Cable branch box online operation monitoring method and system and cable branch box
By collecting high-frequency magnetic field signals and power frequency currents on both sides of the connection node of the cable branch box, propagation delay correction and arc extinction and reignition component analysis are performed. Combined with the repetition relationship of opposite polarity half cycles, the problem of identifying the status of the connection node in the cable branch box is solved, and accurate online monitoring is achieved.
Patent Information
- Application Number
- CN202611660954.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2026-09-21
- Filing Date
- 2026-10-26
- Publication Date
- 2026-11-24
AI Technical Summary
When there is interference propagating from multiple branches and changes in operating load in a cable branch box, it is difficult to identify the micro-arc activity near the zero crossing generated by a specific connection node and determine the status of the connection node accordingly.
High-frequency magnetic field signals and power frequency currents are collected on both sides of the connection node to be monitored. The time window is divided by the zero-crossing moment of the power frequency current, and the propagation delay of the high-frequency channel is corrected. The pulses propagating from the connection node to both sides are identified, and the arc extinction and reignition components are constructed. The current change rate at the current zero-crossing point is normalized to form the connection state characteristics, which are then compared with the repetition relationship of the opposite polarity half-cycles.
It can accurately identify micro-arc activity near zero crossing generated by specific connection nodes under multi-branch propagation interference and load changes, avoid false alarms, and improve the monitoring accuracy of the connection node status of cable branch boxes.
Smart Images

Figure CN123155902A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of power distribution equipment operation status detection, specifically to a method, system, and cable branch box for online monitoring of cable branch box connection nodes by utilizing the phase relationship between high-frequency magnetic field signals and power frequency current on both sides of the connection node. Background Technology
[0002] Cable distribution boxes are typically installed on the outside of roads, industrial parks, or power distribution rooms. After commissioning, the busbar connections, elbow cable joints, and branch terminals inside the box are subjected to load cycles, vibration, moisture intrusion, and weakening of fastening force, causing tiny gaps to gradually appear on the contact surfaces. Before these gaps develop into sustained discharge, the joint temperature may not rise significantly, but a brief arc extinction and re-conduction may occur near the zero-crossing of the AC current. This stage is difficult to observe during on-site inspections.
[0003] Current online monitoring systems primarily utilize temperature sensors. While temperature reflects the heat generated by increased contact resistance, it is also affected by ambient temperature, load current, airflow within the cabinet, and heat generation from adjacent circuits. Post-rain cooling, branch switching, or short-term high loads can all alter the temperature rise curve. To avoid false alarms, temperature thresholds are often set relatively wide, making it difficult to detect minor contact degradation in its early stages.
[0004] Another method involves collecting partial discharge, high-frequency current, or high-frequency magnetic field pulses. In cable distribution boxes where multiple branches share a busbar, pulses generated by nearby cables, switch operations, and external power distribution equipment can propagate along conductors to the monitoring point. A single sensor can only acquire the pulse amplitude and arrival time; it cannot determine whether the pulse originated from the current connection node or was conducted from another branch. Simply increasing the number of sensors is insufficient to resolve the attribution issue because if only the amplitudes of the sensors on both sides are added, external pulses will still appear simultaneously in both channels.
[0005] Contact micro-arcs also have a physical characteristic. When the alternating current approaches zero, the existing arc is easily extinguished; after the voltage recovers, if the contact gap still exists, it may break down again. This process is related to the zero-crossing slope of the load current. Statistically analyzing all high-frequency pulses according to a fixed amplitude threshold can confuse changes in pulse strength caused by load changes with changes in connection status. Intermittent noise occurring once per half-cycle of different polarities can also cause interference.
[0006] Therefore, a monitoring method suitable for multi-branch environments in cable distribution boxes is needed. This method should first determine the propagation direction of high-frequency pulses, separate the pulses generated by the current connection node from external pulses passing through the node, and then use the physical phases before and after the AC zero crossing and the repeatability between opposite polarity half-cycles to determine the connection status. At the same time, it should avoid misusing historical references when there are significant changes in switch topology or load. Summary of the Invention
[0007] The technical problem to be solved by this invention is: how to identify the micro-arc activity near the zero crossing generated by a specific connection node and determine the state of the connection node in the case of multiple branch interference and operating load changes in a cable branch box.
[0008] To address the aforementioned technical problems, this invention provides an online operation monitoring method for cable branch boxes. High-frequency magnetic field signals are collected on both sides of the connection node to be monitored, and the power frequency current flowing through the node is also collected. A pre-zero-crossing time window and a post-zero-crossing time window are defined based on the zero-crossing time of the power frequency current, and propagation delay correction is applied to the two high-frequency channels. Pulses arriving sequentially at the sensing positions on both sides along the same direction are identified as transit pulses; pulses propagating from the connection node to both sides are retained as local source pulses.
[0009] Statistical analysis is performed on local source pulses within the pre-zero-crossing and post-zero-crossing time windows to construct the corresponding half-cycle's extinction and reignition components. Both components are normalized using the current change rate at the current zero-crossing point. Two consecutive half-cycles with opposite current polarities form a half-cycle pair. Connection state characteristics are formed based on the repetitive relationships of the extinction, reignition, and pulse phase distributions within the two half-cycles. The connection state characteristics are compared with the effective reference band of the node only when the switch topology remains unchanged and the load meets the comparability conditions.
[0010] The propagation delay can be calibrated using naturally occurring transit pulses during operation. Pulses with similar amplitude envelopes and dominant frequency bands in two channels are selected as candidate pulse pairs, and their cross-correlation peaks determine the candidate propagation delay. After the candidate propagation delay stabilizes across multiple consecutive pulse pairs, the inter-channel propagation delay is updated. This compensates for sensor installation distance, lead length, and fixed delays in the sampling channels.
[0011] The arc-extinguishing component can be characterized by the energy and quantity of the local source pulses before zero crossing, and the interval between the last pulse and the zero-crossing moment. The reignition component can be characterized by the energy and quantity of the local source pulses after zero crossing, and the interval between the first pulse and the zero-crossing moment. This invention does not require forcibly compressing these quantities into a dimensionless fraction; they can be retained as a set of characteristics compared item by item according to the same dimension.
[0012] This invention also provides an online operation monitoring system for cable branch boxes. The system includes a signal acquisition module, a source pulse separation module, a phase component generation module, a half-cycle pairing module, and a status comparison module. Each module sequentially completes signal acquisition, propagation direction separation, generation of arc extinction and reignition components, pairing of opposite polarity half-cycles, and reference comparison under operating condition gating.
[0013] The present invention also provides a computer-readable storage medium and a cable branch box. The cable branch box has two high-frequency magnetic field sensors with opposite sensing directions on both sides of the connection node, and a power frequency current sensor on the connection node circuit, with the monitoring and control system performing the aforementioned monitoring processes.
