Two-layer table stand column force loading test device and method
By using moving and fixed pulley blocks and wire rope loading devices, the problems of wind influence and inconvenience of high-level measurement in the two-level platform loading test were solved, realizing the simulation of drill string force at a low level, reducing test costs, and facilitating operation and control of loading force distribution.
Patent Information
- Application Number
- CN202510665382.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-05-22
- Publication Date
- 2026-11-24
AI Technical Summary
In existing technologies, the two-tier loading test is affected by wind, the high measurement position makes observation inconvenient, and the cost is high, and the loading time is long.
Loading is achieved using moving and fixed pulley blocks and wire ropes. The second-level platform is fixed by tooling supports. The loading assembly is used to simulate the force of the drill string at a low position. Cross loading is achieved by combining the locking screw buckle to ensure uniform force distribution.
It enables the simulation of drill string forces at low altitudes, avoids the influence of wind loads, reduces test costs, facilitates measurement, is easy to implement, and achieves controllable loading under small load conditions.
Smart Images

Figure CN123155232A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of petroleum machinery manufacturing technology, specifically relating to a loading test device for the force of a two-tiered platform column, and also to a loading test method for the force of a two-tiered platform column. Background Technology
[0002] The second-level platform is a drill string storage facility on the oil drilling rig derrick, used for storing drill tools during tripping in and out of the drilling rig. It also provides a working surface for drilling workers to support the drill string and inspect equipment. During drill string deployment, the drill string is arranged in an orderly manner at a certain angle within the finger beams of the second-level platform. At this time, the second-level platform needs to withstand the lateral horizontal force applied by the vertical support column.
[0003] To test the load-bearing capacity of the second-level platform, the existing method is to fill the second-level platform of the drilling rig with drill strings while the drilling rig is in an upright position, and then load the second-level platform using the force of the inclined drill strings against it. This method is completely consistent with the working conditions of oilfield drilling rigs, but it has the following problems: 1) The conditions for the load test of the second-level platform are harsh and must be verified under windless conditions. Since the windward side of the drill string is large, and the second-level platform does not bear much resistance force from the column, which cannot exceed 350Kg, the influence of wind load cannot be ignored. 2) The test loading time is long (taking the continuous drilling speed of the second-generation automated drilling rig at 22 drill strings / h as an example, it takes more than 9 hours to remove the drill string). 3) The measurement position is high (about 37m above the ground), and strain testing needs to be carried out simultaneously during load testing, making the installation and observation of the testing equipment inconvenient; 4) It requires the cooperation and joint debugging of multiple devices and personnel, resulting in high testing costs. Summary of the Invention
[0004] The purpose of this invention is to provide a loading test device for the force of the columns of a two-story platform, which solves the problems of wind influence on the test and inconvenient observation caused by the excessively high measurement position when loading the two-story platform in the prior art.
[0005] Another objective of this invention is to provide a method for testing the loading force of a two-story pedestal column.
[0006] The first technical solution adopted in this invention is a loading test device for the force of a two-tiered platform column, including a two-tiered platform with four tooling supports fixedly connected to the bottom. The tooling supports are fixedly connected to the ground. Several simulated drill columns are set on the two-tiered platform. The several simulated drill columns are linearly distributed on the two-tiered platform in mutually perpendicular directions. Pulley assemblies are respectively set on the upper and lower sides of the simulated drill columns. Several simulated drill columns linearly distributed in one direction are connected to a first loading beam by steel wire ropes. Several simulated drill columns linearly distributed in another direction are connected to a second loading beam by steel wire ropes. The two ends of the wire rope are respectively connected to the loading assembly, and the other end of the loading assembly is connected to the corresponding first loading beam or second loading beam. The first loading beam and the second loading beam are fixedly connected to the ground.
[0007] The first technical solution of the present invention is further characterized in that, The simulated drill string includes a mandrel, and a roller assembly is sleeved at the connection position between the mandrel and the second-level platform. The roller assembly includes rollers, and self-lubricating bearings are respectively provided on the inner side of the rollers near the upper and lower ends. The rollers are movably connected to the second-level platform, and the pulley assemblies on the simulated drill string are located at the upper and lower ends of the rollers respectively.
