A kind of gas-liquid separation anti-deposition automatic flushing desulfurization slurry density measurement system

By vertically installing the gas-liquid separation buffer tank and the electromagnetic density meter, combined with the automatic flushing sequential control logic module, the problems of gypsum particle deposition and bubble interference were solved, thus achieving accurate measurement of desulfurization slurry density and long-term stable operation of the equipment.

CN123155381APending Publication Date: 2026-11-24HUANENG LONGDONG ENERGY CO LTD ZHENGNING POWER PLANT
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611317820.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-28
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

In existing desulfurization slurry density measurement systems, gypsum particles tend to settle and accumulate at the bottom of the buffer container and in the feed pipeline, causing blockage of the flow channel, and air bubbles interfere with the accuracy of the density measurement values.

Method used

The gas-liquid separation and anti-deposition feeding module includes a gas-liquid separation buffer tank, feeding pipeline, overflow pipeline, density measurement layout structure, and flushing and sewage discharge physical circuit. By controlling the volume flow rate and flow direction of the desulfurization slurry, combined with the vertical installation of the electromagnetic density meter and the automatic flushing sequential control logic module, solid particles are prevented from depositing and cleaned in a timely manner.

Benefits of technology

It effectively prevents solid accumulation in the feed pipe and at the bottom of the tank, ensures the accuracy of density measurement, extends the continuous operation cycle of the equipment, and avoids the tedious operation and downtime risk of traditional manual disassembly and cleaning.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123155381A_ABST
    Figure CN123155381A_ABST
Patent Text Reader

Abstract

This invention discloses an automatic flushing desulfurization slurry density measurement system with gas-liquid separation and anti-deposition features, comprising a gas-liquid separation buffer tank, an electromagnetic densitometer, a flushing and drainage circuit, and a DCS control system. The slurry is vertically injected into the buffer tank from the bottom via the feed pipeline, forming a bottom-up mainstream field that overcomes particle gravity settling and separates internal air bubbles, preventing bottom blockage and gas interference. The separated slurry enters the vertically installed electromagnetic densitometer, and the flow rate is controlled by an outlet regulating valve to reduce the deposition of solid particles in the measurement chamber. The DCS control system, based on timing and status monitoring parameters such as operating pressure difference and fluctuation variance, triggers automatic flushing sequential control logic and controls relevant valves according to valve position feedback signals, automatically completing the physical isolation of the measurement circuit, drainage, and pipeline flushing. This invention improves measurement accuracy and extends the system's continuous operation cycle.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of online fluid parameter detection technology, specifically to a gas-liquid separation anti-deposition automatic flushing desulfurization slurry density measurement system. Background Technology

[0002] In wet desulfurization processes, the density of the desulfurization slurry is a crucial parameter for controlling the system's operational status. The desulfurization slurry typically contains a large amount of gypsum solid particles, and a significant amount of gas is introduced during the reaction and stirring process inside the absorption tower.

[0003] In existing desulfurization slurry density measurement systems, the buffer containers typically use side or top feeding methods during the sampling stage. This lack of internal flow guidance allows gypsum particles to easily settle and accumulate at the bottom of the buffer container and in the feed pipe under gravity, leading to blockages in the flow channels. Furthermore, this conventional container structure cannot effectively extend the gas residence time to separate air bubbles entrained in the slurry. These bubbles directly enter downstream measuring instruments with the slurry, significantly interfering with the accuracy of density measurements.

[0004] In the density measurement process, the density meters and associated pipelines in existing systems are often arranged horizontally or at a certain angle. This conventional installation posture inevitably results in a horizontal support surface inside the measurement chamber. When high-concentration desulfurization slurry flows through this area, solid particles will gradually adhere to the inner wall of the measurement chamber and undergo lateral deposition under the influence of gravity. Over time, the accumulation of internal deposits will change the measurement characteristics of the instrument, leading to serious deviations in the measurement data, thereby significantly shortening the continuous and reliable operation cycle of the measurement equipment. Summary of the Invention

[0005] To address the shortcomings of existing technologies, this invention provides an automatic flushing desulfurization slurry density measurement system for gas-liquid separation and anti-deposition, which solves the problem that gypsum particles are prone to settling and accumulating at the bottom of the buffer container and in the feed pipeline under gravity.

[0006] To achieve the above objectives, the present invention provides the following technical solution: a gas-liquid separation and anti-deposition automatic flushing desulfurization slurry density measurement system, comprising a gas-liquid separation and anti-deposition feeding module, a density measurement arrangement structure connected downstream of the gas-liquid separation and anti-deposition feeding module, a flushing and sewage discharge physical circuit connected to the density measurement arrangement structure, and a control system module connected to the gas-liquid separation and anti-deposition feeding module, the density measurement arrangement structure, and the flushing and sewage discharge physical circuit. The gas-liquid separation and anti-deposition feeding module includes a gas-liquid separation buffer tank, a feeding pipeline and an overflow pipeline. The feeding pipeline is connected to the feeding port of the gas-liquid separation buffer tank and is equipped with a feeding port door. The overflow pipeline is connected to the overflow port of the gas-liquid separation buffer tank and is equipped with an overflow door. The density measurement arrangement structure includes an outlet pipeline, an electromagnetic density meter, and an outlet regulating valve. The outlet pipeline connects the outlet of the gas-liquid separation buffer tank with the fluid inlet of the electromagnetic density meter, and the outlet regulating valve is located at the fluid outlet of the electromagnetic density meter. The flushing and sewage discharge physical circuit includes a sewage discharge pipe and a flushing water pipe. The sewage discharge pipe and the flushing water pipe are respectively connected to the electromagnetic density meter. A sewage discharge valve is provided on the sewage discharge pipe, and a flushing water valve is provided on the flushing water pipe. The control system module includes a DCS control system and an automatic flushing sequential control logic module. The feed inlet gate, the overflow gate, the outlet regulating gate, the sewage discharge gate and the flushing water gate are respectively connected to the DCS control system. The automatic flushing sequential control logic module is located inside the DCS control system.

