A method for monitoring and controlling the construction of a red mud dam on a soft foundation

By collecting red mud liquid phase samples and comparing the characteristics of the effluent from the drainage outlet during the red mud dam construction process, unexpected seepage paths can be identified, solving the problems of delayed identification and discontinuous handling of abnormal seepage in red mud dam construction, and achieving efficient and accurate control of red mud dam construction management.

CN123155772APending Publication Date: 2026-11-24JILIN HUAYE ENVIRONMENTAL MANAGEMENT CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611673809.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-28
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing technologies make it difficult to identify the specific areas and impact range of abnormal seepage during red mud dam construction in a timely manner, resulting in delayed anomaly identification, excessively large on-site verification scope, and insufficient handling. Furthermore, the lack of continuous connection between filling and drainage adjustments may lead to extended downtime and delayed construction arrangements.

Method used

By obtaining records of alkalinity and conductivity characteristics of red mud liquid phase samples, and comparing them with the alkalinity and conductivity of the effluent from the drainage outlet, the source dam section of the effluent was determined and the unexpected seepage path was identified. Filling was stopped and the drainage connection was switched. Filling was resumed after retesting.

Benefits of technology

This narrowed the location range of abnormal seepage, ensured the continuity of filling and drainage treatment, reduced repeated abnormalities and construction delays, and improved the efficiency and accuracy of red mud dam construction management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123155772A_ABST
    Figure CN123155772A_ABST
Patent Text Reader

Abstract

This invention belongs to the field of geotechnical engineering technology and relates to a monitoring and control method for red mud dam construction on soft foundations. The invention involves collecting red mud liquid phase samples from each discharge dam section, recording the dam section identification and discharge time, and detecting the inlet alkalinity and conductivity to form an inlet characteristic record; collecting effluent samples from the drainage outlet, recording the outlet identification and sampling time, and detecting the effluent alkalinity and conductivity, comparing them with the inlet characteristic record to determine the effluent source dam section; determining unexpected seepage paths based on changes in adjacent source dam sections or after cessation of discharge, ensuring the effluent characteristics fall within the error range; stopping the filling of the effluent source dam section and switching the drainage branch; re-measuring the drainage outlet, and resuming filling if conditions are met. This invention solves the problems of difficulty in determining the effluent source and unexpected seepage paths during red mud dam construction, and the lack of basis for resuming filling after treatment, achieving the effects of clearly identifying the effluent source dam section, stopping filling and switching drainage targets, and controlling the resumption of filling.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of geotechnical engineering technology and relates to a monitoring and control method for red mud dam construction suitable for soft foundations. Background Technology

[0002] Red mud is a solid waste generated during alumina production. It is typically disposed of in designated areas within a specific storage site and gradually stockpiled through dam construction. For red mud dams built on soft foundations, the filling load, foundation bearing capacity, drainage process, and dam operation status are interconnected. On-site management involves red mud discharge, dam construction, drainage maintenance, and seepage monitoring. It is necessary to continuously monitor the storage site's operational status and arrange subsequent filling and maintenance operations accordingly.

[0003] Current management of red mud dams typically relies on on-site inspections and decentralized monitoring to assess the operational status of the dam body and drainage facilities. However, the connection between monitoring records and the red mud discharge process, on-site conditions, and the timing of anomalies is not clear enough. When the discharge and drainage status of different areas changes simultaneously, it is difficult to promptly determine the specific areas involved in abnormal seepage and their impact range, which can easily lead to problems such as delayed anomaly identification, excessively broad on-site verification scope, and insufficient basis for handling.

[0004] Furthermore, upon discovering abnormalities in the dam body or drainage, current procedures typically involve separate manual arrangements for on-site adjustments, drainage maintenance, and subsequent verification, resulting in a lack of continuity between monitoring results and construction schedules. After drainage adjustments are completed, if it cannot be promptly confirmed whether the abnormality has been eliminated, it is difficult to determine when to resume normal operations in the corresponding area. This can lead to prolonged downtime, repeated drainage adjustments, delayed construction schedules, or the recurrence of abnormalities, increasing the pressure on on-site verification and scheduling. Summary of the Invention

[0005] In view of this, in order to solve the problems mentioned in the background technology, a monitoring and control method for red mud dam construction applicable to soft foundations is proposed.

[0006] The objective of this invention can be achieved through the following technical solution: a monitoring and control method for red mud dam construction on soft foundations, comprising: S1, acquiring red mud liquid phase samples from each discharge dam section, recording the dam section identification and discharge time, detecting the inlet alkalinity and conductivity of each discharge dam section, and forming an inlet characteristic record.

[0007] S2. Obtain effluent samples from each drainage outlet, record the outlet identification and sampling time, detect the alkalinity and conductivity of the effluent from each drainage outlet, and determine the source dam section of the effluent based on the comparison results between the alkalinity and conductivity of the effluent from each drainage outlet and the corresponding values ​​recorded at the inlet of each discharge dam section.