[0008] The spindle is fitted with retaining rings at the upper and lower ends of the rollers for positioning.
[0009] The first loading beam includes a first support body, on which a pair of ear plates a are provided, and between the pair of ear plates a are several sets of fixed pulleys a. Each set of fixed pulleys a includes upper and lower two. The fixed pulleys a are fixedly connected to the first support body through supports, and the several sets of fixed pulleys a are arranged on the same horizontal line.
[0010] The second loading beam includes a second support body, on which a pair of ear plates b are provided. Between the pair of ear plates b, several sets of fixed pulleys b are provided. Each set of fixed pulleys b includes upper and lower two. The fixed pulleys b are fixedly connected to the second support body through supports. The several sets of fixed pulleys b are arranged on the same horizontal line.
[0011] Several simulated drill strings are connected to the first loading beam or the second loading beam by two steel wire ropes. One end of each steel wire rope is fixed to the ear plate on one side of the first loading beam or the second loading beam through the loading assembly, and the other end passes through the lower pulley assembly of the simulated drill string and the lower fixed pulley of the first loading beam or the second loading beam in sequence, and is connected to the other ear plate of the first loading beam or the second loading beam through the loading assembly. One end of the other wire rope is fixed to one side ear plate of the first or second loading beam through the loading assembly, and the other end passes through the upper pulley assembly of the simulated drill string and the upper fixed pulley of the first or second loading beam in sequence, and is connected to the other side ear plate of the first or second loading beam through the loading assembly.
[0012] The steel wire rope passes sequentially through the pulley assembly and the fixed pulleys on the first or second loading beam, forming an adjacent alternating cyclic connection path.
[0013] The loading assembly includes a force measuring device, one end of which is connected to a rope clamp via a shackle, and the rope clamp is connected to one end of a steel wire rope. The other end of the force measuring device is connected to a locking screw buckle via a shackle, and the end of the locking screw buckle away from the force measuring device is connected to the corresponding ear plate via a shackle.
[0014] The second technical solution adopted in this invention is a loading test method for the force of the two-story pedestal columns, which specifically includes the following steps: Step 1: Place the second-tier platform on the ground and level it. After leveling, fix each tool support to the ground. Step 2: Place the first loading beam and the second loading beam on one side of the simulated drill string that is distributed in different linear directions, and fix the first loading beam and the second loading beam to the ground. Step 3: Use steel wire ropes to connect the simulated drill string, loading assembly, and the first or second loading beam to form an adjacent alternating cyclic connection path; Step 4: Perform a loading test by cross-tightening the locking screws on both sides, ensuring that the loads displayed by the force measuring devices on both sides are the same during the loading process. Step 5: After the load on both sides of the force measuring device reaches the required value, stop loading and complete the test.
[0015] The beneficial effects of this invention are: The loading test device for the two-layer platform column of the present invention utilizes a moving and fixed pulley system to load the load through a steel wire rope, so that the loading force has the characteristics of being distributed and uniformly distributed. When the simulated drill string position is deviated, a restoring force opposite to the deflection direction of the simulated drill string will be generated. Under the action of the restoring force, the simulated drill string will return to the equilibrium position again, thus solving the problem of uniform distribution of the loading force magnitude and position.
[0016] Meanwhile, the present invention fixes the second-level platform in a low position by using tooling supports, and simulates the force of the inclined drill string on the second-level platform in a low position by applying forces in two directions to the simulated drill string through the loading assembly, thereby avoiding high-level tests and reducing test costs and risks.
[0017] Furthermore, this invention can be implemented inside the factory, avoiding the influence of factors such as wind load and derrick alignment. The measurement work has no environmental requirements and is easy to implement. At the same time, since the second-floor platform bears less support force from the columns, multiple cross-loading is achieved through the locking screw buckle, making the loading controllable under small load conditions. Attached Figure Description
[0018] Figure 1 This is a plan view of the loading test device for the two-tiered platform column force of the present invention; Figure 2 This is an elevation view of the loading test device for the two-story platform column force of the present invention; Figure 3 This is a schematic diagram of the connection between the simulated drill string and the loading beam in this invention; Figure 4 This is a schematic diagram of the simulated drill string structure in the loading test device for the force of the two-layer platform column of the present invention; Figure 5This is a plan view of the first loading beam in the loading test device for the force of the two-story platform columns of the present invention; Figure 6 This is a front view of the first loading beam in the loading test device for the force of the two-story platform columns of the present invention; Figure 7 This is a plan view of the second loading beam in the loading test device for the force of the two-story platform columns of the present invention; Figure 8 This is a schematic diagram of the loading assembly in the loading test device for the force of the two-story platform columns of the present invention; Figure 9 This is a schematic diagram of the loading test method for the two-story platform column of the present invention.
