A detection device and detection method for a 120 type air control valve

By designing automated detection devices and methods, the problems of missed detection, false detection, and corrosion in existing detection methods have been solved, achieving efficient and accurate leakage detection and quantification results for the Type 120 air control valve, and supporting the integration of automated production lines.

CN123155121APending Publication Date: 2026-11-24MEISHAN CRRC BRAKE SCI & TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611676105.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-28
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

The existing method for testing the air tightness of the Type 120 air control valve relies on manual experience, which is prone to missed or incorrect judgments, and cannot quantify the leakage amount. Furthermore, the testing process may cause valve body corrosion, and automation is not possible.

Method used

A detection device comprising an air source, an air storage cylinder, a simulated piping system assembly, and a micro-pressure leak detection assembly was designed. Through an automated detection method, a micro differential pressure gauge is used to detect leaks in the valve body, achieving automated detection of the mating surfaces and the exhaust port of the relief valve, thus avoiding manual operation and the use of chemical reagents.

Benefits of technology

It achieves efficient and accurate leakage detection, can quantify leakage amount, avoids valve body corrosion, supports integration into automated production lines, improves detection efficiency and accuracy, and reduces the possibility of human error.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123155121A_ABST
    Figure CN123155121A_ABST
Patent Text Reader

Abstract

This invention belongs to the field of brake valve testing technology, specifically relating to a testing device and method for a type 120 air control valve. The testing device includes an air source, an air reservoir, a simulated piping system assembly, and a micro-pressure leak detection assembly. The micro-pressure leak detection assembly includes a reference manifold, a reference air cylinder, a micro differential pressure gauge, a valve body manifold, and a leak detection manifold. During leak detection, the valve under test and the reference air cylinder are simultaneously inflated to a constant pressure, and then the inflation circuit is cut off. If there is leakage at the mating surface of the valve under test, its pressure decreases, creating a pressure difference with the leak-free reference air cylinder. The rate of change of this pressure difference over time is detected, and the leakage amount at the mating surface of the valve under test is calculated. When performing leak detection on a type 120 air control valve, manual application of leak detection agent is not required, preventing valve body corrosion. The device automatically completes leak tests at the valve's mating surface and at the exhaust port, resulting in high testing efficiency, high accuracy, and reduced likelihood of missed or false detections, providing quantifiable leak data.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of brake valve testing technology, specifically relating to a testing device and testing method for a type 120 air control valve. Background Technology

[0002] The air tightness test of the Type 120 air control valve (hereinafter referred to as the 120 valve), as the main air brake control valve for railway freight cars, is a crucial step in ensuring safe train operation. Traditionally, leakage detection of the 120 valve involves manually applying soapy water. The operator holds a brush soaked in soapy water and applies it to various joints and exhaust ports on the valve body, observing for bubbles to determine if leakage exists. This method has long been used in the maintenance of railway freight car braking systems, and relevant technical specifications such as the "Railway Freight Car Braking Device Maintenance Rules" have explicit requirements for it.

[0003] However, this method has several problems: First, the detection results are highly dependent on the operator's experience and sense of responsibility, and are greatly affected by human factors, making it easy to miss or misjudge; Second, soapy water may seep into the valve body, causing corrosion and affecting the valve's service life; Third, the detection results cannot be quantified, and can only be qualitatively determined whether there is a leak, without obtaining accurate leakage data; Fourth, since the external leakage detection process requires manual supervision, it hinders the complete automation of the detection process and results in a waste of manpower.

[0004] It should be noted that this part of the present invention only provides background technology related to the present invention, and does not necessarily constitute prior art or known technology. Summary of the Invention

[0005] The purpose of this invention is to overcome the shortcomings of existing 120 valve air tightness testing methods, which are prone to missed detections, false detections, easy corrosion of valve bodies, inability to quantify leakage, and inability to achieve automation. This invention provides a testing device and method for a 120 type air control valve that can automatically detect leakage and provide accurate and quantifiable leakage detection results.

[0006] To achieve the above objectives, in a first aspect, the present invention provides a detection device for a type 120 air control valve, comprising: an air source, an air storage cylinder, a simulated piping system assembly, and a micro-pressure leak detection assembly. The air storage cylinder is connected to the air source, the simulated piping system assembly is connected to the air storage cylinder, and the micro-pressure leak detection assembly is connected to the air storage cylinder. An air storage cylinder cut-off switch is provided on the connecting pipeline between the air storage cylinder and the simulated piping system assembly and the micro-pressure leak detection assembly, and a micro-pressure leak detection air filling switch is provided on the connecting pipeline between the air storage cylinder and the micro-pressure leak detection assembly. The simulated piping system assembly includes: A tube-shaped cylinder is connected to the air storage cylinder. A first tube-shaped cylinder fast charging switch and a first tube-shaped cylinder exhaust switch are installed on the connecting pipe between the tube-shaped cylinder and the air storage cylinder. The tube-shaped cylinder is connected to the tube-shaped cylinder pipeline. The tube-shaped cylinder pipeline is used to connect to the air control valve to be tested. A secondary air cylinder is connected to the tube cylinder. A fast-charging air switch for the secondary air cylinder is installed on the connecting pipeline between the secondary air cylinder and the tube cylinder. The secondary air cylinder is connected to the secondary air cylinder pipeline. The secondary air cylinder pipeline is used to connect to the air control valve to be tested. A brake cylinder, which is connected to the air reservoir and to a brake cylinder pipeline, the brake cylinder pipeline being used to connect to the air control valve to be tested; An accelerated relief air cylinder is connected to the air storage cylinder and the tube cylinder respectively. The accelerated relief air cylinder is connected to the accelerated relief air cylinder pipeline. The accelerated relief air cylinder pipeline is used to connect to the air control valve to be tested. The flow meter is connected to the auxiliary air cylinder pipeline, and a switch between the auxiliary air cylinder pipeline and the flow meter is provided on the connecting pipeline. The flow meter is connected to a pipeline for connecting to the exhaust port of the air control valve to be tested, and a switch between the exhaust port and the flow meter and an exhaust switch for controlling the exhaust port are provided on the pipeline. The flow meter is also connected to a pipeline for connecting to the exhaust port of the main valve of the air control valve to be tested, and a switch between the main valve exhaust port and the flow meter and a leak detection cylinder actuation switch for controlling the main valve exhaust port are provided on the pipeline. The micro-pressure leak detection component includes: A reference branch pipe is connected to the air storage cylinder, and a reference air cylinder charging switch is installed on the reference branch pipe. The reference branch pipe is also connected to end A of a micro-pressure leak detection three-way valve. A reference air cylinder, wherein the reference air cylinder is connected to the reference branch pipe; A micro differential pressure gauge is connected to the P end of both the reference air cylinder and the micro-pressure leak detection three-way valve. A valve body branch pipe is connected to the air storage cylinder; The leak detection branch pipes include a brake cylinder leak detection branch pipe, an auxiliary air cylinder leak detection branch pipe, a tube cylinder leak detection branch pipe, and an acceleration and relief air cylinder leak detection branch pipe. Each leak detection branch pipe is connected to a valve body branch pipe. The brake cylinder leak detection branch pipe is connected to the brake cylinder pipeline. The auxiliary air cylinder leak detection branch pipe is connected to the auxiliary air cylinder pipeline. The tube cylinder leak detection branch pipe is connected to the tube cylinder pipeline. The acceleration and relief air cylinder leak detection branch pipe is connected to the acceleration and relief air cylinder pipeline. Each leak detection branch pipe is connected to the B end of a micro-pressure leak detection three-way valve. A brake cylinder pipeline micro-pressure leak detection switch is installed on the brake cylinder leak detection branch pipe. A secondary air cylinder pipeline micro-pressure leak detection switch is installed on the auxiliary air cylinder leak detection branch pipe. A tube cylinder pipeline micro-pressure leak detection switch is installed on the tube cylinder leak detection branch pipe. An acceleration and relief air cylinder pipeline micro-pressure leak detection switch is installed on the acceleration and relief air cylinder leak detection branch pipe.

[0007] In some preferred embodiments, a switch is provided between the tube cylinders and the tube cylinder pipelines; a switch is provided between the auxiliary air cylinders and the auxiliary air cylinder pipelines; a switch is provided between the brake cylinders and the brake cylinder pipelines; a switch is provided between the acceleration and relief air cylinders and the acceleration and relief air cylinder pipelines; a fast-charging air switch is provided between the air storage cylinder and the acceleration and relief air cylinder; and a tube cylinder pipeline exhaust switch is provided on the tube cylinder pipelines.

[0008] In some preferred embodiments, the simulated piping assembly further includes a local reduction chamber, which is connected to the air storage cylinder and to a local reduction chamber pipeline, the local reduction chamber pipeline being used to connect to the air control valve to be tested; The connecting pipeline between the tube cylinder and the air storage cylinder is also equipped with a second tube cylinder fast charging switch, a second tube cylinder exhaust switch and a third tube cylinder exhaust switch, and the brake cylinder pipeline is equipped with a brake cylinder pipeline exhaust switch; An acceleration and relief air cylinder pipeline switch is installed on the acceleration and relief air cylinder pipeline. The acceleration and relief air cylinder pipeline switch is connected to the flow meter. An acceleration and relief air cylinder pipeline exhaust switch and a switch between the acceleration and relief air cylinder pipeline and the flow meter are sequentially installed on the pipeline between the acceleration and relief air cylinder pipeline switch and the flow meter. A differential pressure gauge is installed between the auxiliary air cylinder pipeline and the tube cylinder pipeline. A switch between the auxiliary air cylinder pipeline and the differential pressure gauge is installed between the auxiliary air cylinder pipeline and the differential pressure gauge. A switch between the tube cylinder pipeline and the differential pressure gauge is also installed between the tube cylinder pipeline and the differential pressure gauge.

