Engineering surveying device for geotechnical engineering
By designing storage holes and threaded column structures in the geotechnical engineering surveying and measurement device, the problem of soil composition mixing was solved, enabling precise sampling of soil layers and accurate recording of data.
Patent Information
- Application Number
- CN202611410813.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-11
- Publication Date
- 2026-11-24
AI Technical Summary
When existing geotechnical engineering surveying equipment uses screwdrivers for drilling, the soil components mix together, leading to data mixing and contamination issues during data recording.
A device comprising a base, a drive unit, a drilling component, a cleaning component, and a storage hole is designed. By opening a storage hole at the bottom of the drill rod and plugging it with a threaded post, the required soil sample is taken out after drilling into the soil layer and stored in the storage hole, thus avoiding the mixing of soil layers at different depths.
It enables precise sampling of the required soil layers, avoids mixing of soil layers at different depths, and improves the accuracy of sampling data.
Smart Images

Figure CN123155258A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of geotechnical engineering investigation, and in particular to a geotechnical engineering surveying device. Background Technology
[0002] The purpose of geotechnical engineering investigation is to investigate, study, and analyze a construction site using testing methods and techniques; to study the geological conditions for constructing various engineering structures and the impact of construction on the natural geological environment; to study measures to ensure the strength and stability of the foundation and prevent unacceptable deformation when the foundation, substructure, and superstructure work together; to propose the bearing capacity of the foundation; and to provide the engineering site and geotechnical engineering data required for foundation design and construction, as well as foundation reinforcement when necessary.
[0003] In geotechnical engineering investigation, it is crucial to accurately measure information such as topography, geomorphology, and soil parameters. Existing equipment first drills holes in the soil and rock, then tests the depth of the holes, and samples soil layers to observe the rock composition at different depths to determine the bearing capacity of the foundation.
[0004] However, existing geotechnical engineering surveying equipment uses augers for drilling, and the soil transported by the augers is mixed together, making it impossible to distinguish soil layers. This results in data mixing and contamination during data recording.
[0005] Therefore, it is necessary to provide a geotechnical engineering surveying device to solve the above-mentioned technical problems. Summary of the Invention
[0006] This invention provides a geotechnical engineering surveying device that solves the problem that existing geotechnical engineering surveying devices use augers for drilling, and the soil transported by the augers is mixed together, making it impossible to distinguish soil layers and causing data mixing and contamination during data recording.
[0007] To solve the above-mentioned technical problems, the present invention provides a geotechnical engineering surveying device, comprising: a base;
[0008] A first driving component is fixedly installed on one side of the top of the base. A threaded rod is fixedly connected to the top of the output shaft of the first driving component. A baffle is fixedly connected to the top of the threaded rod. A limit rod is fixedly installed on the other side of the top of the base. A lifting plate is threadedly engaged on the outer surface of the threaded rod. A connecting plate is fixedly installed in the middle of the bottom of the lifting plate.
[0009] A guide component is fixedly connected to one side of the top of the lifting plate, and the guide component includes a second drive component and a first drive gear;
[0010] A drilling component is rotatably mounted in the middle of the bottom of the connecting plate. The drilling component includes a rotating column, an auger, and a first driven gear.
[0011] A cleaning component is disposed in the middle of the top of the base. The cleaning component includes a fixing plate, a fixing ring block, a setting hole, a blower pipe, a connecting pipe, an air pump, and an air inlet pipe.
[0012] A drill rod is fixedly connected to the bottom of the drilling component, and an opening hole is provided in the middle of the bottom of the base;
[0013] The storage hole is located in the middle of the top of the lifting plate and is connected to the middle of the bottom of the drill rod. The storage hole has an internal threaded engagement with a sorting component, which includes a threaded post, a pull rod, and a connecting post.
[0014] Preferably, the rotating column is rotatably mounted in the middle of the bottom of the connecting plate, the auger is fixedly mounted on the outer surface of the rotating column, and the first driven gear is fixedly mounted on the top of the outer surface of the rotating column.
[0015] Preferably, the second driving component is fixedly installed on one side of the top of the lifting plate, and the first driving gear is fixedly connected to the bottom end of the output shaft of the second driving component.