[0019] In the diagram, 1. Second-tier platform, 2. Tooling support, 3. Simulated drill string, 4. Wire rope, 5. Loading assembly, 6. First loading beam, 7. Second loading beam, 8. Pulley assembly, 9. Mandrel, 10. Roller, 11. Self-lubricating bearing, 12. Retaining ring, 13. Rope clamp, 14. Shackle, 15. Force measuring device, 16. Locking screw, 17. Ear plate a, 18. First support body, 19. Second support body, 20. Fixed pulley a, 21. Ear plate b, 22. Fixed pulley b. Detailed Implementation
[0020] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.
[0021] Example 1 The present invention provides a loading test device for the force exerted on the two-story pedestal columns, such as... Figure 1 and Figure 2 As shown, the system includes a two-tiered platform 1 with four tooling supports 2 fixedly connected to its bottom. The tooling supports 2 are connected to the ant-shaped platform via anchor bolts, or can be fixed to the ground via chemical anchors, etc. Several simulated drill strings 3 are set on the two-tiered platform 1, linearly distributed along mutually perpendicular directions. One direction of the linearly distributed simulated drill strings 3 is connected to a first loading beam 6 via steel wire ropes 4, while the other direction is connected to a second loading beam 7 via steel wire ropes 4. Figure 1 It can be seen that the first loading beam 6 and the second loading beam 7 apply loads to the simulated drill string at mutually perpendicular angles.
[0022] like Figure 3As shown, the two ends of the wire rope 4 are respectively connected to the loading assembly 5, and the other end of the loading assembly 5 is connected to the corresponding first loading beam 6 or second loading beam 7. The first loading beam 6 and the second loading beam 7 are fixedly connected to the ground.
[0023] Example 2 The loading test device for the two-tier platform column force of this invention decomposes the column's resistance force into two orthogonally decomposed sets of forces F1 and F2, facilitating the subsequent application of the two-tier platform load. During the two-tier platform load test, it is required that the magnitudes of the forces within each set of F1 and F2 are equal and evenly distributed.
[0024] like Figure 1 As shown, the platform includes a second-level platform 1 with four tooling supports 2 fixedly connected to the bottom. The tooling supports 2 are connected to the ant platform by anchor bolts, or they can be fixed to the ground by chemical anchors or other means. Several simulated drill columns 3 are set on the second-level platform 1. The simulated drill columns 3 are connected to the first loading beam 6 or the second loading beam 7 by steel wire ropes 4. The first loading beam 6 and the second loading beam 7 are firmly fixed to the ground.
[0025] Furthermore, the two ends of the wire rope 4 are respectively connected to the loading assembly 5, and the other end of the loading assembly 5 is connected to the corresponding first loading beam 6 or second loading beam 7.
[0026] like Figure 4 As shown, pulley assemblies 8 are respectively provided on the upper and lower sides of the simulated drill string 3. Specifically, the simulated drill string 3 includes a mandrel 9, and a roller assembly is sleeved at the contact position between the mandrel 9 and the secondary platform 1. The roller assembly includes rollers 10, and self-lubricating bearings 11 are respectively provided on the inner side of the rollers 10 near the upper and lower ends. The rollers 10 contact the secondary platform, and the pulley assemblies 8 provided on the simulated drill string 3 are located at the upper and lower ends of the roller assembly. Retaining rings 12 for limiting movement are respectively installed on the mandrel 9 relative to the upper and lower ends of the roller assembly.
[0027] During operation, the roller 10 contacts the second-level platform and can roll and maintain its balance under the action of the wire rope 4 of the pulley assembly 8.
