Sensor jump error separation and branch-and-bound least squares solution method and system

By using a hybrid integer programming model and branch-and-bound method, and leveraging null basis dimensionality reduction and least squares solution, the problem of separating integer periodic variables and continuous residual variables of sensors is solved, achieving efficient solution and satisfying the integer feasibility of the results and structural closure constraints.

CN123156249APending Publication Date: 2026-11-24WUHAN UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611190948.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-06
Publication Date
2026-11-24

Smart Images

  • Figure CN123156249A_ABST
    Figure CN123156249A_ABST
Patent Text Reader

Abstract

This invention discloses a least-squares solution method and system for sensor jump error separation and branch-bounding. The invention embeds a least-squares heuristic into the entire branch-bounding process: it uses the null basis of structural closure constraints to reduce the dimensionality of the variable space, thus reducing the scale of the continuous relaxation problem; before the search, it constructs initial integer candidate solutions through least-squares solving and integer feasibility repair, establishing an initial global upper bound; during the search process, it extracts the relaxation values ​​of discrete periodic components from the continuous relaxation solutions for each unpruned node and performs integer feasibility repair to generate candidate integer solutions, continuously improving the global upper bound. This invention reduces the number of node expansions and the running time, ensures strict satisfaction of integer feasibility and structural closure constraints, and the output can be directly used for signal compensation and closed-loop control of periodic phase measurement equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of sensor signal processing, measurement data inversion and computer optimization solution, and particularly relates to a sensor jump error separation and branch-bound least squares solution method and system. Background Technology

[0002] Due to limitations in physical measurement principles, clock synchronization, environmental disturbances, signal quantization, and processing algorithms, some sensors exhibit periodic jumps in their output signals, ranging from stable to integer-cycle abrupt changes back to stable. These jumps differ from ordinary random noise; their amplitude is often an integer multiple of a fixed physical reference. Simultaneously, equipment thermal noise, quantization errors, atmospheric delay, and multipath effects create continuous small residuals. If these two types of errors cannot be accurately separated, subsequent positioning, phase recovery, equipment calibration, or control commands will be deviated from their intended purpose.

[0003] Taking a long-baseline multi-station GNSS receiver as an example, the observation residual can be obtained by subtracting the double-difference geometric distance from the double-difference carrier phase, in meters. The integer variable represents the L1 carrier integer ambiguity, in cycles; the L1 carrier wavelength is approximately 0.1903 meters / cycle; continuous variables include ionospheric delay, tropospheric delay, multipath effects, and unmodeled residuals, in meters. Taking InSAR phase measurement as an example, the integer variable represents the number of winding cycles, in cycles, with a mapping coefficient of -2π radians / cycle; the continuous variable represents the phase residual, in radians. Both can be described by the following unified physical observation model: , ; , ; in, The observation residual vector formed by the measured value and the reference value, with the unit being meters in the GNSS scenario and radians in the InSAR scenario; The number of integer cycle jumps, whole-cycle ambiguity, or phase wrapping cycles, in cycles, and rounded to the nearest integer. For continuous residuals including thermal noise, quantization error, atmospheric delay, and multipath effects, the units are... Consistent, usually measured in meters or radians; The matrix mapping integer number of cycles to physical observations is approximately 0.1903 m / cycle in GNSS L1 and approximately [missing value] in InSAR. radians per revolution; The matrix that maps continuous physical error states to each observation channel is determined by the sensor layout, mapping function, or identity matrix; The network or loop closure constraint matrix is ​​an integer state, and the topological coefficients are dimensionless, with elements typically being -1, 0, or 1. , which is the normative constraint and residual closure constraint matrix for continuous states, and , which are dimensionless topological coefficients or coefficients that have been uniformly standardized. and They are respectively The lower and upper bounds of the value; and They are respectively and The i-th component; For the set of integers, It is the set of real numbers.

[0004] In the above model, and These are not purely mathematical constraints imposed by humans, but rather closure conditions of the equipment's physical structure: In a GNSS triangulation network, the sum of the integer ambiguities and residuals of the three orientation baselines for the same satellite should be zero; in an InSAR phase grid, the number of integer cycles accumulated along a predetermined direction for each basic loop and the phase residual should satisfy closure. These conditions can be used to eliminate spurious solutions that are inconsistent with the actual topology.

