Test method and design method for a storage feed unit for an underwater relay station

By combining the silo and feeding device on land, the complexity of the underwater relay station testing system was solved, enabling efficient performance testing and equipment selection, and improving the efficiency of deep-sea mining technology development.

CN123155240APending Publication Date: 2026-11-24CHINA SHIP SCI RES CENT SHANGHAI DIV +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611323184.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-28
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

In existing technologies, the land-based performance testing system for underwater relay stations has a complex structure, resulting in high time costs for relay equipment design iteration and improvement, which restricts the efficiency of technology development.

Method used

By designing various combined test conditions of silos and feeding devices, the performance of the storage and feeding unit was tested and verified using a land-based test system, including the measurement of feeding rate and stability. Material circulation was formed using belt and screw conveyors, simplifying interface connections and observing the feeding situation.

Benefits of technology

It shortened the design, testing, iteration, and improvement time of relay equipment, improved the efficiency of technology development, simplified the structure of the testing system, and improved the comparability and adaptability of data.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123155240A_ABST
    Figure CN123155240A_ABST
Patent Text Reader

Abstract

The application relates to a test method and a design method of a storage unit for an underwater relay station, which comprises the following steps: determining variables of a test working condition; determining the test working condition: a plurality of test working conditions are generated by combining an alternative scheme of a stock bin and an alternative scheme of a feeding device; assembling a test system: selecting a test working condition, assembling and fixedly installing the stock bin and the feeding device on a rack, connecting the outlet of the feeding device with the inlet of a receiving box by using a first conveyor, and arranging a weighing device at the bottom of the receiving box for weighing the ore in the receiving box; feeding test: feeding amount measurement: under the condition that the stock bin stores ore, simultaneously starting the feeding device and the first conveyor, conveying the ore in the stock bin into the receiving box, and measuring the feeding amount parameter of the current test working condition by the weighing device; completing the feeding test of all test working conditions, shortening the time required for design, test iteration and improvement of the relay equipment, and improving the efficiency of technical development.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of deep-sea mining technology, and in particular to a test method and design method for a material storage and feeding unit for an underwater relay station. Background Technology

[0002] Deep-sea mining systems refer to the systems used to extract ore from the seabed to the surface. They typically consist of a surface support system, an underwater exploration system, an underwater mining system, an underwater transport system, and an environmental monitoring system. Currently, mainstream deep-sea mining solutions both domestically and internationally widely employ pipeline hydraulic lifting technology, which is considered the most commercially viable technological approach.

[0003] Submersible relay stations, as key operational equipment in deep-sea mining transportation systems, undertake multiple tasks including ore sorting, temporary ore storage, providing rigid pipe tension, and serving as underwater equipment installation platforms. Their application significantly improves the stability and reliability of mining systems, making them an indispensable pipeline hydraulic transportation device for the commercial exploitation of deep-sea mineral resources. To address the need for performance testing and experimental verification of underwater relay stations on land, existing methods involve setting up circulating silos and water storage tanks on land, connecting them to the inlet and outlet of the relay equipment via pipelines to construct a slurry circulation system. This simulates the actual ore transportation process within the relay equipment, enabling continuous operation of the relay equipment on land. Monitoring the operating status of the relay equipment allows for performance evaluation, addressing the performance verification issues after the development of various relay equipment prototypes.

[0004] However, the aforementioned testing system has a complex structure, and when the underwater relay station is found to be functionally unsatisfactory after testing following design and trial production, it is necessary to first identify the specific unit with the problem, then redesign, trial produce, and test again. This process results in high time costs for the design iteration and improvement of relay equipment, which restricts the efficiency of technology development. Summary of the Invention

[0005] In response to the shortcomings of the existing production technologies, the applicant provides a test method and design method for a feeding unit for underwater relay stations, thereby shortening the time required for the design, testing, iteration and improvement of relay equipment and improving the efficiency of technology development.