[0028] Each of the simulated drill strings 3 has two steel wire ropes 4 that connect to the first loading beam 6 or the second loading beam 7. One end of each steel wire rope 4 is fixed to one side ear plate of the first loading beam 6 or the second loading beam 7 through the loading assembly 5, and the other end passes through the lower pulley assembly 8 of the simulated drill string 3 and the lower fixed pulley of the first loading beam 6 or the second loading beam 7 in sequence, and is connected to the other side ear plate of the first loading beam 6 or the second loading beam 7 through the loading assembly 5. One end of the other wire rope 4 is fixed to one side ear plate of the first loading beam 6 or the second loading beam 7 through the loading assembly 5, and the other end passes through the upper pulley assembly 8 of the simulated drill string 3 and the upper fixed pulley of the first loading beam 6 or the second loading beam 7 in sequence, and is connected to the other side ear plate of the first loading beam 6 or the second loading beam 7 through the loading assembly 5.
[0029] Example 3 The present invention is as follows Figure 1 As shown, the platform includes a second-level platform 1 with four tooling supports 2 fixedly connected to the bottom. The tooling supports 2 are connected to the ant platform by anchor bolts, or they can be fixed to the ground by chemical anchors or other means. Several simulated drill columns 3 are set on the second-level platform 1. The simulated drill columns 3 are connected to the first loading beam 6 or the second loading beam 7 by steel wire ropes 4. The first loading beam 6 and the second loading beam 7 are firmly fixed to the ground.
[0030] Furthermore, the two ends of the wire rope 4 are respectively connected to the loading assembly 5, and the other end of the loading assembly 5 is connected to the corresponding first loading beam 6 or second loading beam 7.
[0031] like Figure 4 As shown, pulley assemblies 8 are respectively provided on the upper and lower sides of the simulated drill string 3. Specifically, the simulated drill string 3 includes a mandrel 9, and a roller assembly is sleeved at the connection position between the mandrel 9 and the secondary platform 1. The roller assembly includes rollers 10, and self-lubricating bearings 11 are respectively provided on the inner side of the rollers 10 near the upper and lower ends. The rollers 10 are movably connected to the secondary platform. The pulley assemblies 8 provided on the simulated drill string 3 are located at the upper and lower ends of the roller assembly. Retaining rings 12 for limiting movement are respectively installed on the mandrel 9 relative to the upper and lower ends of the roller assembly.
[0032] like Figure 5 As shown, the first loading beam 6 includes a first support body 18, on which a pair of ear plates a17 are fixedly connected, and several sets of fixed pulleys a20 are arranged between the pair of ear plates a17, such as... Figure 6 As shown, each set of fixed pulleys a20 includes two, upper and lower, which correspond to the upper and lower pulley assemblies 8 set on the simulated drill string 3. The fixed pulleys a20 are fixedly connected to the first support body 18 through the support, and several sets of fixed pulleys a20 are set on the same horizontal line.
[0033] like Figure 7 As shown, the second loading beam 7 includes a second support body 19. A pair of ear plates b21 are fixedly connected to the second support body 19. Several sets of fixed pulleys b22 are arranged between the pair of ear plates b21. Each set of fixed pulleys b22 includes upper and lower two. The fixed pulleys b22 are fixedly connected to the second support body 19 through supports. The several sets of fixed pulleys b22 are arranged on the same horizontal line.
[0034] Furthermore, in this embodiment, six fixed pulleys a20 are provided on the first support body 18, and twelve fixed pulleys b22 are provided on the second support body 19.
[0035] Furthermore, the wire rope 4 maintains a certain angle ø between its outlet direction on the pulley assembly 8 and the fixed pulley a20 or b22 and the direction of the resultant force borne by the pulley. This angle ensures that the simulated drill string 3 is in a state of force balance in the left and right directions. If the simulated drill string 3 is offset, the force balance on the simulated drill string 3 will be broken, resulting in unequal forces exerted by the wire rope 4 on both sides of the simulated drill string 3. The tension of the wire rope 4 decreases in the direction of the offset of the simulated drill string 3, while the tension of the wire rope 4 increases in the opposite direction. The difference between the horizontal components of these two forces generates a restoring force opposite to the direction of the offset of the simulated drill string 3. Under the action of the restoring force, the simulated drill string 3 will return to the equilibrium position. The roller 10 structure on the simulated drill string 3 helps to reduce the friction between the simulated drill string 3 and the second-level platform 1, facilitating the return of the simulated drill string 3 to the equilibrium position.
