Static instability test method and system for masonry ancient tower based on equivalent loading of substructure

By using the substructure equivalent loading method, the problems of high cost and difficulty in capturing the response of static stability tests of ancient brick and stone pagodas were solved. Controllable loading and repeatable tests were achieved under laboratory conditions, and key static instability indicators were obtained, providing technical support for the stability assessment of ancient pagodas.

CN123155241APending Publication Date: 2026-11-24TONGJI UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611344777.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-01
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing static stability test methods for ancient brick and stone pagodas are costly, require sophisticated equipment, and are difficult to capture in the critical instability stage. They also make it difficult to achieve controllable and repeatable loading paths and directly obtain relevant indices for tilting instability.

Method used

A substructure-based equivalent loading method was adopted. By setting the overall tilt angle target sequence, the target axial force, target bending moment and target shear force were calculated. The stress state of the brick and stone pagoda was simulated by vertical and horizontal loading units. A force-controlled step-by-step loading method was adopted. Combined with a data acquisition and control system, static instability indexes were obtained.

Benefits of technology

The controllable study of the tilting process of the ancient brick and stone pagoda under laboratory conditions was realized, which reduced the experimental cost, improved the controllability and repeatability of loading, and obtained a clear force-displacement response evolution process, which facilitates the identification of key features before and after instability and provides a basis for the stability assessment of the ancient pagoda.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123155241A_ABST
    Figure CN123155241A_ABST
Patent Text Reader

Abstract

This invention discloses a method and system for static instability testing of ancient brick and stone pagodas based on equivalent substructure loading. Belonging to the technical fields of building structure testing and ancient building conservation engineering, the method includes: selecting a representative section of the ancient pagoda as a substructure specimen; setting a sequence of tilt angles and calculating target axial force, bending moment, and shear force; arranging a loading beam, two vertical loading units, and a horizontal loading unit, converting the corresponding loading forces, applying axial force as the resultant force, bending moment as the difference, and shear force as the horizontal force; loading progressively until instability, collecting data, and outputting static instability indicators. This invention features a controllable loading path and strong repeatability, enabling the acquisition of tilt instability characteristics and static instability indicators of ancient brick and stone pagodas under laboratory conditions, providing technical support for stability assessment and restoration decisions of ancient brick and stone pagodas.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the fields of building structure testing and ancient building protection engineering technology, and in particular to a method and system for static instability testing of ancient brick and stone pagodas based on equivalent loading of substructures. Background Technology

[0002] During their long service life, ancient brick and stone pagodas may experience stability problems such as overall tilting accompanied by interlayer slippage or localized damage due to factors such as uneven foundation settlement, material deterioration, and localized defects. As tall structures dominated by their own weight, the stability issues of these pagodas often manifest as eccentric compression effects caused by the deviation of the line of action of the resultant gravity. Experimental research on their static stability under tilting conditions is helpful for safety assessments and repair decisions. Furthermore, since ancient brick and stone pagodas are constructed from stacked blocks, their material and structural behavior exhibits high dispersion, posing challenges to finite element analysis. Therefore, experimental research remains an important means of assessing the static instability of ancient brick and stone pagodas.

[0003] Following similarity relationships, a comprehensive structural test model of the prototype structure can be established. However, the tilting test of the comprehensive structure has high requirements for loading equipment and site conditions, and rapid overturning is prone to occur near instability, making it difficult to fully capture key mechanical responses. Existing methods for testing the bearing capacity, quasi-static, or compression-shear composite of masonry components primarily aim to obtain indicators such as the bearing capacity, shear resistance, ductility, and energy dissipation of the masonry. Their loading paths typically do not target the gradual evolution of gravity eccentricity during tilting, making it difficult to directly obtain indicators related to tilting static instability. Therefore, it is necessary to propose a test method and apparatus for testing the static stability of ancient brick and stone pagodas, to achieve a controllable and repeatable loading path and obtain experimental data related to tilting instability, providing an experimental basis for revealing the tilting instability mechanism of ancient brick and stone pagodas. Summary of the Invention

[0004] The purpose of this invention is to provide a static instability test method and system for brick and stone ancient pagodas based on equivalent loading of substructures, aiming to overcome the problems of high cost, high site and equipment requirements, and difficulty in capturing the response in the critical instability stage of existing overall structure tilt tests.

[0005] To achieve the above objectives, in a first aspect, the present invention provides a method for static instability testing of ancient brick and stone pagodas based on equivalent loading of substructures, comprising the following steps: S1. Select a representative section of the brick and stone ancient pagoda body as a substructure specimen and fix the substructure specimen to the base. S2. Set the overall tilt angle target sequence. Based on the self-weight of the upper equivalent structure above the top section of the substructure specimen, calculate the target axial force, target bending moment and target shear force corresponding to each tilt angle state according to the static equilibrium relationship. S3. A loading beam is set on the top of the substructure specimen, and a first vertical loading unit and a second vertical loading unit are arranged at intervals on the loading beam. Horizontal loading units are arranged on the side of the substructure specimen. S4. Based on the target axial force, target bending moment, and target shear force, the corresponding first vertical loading force, second vertical loading force, and horizontal loading force are calculated. The resultant force of the first vertical loading force and the second vertical loading force is used to apply the target axial force equivalently. The difference between the first vertical loading force and the second vertical loading force, combined with the spacing between the first vertical loading unit and the second vertical loading unit, is used to apply the target bending moment equivalently. The horizontal loading force is used to apply the target shear force equivalently. S5. The force-controlled step-by-step loading method is adopted, with the horizontal loading force as the main control quantity and the first vertical loading force and the second vertical loading force as the tracking adjustment quantity. The first vertical loading force and the second vertical loading force are adjusted synchronously so that the three loading forces reach the target value and meet the preset stability conditions before entering the next level of tilt angle state, until the preset instability criterion is met. S6. Collect force and displacement data during the loading process, determine the instability point according to the preset instability criterion, and output static instability index.