[0007] Preferably, the feed inlet is located at the bottom of the gas-liquid separation buffer tank, the overflow outlet is located at the top, and the discharge outlet is located in the lower middle part of the side wall with a vertical height between the height of the feed inlet and the height of the overflow outlet. The sewage pipe is connected to the lowest point of the bottom of the electromagnetic density meter, and the flushing water pipe is connected to the upper end or upstream pipe of the internal measuring cavity of the electromagnetic density meter.

[0008] Preferably, the gas-liquid separation buffer tank adopts a vertical hollow structure; the feed pipeline guides the desulfurization slurry to be vertically injected into the gas-liquid separation buffer tank from directly below, forming a vertical mainstream field from bottom to top inside the gas-liquid separation buffer tank; The DCS control system controls the volumetric flow rate of the desulfurization slurry entering the gas-liquid separation buffer tank by adjusting the opening of the feed inlet gate, so that the upward macroscopic flow velocity of the desulfurization slurry is greater than the terminal settling velocity of the gypsum solid particles inside the desulfurization slurry.

[0009] Preferably, the electromagnetic density meter is fixedly installed in a vertical position, with its inner wall parallel to the direction of gravity. The DCS control system stores preset opening parameters. The DCS control system adjusts the valve opening of the outlet regulating gate according to the preset opening parameters to control the volumetric flow rate of the desulfurization slurry flowing through the electromagnetic density meter, so that the residence time of the desulfurization slurry in the gas-liquid separation buffer tank is greater than the time required for the bubbles to rise to the liquid surface.

[0010] Preferably, the feed inlet valve, the overflow valve, the outlet regulating valve, the sewage discharge valve, and the flushing water valve are all control valves with actuators, and each of the above control valves is equipped with a valve position feedback device; The valve position feedback device establishes a signal connection with the DCS control system and is used to send a feedback signal indicating that the valve has been properly positioned to the DCS control system.

[0011] Preferably, the control system module further includes pressure sensors installed at the fluid inlet and fluid outlet of the electromagnetic density meter, respectively, and the pressure sensors establish a signal connection with the DCS control system to obtain the operating pressure difference; The automatic flushing sequential control logic module is equipped with a timing unit to record the duration of continuous measurement work performed by the electromagnetic density meter. The DCS control system acquires the density measurement values ​​output by the electromagnetic density meter in real time and calculates the fluctuation variance.

[0012] Preferably, when the time length reaches the standard operating time cycle, the automatic flushing sequential control logic module generates a timed trigger signal; When the operating differential pressure is greater than or equal to the blockage differential pressure threshold, or when the fluctuation variance is greater than or equal to the fluctuation variance threshold, the automatic flushing sequential control logic module generates a state abnormality trigger signal.

[0013] Preferably, after the automatic flushing program is started, the DCS control system locks the current density measurement value and maintains the output; The automatic flushing sequential control logic module sends a closing command to the feed inlet door, and after the DCS control system receives the fully closed signal of the feed inlet door, it sends closing commands to the overflow door and the outlet regulating door to physically isolate the measurement circuit where the electromagnetic density meter is located from the external fluid system.

[0014] Preferably, after the measurement circuit is isolated, the automatic flushing sequence control logic module performs the following operations in sequence: Send an opening command to the drain door; After the sewage discharge time reaches the set value, an opening command is sent to the flushing water gate; After the flushing time reaches the set value, a closing command is sent to the flushing water gate; Upon receiving the signal that the flushing water door is fully closed, a closing command is sent to the drain door; Upon receiving the signal that the drain valve is fully closed, an opening command is sent to the feed inlet valve, the overflow valve, and the outlet regulating valve, and the lock on the density measurement value is released.

[0015] A method for operating a gas-liquid separation, anti-deposition, automatic flushing, and desulfurization slurry density measurement system includes the following steps: S1. Diversion and Separation Stage: The desulfurization slurry is fed into the gas-liquid separation buffer tank through the feed pipeline. The desulfurization slurry separates into gas inside the gas-liquid separation buffer tank. The separated gas and excess slurry are discharged to the ditch through the overflow pipeline. S2, Measurement and Control Stage: The slurry that has completed gas-liquid separation enters the electromagnetic density meter from the gas-liquid separation buffer tank for density measurement. The outlet regulating valve regulates the flow rate of the slurry passing through the electromagnetic density meter. The slurry that has completed the measurement is discharged into the ditch. S3, Isolation Trigger Stage: When the automatic flushing sequential control logic module generates a trigger signal according to the preset time period or operating status parameters, the DCS control system continues to output the currently acquired density measurement signal and controls the sequential closure of the feed inlet door, overflow door and the outlet regulating door to isolate the measurement circuit where the electromagnetic density meter is located. S4. Sewage and Flushing Stage: The DCS control system controls the opening of the sewage discharge gate to discharge residual slurry, and then controls the opening of the flushing water gate to introduce external flushing water, so that the external flushing water flows from top to bottom through the measuring chamber of the electromagnetic density meter for flushing; after the flushing process is completed, the DCS control system closes the flushing water gate and the sewage discharge gate in sequence, and opens the feed inlet gate, the overflow gate and the outlet regulating gate, and the system returns to the diversion and separation stage.

[0016] This invention provides an automatic flushing desulfurization slurry density measurement system for gas-liquid separation and anti-deposition. It has the following beneficial effects: 1. This invention utilizes a structure that combines bottom-feeding and overflow discharge in a gas-liquid separation buffer tank to create a vertical mainstream flow field from bottom to top within the tank. By controlling the volumetric flow rate of the desulfurization slurry, the upward macroscopic flow velocity of the slurry is made greater than the terminal settling velocity of the gypsum solid particles, while simultaneously ensuring that the residence time of the slurry within the tank is greater than the time it takes for bubbles to rise to the liquid surface. This structure not only separates bubbles within the desulfurization slurry to eliminate interference from gas in measurement values, but also utilizes upward fluid kinetic energy to overcome the gravitational settling of solid particles, preventing solid accumulation and blockage in the feed pipe and at the bottom of the tank.