[0006] The technical solution adopted in this invention is as follows: A test method for a material storage and feeding unit for an underwater relay station, the material storage and feeding unit comprising a hopper and a feeding device disposed at an outlet below the hopper, the test method for the material storage and feeding unit of the underwater relay station comprising the following steps: Step 1: Determine the variables of the test conditions: Design N alternative silo schemes, with different cone angles for the lower conical hoppers of the silos. Given a fixed rated feed rate, design M alternative feeding device schemes. Step 2: Determine the test conditions: The alternative solutions for the silo and the alternative solutions for the feeding device are combined to generate a variety of test conditions; Step 3: Assemble the test system: Select a test condition, assemble and fix the hopper and feeding device on the frame, and use the first conveyor to connect the outlet of the feeding device to the inlet of the receiving box. The bottom of the receiving box is equipped with a weighing device for weighing the ore in the receiving box. Step 4: Feeding Test Measurement of feed rate: With ore stored in the silo, the feeding device and the first conveyor are started simultaneously to transport the ore in the silo to the receiving box. The feed rate parameters of the current test condition are measured by the weighing device. Step 5: Complete feeding tests for all test conditions: Repeat steps 2 to 4 to perform feeding tests for all test conditions.

[0007] As a further improvement to the above technical solution: In the step of measuring the feed rate, observe whether the ore in the hopper falls smoothly under the current working conditions, and record whether the feeding device feeds smoothly.

[0008] The testing system also includes a second conveyor; Step three also includes using a second conveyor to connect the receiving box to the inlet of the silo; Before measuring the feed rate, the ore in the receiving box is transported to the silo by the second conveyor. Step four also includes a feeding stability test: the feeding device, the first conveyor and the second conveyor work simultaneously. While the second conveyor transports part of the ore in the receiving box to the silo, the first conveyor transports the ore from the outlet of the feeding device to the receiving box to form a material circulation. The weight change of the ore in the receiving box is detected by a weighing device to see if it is stable.

[0009] In step four, extend the time for the feeding stability test and observe the wear of the feeding device after the test is completed.

[0010] The first conveyor is a belt conveyor, with its inlet located below the outlet of the feeding device and its outlet located above the top opening of the receiving box.

[0011] The second conveyor includes a first conveying section and a second conveying section, both of which are screw conveyors. The feed end of the first conveying section is located inside the receiving box, the discharge end of the first conveying section is connected to the feed end of the second conveying section, and the discharge end of the second conveying section is located above the top opening of the hopper.

[0012] The bottom of the receiving box is provided with a discharge port, and the discharge port is provided with a switch valve; The second conveyor is a belt conveyor, with its inlet located below the discharge port and its outlet located above the top opening of the hopper.

[0013] The test system also includes a first level gauge for detecting the material level in the silo, the first level gauge being located above the upper feed inlet of the silo.

[0014] A design method for an underwater relay station, characterized in that: after testing the feeding unit using the test method for the feeding unit of an underwater relay station as described in any of the above-mentioned methods, the following steps are performed: Determine the selection of the underwater relay station's material storage and feeding unit: Select the silo and feeding device corresponding to the test conditions that meet the requirements of feeding rate parameters and feeding stability.

[0015] As a further improvement to the above technical solution: The method also includes parameter calibration of the feeding unit: The test system was assembled according to the selected underwater relay station material feeding unit; Set the speed of the feeding device motor and measure the feeding amount at the current speed; Change the speed of the feeding device motor and measure the feeding amount again; The feed rate was measured at different speeds to obtain the speed-feed rate characteristic curve of the feeder, which was used for actual control parameter calibration.

[0016] The beneficial effects of this invention are as follows: This invention selects and combines silos and feeding devices with different performance parameters to form multiple test conditions. By testing and verifying the performance of storage and feeding, the core part of the storage and feeding in the underwater relay station is first verified on land, which assists in the design of the underwater relay station and equipment selection. This shortens the time required for the design, testing, iteration and improvement of relay equipment and improves the efficiency of technology development.