[0014] Compared to methods using only single-point temperature or single-end pulse amplitude, this invention first eliminates incoming transit pulses based on the arrival relationship between both sides, allowing the connection status to be located to a specific node. Local source pulses before and after zero crossing correspond to the arc extinction and reignition stages, respectively, and the zero-crossing slope of the load current is used as a normalization basis. Therefore, the same set of state characteristics can still be used for the same node under different but comparable loads. The repetition relationship of opposite polarity half-cycles is used to eliminate intermittent pulses, while topology and load gating prevent updating erroneous benchmarks during branch switching. All these effects stem from the temporal and logical dependencies of each processing step, rather than a simple parallel arrangement of multiple detection quantities.
[0015] The first high-frequency magnetic field signal and the second high-frequency magnetic field signal come from both sides of the connection node to be monitored. The two signals are used to determine the arrival order of the pulses and the initial deflection direction under a unified clock. Attached Figure Description
[0016] Figure 1 This is a flowchart of the online operation monitoring method for cable branch boxes according to the present invention; Figure 2 This is a block diagram of the cable branch box online operation monitoring system of the present invention; Figure 3 This is a schematic diagram of the wiring topology of the connection nodes to be monitored inside the cable branch box; Figure 4 This is a partial cross-sectional view of the high-frequency magnetic field sensors installed on both sides of the connection node. Figure 5 The timing diagram shows the arrival of the transit pulse and the local source pulse through two channels. Figure 6 This is a waveform diagram of the arc-extinguishing component and the reignition component before and after the power frequency current crosses zero. Figure 7 The state transition diagram for determining semi-cycle pairing and repetition relationships; Figure 8 This is a schematic diagram comparing the connection state characteristics with the effective reference band. Figure 9 This is a schematic diagram of a cable branch box with online operation monitoring capabilities. Detailed Implementation
[0017] To clarify the technical solution and the relationship between the various processing quantities of the present invention, the present invention will be described below in conjunction with the accompanying drawings. The specific embodiments described are only for explaining the present invention and are not intended to limit the present invention. The frequencies, durations, distances, and criterion values mentioned below are illustrative examples and do not constitute a limitation on the scope of protection of the present invention. During implementation, recalibration can be performed based on voltage levels, connection structures, sensor bandwidth, and on-site noise.
[0018] Power frequency current refers to the low-frequency current signal flowing through the connection node to be monitored, used to determine the AC half-cycle and the moment of current zero crossing. The connection node to be monitored refers to the conductive connection interface equipped with sensor channels, node identification, and an effective reference band.
[0019] In this manual, a "connection node" refers to a location where a busbar, branch cable, elbow joint, bolt crimp end, or other conductive connector forms a current transmission interface. A branch box may have multiple connection nodes. Each node is assigned a node identifier and associated with the sensor channels, switch topology positions, and reference data on both sides of it.
[0020] "High-frequency magnetic field signal" refers to the response of a high-frequency magnetic field sensor to rapid current changes near a conductor. The sensor can employ a Rogowski coil, a broadband magnetically coupled coil, or a magnetic field probe with differential output, and its operating frequency band can cover 0.5MHz to 30MHz. General-purpose power frequency current transformers are only used to obtain power frequency current and zero-crossing position and do not handle high-frequency pulse detection. The two types of sensors have different applications.
[0021] "Transit pulse" refers to a pulse that originates from one side of the connection node, passes through that node, and continues to propagate to the other side, thus retaining a clear order of arrival after correcting for fixed channel delays. "Local source pulse" refers to a pulse source located between the two sensing positions or near the connection interface, with energy propagating from the connection node to both sides. Since the two sensors have opposite sensing directions, the initial deflection directions of the two channels during local outward propagation conform to a pre-calibrated outward relationship. Using an opposite installation method allows for the combination of arrival time relationship and initial deflection direction, avoiding judgment based solely on amplitude.
[0022] The "arc extinction component" does not refer to a continuously burning arc, but rather to a set of local source pulse characteristics that appear before the current approaches zero and the local conductive path disappears. The "reignition component" is a set of local source pulse characteristics that appear during the voltage recovery phase after the current crosses zero. If the connection interface is normal, there may be no local source pulses in the two time windows. In this case, the corresponding energy and number are set to zero, and the time interval component is marked as the default state. Infinity calculations are not performed in the default state.
[0023] A "half-cycle pair" consists of two consecutive half-cycles of power frequency current with opposite polarities. Half-cycle pairs do not cross intervals of switch changes, sampling interruptions, or abnormal power frequency cycles. "Loads meeting comparability conditions" means that the effective value of the power frequency current, the slope of the current zero-crossing point, and the total harmonic distortion rate of the current half-cycle pair and the reference half-cycle pair are within their respective allowable ranges, not that the two loads must be exactly the same. An "effective reference band" is the distribution range formed by confirmed normal connection state characteristics of the same connection node within a defined topology and load range.
[0024] like Figure 1As shown, the monitoring controller first acquires two high-frequency magnetic field channels and one power frequency current channel. The high-frequency channels use the same sampling clock, and the fixed deviation between channels is calibrated during commissioning. A feasible configuration is a high-frequency sampling rate of 500 MS / s and an analog bandwidth of 20 MHz, and a power frequency current sampling rate of 20 kS / s. The sampling trigger deviation between the two high-frequency channels is controlled within 0.5 ns. The sampled data is stored in a circular buffer with node identifier, channel identifier, and a unified timestamp.
[0025] The zero-crossing moment of the power frequency current is obtained by linear interpolation of adjacent sampling points with opposite signs. If the field harmonics are large, the fundamental power frequency can be obtained first using a low-pass filter with a cutoff frequency of 500Hz before interpolation. The time window before and after the zero-crossing moment are expanded relative to the zero-crossing moment. The time window width can be 0.3ms to 1.5ms, typically 0.8ms. Longer time windows are suitable for cable accessories with slow voltage recovery; when there is a lot of high-frequency interference from the field switches, the time window should be shortened to 0.4ms and the number of consecutive half-cycle pairs should be increased.
[0026] The high-frequency signal is first bandpass filtered from 1MHz to 20MHz. The controller uses the median of the background envelope plus six times the absolute median difference as the pulse initiation detection line, and terminates a pulse event when the envelope falls back to the background median plus three times the absolute median difference. When the quiet interval between two adjacent pulses is less than 0.4μs, they can be merged into the same pulse cluster. The median and absolute median difference are used here because isolated external pulses do not significantly raise the background estimate like the mean.
[0027] Propagation delay correction does not require the injection of additional signals into the operating cable. For example... Figure 5 As shown, within the background interval outside the zero-crossing time window of the power frequency current, natural pulses passing through the connection node from the outside can be found. Candidate transit pulse pairs are formed when the pulse envelope correlation coefficient of the two channels is not less than 0.85 and the dominant frequency difference is not greater than 15%. Cross-correlation is performed on the two local waveforms, and the candidate propagation delay is obtained from the position of the correlation peak. When the cross-correlation peak is located between adjacent sampling points, parabolic interpolation is performed using the peak value and the points on both sides to obtain the delay estimate for the subsampling interval.