[0005] The difficulty of this problem lies in: integer periodic variables. Introducing combinatorial search, continuous residual variables It is also required to retain the numerical optimization structure in the least squares sense. If we directly exhaustively search... The search space increases rapidly with the dimensionality and range of variables; if only continuous least squares are performed and then simply rounded, it may disrupt the search. Even with structural constraints, the results may not correspond to smaller residual costs.

[0006] Currently, integer ambiguity resolution mainly employs three types of methods: The first type is the least squares rounding method, which solves the continuous solution by ignoring integer constraints, and then rounds the result element by element to obtain the integer solution. Although the calculation speed is fast, the rounding result often fails to meet the structural closure constraint and lacks global search capability, making it difficult to guarantee optimality. The second type is the ordinary branch and bound method, which solves the continuous relaxation problem at each node to obtain the lower bound and searches through branching and upper and lower bound pruning. However, when the initial upper bound is weak, the early pruning capability is insufficient, resulting in too many search nodes and a significant increase in solution time. The third type is the general mixed integer programming solver, which directly submits the problem as a general mixed integer programming model for solution. However, it fails to fully utilize the special structure of this problem, such as the dimensionality reduction of structural closure constraints and the rapid recovery of continuous noise variables after fixing periodic variables, resulting in limited solution efficiency.

[0007] Therefore, a method is needed that can deeply integrate the fast solution capability of least squares with the global search framework of branch and bound, so as to make full use of the structural features of the problem and improve the solution efficiency. Summary of the Invention

[0008] To address the challenges posed by existing least squares rounding methods that struggle to satisfy structural closure constraints, the excessive number of search nodes and increased solution time in ordinary branch-and-bound methods due to weak initial upper bounds, and the limited efficiency of general mixed-integer programming solvers that fail to fully utilize the unique structure of the problem, this invention provides a sensor jump error separation and branch-and-bound least squares solution method. This method reduces the dimensionality of the variable space by utilizing the null basis of structural closure constraints to decrease the solution scale of continuous relaxation subproblems. It constructs initial integer candidate solutions and initializes the global upper bound by solving continuous least squares problems and performing integer feasibility repair on continuous approximations. During the iterative search of the branch-and-bound method, it extracts the relaxation values ​​of discrete periodic components from the continuous relaxation solutions for each unpruned node and performs integer feasibility repair to generate candidate integer solutions, continuously improving the global upper bound. This effectively reduces the number of search nodes and solution time while ensuring integer feasibility and satisfaction of structural closure constraints, and outputs optimal estimates of discrete periodic components and continuous residual components that can be used for signal compensation in periodic phase measurement equipment.

[0009] According to one aspect of the present invention, a method for sensor jump error separation and branch-bound least squares solution is provided, comprising: obtaining the observation residual vector and system mapping matrix of a periodic phase measurement device, wherein the observation residual vector includes discrete periodic components and continuous residual components, and the system mapping matrix includes a first mapping matrix mapping the discrete periodic components to physical observations and a second mapping matrix mapping the continuous residual components to each observation channel; constructing a mixed integer programming model based on the observation residual vector and system mapping matrix, wherein the model aims to minimize the weighted sum of squares of the continuous residual components, and uses structural closure constraints and principal equality constraints corresponding to the discrete periodic components and the continuous residual components as constraints; calculating the null basis of the structural closure constraints, and using the null basis to reduce the dimensionality of the variable space of the mixed integer programming model; solving the continuous least squares problem based on the dimensionality-reduced mixed integer programming model to obtain initial continuous approximations of the discrete periodic components, and then... Initial continuous approximations are repaired using integer feasibility to obtain initial integer candidate solutions. A global upper bound is initialized based on these initial integer candidate solutions. The root node of the mixed integer programming model is added to the set of nodes to be processed, and an iterative search is performed. The iterative search stops when a preset termination condition is met, and the optimal estimates of the discrete periodic components and continuous residual components are output. The iterative search includes: solving the dimensionality-reduced continuous relaxation subproblem for the current node to obtain the lower bound and continuous relaxation solution for the current node; if the lower bound is greater than or equal to the global upper bound, the current node is pruned; if the lower bound is less than the global upper bound, the relaxation value of the discrete periodic component is extracted from the continuous relaxation solution, and integer feasibility repair is performed to generate candidate integer solutions for the current node. The current target value is calculated based on the candidate integer solutions, and if the current target value is less than the global upper bound, the global upper bound is updated; and branch variables are selected based on the deviation between the continuous relaxation solution and the integer feasible region, and two child nodes are generated and added to the set of nodes to be processed.