[0006] Preferably, S1 specifically includes: S11, The substructure specimen is a prototype structure scaled down according to geometric dimensions. The model specimens were made, and ; S12. The substructure specimen contains no less than two layers of masonry units and the interlayer interface between the masonry units. S13. When fixing the substructure specimen to the base, the base is anchored to the ground by ground anchors.

[0007] Preferably, S2 specifically includes: S21. Set the overall tilt angle target sequence. Among them, footer Indicates the first The numbering of the tilt angle state. , This represents the total number of levels representing the tilt angle states; S22, Target Axial Force Target bending moment and target shear force Calculate using the following formulas respectively: ; ; ; And satisfy ; in, The equivalent structural weight of the upper part above the top section of the substructure specimen is given. It is the distance from the centroid of the upper equivalent structure to the top section of the substructure specimen.

[0008] Preferably, S3 specifically includes: S31. A pad and a high-strength cement mortar leveling layer are set between the top of the substructure specimen and the loading beam; S32, the first vertical loading unit and the second vertical loading unit are arranged at intervals along the horizontal direction, with a spacing of [missing information]. And spacing Adjustable spacing; S33. The horizontal loading unit is arranged on the side of the substructure specimen, and the horizontal loading direction is consistent with the preset tilt direction.

[0009] Preferably, in S4: The horizontal loading force is equal to the target shear force: ; The sum of the first vertical loading force and the second vertical loading force equals the target axial force: ; The difference between the second vertical loading force and the first vertical loading force, and the spacing. Half of the product of these two factors equals the target bending moment. ; in, The distance between the first vertical loading unit and the second vertical loading unit. For the first Horizontal loading force under a tilt angle condition, For the first Target shear force under a tilt angle condition. and The first The first and second vertical loading forces under the tilt angle condition, For the first The target axial force under a tilt angle condition. For the first The target bending moment under the first tilt angle condition.

[0010] Preferably, S5 specifically includes: S51. For each tilt angle state, first adjust the first vertical loading unit and the second vertical loading unit until they are in contact with the loading beam and no vertical force is applied; S52. Gradually apply horizontal loads with horizontal loading force as the main control quantity, and simultaneously adjust the first vertical loading unit and the second vertical loading unit so that all three loading forces reach the target value. S53. If adjusting one loading force causes other loading forces to deviate from the target value, then feedback correction shall be performed. S54. When the error of the three loading forces relative to the target value does not exceed ±2%, it is determined that the preset stability condition is met and the next level of tilt angle state is entered.

[0011] Preferably, S6 specifically includes: S61. Force data includes horizontal loading force, first vertical loading force, and second vertical loading force; displacement data includes horizontal displacement and vertical displacement. S62. The preset instability criterion is: during the progressive loading process, when the horizontal loading force reaches its historical maximum peak value at a certain level... Subsequently, during the loading process at any subsequent tilt angle, if the maximum stable horizontal loading force collected at any stage does not exceed the historical maximum peak value... If the horizontal displacement increment of any level is greater than or equal to twice the horizontal displacement increment of the previous tilt angle state, then the substructure specimen is determined to have reached the critical instability state. S63, The instability point is taken as the historical maximum stable horizontal force. The sampling point corresponding to the first arrival; S64. Static instability indicators include critical tilt angle, critical horizontal force, critical bending moment, and horizontal and vertical displacements corresponding to the instability point.

[0012] Secondly, the present invention also provides a static instability test system for ancient brick and stone pagodas based on equivalent loading of substructures, comprising: reaction wall; A gantry frame is a portal frame structure consisting of columns and beams. The base, fixed to the ground, is used to install the substructure specimen; A loading beam is placed on top of the substructure specimen; The first vertical loading unit and the second vertical loading unit are arranged at intervals below the gantry beam and act opposite to the loading beam; Load the conversion header; The horizontal loading unit is connected to the reaction wall at one end and to the loading beam at the other end through a loading conversion head; The resultant force of the first vertical loading unit and the second vertical loading unit is used to apply the target axial force, and the difference between the first vertical loading unit and the second vertical loading unit, combined with the spacing between the first vertical loading unit and the second vertical loading unit, is used to apply the target bending moment. The horizontal loading unit is used to apply the target shear force; The data acquisition and control system is used to acquire horizontal loading force, first vertical loading force, second vertical loading force, horizontal displacement and vertical displacement, and to perform loading control according to preset stability conditions and preset instability criteria.

[0013] Preferably, the base is anchored to the ground through ground anchors, to limit translational degrees of freedom and rotational degrees of freedom at the bottom of the sub-structure test piece; A backing plate and a high-strength cement mortar leveling layer are arranged between the loading beam and the top of the sub-structure test piece; The loading adapter includes a connecting end and a loading end, the connecting end is connected to the output end of the horizontal loading unit, and the loading end is connected to the loading beam.

[0014] Preferably, the horizontal loading unit is a servo actuator or a horizontal jack; The first vertical loading unit and the second vertical loading unit are vertical jacks or vertical servo actuators; the position of the action points of the first vertical loading unit and the second vertical loading unit is adjustable, to adjust the spacing.