[0017] Furthermore, the present invention also has the following advantages: (1) Setting up a second conveyor in the test system can not only realize the feeding of ore in the silo before the feeding amount is measured, but also form a closed loop circulation of materials between the receiving box and the silo, which is convenient for long-term feeding tests.

[0018] (2) Dry ore is used as the test material. A belt conveyor is used as the first conveyor to transport the ore from the outlet of the feeding device to the receiving box, simplifying the connection between the receiving box and the feeding device. At the same time, it is convenient to observe the outlet of the feeding device and the discharge volume. The influence of other structures in the test system on the storage and feeding unit is minimized, making the comparability of measurement data under different working conditions higher.

[0019] (3) Using a series screw conveyor as the second conveyor makes it easy to lift the ore in the receiving box directly into the silo, and is also conducive to the fine adjustment of the material conveying volume of the second conveyor.

[0020] (4) The second conveyor adopts the form of a leather conveyor, which is used in conjunction with the material drop port at the bottom of the receiving box to transfer the ore inside the receiving box to the silo. This can increase the maximum ore conveying capacity of the test system and facilitate a wide range of adjustable ore circulation conveying capacity, thereby improving the adaptability of the test system.

[0021] (5) The selection and verification of the material storage and feeding unit are carried out through the test of the material storage and feeding unit. At the same time, the parameter calibration of the feeding unit can be carried out by the test system. The calibration of control parameters can be realized in the design stage, thereby improving the design optimization efficiency of the underwater relay station. Attached Figure Description

[0022] Figure 1 This is a schematic diagram of a structure according to an embodiment of the present invention.

[0023] Figure 2 This is a schematic diagram of the structure of an embodiment of the present invention (from another perspective).

[0024] Figure 3 This is a schematic diagram of the structure of the silo of the present invention.

[0025] Figure 4 This is a schematic diagram of the structure of different conical angle hoppers of the present invention.

[0026] Figure 5 This is a schematic diagram of another embodiment of the present invention.

[0027] The components are: 1. Frame; 11. First level gauge; 12. Second level gauge; 2. Hopper; 21. Transparent structure; 22. Conical hopper; 3. Feeding device; 4. First conveyor; 5. Receiving box; 51. Discharge port; 52. Drop port; 6. Weighing device; 7. Second conveyor; 71. First conveying section; 72. Second conveying section. Detailed Implementation

[0028] The specific embodiments of the present invention will now be described with reference to the accompanying drawings.

[0029] Example 1: like Figures 1-4 As shown, the test method for the feeding unit of an underwater relay station in this embodiment includes a hopper 2 and a feeding device 3 located at the outlet below the hopper 2. The test method for the feeding unit of the underwater relay station includes the following steps: Step 1: Determine the variables of the test conditions: Design N alternative schemes for silo 2, with different cone angles for the lower conical hopper 22 of silo 2. Design M alternative schemes for feeding device 3 under the given rated feeding capacity. Specifically, the cone angle can be selected in three forms: 30°, 45°, and 60°. The variable parameters of the feeding device 3 include the structure of the feeding channel of the feeding device 3. The parameters of the feeding channel structure include the number of impeller blades, the impeller form (right angle, tilt angle), and whether there is a gate valve at the inlet of the feeding device 3. The variable parameters of different alternative schemes also include the torque of the drive motor of the feeding device 3. Different variable parameters can be selected to form alternative schemes of the feeding device 3 according to the experimental needs.

[0030] Step 2: Determine the test conditions: The alternative schemes for silo 2 and feeding device 3 are combined to generate various test conditions; Specifically, there are N×M test conditions. When combining test conditions, the feeding devices 3 of different alternative schemes can be combined sequentially while keeping the silo 2 scheme fixed, to form N×M test conditions.