[0016] Preferably, the threaded post is threaded into the interior of the storage hole, the pull rod is fixedly installed on the top of the threaded post, and the connecting post is fixedly connected to the bottom of the threaded post.
[0017] Preferably, the two fixing plates are respectively fixedly installed on both sides of the top of the base, the fixing ring block is fixedly installed on the top of the fixing plate, the setting hole is opened in the middle of the top of the fixing ring block, the air blowing pipe is fixedly installed on the inner wall surface of the setting hole, the connecting pipe is fixedly connected to one end of the air blowing pipe, the air pump is fixedly connected to one end of the connecting pipe, and the air inlet pipe is fixedly connected to one side of the air pump.
[0018] Preferably, the surface of the limiting rod is provided with scale values.
[0019] Preferably, both the first driving component and the second driving component adopt a servo motor structure.
[0020] Preferably, a third driving component is fixedly installed on the other side of the top of the base, and a second driving gear is fixedly connected to the top of the output shaft of the third driving component. A meshing component is rotatably installed on the bottom of the fixed ring block, and the meshing component includes a connecting ring block, a second driven gear, and a cleaning brush.
[0021] Preferably, the connecting ring block is rotatably mounted on the bottom of the fixed ring block, the second driven gear is fixedly connected to the bottom of the connecting ring block, and the cleaning brush is disposed on the surface of the inner wall of the second driven gear.
[0022] Preferably, the second driving gear meshes with the second driven gear.
[0023] Compared with related technologies, the geotechnical engineering surveying device provided by the present invention has the following beneficial effects:
[0024] This invention provides a geotechnical engineering surveying device. A storage hole is opened in the middle of the bottom of the drill rod. The inside of the storage hole is first filled with threaded rods for plugging. The drill rod penetrates the soil layer, and an auger removes soil that does not need to be tested. After observing the position of the drill rod in the desired soil layer through the scale on the surface of the limiting rod, a sorting component is rotated out. The drill rod then continues to penetrate the soil layer, storing soil blocks from the desired soil layer in the storage hole. After the drill rod moves upward to the ground, the sorting component is reinstalled into the storage hole to push out the sampled soil blocks, facilitating sample collection. This device has a simple structure, is highly practical, and facilitates accurate sampling of the desired soil layer, avoiding mixing of soil layers at different depths and improving the accuracy of sampling data. Attached Figure Description
[0025] Figure 1 This is a schematic diagram of the structure of a first embodiment of a geotechnical engineering surveying device provided by the present invention;
[0026] Figure 2 for Figure 1 The enlarged schematic diagram at point A is shown below;
[0027] Figure 3 for Figure 1 The enlarged schematic diagram at point B is shown below;
[0028] Figure 4 for Figure 1 The diagram shown is a bottom view of the lifting platform.
[0029] Figure 5 for Figure 4 The enlarged schematic diagram at point C is shown below;
[0030] Figure 6 for Figure 1 The diagram shows the structure of the finishing component;
[0031] Figure 7 This is a schematic diagram of the second embodiment of a geotechnical engineering surveying device provided by the present invention;
[0032] Figure 8 for Figure 7 The enlarged schematic diagram at point D is shown below;
[0033] Figure 9 for Figure 7 The diagram shows the structure of the meshing components.
[0034] The diagram is labeled as follows: 1. Base, 2. First driving component, 3. Threaded rod, 4. Baffle, 5. Lifting plate, 6. Connecting plate, 7. Drilling component, 71. Rotating column, 72. Screwdriver, 73. First driven gear, 8. Cleaning component, 81. Fixing plate, 82. Fixing ring block, 83. Setting hole, 84. Air pipe, 85. Connecting pipe, 86. Air pump, 87. Air inlet pipe, 9. Drill rod, 10. Opening hole, 11. Limiting rod, 12. Storage hole, 13. Organizing component, 131. Threaded column, 132. Pull rod, 133. Connecting column, 14. Guide component, 141. Second driving component, 142. First driving gear, 15. Third driving component, 16. Second driving gear, 17. Meshing component, 171. Connecting ring block, 172. Second driven gear, 173. Cleaning brush. Detailed Implementation
[0035] The present invention will be further described below with reference to the accompanying drawings and embodiments.