[0015] Therefore, the present invention adopts the above-mentioned masonry ancient tower static instability test method and system based on sub-structure equivalent loading, which has the following beneficial effects: (1) The present invention establishes a calculation relationship of "overall inclination target - sub-structure target internal force set - test loading force", which can equivalently reproduce the key stress state during the inclination process of masonry ancient towers under laboratory conditions, and realize controllable research on inclined static stability problems. Compared with establishing a whole structure test model, the sub-structure model test piece can be taken as a local part of the whole structure test model (such as the bottom 1 to 2 floors), which greatly reduces the test cost.

[0016] (2) The present invention uses two vertical loading units arranged oppositely and implements differential control, which can independently adjust and control the target bending moment while ensuring the target axial force; cooperating with the lateral horizontal loading unit to apply the target shear force, the combined loading of axial force-bending moment-shear force can be realized and adjusted, and the loading controllability and repeatability are improved. The test device matched with this test method can be applied to masonry structures with various layout types, and one set of device can be reused.

[0017] (3) Through the stepwise force control loading and synchronous adjustment strategy, the present invention can obtain a clear evolution process of force-displacement response, which is convenient for identifying key characteristics such as stiffness degradation, residual bearing capacity and interface slip before and after instability. In the inclination test of the whole structure model, the response window in the critical instability stage is short, and high-speed cameras are common acquisition means; this test method can obtain complete instability process data under conventional acquisition conditions.

[0018] (4) The present invention can be used for parameter analysis under different damage states, and through comparative analysis of instability points and corresponding indicators, the influence relationship of damage, geometry and stress path on inclination stability ability can be obtained, providing test basis and parameter support for ancient tower stability assessment and repair reinforcement.

[0019] The technical solution of the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. Attached Figure Description

[0020] Figure 1 This is a flowchart illustrating the static instability test method for ancient brick and stone pagodas based on equivalent loading of substructures according to the present invention. Figure 2 This is a schematic diagram of the static instability test system for ancient brick and stone pagodas based on equivalent loading of substructures according to the present invention. Figure 3 This is a schematic diagram of the force-horizontal displacement curve obtained from the experiment in an embodiment of the present invention; Figure 4 This is a schematic diagram of the equivalent test loading force conversion in an embodiment of the present invention; Figure Labels 1. Reaction wall; 2. Gantry frame; 3. Base; 4. Substructure specimen; 5. Loading beam; 6. Loading conversion head; 7. Horizontal loading unit; 8. First vertical loading unit; 9. Second vertical loading unit. Detailed Implementation

[0021] The technical solution of the present invention will be further described below with reference to the accompanying drawings and embodiments.

[0022] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0023] Example 1 like Figure 1 This embodiment provides a static instability test method for ancient brick and stone pagodas based on equivalent loading of substructures, including the following steps: S1. Select a representative section of the brick and stone ancient pagoda body as substructure specimen 4, and fix the substructure specimen 4 to the base 3. Specifically, it includes: S11, Substructure Specimen 4 is a prototype structure scaled down according to geometric dimensions. The model specimens were made, and ; The geometric scaling ratio was determined based on the actual dimensions of the prototype ancient pagoda, laboratory loading capacity, and spatial conditions. . For positive numbers less than or equal to 1, when When it indicates that a prototype-sized physical specimen is used, when This indicates a scaled-down model specimen. For example, for a prototype ancient pagoda with a height of 30m, if the laboratory clearance height is limited to 3m, then a scaled-down model specimen can be selected. (i.e., a 1:10 scaling ratio). The external dimensions, floor height, and wall thickness of substructure specimen 4 are geometrically scaled down. Perform similar scaling.

[0024] S12, Substructure specimen 4 contains no less than two layers of masonry units and the interlayer interface between the masonry units; Masonry units refer to masonry blocks such as bricks and stones. Interlayer interfaces refer to the mortar joints or contact surfaces between adjacent masonry units. These are the weakest points in the masonry structure and the main locations where interlayer slippage and cracking occur during tilting instability. Substructure specimen 4 should include at least two layers of masonry units and the interlayer interfaces in between to reflect the interlayer interactions and interface mechanical behavior of the masonry structure. Furthermore, the bottom two layers of the ancient pagoda were selected as substructure specimen 4 because the bottom section bears the largest upper load and is the most critical stress-bearing section during tilting instability.

[0025] S13. When fixing the substructure specimen 4 to the base 3, the base 3 is anchored to the ground by ground anchors.

[0026] The base 3 is a rigid base (e.g., a reinforced concrete base), fixed to the laboratory floor by ground anchor bolts or other anchors to restrict the translational and rotational degrees of freedom of the bottom of the substructure specimen 4 during the test. The anchoring depth and number of ground anchors should be determined according to the expected maximum load force of the test to ensure that the base 3 does not slip or overturn during each loading stage. The substructure specimen 4 is built on the base 3, or a prefabricated substructure specimen 4 is installed on the base 3 using a high-strength adhesive material.

[0027] S2. Set the overall tilt angle target sequence. Based on the self-weight of the upper equivalent structure above the top section of substructure specimen 4, calculate the target axial force, target bending moment and target shear force corresponding to each tilt angle state according to the static equilibrium relationship. Specifically, it includes: S21. Set the overall tilt angle target sequence. Among them, footer Indicates the first The numbering of the tilt angle state. , This represents the total number of levels representing the tilt angle states; Incline angle This refers to the overall tilt angle of the ancient pagoda (in radians), used to simulate the gradual development of the pagoda from its initial upright state to its tilting and instability. Preferably, it is set to... Starting from 0.01 rad, it increases incrementally in increments of 0.01 rad, that is... =0.01rad =0.02rad, =0.03rad......, until the experiment terminates (stops when the preset instability criterion is met). The upper limit of the tilt angle sequence is determined based on the estimated critical tilt angle. For example, if the estimated critical tilt angle is about 0.08rad, the sequence can be preset to 0.10rad or 0.12rad to ensure that the complete instability process can be covered.