[0009] Secondly, the present invention provides a testing method for a type 120 air control valve, employing the testing device for a type 120 air control valve described in the first aspect. After connecting the air control valve to be tested to the testing device, leakage detection is performed on the mating surface and the exhaust port of the relief valve. The leakage detection on the mating surface and the exhaust port of the relief valve includes: Turn on the following switches: air reservoir cut-off switch, brake cylinder pipe micro-pressure leak test switch, auxiliary air cylinder pipe micro-pressure leak test switch, tube cylinder pipe micro-pressure leak test switch, acceleration and relief air cylinder pipe micro-pressure leak test switch, reference air cylinder charging switch, micro-pressure leak test charging switch, exhaust switch controlling the local reduction exhaust port, leak test cylinder action switch controlling the main valve exhaust port, local reduction exhaust port and flow meter switch, main valve exhaust port and flow meter switch, auxiliary air cylinder pipe and flow meter switch. After charging the reference air cylinder and the 120 type air control valve chamber to 600~610kPa, turn on the micro-pressure leak test three-way valve. After the pressure stabilizes, turn off the micro-pressure leak test charging switch. After the pressure stabilizes, turn off the reference air cylinder charging switch, auxiliary air cylinder pipe and flow meter switch, local reduction exhaust port and flow meter switch, main valve exhaust port and flow meter switch. Check the value of the micro differential pressure gauge within a preset time. During the process of checking the value of the micro differential pressure gauge within a preset time, the following steps are performed: close the air storage cylinder cut-off switch, open the exhaust switch of the first tube cylinder, the fast charging switch of the auxiliary air cylinder, and the fast charging switch of the first tube cylinder. After the pressure of the tube cylinder, the auxiliary air cylinder, and the acceleration and relief air cylinder drops to 0, close the fast charging switch of the auxiliary air cylinder and the exhaust switch of the first tube cylinder, open the air storage cylinder cut-off switch, and then charge the tube cylinder to a constant pressure. Brake cylinder pipe micro-pressure leak detection switch, auxiliary air cylinder pipe micro-pressure leak detection switch, column cylinder pipe micro-pressure leak detection switch, acceleration and relief air cylinder pipe micro-pressure leak detection switch, micro-pressure leak detection three-way valve.

[0010] Preferably, before leak detection at the joint surface and at the exhaust port of the relief valve, leakage test preparation, braking and relief passage detection, and emergency second-stage valve function detection are performed. The leakage test preparation, braking and relief passage detection, and emergency second-stage valve function detection include: Turn on the following switches in sequence: air reservoir cut-off switch, tube cylinder to tube cylinder pipeline switch, auxiliary air cylinder to auxiliary air cylinder pipeline switch, brake cylinder to brake cylinder pipeline switch, acceleration and relief air cylinder to acceleration and relief air cylinder pipeline switch, acceleration and relief air cylinder fast charging air switch, first tube cylinder fast charging switch, and auxiliary air cylinder fast charging air switch. After the pressure of the auxiliary air cylinder and the acceleration and relief air cylinder are both charged to the constant pressure, turn off the acceleration and relief air cylinder fast charging air switch and the auxiliary air cylinder fast charging air switch. Turn off the fast charging switch of the first cylinder and turn on the exhaust switch of the first cylinder. When the brake cylinder pressure rises to 350 kPa, turn off the exhaust switch of the first cylinder and turn on the fast charging switch of the first cylinder. After the brake cylinder pressure drops below 150 kPa, turn on the fast charging switch of the acceleration and relief air cylinder and then turn on the fast charging switch of the auxiliary air cylinder. After the pressure of the auxiliary air cylinder and the acceleration and relief air cylinder are both charged to the constant pressure, turn off the fast charging switch of the acceleration and relief air cylinder, the switch between the acceleration and relief air cylinder and the pipeline of the acceleration and relief air cylinder, and the fast charging switch of the first cylinder. Turn off the auxiliary air cylinder fast charging air switch and the switch between the tube cylinder and the tube cylinder pipeline, turn on the tube cylinder pipeline exhaust switch, and after the pressure air in the tube cylinder pipeline is exhausted to zero, turn off the tube cylinder pipeline exhaust switch, and turn on the switch between the acceleration and relief air cylinder and the acceleration and relief air cylinder pipeline.

[0011] Preferably, leakage testing of the brake position spool valve and O-ring is performed between the leakage test preparation, braking and release passage detection, emergency second-stage valve function detection, and leakage detection of the mating surface and release valve exhaust port. The leakage testing of the brake position spool valve and O-ring includes: Turn on the switch between the main valve exhaust port and the flow meter, and the actuation switch of the leak detection cylinder controlling the main valve exhaust port. Based on the flow meter display value, determine that the main valve exhaust port is leaking. Turn off the switch between the main valve exhaust port and the flow meter, and the actuation switch of the leak detection cylinder controlling the main valve exhaust port. Turn on the switch between the partial reduction exhaust port and the flow meter, and the exhaust switch controlling the partial reduction exhaust port. Based on the flow meter display value, determine that the partial reduction exhaust port is leaking. Turn off the switch between the partial reduction exhaust port and the flow meter, and the exhaust switch controlling the partial reduction exhaust port. Turn off the switches between the auxiliary air cylinder and its pipeline, the switches between the brake cylinder and its pipeline, and the switches between the acceleration and relief air cylinder and its pipeline. Check the pressure drop values ​​of the auxiliary air cylinder pipeline, the acceleration and relief air cylinder pipeline, and the tube cylinder pipeline within 10 seconds. Then turn on the switches between the auxiliary air cylinder and its pipeline, the switches between the brake cylinder and its pipeline, and the switches between the acceleration and relief air cylinder and its pipeline.

[0012] Preferably, after leak detection at the joint surface and exhaust port of the relief valve, the auxiliary air cylinder inflation port and the accelerated relief air cylinder inflation pipeline are inspected. The inspection of the auxiliary air cylinder inflation port and the accelerated relief air cylinder inflation pipeline includes: Turn on the switches between the tube cylinders and their pipelines, and between the auxiliary air cylinders and their pipelines; turn on the fast-charging air switch for the auxiliary air cylinders; after the auxiliary air cylinder pressure reaches the set pressure, turn on the switch between the acceleration and relief air cylinders and their pipelines; turn off the fast-charging switch for the first tube cylinder, turn on the fast-charging air switch for the acceleration and relief air cylinder, and after the acceleration and relief air cylinder is charged to 550 kPa, turn on the fast-charging switch for the first tube cylinder; after the auxiliary air cylinder and the acceleration and relief air cylinder pressure reach the set pressure, turn off the fast-charging air switch for the acceleration and relief air cylinder and the fast-charging air switch for the auxiliary air cylinder.

[0013] Preferably, after the inspection of the auxiliary air cylinder inflation port and the acceleration / relief air cylinder inflation pipeline, leakage detection of the relief valve and O-ring is performed. The leakage detection of the relief valve and O-ring includes: Turn on the switch between the main valve exhaust port and the flow meter, and the actuation switch of the leak detection cylinder controlling the main valve exhaust port. Based on the flow meter display value, determine that the main valve exhaust port is leaking. Turn off the switch between the main valve exhaust port and the flow meter, and the actuation switch of the leak detection cylinder controlling the main valve exhaust port. Turn on the switch between the partial reduction exhaust port and the flow meter, and the exhaust switch controlling the partial reduction exhaust port. Based on the flow meter display value, determine that the partial reduction exhaust port is leaking. Turn off the switch between the partial reduction exhaust port and the flow meter, and the exhaust switch controlling the partial reduction exhaust port.

[0014] Preferably, after the leakage detection of the relief valve and O-ring, the partial reduction hole detection, braking sensitivity detection, and valve misinstallation prevention detection are performed. The partial reduction hole detection, braking sensitivity detection, and valve misinstallation prevention detection include: when the air reservoir cut-off switch, the switch between the tube cylinders, the switch between the auxiliary air cylinders, the switch between the brake cylinders, the switch between the acceleration relief air cylinders, and the fast charging switch of the first tube cylinder are turned on, the tube cylinders, auxiliary air cylinders, and acceleration relief air cylinders are charged to a constant pressure, the fast charging switch of the first tube cylinder is turned off, the exhaust switch of the second tube cylinder is turned on, and when the partial reduction effect occurs, the exhaust switch of the second tube cylinder is turned off. Turn on the exhaust switch of the second tube cylinder, and reduce the pressure of the tube cylinder by 50 kPa.

[0015] Preferably, after the local reduction hole detection, brake sensitivity detection, and slide valve misinstallation prevention detection, leakage detection of the brake pressure holding position slide valve and O-ring is performed. The leakage detection of the brake pressure holding position slide valve and O-ring includes: Turn on the switch between the main valve exhaust port and the flow meter, and turn on the leak detection cylinder switch that controls the main valve exhaust port. Based on the value displayed by the flow meter, determine that the main valve exhaust port is leaking, and turn off the switch between the main valve exhaust port and the flow meter, and turn off the leak detection cylinder switch that controls the main valve exhaust port. Turn on the switch between the local exhaust port and the flow meter, and the exhaust switch 8 that controls the local exhaust port. Based on the value displayed by the flow meter, determine that the local exhaust port is leaking, and turn off the switch between the local exhaust port and the flow meter, and the exhaust switch that controls the local exhaust port. Turn off the switch between the acceleration and relief air cylinder and the acceleration and relief air cylinder pipeline, turn on the switch of the acceleration and relief air cylinder pipeline, and after the pressure in the acceleration and relief air cylinder pipeline is reduced to zero, turn on the switch between the acceleration and relief air cylinder pipeline and the flow meter and the exhaust switch of the control valve exhaust port. According to the value displayed by the flow meter, it is determined that the exhaust port of the acceleration and relief air cylinder pipeline is leaking. Turn off the switch between the acceleration and relief air cylinder pipeline and the flow meter, the exhaust switch of the control valve exhaust port, and the acceleration and relief air cylinder pipeline switch, and turn on the switch between the acceleration and relief air cylinder and the acceleration and relief air cylinder pipeline. Turn on the brake cylinder pipeline exhaust switch, turn off the brake cylinder pipeline exhaust switch when the pressure of the cylinder reaches 100 kPa, and turn off the switch between the brake cylinder and the brake cylinder pipeline and the switch between the acceleration and release air cylinder and the acceleration and release air cylinder pipeline after the pressure stabilizes.

[0016] Preferably, after the leakage detection of the brake pressure holding valve and O-ring, the partial pressure reduction valve function detection is performed. The partial pressure reduction valve function detection includes: opening the auxiliary air cylinder fast charging switch and the brake cylinder pipeline exhaust switch; when the brake cylinder pressure drops to 20 kPa, closing the brake cylinder pipeline exhaust switch; stopping the pressure increase when the brake cylinder pipeline pressure is 50 kPa to 70 kPa and opening the brake cylinder pipeline exhaust switch; and when the tube cylinder pressure drops to 30 kPa, closing the brake cylinder pipeline exhaust switch.

