring point in the middle of the motor 12, and the bottom end face of the motor 12. If the pre-filling of the wiring point in the middle of the motor 12 and the bottom end face of the motor 12 is unqualified, when a negative pressure test is performed, gas will enter the motor 12 through the pre-filled points, and be discharged through the power transmission assembly 13 through the connection point between the motor 12 and the power transmission assembly 13.

[0046] Example 1

[0047] This invention provides a method for testing the quality of potting and sealing processes, such as... Figure 1 As shown, the method includes the following steps:

[0048] Step 1: Place the pre-filled test piece 1 on the test device and form a sealed test chamber with the test device; the pre-filled site of the pre-filled test piece 1 is located in the test chamber;

[0049] The process of forming the detection chamber in step one includes inflating the first blocking airbag 21 and the surrounding expansion airbag 421:

[0050] The surrounding expansion chamber 421 includes a first airtight pressure test chamber 4211, a second airtight pressure test chamber 4212, and a third airtight pressure test chamber 4213; a first temperature-sensitive remolded metal 42111 is disposed inside the first working end of the first airtight pressure test chamber 4211; a second temperature-sensitive remolded metal 42121 is disposed on the inner wall of the second working end of the second airtight pressure test chamber 4212; and a third temperature-sensitive remolded metal 42131 is disposed on the inner wall of the third working end of the third airtight pressure test chamber 4213.

[0051] The inflation process of the inflator on the surrounding expansion bladder 421 is as follows:

[0052] S1.1.1 Knowing the rated pressure of the surrounding expansion bladder 421 when it is inflated to 100%, the surrounding expansion bladder 421 is inflated at a rate of 0.1 MPa / s until the pressure inside the surrounding expansion bladder 421 reaches 70% of the rated pressure;

[0053] S1.1.2. Continue to inflate the surrounding expansion bladder 421 at a rate of 0.02 MPa / s until the internal pressure of the surrounding expansion bladder 421 reaches 90% of the rated pressure;

[0054] S1.1.3, Continue to inflate the surrounding expansion bladder 421 at a rate of 0.01 MPa / s until the internal pressure of the surrounding expansion bladder 421 reaches 95% of the rated pressure;

[0055] S1.1.4, energize the heating wire to cause the first temperature-sensitive remolded metal 42111, the second temperature-sensitive remolded metal 42121 and the third temperature-sensitive remolded metal 42131 to expand due to heat, which in turn causes the surrounding expansion bladder 421 to expand toward the pre-filled detection element 1; continue to inflate the surrounding expansion bladder 421 at a rate of 0.01 MPa / s until the internal pressure of the surrounding expansion bladder 421 reaches 100% to 105% of the rated pressure.

[0056] To ensure the encircling effect of the surrounding expansion bladder 421 on the upper airtight rubber band, a temperature-sensitive remolded metal is provided on the inner wall of the surrounding expansion bladder 421. At the same time, the above-mentioned inflation process is carried out on the first airtight pressure test chamber 4211, the second airtight pressure test chamber 4212 and the third airtight pressure test chamber 4213. The temperature-sensitive remolded metal is heated and expands to ensure that the surrounding expansion bladder applies sufficient pressure to the pre-filled test piece 1 to ensure the sealing of the test chamber.

[0057] The inflation process of the inflator on the first blocking airbag 21 is as follows:

[0058] S1.2.1. Given the rated pressure of the first blocking airbag 21 when it is inflated to 100%, inflate the first blocking airbag 21 at a rate of 0.1 MPa / s until the pressure inside the first blocking airbag 21 reaches 80% of the rated pressure.

[0059] S1.2.2 Continue to inflate the first blocking airbag 21 at a rate of 0.02 MPa / s until the internal pressure of the first blocking airbag 21 reaches 100% of the rated pressure.