[0028] The delay stabilization threshold is used to determine whether candidate propagation delays can be updated. This threshold represents the upper limit of the absolute median difference between the most recent twenty candidate propagation delays, and can be selected within the range of 0.5ns to 5ns, typically 1.5ns. During commissioning calibration, the 95th percentile value of the candidate delay dispersion is first calculated from 20 minutes of data with normal connection and no switch operation, and then a sampling margin of 0.3ns is added as the initial value. When the sensor spacing is short or the sampling clock is stable, the value can be tightened towards 0.5ns; when there are long leads and strong electromagnetic noise, the value can be relaxed towards 5ns, but more candidate pulse pairs are required at the same time. Once the dispersion of the most recent twenty candidate delays falls below the delay stabilization threshold, the propagation delay is updated using the median.
[0029] After time delay correction, the pulse events of the two channels are then used for propagation direction determination. If the arrival difference between the two channels falls within the calibrated transit time delay interval, and the initial deflection direction conforms to the propagation relationship from the first side to the second side or from the second side to the first side, the two events are marked as the same transit pulse and deleted from the current node's statistics. The transit time delay interval is centered on the propagation delay calibrated during commissioning, with an additional tolerance of 2ns to 8ns on each side, typically 4ns.
[0030] If the difference in arrival of two events falls within the local source synchronization interval, and the initial deflection conforms to the outward relationship from the node, they are merged into a single local source pulse. The local source synchronization interval can range from ±2 ns to ±10 ns, typically ±6 ns. The interval is determined by the sensor synchronization error, cross-correlation interpolation error, and the actual length of the connection node. Narrowing the synchronization interval can reduce mismatches but may miss local sources located at the node edge; widening the synchronization interval simultaneously increases the envelope correlation requirement of the controller.
[0031] like Figure 3 and Figure 4 As shown, two high-frequency magnetic field sensors are installed on the upstream and downstream conductor segments of the connection interface, respectively. The distances from the two sensors to the connection interface along the conductor can be the same or different. When the distances are different, propagation delay correction is used for compensation. The direction marks on the sensor housings are positioned away from the connection interface. Shielded leads are laid along the inner wall of the housing to prevent the two signal lines from tangling and causing additional coupling. The power frequency current sensor can be located on either side of the node, as long as it measures the current of the same branch passing through the connection interface.
[0032] like Figure 6 As shown, each current half-cycle forms two time windows: before and after zero-crossing. For the arc-extinguishing component, the controller records the sum of local source pulse energies, the number of pulses, and the time from the last pulse to the zero-crossing moment. For the reignition component, it records the sum of local source pulse energies, the number of pulses, and the time from the first pulse to the zero-crossing moment. The pulse energy is calculated as the discrete integral of the square of the sensor output voltage over time. This value is used for comparison between channels of the same model and with the same gain, and is not directly interpreted as the absolute number of joules of discharge.
[0033] The current zero-crossing slope is first converted into a relative slope. The median slope of the same load range during the reference acquisition period is taken as the reference slope. The absolute value of the current slope divided by the reference slope yields the dimensionless slope ratio. The sum of pulse energies divided by a slope ratio not less than 0.2 yields the normalized energy. Setting the lower limit of the slope ratio to 0.2 is to avoid excessively small divisors when the zero-crossing slope is close to zero under light load. Half-cycles with a slope ratio below 0.2 do not participate in the status output; only the original record is retained. The number of pulses and the time interval are not directly added to the energy but are retained as coordinates of the characteristic group, respectively.
[0034] like Figure 7 As shown, the positive half-cycle and the immediately following negative half-cycle constitute a half-cycle pair. The controller calculates the relative deviation of the normalized extinguishing energy and the relative deviation of the normalized reignition energy of the two half-cycles, and calculates the correlation coefficient of the local source pulse phase histograms of the two half-cycles. The denominator of the relative deviation is taken as the larger of the average value of the two energies and the minimum energy protection value. The minimum energy protection value can be taken as 5% of the median of the normal reference energy, thereby avoiding distortion of the ratio when both energies are close to zero.
[0035] The arc extinction deviation threshold and reignition deviation threshold represent the upper limits of the relative energy deviation between two half-cycles, respectively. Both can be set within the range of 0.08 to 0.30, with a typical value of 0.16. The initial value is obtained by adding 0.02 to the 99th percentile of the relative deviation of normal commissioning data. When there are few pulses in the field, the threshold can be relaxed to 0.24, requiring six consecutive half-cycle pairs to be valid; when the pulses are more frequent, the threshold can be tightened to 0.12. The similarity threshold represents the lower limit of the phase histogram correlation coefficient, which can be set between 0.75 and 0.95, with a typical value of 0.86, and is obtained by subtracting 0.03 from the 1st percentile of the correlation coefficient of normal data. Lowering the similarity threshold increases the probability of occasional pulses being mistakenly accepted, therefore the number of consecutive half-cycle pairs should be increased accordingly.
[0036] The load comparability ranges are set for three physical quantities. The relative difference of the effective value of the power frequency current can be 5%–20%, typically 10%; the relative difference of the current zero-crossing slope can be 5%–20%, typically 12%; the difference of the total harmonic distortion rate can be 1–5 percentage points, typically 3 percentage points. Each range is determined based on the natural fluctuations of the same load interval during the initial commissioning phase: using the 95th percentile of normal data plus a sampling resolution margin. Adjust towards the smaller value when the load is stable and the measurement noise is low; adjust towards the larger value when the output of the distributed power source fluctuates significantly, but must not cross the switch topology change.
[0037] Effective reference bands are stored separately for nodes, topology identifiers, and load intervals. For example... Figure 8 As shown, after the connection nodes are tightened and commissioning is confirmed, data is continuously collected for no less than seven operating days. The median and absolute median difference are calculated for each characteristic coordinate. The lower and upper limits of the reference band can be taken as the median minus or plus three times the absolute median difference; when three times the absolute median difference is less than the sensor repeatability error, the repeatability error is used instead. Data judged as connection anomalies is not updated to the reference. Data during periods of incomparable loads or topology changes is also not updated.
[0038] The following is a set of illustrative calculation examples to illustrate how the intermediate quantities are connected. These values are not actual field-measured performance data. The reference slope is 320 A / ms. The zero-crossing slope of a positive half-cycle is 345.6 A / ms, with a slope ratio of 1.08; the sum of pulse energies before zero crossing is 4.86 sampled energy units, which, after normalization, is 4.86 ÷ 1.08 = 4.50; the sum of pulse energies after zero crossing is 6.21, which, after normalization, is 5.75. The zero-crossing slope of the adjacent negative half-cycle is 307.2 A / ms, with a slope ratio of 0.96; the energy before zero crossing is 4.32, normalized to 4.50, and the energy after zero crossing is 5.47, normalized to 5.70.