[0017] Preferably, after the local pressure reducing valve action detection, a pressure holding and stabilizing orifice detection is performed, the pressure holding and stabilizing orifice detection including: Turn on the auxiliary air cylinder fast charging air switch and the third cylinder exhaust air switch. After the train pipe pressure is reduced to 450 kPa, turn off the third cylinder exhaust air switch. Turn on the switches between the auxiliary air cylinder pipeline and the differential pressure gauge, the train cylinder pipeline and the differential pressure gauge, and the auxiliary air cylinder pipeline and the flow meter. After the train pipe pressure and the flow meter readings stabilize, reset the differential pressure gauge to zero and turn off the switches between the auxiliary air cylinder and the auxiliary air cylinder pipeline, as well as the auxiliary air cylinder fast charging switch.

[0018] Preferably, after the pressure stabilizing orifice is tested, the resistance relief and acceleration relief valve function test is performed, which includes: Turn on the switch between the auxiliary air cylinder and the auxiliary air cylinder pipeline, the switch between the acceleration and relief air cylinder pipeline, and the switch between the auxiliary air cylinder fast charging air. Then turn on the switch between the auxiliary air cylinder pipeline and the differential pressure gauge and the switch between the tube cylinder pipeline and the differential pressure gauge. After the pressure stabilizes, reset the differential pressure gauge to zero. Turn off the acceleration and relief air cylinder pipeline switch and the auxiliary air cylinder fast charging switch, turn on the second row cylinder fast charging switch, and after the brake cylinder is released, turn off the second row cylinder fast charging switch, the auxiliary air cylinder pipeline and differential pressure gauge switch and the row cylinder pipeline and differential pressure gauge switch.

[0019] The detection device for the 120-type air control valve of the present invention includes a micro-pressure leak detection component, which is connected to an air reservoir. A micro-pressure leak detection charging switch is installed on the connecting pipeline between the air reservoir and the micro-pressure leak detection component. The micro-pressure leak detection component includes a reference branch pipe, a reference air cylinder, a micro-differential pressure gauge, a valve body branch pipe, and a leak detection branch pipe. The reference branch pipe is connected to the air reservoir, and a reference air cylinder charging switch is installed on the reference branch pipe. The reference branch pipe is connected to the A end of the micro-pressure leak detection three-way valve. The reference air cylinder is connected to the reference branch pipe. The micro-differential pressure gauge is connected to the P end of both the reference air cylinder and the micro-pressure leak detection three-way valve. The valve body branch pipe is connected to the air reservoir. The leak detection branch pipe includes a brake cylinder leak detection branch pipe, an auxiliary air cylinder leak detection branch pipe, a tube cylinder leak detection branch pipe, and an acceleration / relief air cylinder leak detection branch pipe. The leak detection branch pipes are connected to the valve body branch pipe and to the brake cylinder pipeline, auxiliary air cylinder pipeline, and... The tubular cylinder pipeline and the acceleration / relief air cylinder pipeline are connected. The leak test branch is connected to the B end of the micro-pressure leak test three-way valve. During leak detection, the tested 120-type air control valve and the reference air cylinder are simultaneously inflated to a constant pressure, and then the inflation circuit is cut off. If there is a leak at the joint surface of the tested 120-type air control valve, its pressure will decrease, forming a pressure difference with the non-leaking reference air cylinder. By detecting the rate of change of this pressure difference over time, the leakage amount at the joint surface of the tested air control valve can be calculated. When performing leak detection on the 120-type air control valve, this invention does not require manual application of soap or leak detection agent, and will not cause valve body corrosion. It automatically completes the leak test of the valve joint surface and the exhaust port of the relief valve, with high detection efficiency. It can be integrated with automated production line processes, has high detection accuracy, is not prone to missed or false detections, and can obtain quantitative leak data.

[0020] The detection method for the 120-type air control valve of the present invention can automatically detect leakage at the mating surface of the 120-type air control valve and the exhaust port of the relief valve in the braking position, relief position and normal braking pressure holding position. It has high detection efficiency, can be integrated with the process of automated production line, has high detection accuracy, is not prone to missed detection and false detection, and can obtain quantitative leakage data. Attached Figure Description

[0021] To more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings used in the embodiments will be briefly introduced below. It should be understood that the following drawings only show some embodiments of the present invention and should not be regarded as a limitation on the scope. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.

[0022] Figure 1 This is a schematic diagram of the air circuit of the air control valve detection device of the present invention (Type 120).

[0023] Explanation of reference numerals in the attached figures 1. Air reservoir cut-off switch; 2. Micro-pressure leak detection charging switch; 3. First row cylinder fast charging switch; 4. First row cylinder exhaust switch; 5. Auxiliary air cylinder fast charging switch; 6. Switch between auxiliary air cylinder pipeline and flow meter; 7. Switch between partial reduction exhaust port and flow meter; 8. Exhaust switch controlling partial reduction exhaust port; 9. Switch between main valve exhaust port and flow meter; 10. Leak detection cylinder actuation switch controlling main valve exhaust port; 11. Reference air cylinder charging switch; 12. Micro-pressure leak detection three-way valve; 13. Brake cylinder pipeline micro-pressure leak detection switch; 14. Auxiliary air cylinder pipeline micro-pressure leak detection switch; 5. Micro-pressure leak detection switch for the tube cylinder; 16. Micro-pressure leak detection switch for the acceleration and relief air cylinder; 17. Switch between tube cylinders and tube cylinder pipelines; 18. Switch between auxiliary air cylinders and auxiliary air cylinder pipelines; 19. Switch between brake cylinders and brake cylinder pipelines; 20. Switch between acceleration and relief air cylinders and acceleration and relief air cylinder pipelines; 21. Fast charging switch for acceleration and relief air cylinders; 22. Exhaust switch for tube cylinder pipelines; 23. Fast charging switch for the second tube cylinder; 24. Exhaust switch for the second tube cylinder; 25. Exhaust switch for the third tube cylinder; 26. Exhaust switch for brake cylinder pipelines; 27. Acceleration and relief air cylinder 28. Pipeline switch; 29. ​​Acceleration and relief air cylinder pipeline exhaust switch; 30. Acceleration and relief air cylinder pipeline and flow meter switch; 31. Auxiliary air cylinder pipeline and differential pressure gauge switch; 32. Tube cylinder pipeline and differential pressure gauge switch; 33. Main air cut-off switch; 34. Brake cylinder fast charging air switch; 35. Local reduction chamber fast charging air switch; 36. Local reduction chamber cut-off switch; 37. Tube cylinder and acceleration and relief air cylinder switch; 38. Auxiliary air cylinder pipeline exhaust switch; 39. Push relief valve handle action and automatic reset switch; 40. Fourth tube cylinder exhaust switch; 41. Fifth tube cylinder Exhaust switch; 41, sixth row cylinder exhaust switch; 42, seventh row cylinder exhaust switch; S1, main air supply cut-off valve; CFG, air reservoir sensor; JG, acceleration and relief cylinder sensor; JGG, acceleration and relief cylinder pipeline sensor; LG, cylinder sensor; LGG, cylinder pipeline sensor; FG, auxiliary cylinder sensor; FGG, auxiliary cylinder pipeline sensor; ZG, brake cylinder sensor; ZGG, brake cylinder pipeline sensor; JZ, reference cylinder sensor; JU, local reduction chamber sensor; K1, type 120 air control valve clamping switch. Detailed Implementation

[0024] The endpoints and any values ​​of the ranges disclosed herein are not limited to the precise ranges or values, and these ranges or values ​​should be understood to include values ​​close to these ranges or values. For numerical ranges, the endpoint values ​​of the various ranges, the endpoint values ​​of the various ranges and individual point values, and individual point values ​​can be combined with each other to obtain one or more new numerical ranges, which should be considered as specifically disclosed herein.

[0025] In this invention, unless otherwise explicitly specified and limited, the terms "connection," "fixed," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. Those skilled in the art can understand the specific meaning of the above terms in this invention according to the specific circumstances.

[0026] The inventors of this invention have discovered that existing methods for testing the air tightness of 120 valves are prone to missed detections, misjudgments, and valve body corrosion, and cannot quantify leakage or achieve automation.

[0027] In this regard, firstly, the present invention provides a detection device for a type 120 air control valve, with reference to... Figure 1 The system includes: an air source, an air storage cylinder, a simulated piping system assembly, and a micro-pressure leak detection assembly. The air storage cylinder is connected to the air source, the simulated piping system assembly is connected to the air storage cylinder, and the micro-pressure leak detection assembly is connected to the air storage cylinder. An air storage cylinder cut-off switch 1 is installed on the connecting pipeline between the air storage cylinder and the simulated piping system assembly and the micro-pressure leak detection assembly, and a micro-pressure leak detection air filling switch 2 is installed on the connecting pipeline between the air storage cylinder and the micro-pressure leak detection assembly. The simulated piping system assembly includes: A tube-shaped cylinder is connected to the air storage cylinder. A first tube-shaped cylinder fast charging switch 3 and a first tube-shaped cylinder exhaust switch 4 are installed on the connecting pipe between the tube-shaped cylinder and the air storage cylinder. The tube-shaped cylinder is connected to the tube-shaped cylinder pipeline. The tube-shaped cylinder pipeline is used to connect to the air control valve to be tested. A secondary air cylinder is connected to the tube cylinder. A fast-charging air switch 5 for the secondary air cylinder is installed on the connecting pipe between the secondary air cylinder and the tube cylinder. The secondary air cylinder is connected to the secondary air cylinder pipeline. The secondary air cylinder pipeline is used to connect to the air control valve to be tested. A brake cylinder, which is connected to the air reservoir and to a brake cylinder pipeline, the brake cylinder pipeline being used to connect to the air control valve to be tested; An accelerated relief air cylinder is connected to the air storage cylinder and the tube cylinder respectively. The accelerated relief air cylinder is connected to the accelerated relief air cylinder pipeline. The accelerated relief air cylinder pipeline is used to connect to the air control valve to be tested. The flow meter is connected to the auxiliary air cylinder pipeline and a switch 6 between the auxiliary air cylinder pipeline and the flow meter is provided on the connecting pipeline. The flow meter is connected to a pipeline for connecting to the exhaust port of the air control valve to be tested and a switch 7 between the exhaust port and the flow meter and an exhaust switch 8 for controlling the exhaust port are provided on the pipeline. The flow meter is connected to a pipeline for connecting to the exhaust port of the main valve of the air control valve to be tested and a switch 9 between the exhaust port of the main valve and the flow meter and a leak detection cylinder action switch 10 for controlling the exhaust port of the main valve are provided on the pipeline. The micro-pressure leak detection component includes: A reference branch pipe is connected to the air storage cylinder, and a reference air cylinder charging switch 11 is installed on the reference branch pipe. The reference branch pipe is also connected to end A of a micro-pressure leak detection three-way valve 12. A reference air cylinder, wherein the reference air cylinder is connected to the reference branch pipe; The micro differential pressure gauge is connected to the P end of the reference air cylinder and the micro pressure leak detection three-way valve 12 respectively; A valve body branch pipe is connected to the air storage cylinder; The leak detection branch pipes include a brake cylinder leak detection branch pipe, an auxiliary air cylinder leak detection branch pipe, a tube cylinder leak detection branch pipe, and an acceleration and relief air cylinder leak detection branch pipe. Each leak detection branch pipe is connected to a valve body branch pipe. The brake cylinder leak detection branch pipe is connected to the brake cylinder pipeline. The auxiliary air cylinder leak detection branch pipe is connected to the auxiliary air cylinder pipeline. The tube cylinder leak detection branch pipe is connected to the tube cylinder pipeline. The acceleration and relief air cylinder leak detection branch pipe is connected to the acceleration and relief air cylinder pipeline. Each leak detection branch pipe is connected to the B end of the micro-pressure leak detection three-way valve 12. A brake cylinder tube micro-pressure leak detection switch 13 is installed on the brake cylinder leak detection branch pipe. A secondary air cylinder tube micro-pressure leak detection switch 14 is installed on the auxiliary air cylinder leak detection branch pipe. A tube cylinder tube micro-pressure leak detection switch 15 is installed on the tube cylinder leak detection branch pipe. An acceleration and relief air cylinder tube micro-pressure leak detection switch 16 is installed on the acceleration and relief air cylinder leak detection branch pipe.