[0060] The pre-filled test piece 1 is placed on the test device. The inflation component inflates the first blocking airbag 21 and the surrounding expansion bladder 421 of the test device. The inflated surrounding expansion bladder 421 surrounds the upper airtight rubber band 15 of the pre-filled test piece 1. The first blocking airbag 21 seals the lower end of the hollow channel 14 of the pre-filled test piece 1. The hollow channel 14 and the accommodating cavity of the test device form a test chamber.

[0061] Step 2: Inflate the detection chamber. If the pre-filling of the pre-filling point of the pre-filled detection element 1 is qualified, the air pressure in the detection chamber remains unchanged. If the pre-filling of the pre-filling point of the pre-filled detection element 1 is unqualified, the gas in the detection chamber enters the interior of the pre-filled detection element 1 and is released to the outside of the detection device through the structure of the pre-filled detection element 1 located outside the detection chamber, and the air pressure in the detection chamber decreases.

[0062] Step two above involves inflating the testing chamber to check whether the pre-filling of all pre-filled sites within the chamber is qualified. In a vacuum filling environment, the pressure difference between the inside and outside of the aircraft is approximately 0.1 MPa. Using 0.5 MPa as the ultimate pressure resistance condition, the servo actuator of the pre-filled testing component 1 needs to be evaluated for its airtightness and the time it can withstand this pressure. Inflate the testing chamber using an inflation device. If the pressure gauge reading gradually increases with the inflation volume, it proves that the internal flow channel of the actuator is well-sealed. When the pressure gauge reading jumps to 0.5 MPa, indicating a 0.5 MPa pressure difference between the actuator inside the chamber and the outside, stop inflation and maintain the pressure gauge reading at 0.5 MPa for a period of time before depressurizing.

[0063] The potting quality testing method of the present invention involves setting the pre-potting point of the pre-potting test piece 1 in a sealed test chamber, inflating the test chamber, and judging whether the pre-potting point of the pre-potting test piece 1 is qualified by judging whether the air pressure value in the test chamber decreases. The present invention can match pre-potting test pieces 1 of different sizes, has strong versatility, and can quickly judge whether the overall pre-potting of the pre-potting test piece 1 is qualified, and screen out pre-potting test pieces 1 that are not qualified.

[0064] The detection device and the pre-filled detection component 1 form a sealed detection chamber. The first blocking airbag 21 and the surrounding expansion airbag 421 can be adaptively adjusted according to the shape and size of the pre-filled detection component 1, and can closely fit the surface of the pre-filled detection component 1. The airbag has reliable sealing performance and can form a sealed detection chamber with pre-filled detection components 1 of different sizes, ensuring the accuracy of the detection.

[0065] The embodiment also includes step three, dividing the detection chamber into multiple sub-detection spaces according to the pre-filling site; the sub-detection spaces include a first sub-detection space for detecting the hollow channel 14 of the pre-filled detection component 1; the sub-detection spaces also include a second sub-detection space for detecting the motor 12 of the pre-filled detection component 1.

[0066] The detection device is provided with a telescopic push rod 43 in the cavity 48. The telescopic end of the telescopic push rod 43 is provided with a second blocking airbag 431. After the second blocking airbag 431 is inflated, it blocks the upper port of the hollow channel 14, thereby dividing the detection chamber into a first sub-detection space chamber and a second sub-detection space chamber.

[0067] Furthermore, a sealed upper testing space 441 is formed between the first airtight pressure testing chamber 4211 and the second airtight pressure testing chamber 4212, and a sealed lower testing space 442 is formed between the second airtight pressure testing chamber 4212 and the third airtight pressure testing chamber 4213. The upper testing space 441 and the lower testing space 442 are used to test the sealing performance of the upper airtight rubber band.

[0068] In step three above, the inflation step of the inflator to inflate the second blocking airbag 431 is specifically as follows:

[0069] S3.1. Given the rated pressure of the second blocking airbag 431 when it is inflated to 100%, the second blocking airbag 431 is inflated at a rate of 0.1 MPa / s until the pressure inside the second blocking airbag 431 reaches 70% of the rated pressure.