[0036] First Embodiment
[0037] Please refer to the following: Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 and Figure 6 ,in, Figure 1 This is a schematic diagram of the structure of a first embodiment of a geotechnical engineering surveying device provided by the present invention; Figure 2 for Figure 1 The enlarged schematic diagram at point A is shown below; Figure 3 for Figure 1 The enlarged schematic diagram at point B is shown below; Figure 4 for Figure 1 The diagram shown is a bottom view of the lifting platform. Figure 5 for Figure 4 The enlarged schematic diagram at point C is shown below; Figure 6 for Figure 1 The diagram shows the structural design of the assembly components. A geotechnical engineering surveying device includes: a base 1;
[0038] The first driving component 2 is fixedly installed on one side of the top of the base 1. The top of the output shaft of the first driving component 2 is fixedly connected to a threaded rod 3. The top of the threaded rod 3 is fixedly connected to a baffle 4. The other side of the top of the base 1 is fixedly installed with a limit rod 11. The outer surface of the threaded rod 3 is threadedly engaged with a lifting plate 5. The middle of the bottom of the lifting plate 5 is fixedly installed with a connecting plate 6.
[0039] The guide component 14 is fixedly connected to one side of the top of the lifting plate 5. The guide component 14 includes a second drive component 141 and a first drive gear 142.
[0040] Drilling component 7 is rotatably mounted in the middle of the bottom of the connecting plate 6. The drilling component 7 includes a rotating column 71, an auger 72 and a first driven gear 73.
[0041] Cleaning component 8 is disposed in the middle of the top of the base 1. The cleaning component 8 includes a fixing plate 81, a fixing ring block 82, a setting hole 83, a blower pipe 84, a connecting pipe 85, an air pump 86, and an air inlet pipe 87.
[0042] Drill rod 9, which is fixedly connected to the bottom of the drilling component 7, and an opening hole 10 is provided in the middle of the bottom of the base 1;
[0043] Storage hole 12 is located in the middle of the top of the lifting plate 5 and is connected to the middle of the bottom of the drill rod 9. The storage hole 12 is threaded with a sorting component 13, which includes a threaded post 131, a pull rod 132 and a connecting post 133.
[0044] The rotating column 71 is rotatably mounted in the middle of the bottom of the connecting plate 6, the auger 92 is fixedly mounted on the outer surface of the rotating column 71, and the first driven gear 73 is fixedly mounted on the top of the outer surface of the rotating column 71.
[0045] The second driving component 141 is fixedly installed on one side of the top of the lifting plate 5, and the first driving gear 142 is fixedly connected to the bottom end of the output shaft of the second driving component 141.
[0046] The threaded post 131 is threaded into the interior of the storage hole 12, the pull rod 132 is fixedly installed on the top of the threaded post 131, and the connecting post 133 is fixedly connected to the bottom of the threaded post 131.
[0047] Two fixing plates 81 are respectively fixedly installed on both sides of the top of the base 1. The fixing ring block 82 is fixedly installed on the top of the fixing plate 81. The setting hole 83 is opened in the middle of the top of the fixing ring block 82. The blowing pipe 84 is fixedly installed on the inner wall surface of the setting hole 83. The connecting pipe 85 is fixedly connected to one end of the blowing pipe 84. The air pump 86 is fixedly connected to one end of the connecting pipe 85. The air inlet pipe 87 is fixedly connected to one side of the air pump 86.
[0048] The surface of the limiting rod 11 is provided with scale values.
[0049] Both the first driving component 2 and the second driving component 141 adopt a servo motor structure.
[0050] The inner wall surface of the storage hole 12 is provided with a threaded layer, which engages with the threaded post 131.