[0028] The detection device for the 120-type air control valve of the present invention includes a micro-pressure leak detection component, which is connected to an air reservoir. A micro-pressure leak detection charging switch is installed on the connecting pipeline between the air reservoir and the micro-pressure leak detection component. The micro-pressure leak detection component includes a reference branch pipe, a reference air cylinder, a micro-differential pressure gauge, a valve body branch pipe, and a leak detection branch pipe. The reference branch pipe is connected to the air reservoir, and a reference air cylinder charging switch is installed on the reference branch pipe. The reference branch pipe is connected to the A end of the micro-pressure leak detection three-way valve. The reference air cylinder is connected to the reference branch pipe. The micro-differential pressure gauge is connected to the P end of both the reference air cylinder and the micro-pressure leak detection three-way valve. The valve body branch pipe is connected to the air reservoir. The leak detection branch pipe includes a brake cylinder leak detection branch pipe, an auxiliary air cylinder leak detection branch pipe, a tube cylinder leak detection branch pipe, and an acceleration / relief air cylinder leak detection branch pipe. The leak detection branch pipes are connected to the valve body branch pipe and to the brake cylinder pipeline, auxiliary air cylinder pipeline, and... The tubular cylinder pipeline and the acceleration / relief air cylinder pipeline are connected. The leak test branch is connected to the B end of the micro-pressure leak test three-way valve. During leak detection, the tested 120-type air control valve and the reference air cylinder are simultaneously inflated to a constant pressure, and then the inflation circuit is cut off. If there is a leak at the joint surface of the tested 120-type air control valve, its pressure will decrease, forming a pressure difference with the non-leaking reference air cylinder. By detecting the rate of change of this pressure difference over time, the leakage amount at the joint surface of the tested air control valve can be calculated. When performing leak detection on the 120-type air control valve, this invention does not require manual application of soap or leak detection agent, and will not cause valve body corrosion. It automatically completes the leak test of the valve joint surface and the exhaust port of the relief valve, with high detection efficiency. It can be integrated with automated production line processes, has high detection accuracy, is not prone to missed or false detections, and can obtain quantitative leak data.

[0029] In some preferred embodiments, a switch 17 between the tube cylinders and the tube cylinder pipeline is provided on the pipeline between the tube cylinders; a switch 18 between the auxiliary air cylinders and the auxiliary air cylinder pipeline is provided on the pipeline between the auxiliary air cylinders; a switch 19 between the brake cylinders and the brake cylinder pipeline is provided on the pipeline between the brake cylinders; a switch 20 between the acceleration and relief air cylinders and the acceleration and relief air cylinder pipeline is provided on the pipeline between the acceleration and relief air cylinders; a fast-charging air switch 21 for the acceleration and relief air cylinder is provided on the pipeline between the air storage cylinder and the acceleration and relief air cylinder; and a tube cylinder pipeline exhaust switch 22 is provided on the tube cylinder pipeline.

[0030] In some preferred embodiments, the simulated piping assembly further includes a local reduction chamber, which is connected to the air storage cylinder and to a local reduction chamber pipeline, the local reduction chamber pipeline being used to connect to the air control valve to be tested; The connecting pipeline between the tube cylinder and the air storage cylinder is also equipped with a second tube cylinder fast charging switch 23, a second tube cylinder exhaust switch 24 and a third tube cylinder exhaust switch 25, and the brake cylinder pipeline is equipped with a brake cylinder pipeline exhaust switch 26. An acceleration and relief air cylinder pipeline switch 27 is provided on the acceleration and relief air cylinder pipeline. The acceleration and relief air cylinder pipeline switch 27 is connected to the flow meter. An acceleration and relief air cylinder pipeline exhaust switch 28 and an acceleration and relief air cylinder pipeline and flow meter switch 29 are sequentially provided on the pipeline between the acceleration and relief air cylinder pipeline switch 27 and the flow meter. A differential pressure gauge is installed between the auxiliary air cylinder pipeline and the tube cylinder pipeline. A switch 30 between the auxiliary air cylinder pipeline and the differential pressure gauge is installed between the auxiliary air cylinder pipeline and the differential pressure gauge. A switch 31 between the tube cylinder pipeline and the differential pressure gauge is installed between the tube cylinder pipeline and the differential pressure gauge.

[0031] Preferably, a main air cut-off switch 32 and a main air source cut-off plug S1 are sequentially installed on the connecting pipeline between the air storage cylinder and the air source, and a proportional valve or other pressure regulating valve is installed on the connecting pipeline between the air storage cylinder and the simulated piping system assembly and the micro-pressure leak detection assembly.

[0032] Preferably, an air reservoir sensor CFG is installed between the air reservoir and the main air cut-off switch 32; an acceleration / relief air reservoir sensor JG is installed on the pipeline between the acceleration / relief air reservoir fast-charge switch 21 and the acceleration / relief air reservoir; an acceleration / relief air reservoir pipeline sensor JGG is installed on the acceleration / relief air reservoir pipeline; a tube cylinder sensor LG is installed on the tube cylinder; a tube cylinder pipeline sensor LGG is installed on the tube cylinder pipeline; an auxiliary air reservoir sensor FG is installed on the pipeline between the auxiliary air reservoir fast-charge switch 5 and the auxiliary air reservoir; an auxiliary air reservoir pipeline sensor FGG is installed on the auxiliary air reservoir pipeline; and a brake cylinder fast-charge switch 33 is installed on the connecting pipeline between the brake cylinder and the air reservoir. A brake cylinder sensor ZG is installed on the pipeline between the brake cylinder fast-charge air switch 33 and the brake cylinder, and a brake cylinder pipeline sensor ZGG is installed on the brake cylinder pipeline. A reference air cylinder sensor JZ is installed between the reference air cylinder charging switch 11 and the reference air cylinder. A local reduction chamber fast-charge air switch 34 is installed on the connecting pipeline between the local reduction chamber and the air storage cylinder. A local reduction chamber cut-off switch 35 is installed on the local reduction chamber pipeline. A local reduction chamber sensor JU is installed between the local reduction chamber and the local reduction chamber cut-off switch 35. A switch 36 is installed between the air cylinder and the acceleration and relief air cylinder on the connecting pipeline between the acceleration and relief air cylinder and the tube cylinder. An auxiliary air cylinder pipeline exhaust switch 37 is installed on the auxiliary air cylinder pipeline.

[0033] Preferably, the differential pressure gauge is a 0.01% high-precision differential pressure gauge to improve the accuracy of the detection data. The detection device also includes a push-release valve handle action and automatic reset switch 38, a 120-type air control valve clamping switch K1, a fourth-row cylinder exhaust switch 39, a fifth-row cylinder exhaust switch 40, a sixth-row cylinder exhaust switch 41, and a seventh-row cylinder exhaust switch 42.

[0034] Secondly, the present invention provides a testing method for a type 120 air control valve, employing the testing device for a type 120 air control valve described in the first aspect. After connecting the air control valve to be tested to the testing device, leakage detection is performed on the mating surface and the exhaust port of the relief valve. The leakage detection on the mating surface and the exhaust port of the relief valve includes: Turn on the following switches: air reservoir cut-off switch 1, brake cylinder pipe micro-pressure leak test switch 13, auxiliary air cylinder pipe micro-pressure leak test switch 14, tube cylinder pipe micro-pressure leak test switch 15, acceleration and relief air cylinder pipe micro-pressure leak test switch 16, reference air cylinder charging switch 11, micro-pressure leak test charging switch 2, exhaust switch 8 controlling the exhaust port of the local reduction exhaust, leak test cylinder action switch 10 controlling the exhaust port of the main valve, switch 7 between the exhaust port of the local reduction exhaust and the flow meter, switch 9 between the exhaust port of the main valve and the flow meter, and switch 6 between the auxiliary air cylinder pipe and the flow meter. After charging the reference air cylinder and the valve chamber of the 120 type air control valve to 600~610kPa, turn on the micro-pressure leak test three-way valve 12. After the pressure stabilizes, turn off the micro-pressure leak test charging switch 2. After the pressure stabilizes, turn off the reference air cylinder charging switch 11, the auxiliary air cylinder pipe and the flow meter switch 6, the local reduction exhaust port and the flow meter switch 7, and the main valve exhaust port and the flow meter switch 9. Check the value of the micro differential pressure gauge within a preset time. During the process of checking the value of the micro differential pressure gauge within a preset time, the following steps are performed: close the air storage cylinder cut-off switch 1, open the first tube cylinder exhaust switch 4, the auxiliary air cylinder fast charging switch 5, and the first tube cylinder fast charging switch 3. After the pressure of the tube cylinder, auxiliary air cylinder, and acceleration and relief air cylinder drops to 0, close the auxiliary air cylinder fast charging switch 5 and the first tube cylinder exhaust switch 4, open the air storage cylinder cut-off switch 1, and then charge the tube cylinder to a constant pressure. 13. Brake cylinder pipe micro-pressure leak test switch; 14. Auxiliary air cylinder pipe micro-pressure leak test switch; 15. Pipe cylinder pipe micro-pressure leak test switch; 16. Acceleration and relief air cylinder pipe micro-pressure leak test switch; 12. Micro-pressure leak test three-way valve.

