An adjustable tower liquid spray test device
By combining the lifting regulator and the nozzle transfer device, the automatic comparison of spray performance and the rapid replacement and cleaning of nozzles are realized, which solves the problem of difficult adjustment and cleaning of traditional devices and improves the continuity of experiments and data accuracy.
Patent Information
- Application Number
- CN202611220613.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-12
- Publication Date
- 2026-11-24
AI Technical Summary
Existing spray test devices operate under limited conditions, making it difficult to conveniently adjust the relative height between the packing layer and the spray nozzle. This makes it challenging to systematically compare the spray uniformity and droplet distribution range under different conditions. Furthermore, traditional devices are complex to disassemble and clean, affecting the continuity of experiments and the accuracy of data.
An adjustable tower liquid spray test device is adopted. The height of the multi-hole lifting plate is controlled by a lifting regulator. Combined with a servo-driven grab hook and a nozzle transfer plate, the nozzle replacement and cleaning are automated, forming an automated process that eliminates human error.
This enables efficient and continuous comparison of spray performance, ensuring consistent nozzle status each time, improving the continuity of experiments and data comparability, and providing precise data support for industrial tower design.
Smart Images

Figure CN123155237A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of liquid spraying test technology for packed towers, and specifically to an adjustable liquid spraying test device for towers. Background Technology
[0002] Packed towers, as core equipment in chemical separation processes, rely heavily on the initial uniformity of liquid distribution from the top liquid distributor for their separation efficiency. To optimize the design of spray systems, the industry typically utilizes specialized testing equipment to simulate and evaluate spray effects under different operating conditions. However, existing spray testing equipment has the following significant drawbacks in practical applications: The existing test equipment operates under a single mode, making it difficult to conveniently adjust the relative height between the packing layer and the spray nozzle. This makes it challenging to systematically compare key indicators such as spray uniformity and droplet distribution range under different operating conditions. Furthermore, when conducting multiple comparative experiments, it is not convenient to replace spray heads of different specifications or types. Moreover, the experimental process is highly dependent on manual intervention. From adjusting the height and replacing the spray head to reinstalling and debugging, each step requires manual operation. This discrete and discontinuous operation mode makes it extremely difficult to conduct large-scale, high-throughput spray performance screening experiments, and it cannot meet the needs of modern, intelligent laboratories for efficient and unmanned operation. Traditional experimental devices often employ fixed structures, which are difficult to disassemble and clean, prone to clogging, and make it impossible to visually observe the spraying status. When the spray head becomes clogged due to impurities or crystals in the medium, the machine must be stopped and a complex manual disassembly must be performed for cleaning. This not only severely disrupts the continuity of the experiment and reduces research and development efficiency, but also makes it difficult to ensure that the performance of the spray head is restored to a consistent state after each cleaning, thus affecting the comparability of experimental data. Traditional experimental setups lack standardized structures for observing spray conditions and measuring the distribution range, as well as standardized automatic cleaning and positioning installation mechanisms. Various factors during manual operation can directly lead to fluctuations in experimental data, reducing the accuracy and reliability of experimental results and making it difficult to provide accurate data support for industrial scale-up design. Therefore, it is necessary to invent an adjustable tower liquid spray test device. Summary of the Invention
[0003] To achieve the above objectives, the present invention provides the following technical solution: an adjustable tower liquid spray test device, comprising an adjustable test tower, a pressure-stabilizing liquid supply assembly, and a quick-install cleaning assembly for spray heads; The adjustable test tower includes a visual test tower, which is made of high borosilicate glass. A waste liquid recovery storage tank is installed at the bottom of the visual test tower, and a top cover is installed at the top of the visual test tower. A perforated lifting plate is slidably installed inside the visual test tower. The top of the perforated lifting plate is used to place a packing layer. A lifting adjuster is installed on the top cover, and the lifting adjuster is used to drive and adjust the height of the perforated lifting plate. The pressure-stabilizing liquid supply assembly includes a liquid supply pipe, which is located outside the visual test tower. The upper end of the liquid supply pipe penetrates the visual test tower and extends to the center of the visual test tower. A split-type nozzle is inserted and installed at the upper end of the liquid supply pipe. The lower end of the liquid supply pipe is connected to a conveying pipeline, and the input end of the conveying pipeline is connected to the lower part of the waste liquid recovery storage tank. The quick-release cleaning assembly for the spray head includes a transfer chamber, which is fixedly installed on the upper part of the visual test tower away from the liquid supply pipe. A spray head transfer device is rotatably installed inside the transfer chamber. The spray head transfer device includes a spray head transfer disc, and a telescopic cantilever is installed inside the spray head transfer disc. A servo-driven gripper capable of fixing and gripping a split spray head is installed at the extended end of the telescopic cantilever. A cleaning chamber is installed at the end of the transfer chamber away from the visual test tower.