[0036] Example 4 Based on Embodiment 3 above, in this embodiment, the steel wire rope 4 of the present invention passes sequentially through the pulley assembly 8 and the fixed pulleys on the first loading beam 6 or the second loading beam 7 to form an adjacent alternating cyclic connection path.
[0037] The pulleys on the first loading beam 6 or the second loading beam 7 of this invention form a fixed pulley group, and the ear plates on both sides are the fixing points at both ends of the steel wire rope 4. The pulley assembly 8 on the simulated drill string 3 forms a movable pulley group. There is no rigid connection between all the movable pulleys, and each is in an independent state, which facilitates the contact between the simulated drill string 3 and the second platform 1 when subjected to force. All adjacent fixed pulleys a20 or fixed pulleys b22 are arranged at equal intervals.
[0038] Example 5 This embodiment is based on embodiment 4 above, such as Figure 8 As shown, the loading assembly 5 of the present invention includes a force measuring device 15. One end of the force measuring device 15 is connected to a rope clamp 13 via a shackle 14. The rope clamp 13 is connected to one end of the wire rope 4. The other end of the force measuring device 15 is connected to a locking screw buckle 16 via a shackle 14. The end of the locking screw buckle 16 away from the force measuring device 15 is connected to the corresponding ear plate via the shackle 14.
[0039] During the loading process of the second-level platform 1, the locking screws 16 of the loading assemblies 5 on the left and right sides are tightened in a cross manner to ensure that the loads displayed by the force measuring devices 15 on both sides are the same, thus ensuring that each section of the wire rope 4 bears the same force to the maximum extent, thereby ensuring that each simulated drill string 3 is subjected to equal force.
[0040] Example 6 The loading test method for the force of a two-story pedestal column of the present invention, using the above-mentioned loading test device for the force of a two-story pedestal column, specifically includes the following steps: Step 1: Place the second-layer platform 1 on the ground and level it. After leveling, fix each tool support 2 to the ground. Step 2: Place the first loading beam 6 and the second loading beam 7 on one side of the simulated drill string 3 which is distributed in different linear directions, and fix the first loading beam 6 and the second loading beam 7 to the ground. Step 3, as follows Figure 9 As shown, steel wire rope 4 is used to connect the simulated drill string 3, the loading assembly 5 and the first loading beam 6 or the second loading beam 7 to form an adjacent alternating cyclic connection path; Step 4: Perform a loading test by cross-tightening the locking screws 16 on both sides, ensuring that the loads displayed by the force measuring devices 15 on both sides are the same during the loading process. Step 5: After the load on both sides of the force measuring device 15 reaches the required value, stop loading and complete the test.
[0041] The various embodiments in this specification are described in a progressive manner, with each embodiment focusing on the differences from other embodiments. The same or similar parts between the various embodiments can be referred to each other.
[0042] The above description of the disclosed embodiments enables those skilled in the art to make or use this application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of this application. Therefore, this application is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A loading test device for the force of a two-tiered platform column, comprising a two-tiered platform (1) with four tool supports (2) fixedly connected to its bottom, the tool supports (2) being fixedly connected to the ground, characterized in that, Several simulated drill strings (3) are set on the second-level platform (1). The simulated drill strings (3) are linearly distributed on the second-level platform (1) in mutually perpendicular directions. Pulley assemblies (8) are set on the upper and lower sides of the simulated drill strings (3). The simulated drill strings (3) linearly distributed in one direction are connected to the first loading beam (6) by steel wire rope (4), and the simulated drill strings (3) linearly distributed in the other direction are connected to the second loading beam (7) by steel wire rope (4). The two ends of the wire rope (4) are respectively connected to the loading assembly (5), and the other end of the loading assembly (5) is connected to the corresponding first loading beam (6) or second loading beam (7). The first loading beam (6) and the second loading beam (7) are fixedly connected to the ground.