[0035] The detection method for the 120-type air control valve of the present invention can automatically detect leakage at the mating surface of the 120-type air control valve and the exhaust port of the relief valve in the braking position, relief position and normal braking pressure holding position. It has high detection efficiency, can be integrated with the process of automated production line, has high detection accuracy, is not prone to missed detection and false detection, and can obtain quantitative leakage data.

[0036] The detection method for the Type 120 air control valve of the present invention involves closing the following: after closing the reference air cylinder charging switch 11, the auxiliary air cylinder pipeline and flow meter switch 6, the partial reduction exhaust port and flow meter switch 7, and the main valve exhaust port and flow meter switch 9, the micro-pressure difference count value does not exceed 1000 Pa within a preset time, and the leakage detection of each mating surface of the air control valve and the exhaust port of the relief valve is qualified. The present invention does not limit the preset time, but it is preferably 1 minute or more, for example, 1 minute, 2 minutes, or 3 minutes.

[0037] Preferably, before leak detection at the joint surface and at the exhaust port of the relief valve, leakage test preparation, braking and relief passage detection, and emergency second-stage valve function detection are performed. The leakage test preparation, braking and relief passage detection, and emergency second-stage valve function detection include: Turn on the following switches in sequence: air reservoir cut-off switch 1, tube cylinder to tube cylinder pipeline switch 17, auxiliary air cylinder to auxiliary air cylinder pipeline switch 18, brake cylinder to brake cylinder pipeline switch 19, acceleration and relief air cylinder to acceleration and relief air cylinder pipeline switch 20, acceleration and relief air cylinder fast charging air switch 21, first tube cylinder fast charging switch 3, and auxiliary air cylinder fast charging air switch 5. After the pressure of the auxiliary air cylinder and the acceleration and relief air cylinder is charged to the constant pressure, turn off the acceleration and relief air cylinder fast charging air switch 21 and the auxiliary air cylinder fast charging air switch 5. Turn off the fast charging switch 3 of the first cylinder and turn on the exhaust switch 4 of the first cylinder. When the brake cylinder pressure rises to 350 kPa, turn off the exhaust switch 4 of the first cylinder and turn on the fast charging switch 3 of the first cylinder. After the brake cylinder pressure drops below 150 kPa, turn on the fast charging switch 21 for the acceleration and relief cylinder and then turn on the fast charging switch 5 for the auxiliary cylinder. After the pressure of the auxiliary cylinder and the acceleration and relief cylinder are both charged to the constant pressure, turn off the fast charging switch 21 for the acceleration and relief cylinder, the switch 20 between the acceleration and relief cylinder and the pipeline of the acceleration and relief cylinder, and the fast charging switch 3 for the first cylinder. Turn off the auxiliary air cylinder fast charging air switch 5 and the switch 17 between the tube cylinder and the tube cylinder pipeline, turn on the tube cylinder pipeline exhaust switch 22, and after the pressure air in the tube cylinder pipeline is exhausted to zero, turn off the tube cylinder pipeline exhaust switch 22, and turn on the switch 20 between the acceleration and relief air cylinder and the acceleration and relief air cylinder pipeline.

[0038] In this preferred embodiment, the first-row cylinder fast-charging switch 3 is turned off, and the first-row cylinder exhaust switch 4 is turned on. When the brake cylinder pressure rises to 350 kPa, turning off the first-row cylinder exhaust switch 4 results in the brake cylinder pressure rising from zero to 350 kPa taking no more than 4 seconds. Turning on the first-row cylinder fast-charging switch 3 results in the brake cylinder pressure dropping from 300 kPa to 150 kPa taking 4 seconds with a 254 mm diameter brake cylinder. ~7s, with a 356mm diameter brake cylinder it is 3~5.5s, the braking and release passage tests are qualified. After shutting off the acceleration and release air cylinder fast charging switch 21, the acceleration and release air cylinder and acceleration and release air cylinder pipeline switch 20, and the first tube cylinder fast charging switch 3, the tube cylinder pressure rises rapidly from zero to 110~170kPa, and then slowly rises to the equilibrium pressure. The time to rise from zero to 350kPa is tested. With a 254mm diameter brake cylinder it is 6.5~9s, with a 356mm diameter brake cylinder it is 4.5~6.5s. The emergency second stage valve function test is qualified.

[0039] Preferably, leakage testing of the brake position spool valve and O-ring is performed between the leakage test preparation, braking and release passage detection, emergency second-stage valve function detection, and leakage detection of the mating surface and release valve exhaust port. The leakage testing of the brake position spool valve and O-ring includes: Turn on the switch 9 between the main valve exhaust port and the flow meter, and the actuation switch 10 of the leak detection cylinder controlling the main valve exhaust port. Based on the flow meter display value, determine that the main valve exhaust port is leaking. Turn off the switch 9 between the main valve exhaust port and the flow meter, and the actuation switch 10 of the leak detection cylinder controlling the main valve exhaust port. Turn on the switch 7 between the partial reduction exhaust port and the flow meter, and the exhaust switch 8 of the partial reduction exhaust port. Based on the flow meter display value, determine that the partial reduction exhaust port is leaking. Turn off the switch 7 between the partial reduction exhaust port and the flow meter, and the exhaust switch 8 of the partial reduction exhaust port, and perform a leak detection of the brake position slide valve. Turn off the switch 18 between the auxiliary air cylinder and the auxiliary air cylinder pipeline, the switch 19 between the brake cylinder and the brake cylinder pipeline, and the switch 20 between the acceleration and relief air cylinder and the acceleration and relief air cylinder pipeline. Check the pressure drop value within 10 seconds for the auxiliary air cylinder pipeline, the acceleration and relief air cylinder pipeline, and the tube cylinder pipeline, respectively. Turn on the switch 18 between the auxiliary air cylinder and the auxiliary air cylinder pipeline, the switch 19 between the brake cylinder and the brake cylinder pipeline, and the switch 20 between the acceleration and relief air cylinder and the acceleration and relief air cylinder pipeline. Perform leakage detection on the brake position main piston diaphragm and O-ring, the local reduction valve rod O-ring, the acceleration and relief sandwich valve and O-ring, the emergency second stage valve rod O-ring, the relief piston rod O-ring, and the exhaust valve.

[0040] Under this preferred scheme, when the switch 9 between the main valve exhaust port and the flow meter is turned on, and the leak detection cylinder action switch 10 of the main valve exhaust port is controlled, the flow meter reading is no greater than 80 ml / min, and the leakage test of the main valve exhaust port is qualified. When the switch 7 between the partial reduction exhaust port and the flow meter is turned on, and the exhaust switch 8 of the partial reduction exhaust port is controlled, the flow meter reading is no greater than 80 ml / min, and the leakage test of the partial reduction exhaust port is qualified. The pressure drop value within 10 seconds of the auxiliary air cylinder pipeline, the acceleration and relief air cylinder pipeline, and the tube cylinder pipeline does not exceed 5 kPa. The leakage tests of the main piston diaphragm and O-ring, the partial reduction valve rod O-ring, the acceleration and relief sandwich valve and O-ring, the emergency second stage valve rod O-ring, the relief piston rod O-ring, and the exhaust valve are qualified.

[0041] Preferably, after leak detection at the joint surface and exhaust port of the relief valve, the auxiliary air cylinder inflation port and the accelerated relief air cylinder inflation pipeline are inspected. The inspection of the auxiliary air cylinder inflation port and the accelerated relief air cylinder inflation pipeline includes: Turn on the switch 17 between the tube cylinder and the tube cylinder pipeline, and the switch 18 between the auxiliary air cylinder and the auxiliary air cylinder pipeline; turn on the auxiliary air cylinder fast charging switch 5, and after the auxiliary air cylinder pressure reaches the constant pressure, turn on the switch 20 between the acceleration and relief air cylinder pipeline; turn off the first tube cylinder fast charging switch 3, turn on the acceleration and relief air cylinder fast charging switch 21, and after the acceleration and relief air cylinder is charged to 550 kPa, turn on the first tube cylinder fast charging switch 3, and after the auxiliary air cylinder and the acceleration and relief air cylinder pressure reach the constant pressure, turn off the acceleration and relief air cylinder fast charging switch 21 and the auxiliary air cylinder fast charging switch 5.

[0042] Under this preferred scheme, after opening the switch 17 between the tube cylinder and the tube cylinder pipeline and the switch 18 between the auxiliary air cylinder and the auxiliary air cylinder pipeline, the time for the auxiliary air cylinder pressure to rise from 50 kPa to 150 kPa is 15.5~19s with a 254mm diameter brake cylinder and 12.5~16s with a 356mm diameter brake cylinder. The auxiliary air cylinder inflation port is qualified. After opening the switch 20 between the acceleration and relief air cylinder pipeline and the acceleration and relief air cylinder pipeline, when the time for the acceleration and relief air cylinder pressure to rise from 100 kPa to 200 kPa is 12~18s, the acceleration and relief air cylinder inflation pipeline is qualified.

[0043] Preferably, after the inspection of the auxiliary air cylinder inflation port and the acceleration / relief air cylinder inflation pipeline, leakage detection of the relief valve and O-ring is performed. The leakage detection of the relief valve and O-ring includes: Turn on the switch 9 between the main valve exhaust port and the flow meter, and the actuation switch 10 of the leak detection cylinder controlling the main valve exhaust port. Based on the flow meter display value, determine that the main valve exhaust port is leaking. Turn off the switch 9 between the main valve exhaust port and the flow meter, and the actuation switch 10 of the leak detection cylinder controlling the main valve exhaust port to perform leak detection of the slide valve, the acceleration and deceleration valve sleeve O-ring, and the push rod O-ring. Turn on the switch 7 between the partial reduction exhaust port and the flow meter, and the exhaust switch 8 of the partial reduction exhaust port. Based on the flow meter display value, determine that the partial reduction exhaust port is leaking. Turn off the switch 7 between the partial reduction exhaust port and the flow meter, and the exhaust switch 8 of the partial reduction exhaust port to perform leak detection of the slide valve and the control valve.

[0044] In this preferred scheme, the switch 9 between the main valve exhaust port and the flow meter is turned on, and the leak detection cylinder switch 10 of the main valve exhaust port is controlled. The flow meter reading is no greater than 80 ml / min, and the leakage detection of the main valve exhaust port is qualified. The switch 7 between the local reduction exhaust port and the flow meter is turned on, and the exhaust switch 8 of the local reduction exhaust port is controlled. The flow meter reading is no greater than 80 ml / min, and the leakage detection of the local reduction exhaust port is qualified.