[0004] Preferably, the lifting adjuster includes a high-precision hydraulic rod, which is fixedly installed on the top surface of the top cover. A lifting frame is fixedly installed on the upper end of the high-precision hydraulic rod, and a lifting frame is fixedly installed on the upper output end of the lifting frame. Connecting rods are fixedly installed around the lifting frame, and the lower end of the connecting rods penetrates the top cover downward and is fixedly connected to a multi-hole lifting plate.
[0005] Preferably, the split-type nozzle includes a spray head, the bottom of which is provided with a plurality of spray holes, and a spray interface is fixedly installed on the top of which is connected to the interior of the spray head. The bottom of the spray interface is connected to the interior of the spray head. One side of the spray interface is sealed, and the other side is provided with an opening that can be fitted onto the output end of the liquid supply pipe. The inner wall of the opening of the spray interface is provided with a sealing structure.
[0006] Preferably, a motor bracket is installed at the bottom of the transfer chamber, a servo motor is installed at the bottom of the motor bracket, and the upper output end of the servo motor extends upward into the transfer chamber and is fixedly connected to the nozzle transfer plate.
[0007] Preferably, the nozzle transfer disc has nozzle storage slots on opposite sides, and the spray head can be embedded in the nozzle storage slots. The nozzle transfer disc has internal sliding grooves arranged opposite to each other, and the two sets of internal sliding grooves correspond one-to-one with the two sets of nozzle storage slots. One end of the internal sliding groove leads to the corresponding nozzle storage slot.
[0008] Preferably, the telescopic cantilever is slidably installed in the internal groove, and the servo-driven gripper hook installed at the extended end of the telescopic cantilever has a C-shaped gripping structure, which can clamp the connecting neck of the spray head and the spray interface. A hydraulic push rod is installed inside the internal groove, and the output end of the hydraulic push rod is fixedly connected to the end of the telescopic cantilever away from the servo-driven gripper hook.
[0009] Preferably, a cleaning brush plate and a high-pressure cleaning nozzle are arranged and installed at the bottom of the cleaning chamber, with the cleaning brush plate and the high-pressure cleaning nozzle being distributed at intervals at the bottom of the cleaning chamber. The input end of the high-pressure cleaning nozzle is connected to the city water supply system. A curved top cover is installed on the top of the cleaning chamber, and a curved flip cover is installed on one side of the curved top cover.
[0010] Preferably, a diaphragm pump is fixedly installed at the connection between the lower end of the supply pipe and the delivery pipe. From the diaphragm pump at the lower end, the supply pipe is connected to a return pipe, a flow regulating valve, a pressure gauge and a float flow meter from bottom to top. The output end of the return pipe is connected to a waste liquid recovery storage tank.
[0011] Preferably, a discharge pipeline is installed on the side wall of the delivery pipeline near the diaphragm pump, and servo-driven fluoropolymer-lined ball valves are installed on the delivery pipeline, return pipeline, and discharge pipeline.
[0012] Preferably, a perforated bottom plate is installed at the bottom of the inner wall of the visual test tower. The perforated bottom plate has a plurality of drainage holes. A waste liquid collection hopper is fixedly installed at the bottom of the perforated bottom plate, and the lower end of the waste liquid collection hopper tapers towards the center.