[0010] As a further technical solution, the variable space of the mixed integer programming model is reduced in dimensionality using a null basis, including: performing a linear transformation representation of the discrete periodic components using the first null basis of the first structural constraint matrix corresponding to the discrete periodic components, and performing a linear transformation representation of the continuous residual components using the second null basis of the second structural constraint matrix corresponding to the continuous residual components; constructing a dimension-reduced equality constraint matrix based on the result of the linear transformation representation, which is used to solve the continuous relaxation subproblems at each node.

[0011] As a further technical solution, the initial continuous approximation value is subjected to integer feasible repair to obtain an initial integer candidate solution, including: performing a rounding operation on each component in the initial continuous approximation value; restricting each rounded component to the upper and lower bounds of the discrete periodic component; projecting the solution vector after rounding and boundary restriction onto the feasible domain of the structural closure constraint corresponding to the discrete periodic component to obtain an initial integer candidate solution that satisfies the structural closure constraint condition; after fixing the initial integer candidate solution, the corresponding continuous residual component value is solved inversely under the structural closure constraint condition corresponding to the continuous residual component, and the objective function value is calculated based on the continuous residual component value, and the objective function value is used as the initial global upper bound.

[0012] As a further technical solution, the relaxation value is subjected to integer feasible repair to generate candidate integer solutions for the current node, including: extracting the component values ​​corresponding to the discrete periodic components from the continuous relaxation solutions of the current node; performing a rounding operation on each component value; performing boundary truncation processing on each rounded component according to the branch constraint boundary corresponding to the current node; repairing the solution vector after boundary truncation to the feasible region of the structural closure constraint corresponding to the discrete periodic component to generate candidate integer solutions for the current node; fixing the candidate integer solutions and restoring the corresponding continuous residual component values, and calculating the objective function value as the current objective value based on the continuous residual component values.

[0013] As a further technical solution, branch variables are selected based on the deviation between the continuous relaxation solution and the integer feasible region, including: calculating the absolute value of the deviation between each component of the discrete periodic component in the continuous relaxation solution and its nearest integer value; selecting the discrete periodic variable corresponding to the component with the largest absolute value of deviation as the branch variable; obtaining the current relaxation value of the branch variable in the continuous relaxation solution; when generating two child nodes, adding a first boundary constraint of not greater than the current relaxation value and a downward rounding value to the branch variable in one child node, and adding a second boundary constraint of not less than the current relaxation value and an upward rounding value to the branch variable in the other child node.

[0014] As a further technical solution, the structural closure constraint includes the sum of the periodic jump values ​​accumulated between stations or between pixels along the closed loop being zero, and the sum of the continuous residual values ​​accumulated along the closed loop being zero.

[0015] As a further technical solution, the projection of the feasible region of the structural closure constraint in the integer feasible repair is to project the solution vector of the discrete variable to be repaired onto the solution space of the homogeneous equation system of the structural constraint corresponding to the discrete periodic components using the least squares criterion.

[0016] As a further technical solution, it also includes: multiplying the optimal estimate of the discrete periodic component with the first mapping matrix to generate an integer correction amount; generating a corrected continuous signal based on the difference between the observation residual vector and the integer correction amount; and outputting the optimal estimate of the discrete periodic component, the optimal estimate of the continuous residual component, the integer correction amount, and the corrected continuous signal to the signal compensation module, state estimation module, or closed-loop control module of the periodic phase measurement device.

[0017] According to one aspect of the present invention, a sensor jump error separation and branch-bound least squares solution device is provided, comprising: one or more processors; a storage device for storing one or more programs; when the one or more programs are executed by the one or more processors, the one or more processors implement the sensor jump error separation and branch-bound least squares solution method.