2. The loading test device for the force of the two-story platform column according to claim 1, characterized in that, The simulated drill string (3) includes a mandrel (9), and a roller assembly is sleeved at the connection position between the mandrel (9) and the second-level platform (1). The roller assembly includes a roller (10), and self-lubricating bearings (11) are respectively provided on the inner side of the roller (10) near the upper and lower ends. The roller (10) is movably connected to the second-level platform (1), and the pulley assembly (8) provided on the simulated drill string (3) is located at the upper and lower ends of the roller (10).
3. The loading test device for the force of the two-story platform column according to claim 2, characterized in that, The mandrel (9) is equipped with retaining rings (12) for limiting the position at the upper and lower ends relative to the roller (10).
4. The loading test device for the force of the two-story platform column according to claim 1, characterized in that, The first loading beam (6) includes a first support body (18), on which a pair of ear plates a (17) are provided, and between the pair of ear plates a (17) are several sets of fixed pulleys a (20). Each set of fixed pulleys a (20) includes upper and lower two. The fixed pulleys a (20) are fixedly connected to the first support body (18) through a support, and the several sets of fixed pulleys a (20) are arranged on the same horizontal line.
5. The loading test device for the force of the two-story platform column according to claim 4, characterized in that, The second loading beam (7) includes a second support body (19), on which a pair of ear plates b (21) are provided, and between the pair of ear plates b (21) are several sets of fixed pulleys b (22). Each set of fixed pulleys b (22) includes upper and lower two. The fixed pulleys b (22) are fixedly connected to the second support body (19) through supports, and the several sets of fixed pulleys b (22) are arranged on the same horizontal line.
6. The loading test device for the force of the two-story platform column according to claim 4, characterized in that, There are two steel wire ropes (4) connecting several simulated drill strings (3) to the first loading beam (6) or the second loading beam (7). One end of one steel wire rope (4) is fixed to the ear plate on one side of the first loading beam (6) or the second loading beam (7) through the loading assembly (5), and the other end passes through the lower pulley assembly (8) of the simulated drill string (3) and the lower fixed pulley of the first loading beam (6) or the second loading beam (7) in sequence, and is connected to the other ear plate of the first loading beam (6) or the second loading beam (7) through the loading assembly (5). One end of another wire rope (4) is fixed to the side ear plate of the first loading beam (6) or the second loading beam (7) through the loading assembly (5), and the other end passes through the upper pulley assembly (8) of the simulated drill string (3) and the upper fixed pulley of the first loading beam (6) or the second loading beam (7) in sequence, and is connected to the other side ear plate of the first loading beam (6) or the second loading beam (7) through the loading assembly (5).
7. The loading test device for the force of the two-story platform column according to claim 6, characterized in that, The steel wire rope (4) passes sequentially through the pulley assembly (8) and the fixed pulleys on the first loading beam (6) or the second loading beam (7) to form an adjacent alternating cyclic connection path.
8. The loading test device for the force of the two-story platform column according to claim 7, characterized in that, The loading assembly (5) includes a force measuring device (15), one end of which is connected to a rope clip (13) via a shackle (14), and the rope clip (13) is connected to one end of a wire rope (4). The other end of the force measuring device (15) is connected to a lock screw buckle (16) via a shackle (14). The end of the lock screw buckle (16) away from the force measuring device (15) is connected to the corresponding ear plate via the shackle (14).
9. A method for testing the loading force on a two-story pedestal column, characterized in that, The loading test device for the force of the two-story pedestal column as described in claims 1-8 specifically includes the following steps: Step 1: Place the second-layer platform (1) on the ground and level it. After leveling, fix each tool support (2) to the ground. Step 2: Place the first loading beam (6) and the second loading beam (7) on one side of the simulated drill string (3) which is distributed in different linear directions, and fix the first loading beam (6) and the second loading beam (7) to the ground. Step 3: Use steel wire rope (4) to connect the simulated drill string (3), loading assembly (5) to the first loading beam (6) or the second loading beam (7) to form an adjacent alternating cyclic connection path; Step 4, perform a loading test, cross-tighten the locking screws (16) on the left and right sides, and ensure that the loads displayed by the force measuring devices (15) on both sides are the same during the loading process; Step 5: After the load displayed by the force measuring devices (15) on both sides reaches the required value, stop loading and complete the test.