[0013] The beneficial effects of this invention are: This spray test device places the test packing layer on a perforated lifting plate, starts the pressure-stabilizing liquid supply assembly to smoothly deliver the medium to the split nozzles for spraying, and then controls the lifting of the perforated lifting plate by the lifting regulator to achieve flexible control of the vertical installation distance between the packing layer and the spray cloth nozzles, thereby achieving efficient comparison of key indicators such as spray uniformity and droplet distribution range under different working conditions. This invention uses a servo-driven gripper at the front end of a telescopic cantilever to grab a split nozzle installed at the output end of the liquid supply pipe. Then, with the help of a nozzle transfer plate, it moves the nozzle out of the visual test tower. At the same time, the nozzle transfer plate transfers another split nozzle of a different specification into the visual test tower and installs it, so as to achieve the effect of automatically completing the rapid replacement and continuous testing of nozzles of different specifications. The split nozzles that are transferred from the visual test tower enter the cleaning chamber and undergo standardized online cleaning to reduce the time for nozzle replacement and cleaning, greatly improving the continuity of the experiment. At the same time, it ensures that each nozzle is in the best and consistent condition before the experiment, fundamentally solving the problem of experimental error caused by nozzle blockage or incomplete cleaning. This invention integrates the discrete operations of replacing, cleaning, and installing split-type nozzles into an automated process uniformly scheduled by a control system through a lifting regulator and a nozzle transfer device. This method eliminates human error and ensures that each time a split-type nozzle is installed, it can be restored to the preset precise position and posture. It also eliminates the centering error and height deviation caused by manual installation, making the test highly consistent and comparable, and providing a more accurate and reliable data foundation for optimizing the design of industrial towers. Attached Figure Description
[0014] Figure 1 The front view provided for this invention; Figure 2 A cross-sectional view provided for this invention; Figure 3 This is a schematic diagram of the lifting regulator structure provided by the present invention; Figure 4 This is a top view of the interior of the visual test tower provided by the present invention; Figure 5 This is a schematic diagram of servo-driven gripping hook provided by the present invention; Figure 6 This is a schematic diagram of the installation of the split-type nozzle provided by the present invention; Figure 7 This is a schematic diagram of the curved flip cover opening provided by the present invention; Figure 8 This is a cross-sectional view of the cleaning chamber provided by the present invention; Figure 9 Provided by the present invention Figure 8 Detail image A; Figure 10 This is a schematic diagram of the nozzle transfer device provided by the present invention; Figure 11 This is a schematic diagram of the internal structure of the nozzle transfer disc provided by the present invention.
[0015] In the diagram: 111. Waste liquid recovery storage tank; 112. Visual test tower; 113. Perforated bottom plate; 114. Waste liquid collection hopper; 115. Top cover; 121. High-precision hydraulic rod; 122. Lifting top frame; 123. Connecting rod; 124. Perforated lifting plate; 131. Supply pipe; 132. Float flow meter; 133. Pressure gauge; 134. Flow regulating valve; 135. Diaphragm pump; 136. Delivery pipeline; 137. Return pipeline; 138. Discharge pipe, 141. Spray head, 142. Spray interface, 151. Transfer chamber, 152. Motor bracket, 153. Servo motor, 161. Spray head transfer plate, 162. Spray head storage slot, 163. Internal slide, 164. Telescopic cantilever, 165. Hydraulic push rod, 166. Servo-driven grab hook, 171. Cleaning chamber, 172. Curved top cover, 173. Curved flip cover, 174. Cleaning brush plate, 175. High-pressure cleaning nozzle. Detailed Implementation
[0016] The preferred embodiments of the present invention will be described below with reference to the accompanying drawings. It should be understood that the preferred embodiments described herein are for illustration and explanation only and are not intended to limit the present invention.