[0070] S3.2 Continue to inflate the second blocking airbag 431 at a rate of 0.02 MPa / s until the internal pressure of the second blocking airbag 431 reaches 80% of the rated pressure;

[0071] S3.3, continue to inflate the second blocking airbag 431 at a rate of 0.01 MPa / s until the internal pressure of the second blocking airbag 431 reaches 90% to 100% of the rated pressure.

[0072] The expansion diameter of the second blocking airbag 431 is D = d * k;

[0073] Where D represents the expansion diameter of the second blocking airbag 431, d represents the distance between the inner walls of the hollow channel 14, and k represents a coefficient, with a value of 1.1 to 1.3.

[0074] In step four, if the pre-filling of the pre-filled sites in the sub-detection space is qualified, the air pressure in the sub-detection space remains unchanged; if the pre-filling of the pre-filled sites in the sub-detection space is unqualified, the gas in the detection chamber enters the interior of the pre-filled detection element 1 and is released to the outside of the detection device through the structure of the pre-filled detection element 1 located outside the detection chamber, and the air pressure in the sub-detection space decreases.

[0075] In the above scheme, in steps two and four, the inflation component inflates the detection chamber and the sub-detection space until the pressure value in the detection chamber reaches a predetermined pressure value, and then stops inflation.

[0076] The predetermined pressure value is the maximum pressure value that the pre-filled test piece 1 can withstand.

[0077] In this embodiment, the predetermined pressure value is 0.5 MPa.

[0078] In this embodiment, a fifth step is also included: after completing the above four steps, the sealing performance of the lower airtight rubber band of the pre-filled test piece 1 is tested. The pre-filled test piece 1 is fixed to the bottom support of the testing device by screws. With the surrounding expansion bladder 421 inflated and surrounding the upper airtight rubber band of the pre-filled test piece 1, the second blocking air bladder 431 and the first blocking air bladder 21 are deflated, and then air is injected into the testing chamber to test whether there is any air leakage in the chamber. If there is an air leakage problem, the sealing of the lower airtight rubber band of the pre-filled test piece 1 is unqualified; if there is no air leakage problem, the sealing of the lower airtight rubber band of the pre-filled test piece 1 is qualified.

[0079] Example 2

[0080] This embodiment provides a potting quality testing device. The testing method described in Embodiment 1 is performed using the testing device described in this embodiment. Figure 3 As shown, it includes a bottom support base 2, a support structure 3, an inspection chamber 4, an inflatable component, and an air pressure detection device 6;

[0081] The support structure 3 is vertically mounted on the bottom support base 2, and the inspection chamber 4 is vertically and flexibly mounted on the support structure 3; Figure 4 As shown, the support structure 3 includes a first track 31, a fixing groove 32, and a first transmission rod 33. The first transmission rod 33 is rotatably disposed in the fixing groove 32 and is disposed at the output end of the first power device 34. The first transmission rod 33 rotates under the drive of the first power device 34. The docking assembly 41 of the inspection chamber 4 is vertically and vertically disposed on the support structure 3. The docking assembly 41 includes a connecting accessory 411 and a rack 412. The rack 412 is disposed on the connecting accessory 411 and is disposed opposite to the first transmission rod 33. The connecting accessory 411 includes a slider, which is slidably disposed in the first track 31. Correspondingly, the rack 412 meshes with the first transmission rod 33.

[0082] When the pre-filled test piece 1 is placed on the bottom support 2, the first power device 34 is activated. The first power device 34 drives the first transmission rod 33 to rotate, and the first transmission rod 33 drives the rack 412 to move downward, thereby realizing the downward movement of the test chamber 4 to the test position of the pre-filled test piece 1.