[0031] Step 3: Assemble the test system: Select the test conditions of this embodiment, assemble and fix the hopper 2 and the feeding device 3 on the frame 1, and use the first conveyor 4 to connect the outlet of the feeding device 3 to the inlet of the receiving box 5. The bottom of the receiving box 5 is equipped with a weighing device 6 for weighing the ore in the receiving box 5. Specifically, the frame 1 of the testing system is used to mount various testing equipment, providing support and protection. A working platform is built on the frame 1 to facilitate the feeding, testing, and equipment maintenance by testing personnel. The working platform is equipped with guardrails for protection and to attach safety ropes, preventing testing personnel from climbing and causing danger. A ladder is installed on the frame 1 to facilitate the climbing of testing personnel onto the working platform. The receiving box 5 is used to temporarily store the ore supplied by the feeding device 3, and the weighing device 6 is used to display the weight of the ore in the receiving box 5 in real time. The receiving box 5 also includes a discharge port 51 for discharging the ore from the receiving box 5.

[0032] Step 4: Feeding Test Measurement of feed rate: With ore stored in silo 2, feed device 3 and first conveyor 4 are started simultaneously to transport the ore in silo 2 to receiving box 5. The feed rate parameters of the current test condition are measured by weighing device 6. Specifically, before measuring the feed rate, it is necessary to ensure that the amount of ore stored in the silo 2 is sufficient to support the stable operation of the feeding device 3 for a period of time. The specific amount of ore to be stored is the total amount of test ore. The weighing device 6 continuously collects the weight of the ore in the receiving box 5. The ratio of the increase in the weight of the ore in the receiving box 5 per unit time to the unit time is the real-time feed rate under the current working condition. During the measurement of the feed rate, the maximum or average value of the feed rate can be measured, and the total time required for all the test ore to be discharged from the silo 2 (i.e., the complete feeding time) can also be recorded. In this embodiment, the feed rate parameters include one or more of the real-time feed rate, the maximum value of the feed rate, the average value of the feed rate, and the complete feeding time.

[0033] Step 5: Complete feeding tests for all test conditions: Repeat steps 2 to 4 to perform feeding tests for all test conditions.

[0034] After completing the feeding tests under all test conditions, the performance of different feeding conditions was compared, and the specific scheme of the hopper 2 and feeding device 3 corresponding to the test condition with better performance was selected for use in the subsequent design and manufacturing of the entire underwater relay station system.

[0035] The entire underwater relay station system is complex and has many functional components. The test method for the material storage and feeding unit of the underwater relay station in this embodiment selects silos 2 and feeding devices 3 with different performance parameters and combines them to form multiple test conditions. By testing and verifying the performance of the material storage and feeding, the core part of the material storage and feeding in the underwater relay station is first verified on land, which assists in the design of the underwater relay station and the selection of equipment. This shortens the time required for the design, testing, iteration and improvement of relay equipment and improves the efficiency of technology development.

[0036] In this embodiment, during the feeding measurement step, it is observed whether the ore in the hopper 2 falls smoothly under the current working conditions, and the feeding of the feeding device 3 is recorded as smooth.

[0037] Specifically, the uneven descent of ore in silo 2 includes arching, which means that the ore adheres to the inner wall of silo 2 and cannot fall; the feeding device 3 is not smooth, including jamming during the feeding process; whether the ore in silo 2 falls smoothly under the current working conditions can be monitored by a camera throughout the test.

[0038] Example 2: The test method for the feeding unit of the underwater relay station in this embodiment is further optimized based on Embodiment 1: Step 1: Determine the variables of the test conditions: Design N alternative schemes for silo 2, with different cone angles for the lower conical hopper 22 of silo 2. Design M alternative schemes for feeding device 3 under the condition of determining the rated feeding amount.

[0039] Step 2: Determine the test conditions: The alternative schemes for silo 2 and feeding device 3 are combined to generate a variety of test conditions.