[0017] like Figure 1 - Figure 3 and Figure 5 - Figure 7 As shown, an adjustable tower liquid spray test device includes an adjustable test tower, a pressure-stabilizing liquid supply assembly, and a quick-install cleaning assembly for spray heads; The adjustable test tower includes a visual test tower 112, which is made of high borosilicate glass. A waste liquid recovery storage tank 111 is installed at the bottom of the visual test tower 112, and a top cover 115 is installed at the top of the visual test tower 112. A perforated lifting plate 124 is slidably installed inside the visual test tower 112. The top of the perforated lifting plate 124 is used to place the packing layer. A lifting adjuster is installed on the top cover 115, which is used to drive and adjust the height of the perforated lifting plate 124. The pressure-stabilizing liquid supply assembly includes a liquid supply pipe 131, which is located outside the visual test tower 112. The upper end of the liquid supply pipe 131 passes through the visual test tower 112 and extends to the center of the visual test tower 112. A split-type nozzle is inserted and installed at the upper end of the liquid supply pipe 131. The lower end of the liquid supply pipe 131 is connected to a conveying pipe 136, and the input end of the conveying pipe 136 is connected to the lower part of the waste liquid recovery storage tank 111. The quick-release cleaning assembly for the spray head includes a transfer chamber 151, which is fixedly installed on the upper part of the visual test tower 112 away from the liquid supply pipe 131. A spray head transfer device is rotatably installed inside the transfer chamber 151. The spray head transfer device includes a spray head transfer plate 161, and a telescopic cantilever 164 is installed inside the spray head transfer plate 161. A servo-driven gripper 166 capable of fixing and gripping the split spray head is installed at the extended end of the telescopic cantilever 164. A cleaning chamber 171 is installed at the end of the transfer chamber 151 away from the visual test tower 112.
[0018] In the above embodiments, it should be noted that: (1) During the test assembly, industrial fillers of different specifications are first evenly laid on the perforated lifting plate 124, and the height of the perforated lifting plate 124 is controlled by the lifting regulator to maintain it in the middle section of the visible test tower 112, so as to ensure that the filler is laid flat, the force is uniform, there is no gap, and there are no voids. Then, the split nozzle is installed at the output end of the liquid supply pipe 131 to ensure that the spray nozzle is vertically aligned with the center area of the filler below, the centering accuracy is high, and there will be no off-center spraying. (2) During the formal test, the acid or alkaline test medium is added to the waste liquid recovery storage tank 111, and the pressure stabilizing liquid supply assembly is turned on. The acid or alkaline medium is smoothly transported to the split nozzle through the liquid supply pipe 131 and sprayed downward from the spray nozzle, evenly falling on the surface of the packing layer. The operator can directly observe the spray shape, diffusion range, liquid distribution uniformity and overall packing wetting effect under different spray heights through the visual test tower 112. At the same time, observe whether there are scale, siltation, blockage or other adverse conditions inside the spray nozzle. Under the same flow rate and pressure conditions, the installation height of the multi-hole lifting plate 124 is adjusted up and down using the lifting regulator. Low, medium and high spray spacings are set respectively. Multiple sets of comparative tests are carried out in sequence. After each height adjustment and stable operation for a certain period of time, the test data such as spray coverage diameter, liquid drop point uniformity and packing wetting area are recorded. The influence of spray height change on the initial liquid distribution effect is compared and analyzed. (3) During the test, all the acid and alkali media that fell were collected into the waste liquid recovery storage tank 111 to achieve closed-loop recovery. It can be reused repeatedly and will not cause safety problems such as media leakage or corrosion splashing. (4) After the test is completed, shut down the pressure-stabilizing liquid supply assembly, start the nozzle transfer device, extend the servo-driven gripper 166 at the front end of the telescopic cantilever 164, remove the split nozzle installed at the output end of the liquid supply pipe 131, and then move it out to the cleaning chamber 171 with the help of the nozzle transfer plate 16. The split nozzle is thoroughly