[0008] S3. If the effluent source dam sections at adjacent sampling times of the same outlet are inconsistent, or if the alkalinity and conductivity of the effluent at each drainage outlet fall within the error range of the corresponding values ​​in the inlet characteristic record of the effluent source dam section, then the unexpected seepage path is determined.

[0009] S4. Stop filling the dam section of the water source according to the unexpected seepage path, and switch the outlet drainage to the drainage branch of the water source dam section.

[0010] S5. Based on the drainage switching results, remeasure the alkalinity and conductivity of the effluent at each drainage outlet; if only the alkalinity and conductivity of the effluent at the outlet corresponding to the unexpected seepage path falls within the error range of the corresponding values ​​in the inlet characteristic record of each discharge dam section, then restore the filling of the effluent source dam section.

[0011] Compared with the prior art, the beneficial effects of the present invention are as follows: (1) The present invention addresses the problem that it is difficult to associate the monitoring records with the discharge process, dam section and outlet status, which makes it difficult to determine the source of abnormal seepage. By collecting red mud liquid phase samples from the discharge dam section and drainage outlet, recording the identification and time and detecting alkalinity and conductivity, and comparing the inlet characteristic records with the outlet characteristic records according to the correspondence and error range, the outlet source dam section is determined and the unexpected seepage path is identified, thus narrowing the location range of abnormal seepage and providing a clear target for stopping filling and drainage treatment.

[0012] (2) This invention addresses the problem of a lack of continuity between stopping filling, adjusting drainage, and resuming filling after abnormal seepage. By extracting the outlet and water source dam section of the unexpected seepage path, stopping the filling of the water source dam section and switching the drainage connection, verifying the connection status, and retesting the alkalinity and conductivity of the water at the drainage outlet, filling is resumed only when the retest results meet the conditions. This ensures that stopping filling, switching drainage, and resuming construction are sequentially connected, reducing repeated abnormalities caused by incomplete handling or premature resumption. Attached Figure Description

[0013] To more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0014] Figure 1 This is a flowchart of a monitoring and control method for red mud dam construction on soft foundations, as described in this invention.

[0015] Figure 2 This is a flowchart illustrating the process of identifying unexpected seepage paths, switching drainage, and restoring the backfill in this invention.

[0016] Figure 3 This is a flowchart of the process for determining the full pairing of the outlet dam section sequence in this invention. Detailed Implementation

[0017] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0018] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention pertains.

[0019] The following description, in conjunction with the accompanying drawings, details a specific scheme for a monitoring and control method for red mud dam construction on soft foundations provided by the present invention.

[0020] Please see Figure 1 As shown, the implementation of this invention includes S1 to S5: When the red mud dump is built on a soft foundation, the red mud discharge, dam construction, and drainage processes are constantly changing, and the effluent status of the drainage outlet may be affected by the discharge process of different discharge dam sections. Based solely on on-site inspections or decentralized monitoring results, it is difficult to associate abnormal effluent status with specific discharge dam sections, and it is also difficult to provide a clear basis for subsequent filling arrangements and drainage treatment.

[0021] This invention uses the alkalinity and conductivity of red mud liquid phase samples as comparative features, combined with dam section identification, discharge time, outlet identification, and sampling time, to form inlet characteristic records and effluent characteristic records. Based on this, the effluent source dam section is determined. When the effluent source dam section is inconsistent at adjacent sampling times at the same outlet, or when the effluent characteristics still fall within the corresponding error range after discharge is stopped, the unexpected seepage path is determined. Then, the filling of the corresponding dam section is stopped, the drainage connection is switched, and the filling is resumed after the recovery conditions are met by retesting.

[0022] This invention achieves the effect of linking unexpected seepage paths to the dam section of the water source and the drainage outlet, and clearly identifying the objects of stopping filling and switching drainage. By verifying the connection status and retesting the conditions, it avoids resuming filling when drainage switching is not completed or the abnormal state has not been eliminated, thus reducing repeated anomalies caused by unclear sources of abnormal seepage, incomplete treatment, and premature resumption of filling.

[0023] S1. Obtain red mud liquid phase samples from each discharge dam section, record the dam section identification and discharge time, detect the inlet alkalinity and conductivity of each discharge dam section, and form an inlet characteristic record.

[0024] Because it is necessary to compare the effluent characteristic records collected from each discharge outlet with the inlet characteristic records of each discharge dam section to determine the effluent source dam section, the inlet characteristic records need to simultaneously retain the dam section identification, discharge time, inlet alkalinity, and conductivity to distinguish the test results of different discharge dam sections and reflect the inlet characteristics of the same discharge dam section at different discharge times. If the dam section identification or discharge time is not retained, it is impossible to subsequently compare the effluent source based on the discharge dam section and discharge time. Therefore, it is necessary to determine the discharge process time of each discharge dam section, collect red mud liquid phase samples at the corresponding time, test the inlet alkalinity and conductivity, and form an inlet characteristic record sequence for each discharge dam section.