[0040] Step 3: Assemble the test system: Select the test conditions of this embodiment, assemble and fix the hopper 2 and the feeding device 3 on the frame 1, and use the first conveyor 4 to connect the outlet of the feeding device 3 to the inlet of the receiving box 5. The bottom of the receiving box 5 is equipped with a weighing device 6 for weighing the ore in the receiving box 5. The test system also includes a second conveyor 7, which connects the receiving box 5 to the inlet of the silo 2; Before measuring the feed amount, the ore in the receiving box 5 is transported to the silo 2 by the second conveyor 7.

[0041] Step 4: Feeding Test Measurement of feed rate: With ore stored in silo 2, feed device 3 and first conveyor 4 are started simultaneously to transport the ore in silo 2 to receiving box 5. The feed rate parameters of the current test condition are measured by weighing device 6. Feeding stability test: The feeding device 3, the first conveyor 4 and the second conveyor 7 work at the same time. The second conveyor 7 transports part of the ore in the receiving box 5 to the silo 2, while the first conveyor 4 transports the ore from the outlet of the feeding device 3 to the receiving box 5 to form a material circulation. The weight change of the ore in the receiving box 5 is detected by the weighing device 6 to see if it is stable. Specifically, the feeding rates of the first conveyor 4 and the second conveyor 7 need to be adjusted to be close. The specific adjustment method can be based on the actual feeding rate in the receiving box 5 to adjust the feeding speed of the second conveyor 7; "the weight change of the ore in the receiving box 5 is detected by the weighing device 6 to see if it is stable". Specifically, the weight value measured by the weighing device 6 can be observed to see if it is stable.

[0042] Step 5: Complete feeding tests for all test conditions: Repeat steps 2 to 4 to perform feeding tests for all test conditions.

[0043] The second conveyor 7 is set in the test system, which can not only realize the feeding of ore in the silo 2 before the feeding amount is measured, but also form a closed loop circulation of materials between the receiving box 5 and the silo 2, which is convenient for long-term feeding tests.

[0044] Furthermore, in this embodiment, the feeding stability test time is extended in step four, and the wear of the feeding device 3 is observed after the test is completed.

[0045] Specifically, observing the wear condition mainly involves testing the wear resistance of the impeller of the feeding device 3.

[0046] Example 3: Based on Embodiment 2, in the test method of the material storage and feeding unit for the underwater relay station in this embodiment, the first conveyor 4 is a belt conveyor, the feed end of the first conveyor 4 is located below the discharge port of the feeding device 3, and the discharge end of the first conveyor 4 is located above the top opening of the receiving box 5.

[0047] Specifically, the ore used in the test method of this embodiment is dry material.

[0048] Dry ore was used as the test material. A belt conveyor was used as the first conveyor 4 to transport the ore from the outlet of the feeding device 3 to the receiving box 5. This simplified the connection between the receiving box 5 and the feeding device 3, facilitated the observation of the outlet condition of the feeding device 3 and the discharge rate, and minimized the impact of other structures in the test system on the performance of the feeding unit, making the comparability of measurement data under different working conditions higher.

[0049] In one specific implementation, such as Figure 1 , Figure 2 As shown, the second conveyor 7 includes a first conveying section 71 and a second conveying section 72. Both the first conveying section 71 and the second conveying section 72 are screw conveyors. The feed end of the first conveying section 71 is located inside the receiving box 5. The discharge end of the first conveying section 71 is connected to the feed end of the second conveying section 72. The discharge end of the second conveying section 72 is located above the top opening of the hopper 2.

[0050] Specifically, the conveying directions of the first conveying section 71 and the second conveying section 72 are perpendicular.

[0051] Using a screw conveyor in series as the second conveyor 7 facilitates the direct lifting of ore from the receiving box 5 into the silo 2, and also allows for precise adjustment of the material conveying capacity of the second conveyor 7.