cleaned and impurities are cleared. The cleaned split nozzle can be reinstalled at the output end of the liquid supply pipe 131 through the nozzle transfer device to continue the same group of tests. Alternatively, a split nozzle of different specifications can be replaced and installed at the output end of the liquid supply pipe 131 through the nozzle transfer device to conduct another group of tests. This spray test device places the test packing layer on the perforated lifting plate 124, activates the pressure-stabilizing liquid supply assembly to smoothly deliver the medium to the split-type nozzles for spraying, and then controls the lifting of the perforated lifting plate 124 through the lifting regulator to achieve flexible control of the vertical installation distance between the packing layer and the spray nozzle. It can quickly, accurately and safely complete comparative tests of spray performance under different spray heights, different packing types and different acid and alkaline media conditions, effectively optimize the structural parameters of the tower spray device, improve the uniformity of liquid distribution in the industrial tower, reduce the probability of clogging, and extend the service life of the equipment. This invention uses a servo-driven gripper 166 at the front end of a telescopic cantilever 164 to grab a split-type nozzle installed at the output end of the liquid supply pipe 131. Then, in conjunction with a nozzle transfer plate 161, the nozzle is moved out of the visual test tower 112. Simultaneously, the nozzle transfer plate 161 transfers another type of split-type nozzle into the visual test tower 112 and installs it, achieving the effect of automatically and quickly changing and continuously testing nozzles of different specifications. The split-type nozzle transferred from the visual test tower 112 enters the cleaning chamber 171 for standardized online cleaning, thereby reducing nozzle replacement and cleaning time, greatly improving the continuity of the experiment, and ensuring that each nozzle is in optimal and consistent condition before the experiment, fundamentally solving the problem of experimental errors caused by nozzle blockage or incomplete cleaning. This invention integrates the discrete operations of replacing, cleaning, and installing split-type nozzles into an automated process uniformly scheduled by a control system through a lifting regulator and a nozzle transfer device. This method eliminates human error and ensures that each time a split-type nozzle is installed, it can be restored to the preset precise position and posture. It also eliminates the centering error and height deviation caused by manual installation, making the test highly consistent and comparable, and providing a more accurate and reliable data foundation for optimizing the design of industrial towers.
[0019] like Figure 1 - Figure 4 and Figure 7 As shown, an adjustable tower liquid spray test device further includes a lifting regulator comprising a high-precision hydraulic rod 121, which is fixedly installed on the top surface of the top cover 115. A lifting frame 122 is fixedly installed on the upper end of the high-precision hydraulic rod 121. A lifting frame 122 is fixedly installed on the upper output end of the lifting frame 122. A connecting rod 123 is fixedly installed around the lifting frame 122. The lower end of the connecting rod 123 passes downward through the top cover 115 and is fixedly connected to a perforated lifting plate 124. A perforated bottom plate 113 is installed at the bottom of the inner wall of the visible test tower 112. The perforated bottom plate 113 has several drainage holes. A waste liquid collection hopper 114 is fixedly installed at the bottom of the perforated bottom plate 113. The lower end of the waste liquid collection hopper 114 tapers towards the center.
[0020] In the above embodiments, it should be noted that the high-precision hydraulic rod 121 is connected to an external hydraulic component, power supply and control system. By controlling the extension distance of the high-precision hydraulic rod 121, the lifting top frame 122 is driven to move up and down, and the multi-hole lifting plate 124 is linked up and down through the connecting rod 123, so as to achieve precise adjustment of the spraying distance between the filler layer and the split nozzle, which facilitates the sequential implementation of multiple sets of comparative tests. The porous bottom plate 113 is used to filter out the acid and alkali media after passing through the packing layer. The acid and alkali media are collected in the waste liquid recovery storage tank 111 through the waste liquid collection hopper 114 to achieve closed-loop recovery and repeated recycling.