[0083] The inspection chamber 4 includes an open-end cavity 48 and an airtight ring 42; the airtight ring 42 is used to surround the upper airtight rubber band 15 of the pre-filled test piece 1, so that the cavity 48 forms a test chamber for load testing of the motor 12 of the pre-filled test piece 1; the inflation component inflates the test chamber, and the air pressure detection device 6 is used to detect whether there is an air leakage problem in the test chamber.

[0084] In this embodiment, the inspection chamber 4 further includes a retractable push rod 43 and a horizontal rod 47. The horizontal rod 47 is horizontally mounted on the retractable push rod 43, positioned near the telescopic end of the push rod 43. During the descent of the push rod 43, the horizontal rod 47 moves to the upper surface of the structural support 11, stopping the push rod 43's descent. Due to the obstruction of the structural support 11, the horizontal rod cannot continue to descend. In a specific embodiment, this can be achieved by setting a descent height, or by installing a touch switch on the horizontal rod 47. When the horizontal rod contacts the upper surface of the structural support 11, the touch switch controls the first power unit to stop working, stopping the inspection chamber's descent. At this time, the second blocking airbag 431, located at the telescopic end of the push rod 43, is positioned at the upper end of the hollow channel 14, and the airtight ring 42, mounted on the horizontal rod 47, is positioned at the location of the upper airtight rubber band 15 of the pre-filled test piece 1.

[0085] When the pre-filled test piece 1 is in the test position, the second blocking airbag 431 is located at the upper end port of the hollow channel 12, and the first blocking airbag 21 is located at the lower end port of the hollow channel. The inflation component inflates the second blocking airbag 431 and the first blocking airbag 21, and after sealing the upper and lower ports of the hollow channel, the first sub-inspection chamber 46 is formed to perform load testing on the hollow channel and detect whether there is an air leakage problem in the hollow channel.

[0086] The testing device is equipped with an inflation channel for an inflation component, which includes channel one, channel two, and channel three.

[0087] The first sub-inspection chamber 46 of the channel is inflated to conduct a sealing test. The channel includes a branch for inflating the first sub-inspection chamber 46.

[0088] When the second blocking airbag 431 is inflated to block the upper end of the hollow channel 14, and the surrounding expansion bladder 421 surrounds the upper airtight ring 42 of the pre-filled test piece 1, the inflation component inflates the first sub-inspection chamber 46 through the channel to check whether the first sub-inspection chamber 46 has any air leakage, thus completing the test of the sealing performance of the motor 12 of the pre-filled test piece 1.

[0089] Simultaneously, a second sub-inspection chamber 45 is formed within the accommodating cavity 48. The second channel inflates the second sub-inspection chamber 45 to conduct a sealing test. The second channel includes a branch for inflating the second sub-inspection chamber 45.

[0090] The pre-filled test piece 1 is fixed to the bottom support 2 with screws. The screws tighten the lower end face of the pre-filled test piece 1 to the bottom support 2. When the second blocking airbag 431 blocks the upper end of the hollow channel, the first blocking airbag 21 is not inflated, that is, the lower end of the hollow channel is not blocked. The inflation component inflates the hollow channel and applies a load to test whether the seal of the lower airtight rubber band 16 of the pre-filled test piece 1 is qualified. If the gas pressure value remains unchanged after the hollow channel is inflated, the seal of the lower airtight rubber band 16 is qualified; otherwise, the seal of the lower airtight rubber band 16 is unqualified.

[0091] In the embodiments, such as Figure 6 As shown, the airtight ring 42 includes a surrounding expansion bladder 421. The inflation component inflates the surrounding expansion bladder 421, and the surrounding expansion bladder 421 surrounds the upper airtight rubber band 15 of the pre-filled test piece 1, forming a third sub-inspection chamber 44 for sealing testing of the upper airtight rubber band 15. The inflation component inflates the third sub-inspection chamber 44, and the air pressure detection device 6 performs sealing testing on the upper airtight rubber band 15 of the pre-filled test piece 1.