[0052] In another specific implementation, such as Figure 5As shown, the bottom of the receiving box 5 is provided with a discharge port 52, and a switch valve is provided on the discharge port 52; specifically, the opening size of the switch valve can be adjusted; the bottom side wall of the receiving box 5 is designed with an inclined surface to connect to the discharge port 52. The second conveyor 7 is a belt conveyor, the inlet end of the second conveyor 7 is located below the discharge port 52, and the outlet end of the second conveyor 7 is located above the top opening of the hopper 2.

[0053] The second conveyor 7 is a leather conveyor, which works with the discharge port 52 at the bottom of the receiving box 5 to transfer the ore inside the receiving box 5 to the silo 2. This can increase the maximum ore conveying capacity of the test system and facilitate a wide range of adjustable ore circulation conveying capacity, thereby improving the adaptability of the test system.

[0054] In addition, the test system also includes a first level gauge 11 for detecting the material level in the silo 2, the first level gauge 11 being located above the upper feed inlet of the silo 2.

[0055] Specifically, the first level gauge 11 is fixedly installed on the working platform and can be detected by laser or ultrasonic means. The first level gauge 11 is used to detect the amount of material in the silo 2 and to confirm whether there is still ore in the silo 2.

[0056] Furthermore, the test system also includes a second level gauge 12 for detecting the material level in the silo 2. The side wall of the silo 2 is provided with a transparent structure 21 along the vertical direction. The second level gauge 12 is a vision camera that collects the material position information of the uppermost ore in the silo 2 through the transparent structure 21. The transparent structure 21 is an embedded transparent plate made of sapphire glass, which facilitates observation of the material level inside the silo 2 from the outside. The side wall is provided with scale lines. The result of the first level gauge 11 is compared with the actual measurement of the second level gauge 12 to verify the accuracy of the material level measurement and ensure that there is always material in the silo 2 during the test. The second level gauge 12 is fixedly installed on the work platform, which is also equipped with a lighting lamp for supplementary lighting.

[0057] Example 4: The design method for an underwater relay station in this embodiment is characterized by the following steps after testing the feeding unit using the testing method for the feeding unit of an underwater relay station in any of the above embodiments: Determine the selection of the underwater relay station's material storage and feeding unit: Select the silo 2 and feeding device 3 corresponding to the test conditions that meet the requirements of feeding quantity parameters and feeding stability.

[0058] The design methodology for underwater relay stations also includes parameter calibration of the feeding unit: The test system was assembled according to the selected underwater relay station material storage and feeding unit; Set the rotational speed of the motor of the feeding device 3, and measure the feeding amount at the current rotational speed; Change the speed of motor 3 of the feeding device and measure the feeding amount again; The feed rate was measured at different speeds to obtain the speed-feed rate characteristic curve of the feeder 3, which was used for actual control parameter calibration.

[0059] The selection and verification of the material storage and feeding unit are carried out through testing. At the same time, the parameters of the feeding unit can be calibrated using the testing system. The calibration of control parameters can be achieved during the design phase, thereby improving the design optimization efficiency of the underwater relay station.

[0060] The above description is an explanation of the present invention and not a limitation thereof. The scope of the present invention is defined by the claims. Within the scope of protection of the present invention, any form of modification may be made.

Claims

1. A test method for a feeding and storage unit for an underwater relay station, characterized in that: The feeding unit includes a silo (2) and a feeding device (3) located at the outlet below the silo (2). The test method for the feeding unit of the underwater relay station includes the following steps: Step 1: Determine the variables of the test conditions: Design N alternative schemes for silos (2). The cone angle of the lower conical hopper (22) of the silos (2) of different alternative schemes is different. Design M alternative schemes for feeding devices (3) under the condition of determining the rated feeding amount. Step 2: Determine the test conditions: The alternative schemes for the silo (2) and the alternative schemes for the feeding device (3) are combined to generate a variety of test conditions; Step 3: Assemble the test system: Select a test condition, assemble and fix the hopper (2) and the feeding device (3) on the frame (1), and use the first conveyor (4) to connect the outlet of the feeding device (3) to the inlet of the receiving box (5). The bottom of the receiving box (5) is equipped with a weighing device (6) for weighing the ore in the receiving box (5). Step 4: Feeding Test Measurement of feed rate: When there is ore stored in the silo (2), the feeding device (3) and the first conveyor (4) are started at the same time to transport the ore in the silo (2) to the receiving box (5), and the feed rate parameters of the current test condition are measured by the weighing device (6); Step 5: Complete feeding tests for all test conditions: Repeat steps 2 to 4 to perform feeding tests for all test conditions.