[0039] The relative deviation of the extinguishing energy for the above half-cycle pair is 0, and the relative deviation of the reignition energy is 0.05 ÷ 5.725 = 0.0087. Its phase histogram correlation coefficient is 0.91, satisfying the deviation threshold of 0.16 and the similarity threshold of 0.86, thus forming a repeatability characteristic. The effective reference band for the normalized reignition energy of this node in the same topology and load range is 3.80–5.05, with 5.75 and 5.70 for both half-cycles exceeding the upper limit. The controller records this node as a connection to be verified and saves the node identifier, half-cycle pair timestamp, and original waveform. The values of 5.75 and 5.70 obtained in the previous step are directly used in the benchmark comparison, maintaining consistency in calculation among the values.
[0040] In the non-triggered case, a pulse passing through the connection node arrives at the first channel first, and then at the second channel 4.2 ns later. The initial deflection coincidence propagates from the first side to the second side. The corrected arrival difference falls within the transit delay interval, and the pulse is removed from the local source statistics of this node. Even if its amplitude is higher than the background detection line, it does not form an extinction or reignition component. This example illustrates that an incoming pulse with a large amplitude will not trigger the connection state output solely due to its amplitude.
[0041] The switch topology is formed by the combination of the positions of the in-box switches, sectionalizing switches, and grounding switches. Each change in position generates a new topology identifier. Half-cycles before and after the topology change do not form half-cycle pairs. Under the new topology, the controller first enters observation mode, waiting for the load to stabilize and for at least a predetermined number of normal half-cycle pairs to be obtained before activating the reference band corresponding to that topology; if there is no valid reference band, only "Reference Establishing" is output, and no connection abnormality is output.
[0042] like Figure 2As shown, the signal acquisition module in the online operation monitoring system connects two high-frequency magnetic field sensors and a power frequency current sensor. The source pulse separation module performs channel delay correction and propagation direction determination. The phase component generation module forms arc extinction and reignition characteristic groups according to the time windows before and after zero crossing. The half-cycle pairing module calculates the repetition relationship of half-cycles with opposite polarities. The state comparison module manages the topology, load grouping, and effective reference band, and sends the results to the local recorder or power distribution monitoring terminal. The modules can be implemented by program segments on the same processor, or they can be shared by the acquisition board and the edge controller.
[0043] The monitoring controller may include a processor, a synchronous sampling interface, a memory, a digital input interface, and a communication interface. The memory stores the computer program, channel calibration parameters, node topology relationships, and effective reference bands. When the computer program is executed by the processor, it performs the aforementioned online monitoring method. High-frequency pulse extraction, cross-correlation, and robust statistics are all mature technologies in digital signal processing; their general program implementation will not be elaborated upon.
[0044] like Figure 9 As shown, the cable branch box includes a box body, busbar, at least two branch cables, connection nodes, two high-frequency magnetic field sensors, a current sensor, and a monitoring controller. A shielding partition can also be installed inside the box to maintain an electrical clearance between the sampling leads and the main circuit. When the sensor is installed using a detachable clamp, maintenance personnel can replace the sensor without changing the original connection structure. After sensor installation, the direction and channel number are recorded. If the direction changes, propagation relationship calibration must be performed again.
[0045] The monitoring records of this invention retain at least the original waveforms, current topology identifiers, load comparability parameters, propagation delays, and coordinates of each characteristic for several power frequency cycles before and after the trigger. When communication is interrupted, the controller continues to operate locally and caches records in chronological order; records are uploaded after communication is restored. When the sampling channel is saturated, the clock is unlocked, or the power frequency current sensor is disconnected, no connection status is output; instead, a sampling invalidation flag is output. These degradation processes prevent the interpretation of equipment malfunctions as connection anomalies.
[0046] Those skilled in the art can arrange the two high-frequency magnetic field sensors on both sides of the same connector, or at both ends of a node region containing a short busbar, depending on the connection structure. The processing method of this invention can be used as long as the propagation directions of the two channels can be calibrated and determined, and the source region of the local source pulse is located between the two sensing positions. This invention is not limited by the specific sensor packaging, communication protocol, or processor model.
[0047] In another installation method, the two high-frequency magnetic field sensors are not directly fixed to the outer surface of the cable insulation, but are instead fixed to short busbar supports on both sides of the connection node. A fixed distance is maintained between the sensors and the conductor, and the supports are made of non-magnetic materials. As long as the commissioning calibration can obtain the initial deflection relationship and fixed time delay of the two channels in the same propagation direction, this non-contact installation can still use the aforementioned judgment. Loosening of the sensor supports will simultaneously change the amplitude and time delay; therefore, the controller will treat the candidate propagation time delay offset as an installation verification prompt, rather than directly interpreting it as a contact anomaly.
[0048] The channel directions are registered one by one during commissioning. On-site, after the branch box is de-energized for maintenance, a low-energy calibration pulse can be coupled from the first side of the node using a portable pulse source. The arrival time of the first channel, the arrival time of the second channel, and the initial deflection directions of both channels are recorded. The calibration operation is then repeated from the second side. This calibration pulse is only used to confirm the sampling chain direction and is not used for operational monitoring. After the equipment is commissioned, a natural transit pulse is used to fine-tune the fixed time delay; continuous injection of test signals into the energized main circuit is not required.
[0049] The gain of the high-frequency magnetic field sensor can vary. The controller maintains an amplitude-frequency response calibration table for each channel, converting the original waveform to a unified reference gain before comparing the envelope and the main frequency band. Amplitude-frequency calibration can be performed using a sweep coil at frequencies of 0.5MHz, 1MHz, 5MHz, 10MHz, and 20MHz. Linear interpolation is used between adjacent frequency points. The calibration table is primarily used for pulse pairing; connection status characteristics are still compared based on the node's own reference, avoiding the inclusion of absolute gain differences between different nodes in the judgment.
[0050] Both channels are driven by the same crystal oscillator and the same trigger signal. When the sampling boards are arranged separately, triggering can be distributed via a synchronization line of a defined length, and a synchronization counter is written into each data frame. If the synchronization counter is discontinuous, the number of data frames in the two channels is unequal, or the sampling clock lock flag fails, that frame will not participate in the propagation direction determination. After synchronization is restored, sufficient transit pulses are obtained to reconfirm the propagation delay before output is restored.
[0051] The initial deflection direction of a pulse event is determined by the sign of the first stable offset after the pulse origin. To avoid noise changing the sign at a single sampling point, a signed integral can be calculated over four to twelve sampling points after the origin, typically eight sampling points. The direction is marked as uncertain when the absolute value of the signed integral is less than four times the integral of the background noise. Events with uncertain directions can be retained in the original record but are not used for pairing transit pulses and local source pulses.
[0052] Pulse envelope similarity does not necessarily mean that two pulses originate from the same event. The controller first searches for candidates by arrival time, then compares the envelope correlation coefficient, dominant frequency, and duration. When there are more than two events within the candidate range, the combination with the lowest total pairing cost is used, and each event is only allowed to be used once. The pairing cost consists of the corrected arrival difference, envelope dissimilarity, and relative difference in dominant frequency. Each term is first normalized according to the discrete scale of normal calibration data, and nanoseconds, correlation coefficients, and megahertz are not directly added together.