[0025] First, before collecting inlet samples, the emission process time corresponding to each emission dam section is determined. For the same emission dam section, the emission start time and emission stop time are recorded, and the midpoint between the emission start time and emission stop time is determined as the midpoint time. The last emission time before the emission stop time is determined from the actual emission times of the emission dam section and is taken as the last emission time before the emission stop time. The emission start time, midpoint time, and last emission time before the emission stop time are taken as the emission process time of the emission dam section and arranged according to the actual time sequence. When two or three times are the same, only one time is retained, and an inlet feature record is formed for that time. When there is no actual emission time independent of the emission start time before the emission stop time, the last emission time is not added again. Among them, the midpoint time is used to characterize the middle period of the emission process, and the last emission time before the emission stop time is used to characterize the inlet feature before the end of the emission.

[0026] Secondly, at each discharge stage, a red mud liquid phase sample was collected from the corresponding discharge dam section, and this sample was associated with the corresponding dam section identifier and discharge time. The discharge dam section to which the sample belonged was determined based on the dam section identifier, and the time position of the sample in the discharge process of that discharge dam section was determined based on the discharge time. The inlet alkalinity and inlet conductivity of each sample were measured separately, so that a set of inlet alkalinity and a set of inlet conductivity obtained from the same red mud liquid phase sample together constitute the inlet characteristics at that moment.

[0027] Subsequently, an inlet characteristic record was generated for each inlet sample. This record included the dam section identifier, discharge time, inlet alkalinity, and inlet conductivity. The dam section identifier distinguished the discharge dam section to which the record belonged; the discharge time determined the record's temporal position during the discharge process; and the inlet alkalinity and conductivity characterized the red mud liquid phase characteristics of that discharge dam section at the corresponding discharge time. Later, when determining the effluent source dam section, the corresponding inlet characteristic record was located based on the dam section identifier and discharge time.

[0028] Finally, the inlet characteristic records obtained for the same discharge dam section are arranged in order of discharge time from first to last to form an inlet characteristic record sequence for that discharge dam section. Each record in the inlet characteristic record sequence retains the original dam section identifier, discharge time, inlet alkalinity, and inlet conductivity.

[0029] For example, let D1 represent a discharge dam section. The three inlet characteristic records can be represented as (D1, discharge start time, A1, K1), (D1, midpoint time, A2, K2), and (D1, last discharge time before discharge cessation, A3, K3). Here, A1, A2, and A3 represent the inlet alkalinity at the corresponding time, and K1, K2, and K3 represent the inlet conductivity at the corresponding time. After obtaining the records, they are arranged according to the actual chronological order of the three discharge times to form the inlet characteristic record sequence of D1. The formed inlet characteristic record sequences for each discharge dam section serve as input for subsequent effluent characteristic comparison and determination of the effluent source dam section.

[0030] S2. Obtain effluent samples from each drainage outlet, record the outlet identification and sampling time, detect the alkalinity and conductivity of the effluent from each drainage outlet, and determine the source dam section of the effluent based on the comparison results between the alkalinity and conductivity of the effluent from each drainage outlet and the corresponding values ​​recorded at the inlet of each discharge dam section.

[0031] Because the effluent characteristics of the same discharge outlet need to be compared with the inlet characteristic records of each discharge dam section, it is impossible to determine the discharge dam section to which the effluent belongs based solely on the alkalinity or conductivity of a single effluent sample. Without recording the outlet identification and sampling time, it is impossible to distinguish the effluent records of different discharge outlets, nor can the temporal relationship between the effluent records and the inlet records be established. Furthermore, without specifying that the inlet discharge time must precede the outlet sampling time and without specifying the order of the two sets of records, records from different discharge dam sections or different discharge times may be incorrectly paired. Therefore, it is necessary to form an effluent characteristic record sequence based on the outlet identification and sampling time, and then match it line by line with the inlet characteristic record sequence of each discharge dam section. Only when all matching can be completed for a single dam section is the effluent source dam section determined. If multiple candidate dam sections appear, no association is established, and samples are re-acquired.

[0032] First, within the same monitoring batch, the discharge process times of each discharge dam section are summarized, and a sampling time set is formed according to the time sequence. Effluent samples are obtained from each discharge outlet based on the same sampling time set. Each time an effluent sample is obtained, the outlet identifier and sampling time are recorded, and the alkalinity and conductivity of the effluent are measured using the same detection caliber and unit of measurement as the inlet sample. The outlet identifier, sampling time, effluent alkalinity, and effluent conductivity of the same effluent sample are combined to form an effluent characteristic record. For effluent characteristic records corresponding to the same outlet identifier, they are arranged in chronological order according to the sampling time to form an effluent characteristic record sequence for that discharge outlet. If an alkalinity or conductivity detection result is missing for a certain sampling time, that record is not included in the full pairing determination, and an effluent sample for that sampling time is re-obtained.