[0017] 2. This invention fixes the electromagnetic density meter vertically, ensuring the inner wall of the internal measuring chamber is parallel to the direction of gravity, thus eliminating the horizontal support surface that allows solid particles to accumulate. The system controls the flow rate of the desulfurization slurry passing through the electromagnetic density meter via an outlet regulating valve. Under the combined action of gravity in the vertical direction and the kinetic energy of the fluid scouring, the lateral adhesion of solid particles to the inner wall of the measuring chamber is limited. This arrangement design and flow control mechanism reduce the amount of solid particles deposited inside the density meter, ensuring the accuracy of density measurement and extending the continuous operation cycle of the equipment.

[0018] 3. This invention constructs an automatic flushing sequential control loop based on a dual triggering mechanism of timing and status monitoring. The DCS control system assesses the internal deposition risk by acquiring the operating pressure difference and density fluctuation variance, and strictly executes logical interlocks based on the signals sent by the valve position feedback devices on each valve when the flushing procedure is triggered. The system sequentially completes the physical isolation of the measurement loop, bottom opening for sewage discharge, and upstream water flushing actions according to a preset sequence. This control logic enables timely cleaning of residual slurry inside the electromagnetic density meter and connected pipelines, avoiding the cumbersome operation and downtime risks of traditional manual disassembly and cleaning. Attached Figure Description

[0019] Figure 1 This is a schematic diagram of the overall structure of the present invention; Figure 2 This is a schematic flowchart of the desulfurization slurry density measurement method of the present invention.

[0020] Among them, 1. Gas-liquid separation buffer tank; 2. Electromagnetic density meter; 3. Feed pipeline; 31. Feed inlet gate; 4. Overflow pipeline; 41. Overflow gate; 5. Outlet pipeline; 51. Outlet regulating gate; 6. Sewage pipeline; 61. Sewage gate; 7. Flushing water pipeline; 71. Flushing water gate; 8. DCS control system; 81. Automatic flushing sequential control logic module. Detailed Implementation

[0021] The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0022] Example: See attached document Figure 1 - Appendix Figure 2The present invention provides a gas-liquid separation anti-deposition automatic flushing desulfurization slurry density measurement system, comprising: a gas-liquid separation buffer tank 1, an electromagnetic density meter 2, a feed pipeline 3, an overflow pipeline 4, an outlet pipeline 5, a sewage discharge pipeline 6, a flushing water pipeline 7, and a DCS control system 8.

[0023] The feed pipe 3 connects the feed inlet of the desulfurization absorption tower to the feed inlet at the bottom of the gas-liquid separation buffer tank 1, and the feed pipe 3 is equipped with a feed inlet gate 31.

[0024] Overflow pipe 4 connects the overflow port at the top of gas-liquid separation buffer tank 1 to the trench, and overflow valve 41 is installed on overflow pipe 4.

[0025] The outlet pipe 5 connects the discharge port at the lower part of the gas-liquid separation buffer tank 1 to the fluid inlet of the electromagnetic density meter 2. The electromagnetic density meter 2 is installed vertically, and an outlet regulating valve 51 is provided at the fluid outlet of the electromagnetic density meter 2.

[0026] The sewage pipe 6 connects the bottom of the electromagnetic density meter 2 to the trench, and a sewage gate 61 is installed on the sewage pipe 6.

[0027] The flushing water pipe 7 is connected to the flushing water source and the electromagnetic density meter 2. The flushing water pipe 7 is equipped with a flushing water valve 71.

[0028] The feed inlet valve 31, overflow valve 41, outlet regulating valve 51, sewage discharge valve 61 and flushing water valve 71 are control valves with actuators. The feed inlet valve 31, overflow valve 41, outlet regulating valve 51, sewage discharge valve 61 and flushing water valve 71 are respectively connected to the DCS control system 8. The DCS control system 8 is equipped with an automatic flushing sequential control logic module 81.

[0029] The workflow of the gas-liquid separation desulfurization slurry density measurement system includes the diversion and separation stage, the measurement and control stage, the isolation and triggering stage, and the sewage discharge and flushing stage.

[0030] During the diversion and separation stage, the slurry is fed into the gas-liquid separation buffer tank 1 from the bottom through the feed pipe 3. The slurry separates into gas inside the gas-liquid separation buffer tank 1, and the separated gas and excess slurry are discharged to the ditch through the overflow pipe 4.

[0031] During the measurement and control phase, the slurry that has completed gas-liquid separation flows out of the gas-liquid separation buffer tank 1 and enters the electromagnetic density meter 2. The electromagnetic density meter 2 collects and outputs the slurry density value. The outlet regulating valve 51 regulates the slurry flow rate through the electromagnetic density meter 2, and the slurry that has completed the measurement is discharged into the ditch.

[0032] During the isolation triggering phase, the automatic flushing sequential control logic module 81 triggers the automatic flushing program according to the preset time period or operating status parameters. The DCS control system 8 maintains the output of the currently acquired density measurement signal. Subsequently, the DCS control system 8 sends control commands to sequentially close the feed inlet door 31, overflow door 41 and outlet regulating door 51, thus isolating the measurement circuit where the electromagnetic density meter 2 is located.

[0033] During the sewage flushing stage, the DCS control system 8 sends a control command to open the sewage discharge gate 61, and the residual slurry inside the electromagnetic density meter 2 and the connected pipeline is discharged under gravity. After the sewage discharge operation is completed, the DCS control system 8 sends a control command to open the flushing water gate 71, and flushing water is introduced to clean the electromagnetic density meter 2 and the connected pipeline. When the flushing process ends, the DCS control system 8 closes the flushing water gate 71 and the sewage discharge gate 61 in sequence. Finally, the DCS control system 8 sends a control command to open the feed inlet gate 31, the overflow gate 41 and the outlet regulating gate 51, and the gas-liquid separation desulfurization slurry density measurement system returns to the diversion and separation stage.