[0053] A series of pulses may be generated near the connection node during an oscillation. If the interval between consecutive pulses is less than the pulse cluster merging interval, the controller treats it as a local source pulse cluster and stores the number of pulses and total energy within the cluster. The merging interval can be 0.2μs to 1.0μs, typically 0.4μs. An interval that is too short will split the same oscillation into multiple events, while an interval that is too long will merge two independent micro-arcs. The initial value can be determined based on the oscillation decay time of the normal switching waveform and should be rechecked after the noise source in the field changes.
[0054] Interpolation at zero-crossing times can also be performed using a phase-locked loop (PLL). The PLL tracks the fundamental phase from the power frequency current, and the zero-crossing time of the first half-cycle is determined by the phase reaching zero or π. If the difference between the linear interpolation and the PLL result exceeds 0.2% of the power frequency cycle, that half-cycle is marked as phase unreliable. Phase unreliability is commonly seen in current sensor saturation, sudden branch loads, or severe waveform distortion. This half-cycle neither forms a half-cycle pair nor updates the reference.
[0055] The pre-zero crossing time window and the post-zero crossing time window can be of equal or unequal width. When the conductive path at the contact interface extinguishes earlier during the current decrease phase, the pre-zero crossing time window can be 1.0 ms, and the post-zero crossing time window can be 0.6 ms. Different widths do not change the meaning of the components, because energy, number, and time interval are recorded according to their respective time windows. After the time window is changed, a new parameter version should be created; the old version data is not directly transferred to the new reference band.
[0056] The extinction and reignition components can be stored as structured records. A record includes a node identifier, half-cycle polarity, zero-crossing timestamp, normalized energy, number of local source pulses, relative time of the first or last pulse, phase histogram, slope ratio, and data quality flags. The advantage of using structured records is that when the subordination criteria are adjusted, the data can still be recalculated from the original coordinates without compressing early data into an untraceable single fraction.
[0057] The phase histogram is set to zero at the zero-crossing point. The phase is negative before the zero-crossing and positive after the zero-crossing. The time window can be divided into eight to thirty-two phase grids, typically sixteen. Each local source pulse is added to the corresponding phase grid according to its energy or the number of pulse clusters. Before comparing the positive and negative half-cycles, the negative half-cycle phase is mirrored to the positive half-cycle reference according to the current polarity, so that the same physical stage in both half-cycles falls into the same phase grid.
[0058] When both phase histograms are free of pulses, the controller does not calculate the correlation coefficient, but instead treats "both half-cycles being quiet" as the normal repetitive state. If only one half-cycle has a local source pulse, the repetitive relationship does not hold. When both half-cycles have pulses but the total energy is below the background energy protection value, the correlation coefficient is also not included in the abnormal output, avoiding unstable results after normalization from very small random quantities.
[0059] Repetition relationships require multiple consecutive half-cycle pairs to be valid. The number of consecutive pairs can be three to ten, typically four. When periodic inverter interference exists in industrial settings, the number can be increased to eight, and it should be checked whether the interference frequency is locked to a fixed harmonic of the power frequency. Increasing the number of consecutive pairs will prolong the confirmation time, but will not change the characteristics of a single half-cycle pair. When a quick status establishment is needed after maintenance, three pairs can be temporarily used and baseline updates can be disabled.
[0060] The effective reference band load range can be divided according to the proportion of the rated power frequency current. For example, five initial ranges can be set: 0-20%, 20%-40%, 40%-60%, 60%-80%, and 80%-100% of the rated current. If the sample size of a certain range is insufficient for a long period, it can be merged with adjacent ranges; if the slope and harmonic distribution of a certain range show obvious bimodalities, it can be split. Range adjustments only use data that has been confirmed to be normal, and the versions before and after adjustment are saved.
[0061] A node reference is not a copy of other nodes. Even if two connectors are of the same model, their conductor lengths, sensor spacing, and installation orientations will result in different pulse responses. When a new node does not have its own reference, the distribution of nodes of the same model can be used as an observation reference, but anomalies cannot be directly output based on this. After tightening verification is completed and the node data is accumulated, the reference distribution is replaced by the effective reference band of this node.
[0062] The benchmark update employs a limiting method. Let the current benchmark center be m, and the current normal feature be z. The update step size α can range from 0.001 to 0.05, typically 0.01. First, z is limited to the range of an absolute median difference extending outward from the current benchmark band. Then, the update is performed by adding α to m and multiplying by the difference between z and m. This allows for tracking of long-term, slow drifts, while preventing a single event near the boundary from significantly shifting the benchmark center. α is a dimensionless update ratio, its value determined by the set benchmark memory time.
[0063] If the connection status characteristics continuously exceed the valid reference band, the controller can output three maintenance statuses: observation, verification, and anomaly. The first time the reference band is exceeded, it only enters the observation status and freezes the reference. If the characteristics recur within the set observation period and the half-week repetition relationship is established, it enters the verification status. After maintenance personnel confirm abnormal node tightening or contact surface defects, the anomaly is recorded. These statuses are used for maintenance scheduling and do not change the scope of "outputting connection status and connection node position" as described in the claims.
[0064] The pre-maintenance baseline cannot be used after maintenance. After receiving the node maintenance completion notification, the controller archives the old baseline version, checks the direction and propagation delay of the two high-frequency channels, and then enters the new baseline acquisition period. Original records before and after maintenance can be used to observe the repair effect, but they should not be mixed to calculate a single baseline band. If only the sensor is replaced without opening the connectors, the channel gain and delay should still be recalibrated.
[0065] When a branch box has multiple connected nodes to be monitored, each node is configured with two logical high-frequency channels. Adjacent nodes can share a single physical sensor located between them, but the controller must store the orientation calibration and propagation delay for each node. A physical pulse in the pairing of multiple nodes can only be marked according to the propagation path; the same pulse must not be treated as multiple local sources simultaneously. The propagation path can be reconstructed first from the earliest arriving sensor position, and then local source judgment can be performed node by node.
[0066] like Figure 3 When the busbar shown has three branches, the transit pulse may split into two paths after entering the busbar from the third branch. For a given connection node, the two sensing positions still appear to arrive sequentially in one direction, and this pulse is deleted. If the bifurcation causes the two channels to arrive approximately simultaneously, the initial deflection direction usually does not conform to the paired relationship from that node outwards; the direction condition serves as a second screening. When both time and direction cannot be determined, the event is marked as unclassified and is not included in the local source statistics.
[0067] Another illustrative boundary example is given. The normalized extinction energy is 0 in the first half-cycle, and the normalized reignition energy is 0; the second half-cycle is also 0. Both half-cycles are quiet, forming a normal repeating state. If the reignition energy is 0.06 in the first half-cycle and 0 in the second half-cycle, and the background energy protection value is 0.10, then this small energy event is recorded in the raw record but no anomaly is output. If the first half-cycle is 2.6 and the second half-cycle is 0.1, then the repeating relationship does not hold; even if 2.6 exceeds the reference band, it is only observed and not confirmed as a persistent state.