[0045] Preferably, after the leakage detection of the relief valve and O-ring, the partial reduction hole detection, braking sensitivity detection, and valve misinstallation prevention detection are performed. The partial reduction hole detection, braking sensitivity detection, and valve misinstallation prevention detection include: when the air reservoir cut-off switch 1, the switch 17 between the tube cylinders, the switch 18 between the auxiliary air cylinders, the switch 19 between the brake cylinders, the switch 20 between the acceleration relief air cylinders and the acceleration relief air cylinders, and the first tube cylinder fast charging switch 3 are open, the tube cylinders, auxiliary air cylinders, and acceleration relief air cylinders are charged to a constant pressure, the first tube cylinder fast charging switch 3 is turned off, the second tube cylinder exhaust switch 24 is turned on, and when the partial reduction effect occurs, the second tube cylinder exhaust switch 24 is turned off. Turn on the exhaust switch 24 of the second tube cylinder, and reduce the pressure of the tube cylinder by 50 kPa.

[0046] Under this preferred scheme, after the second cylinder exhaust switch 24 is turned off, the time for the pressure in the local reduction chamber to drop from the initial pressure increase to 40 kPa is 3-9 seconds. After the local reduction exhaust is completed, the pressure reduction of the train pipe is no more than 40 kPa, the local reduction hole test is qualified, the 120 main valve has a local pressure reduction effect before the train pipe pressure is reduced to 20 kPa, and a braking effect before the pressure is reduced to 40 kPa, the braking sensitivity test is qualified. This preferred scheme utilizes the three local reduction functions of the 120-1 slide valve to extend the exhaust time of the brake pipe. For the 120 slide valve, when the second cylinder exhaust switch 24 is turned on, the train pipe pressure is reduced to 50 kPa, and no local reduction effect occurs during the pressure reduction process. For the 120-1 slide valve, when the second cylinder exhaust switch 24 is turned on, the train pipe pressure is reduced to 50 kPa, and a local reduction effect occurs during the pressure reduction process. This can prevent the 120 slide valve and the 120-1 slide valve from being misinstalled.

[0047] Preferably, after the local reduction hole detection, brake sensitivity detection, and slide valve misinstallation prevention detection, leakage detection of the brake pressure holding position slide valve and O-ring is performed. The leakage detection of the brake pressure holding position slide valve and O-ring includes: Turn on the switch 9 between the main valve exhaust port and the flow meter, and the leak detection cylinder actuation switch 10 controlling the main valve exhaust port. Based on the flow meter display value, determine that the main valve exhaust port is leaking, and turn off the switch 9 between the main valve exhaust port and the flow meter, and the leak detection cylinder actuation switch 10 controlling the main valve exhaust port. Turn on the switch 7 between the partial reduction exhaust port and the flow meter, and the exhaust switch 8 controlling the partial reduction exhaust port. Based on the flow meter display value, determine that the partial reduction exhaust port is leaking, and turn off the switch 7 between the partial reduction exhaust port and the flow meter, and the exhaust switch 8 controlling the partial reduction exhaust port. Turn off the switch 20 between the acceleration and relief air cylinder and the acceleration and relief air cylinder pipeline, turn on the switch 27 of the acceleration and relief air cylinder pipeline, and after the pressure in the acceleration and relief air cylinder pipeline is reduced to zero, turn on the switch 29 between the acceleration and relief air cylinder pipeline and the flow meter and the exhaust switch 8 controlling the exhaust port of the local reduction valve. According to the value displayed by the flow meter, it is determined that the exhaust port of the acceleration and relief air cylinder pipeline is leaking. Turn off the switch 29 between the acceleration and relief air cylinder pipeline and the flow meter, the exhaust switch 8 controlling the exhaust port of the local reduction valve, and the switch 27 of the acceleration and relief air cylinder pipeline, and turn on the switch 20 between the acceleration and relief air cylinder and the acceleration and relief air cylinder pipeline. Perform leakage detection on the commonly used brake pressure holding position control valve and slide valve, local reduction valve stem O-ring, Φ38 sandwich valve, and emergency second stage valve stem O-ring. Turn on the brake cylinder pipeline exhaust switch 26. When the pressure of the cylinder tube is reduced to 100 kPa, turn off the brake cylinder pipeline exhaust switch 26. After the pressure stabilizes, turn off the switch 19 between the brake cylinder and the brake cylinder pipeline and the switch 20 between the acceleration release air cylinder and the acceleration release air cylinder pipeline. Perform a leak test on the commonly used brake pressure holding position slide valve.

[0048] In this preferred scheme, switch 9 between the main valve exhaust port and the flow meter is activated, and switch 10 of the leak detection cylinder at the main valve exhaust port is controlled. The flow meter reading is no greater than 80 ml / min, and the leakage test of the main valve exhaust port at the normal braking pressure holding position is qualified. Switch 7 between the partial reduction exhaust port and the flow meter is activated, and exhaust switch 8 of the partial reduction exhaust port is controlled. The flow meter reading is no greater than 80 ml / min, and the leakage test of the partial reduction exhaust port at the normal braking pressure holding position is qualified. Switch 29 between the acceleration and relief cylinder pipeline and the flow meter is activated, and exhaust switch 8 of the partial reduction exhaust port is controlled. The meter reading is no greater than 120 ml / min, and the leakage test of the exhaust port of the acceleration and relief air cylinder pipeline in the commonly used brake pressure holding position is qualified; when the pressure of the tube cylinder drops to 100 kPa, the exhaust switch 26 of the brake cylinder pipeline is turned off, and after the pressure stabilizes, the switch 19 between the brake cylinder and the brake cylinder pipeline and the switch 20 between the acceleration and relief air cylinder and the acceleration and relief air cylinder pipeline are turned off. The pressure change of the brake cylinder pipeline within 10 seconds does not exceed 7 kPa, and the pressure drop of the acceleration and relief air cylinder pipeline within 10 seconds does not exceed 5 kPa. The leakage test of the slide valve in the commonly used brake pressure holding position is qualified.

[0049] Preferably, after the leakage detection of the brake pressure holding valve and O-ring, the partial pressure reduction valve function detection is performed. The partial pressure reduction valve function detection includes: opening the auxiliary air cylinder fast charging switch 5 and the brake cylinder pipeline exhaust switch 26; when the brake cylinder pressure drops to 20 kPa, closing the brake cylinder pipeline exhaust switch 26; stopping the pressure increase when the brake cylinder pipeline pressure is 50 kPa to 70 kPa and opening the brake cylinder pipeline exhaust switch 26; and closing the brake cylinder pipeline exhaust switch 26 when the pressure of the tube cylinder drops to 30 kPa.

[0050] Under this preferred scheme, the auxiliary air cylinder fast charging switch 5 and the brake cylinder pipeline exhaust switch 26 are turned on. When the brake cylinder pressure drops to 20 kPa, the brake cylinder pipeline exhaust switch 26 is turned off. The time for the brake cylinder pipeline pressure to rise from 30 kPa to 50 kPa is 1.5-4 seconds. The brake cylinder pipeline exhaust switch 26 is then turned on. When the tube cylinder pressure drops to 30 kPa, the brake cylinder pipeline exhaust switch 26 is turned off. The brake cylinder pipeline pressure then rises to 50~70 kPa, and the function of the local reduction valve is tested and found to be qualified.

[0051] Preferably, after the local pressure reducing valve action detection, a pressure holding and stabilizing orifice detection is performed, the pressure holding and stabilizing orifice detection including: Turn on the auxiliary air cylinder fast charging air switch 5 and the third cylinder exhaust air switch 25. After the train pipe pressure is reduced to 450 kPa, turn off the third cylinder exhaust air switch 25. Turn on the switch 30 between the auxiliary air cylinder pipeline and the differential pressure gauge, the switch 31 between the train cylinder pipeline and the differential pressure gauge, and the switch 6 between the auxiliary air cylinder pipeline and the flow meter. After the train pipe pressure and the flow meter display value stabilize, clear the differential pressure gauge to zero and turn off the switch 18 between the auxiliary air cylinder and the auxiliary air cylinder pipeline and the auxiliary air cylinder fast charging switch 5.

[0052] Under this preferred scheme, the switch 18 between the auxiliary air cylinder and the auxiliary air cylinder pipeline and the fast charging air switch 5 of the auxiliary air cylinder are turned off. The pressure difference count value after stabilization is 1.5~6kPa, and the main valve does not release at this time, and the pressure stabilization hole test is qualified.

[0053] Preferably, after the pressure stabilizing orifice is tested, the resistance relief and acceleration relief valve function test is performed, which includes: Turn on the switch 18 between the auxiliary air cylinder and the auxiliary air cylinder pipeline, the switch 27 between the accelerated and relieved air cylinder pipeline, and the switch 5 between the auxiliary air cylinder fast charging air. Then turn on the switch 30 between the auxiliary air cylinder pipeline and the differential pressure gauge and the switch 31 between the tube cylinder pipeline and the differential pressure gauge. After the pressure stabilizes, reset the differential pressure gauge to zero. Turn off the acceleration and relief air cylinder pipeline switch 27 and the auxiliary air cylinder fast charging switch 5, turn on the second cylinder fast charging switch 23, and after the brake cylinder is released, turn off the second cylinder fast charging switch 23, the auxiliary air cylinder pipeline and differential pressure gauge switch 30 and the cylinder pipeline and differential pressure gauge switch 31.

[0054] Under this preferred scheme, during the process from turning on the second tube cylinder fast charging switch 23 to turning off the second tube cylinder fast charging switch 23, the maximum pressure difference between the tube cylinder and the auxiliary air cylinder is 6~16kPa, and the resistance relief test is qualified. From the time the brake cylinder pressure begins to relieve until the brake cylinder pressure is discharged to 0, the highest pressure value of the tube cylinder is more than 10kPa higher than the tube cylinder pressure value before the brake cylinder pressure begins to relieve, and then decreases, and the acceleration relief valve function test is qualified.

[0055] Preferably, before connecting the air control valve to be tested to the testing device, the present invention first opens the main air source cutoff valve S1 to confirm that the main air source pressure is not lower than 650 kPa, adjusts the pressure regulating valve to make the air storage cylinder pressure 600 kPa (the testing device's set pressure), and performs device function testing. After the test is completed, before removing the air control valve from the testing device, the pressurized air in each part is emptied.