[0033] Secondly, for inlet samples corresponding to the same dam section marker and the same discharge time, the inlet samples were thoroughly stirred. Two equal-volume samples were taken each time, and the alkalinity and conductivity of the two samples were measured using the same testing method and units of measurement. This sampling and testing was repeated at least twice. After each repeated test, the absolute values ​​of the alkalinity and conductivity differences between the two samples were calculated. The maximum value among the absolute values ​​of the alkalinity differences obtained from multiple repeated tests was taken as the alkalinity tolerance, and the maximum value among the absolute values ​​of the conductivity differences was taken as the conductivity tolerance. For each inlet characteristic record, the alkalinity tolerance was subtracted from and the conductivity tolerance was added to the inlet alkalinity, and the conductivity tolerance was subtracted from and added to the inlet conductivity, respectively, to obtain the alkalinity error range and conductivity error range corresponding to that inlet characteristic record.

[0034] For example, when the inlet alkalinity is A and the alkalinity tolerance is ΔA, the alkalinity error range is [A-ΔA, A+ΔA]; when the inlet conductivity is K and the conductivity tolerance is ΔK, the conductivity error range is [K-ΔK, K+ΔK].

[0035] Finally, using the effluent characteristic record sequence corresponding to an outlet identifier as the comparison sequence, the inlet characteristic record sequences of each discharge dam section were selected as candidate sequences. Based on the sampling time in the effluent characteristic record sequence, the effluent characteristic records were paired with the candidate inlet characteristic records one by one. In each pairing, the inlet discharge time was earlier than the corresponding effluent sampling time, the effluent alkalinity fell within the alkalinity error range of the corresponding inlet characteristic record, the effluent conductivity fell within the conductivity error range of the corresponding inlet characteristic record, and the discharge time of the candidate inlet characteristic records increased sequentially according to the effluent sampling time.

[0036] Since the above pairing conditions involve the temporal sequence of each pairing record, the alkalinity of the effluent, the conductivity of the effluent, and the increasing relationship of all inlet discharge times, the fact that only some pairing records meet the conditions does not mean that the entire sequence of effluent characteristic records for the same outlet can be paired. Therefore, the pairing results between all effluent characteristic records of the same outlet and the inlet characteristic records of the candidate discharge dam section form the outlet-dam section sequence full pairing judgment value:

[0037] In the formula, Indicates candidate discharge dam sections With drainage outlet The sequence pairing determination value between them. The export label is The number of records of water discharge characteristics The export label is indicated as The The sampling time of the water discharge characteristic record, This indicates the dam section identifier paired with the water discharge characteristic record. The emission time is recorded by the inlet characteristics. and These represent the alkalinity and conductivity of the effluent, respectively, in this effluent characteristic record. and These respectively indicate the dam section as... Emission time is The entry characteristic records correspond to the alkalinity error range and conductivity error range. This indicates that the value is 1 if the condition is met and 0 if the condition is not met.

[0038] Since all judgment results are 0 or 1, if any pairing record does not meet the corresponding condition, or if the inlet discharge time does not increase sequentially, That is, 0; only when all pairing conditions are met, The value is 1.

[0039] like Figure 3 As shown, inlet feature record sequences and effluent feature record sequences are first formed separately. For a candidate discharge dam section, the two types of sequences are paired one by one according to the effluent sampling time, and the full pairing judgment value of the outlet-dam section sequence is calculated. When the inlet discharge time is earlier than the corresponding effluent sampling time, and the effluent alkalinity and conductivity fall within their respective error ranges, and the inlet discharge time increases sequentially according to the effluent sampling time, =1, retain the candidate discharge dam section; if any condition is not met... =0, exclude the candidate discharge dam section. After comparing all candidate discharge dam sections, if only one candidate discharge dam section is found to be 0, exclude it. =1, then the dam section is determined to be the source dam section; if there are two or more candidate discharge dam sections... If the value is 1, then record the source candidate conflict record and re-acquire the sample of the corresponding drainage outlet.

[0040] For example, when all effluent characteristic records with outlet identifier E1 can be matched one by one with inlet characteristic records with dam section identifier D1, and each pairing satisfies the following conditions: the inlet discharge time is earlier than the effluent sampling time, the effluent alkalinity and effluent conductivity fall within their respective error ranges, and the inlet discharge times increase sequentially, then it is determined that... =1; when the alkalinity or conductivity of any of the records does not fall within the corresponding error range, or when the discharge time at a certain inlet does not increase sequentially according to the effluent sampling time, determine =0.

[0041] When only one discharge dam segment has a sequence full pairing determination value When the value is 1, it means that all the effluent feature records of the outlet can only be paired with the inlet feature record sequence of one discharge dam section. The dam section identifier of the discharge dam section is identified as the effluent source dam section, and the dam section identifier is associated with the corresponding outlet identifier and each sampling time.