[0021] like Figure 2 , Figure 5 , Figure 6 , Figure 10 and Figure 11 As shown, an adjustable tower liquid spray test device further includes a split-type spray head including a spray head 141, with several spray holes at the bottom of the spray head 141, and a spray interface 142 fixedly installed at the top of the spray head 141. The bottom of the spray interface 142 is connected to the inside of the spray head 141. One side of the spray interface 142 is sealed, and the other side has an opening that can be fitted onto the output end of the liquid supply pipe 131. The inner wall of the opening of the spray interface 142 is fitted with a sealing structure. A motor bracket 152 is installed at the bottom of the transfer chamber 151, and a servo motor 153 is installed at the bottom of the motor bracket 152. The upper output end of the servo motor 153 extends upward into the transfer chamber 151 and is fixedly connected to the spray head transfer plate 161. The spray head transfer plate 161 is connected to the spray head transfer plate 161. Spray head 141 is embedded in the spray head 141 by a nozzle receiving slot 162 on both sides of the nozzle transfer plate 162. Internal sliding grooves 163 are arranged opposite each other inside the nozzle transfer plate 161. Two sets of internal sliding grooves 163 correspond one-to-one with two sets of spray head receiving slots 162. One end of each internal sliding groove 163 leads to the corresponding spray head receiving slot 162. A telescopic cantilever 164 is slidably installed within the internal sliding groove 163. A servo-driven gripper 166 with a C-shaped gripping structure is installed at the extended end of the telescopic cantilever 164, which can clamp the connecting neck of the spray head 141 and the spray interface 142. A hydraulic push rod 165 is installed inside the internal sliding groove 163. The output end of the hydraulic push rod 165 is fixedly connected to the end of the telescopic cantilever 164 away from the servo-driven gripper 166. In the above embodiments, it should be noted that the sealing structure installed on the inner wall of the spray interface 142 adopts a multi-layer sealing ring. By controlling the start of the servo motor 153, the spray head transfer disk 161 can be driven to rotate 180°. A micro servo motor is installed at the shaft of the servo-driven gripper 166. By controlling the start of the micro servo motor, the servo-driven gripper 166 can be manipulated to grip or release the neck connecting the spray head 141 and the spray interface 142. The hydraulic push rod 165 is connected to an external hydraulic component, power supply and control system. By driving the hydraulic push rod 165, the telescopic cantilever 164 is extended or retracted, so as to cooperate with the servo-driven grab hook 166 to push and install the spray interface 142 or disassemble the spray head 141 and put it into the spray head storage slot 162.
[0022] like Figure 2 , Figure 5 - Figure 9As shown, an adjustable tower liquid spray test device further includes a cleaning brush plate 174 and a high-pressure cleaning nozzle 175 arranged and installed at the bottom of the cleaning chamber 171. The cleaning brush plate 174 and the high-pressure cleaning nozzle 175 are distributed at intervals at the bottom of the cleaning chamber 171. The input end of the high-pressure cleaning nozzle 175 is connected to an urban water supply system. A curved top cover 172 is installed on the top of the cleaning chamber 171, and a curved flip cover 173 is installed on one side of the curved top cover 172.
[0023] In the above embodiments, it should be noted that when the nozzle transfer plate 161 drives the spray head 141 to rotate into the cleaning chamber 171, the bottom of the spray head 141 will rub against the bristles on the cleaning brush plate 174, and the high-pressure cleaning nozzle 175 will be activated to spray high-pressure water to rinse the bottom of the spray head 141, so as to achieve the effect of thoroughly cleaning the spray port at the bottom of the spray head 141 and the inside of the cavity and clearing impurities.
[0024] like Figure 1 and Figure 2 As shown, an adjustable tower liquid spray test device further includes a diaphragm pump 135 fixedly installed at the connection between the lower end of the supply pipe 131 and the delivery pipe 136. The supply pipe 131 is connected from bottom to top to the diaphragm pump 135 to a return pipe 137, a flow regulating valve 134, a pressure gauge 133, and a float flow meter 132. The output end of the return pipe 137 is connected to a waste liquid recovery storage tank 111. A discharge pipe 138 is installed on the side wall of the delivery pipe 136 near the diaphragm pump 135. Servo-driven fluoropolymer-lined ball valves are installed on the delivery pipe 136, the return pipe 137, and the discharge pipe 138.