[0056] Understandably, the testing method for the Type 120 air control valve of the present invention can be performed by assembling the relief valve and the main valve together after the relief valve has passed the separate testing.

[0057] The testing method for the Type 120 air control valve of this invention changes the traditional manual operation method, automatically completing the performance test of the Type 120 air control valve. It integrates the testing of the auxiliary air cylinder charging port, the acceleration and relief air cylinder charging pipeline, the local reduction port, the pressure holding and stabilizing port, the relief resistance, the braking and relief passage, and the emergency second-stage valve function. It optimizes the seven brakes to complete all tests with four brakes, reducing the number of air charging times and improving the testing efficiency and accuracy of the Type 120 valve. The testing method of this invention adds three test items: braking sensitivity, slide valve misinstallation prevention, and brake position train pipe pressure rise leakage detection, which can improve the reliability of the Type 120 valve testing.

[0058] The preferred embodiments of the present invention have been described in detail above; however, the present invention is not limited thereto. Within the scope of the inventive concept, various simple modifications can be made to the technical solutions of the present invention, including combinations of various technical features in any other suitable manner. These simple modifications and combinations should also be considered as the content disclosed in the present invention and are all within the protection scope of the present invention.

Claims

1. A testing device for a type 120 air control valve, characterized in that, include: The system includes an air source, an air storage cylinder, a simulated piping system assembly, and a micro-pressure leak detection assembly. The air storage cylinder is connected to the air source, the simulated piping system assembly is connected to the air storage cylinder, and the micro-pressure leak detection assembly is connected to the air storage cylinder. An air storage cylinder cut-off switch (1) is installed on the connecting pipeline between the air storage cylinder and the simulated piping system assembly and the micro-pressure leak detection assembly. A micro-pressure leak detection air filling switch (2) is installed on the connecting pipeline between the air storage cylinder and the micro-pressure leak detection assembly. The simulated piping system assembly includes: The tube cylinder is connected to the air storage cylinder. A first tube cylinder fast charging switch (3) and a first tube cylinder exhaust switch (4) are provided on the connecting pipe between the tube cylinder and the air storage cylinder. The tube cylinder is connected to the tube cylinder pipeline. The tube cylinder pipeline is used to connect to the air control valve to be tested. Auxiliary air cylinder, the auxiliary air cylinder is connected to the tube cylinder, the auxiliary air cylinder fast charging switch (5) is provided on the connecting pipeline between the auxiliary air cylinder and the tube cylinder, the auxiliary air cylinder is connected to the auxiliary air cylinder pipeline, and the auxiliary air cylinder pipeline is used to connect to the air control valve to be tested; A brake cylinder, which is connected to the air reservoir and to a brake cylinder pipeline, the brake cylinder pipeline being used to connect to the air control valve to be tested; An accelerated relief air cylinder is connected to the air storage cylinder and the tube cylinder respectively. The accelerated relief air cylinder is connected to the accelerated relief air cylinder pipeline. The accelerated relief air cylinder pipeline is used to connect to the air control valve to be tested. The flow meter is connected to the auxiliary air cylinder pipeline and a switch (6) between the auxiliary air cylinder pipeline and the flow meter is provided on the connecting pipeline. The flow meter is connected to a pipeline for connecting the exhaust port of the air control valve to be tested and a switch (7) between the exhaust port and the flow meter and an exhaust switch (8) for controlling the exhaust port are provided on the pipeline. The flow meter is connected to a pipeline for connecting the exhaust port of the main valve of the air control valve to be tested and a switch (9) between the exhaust port of the main valve and the flow meter and a leak detection cylinder action switch (10) for controlling the exhaust port of the main valve are provided on the pipeline. The micro-pressure leak detection component includes: A reference branch pipe is connected to the air storage cylinder, and a reference air cylinder charging switch (11) is installed on the reference branch pipe. The reference branch pipe is connected to the A end of a micro-pressure leak detection three-way valve (12). A reference air cylinder, wherein the reference air cylinder is connected to the reference branch pipe; The micro differential pressure gauge is connected to the P end of the reference air cylinder and the micro pressure leak detection three-way valve (12); A valve body branch pipe is connected to the air storage cylinder; Leak testing sub-pipes include a brake cylinder leak testing sub-pipe, an auxiliary air cylinder leak testing sub-pipe, a tubular cylinder leak testing sub-pipe, and an acceleration and relief air cylinder leak testing sub-pipe. Each leak testing sub-pipe is connected to a valve body sub-pipe. The brake cylinder leak testing sub-pipe is connected to the brake cylinder pipeline. The auxiliary air cylinder leak testing sub-pipe is connected to the auxiliary air cylinder pipeline. The tubular cylinder leak testing sub-pipe is connected to the tubular cylinder pipeline. The acceleration and relief air cylinder leak testing sub-pipe is connected to the acceleration and relief air cylinder pipeline. Each leak testing sub-pipe is connected to the B end of the micro-pressure leak testing three-way valve (12). A brake cylinder tube micro-pressure leak testing switch (13) is installed on the brake cylinder leak testing sub-pipe. A secondary air cylinder tube micro-pressure leak testing switch (14) is installed on the auxiliary air cylinder leak testing sub-pipe. A tubular cylinder tube micro-pressure leak testing switch (15) is installed on the tubular cylinder leak testing sub-pipe. An acceleration and relief air cylinder tube micro-pressure leak testing switch (16) is installed on the acceleration and relief air cylinder leak testing sub-pipe.

2. The detection device according to claim 1, characterized in that, A switch (17) is installed on the pipeline between the tube cylinder and the tube cylinder pipeline. A switch (18) is installed on the pipeline between the auxiliary air cylinder and the auxiliary air cylinder pipeline. A switch (19) is installed on the pipeline between the brake cylinder and the brake cylinder pipeline. A switch (20) is installed on the pipeline between the acceleration and relief air cylinder and the acceleration and relief air cylinder pipeline. A fast charging switch (21) is installed on the pipeline between the air storage cylinder and the acceleration and relief air cylinder. A tube cylinder pipeline exhaust switch (22) is installed on the tube cylinder pipeline.

3. The detection device according to claim 1, characterized in that, The simulated piping system assembly also includes a local reduction chamber, which is connected to the air storage cylinder and a local reduction chamber pipeline. The local reduction chamber pipeline is used to connect to the air control valve to be tested. The connecting pipeline between the tube cylinder and the air storage cylinder is also equipped with a second tube cylinder fast charging switch (23), a second tube cylinder exhaust switch (24) and a third tube cylinder exhaust switch (25), and the brake cylinder pipeline is equipped with a brake cylinder pipeline exhaust switch (26). An acceleration and relief cylinder pipeline switch (27) is provided on the acceleration and relief cylinder pipeline. The acceleration and relief cylinder pipeline switch (27) is connected to the flow meter. An acceleration and relief cylinder pipeline exhaust switch (28) and an acceleration and relief cylinder pipeline and flow meter switch (29) are sequentially provided on the pipeline between the acceleration and relief cylinder pipeline switch (27) and the flow meter. A differential pressure gauge is installed between the auxiliary air cylinder pipeline and the tube cylinder pipeline. A switch (30) between the auxiliary air cylinder pipeline and the differential pressure gauge is installed between the auxiliary air cylinder pipeline and the differential pressure gauge. A switch (31) between the tube cylinder pipeline and the differential pressure gauge is installed between the tube cylinder pipeline and the differential pressure gauge.

4. A method for testing a type 120 air control valve, using the testing device for a type 120 air control valve as described in any one of claims 1 to 3, characterized in that, After connecting the air control valve to be tested to the testing device, leakage detection is performed on the mating surface and the exhaust port of the relief valve. The leakage detection on the mating surface and the exhaust port of the relief valve includes: Turn on the air reservoir cut-off switch (1), brake cylinder pipe micro-pressure leak test switch (13), auxiliary air cylinder pipe micro-pressure leak test switch (14), tube cylinder pipe micro-pressure leak test switch (15), acceleration relief air cylinder pipe micro-pressure leak test switch (16), reference air cylinder charging switch (11), micro-pressure leak test charging switch (2), control the exhaust port of the local reduction exhaust port (8), control the main valve exhaust port leak test cylinder action switch (10), local reduction exhaust port and flow meter switch (7), main valve exhaust port and After filling the reference air cylinder and the valve chamber of the 120 type air control valve to 600~610kPa, open the micro-pressure leak test three-way valve (12). After the pressure stabilizes, close the micro-pressure leak test air filling switch (2). After the pressure stabilizes, close the reference air cylinder air filling switch (11), the auxiliary air cylinder pipeline and the flow meter switch (6), the local reduction exhaust port and the flow meter switch (7), the main valve exhaust port and the flow meter switch (9). Check the value of the micro differential pressure gauge within the preset time. During the process of checking the value of the micro differential pressure gauge within the preset time, the following steps are performed: turn off the air storage cylinder cut-off switch (1), turn on the first tube cylinder exhaust switch (4), the auxiliary air cylinder fast charging switch (5), and the first tube cylinder fast charging switch (3). After the pressure of the tube cylinder, auxiliary air cylinder, and acceleration relief air cylinder drops to 0, turn off the auxiliary air cylinder fast charging switch (5) and the first tube cylinder exhaust switch (4), turn on the air storage cylinder cut-off switch (1), and then charge the tube cylinder to a constant pressure. The following are the components: brake cylinder pipe micro pressure leak test switch (13), auxiliary air cylinder pipe micro pressure leak test switch (14), column cylinder pipe micro pressure leak test switch (15), acceleration and relief air cylinder pipe micro pressure leak test switch (16), and micro pressure leak test three-way valve (12).