[0092] When the surrounding expansion bladder 421 surrounds the upper airtight rubber band 15 of the pre-filled test piece 1, the accommodating cavity 48 forms a sealing structure for sealing test of the pre-filled test piece 1.

[0093] The third channel is used to inflate the surrounding expansion bladder 421 and the third sub-inspection chamber 44 for a sealing test.

[0094] The third channel includes the first branch, the second branch, the third branch, the fourth branch, and the fifth branch.

[0095] In the embodiments, such as Figure 6As shown, the surrounding expansion chamber 421 includes a first airtight pressure testing chamber 4211, a second airtight pressure testing chamber 4212, and a third airtight pressure testing chamber 4213; the first branch connects the first airtight pressure testing chamber 4211 and the inflation component, the inflation component inflates the first airtight pressure testing chamber 4211, the first working end of the first airtight pressure testing chamber 4211 expands downward and squeezes the upper end surface of the pre-filled test component 1 frame support body 11; the second branch connects the second airtight pressure testing chamber 4212 and the third airtight pressure testing chamber 4213. An inflatable component inflates the second airtight pressure-bearing test chamber 4212, causing the second functional end of the second airtight pressure-bearing test chamber 4212 to expand upwards towards the airtight rubber band 15 and compress the upper airtight rubber band 15; a third branch connects the third airtight pressure-bearing test chamber 4213 and the inflatable component, inflating the third airtight pressure-bearing test chamber 4213, causing the third functional end of the third airtight pressure-bearing test chamber 4213 to expand towards the outer wall of the pre-filled test component 1 frame support 11 and compress the outer wall of the pre-filled test component 1 frame support 11.

[0096] like Figure 5 As shown, a sealed upper testing space 441 is formed between the first airtight pressure testing chamber 4211 and the second airtight pressure testing chamber 4212, and a sealed lower testing space 442 is formed between the second airtight pressure testing chamber 4212 and the third airtight pressure testing chamber 4213. A first air outlet valve is provided on the upper testing space 441; a second air outlet valve is provided on the lower testing space 442; a fourth branch connects the inflation component and the first air outlet valve, and a fifth branch connects the inflation component and the second air outlet valve; the sealed upper testing space 441 and lower testing space 442 are inflated through the fourth and fifth branches, and the air pressure detection device 6 detects the change in gas pressure in the upper testing space 441 and lower testing space 442 to detect whether the upper airtight rubber band 15 is sealed properly.

[0097] To further ensure the airtightness of the upper testing space 441, a first temperature-sensitive remolded metal 42111 is provided inside the first working end of the first airtight pressure-bearing test chamber 4211. This ensures that the first airtight pressure-bearing test chamber 4211 applies a certain force to the upper end face of the pre-filled test component 1 frame support 11, ensuring a seal between the first airtight pressure-bearing test chamber 4211 and the upper end face of the frame support 11. Simultaneously, a second temperature-sensitive remolded metal 42121 is provided on the inner wall of the second working end of the second airtight pressure-bearing test chamber 4212. When the second airtight pressure-bearing test chamber 4212 applies force to the upper airtight rubber band 15 of the pre-filled test component 1, the second temperature-sensitive remolded metal 42121 is heated. 121, the second temperature-sensitive remolded metal 42121 moves further upward towards the airtight rubber band 15, and the outer wall of the second airtight pressure-bearing test chamber 4212 presses against the airtight rubber band 15, so that a sealed upper test space 441 is formed between the first airtight pressure-bearing test chamber 4211 and the second airtight pressure-bearing test chamber 4212; similarly, the third airtight pressure-bearing test chamber 4213 is inflated, and the third temperature-sensitive remolded metal 42131 on the inner wall of the third working end of the third airtight pressure-bearing test chamber 4213 is energized, so that the outer wall of the third airtight pressure-bearing test chamber 4213 presses against the outer wall of the structural support 11, so that a sealed lower test space 442 is formed between the second airtight pressure-bearing test chamber 4212 and the third inflated chamber.