[0034] See attached document Figure 1 - Appendix Figure 2 The gas-liquid separation and anti-deposition automatic flushing desulfurization slurry density measurement system of the present invention includes a gas-liquid separation buffer tank 1, a feed pipeline 3, an overflow pipeline 4, and an outlet pipeline 5.

[0035] The gas-liquid separation buffer tank 1 adopts a vertical hollow structure design. The bottom end of the gas-liquid separation buffer tank 1 is provided with a feed inlet, the lower middle part of the side wall of the gas-liquid separation buffer tank 1 is provided with a discharge outlet, and the upper part of the side wall of the gas-liquid separation buffer tank 1 is provided with an overflow outlet. The vertical height of the discharge outlet is between the height of the feed inlet and the height of the overflow outlet.

[0036] The inlet end of the feed pipe 3 is connected to the feed outlet of the desulfurization absorption tower, and the outlet end of the feed pipe 3 is connected to the feed inlet at the bottom of the gas-liquid separation buffer tank 1. The feed pipe 3 guides the slurry to be vertically injected into the gas-liquid separation buffer tank 1 from directly below it. The feed pipe 3 is equipped with a feed inlet gate 31.

[0037] The inlet end of the overflow pipe 4 is connected to the overflow port on the upper side wall of the gas-liquid separation buffer tank 1. The outlet end of the overflow pipe 4 extends to the trench. An overflow gate 41 is provided on the overflow pipe 4. The separated gas is collected in the top space inside the gas-liquid separation buffer tank 1 above the overflow port and discharged through the overflow pipe 4.

[0038] The inlet end of the outlet pipe 5 is connected to the outlet port in the lower middle part of the side wall of the gas-liquid separation buffer tank 1, and the outlet end of the outlet pipe 5 is connected to the fluid inlet of the electromagnetic density meter 2. The outlet pipe 5 receives the slurry after the gas is separated and guides the slurry into the electromagnetic density meter 2.

[0039] See attached document Figure 1 - Appendix Figure 2 The present invention provides a gas-liquid separation anti-deposition automatic flushing desulfurization slurry density measurement system. The system includes a bottom feeding and kinetic energy anti-deposition mechanism, comprising: a feeding pipeline 3, a feeding port 31, and a gas-liquid separation buffer tank 1.

[0040] The output end of the feed pipe 3 is connected to the feed port at the bottom of the gas-liquid separation buffer tank 1. The feed pipe 3 vertically injects desulfurization slurry into the gas-liquid separation buffer tank 1, and the desulfurization slurry forms a vertical mainstream field from bottom to top inside the gas-liquid separation buffer tank 1.

[0041] The desulfurization slurry contains gypsum solid particles, which settle downwards under the influence of gravity. Terminal settling velocity of gypsum solid particles in desulfurization slurry Determined by the following fluid dynamics formula:

[0042] In the formula, It is the acceleration due to gravity; The equivalent diameter of the gypsum solid particles; The solid density of the gypsum solid particles; The liquid density of the desulfurization slurry; The dynamic viscosity of the desulfurization slurry.

[0043] The process of injecting desulfurization slurry into the feed pipe 3 is the initial kinetic energy input of the fluid. By adjusting the opening of the feed inlet gate 31, the volumetric flow rate of the desulfurization slurry entering the gas-liquid separation buffer tank 1 is controlled. The upward macroscopic flow velocity of the desulfurization slurry inside the gas-liquid separation buffer tank 1 is equal to the volumetric flow rate divided by the internal cross-sectional area of ​​the gas-liquid separation buffer tank 1. By controlling this volumetric flow rate, the upward macroscopic flow velocity of the desulfurization slurry inside the gas-liquid separation buffer tank 1 is maintained at a level greater than the terminal settling velocity. The state.

[0044] The upward flow direction of the desulfurization slurry is on the same vertical line and opposite to the gravitational settling direction of the gypsum solid particles. The upward fluid kinetic energy continuously overcomes the gravitational settling effect of the gypsum solid particles, and the gypsum solid particles follow the desulfurization slurry upward inside the gas-liquid separation buffer tank 1.

[0045] The above-mentioned fluid control process inhibits the accumulation of gypsum solid particles at the bottom of the gas-liquid separation buffer tank 1. The gas-liquid separation buffer tank 1 uses the internal flow field distribution to prevent solid deposition in the bottom feeding area, thus avoiding blockage at the bottom of the gas-liquid separation buffer tank 1 and the feeding pipeline 3.

[0046] See attached document Figure 1 - Appendix Figure 2 , Figure 1 This is a schematic diagram of the structure of an automatic flushing desulfurization slurry density measurement system for gas-liquid separation and anti-deposition according to an embodiment of the present invention. The present invention provides a gas-liquid separation and anti-deposition automatic flushing desulfurization slurry density measurement system. The physical structure of the system for realizing gas-liquid separation includes: a gas-liquid separation buffer tank 1, an overflow pipeline 4, an overflow valve 41, and an outlet pipeline 5.

[0047] The desulfurization slurry enters the gas-liquid separation buffer tank 1. The gas contained in the desulfurization slurry forms bubbles. The bubbles are buoyed by the desulfurization slurry and move upward inside the gas-liquid separation buffer tank 1.

[0048] Terminal rise velocity of bubbles inside the desulfurization slurry Determined by the following fluid dynamics formula:

[0049] In the formula, It is the acceleration due to gravity; The equivalent diameter of the bubble; The liquid density of the desulfurization slurry; The density of the gas inside the bubble; The dynamic viscosity of the desulfurization slurry.