[0028] S22, Target Axial Force Target bending moment and target shear force Calculate using the following formulas respectively: ; ; ; And satisfy ; like Figure 4 The diagram shown is a schematic representation of the equivalent experimental loading force conversion of the present invention. Wherein, The equivalent structural self-weight of the upper part above the top section of substructure specimen 4. This is the distance from the center of gravity of the upper equivalent structure to the top section of the substructure specimen 4.

[0029] Self-weight of the superstructure This refers to the self-weight of the entire pagoda body above the top section of the substructure specimen 4 in the actual ancient pagoda structure. In the experiment, this self-weight value was obtained through statistical calculations of the structural dimensions and material density of the prototype ancient pagoda. Specifically, the external dimensions (including side length or diameter, wall thickness, etc.), cavity dimensions, material type and density of each layer of the ancient pagoda were obtained, as well as information on whether there were openings or defects, to calculate the total weight of the portion above the top section. For the scaled-down model specimen, It should be converted into the equivalent self-weight value of the superstructure corresponding to the scaled model according to the similarity relationship.

[0030] Center of gravity height This refers to the vertical distance from the overall center of gravity of the upper equivalent structure to the top section of substructure specimen 4. When the upper equivalent structure is a homogeneous structure with a uniform cross-section... Take the equivalent structural height of the upper part Half of, that is When the upper equivalent structure is a variable cross-section, hollow, open, or partially defective structure, The dimensions of the superstructure must be determined through actual measurement or calculation based on the geometric dimensions, cavity dimensions, material density, and damage / missing information of the equivalent superstructure. For example, for a variable cross-section ancient pagoda, the pagoda body can be divided into multiple micro-segments along the height direction, and the self-weight and center of gravity of each micro-segment can be calculated separately. Then, the distance from the overall center of gravity to the top cross-section can be obtained by combining the results.

[0031] It should be noted that the above-mentioned target axial force Target bending moment and target shear force They do not take values ​​independently, but are interconnected through the above formula, collectively describing the angle of inclination. The actual three-dimensional stress state of the top section of substructure specimen 4 under the specified conditions. The target axial force is shown in the figure. and shear force The equivalent self-weight of the upper structure are respectively Components along the vertical and horizontal directions, target bending moment For the self-weight of the equivalent superstructure Overturning moment caused by shift in center of gravity.

[0032] S3. A loading beam 5 is set on the top of the substructure specimen 4, and a first vertical loading unit 8 and a second vertical loading unit 9 are arranged at intervals on the loading beam 5. A horizontal loading unit 7 is arranged on the side of the substructure specimen 4. Specifically, it includes: S31. A pad and a high-strength cement mortar leveling layer are set between the top of the substructure specimen 4 and the loading beam 5.

[0033] The pad is a rigid steel plate, placed between the top surface of substructure specimen 4 and the bottom surface of loading beam 5, to uniformly transfer the vertical loading force to the entire top section of substructure specimen 4. A high-strength cement mortar leveling layer is placed between the pad and the top surface of substructure specimen 4 to fill any local unevenness on the top surface of the specimen, eliminate local stress concentration, and ensure uniform transmission of vertical force. The leveling layer should not be too thick (usually 10mm~20mm) and should have sufficient strength and rigidity to prevent crushing or excessive deformation during loading.

[0034] S32, the first vertical loading unit 8 and the second vertical loading unit 9 are arranged at intervals along the horizontal direction, with a spacing of [missing information]. And spacing The spacing is adjustable.

[0035] The first vertical loading unit 8 and the second vertical loading unit 9 are positioned above the loading beam 5 (below the crossbeam of the gantry 2), and are arranged horizontally at intervals on both sides of the loading beam 5, with a spacing of [missing information]. .spacing The spacing can be adjusted according to the cross-sectional dimensions of substructure specimen 4 and the required equivalent bending moment. Specifically, when the cross-sectional dimensions of the specimen are large, the spacing can be increased. This allows the two vertical loading forces to form a larger lever arm, thus generating a larger bending moment; when the specimen cross-section is small, the spacing can be reduced. .spacing The adjustment can be achieved by setting slide rails on the crossbeam of the gantry frame 2 or reserving mounting holes at different positions, so that the position of the action point of the two vertical loading units can be moved in the horizontal direction.

[0036] S33, the horizontal loading unit 7 is arranged on the side of the substructure specimen 4, and the horizontal loading direction is consistent with the preset tilt direction.

[0037] The horizontal loading unit 7 is positioned laterally on the substructure specimen 4. One end (fixed end) is connected to the reaction wall 1, and the other end (loading end) is connected to the loading beam 5 via the loading conversion head 6. The direction of action of the horizontal loading unit 7 should be consistent with the preset tilt direction of the ancient pagoda, that is, the horizontal thrust is applied to the loading beam 5 along this direction to simulate the horizontal component force generated by the tilt. The preset tilt direction is usually selected as the actual tilt direction of the ancient pagoda or the most unfavorable tilt direction (i.e., the direction most prone to instability). The center height of the horizontal loading unit 7 should be consistent with the height of the side loading point of the loading beam 5 to avoid additional bending moments caused by loading eccentricity.