[0098] In this embodiment, the first thermosensitive remolded metal 42111, the second thermosensitive remolded metal 42121, and the third thermosensitive remolded metal 42131 are all inverse elongation alloys, meaning they are in a contracted state at room temperature and elongated after heating. A heating wire (nickel-chromium wire) is spirally wound around the outside of the thermosensitive remolded metal spring at a spacing of 2-3 mm and secured with high-temperature resistant insulating tape (such as polyimide tape). Meanwhile, to prevent damage to the airbag during heating, the airbag is made of high-temperature resistant rubber materials such as silicone rubber or fluororubber, or ceramic fiber cotton is placed between the heating wire and the inner wall of the airbag.

[0099] By inflating the sealed upper detection space 441 and lower detection space 442 with air through the first and second air outlet valves respectively, the air leakage in the upper detection space 441 and lower detection space 442 is detected, thus completing the test of the sealing performance of the airtight rubber band 15 on the pre-filled test piece 1.

[0100] The load testing device described in this embodiment applies a load to the pre-filled test piece 1 to detect whether its pre-filled sites are qualified. If there are unqualified sites in the pre-filled test piece 1, the load test can be performed on the motor 12, hollow channel 14, upper airtight rubber band 15 and lower airtight rubber band 16 of the pre-filled test piece 1 to quickly identify the unqualified sites, improve maintenance efficiency, and further improve the yield and production efficiency of qualified pre-filled test pieces 1.

[0101] Example 3

[0102] This embodiment provides a load testing device, such as... Figure 7 As shown, based on Embodiment 2, the inspection chamber 4 further includes: a accommodating cavity 48, an airtight ring 42, a space partition 49, a cover plate 410, and a retractable push rod 43; the accommodating cavity 48 has an open end structure, and the airtight ring 42 is disposed at the open end of the accommodating cavity 48; the space partition 49, the cover plate 410, and the retractable push rod 43 are disposed within the accommodating cavity 48;

[0103] Furthermore, a second through hole 491 is provided on the space partition 49. The second through hole 491 is arranged opposite to the motor 12. When the airtight ring 42 is located at the position of the upper airtight rubber band of the pre-filled test piece 1, the cover plate 410 is located at the bottom end face of the motor 12, and the space partition 49 is located in the middle and lower part of the motor 12.

[0104] Furthermore, such as Figure 8 and Figure 9 As shown, the top cover plate includes a plate body 4101, a gas filling chamber 4102, and a tightening airbag 4103. The plate body 4101 has a first through hole 4104 at a position corresponding to the motor 12. The gas filling chamber 4102 is disposed at the first through hole 4104. The gas filling chamber 4102 is a cylindrical structure with one end open. The tightening airbag 4103 is disposed at the opening position of the gas filling chamber 4102.

[0105] The upper part of the motor 12 of the pre-filling test piece 1 is located inside the tightening airbag 4103; the inflation component inflates the tightening airbag 4103, and after the tightening airbag 4103 expands, it hugs the upper side wall of the motor 12. After the tightening airbag 4103 expands, it houses the bottom end face of the motor 12 into the gas filling chamber 4102. In this embodiment, the pre-filling test piece 1 is provided with 4 motors 12 and 4 gas filling chambers 4102 are provided on the top cover plate. The 4 gas filling chambers 4102 respectively test the pre-filling of the bottom end face of the 4 motors 12. If there is a leak in the gas filling chamber 4102, the pre-filling of the bottom end face of the motor 12 corresponding to that gas filling chamber 4102 is unqualified.