[0050] The desulfurization slurry has a residence time inside the gas-liquid separation buffer tank 1, which is equal to the effective internal volume of the gas-liquid separation buffer tank 1 divided by the volumetric flow rate of the desulfurization slurry. The time required for bubbles to rise to the liquid surface of the gas-liquid separation buffer tank 1 is equal to the liquid surface height of the gas-liquid separation buffer tank 1 divided by the terminal rising velocity. .

[0051] By pre-setting the effective volume of the gas-liquid separation buffer tank 1 and adjusting the volumetric flow rate of the desulfurization slurry entering the gas-liquid separation buffer tank 1 in conjunction with the feed inlet gate 3, the time required for the bubbles to rise to the liquid surface is less than the residence time of the desulfurization slurry inside the gas-liquid separation buffer tank 1. The bubbles reach the liquid surface and detach from the desulfurization slurry before the desulfurization slurry flows out of the gas-liquid separation buffer tank 1.

[0052] The separated gas is collected in the top space inside the gas-liquid separation buffer tank 1, which is higher than the overflow port. The separated gas is discharged through the overflow pipe 4. The desulfurization slurry with a liquid level higher than the overflow port is discharged to the ditch through the overflow pipe 4.

[0053] The desulfurized slurry after gas-liquid separation flows to the discharge port at the lower part of the gas-liquid separation buffer tank 1. The desulfurized slurry after gas separation enters the electromagnetic density meter 2 through the outlet pipe 5. The internal gas content of the desulfurized slurry entering the electromagnetic density meter 2 is reduced, thus avoiding interference from the gas on the measurement value of the electromagnetic density meter 2.

[0054] See attached document Figure 1 - Appendix Figure 2 The density measurement layout involved in the system includes: outlet pipe 5, electromagnetic density meter 2, and sewage pipe 6.

[0055] The outlet end of the outlet pipe 5 is connected to the fluid inlet of the electromagnetic density meter 2. The electromagnetic density meter 2 is fixedly installed in a vertical position and has a measuring chamber inside.

[0056] The desulfurization slurry enters the measuring chamber of the electromagnetic density meter 2 through the outlet pipe 5, and the desulfurization slurry flows vertically inside the measuring chamber.

[0057] The desulfurization slurry contains solid particles, and the vertical flow field distribution makes the gravity direction of the solid particles and the flow direction of the desulfurization slurry lie in the same straight line.

[0058] Solid particles move downwards under the influence of gravity. The inner wall of the measuring cavity is parallel to the direction of gravity, eliminating the horizontal support surface where solid particles accumulate under gravity. This vertical installation method reduces the amount of solid particles deposited inside the measuring cavity.

[0059] An outlet regulating valve 51 is provided at the fluid outlet of the electromagnetic density meter 2. The desulfurization slurry flows through the measuring chamber and is discharged through the fluid outlet.

[0060] The bottom end of the electromagnetic density meter 2 is connected to the inlet end of the sewage pipe 6, the outlet end of the sewage pipe 6 extends to the ditch, a sewage gate 61 is provided on the sewage pipe 6, and the inlet end of the sewage pipe 6 is connected to the lowest point of the bottom of the electromagnetic density meter 2.

[0061] When the drain door 61 is open, the residual desulfurization slurry inside the measuring chamber of the electromagnetic density meter 2 moves downward under the action of gravity, and the residual desulfurization slurry is discharged into the ditch through the drain pipe 6.

[0062] See attached document Figure 1 - Appendix Figure 2 The present invention provides a gas-liquid separation anti-deposition automatic flushing desulfurization slurry density measurement system. The dynamic flow control module involved in the system includes: an outlet regulating valve 51, an electromagnetic density meter 2, a gas-liquid separation buffer tank 1, and a DCS control system 8.

[0063] An outlet regulating valve 51 is provided at the fluid outlet of the electromagnetic density meter 2. The outlet regulating valve 51 is a control valve with an actuator, and the outlet regulating valve 51 establishes a signal connection with the DCS control system 8.

[0064] The outlet regulating valve 51 is used to control the volumetric flow rate of the desulfurization slurry flowing through the electromagnetic density meter 2. Determined by the following fluid control formula:

[0065] In the formula, The flow coefficient of the outlet regulating valve 51; The pressure difference before and after the outlet regulating valve 51; This refers to the liquid density of the desulfurization slurry.

[0066] The DCS control system 8 stores preset opening parameters, which are calculated based on the effective volume of the gas-liquid separation buffer tank 1 and the internal cross-sectional area of ​​the electromagnetic density meter 2. The DCS control system 8 sends control commands to the outlet regulating valve 51, which changes its valve opening according to the control commands. This change in valve opening affects the flow coefficient. The numerical change in the value of the desulfurization slurry thus alters the volumetric flow rate of the desulfurization slurry in the entire measurement loop. .

[0067] Reducing the valve opening of the outlet regulating valve 51 lowers the volumetric flow rate of the desulfurization slurry. This reduced flow rate increases the residence time of the desulfurization slurry inside the gas-liquid separation buffer tank 1, making the residence time of the desulfurization slurry inside the gas-liquid separation buffer tank 1 longer than the time required for bubbles to rise to the liquid surface.

[0068] Increasing the valve opening of the outlet regulating valve 51 increases the volumetric flow rate of the desulfurization slurry. The increased volumetric flow rate increases the flow velocity of the desulfurization slurry inside the electromagnetic density meter 2. The increased flow velocity increases the scouring kinetic energy of the fluid, preventing solid particles from depositing inside the electromagnetic density meter 2.

[0069] The DCS control system 8 adjusts the valve opening of the outlet regulating gate 51 according to the preset opening parameters, so that the volumetric flow rate of the desulfurization slurry can maintain the required residence time for some bubbles to detach from the gas-liquid separation buffer tank 1, while maintaining the flow rate required to prevent solid particles from depositing inside the electromagnetic density meter 2.

[0070] The specific flushing and sewage discharge physical circuit includes: electromagnetic density meter 2, sewage discharge pipe 6, sewage discharge gate 61, flushing water pipe 7, flushing water gate 71, and DCS control system 8.