[0068] The load is not proportional. The current half-cycle pair has an RMS current of 186A, while the reference half-cycle pair has 168A, a relative difference of 10.7%. The current zero-crossing slope is 338A / ms, while the reference is 315A / ms, a relative difference of 7.3%. The total harmonic distortion (THD) rates are 4.8% and 3.1%, respectively, a difference of 1.7 percentage points. If a comparable range of 10%, 12%, and 3 percentage points is used, and the relative difference in the current RMS value exceeds 10%, the reference comparison will not be performed for this half-cycle pair. The controller saves the characteristics and waits for subsequent half-cycle pairs falling into the comparable load range.
[0069] If the comparable range of current RMS values is calibrated to 12%, then the 186A and 168A values mentioned above meet this condition; the other two also meet it. Whether to compare depends on the saved parameter version and the range cannot be changed temporarily after seeing the results. The parameter version, calibration time, and calibration data range are written into the monitoring record for easy subsequent verification.
[0070] Lightning strikes, switching operations, and wireless communication equipment can generate broadband interference. Lightning pulses often act simultaneously on multiple branches, forming a clear propagation path; directional filtering can eliminate most of them. During switch operations within the enclosure, topology shift flags prevent the corresponding half-cycle from participating in status judgment. Fixed-band narrow pulses generated by communication transmissions can be filtered using notch filtering during high-frequency preprocessing, but the notch filter band must not cover the main frequency band of the local source confirmed by commissioning observation.
[0071] When a high-frequency channel is saturated, the envelope, energy, and initial deflection direction are all unreliable. A pulse is considered saturated when any channel reaches 98% of its full-scale analog-to-digital conversion range within the candidate pulse range. Even if both channels are saturated, they cannot be considered a local source based on "simultaneous arrival." Continuous saturation indicates excessive sensor gain or strong external interference, prompting the controller to request a gain reduction and recalibration.
[0072] The monitoring system can retain feature records for the most recent 24 hours to 30 days in the edge controller, while the original high-frequency waveforms are only saved before and after the event. For normal quiet half-cycles, only the feature group can be saved, saving storage space. When repetitive features, parameter changes, topology shifts, or invalid sampling occur, the complete waveform is saved. Data compression must not alter the event timestamp or the relative sampling positions of the two channels.
[0073] The status comparison module can send connection status and node location to the station via IEC 61850, Modbus, or other power distribution communication interfaces. Communication mapping is an output carrier and does not participate in connection status calculation. If the station rejects the data or the communication link is interrupted, the node status is still stored locally. Changes in the communication protocol do not require re-establishing the high-frequency channel propagation delay and node reference.
[0074] The computer-readable storage medium can be flash memory, solid-state memory, or other non-transitory storage media. The program can be divided into a sampling interrupt section and a low-speed state processing section. The sampling interrupt only writes to the synchronization buffer and marks the zero-crossing neighborhood; pulse pairing, half-cycle pairing, and reference management are performed in subsequent tasks. If a processing task is not completed before the next half-cycle arrives, the raw data is queued by timestamp, and the previous half-cycle is not discarded.
[0075] The monitoring controller can also use a programmable logic device (PLD) to extract high-frequency events, while a microprocessor can handle half-cycle relationships and benchmark comparisons. Each event output by the PLD includes at least the channel number, start and end sampling points, signed integral, energy, and main frequency. The microprocessor uses the same event format, and the hardware division of labor does not change the methodology.
[0076] When the cable distribution box door is open, or when maintenance grounding or test cables are connected, the online judgment can be paused by the door status and maintenance input. Data can still be collected for calibration during the pause, but this data is not included in the operating reference. After the box door is closed, the maintenance input is released, and the topology stabilizes, the controller waits for at least several complete power frequency cycles before resuming to avoid maintenance transients entering half-cycle pairs.
[0077] On out-of-operation branches without power frequency current, the current zero-crossing slope has no physical meaning, and this invention does not output the connection status. After the branch is re-energized, the controller first confirms the power frequency period and the polarity of the current sensor, and then restores the zero-crossing time window. Branches with light loads but slope ratios below the protection lower limit are also only recorded, without energy normalization. This boundary treatment corresponds to the aforementioned denominator protection.
[0078] Therefore, propagation direction calibration, phase component formation, half-cycle pairing, and operating condition gating each address different error sources, and are interconnected through clearly defined data input and output. If the data quality at any stage fails to meet the requirements, the system displays an invalid or waiting status, without supplementing the connection conclusion with missing data.
[0079] During the baseline acquisition period, the controller can generate a node data quality summary daily. The summary includes the number of valid half-cycle pairs, load range coverage, number of transit pulse calibrations, number of local source pulses, number of channel saturation occurrences, and clock lockout duration. If valid half-cycle pairs are insufficient, the acquisition period is extended instead of reducing the number of consecutive pairs to make up the baseline. The data quality summary is not considered evidence of connectivity anomalies; it is only used to determine the reliability of the baseline.
[0080] Sensor repeatability error can be estimated within a short period of time when the connection nodes are normal, the load is stable, and the topology is stable. The controller divides several consecutive half-cycle pairs into two groups according to odd and even numbers, and compares the differences in the feature centers of the two groups. The upper quantile value of the differences between multiple groups is taken as the repeatability error. This error is included in the minimum width of the effective reference band to prevent the absolute median difference from becoming an unrealistically narrow band due to overly concentrated samples.
[0081] The effective reference band can be set separately for arc extinction energy, reignition energy, pulse count, and phase distribution. Exceeding the reference band for a particular coordinate does not automatically cause all coordinates to become abnormal. The controller saves the out-of-band coordinates and the direction of the out-of-band deviation. Early contact degradation may initially manifest as an increase in reignition energy, followed by an increase in the pulse count; saving the coordinates allows for observation of this evolution during maintenance, rather than simply leaving a single overall alarm bit.
[0082] Half-cycle polarity asymmetry can exist. Connection structures, sensor installations, or power waveforms can cause the absolute characteristics of the positive and negative half-cycles to differ. This invention compares the repetition relationship of the two half-cycles after polarity mirroring during the arc extinction and reignition phases, and allows each of the positive and negative half-cycles to have an independent normal center. The repetition relationship is used to confirm the duration of the event, and does not require all coordinates of the two half-cycles to be completely equal.
[0083] When a branch current contains DC bias, the zero-crossing slopes of the positive and negative half-cycles are different. They can still be paired after normalization using their respective slope ratios. If the DC bias causes a certain polarity half-cycle to no longer reliably cross zero, or if the interval between adjacent zero-crossings deviates from the power frequency cycle by more than 2%, that half-cycle pair is marked as unusable. The controller does not replace the missing slope with the slope of the other half-cycle.
[0084] The polarity of the power frequency current sensor is registered along with the direction of the high-frequency sensor during commissioning. Reversing the current sensor connection will swap the positive and negative half-cycles, but will not change the zero-crossing time. To maintain the engineering meaning of the phase histogram, the controller verifies the polarity using the known load direction. When the power flow reverses, the power flow flag is updated with the actual current direction, and node references are grouped according to the power flow direction.