[0038] S4. Based on the target axial force, target bending moment, and target shear force, the corresponding first vertical loading force, second vertical loading force, and horizontal loading force are calculated. The resultant force of the first vertical loading force and the second vertical loading force is used to apply the target axial force equivalently. The difference between the first vertical loading force and the second vertical loading force, combined with the distance between the first vertical loading unit 8 and the second vertical loading unit 9, is used to apply the target bending moment equivalently. The horizontal loading force is used to apply the target shear force equivalently. Wherein, the horizontal loading force is equal to the target shear force: ; The sum of the first vertical loading force and the second vertical loading force equals the target axial force: ; The difference between the second vertical loading force and the first vertical loading force, and the spacing. Half of the product of these two factors equals the target bending moment. ; in, The distance between the first vertical loading unit 8 and the second vertical loading unit 9. For the first Horizontal loading force under a tilt angle condition, For the first Target shear force under a tilt angle condition. and The first The first and second vertical loading forces under the tilt angle condition, For the first The target axial force under a tilt angle condition. For the first The target bending moment under the first tilt angle condition.

[0039] Specifically, horizontal loading force The load is applied to the side of the loading beam 5 by the horizontal loading unit 7 (such as a horizontal servo actuator), and its value is directly equal to the target shear force. This is used to simulate the horizontal component force generated by tilting. The resultant force of the two vertical loading forces ( ) equals the target axial force This is used to simulate the vertical component of the superstructure's self-weight. The difference between the two vertical loading forces ( ) and spacing Half of the product equals the target bending moment. This is used to simulate the overturning moment caused by a shift in the center of gravity. When, it indicates that the two vertical loading forces are unequal, producing a bending moment effect around the horizontal axis; when When the two forces are equal, it indicates that there is no bending moment (i.e., the state is upright or the state is under axial compression).

[0040] Based on the above three relationships, for each tilt angle state Known , , and The three loading forces can be uniquely determined by solving the system of equations: ; ; .

[0041] As can be seen from the above formula, and Subtracting and adding a term related to bending moment from 50% of the target axial force, respectively. This ensures that the total axial force equals the target axial force, while using the difference between the two loading forces to generate the required target bending moment.

[0042] Since both the first vertical loading unit 8 and the second vertical loading unit 9 are actuators that can only apply pressure, the first vertical loading force Second vertical loading force It must be a positive value. According to... , must meet If the target bending moment exceeds this upper limit, the first vertical loading force will become negative, meaning that tensile force is required to meet the equivalent bending moment requirement, but the vertical jacks cannot provide tensile force. In this case, the spacing should be increased. Alternatively, the upper limit of the target tilt angle can be lowered to adjust the load control. When approaching the upper limit of the applicable bending moment, the increment between adjacent tilt angle target levels can be reduced to ensure that the target bending moment at each level meets the above conditions, thereby improving the stability of the load control.

[0043] S5. The force-controlled step-by-step loading method is adopted, with the horizontal loading force as the main control quantity and the first vertical loading force and the second vertical loading force as the tracking adjustment quantity. The first vertical loading force and the second vertical loading force are adjusted synchronously so that the three loading forces reach the target value and meet the preset stability conditions before entering the next level of tilt angle state, until the preset instability criterion is met. Specifically, it includes: S51. For each tilt angle state, first adjust the first vertical loading unit 8 and the second vertical loading unit 9 until they are in contact with the loading beam 5 and no vertical force is applied; Before starting loading at each tilt angle, the loading ends (such as the top of the jack piston) of the first vertical loading unit 8 and the second vertical loading unit 9 are first brought into contact with the upper surface of the loading beam 5, but no additional vertical force is applied (i.e., they are in a zero-load contact state). The purpose of this operation is to ensure that the loading force can be transmitted to the loading beam 5 in a timely and accurate manner during subsequent loading, avoiding loading lag or impact due to gaps between the loading ends and the loading beam 5. The contact state can be determined by the force sensor on the vertical loading unit—when the force sensor reading changes from zero to a positive value, it indicates that the loading end has contacted the loading beam 5; at this time, the extension should be stopped, maintaining contact but without applying additional force.

[0044] S52. Gradually apply horizontal loads with horizontal loading force as the main control quantity, and simultaneously adjust the first vertical loading unit 8 and the second vertical loading unit 9 so that all three loading forces reach the target value. With horizontal loading force To achieve the primary control objective, the output force of the horizontal loading unit 7 is gradually increased according to a preset loading rate, so that the horizontal loading force gradually increases from the current value to the target value for that stage. As the horizontal loading force increases, the first vertical loading unit 8 and the second vertical loading unit 9 operate at the target value. and To track the target, the output forces of each component are adjusted synchronously. The meaning of the horizontal loading force as the main control variable is that the loading progress of the horizontal force determines the rhythm of the loading at this stage, while the vertical force continuously tracks its target value as the horizontal force increases.

[0045] The principle for selecting the loading rate is: to ensure a smooth loading process and avoid dynamic effects, a slower loading rate should be used to allow for thorough observation of the structural response. For example, the horizontal loading rate can be 0.1 kN / s to 1.0 kN / s, with the specific value determined based on the specimen size and estimated bearing capacity. The adjustment rate of the vertical loading unit should be coordinated with the horizontal loading rate to ensure that both reach the target value simultaneously or within a short time difference.

[0046] S53. If adjusting one loading force causes other loading forces to deviate from the target value, then feedback correction shall be performed. Because there is a mechanical coupling relationship between the horizontal and vertical loading forces through the loading beam 5 and the substructure specimen 4—for example, increasing the horizontal thrust may cause horizontal displacement of the specimen, thereby changing the vertical support state of the loading beam 5 and causing fluctuations in the vertical force; similarly, adjusting the vertical force may also change the compression deformation state of the specimen, affecting the transmission of the horizontal force—the data acquisition and control system collects the actual values ​​of the three loading forces in real time during the loading process. When a loading force deviates from its target value, the control system automatically provides feedback adjustment to that loading force, bringing it back to near the target value. This feedback correction process continues to ensure that the three loading forces remain under control at all times.