[0042] When the inlet characteristic record sequences of two or more discharge dam sections can be fully matched with the effluent characteristic record sequences corresponding to the same outlet identifier, it indicates that the current effluent record cannot uniquely determine the effluent source dam section. In this case, the dam section identifier, outlet identifier, and sampling time of each dam section that can be matched are recorded together in the source candidate conflict record; for this outlet identifier, no association is established between the outlet identifier and any dam section identifier. Subsequently, the effluent sample of the discharge outlet corresponding to this outlet identifier is reacquired, the outlet identifier and sampling time are re-recorded, and the effluent alkalinity and conductivity are detected. The effluent characteristic record sequence of this discharge outlet is updated based on the reacquired sample, and the matching of the effluent characteristic record sequence with the inlet characteristic record sequence is performed again.

[0043] S3. If the effluent source dam sections at adjacent sampling times of the same outlet are inconsistent, or if the alkalinity and conductivity of the effluent at each drainage outlet fall within the error range of the corresponding values ​​in the inlet characteristic record of the effluent source dam section, then the unexpected seepage path is determined.

[0044] Since the effluent source dam section is determined by comparing effluent characteristics at different sampling times, the source result at a single sampling time cannot reflect whether the source at the same outlet is continuous at different sampling times, nor can it indicate whether the effluent characteristics at the outlet still correspond to the inlet characteristics of that dam section after the source dam section stops discharging. Therefore, it is necessary to verify the effluent source dam section at adjacent sampling times based on the outlet identification and sampling time, and to compare the alkalinity and conductivity of the effluent after the source dam section stops discharging.

[0045] like Figure 2 As shown, the source dam section of the same drainage outlet at adjacent sampling times is reviewed, and the effluent characteristics after the source dam section stops discharging are also reviewed. If the source dam section at adjacent sampling times is inconsistent, or if the alkalinity and conductivity of the effluent still fall within the error range of the corresponding inlet characteristic record after the source dam section stops discharging, then an unexpected seepage path is identified. The outlets corresponding to the unexpected seepage paths are grouped, the filling of the corresponding effluent source dam section is stopped, and the drainage connection is switched. The connection of the target drainage branch is verified to be connected and the drainage branches of other dam sections are disconnected. If the connection test is not met, the filling is stopped. If the connection test is met, each drainage outlet is retested and the error range is screened. If only the outlet corresponding to the unexpected seepage path meets the screening conditions, the filling of the effluent source dam section is resumed; otherwise, it is not resumed. If the determination conditions for the unexpected seepage path are not met, the sampling is repeated and the effluent source dam section is re-determined.

[0046] First, the results of the effluent source dam sections corresponding to each drainage outlet are assigned to their respective outlets based on the outlet identifier. For multiple sampling times corresponding to the same outlet identifier, the sampling times are arranged in chronological order, and the dam section identifiers of the effluent source dam sections corresponding to two adjacent sampling times are extracted. Adjacent sampling times refer to two consecutive sampling times within the same outlet identifier sequence; sampling times corresponding to different outlet identifiers are not compared. The two dam section identifiers corresponding to adjacent sampling times are compared for consistency. When the two dam section identifiers are inconsistent, it indicates that the effluent source dam section corresponding to the same outlet has changed at adjacent sampling times, and this situation is used as the first criterion for determining unexpected seepage paths.

[0047] Secondly, for the outlet of the identified dam section, the cessation of discharge at that dam section is recorded. Based on the outlet identifier, effluent characteristic records with sampling times later than the cessation of discharge are extracted as effluent characteristic records after the cessation of discharge. Based on the dam section identifier and the last discharge time before the cessation of discharge, the corresponding inlet characteristic record is located from the inlet characteristic record sequence of that dam section, and the inlet alkalinity, inlet conductivity, and their corresponding error ranges are read from the inlet characteristic record. The error ranges of effluent alkalinity and inlet alkalinity in the effluent characteristic records after the cessation of discharge are compared with those of effluent alkalinity, and the error ranges of effluent conductivity and inlet conductivity are compared with those of effluent conductivity.

[0048] Furthermore, when the alkalinity of the effluent after the discharge stops falls within the error range of the corresponding inlet alkalinity, and the conductivity of the effluent falls within the error range of the corresponding inlet conductivity, it indicates that the effluent characteristics of the outlet after the discharge stops still correspond to the inlet characteristics of the effluent source dam section before the discharge stops. This situation is used as the second judgment condition for determining the unexpected seepage path.

[0049] Finally, when either the first or second judgment condition is met, the corresponding outlet identifier is identified as having an unexpected seepage path, and the determination result of the unexpected seepage path is used as input for subsequent cessation of filling and switching of drainage branches. When the dam section identifiers corresponding to adjacent sampling times are consistent, and the alkalinity and conductivity of the effluent after discharge cessation do not simultaneously fall within the error range of the corresponding inlet characteristic record, the current effluent record does not meet the determination condition for an unexpected seepage path. At this time, effluent samples from each drainage outlet are re-acquired, the outlet identifier and sampling time are recorded, the effluent alkalinity and conductivity are detected, and the re-obtained effluent characteristics are compared with the inlet characteristic record to re-determine the dam section from which the effluent originates.