[0071] The inlet end of the sewage pipe 6 is connected to the lowest point of the bottom of the electromagnetic density meter 2, and the outlet end of the sewage pipe 6 extends to the ditch. A sewage gate 61 is installed on the sewage pipe 6, which is used to control the opening and closing of the fluid channel of the sewage pipe 6.

[0072] The inlet of the flushing water pipe 7 is connected to an external flushing water source, and the outlet of the flushing water pipe 7 is connected to the upper end or upstream pipe of the internal measuring chamber of the electromagnetic density meter 2. A flushing water valve 71 is installed on the flushing water pipe 7, which is used to control the opening and closing of the fluid channel of the flushing water pipe 7.

[0073] The drain valve 61 and the flushing water valve 71 are control valves with actuators. The drain valve 61 establishes a signal connection with the DCS control system 8, and the flushing water valve 71 establishes a signal connection with the DCS control system 8.

[0074] The DCS control system 8 is equipped with an automatic flushing sequential control logic module 81. The automatic flushing sequential control logic module 81 sends control commands to the drain door 61 and the flushing water door 71. The drain door 61 and the flushing water door 71 perform opening or closing actions according to the control commands.

[0075] When the drain valve 61 is open, the desulfurization slurry remaining inside the electromagnetic density meter 2 is discharged through the drain pipe 6.

[0076] When the flushing water gate 71 is open, external flushing water enters the electromagnetic density meter 2 through the flushing water pipe 7. The flushing water flows from top to bottom through the measuring chamber of the electromagnetic density meter 2 and is finally discharged into the ditch through the sewage pipe 6, thereby achieving the flushing and cleaning of the inside of the electromagnetic density meter 2.

[0077] Furthermore, the dual triggering mechanism of timing and status monitoring includes: an electromagnetic density meter 2, a pressure sensor, a DCS control system 8, and an automatic flushing sequential control logic module 81 installed inside the DCS control system 8. The automatic flushing sequential control logic module 81 is equipped with a timing unit, which records the duration of continuous measurement work performed by the electromagnetic density meter 2. The DCS control system 8 stores a standard operating time cycle. When the duration recorded by the timing unit reaches the standard operating time cycle, the automatic flushing sequential control logic module 81 generates a timing trigger signal.

[0078] Pressure sensors are installed at the fluid inlet and fluid outlet of the electromagnetic density meter 2. The pressure sensors are connected to the DCS control system 8, and the DCS control system 8 obtains the operating pressure difference between the fluid inlet and fluid outlet of the electromagnetic density meter 2 in real time through the pressure sensors. The DCS control system 8 internally stores the blockage differential pressure threshold. When the operating pressure difference The following physical conditions indicate a risk of solid particle deposition inside the electromagnetic density meter 2:

[0079] In the formula, The operating pressure difference between the fluid inlet and fluid outlet of the electromagnetic density meter 2; This is the differential pressure threshold for clogging.

[0080] The DCS control system 8 acquires the density measurement values ​​output by the electromagnetic density meter 2 in real time. The DCS control system 8 performs statistical calculations on the density measurement values ​​over a continuous time period to obtain the fluctuation variance of the density measurement values. The DCS control system 8 internally stores the fluctuation variance threshold. When the variance of the fluctuation The following physical conditions indicate that the fluctuation of the internal measurement data of the electromagnetic density meter 2 exceeds the normal range:

[0081] In the formula, The variance of the density measurement values; This is the fluctuation variance threshold.

[0082] When the automatic flushing sequence control logic module 81 generates a timed trigger signal or a status abnormality trigger signal, the automatic flushing sequence control logic module 81 starts the automatic flushing program.

[0083] After the trigger command is issued, the gas-liquid separation anti-deposition automatic flushing desulfurization slurry density measurement system ends the diversion and separation stage and the measurement and control stage, and enters the isolation trigger stage and the sewage flushing stage. The automatic flushing sequential control logic module 81 controls the opening or closing of the feed inlet gate 31, overflow gate 41, outlet regulating gate 51, sewage gate 61 and flushing water gate 71 according to the preset timing.

[0084] See attached document Figure 1 - Appendix Figure 2 , Figure 1 This is a schematic diagram of the structure of an automatic flushing desulfurization slurry density measurement system for gas-liquid separation and anti-deposition according to an embodiment of the present invention. The present invention provides an automatic flushing desulfurization slurry density measurement system for gas-liquid separation and anti-deposition. The hardware structure and control unit involved in the flushing sequence control timing and logic interlocking steps executed by the system include: an electromagnetic density meter 2, an inlet gate 31, an overflow gate 41, an outlet regulating gate 51, a sewage gate 61, a flushing water gate 71, a DCS control system 8, and an automatic flushing sequence control logic module 81.

[0085] The feed inlet gate 31, overflow gate 41, outlet regulating gate 51, drain gate 61 and flushing water gate 71 are all equipped with valve position feedback devices. The valve position feedback devices establish a signal connection with the DCS control system 8 and are used to send feedback signals to the DCS control system 8 indicating that the corresponding valve action is in place.

[0086] The automatic flushing sequential control logic module 81 triggers the execution of the automatic flushing program. The DCS control system 8 records and locks the current density measurement value of the electromagnetic density meter 2. During the execution of the automatic flushing program, the DCS control system 8 maintains the output of the locked density measurement value.

[0087] The automatic flushing sequential control logic module 81 sends a closing command to the feed inlet gate 31, and the feed inlet gate 31 performs the closing action, stopping the input of desulfurization slurry to the gas-liquid separation buffer tank 1.

[0088] After receiving the fully closed signal from the valve position feedback device of the feed inlet gate 31, the DCS control system 8 sends a closing command to the overflow gate 41 and the outlet regulating gate 51. The overflow gate 41 and the outlet regulating gate 51 perform the closing action. This interlocking step isolates the measurement circuit of the electromagnetic density meter 2 from the external fluid system.