[0025] In the above embodiments, it should be noted that by opening the electrically driven fluoropolymer-lined ball valve on the delivery pipeline 136, the diaphragm pump 135 is started to deliver the medium. The working pressure and flow rate of the pipeline are monitored in real time by the pressure gauge 133 and the float flow meter 132. The flow rate of the medium is precisely controlled by the flow regulating valve 134, so as to achieve the effect of smoothly delivering the acid and alkali medium to the split nozzle through the liquid supply pipe 131 and maintaining the stability of the test conditions. After the test, the acid and alkali media in the supply pipe 131 are returned to the waste liquid recovery storage tank 111 by opening the electrically driven fluoropolymer-lined ball valve on the return pipe 137; at the same time, the media in the waste liquid recovery storage tank 111 can be emptied by opening the electrically driven fluoropolymer-lined ball valves on the delivery pipe 136 and the discharge pipe 138.
[0026] The process of using this invention is as follows: First, those skilled in the art will evenly lay industrial packings of different specifications on the porous lifting plate 124. The height of the porous lifting plate 124 will be adjusted by the lifting regulator to maintain it in the middle section inside the visual test tower 112. Then, a split-type nozzle will be installed at the output end of the supply pipe 131, ensuring the spray nozzle is vertically aligned with the center area of the packing below. Next, acidic or alkaline test media will be added to the waste liquid recovery storage tank 111. The electrically driven fluoropolymer-lined ball valve on the delivery pipeline 136 will be opened, and then the diaphragm pump 135 will be started to deliver the media. The working pressure and flow rate of the pipeline will be monitored in real time by the pressure gauge 133 and the float flowmeter 132. The flow rate of the media will be precisely controlled by the flow regulating valve 134. The acid and alkaline media will be smoothly delivered to the split-type nozzle through the supply pipe 131 and sprayed downwards from the spray nozzle, evenly landing on the surface of the packing layer. The operator can visually observe the different spray heights throughout the process through the visual test tower 112. The spray shape, diffusion range, uniformity of liquid distribution, and overall wetting effect of the filler were assessed by adjusting the installation height of the perforated lifting plate 124 using a lifting regulator. Multiple sets of comparative tests were conducted sequentially. During the tests, all the acid and alkali media that fell were collected in the waste liquid recovery storage tank 111 for closed-loop recovery and repeated use. After the tests were completed, the pressure-stabilizing liquid supply assembly was shut off, and the nozzle transfer device was activated. The servo-driven grab hook 166 at the front end of the telescopic cantilever 164 was used to disassemble the split nozzle installed at the output end of the liquid supply pipe 131. Then, with the help of the nozzle transfer plate 16, the nozzle was moved out to the cleaning chamber 171 and thoroughly cleaned and cleared of impurities. After cleaning, the split nozzle could be reinstalled at the output end of the liquid supply pipe 131 using the nozzle transfer device to continue the same set of tests. Alternatively, a split nozzle of a different specification could be replaced and installed at the output end of the liquid supply pipe 131 using the nozzle transfer device to conduct another set of tests.
[0027] The above description is merely a preferred embodiment of the present invention. Any person skilled in the art can modify the present invention or modify it into an equivalent technical solution using the technical solutions described above. Therefore, any simple modifications or equivalent substitutions made based on the technical solutions of the present invention fall within the scope of protection claimed by the present invention.
Claims
1. An adjustable tower liquid spray test device, comprising an adjustable test tower, a pressure-stabilizing liquid supply assembly, and a quick-assembly cleaning assembly for spray heads, characterized in that: The adjustable test tower includes a visual test tower, which is made of high borosilicate glass. A waste liquid recovery storage tank is installed at the bottom of the visual test tower, and a top cover is installed at the top of the visual test tower. A perforated lifting plate is slidably installed inside the visual test tower. The top of the perforated lifting plate is used to place a packing layer. A lifting adjuster is installed on the top cover, and the lifting adjuster is used to drive and adjust the height of the perforated lifting plate. The pressure-stabilizing liquid supply assembly includes a liquid supply pipe, which is located outside the visual test tower. The upper end of the liquid supply pipe penetrates the visual test tower and extends to the center of the visual test tower. A split-type nozzle is inserted and installed at the upper end of the liquid supply pipe. The lower end of the liquid supply pipe is connected to a conveying pipeline, and the input end of the conveying pipeline is connected to the lower part of the waste liquid recovery storage tank. The quick-release cleaning assembly for the spray head includes a transfer chamber, which is fixedly installed on the upper part of the visual test tower away from the liquid supply pipe. A spray head transfer device is rotatably installed inside the transfer chamber. The spray head transfer device includes a spray head transfer disc, and a telescopic cantilever is installed inside the spray head transfer disc. A servo-driven gripper capable of fixing and gripping a split spray head is installed at the extended end of the telescopic cantilever. A cleaning chamber is installed at the end of the transfer chamber away from the visual test tower.