[0050] S4. Stop filling the dam section of the water source according to the unexpected seepage path, and switch the outlet drainage to the drainage branch of the water source dam section.

[0051] Since a single dam section with a water source may correspond to multiple drainage outlets, switching drainage based on individual outlets makes it difficult to guarantee that each outlet for the same dam section will switch to the correct drainage branch. Furthermore, simply switching drainage connections without checking the connection status makes it impossible to confirm that the target drainage branch is connected and that drainage branches for other dam sections are disconnected. Therefore, it is necessary to group the drainage outlets corresponding to unintended seepage paths according to the dam section with the water source, and then stop the filling of the corresponding dam section, switch drainage connections, and check the connection status for each group.

[0052] First, extract the outlet identifiers and dam segment identifiers of the effluent source dam segments corresponding to each unexpected seepage path. Each outlet group includes the dam segment identifier of an effluent source dam segment, and one or more outlet identifiers belonging to that dam segment identifier. Based on the dam segment identifier of the effluent source dam segment, outlet identifiers with the same dam segment identifier are grouped into the same outlet group, while different dam segment identifiers form different outlet groups.

[0053] Secondly, for the current outlet group, identify the corresponding water source dam section and cease red mud filling to that section, keeping it in a state of no filling. This cessation of filling only applies to the water source dam section corresponding to the current outlet group and does not change the filling status of dam sections corresponding to other outlet groups.

[0054] It should be noted that, within the current outlet group, for each outlet corresponding to an outlet identifier, the drainage connection between that outlet and the drainage branch of the effluent source dam section corresponding to the current outlet group is opened; simultaneously, the drainage connection between that outlet and other dam section drainage branches is closed. Here, "other dam section drainage branches" refers to drainage branches other than the drainage branch of the effluent source dam section corresponding to the current outlet group. After completing the above operations, each outlet in the current outlet group will use the corresponding effluent source dam section's drainage branch as its target drainage path.

[0055] Subsequently, based on the outlet identifier in the current outlet group, the connectivity between each drainage outlet and the corresponding drainage branch of the dam section from which the water originates is located is checked, as well as the disconnection between each drainage outlet and other drainage branches of the dam section. The outlet identifier, connectivity detection results, and disconnection detection results are recorded together in the outlet group connection record. Each outlet group connection record corresponds to one outlet identifier, used to record the connection status of the target drainage branch corresponding to that outlet and the disconnection status of other drainage branches.

[0056] Finally, when the connectivity test results for each outlet identifier in the same outlet group are all connected and the disconnection test results are all disconnected, it is determined that each drainage outlet in the outlet group has completed the drainage connection switch, the drainage switch of the outlet group is completed, and the outlet group connection record and drainage switch completion result are used as inputs for subsequent retesting and restoration judgment.

[0057] When the connectivity detection result corresponding to any outlet identifier does not meet the connectivity condition, or the disconnection detection result does not meet the disconnection condition, it is determined that at least one drainage outlet of the outlet group has not completed the drainage connection switch, the water source dam section corresponding to the outlet group remains in a stopped filling state, and it is not determined that the outlet group has completed the drainage switch.

[0058] S5. Based on the drainage switching results, remeasure the alkalinity and conductivity of the effluent at each drainage outlet; if only the alkalinity and conductivity of the effluent at the outlet corresponding to the unexpected seepage path falls within the error range of the corresponding values ​​in the inlet characteristic record of each discharge dam section, then restore the filling of the effluent source dam section.

[0059] After completing the drainage connection switchover, it is necessary to confirm whether the outlets falling within the error range of the inlet characteristic record in the retest results of each drainage outlet are only those corresponding to the unexpected seepage path. Only when all outlets corresponding to the unexpected seepage path meet the conditions, and all other outlets do not meet the conditions, should the filling of the corresponding water source dam section be restored.

[0060] First, effluent samples were recollected from each drainage outlet. The corresponding outlet identifier and sampling time were recorded for each sampling, and the alkalinity and conductivity of the effluent sample were measured. The outlet identifier, sampling time, alkalinity, and conductivity corresponding to the same sample were recorded together in one outlet retest record, so that one outlet retest record corresponds to the retest results of one drainage outlet at one sampling time.

[0061] Secondly, for each outlet retest record, the corresponding inlet characteristic record sequence is located sequentially using the dam segment identifier of each discharge dam section. Based on the discharge time in the inlet characteristic record, the corresponding inlet characteristic record is found to match the sampling time of the outlet retest record. The chronological relationship between the discharge time of the inlet characteristic record and the sampling time of the outlet retest record follows the comparison relationship of the effluent source, with the discharge time preceding the sampling time. The inlet alkalinity and inlet conductivity in the found inlet characteristic records are used as corresponding comparison values, and the error ranges determined by the allowable deviations for alkalinity and conductivity are used for comparison, respectively.