[0051] The working principle of the geotechnical engineering surveying device provided by this invention is as follows:
[0052] During operation, the threaded column 13 is first rotated and threaded into the storage hole 12. Then, the output shafts of the first drive member 2 and the second drive member 141 rotate. The rotation of the output shaft of the first drive member 2 engages the lifting plate 5, causing the rotating column 71 and the drill rod 9 to move downward. The rotation of the output shaft of the second drive member 141 causes the first driving gear 142 to rotate and engage the first driven gear 73 to rotate. The rotation of the first driven gear 73 causes the rotating column 71, the auger 72, and the drill rod 9 to rotate.
[0053] Drill rod 9 drills a hole into the soil layer. Lifting plate 5 moves on the surface of limit rod 11. Then observe the scale value on the surface of limit rod 11. After the drill rod 9 drills into the soil layer to the top of the soil layer to be sampled, hold pull rod 132 and rotate threaded column 131 so that threaded column 131 is taken out from storage hole 12. Then control drill rod 9 to continue drilling downward and store the soil block of the soil layer to be sampled inside storage hole 12.
[0054] Then, control the output shaft of the first drive unit 2 to rotate in the opposite direction, so that the bottom end of the drill rod 9 moves to the top of the base 1, and then install the threaded column 131 back into the storage hole 12, and push out the soil sampled inside the storage hole 12 for collection and testing.
[0055] Compared with related technologies, the geotechnical engineering surveying device provided by the present invention has the following beneficial effects:
[0056] This invention provides a geotechnical engineering surveying device. A storage hole 12 is opened in the middle of the bottom of a drill rod 9. The storage hole 12 is first filled with threaded posts 13 for plugging. The drill rod 9 drills into the soil layer, and the auger 72 removes soil that does not need to be tested. After observing the position of the drill rod 9 in the desired soil layer through the scale on the surface of the limiting rod 11, the sorting component 13 is rotated out. Then, the drill rod 9 continues to drill into the soil layer, storing soil blocks from the desired soil layer in the storage hole 12. After the drill rod 9 moves upward to the ground, the sorting component 13 is reinstalled into the storage hole 12 to push out the soil blocks, facilitating sample collection. This device has a simple structure, is highly practical, facilitates accurate sampling of the desired soil layer, avoids mixing of soil layers at different depths, and improves the accuracy of sampling data.
[0057] Second Embodiment
[0058] Please refer to the following: Figure 7 , Figure 8 and Figure 9 Based on the first embodiment of this application, which provides an engineering surveying device for geotechnical engineering investigation, the second embodiment of this application proposes another engineering surveying device for geotechnical engineering investigation. The second embodiment is merely a preferred embodiment of the first embodiment, and the implementation of the second embodiment will not affect the separate implementation of the first embodiment.
[0059] Specifically, the second embodiment of this application provides a different type of geotechnical engineering surveying device, wherein a third driving member 15 is fixedly installed on the other side of the top of the base 1, a second driving gear 16 is fixedly connected to the top of the output shaft of the third driving member 15, and a meshing component 17 is rotatably installed on the bottom of the fixed ring block 82, the meshing component 17 including a connecting ring block 171, a second driven gear 172 and a cleaning brush 173.
[0060] The connecting ring block 171 is rotatably mounted on the bottom of the fixed ring block 82, the second driven gear 172 is fixedly connected to the bottom of the connecting ring block 171, and the cleaning brush 173 is disposed on the surface of the inner wall of the second driven gear 172.
[0061] The second driving gear 16 meshes with the second driven gear 172.
[0062] The working principle of the geotechnical engineering surveying device provided by this invention is as follows:
[0063] During operation, the output shaft of the third drive component 15 rotates, driving the second drive gear 16 to rotate. The rotation of the second drive gear 16 meshes with the second driven gear 172, which in turn drives the cleaning brush 173 on the inner wall to rotate, cleaning the mud adhering to the surface of the auger 72 and the drill rod 9.
[0064] Compared with related technologies, the geotechnical engineering surveying device provided by the present invention has the following beneficial effects:
[0065] This invention provides a geotechnical engineering surveying device. By installing a rotating meshing component 17 at the bottom of a fixed ring block 82, when the meshing component 17 is meshed and rotated by a third driving component 15 and a second driving gear 16, the cleaning brush 173 can clean the soil adhering to the surface of the auger 72. Combined with the airflow blown on the surface of the auger 72 by the cleaning component 8, the soil adhering to the drill rod 9 and the surface of the auger 72 is cleaned, keeping the surface of the drill rod 9 and the auger 72 clean, keeping the surface of the device clean, and avoiding soil residue from affecting the drilling effect.