[0018] According to one aspect of the present invention, a sensor jump error separation and branch-bound least squares solution system is provided, comprising: a data reading module for reading the observation residual vector and system mapping matrix of a periodic phase measurement device; a structure dimensionality reduction module for calculating the null basis of the structural closure constraints and reducing the dimensionality of the variable space; an initialization module for solving a continuous least squares problem and performing integer feasibility repair on continuous approximations to obtain initial integer candidate solutions and an initial global upper bound; a continuous relaxation solution module for solving the dimensionality-reduced continuous relaxation subproblems of the current node to obtain lower bounds and continuous relaxation solutions; a candidate solution repair module for performing integer feasibility repair on relaxation values ​​to generate candidate integer solutions and update the global upper bound when nodes are not pruned; a branch pruning control module for performing node pruning, selecting branch variables to generate child nodes, and controlling the iterative search; and a result output module for outputting the optimal estimates of discrete periodic components and continuous residual components.

[0019] Compared with the prior art, the beneficial effects of the present invention are as follows: (i) Significantly improves branch and bound search efficiency and reduces computational resource consumption. This invention establishes a strong initial global upper bound by constructing initial integer candidate solutions using least squares calculation and integer feasibility repair before the branch-and-bound search begins, enabling the search tree to possess strong pruning capabilities early on. During the iterative search process, for each unpruned node, the relaxation values ​​of discrete periodic components are extracted from the continuous relaxation solutions, and integer feasibility repair is performed to generate candidate integer solutions, continuously improving the global upper bound and ensuring that more nodes meet the pruning conditions. Experimental results show that, compared to the ordinary branch-and-bound method, the average number of expanded nodes in this invention is reduced from 60.35 to 12.45, a reduction of approximately 79.37%; the average running time is reduced from 85.31 ms to 49.83 ms, a reduction of approximately 41.59%, effectively reducing the processor's computational load and memory storage overhead.

[0020] (ii) Ensuring the feasibility of integers and the strict satisfaction of structural closure constraints. This invention performs integer feasibility repair operations in both the initialization and node repair stages—rounding the nodes, trunculating the boundaries, and projecting the solution onto the feasible region with structural closure constraints—ensuring that candidate solutions strictly satisfy integerity, boundary constraints, and structural closure constraints. Compared to existing methods that directly use least-squares rounding, this avoids the defect of unusable solutions due to breaking structural closure constraints, thus guaranteeing the validity of the output results in the physical topology.

[0021] (iii) Reuse the dimensionality reduction model among nodes to avoid redundant constraint calculations This invention utilizes the null basis of structural closure constraints to reduce the dimensionality of the variable space of a mixed-integer programming model, absorbing the structural closure constraints that were originally used as constraints into the variable expression. The dimensionality-reduced equality constraint matrix can be reused to solve the continuous relaxation subproblems of all nodes, and each node does not need to repeatedly process the structural closure constraints, thereby further reducing the computational scale of each node.

[0022] (iv) The ability to solve least squares problems quickly is built into the branch and bound framework, achieving a deep integration of the two methods. This invention directly embeds the fast solution capability of least squares into the node processing flow of branch and bound. By performing integer feasible repair at each unpruned node and continuously improving the global upper bound, it achieves a deep integration of local least squares optimization and global branch and bound search. It overcomes the shortcomings of using the least squares rounding method alone, which cannot guarantee global optimality, and the branch and bound method alone, which has insufficient initial pruning. It also makes full use of the special structure of the problem, which can reduce the dimensionality of structural closure constraints and can quickly recover continuous residual variables after fixing periodic variables. Compared with general mixed integer programming solvers, it has higher solution efficiency.

[0023] (v) The output results can be directly used for signal compensation and control on the equipment side. The optimal estimates of the discrete periodic components and continuous residual components output by this invention can be used to generate integer correction values ​​and restore the corrected continuous signal. They can be directly provided to the signal compensation module, state estimation module, or closed-loop control module of the periodic phase measurement equipment, realizing a complete link from data calculation to equipment physical control, and have clear technical implementation value. Attached Figure Description

[0024] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the accompanying drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the accompanying drawings described below are some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0025] Figure 1 This is a schematic diagram of a sensor periodic jump error separation and device control scenario provided in an embodiment of the present invention; Figure 2 A flowchart of the branch and bound method based on the least squares heuristic provided for embodiments of the present invention; Figure 3 This is a schematic diagram of structural constraint dimensionality reduction provided in an embodiment of the present invention; Figure 4 This is a flowchart of branch delimitation node processing provided in an embodiment of the present invention; Figure 5 This is a block diagram of a computer-implemented system module provided for an embodiment of the present invention. Detailed Implementation