[0089] After the measurement circuit is isolated, the automatic flushing sequential control logic module 81 sends an opening command to the drain door 61. The drain door 61 performs the opening action, and the electromagnetic density meter 2 and the desulfurization slurry remaining in the connected pipeline are discharged through the drain door 61.

[0090] After the drain gate 61 remains open for the set draining time, the automatic flushing sequential control logic module 81 sends an opening command to the flushing water gate 71. The flushing water gate 71 then opens, and the flushing water enters the internal measuring chamber of the electromagnetic density meter 2 for flushing. The flushing water and residual desulfurization slurry are then discharged into the ditch through the drain gate 61.

[0091] After the flushing water gate 71 remains open for the set flushing time, the automatic flushing sequence control logic module 81 sends a closing command to the flushing water gate 71, and the flushing water gate 71 performs the closing action.

[0092] After receiving the fully closed signal from the valve position feedback device of the flushing water gate 71, the DCS control system 8 sends a closing command to the drain gate 61, and the drain gate 61 performs the closing action.

[0093] After receiving the fully closed signal from the valve position feedback device of the drain valve 61, the DCS control system 8 sends an opening command to the inlet valve 31, the overflow valve 41, and the outlet regulating valve 51. The inlet valve 31, the overflow valve 41, and the outlet regulating valve 51 are restored to their opening states before the automatic flushing program is started. The DCS control system 8 releases the lock on the density measurement value and resumes the acquisition and output of the real-time density measurement value.

[0094] In practical implementation, the control valves involved include: inlet valve 31, overflow valve 41, outlet regulating valve 51, drain valve 61, and flushing water valve 71.

[0095] The valve bodies of the feed inlet valve 31, overflow valve 41, outlet regulating valve 51, drain valve 61, and flushing water valve 71 are equipped with pneumatic actuators. The pneumatic actuators are connected to the compressed air source through solenoid valves. The solenoid valves establish a signal connection with the DCS control system 8. The DCS control system 8 sends an electrical signal command to the solenoid valves. The solenoid valves control the opening or closing of the compressed air source path according to the electrical signal command, thereby driving the pneumatic actuators to control the corresponding valves to perform opening or closing actions.

[0096] As an alternative implementation, the valve body drive end of the feed inlet valve 31, overflow valve 41, outlet regulating valve 51, drain valve 61 and flushing water valve 71 is equipped with an electric actuator. The electric actuator establishes a signal connection with the DCS control system 8. The electric actuator receives the control command issued by the DCS control system 8 and drives the corresponding valve to perform opening or closing actions.

[0097] The feed pipeline 3 of the gas-liquid separation anti-deposition automatic flushing desulfurization slurry density measurement system is connected to the fluid pipeline of the chemical production system or the metallurgical production system. The slurry containing bubbles and solid particles in the chemical production system or the metallurgical production system enters the gas-liquid separation buffer tank 1. The gas-liquid separation buffer tank 1 performs the aforementioned gas-liquid separation operation on the slurry containing bubbles and solid particles. The electromagnetic density meter 2 performs the density measurement operation on the slurry from which the gas is separated.

[0098] The above-described embodiments are descriptions of the specific structure and working logic of the gas-liquid separation anti-deposition automatic flushing desulfurization slurry density measurement system. Conventional hardware replacements or application field expansions made by those skilled in the art based on the disclosed mechanical structure and logic timing of this system all fall within the protection scope of this invention.

[0099] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A gas-liquid separation anti-deposition automatic flush desulfurized slurry density measurement system, comprising a gas-liquid separation and anti-deposition feed module, characterized in that, Downstream of the gas-liquid separation and anti-deposition feeding module is a density measurement arrangement structure, and a flushing and sewage discharge physical circuit is connected to the density measurement arrangement structure. A control system module is connected to the gas-liquid separation and anti-deposition feeding module, the density measurement arrangement structure, and the flushing and sewage discharge physical circuit. The gas-liquid separation and anti-deposition feeding module includes a gas-liquid separation buffer tank (1), a feeding pipeline (3) and an overflow pipeline (4). The feeding pipeline (3) is connected to the inlet of the gas-liquid separation buffer tank (1) and is provided with an inlet gate (31). The overflow pipeline (4) is connected to the overflow port of the gas-liquid separation buffer tank (1) and is provided with an overflow gate (41). The density measurement arrangement structure includes an outlet pipe (5), an electromagnetic density meter (2), and an outlet regulating valve (51). The outlet pipe (5) connects the outlet of the gas-liquid separation buffer tank (1) with the fluid inlet of the electromagnetic density meter (2). The outlet regulating valve (51) is located at the fluid outlet of the electromagnetic density meter (2). The flushing and sewage discharge physical circuit includes a sewage discharge pipe (6) and a flushing water pipe (7). The sewage discharge pipe (6) and the flushing water pipe (7) are respectively connected to the electromagnetic density meter (2). A sewage discharge valve (61) is provided on the sewage discharge pipe (6), and a flushing water valve (71) is provided on the flushing water pipe (7). The control system module includes a DCS control system (8) and an automatic flushing sequential control logic module (81). The feed inlet gate (31), the overflow gate (41), the outlet regulating gate (51), the sewage gate (61) and the flushing water gate (71) are respectively connected to the DCS control system (8). The automatic flushing sequential control logic module (81) is located inside the DCS control system (8).

2. The gas-liquid separation anti-deposition automatic flushing desulfurization slurry density measurement system according to claim 1, characterized in that: The feed inlet is located at the bottom of the gas-liquid separation buffer tank (1), the overflow outlet is located at the top, and the discharge outlet is located at the lower middle part of the side wall and its height in the vertical direction is between the height of the feed inlet and the height of the overflow outlet. The sewage pipe (6) is connected to the lowest point of the bottom of the electromagnetic density meter (2), and the flushing water pipe (7) is connected to the upper end or upstream pipe of the internal measuring cavity of the electromagnetic density meter (2).