[0062] Furthermore, outlet retest records with alkalinity falling within the corresponding inlet alkalinity error range are selected to form alkalinity screening results; outlet retest records with water conductivity falling within the corresponding inlet conductivity error range are selected to form conductivity screening results. The outlet identifier and sampling time are used as the location combination for the outlet retest records, and only outlet retest records that appear in both screening results and have the same outlet identifier and sampling time are retained.

[0063] For example, all drainage outlets are labeled E1, E2, and E3, while outlets corresponding to unexpected seepage paths are labeled E1 and E2. If, after screening by alkalinity and conductivity, the retained outlet retest records only contain E1 and E2 and not E3, then the requirement that only outlets corresponding to unexpected seepage paths meet the condition is satisfied; if the retained results lack E1 or E2, or contain E3, then this requirement is not met.

[0064] Finally, the outlet identifiers in the retained outlet re-measurement records are checked one by one against the outlet identifiers corresponding to the unexpected seepage paths. If the retained outlet re-measurement records contain the outlet identifiers of all outlets corresponding to the unexpected seepage paths, and do not contain outlet identifiers other than those corresponding to the unexpected seepage paths, it indicates that the conditions for resuming filling have been met after the re-measurement, and the corresponding water source dam section that was previously stopped from filling will be resumed. If any condition is not met, the filling of the corresponding water source dam section will not be resumed for the time being, and its stopped filling status will remain.

[0065] The above embodiments can be implemented, in whole or in part, by software, hardware, firmware, or any other combination thereof. When implemented using software, the above embodiments can be implemented, in whole or in part, in the form of a computer program product.

[0066] Those skilled in the art will recognize that the algorithmic steps of the various examples described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are implemented in hardware or software depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementations should not be considered beyond the scope of this invention.

[0067] In addition, the functional modules in the various embodiments of the present invention can be integrated into one processing module, or each module can exist physically separately, or two or more modules can be integrated into one module.

[0068] The above description is merely a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any changes or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in the present invention should be included within the scope of protection of the present invention.

[0069] Finally, the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A method for monitoring and controlling the construction of a red mud dam suitable for soft ground, characterized in that, include: S1. Obtain red mud liquid phase samples from each discharge dam section, record the dam section identification and discharge time, detect the inlet alkalinity and conductivity of each discharge dam section, and form an inlet characteristic record. S2. Obtain effluent samples from each drainage outlet, record the outlet identification and sampling time, detect the alkalinity and conductivity of the effluent from each drainage outlet, and determine the source dam section of the effluent based on the comparison results between the alkalinity and conductivity of the effluent from each drainage outlet and the corresponding values ​​recorded at the inlet of each discharge dam section. S3. If the effluent source dam sections at adjacent sampling times of the same outlet are inconsistent, or if the alkalinity and conductivity of the effluent at each drainage outlet fall within the error range of the corresponding values ​​in the inlet characteristic record of the effluent source dam section, then the unexpected seepage path is determined. S4. Stop filling the dam section of the water source according to the unexpected seepage path, and switch the outlet drainage to the drainage branch of the water source dam section; S5. Based on the drainage switching results, remeasure the alkalinity and conductivity of the effluent at each drainage outlet; if only the alkalinity and conductivity of the effluent at the outlet corresponding to the unexpected seepage path falls within the error range of the corresponding values ​​in the inlet characteristic record of each discharge dam section, then restore the filling of the effluent source dam section.

2. The monitoring and control method for red mud dam construction on soft foundations as described in claim 1, characterized in that, S1 specifically includes: Based on the red mud dump dam body with weak foundation, red mud liquid phase samples were collected at different times during the discharge process of the same discharge dam section; Record the dam section identification and discharge time corresponding to each red mud liquid phase sample, and detect the inlet alkalinity and conductivity of each red mud liquid phase sample according to the dam section identification and discharge time; The inlet alkalinity and conductivity at each discharge time of the same discharge dam section are arranged from first to last according to the discharge time to form an inlet characteristic record sequence for the same discharge dam section.

3. The monitoring and control method for red mud dam construction on soft foundations as described in claim 2, characterized in that, The method for determining the timing of the emission process is as follows: Record the start and stop times of discharge for the same discharge dam section, and determine the midpoint between the start and stop times as the midpoint time; The emission start time, midpoint time, and the last emission time before the emission stops are defined as the emission process time.