[0026] It should be noted that: This invention addresses periodic phase measurement sensors in industrial monitoring and control systems, particularly suitable for GNSS receiver carrier phase integer ambiguity resolution, InSAR winding phase unwrapping, and other signal processing devices containing both integer periodic jumps and continuous measurement errors. To address the issues of potential disruption of physical closure constraints after continuous least-squares rounding, weak initial upper bounds in ordinary branch-and-bound methods, and the generation of numerous search nodes, a solution method embedding least-squares heuristics throughout the branch-and-bound process is proposed. This method utilizes the structural closure constraints of the station network or phase grid for null space dimensionality reduction. Before the search begins, initial integer candidate solutions are constructed, and at each search node, continuous relaxed solutions are repaired to candidate solutions satisfying integerity, boundary conditions, and physical closure, continuously improving the global upper bound and enhancing pruning. The obtained integer jump vector and continuous residuals are used to eliminate sensor integer periodic jumps, recover continuous phase signals, and output correction amounts and quality indicators to the positioning engine, phase recovery module, calibration module, or closed-loop controller.

[0027] The periodic phase measurement equipment includes, but is not limited to, GNSS receivers, interferometric synthetic aperture radar phase processing equipment, and periodic output sensors in industrial monitoring systems.

[0028] The terms “comprising” and “having”, and any variations thereof, in the specification, claims, and accompanying drawings of this invention are intended to cover a non-exclusive inclusion, such as a process, method, system, product, or apparatus that includes a series of steps or units, not necessarily limited to those explicitly listed, but may include other steps or units not explicitly listed or inherent to such processes, methods, products, or apparatus.

[0029] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention. In addition, the technical features of the various embodiments or individual embodiments provided by the present invention can be arbitrarily combined to form new technical solutions. Such combinations are not bound by the order of steps and / or structural composition patterns, but must be based on the ability of those skilled in the art to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection claimed by the present invention.

[0030] This invention aims to provide a method for efficiently separating periodic integer transitions and continuous measurement residuals of sensors while ensuring integerity, variable boundaries, and physical closure constraints of the equipment. This method combines least-squares heuristics with branch-and-bound global search to recover the integer periodic transition states and continuous residuals in the sensor signal, and provides the recovery results to signal compensation, state estimation, positioning calculation, or equipment control modules. Furthermore, the recovery results are used to generate the integer correction amount M1p, recover the corrected continuous signal dq-M1p, and then... Opt n Opt The objective function value and operational quality index are output to the sensor calibration module, GNSS positioning engine, InSAR phase recovery module or industrial controller, so that the purpose of the invention is realized in actual equipment signal compensation and state control, rather than just obtaining an abstract numerical solution.

[0031] The specific implementation of this invention can be described by referring to the following steps, in which error separation and parameter estimation of the observation residual vector output by the periodic phase measurement device are completed in a computer system. A GNSS receiver and an InSAR phase processing device are used as typical implementation objects, but the scope of application of this invention is not limited thereto.

[0032] The following reference Figures 1 to 4 The general implementation process of the present invention will be described below. Figure 1 In this process, the periodic phase measurement device outputs an observation signal containing integer period jumps and continuous measurement errors. After being processed by the error separation and calculation method of this invention, a correction signal is output to the signal compensation module, the state estimation module, or the closed-loop control module. Figure 2 The process includes four main stages: data acquisition and model building, null space dimensionality reduction of structural closure constraints, construction of initial global upper bound based on least squares, and branch and bound iterative search. The iterative search stage further includes continuous relaxation of nodes, pruning judgment, intra-node least squares heuristic repair and upper bound update, and selection of branch variables and generation of child nodes. Figure 3 It demonstrates that C1p=0 and C2n=0, after calculating the null space basis Z and N2 and representing them through linear transformations of p=Zx and n=N2y, are automatically accepted into the variable expression, and the subject observation equation is transformed into a dimensionality reduction process of Aeq z=dq. Figure 4 The process demonstrates that starting from the current node, the lower bound and relaxed solution are obtained by solving consecutive relaxed subproblems. If the lower bound is greater than or equal to the global upper bound, the node is pruned. If the lower bound is less than the global upper bound, the least squares heuristic repair is performed to generate candidate integer solutions and update the global upper bound. Then, two child nodes are generated and added to the set of nodes to be processed.