5. The detection method according to claim 4, characterized in that, Before leak testing at the joint surface and at the exhaust port of the relief valve, leakage test preparation, braking and relief passage testing, and emergency second-stage valve function testing are performed. The leakage test preparation, braking and relief passage testing, and emergency second-stage valve function testing include: Turn on the following switches in sequence: air reservoir cut-off switch (1), tube cylinder to tube cylinder pipeline switch (17), auxiliary air cylinder to auxiliary air cylinder pipeline switch (18), brake cylinder to brake cylinder pipeline switch (19), acceleration and relief air cylinder to acceleration and relief air cylinder pipeline switch (20), acceleration and relief air cylinder fast charging air switch (21), first tube cylinder fast charging switch (3), auxiliary air cylinder fast charging air switch (5). After the pressure of the auxiliary air cylinder and the acceleration and relief air cylinder is charged to the constant pressure, turn off the acceleration and relief air cylinder fast charging air switch (21) and the auxiliary air cylinder fast charging air switch (5). Turn off the fast charging switch (3) of the first cylinder and turn on the exhaust switch (4) of the first cylinder. When the brake cylinder pressure rises to 350 kPa, turn off the exhaust switch (4) of the first cylinder and turn on the fast charging switch (3) of the first cylinder. After the brake cylinder pressure drops below 150 kPa, turn on the fast charging switch (21) of the acceleration relief cylinder and then turn on the fast charging switch (5) of the auxiliary cylinder. After the pressure of the auxiliary cylinder and the acceleration relief cylinder are both charged to the constant pressure, turn off the fast charging switch (21) of the acceleration relief cylinder, the switch (20) between the acceleration relief cylinder and the acceleration relief cylinder pipeline, and the fast charging switch (3) of the first cylinder. Turn off the auxiliary air cylinder fast charging air switch (5) and the switch between the tube cylinder and the tube cylinder pipeline (17), turn on the tube cylinder pipeline exhaust switch (22), after the tube cylinder pipeline pressure air is discharged to zero, turn off the tube cylinder pipeline exhaust switch (22), and turn on the switch between the acceleration and relief air cylinder and the acceleration and relief air cylinder pipeline (20).

6. The detection method according to claim 5, characterized in that, Leakage testing of the brake position valve and O-ring is performed between the leakage test preparation, braking and release passage detection, emergency second-stage valve function detection, and leakage detection of the mating surface and release valve exhaust port. The leakage detection of the brake position valve and O-ring includes: Turn on the switch (9) between the main valve exhaust port and the flow meter, and the leak detection cylinder action switch (10) that controls the main valve exhaust port. Based on the flow meter display value, determine that the main valve exhaust port is leaking. Turn off the switch (9) between the main valve exhaust port and the flow meter, and the leak detection cylinder action switch (10) that controls the main valve exhaust port. Turn on the switch (7) between the partial reduction exhaust port and the flow meter, and the exhaust switch (8) that controls the partial reduction exhaust port. Based on the flow meter display value, determine that the partial reduction exhaust port is leaking. Turn off the switch (7) between the partial reduction exhaust port and the flow meter, and the exhaust switch (8) that controls the partial reduction exhaust port. Turn off the switch (18) between the auxiliary air cylinder and the auxiliary air cylinder pipeline, the switch (19) between the brake cylinder and the brake cylinder pipeline, and the switch (20) between the acceleration and relief air cylinder and the acceleration and relief air cylinder pipeline. Check the pressure drop value within 10 seconds for the auxiliary air cylinder pipeline, the acceleration and relief air cylinder pipeline, and the tube cylinder pipeline respectively. Turn on the switch (18) between the auxiliary air cylinder and the auxiliary air cylinder pipeline, the switch (19) between the brake cylinder and the brake cylinder pipeline, and the switch (20) between the acceleration and relief air cylinder and the acceleration and relief air cylinder pipeline.

7. The detection method according to claim 6, characterized in that, After leak detection at the joint surface and exhaust port of the relief valve, the auxiliary air cylinder inflation port and the accelerated relief air cylinder inflation pipeline are inspected. The inspection of the auxiliary air cylinder inflation port and the accelerated relief air cylinder inflation pipeline includes: Turn on the switch between the tube cylinder and the tube cylinder pipeline (17) and the switch between the auxiliary air cylinder and the auxiliary air cylinder pipeline (18); turn on the auxiliary air cylinder fast charging switch (5), and after the auxiliary air cylinder pressure reaches the constant pressure, turn on the switch between the acceleration relief air cylinder and the acceleration relief air cylinder pipeline (20); turn off the first tube cylinder fast charging switch (3), turn on the acceleration relief air cylinder fast charging switch (21), and after the acceleration relief air cylinder is charged to 550 kPa, turn on the first tube cylinder fast charging switch (3), and after the auxiliary air cylinder and the acceleration relief air cylinder pressure reach the constant pressure, turn off the acceleration relief air cylinder fast charging switch (21) and the auxiliary air cylinder fast charging switch (5).

8. The detection method according to claim 7, characterized in that, After inspecting the auxiliary air cylinder inflation port and the acceleration / relief air cylinder inflation pipeline, leakage detection of the relief valve and O-ring is performed. This leakage detection of the relief valve and O-ring includes: Turn on the switch (9) between the main valve exhaust port and the flow meter, and the leak detection cylinder action switch (10) controlling the main valve exhaust port. Based on the flow meter display value, determine that the main valve exhaust port is leaking. Turn off the switch (9) between the main valve exhaust port and the flow meter, and the leak detection cylinder action switch (10) controlling the main valve exhaust port. Turn on the switch (7) between the partial reduction exhaust port and the flow meter, and the exhaust switch (8) controlling the partial reduction exhaust port. Based on the flow meter display value, determine that the partial reduction exhaust port is leaking. Turn off the switch (7) between the partial reduction exhaust port and the flow meter, and the exhaust switch (8) controlling the partial reduction exhaust port.

9. The detection method according to claim 8, characterized in that, After the leakage detection of the relief valve and O-ring, the partial reduction hole detection, braking sensitivity detection and valve misinstallation detection are performed. The partial reduction hole detection, braking sensitivity detection and valve misinstallation detection include: when the air storage cylinder cut-off switch (1), the tube cylinder and tube cylinder pipeline switch (17), the auxiliary air cylinder and auxiliary air cylinder pipeline switch (18), the brake cylinder and brake cylinder pipeline switch (19), the acceleration relief air cylinder and acceleration relief air cylinder pipeline switch (20), and the first tube cylinder fast charging switch (3) are turned on, the tube cylinder, auxiliary air cylinder and acceleration relief air cylinder are charged to a constant pressure, the first tube cylinder fast charging switch (3) is turned off, the second tube cylinder exhaust switch (24) is turned on, and when the partial reduction effect is generated, the second tube cylinder exhaust switch (24) is turned off. Turn on the exhaust switch (24) of the second tube cylinder, and the tube cylinder is depressurized by 50 kPa.

10. The detection method according to claim 9, characterized in that, After the local reduction hole detection, brake sensitivity detection, and slide valve misinstallation prevention detection, leakage detection of the brake pressure holding position slide valve and O-ring is performed. The leakage detection of the brake pressure holding position slide valve and O-ring includes: Turn on the switch (9) between the main valve exhaust port and the flow meter, and the leak detection cylinder action switch (10) that controls the main valve exhaust port. Based on the value displayed by the flow meter, determine that the main valve exhaust port is leaking, and turn off the switch (9) between the main valve exhaust port and the flow meter, and the leak detection cylinder action switch (10) that controls the main valve exhaust port. Turn on the switch (7) between the local exhaust port and the flow meter and the exhaust switch (8) controlling the local exhaust port. Based on the value displayed by the flow meter, determine that the local exhaust port is leaking and turn off the switch (7) between the local exhaust port and the flow meter and the exhaust switch (8) controlling the local exhaust port. Turn off the switch (20) between the acceleration and relief air cylinder and the acceleration and relief air cylinder pipeline, turn on the switch (27) of the acceleration and relief air cylinder pipeline, and after the pressure in the acceleration and relief air cylinder pipeline is reduced to zero, turn on the switch (29) between the acceleration and relief air cylinder pipeline and the flow meter and the exhaust switch (8) of the control valve exhaust port. According to the value displayed by the flow meter, it is determined that the exhaust port of the acceleration and relief air cylinder pipeline is leaking. Turn off the switch (29) between the acceleration and relief air cylinder pipeline and the flow meter, the exhaust switch (8) of the control valve exhaust port, and the acceleration and relief air cylinder pipeline switch (27), and turn on the switch (20) between the acceleration and relief air cylinder and the acceleration and relief air cylinder pipeline. Turn on the brake cylinder pipeline exhaust switch (26), turn off the brake cylinder pipeline exhaust switch (26) when the pressure of the cylinder is reduced to 100 kPa, and turn off the switch between the brake cylinder and the brake cylinder pipeline (19) and the switch between the acceleration and relief air cylinder and the acceleration and relief air cylinder pipeline (20) after the pressure stabilizes.

11. The detection method according to claim 10, characterized in that, After the leakage detection of the brake pressure holding valve and O-ring, the function detection of the partial reduction valve is carried out. The function detection of the partial reduction valve includes: opening the auxiliary air cylinder fast charging air switch (5) and the brake cylinder pipeline exhaust switch (26); when the brake cylinder pressure drops to 20 kPa, closing the brake cylinder pipeline exhaust switch (26); stopping the pressure increase when the brake cylinder pipeline pressure is 50 kPa to 70 kPa and opening the brake cylinder pipeline exhaust switch (26); and closing the brake cylinder pipeline exhaust switch (26) when the pressure of the tube cylinder drops to 30 kPa.

12. The detection method according to claim 11, characterized in that, After the local pressure reducing valve action detection, a pressure holding and stabilizing orifice detection is performed, which includes: Turn on the auxiliary air cylinder fast charging air switch (5) and the third cylinder exhaust air switch (25). After the train pipe pressure is reduced to 450 kPa, turn off the third cylinder exhaust air switch (25). Turn on the switch between the auxiliary air cylinder pipeline and the differential pressure gauge (30), the switch between the train cylinder pipeline and the differential pressure gauge (31), and the switch between the auxiliary air cylinder pipeline and the flow meter (6). After the train pipe pressure and the flow meter display value stabilize, clear the differential pressure gauge and turn off the switch between the auxiliary air cylinder and the auxiliary air cylinder pipeline (18) and the auxiliary air cylinder fast charging switch (5).

13. The detection method according to claim 12, characterized in that, After the pressure stabilizing orifice is tested, the resistance relief and acceleration relief valve function is tested. The resistance relief and acceleration relief valve function test includes: Turn on the switch between the auxiliary air cylinder and the auxiliary air cylinder pipeline (18), the switch between the accelerated relief air cylinder pipeline (27), and the switch between the auxiliary air cylinder fast charging air (5). Then turn on the switch between the auxiliary air cylinder pipeline and the differential pressure gauge (30) and the switch between the tube cylinder pipeline and the differential pressure gauge (31). After the pressure stabilizes, the differential pressure gauge is zeroed. Turn off the acceleration and relief air cylinder pipeline switch (27) and the auxiliary air cylinder fast charging air switch (5), turn on the second row cylinder fast charging switch (23), and after the brake cylinder is released, turn off the second row cylinder fast charging switch (23), the auxiliary air cylinder pipeline and differential pressure gauge switch (30) and the row cylinder pipeline and differential pressure gauge switch (31).