[0085] After distributed power sources are connected, two power flow directions may exist within the same switching topology. A power flow direction bit can be added to the switching topology identifier. The transition half-cycle of a power flow direction change does not participate in pairing. References are accumulated separately for forward and reverse power flows to avoid misinterpreting the initial sensor deflection changing with the power flow direction as a change in the pulse direction emitted by the connected node.
[0086] When the number of transit pulses is too small, the propagation delay uses the most recent valid value, but the delay age is saved. When the delay age exceeds the maintenance set cycle, or when the temperature change inside the enclosure exceeds the calibration range, the status output drops to pending confirmation. The controller will not use a delay that has never been updated indefinitely for high-confidence judgment. After a new candidate transit pulse pair is obtained, the delay age is reset to zero.
[0087] The temperature inside the chamber will cause a slight delay drift in the sampling leads and sensor response. The propagation delay can be stored in temperature ranges, or the first-order change of the delay with temperature can be fitted online. Fitting only uses confirmed transit pulse pairs. Local source pulses during periods of connection anomalies are not included in the delay fitting to avoid the anomaly event affecting the direction criterion.
[0088] When two local sources occur simultaneously within the nodal region, the pulses may overlap. If the envelope contains two separable peaks, separate events are established; if they cannot be separated, they are treated as a composite pulse cluster, and the composite state is marked. The energy of the composite pulse cluster participates in the arc extinction or reignition component, but the number of pulses is only counted as one cluster to avoid artificially splitting the indivisible waveform into multiple events.
[0089] Status outputs can include evidence snippets. These snippets include local waveforms before and after calibration for both channels, the zero-crossing position of the power frequency current, deleted transit pulse markers, retained local source pulse markers, and their respective half-cycle pairs. Maintenance personnel can review why a pulse was assigned to this node, instead of simply receiving inexplicable alarm results.
[0090] The location of connection nodes is output as node identifiers and can be associated with the coordinates of the layout within the box. Node identifiers correspond to the bus segment, branch number, and phase on the drawing. For example, "N2-B" can represent the connection node of phase B of the second branch. The identifier rules are determined by the project configuration and do not participate in the detection algorithm, but all sensor channels, reference bands, and monitoring records must reference the same node identifier version.
[0091] Three-phase connection nodes can be monitored phase-by-phase. The three phases share a common switch topology identifier, while the power frequency current and high-frequency magnetic field channels are handled independently for each phase. When a local source pulse occurs in one phase, the synchronization pulses of other phases can be used as common-mode interference checks, but the three-phase energy is not summed. A sensor failure in one phase will not prevent other phases from maintaining their own monitoring.
[0092] If only two sensors, spaced a certain distance apart, can be installed on one side of the connection node, they can be used to determine the external propagation path, but cannot form a local source condition of "propagation from the node to both sides". This installation does not meet the main implementation requirements of this invention, and the controller does not claim to be able to locate the node using this method. Only when the sensor positions are located on both sides of the connection interface is the local source direction relationship complete.
[0093] The self-test of the monitoring controller also includes memory verification, parameter verification, and sensor open-circuit checks. The parameter file contains a version number and a checksum. If verification fails, using read-only factory parameters will only maintain data acquisition and will not enable node reference comparison. Sensor open-circuit checks will simultaneously confirm abnormalities in input noise and bias; a single low-amplitude signal will not be considered an open circuit.
[0094] When compared with existing temperature monitoring, the status results of this invention can be displayed alongside the temperature records, but temperature is not a necessary input for determining the direction of local source pulses. Temperature increases can be used to prioritize maintenance. Even if the temperature has not yet exceeded the temperature rise limit, as long as this method repeatedly confirms the local micro-arcs at the node, the status is still saved for review. Both detection quantities retain their respective physical meanings.
[0095] In the illustrative maintenance example, node N2-B exhibits recurring reignition characteristics for four consecutive half-cycles. The switch topology is T03, and the load range is 40%–60% of the rated current. The controller outputs node N2-B and its pending verification status. After the maintenance personnel tighten the node, a maintenance completion flag is set, the old reference B17 is archived, and data acquisition begins on the new reference B18. Subsequent data is only compared with B18, ensuring that the wider old reference does not obscure post-maintenance changes.
[0096] Remote parameter modifications should be performed with maintenance permissions, and the old value, new value, and effective time should be recorded. The old parameters should be used for the forming half-cycle pair, and the new parameter version should only be used for the next complete half-cycle pair. The time window, bias threshold, or similarity threshold cannot be changed between the two half-cycles of a half-cycle pair; otherwise, the two inputs of the repeating relationship will not be on the same scale.
[0097] This invention does not require absolute measurement of contact resistance, nor does it directly calculate gap dimensions based on high-frequency energy. Output is limited to the connection state and node location. Contact resistance, gap, or degree of erosion requires power-off testing and maintenance confirmation. Such output boundaries avoid interpreting indirect high-frequency characteristics as physical dimensions without a measurement basis.
[0098] In summary, those skilled in the art can determine the calibration values based on the sensor spacing, sampling bandwidth, and load variations of a specific cable branch box. The key conditions are always the propagation relationship between the two sides, the current zero-crossing phase, the repetition of opposite polarity half-cycles, and comparable operating conditions. Other hardware models and communication methods can be adjusted according to engineering conditions.
[0099] Comparative Example 1 To verify the judgment boundary, the inventors processed the same saved two-channel waveform using both the one-sided amplitude thresholding method and this embodiment. This waveform originated during the upstream switch operation, with both high-frequency magnetic field channels recording significant pulses. The one-sided amplitude thresholding method, without considering the pulse propagation direction, would classify the pulse with the larger amplitude as an anomaly at the monitored node. This embodiment first identifies the pulse based on the arrival order and initial deflection direction of the two channels, determining that it entered from one side and left from the other, thus classifying it as a transit pulse and excluding it from the node's local source pulse set. This comparison is not used to provide performance percentages, but only to illustrate that the direction discrimination alters the attribution of evidence.
[0100] The inventors also discovered in early waveform playback that comparing the high-frequency energy of adjacent positive and negative half-cycles individually is easily affected by load changes. When the zero-crossing slope of the power frequency current was also examined, some records that appeared to show increased energy were actually accompanied by a synchronous increase in slope. Therefore, this implementation retains slope normalization and limits the repetition relationship of opposite polarity half-cycles to conditions where the topology and load are comparable. If this condition is removed, the reference band will be widened by irrelevant waveforms during load switching.
[0101] The connection monitoring schemes disclosed in the application date show technical approaches that use temperature or single-channel high-frequency quantities as the main criteria. The temperature-based approach has a slow response before heat accumulates; the single-channel high-frequency quantity-based approach struggles to determine whether an upstream switching pulse originates from or passes through a node when it enters the enclosure. This implementation addresses these two failure scenarios, but does not deny that the aforementioned detection quantities can be used as maintenance references.
[0102] For easy reference to the attached figures, Figure 3 , Figure 4 and Figure 9 In the diagram, T1 and T2 represent the first high-frequency magnetic field sensor and the second high-frequency magnetic field sensor on the two sides of the connection interface, respectively. Figure 5 R1, R2, and R3 represent the first channel, the connection node, and the second channel, respectively.