2. The adjustable tower liquid spray test device according to claim 1, characterized in that: The lifting regulator includes a high-precision hydraulic rod, which is fixedly installed on the top surface of the top cover. A lifting frame is fixedly installed on the upper end of the high-precision hydraulic rod. A lifting frame is fixedly installed on the upper output end of the lifting frame. Connecting rods are fixedly installed around the lifting frame. The lower end of the connecting rods penetrates the top cover downwards and is fixedly connected to a multi-hole lifting plate.
3. The adjustable tower liquid spray test device according to claim 1, characterized in that: The split-type spray head includes a spray head with several spray holes at the bottom and a spray interface fixedly installed at the top. The bottom of the spray interface is connected to the inside of the spray head. One side of the spray interface is sealed, and the other side has an opening that can be fitted onto the output end of the liquid supply pipe. The inner wall of the opening of the spray interface is fitted with a sealing structure.
4. The adjustable tower liquid spray test device according to claim 1, characterized in that: A motor bracket is installed at the bottom of the transfer chamber, and a servo motor is installed at the bottom of the motor bracket. The upper output end of the servo motor extends upward into the transfer chamber and is fixedly connected to the nozzle transfer plate.
5. The adjustable tower liquid spray test device according to claim 3, characterized in that: The nozzle transfer plate has nozzle storage slots on both sides opposite each other, and the spray head can be embedded in the nozzle storage slot. The nozzle transfer plate has internal sliding grooves arranged opposite each other inside, and the two sets of internal sliding grooves correspond one-to-one with the two sets of nozzle storage slots. One end of the internal sliding groove leads to the corresponding nozzle storage slot.
6. The adjustable tower liquid spray test device according to claim 5, characterized in that: The telescopic cantilever is slidably installed in the internal groove. The servo-driven gripper hook installed at the extended end of the telescopic cantilever has a C-shaped gripping structure, which can clamp the connecting neck of the spray head and the spray interface. A hydraulic push rod is installed inside the internal groove, and the output end of the hydraulic push rod is fixedly connected to the end of the telescopic cantilever away from the servo-driven gripper hook.
7. The adjustable tower liquid spray test device according to claim 1, characterized in that: The bottom of the cleaning chamber is equipped with cleaning brush plates and high-pressure cleaning nozzles, which are spaced apart. The input end of the high-pressure cleaning nozzles is connected to the city water supply system. The top of the cleaning chamber is equipped with a curved top cover, and a curved flip cover is installed on one side of the curved top cover.
8. The adjustable tower liquid spray test device according to claim 1, characterized in that: A diaphragm pump is fixedly installed at the connection between the lower end of the supply pipe and the delivery pipe. From the diaphragm pump at the lower end, the supply pipe is connected to a return pipe, a flow regulating valve, a pressure gauge and a float flow meter from bottom to top. The output end of the return pipe is connected to a waste liquid recovery storage tank.
9. The adjustable tower liquid spray test device according to claim 8, characterized in that: A discharge pipeline is installed on the side wall of the delivery pipeline near the diaphragm pump. Servo-driven fluoropolymer-lined ball valves are installed on the delivery pipeline, return pipeline, and discharge pipeline.
10. The adjustable tower liquid spray test device according to claim 1, characterized in that: The bottom of the inner wall of the visual test tower is equipped with a perforated bottom plate, which has several drainage holes. A waste liquid collection hopper is fixedly installed at the bottom of the perforated bottom plate, and the lower end of the waste liquid collection hopper tapers towards the center.