2. The test method for the feeding and storage unit of an underwater relay station as described in claim 1, characterized in that: In the step of measuring the feed rate, observe whether the ore in the silo (2) falls smoothly under the current working conditions, and record whether the feeding device (3) feeds smoothly.

3. The test method for the feeding and storage unit of an underwater relay station as described in claim 1, characterized in that: The test system also includes a second conveyor (7); Step three also includes using a second conveyor (7) to connect the receiving box (5) to the inlet of the silo (2); Before measuring the feed amount, the ore in the receiving box (5) is transported to the silo (2) by the second conveyor (7); Step four also includes a feeding stability test: the feeding device (3), the first conveyor (4) and the second conveyor (7) work at the same time. The second conveyor (7) transports part of the ore in the receiving box (5) to the silo (2), while the first conveyor (4) transports the ore from the outlet of the feeding device (3) to the receiving box (5) to form a material circulation. The weight change of the ore in the receiving box (5) is detected by the weighing device (6) to see if it is stable.

4. The test method for the feeding and storage unit for an underwater relay station as described in claim 3, characterized in that: In step four, the feeding stability test time is extended, and the wear of the feeding device (3) is observed after the test is completed.

5. The test method for the feeding and storage unit for an underwater relay station as described in claim 3, characterized in that: The first conveyor (4) is a belt conveyor. The feed end of the first conveyor (4) is located below the discharge port of the feeding device (3), and the discharge end of the first conveyor (4) is located above the top opening of the receiving box (5).

6. The test method for the feeding and storage unit for an underwater relay station as described in claim 5, characterized in that: The second conveyor (7) includes a first conveying section (71) and a second conveying section (72). Both the first conveying section (71) and the second conveying section (72) are screw conveyors. The feed end of the first conveying section (71) is located inside the receiving box (5). The discharge end of the first conveying section (71) is connected to the feed end of the second conveying section (72). The discharge end of the second conveying section (72) is located above the top opening of the silo (2).

7. The test method for the feeding and storage unit of an underwater relay station as described in claim 5, characterized in that: The bottom of the receiving box (5) is provided with a discharge port (52), and the discharge port (52) is provided with a switch valve; The second conveyor (7) is a belt conveyor. The feed end of the second conveyor (7) is located below the discharge port (52), and the discharge end of the second conveyor (7) is located above the top opening of the hopper (2).

8. The test method for the feeding and storage unit of an underwater relay station as described in claim 1, characterized in that: The test system also includes a first level gauge (11) for detecting the material level in the silo (2), the first level gauge (11) being located above the upper feed inlet of the silo (2).

9. A design method for an underwater relay station, characterized in that: After testing the feed unit using the test method for the feed unit of an underwater relay station according to any one of claims 1-8, the following steps are performed: Determine the selection of the underwater relay station's material storage and feeding unit: Select the silo (2) and feeding device (3) corresponding to the test conditions that meet the requirements of feeding quantity parameters and feeding stability.

10. The design method for an underwater relay station as described in claim 9, characterized in that: The method also includes parameter calibration of the feeding unit: The test system was assembled according to the selected underwater relay station material feeding unit; Set the speed of the motor of the feeding device (3) and measure the feeding amount at the current speed; Change the speed of the motor of the feeding device (3) and measure the feeding amount again; Complete the measurement of feed rate at different speeds to obtain the speed-feed rate characteristic curve of the feed device (3) for actual control parameter calibration.