4. The monitoring and control method for red mud dam construction on soft foundations as described in claim 2, characterized in that, S2 specifically includes: Samples were obtained from each drainage outlet at each moment of discharge, and the outlet identification and sampling time were recorded. The alkalinity and conductivity of the effluent were detected. The alkalinity and conductivity of the effluent were arranged from first to last according to the sampling time based on the outlet identification to form an effluent characteristic recording sequence. According to the dam section identification, the effluent characteristic record sequence is paired with the inlet characteristic record sequence one by one. Each pairing satisfies that the discharge time is earlier than the sampling time, the effluent alkalinity and conductivity fall within the error range of the inlet alkalinity and conductivity, respectively, and the discharge time increases sequentially with the sampling time. If the inlet feature record sequence of only one dam section can be fully matched with the outlet feature record sequence, the corresponding dam section will be identified as the outlet source dam section and associated with the outlet identifier and each sampling time in the outlet feature record sequence.

5. A monitoring and control method for red mud dam construction on soft foundations as described in claim 4, characterized in that, The method for determining the error range is as follows: Obtain and stir red mud liquid phase samples corresponding to the same dam section identification and discharge time. Take two equal volume samples each time and test alkalinity and conductivity respectively. Repeat sampling and testing at least twice. Calculate the absolute values ​​of alkalinity and conductivity differences for each pair of equal-volume samples, and use the maximum values ​​as the allowable deviations for alkalinity and conductivity. Subtract and add the allowable deviations for alkalinity and conductivity from the inlet alkalinity and conductivity recorded in the inlet feature record to determine their respective error ranges.

6. The monitoring and control method for red mud dam construction on soft foundations as described in claim 4, characterized in that, The S2 further includes: When the inlet feature record sequences of two or more dam sections can be matched with the effluent feature record sequences of the same outlet, the dam section identifier, outlet identifier and sampling time of each dam section will be recorded together in the source candidate conflict record. For the exit identifier in the source candidate conflict record, do not establish an association between the exit identifier and any dam section identifier for the time being, and re-obtain the sample of the drainage outlet corresponding to the exit identifier.

7. The monitoring and control method for red mud dam construction on soft foundations as described in claim 1, characterized in that, S3 specifically includes: Based on the outlet identification, the sampling times of the same outlet are arranged from first to last, and the dam segment identification of the water source dam segment corresponding to adjacent sampling times is extracted, and the dam segment identification is compared to see if they are consistent. Record the cessation of discharge at the dam section of the effluent source, extract the alkalinity and conductivity of the effluent after the cessation of discharge at the same outlet, and search for inlet characteristic records based on the dam section identification and discharge time. Compare whether the effluent alkalinity and conductivity fall within the error range of inlet alkalinity and conductivity. If the dam section identifiers corresponding to adjacent sampling times are inconsistent, or if the alkalinity and conductivity of the effluent after the discharge stop time fall within the error range of the inlet alkalinity and conductivity, respectively, then an unexpected seepage path is determined to exist; otherwise, samples from each drainage outlet are re-acquired, the outlet identifier and sampling time are recorded, the alkalinity and conductivity of the effluent are detected, and compared with the inlet characteristic records to redetermine the dam section from which the effluent originates.

8. The monitoring and control method for red mud dam construction on soft foundations as described in claim 1, characterized in that, S4 specifically includes: Extract the outlet identifiers of each unexpected seepage path and the dam segment identifiers of the effluent source dam segment. Based on the dam segment identifiers, group the outlet identifiers of the same effluent source dam segment into the same outlet group. Process each outlet group one by one, stop the filling of the water source dam section corresponding to the outlet group, and open the drainage connection between the drainage outlet and the drainage branch of the water source dam section according to the outlet identifier in the outlet group, and close the drainage connection between the drainage outlet and the drainage branch of other dam sections.

9. A monitoring and control method for red mud dam construction on soft foundations as described in claim 8, characterized in that, The S4 further includes: Based on the outlet identifier in the outlet group, check whether each drainage outlet is connected to the drainage branch of the dam section corresponding to the outlet group, and whether each drainage outlet is disconnected from the drainage branch of other dam sections. Record the connection test results, disconnection test results and outlet identifier together in the outlet group connection record. When the connectivity test results for all outlet identifiers in the same outlet group are both connected and the disconnection test results are both disconnected, the drainage switching of the outlet group is completed; if the test result for any outlet identifier does not meet the requirements, the dam section corresponding to the water source of the outlet group is kept closed for filling.

10. A monitoring and control method for red mud dam construction on soft foundations as described in claim 1, characterized in that, S5 specifically includes: The alkalinity and conductivity of the effluent from each drainage outlet were retested, and the outlet identification, sampling time, alkalinity and conductivity of the same sample were recorded together in the outlet retest record. Based on the dam section identification and discharge time, search for inlet characteristic records, and select outlet retest records whose water alkalinity and conductivity fall within the corresponding error range. Keep outlet retest records where the outlet identification and sampling time are the same in both screenings. If the retained outlet re-measurement records contain outlet identifiers for all outlets corresponding to the unexpected seepage paths, but do not contain outlet identifiers other than those corresponding to the unexpected seepage paths, then the filling of the outlet source dam section shall be restored.