[0066] The above description is merely an embodiment of the present invention and does not limit the patent scope of the present invention. Any equivalent structural or procedural transformations made based on the content of the present invention specification and drawings, or direct or indirect applications in other related technical fields, are similarly included within the patent protection scope of the present invention.
Claims
1. A surveying device for geotechnical engineering investigation, characterized in that, include: Base; A first driving component is fixedly installed on one side of the top of the base. A threaded rod is fixedly connected to the top of the output shaft of the first driving component. A baffle is fixedly connected to the top of the threaded rod. A limit rod is fixedly installed on the other side of the top of the base. A lifting plate is threadedly engaged on the outer surface of the threaded rod. A connecting plate is fixedly installed in the middle of the bottom of the lifting plate. A guide component is fixedly connected to one side of the top of the lifting plate, and the guide component includes a second drive component and a first drive gear; A drilling component is rotatably mounted in the middle of the bottom of the connecting plate. The drilling component includes a rotating column, an auger, and a first driven gear. A cleaning component is disposed in the middle of the top of the base. The cleaning component includes a fixing plate, a fixing ring block, a setting hole, a blower pipe, a connecting pipe, an air pump, and an air inlet pipe. A drill rod is fixedly connected to the bottom of the drilling component, and an opening hole is provided in the middle of the bottom of the base; The storage hole is located in the middle of the top of the lifting plate and is connected to the middle of the bottom of the drill rod. The storage hole has an internal threaded engagement with a sorting component, which includes a threaded post, a pull rod, and a connecting post.
2. The geotechnical engineering surveying device according to claim 1, characterized in that, The rotating column is rotatably mounted in the middle of the bottom of the connecting plate, the auger is fixedly mounted on the outer surface of the rotating column, and the first driven gear is fixedly mounted on the top of the outer surface of the rotating column.
3. The geotechnical engineering surveying device according to claim 1, characterized in that, The second driving component is fixedly installed on one side of the top of the lifting plate, and the first driving gear is fixedly connected to the bottom end of the output shaft of the second driving component.
4. The geotechnical engineering surveying device according to claim 1, characterized in that, The threaded post is threaded into the interior of the storage hole, the pull rod is fixedly installed on the top of the threaded post, and the connecting post is fixedly connected to the bottom of the threaded post.
5. The geotechnical engineering surveying device according to claim 1, characterized in that, The two fixing plates are respectively fixedly installed on both sides of the top of the base, the fixing ring block is fixedly installed on the top of the fixing plate, the setting hole is opened in the middle of the top of the fixing ring block, the air blowing pipe is fixedly installed on the inner wall surface of the setting hole, the connecting pipe is fixedly connected to one end of the air blowing pipe, the air pump is fixedly connected to one end of the connecting pipe, and the air inlet pipe is fixedly connected to one side of the air pump.
6. The geotechnical engineering surveying device according to claim 1, characterized in that, The surface of the limiting rod is provided with scale values.
7. The geotechnical engineering surveying device according to claim 1, characterized in that, Both the first driving component and the second driving component adopt a servo motor structure.
8. The geotechnical engineering surveying device according to claim 1, characterized in that, A third driving component is fixedly installed on the other side of the top of the base. A second driving gear is fixedly connected to the top of the output shaft of the third driving component. A meshing component is rotatably installed at the bottom of the fixed ring block. The meshing component includes a connecting ring block, a second driven gear, and a cleaning brush.
9. A geotechnical engineering surveying device according to claim 8, characterized in that, The connecting ring block is rotatably mounted on the bottom of the fixed ring block, the second driven gear is fixedly connected to the bottom of the connecting ring block, and the cleaning brush is disposed on the surface of the inner cavity wall of the second driven gear.
10. A geotechnical engineering surveying device according to claim 8, characterized in that, The second driving gear meshes with the second driven gear.