[0047] It should be noted that changes in the horizontal loading force will alter the deformation state of the specimen, leading to fluctuations in the adjusted vertical loading force. When using force-controlled stepwise loading, a coupling compensation strategy can be employed for feedback correction: During the gradual increase of the horizontal loading force, the deviation between the actual and target values ​​of the two vertical loading forces is monitored in real time. The output forces of the two vertical loading units are adjusted synchronously based on the direction and magnitude of the deviation, ensuring that the horizontal and vertical loading forces approach their respective target values ​​simultaneously. Feedback correction can be implemented using conventional control algorithms such as proportional-integral-derivative (PI-DI) control or fuzzy control. The adjustment amount is calculated based on the deviation between the actual and target values ​​and output to the corresponding loading unit actuator. The sampling frequency for data acquisition and control should be sufficiently high (e.g., 100Hz~1000Hz) to capture rapid changes during the loading process and respond promptly.

[0048] S54. When the error of the three loading forces relative to the target value does not exceed ±2%, it is determined that the preset stability condition is met and the next level of tilt angle state is entered.

[0049] When horizontal loading force First vertical loading force Second vertical loading force When the relative error between the actual measured values ​​and their respective target values ​​is within ±2%, the loading level is considered to have met the stability condition. After all three loading forces have reached their target values ​​and met the stability condition, the horizontal loading force, two vertical loading forces, horizontal displacement, and vertical displacement data are recorded under the tilt angle state at that level. Then, the process proceeds to the next tilt angle state (i.e., ... (Level). If, during a certain level of loading, the three loading forces cannot converge to within ±2% error within a reasonable time (e.g., 5 minutes), or if abnormal fluctuations occur in the loading force, loading should be paused and the loading system and specimen status should be checked.

[0050] S6. Collect force and displacement data during the loading process, determine the instability point according to the preset instability criterion, and output static instability index.

[0051] Specifically, it includes: S61. Force data includes horizontal loading force, first vertical loading force, and second vertical loading force; displacement data includes horizontal displacement and vertical displacement. Horizontal displacement is measured by displacement sensors (such as LVDT displacement gauges or laser displacement gauges) installed on the sides of the loading beam 5 or the substructure specimen 4, reflecting the lateral deformation of the specimen under horizontal thrust. Vertical displacement is measured by displacement sensors installed on the upper surface of the loading beam 5 or the top of the substructure specimen 4, reflecting the vertical compressive deformation and uneven settlement of the specimen under vertical pressure. Data from all force and displacement sensors are acquired synchronously through a data acquisition system, and the sampling frequency should be kept consistent (e.g., 10Hz~100Hz) for subsequent force-displacement curve plotting and analysis.

[0052] The maximum stable horizontal loading force refers to the effective value of the horizontal loading force recorded during the stable loading phase of the current stage after the tilt angle of the current stage has stabilized, rather than the transient peak value during the loading process. Loading stability refers to a loading phase in which all three loading forces meet the preset stability conditions (the error relative to their respective target values ​​does not exceed ±2%) and remain stable for no less than 10 seconds.

[0053] S62. The preset instability criterion is: during the progressive loading process, when the horizontal loading force reaches the historical maximum stable horizontal loading force at a certain level... Subsequently, during the loading process at any subsequent tilt angle, if the maximum stable horizontal loading force collected at any stage does not exceed the historical maximum peak value... If the horizontal displacement increment of any level is greater than or equal to twice the horizontal displacement increment of the previous tilt angle state, then the substructure specimen 4 is determined to have reached the critical instability state. Historical peak This refers to the maximum horizontal loading force that can be stably reached across all completed loading stages from stage 1 to the current stage in the current test. Since the horizontal force does not increase monotonically during loading (it may decrease when approaching instability), it is necessary to record the historical maximum values ​​as a criterion.

[0054] The meaning of this instability criterion is: when the horizontal loading force can no longer be significantly increased (relative to the historical maximum peak value)... If the increase in horizontal force does not exceed 10%, and the horizontal displacement accelerates (the current displacement increment reaches twice or more than the previous level), it indicates that the structural stiffness has significantly degraded. Even a small increase in horizontal force will produce large lateral deformation, at which point the structure has reached a critical instability state. Both conditions must be met simultaneously for instability to be determined, to avoid misjudgment due to fluctuations in a single measurement. The aforementioned 1.1-fold and 2-fold thresholds are determined based on engineering experience from quasi-static tests of masonry structures and are used to identify the critical state where the increase in horizontal force stagnates and the horizontal displacement accelerates.

[0055] S63, The instability point is taken as the historical maximum stable horizontal force. The sampling point corresponding to the first arrival; Once it is determined that substructure specimen 4 has reached the critical instability state, the force and displacement values ​​at the instability point are taken as the historical maximum stable horizontal force. The value at the sampling time corresponding to the first occurrence is used, not the value at the instability determination time. This is because by the instability determination time, the horizontal force may have decreased, while the physical meaning of the instability point is "the maximum horizontal force that the structure can withstand." Therefore, the value at the moment when the horizontal force is at its maximum should be taken as the instability point.

[0056] S64. Static instability indicators include critical tilt angle, critical horizontal force, critical bending moment, and horizontal and vertical displacements corresponding to the instability point.