[0106] Furthermore, a second through hole 491 is provided on the space partition 49, which is opposite to the motor 12. The diameter of the second through hole 491 is larger than the diameter of the motor 12. A filling airbag 492 is provided on the inner wall of the second through hole 491. The inflation device inflates the filling airbag 492 so that the filling airbag 492 hugs the motor 12, forming a sealed space between the space partition 49 and the top cover plate. The wiring point in the middle of the motor 12 is located in this sealed space. The inflation device inflates the sealed space. If the pre-filling of the wiring point in the middle of the motor 12 is qualified, the air pressure value of the sealed space after inflation remains unchanged. If the pre-filling of the wiring point in the middle of the motor 12 is unqualified, the air pressure value of the sealed space after inflation decreases, and the wiring point in the middle of the motor 12 needs to be re-pre-filled.

[0107] Furthermore, the space divider 49 also includes a partition grid 493, which divides the second through hole 491 on the middle partition into multiple independent spaces. Each independent space corresponds to a wiring point of a motor 12. The inflation component inflates the independent space. If the pre-filling of the wiring point in the middle of the motor 12 is qualified, the air pressure of the inflated independent space remains unchanged. If the pre-filling of the wiring point in the middle of the motor 12 is unqualified, the air pressure of the corresponding independent space decreases, and the wiring point in the middle of the motor 12 needs to be re-pre-filled.

[0108] In this embodiment, a shock-absorbing buffer pad 434 is provided at the lower end of the outer sleeve 432.

[0109] In the embodiment, it is possible to further determine which pre-filling point on the motor 12 of the pre-filling test piece 1 is unqualified, directly and accurately identify the motor 12 with unqualified pre-filling, and determine which pre-filling of the motor 12 is unqualified, which greatly improves maintenance efficiency.

[0110] The above description is only a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any changes or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in the present invention should be included within the scope of protection of the present invention.

Claims

1. A method for testing the quality of potting and sealing processes, characterized in that, Includes the following steps: Step 1: Place the pre-filled test piece on the testing device, which forms a sealed testing chamber; the pre-filled test piece's pre-filling point is located within the testing chamber; Step 2: Inflate the detection chamber. If the pre-filling of the pre-filling point of the pre-filled detection element is qualified, the air pressure in the detection chamber remains unchanged. If the pre-filling of the pre-filling point of the pre-filled detection element is unqualified, the gas in the detection chamber enters the interior of the pre-filled detection element and is released to the outside of the detection device through the structure of the pre-filled detection element, thus reducing the air pressure in the detection chamber.

2. The method for detecting potting quality according to claim 1, characterized in that, It also includes step three, which involves dividing the detection chamber into multiple sub-detection spaces according to the pre-filling sites.

3. The method for detecting potting quality according to claim 2, characterized in that, It also includes step four, where the inflation component inflates the multiple sub-detection chambers and detects whether the pre-filling sites within the sub-detection chambers are qualified.

4. The potting quality testing method according to claim 3, characterized in that, The sub-testing space chamber includes a first sub-testing space chamber for testing the hollow channels of the pre-filled test piece.

5. The potting quality testing method according to claim 3, characterized in that, The sub-testing space chamber also includes a second sub-testing space chamber for testing the motor of the pre-filled test piece.

6. The potting quality testing method according to claim 3, characterized in that, In step four, if the pre-filling of the pre-filling site in the sub-detection space is qualified, the air pressure value in the sub-detection space remains unchanged.

7. The method for testing the filling quality according to claim 3, characterized in that, In step four, if the pre-filling of the pre-filled site in the sub-detection space is unqualified, the gas in the sub-detection space enters the pre-filled detection element and is released to the outside of the detection device through the pre-filled detection element, thus causing the gas pressure value in the sub-detection space to decrease.

8. The method for detecting potting quality according to claim 3, characterized in that, In steps two and four, the inflation component inflates the detection chamber and the sub-detection space until the pressure value in the detection space reaches a predetermined pressure value, at which point inflation stops.

9. The method for detecting potting quality according to claim 8, characterized in that, The predetermined pressure value is the maximum pressure that the pre-filled test piece can withstand.

10. The potting quality testing method according to claim 8, characterized in that, The method employs a potting quality testing device to test the potting quality.