[0103] When the inventors were organizing the online records of the branch boxes during different load periods, they found that it was easy to mistake the incoming pulses as node anomalies by looking at the amplitude of the high-frequency pulses alone. Only by checking the order of arrival of the two sides, the current crossing to zero, and the repetition of the opposite polarity half-cycles together could the comparison object be stabilized.
Claims
1. A method for online operation monitoring of cable branch boxes, characterized in that, include: The first high-frequency magnetic field signal and the second high-frequency magnetic field signal are collected on both sides of the connection node to be monitored in the cable branch box, and the power frequency current flowing through the connection node to be monitored is also collected. Divide the zero-crossing time window and the zero-crossing time window according to the zero-crossing time of the power frequency current, perform propagation delay correction on the first high-frequency magnetic field signal and the second high-frequency magnetic field signal, remove the transit pulses that arrive at both sides in sequence along the same direction, and retain the local source pulses that propagate from the connection node to be monitored to both sides. Based on the local source pulses in the time window before and after the zero crossing, the arc extinction component and reignition component of the corresponding half-cycle are constructed, and the current change rate at the current zero crossing point is used to normalize the arc extinction component and reignition component. Two consecutive half-cycles with opposite current polarities are paired to form a half-cycle pair. The connection state characteristics are formed based on the repetitive relationship between the normalized arc-extinguishing component and the reignition component within the half-cycle pair. When the switch topology of the cable branch box remains unchanged and the load of the half-cycle pair meets the comparability conditions, the connection status characteristics are compared with the effective reference band of the corresponding connection node, the connection status and the location of the connection node are output, and the connection status, connection node identifier and the timestamp of the corresponding half-cycle pair are written into the monitoring record.
2. The online operation monitoring method for cable branch boxes according to claim 1, characterized in that, Propagation delay correction includes: within the calibration interval where no local source pulses are detected, selecting transit pulse pairs from the first high-frequency magnetic field signal and the second high-frequency magnetic field signal whose amplitude envelopes and main frequency bands are matched; Candidate propagation delays are obtained based on the positions of the cross-correlation peaks of each transit pulse pair; When the dispersion of multiple consecutive candidate propagation delays is less than the delay stability threshold, the propagation delays on both sides are updated with the median of the candidate propagation delays.
3. The online operation monitoring method for cable branch boxes according to claim 1, characterized in that, Eliminating transit pulses includes converting the first and second high-frequency magnetic field signals, which have undergone propagation delay correction, into pulse event sequences, respectively. Two pulse events in the two event sequences whose arrival time difference is within the transit delay interval and whose initial deflection direction conforms to the unidirectional propagation relationship are marked as transit pulses; Two pulse events whose arrival time difference is within the local source synchronization interval and whose initial deflection direction conforms to the propagation relationship from the connection node outward are merged into a single local source pulse.
4. The online operation monitoring method for cable branch boxes according to claim 1, characterized in that, The arc extinction component is characterized by the pulse energy, number of pulses of each local source pulse within the time window before zero crossing, and the interval from the last pulse to the current zero crossing time. The reignition component is characterized by the pulse energy, number of pulses of each local source pulse within the time window after zero crossing, and the interval from the current zero crossing time to the first pulse. The widths of the time window before and after zero crossing are adjusted synchronously with the measured values of the power frequency cycle.
5. The online operation monitoring method for cable branch boxes according to claim 1, characterized in that, The repetition relation includes: calculating the arc extinction deviation between the normalized arc extinction components of the two half-cycles in the half-cycle pair, the reignition deviation between the normalized reignition components, and the similarity between the local source pulse phase distributions; When the arc extinction deviation and reignition deviation of multiple consecutive half-cycle pairs are both lower than the corresponding deviation threshold and the similarity is higher than the similarity threshold, the connection state feature is marked as a repeatability feature.
6. The online operation monitoring method for cable branch boxes according to claim 1, characterized in that, The load meets the comparability conditions as follows: the relative difference of the effective value of the power frequency current, the relative difference of the rate of change of the current at the current zero crossing point, and the difference of the total harmonic distortion rate of the current are all within the corresponding comparable range between the current half-cycle pair and a reference half-cycle pair pre-selected when forming the effective reference band. If any item exceeds the corresponding comparable range, the connection state characteristics are preserved and benchmark comparison and benchmark update are not performed.
7. The online operation monitoring method for cable branch boxes according to claim 1, characterized in that, The effective reference band is established as follows: During the reference acquisition period after the connection node is tightened and commissioning is confirmed, the connection status characteristics are grouped according to the switch topology identifier and load interval. For each group of connection state characteristics, calculate the robust center value and absolute median difference, and use the robust center value and absolute median difference to define the effective reference band; Limiting updates are performed on the corresponding valid reference bands only using connection status characteristics that have not triggered connection anomalies and whose loads meet comparable conditions.
8. A computer-readable storage medium, characterized in that, The computer-readable storage medium stores a computer program that, when executed by a processor, implements the steps of the method according to any one of claims 1 to 7.
9. An online operation monitoring system for cable branch boxes, characterized in that, include: The signal acquisition module is used to acquire the first high-frequency magnetic field signal and the second high-frequency magnetic field signal on both sides of the connection node to be monitored, as well as the power frequency current flowing through the connection node to be monitored. The source pulse separation module is used to divide the time window based on the zero-crossing time of the power frequency current, correct the propagation delay of the high-frequency magnetic field signals on both sides, eliminate the passing pulses, and retain the local source pulses propagating from the connection node to be monitored to both sides. The phase component generation module is used to construct the arc extinction component and the reignition component from the local source pulses before and after the current crosses zero, and normalize them with the current change rate at the current crossing zero point. The half-cycle pairing module is used to pair adjacent half-cycles of opposite polarity and form a connection state feature based on the repetition relationship between the arc extinguishing component and the reignition component. The status comparison module is used to compare the connection status characteristics with the effective reference band of the corresponding connection node and output the connection status and the location of the connection node when the switch topology remains unchanged and the load meets the comparability conditions.
10. A cable branch box, characterized in that, It includes a housing, a busbar installed inside the housing, at least two branch cables connected to the busbar, a connection node located between the busbar and the branch cables, two high-frequency magnetic field sensors respectively installed on both sides of the connection node with opposite sensing directions, a current sensor for collecting the power frequency current flowing through the connection node, and a monitoring controller. The monitoring controller is connected to two high-frequency magnetic field sensors and a current sensor respectively. It is used to separate the transit pulse and the local source pulse propagating from the connection node to both sides according to the arrival relationship of the two high-frequency magnetic field signals. The connection state characteristics are formed based on the repetition relationship between the arc extinction component, reignition component and opposite polarity half-cycle of the local source pulse relative to the zero crossing of the power frequency current. When the switch topology remains unchanged and the load meets the comparability conditions, the connection state characteristics are compared with the effective reference band of the corresponding connection node to determine the connection state of the connection node.