[0057] Critical tilt angle The tilt angle corresponding to the instability point, i.e., with corresponding Values ​​can be obtained through formulas. The result is obtained by reverse calculation, i.e. .in This represents the historical maximum stable horizontal loading force corresponding to the instability point. The critical horizontal force is the horizontal loading force corresponding to the instability point. The critical bending moment is the target bending moment corresponding to the instability point. It can be accessed through Calculate the horizontal and vertical displacements corresponding to the instability point to achieve... The synchronous displacement value recorded by the time-displacement sensor. The above indicators comprehensively describe the critical conditions for static instability of the ancient brick and stone pagoda in a tilted state. They can be used to assess the tilt stability of the ancient pagoda in its current damaged state and provide a quantitative basis for repair and reinforcement decisions.

[0058] As an example, in an experiment using this method, substructure specimen 4 was a 1:10 scale model of the bottom two layers of a brick and stone ancient pagoda, and a sequence of tilt angles was set. Starting from 0.01 rad, the values ​​were increased incrementally in 0.01 rad increments. During the experiment, vertical force, horizontal force, horizontal displacement, and vertical displacement data were collected simultaneously, resulting in the horizontal force-horizontal displacement curve shown below. Figure 3 As shown in the figure, after the horizontal loading force reaches approximately 25 kN, subsequent horizontal loading stages show that the horizontal loading force struggles to increase steadily, with the maximum stable horizontal loading force not exceeding 27.5 kN (1.1 times 25 kN). Meanwhile, the horizontal displacement continues to develop, with the increment reaching twice or more the increment of the previous loading stage. At this point, substructure specimen 4 is determined to have reached a critical instability state. The instability point is taken as the sampling point corresponding to the first occurrence of the historical maximum stable horizontal force, according to the formula... The calculated critical tilt angle is approximately 0.08 rad.

[0059] like Figure 2 As shown, this embodiment also provides a static instability test system for ancient brick and stone pagodas based on equivalent loading of substructures, including: Reaction wall 1; Gantry Frame 2 is a portal frame structure composed of columns and beams; Base 3, fixed to the ground, is used to install substructure specimen 4; Loading beam 5 is placed on top of substructure specimen 4; The first vertical loading unit 8 and the second vertical loading unit 9 are arranged at intervals below the crossbeam of the gantry frame 2 and act opposite to the loading beam 5. Load converter header 6; The horizontal loading unit 7 is connected to the reaction wall 1 at one end and to the loading beam 5 at the other end through the loading conversion head 6; The resultant force of the first vertical loading unit 8 and the second vertical loading unit 9 is used to apply the target axial force, and the difference between the first vertical loading unit 8 and the second vertical loading unit 9, combined with the distance between the first vertical loading unit 8 and the second vertical loading unit 9, is used to apply the target bending moment. Horizontal loading unit 7 is used to apply the target shear force; The data acquisition and control system is used to acquire horizontal loading force, first vertical loading force, second vertical loading force, horizontal displacement and vertical displacement, and to perform loading control according to preset stability conditions and preset instability criteria.

[0060] The base 3 is anchored to the ground by ground anchors to restrict the translational and rotational degrees of freedom of the bottom of the substructure specimen 4; A pad and a high-strength cement mortar leveling layer are set between the top of the loading beam 5 and the top of the substructure specimen 4. The loading conversion head 6 includes a connecting end and a loading end. The connecting end is connected to the output end of the horizontal loading unit 7, and the loading end is connected to the loading beam 5.

[0061] Horizontal loading unit 7 is a servo actuator or a horizontal jack; The first vertical loading unit 8 and the second vertical loading unit 9 are vertical jacks or vertical servo actuators; the positions of the action points of the first vertical loading unit 8 and the second vertical loading unit 9 are adjustable to adjust the spacing.

[0062] Therefore, the present invention adopts the above-mentioned static instability test method and system for brick and stone ancient pagodas based on equivalent loading of substructures, which can simulate the stress state of substructures during the overall tilting process in a laboratory setting in a low-cost and repeatable manner, and obtain a clear force-displacement response evolution process and static instability index, providing technical support for stability assessment and repair decisions of brick and stone ancient pagodas.

[0063] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can still be made to the technical solutions of the present invention, and these modifications or equivalent substitutions cannot cause the modified technical solutions to deviate from the spirit and scope of the technical solutions of the present invention.

Claims

1. A static instability test method for ancient brick and stone pagodas based on equivalent loading of substructures, characterized in that, Includes the following steps: S1. Select a representative section of the brick and stone ancient pagoda body as a substructure specimen and fix the substructure specimen to the base. S2. Set the overall tilt angle target sequence. Based on the self-weight of the upper equivalent structure above the top section of the substructure specimen, calculate the target axial force, target bending moment and target shear force corresponding to each tilt angle state according to the static equilibrium relationship. S3. A loading beam is set on the top of the substructure specimen, and a first vertical loading unit and a second vertical loading unit are arranged at intervals on the loading beam. Horizontal loading units are arranged on the side of the substructure specimen. S4. Based on the target axial force, target bending moment, and target shear force, the corresponding first vertical loading force, second vertical loading force, and horizontal loading force are calculated. The resultant force of the first vertical loading force and the second vertical loading force is used to apply the target axial force equivalently. The difference between the first vertical loading force and the second vertical loading force, combined with the spacing between the first vertical loading unit and the second vertical loading unit, is used to apply the target bending moment equivalently. The horizontal loading force is used to apply the target shear force equivalently. S5. The force-controlled step-by-step loading method is adopted, with the horizontal loading force as the main control quantity and the first vertical loading force and the second vertical loading force as the tracking adjustment quantity. The first vertical loading force and the second vertical loading force are adjusted synchronously so that the three loading forces reach the target value and meet the preset stability conditions before entering the next level of tilt angle state, until the preset instability criterion is met. S6. Collect force and displacement data during the loading process, determine the instability point according to the preset instability criterion, and output static instability index.