3. The gas-liquid separation anti-deposition automatic flushing desulfurization slurry density measurement system according to claim 2, characterized in that: The gas-liquid separation buffer tank (1) adopts a vertical hollow structure; the feed pipeline (3) guides the desulfurization slurry to be vertically injected into the gas-liquid separation buffer tank (1) from directly below, forming a vertical mainstream field from bottom to top inside the gas-liquid separation buffer tank (1); The DCS control system (8) controls the volume flow rate of the desulfurization slurry entering the gas-liquid separation buffer tank (1) by adjusting the opening of the feed inlet gate (31), so that the upward macroscopic flow velocity of the desulfurization slurry is greater than the terminal settling velocity of the gypsum solid particles inside the desulfurization slurry.

4. The gas-liquid separation anti-deposition automatic flushing desulfurization slurry density measurement system according to claim 1, characterized in that: The electromagnetic density meter (2) is fixed in a vertical position, with its inner wall parallel to the direction of gravity. The DCS control system (8) stores preset opening parameters. The DCS control system (8) adjusts the valve opening of the outlet regulating gate (51) according to the preset opening parameters to control the volume flow rate of the desulfurization slurry flowing through the electromagnetic density meter (2), so that the residence time of the desulfurization slurry in the gas-liquid separation buffer tank (1) is greater than the time required for the bubbles to rise to the liquid surface.

5. The gas-liquid separation anti-deposition automatic flushing desulfurization slurry density measurement system according to claim 1, characterized in that: The feed inlet valve (31), the overflow valve (41), the outlet regulating valve (51), the sewage discharge valve (61) and the flushing water valve (71) are all control valves with actuators, and all of the above control valves are equipped with valve position feedback devices. The valve position feedback device establishes a signal connection with the DCS control system (8) and is used to send a feedback signal indicating that the valve has been in place to the DCS control system (8).

6. The gas-liquid separation anti-deposition automatic flushing desulfurization slurry density measurement system according to claim 1, characterized in that: The control system module also includes pressure sensors installed at the fluid inlet and fluid outlet of the electromagnetic density meter (2), respectively. The pressure sensors establish a signal connection with the DCS control system (8) to obtain the operating pressure difference. The automatic flushing sequential control logic module (81) is equipped with a timing unit to record the duration of continuous measurement work performed by the electromagnetic density meter (2); The DCS control system (8) collects the density measurement values ​​output by the electromagnetic density meter (2) in real time and calculates the fluctuation variance.

7. The gas-liquid separation anti-deposition automatic flushing desulfurization slurry density measurement system according to claim 6, characterized in that: When the time length reaches the standard operating time cycle, the automatic flushing sequential control logic module (81) generates a timed trigger signal; When the operating differential pressure is greater than or equal to the blockage differential pressure threshold, or when the fluctuation variance is greater than or equal to the fluctuation variance threshold, the automatic flushing sequential control logic module (81) generates a state abnormality trigger signal.

8. The gas-liquid separation anti-deposition automatic flushing desulfurization slurry density measurement system according to claim 5, characterized in that: After the automatic flushing program is started, the DCS control system (8) locks the current density measurement value and maintains the output; The automatic flushing sequential control logic module (81) sends a closing command to the feed inlet gate (31), and after the DCS control system (8) receives the complete closing signal of the feed inlet gate (31), it sends a closing command to the overflow gate (41) and the outlet regulating gate (51) to physically isolate the measurement circuit where the electromagnetic density meter (2) is located from the external fluid system.

9. The gas-liquid separation, anti-depositing, automatic-flushing, desulfurized slurry density measurement system of claim 8, wherein, After the measurement circuit is isolated, the automatic flushing sequence control logic module (81) performs the following operations in sequence: Send an opening command to the drain door (61); After the sewage discharge time reaches the set value, an opening command is sent to the flushing water gate (71); After the flushing time reaches the set value, a closing command is sent to the flushing water gate (71); After receiving the complete closing signal from the flushing water gate (71), a closing command is sent to the drain gate (61); After receiving the complete closing signal of the drain valve (61), an opening command is sent to the feed inlet valve (31), the overflow valve (41) and the outlet regulating valve (51), and the locking of the density measurement value is released.

10. A method for operating the gas-liquid separation anti-deposition automatic flushing desulfurization slurry density measurement system as described in any one of claims 1 to 9, characterized in that, Includes the following steps: S1, Diversion and Separation Stage: The desulfurization slurry is fed into the gas-liquid separation buffer tank (1) through the feed pipeline (3). The desulfurization slurry separates into gas inside the gas-liquid separation buffer tank (1). The separated gas and excess slurry are discharged to the ditch through the overflow pipeline (4). S2, Measurement and Control Stage: The slurry that has completed gas-liquid separation enters the electromagnetic density meter (2) from the gas-liquid separation buffer tank (1) for density measurement. The outlet regulating valve (51) regulates the flow rate of the slurry flowing through the electromagnetic density meter (2). The slurry that has completed the measurement is discharged into the ditch. S3, Isolation Trigger Stage: When the automatic flushing sequential control logic module (81) generates a trigger signal according to the preset time period or operating status parameters, the DCS control system (8) maintains the output of the currently acquired density measurement signal and controls the sequential closure of the feed inlet door (31), overflow door (41) and the outlet regulating door (51) to isolate the measurement circuit where the electromagnetic density meter (2) is located. S4. Sewage flushing stage: The DCS control system (8) controls the opening of the sewage gate (61) to discharge the residual slurry, and then controls the opening of the flushing water gate (71) to introduce external flushing water, so that the external flushing water flows from top to bottom through the measuring chamber of the electromagnetic density meter (2) for flushing; after the flushing process is completed, the DCS control system (8) closes the flushing water gate (71) and the sewage gate (61) in sequence, and opens the feed inlet gate (31), the overflow gate (41) and the outlet regulating gate (51), and the system returns to the diversion and separation stage.