2. The method according to claim 1, characterized in that, S1 specifically includes: S11, The substructure specimen is a prototype structure scaled down according to geometric dimensions. The model specimens were made, and ; S12. The substructure specimen contains no less than two layers of masonry units and the interlayer interface between the masonry units. S13. When fixing the substructure specimen to the base, the base is anchored to the ground by ground anchors.

3. The method according to claim 1, characterized in that, S2 specifically includes: S21. Set the overall tilt angle target sequence. Among them, footer Indicates the first The numbering of the tilt angle state. , This represents the total number of levels representing the tilt angle states; S22, Target Axial Force Target bending moment and target shear force Calculate using the following formulas respectively: ; ; ; And satisfy ; in, The equivalent structural weight of the upper part above the top section of the substructure specimen is given. It is the distance from the centroid of the upper equivalent structure to the top section of the substructure specimen.

4. The method according to claim 1, characterized in that, S3 specifically includes: S31. A pad and a high-strength cement mortar leveling layer are set between the top of the substructure specimen and the loading beam; S32, the first vertical loading unit and the second vertical loading unit are arranged at intervals along the horizontal direction, with a spacing of [missing information]. And spacing Adjustable spacing; S33. The horizontal loading unit is arranged on the side of the substructure specimen, and the horizontal loading direction is consistent with the preset tilt direction.

5. The method according to claim 1, characterized in that, In S4: The horizontal loading force is equal to the target shear force: ; The sum of the first vertical loading force and the second vertical loading force equals the target axial force: ; The difference between the second vertical loading force and the first vertical loading force, and the spacing. Half of the product of these two factors equals the target bending moment. ; in, The distance between the first vertical loading unit and the second vertical loading unit. For the first Horizontal loading force under a tilt angle condition, For the first Target shear force under a tilt angle condition. and The first The first and second vertical loading forces under the tilt angle condition, For the first The target axial force under a tilt angle condition. For the first The target bending moment under the first tilt angle condition.

6. The method according to claim 1, characterized in that, S5 specifically includes: S51. For each tilt angle state, first adjust the first vertical loading unit and the second vertical loading unit until they are in contact with the loading beam and no vertical force is applied; S52. Gradually apply horizontal loads with horizontal loading force as the main control quantity, and simultaneously adjust the first vertical loading unit and the second vertical loading unit so that all three loading forces reach the target value. S53. If adjusting one loading force causes other loading forces to deviate from the target value, then feedback correction shall be performed. S54. When the error of the three loading forces relative to the target value does not exceed ±2%, it is determined that the preset stability condition is met and the next level of tilt angle state is entered.

7. The method according to claim 1, characterized in that, S6 specifically includes: S61. Force data includes horizontal loading force, first vertical loading force, and second vertical loading force; displacement data includes horizontal displacement and vertical displacement. S62. The preset instability criterion is: during the progressive loading process, when the horizontal loading force reaches its historical maximum peak value at a certain level... Subsequently, during the loading process at any subsequent tilt angle, if the maximum stable horizontal loading force collected at any stage does not exceed the historical maximum peak value... If the horizontal displacement increment of any level is greater than or equal to twice the horizontal displacement increment of the previous tilt angle state, then the substructure specimen is determined to have reached the critical instability state. S63, The instability point is taken as the historical maximum stable horizontal force. The sampling point corresponding to the first arrival; S64. Static instability indicators include critical tilt angle, critical horizontal force, critical bending moment, and horizontal and vertical displacements corresponding to the instability point.

8. A static instability test system for brick and stone ancient pagodas based on equivalent loading of substructures, used to perform the method according to any one of claims 1-7, characterized in that, include: reaction wall; A gantry frame is a portal frame structure consisting of columns and beams. The base, fixed to the ground, is used to install the substructure specimen; A loading beam is placed on top of the substructure specimen; The first vertical loading unit and the second vertical loading unit are arranged at intervals below the gantry beam and act opposite to the loading beam; Load the conversion header; The horizontal loading unit is connected to the reaction wall at one end and to the loading beam at the other end through a loading conversion head; The resultant force of the first vertical loading unit and the second vertical loading unit is used to apply the target axial force, and the difference between the first vertical loading unit and the second vertical loading unit, combined with the spacing between the first vertical loading unit and the second vertical loading unit, is used to apply the target bending moment. The horizontal loading unit is used to apply the target shear force; The data acquisition and control system is used to acquire horizontal loading force, first vertical loading force, second vertical loading force, horizontal displacement and vertical displacement, and to perform loading control according to preset stability conditions and preset instability criteria.

9. The system according to claim 8, characterized in that, The base is anchored to the ground by ground anchors to restrict the translational and rotational degrees of freedom of the bottom of the substructure specimen; A pad and a high-strength cement mortar leveling layer are placed between the loading beam and the top of the substructure specimen. The loading conversion head includes a connecting end and a loading end. The connecting end is connected to the output end of the horizontal loading unit, and the loading end is connected to the loading beam.

10. The system according to claim 8, characterized in that, The horizontal loading unit is a servo actuator or a horizontal jack; The first and second vertical loading units are vertical jacks or vertical servo actuators; the positions of the action points of the first and second vertical loading units are adjustable to adjust the spacing.