[0033] First, sensor measurements and reference values ​​are collected to form the observation residual vector. And complete the calibration according to the physical units of the equipment. The unit is meters in GNSS scenarios and radians in InSAR scenarios. It includes discrete periodic components generated by integer periodic transitions and continuous residual components generated by measurement errors. The discrete periodic components correspond to L1 carrier integer ambiguity in GNSS and the number of winding periods in InSAR. The continuous residual components include ionospheric delay, tropospheric delay, multipath effects, and unmodeled residuals.

[0034] Secondly, a first mapping matrix is ​​constructed based on the sensor response, network topology, or phase grid. Second mapping matrix and the first structural constraint matrix Second structural constraint matrix And set discrete periodic components The upper and lower bounds of the value and and three standard deviations of the continuous error of each observation channel. (i.e., three_sigma_i). Mapping the integer number of cycles to physical observations yields approximately 0.1903 m / cycle in GNSS L1 and -2π radians / cycle in InSAR; The continuous physical error state is mapped to each observation channel, which is determined by the sensor layout, mapping function, or identity matrix. For network or loop closure constraint matrices with integer states, This is the normal constraint and residual closure constraint matrix for continuous states, both of which are dimensionless topological coefficients, with elements typically being... .

[0035] The constructed matrix and the set parameters constitute a mixed-integer programming model, namely the following weighted mixed-integer least squares model: ; ; ; Where m is the number of observation channels; For continuous residual vectors The i-th component; The scale is three standard deviations for the i-th observation channel, with units equal to... Consistent; For discrete periodic component vectors, Let i be its i-th component. The objective function normalizes channels with different dimensions and noise levels. The smaller the value, the higher the reliability of the channel, and the greater the penalty for residuals of the same magnitude.

[0036] The third step is to calculate separately. and null space basis and ,make , and order .thus and This automatically holds true in the variable representation, and the subject observation equation is transformed into... ,in Continuous node relaxation only requires processing the dimensionality-reduced variables and the current node boundary, reducing redundant constraint calculations.

[0037] The fourth step is to solve the continuous least squares problem to obtain the discrete periodic components. The continuous approximate positions; perform rounding, upper and lower bound truncation and... Closure constraint repair yields initial integer candidate solutions. .fixed Afterwards, Recovery of continuous residual components under certain conditions Calculate the objective function value This value is used to establish the initial global upper bound.

[0038] The fifth step is to establish the root node for branch and bound and add it to the set of nodes to be processed. During the branch and bound search process, each node corresponds to a set of upper and lower bounds for the shrunken discrete periodic component p. For the current node, p is temporarily treated as a continuous variable, and the continuous relaxation problem after dimensionality reduction is solved to obtain the lower bound of the node and the node relaxation solution. If a node is infeasible or its lower bound is not better than the current global upper bound, prune it immediately.

[0039] Step 6: For nodes that have not been pruned, relax the nodes. Extracting discrete periodic components The relaxation value is used to perform rounding, boundary truncation, and... Structural closure repair, forming candidate integer solutions for nodes. Then fix Later Recovery under conditions If a candidate solution is feasible and the objective value is better, then update the global upper bound.

[0040] Step 7: When the node relaxation solution does not yet satisfy integer property, select the solution with a larger non-integer deviation. As a branch variable, generate and The two child nodes are added to the set of nodes to be processed.

[0041] Step 8: Repeat the node selection, continuous relaxation solution, least squares heuristic repair, upper bound update, pruning and branching steps until the node queue is empty, the time limit is reached, or the difference between the upper and lower bounds meets the accuracy requirements.

[0042] Step 9, Output , , Calculate the number of nodes, the number of prunings, and whether a timeout occurred, and calculate the integer correction amount. and correction signal The equipment side inputs this correction signal into positioning, phase recovery, calibration, alarm, or closed-loop control circuits.

[0043] To visually illustrate the above steps, a two-dimensional desensitization example consistent with the GNSS L1 integer mapping scale is constructed. Two directional observation channels form a closed pair. and The unit is meters. The unit is week.

[0044] Example input: .

[0045] The continuous relaxed least squares solution is , After rounding, boundary checks, and... After closure repair, initial integer candidate solutions are obtained. .fixed After recovery of continuous residual components objective function .

[0046] The processing conclusions for each node are as follows: Root node: Continuous value approximately 2.2070, lower bound 0, and so on. Branch.

[0047] Left child node: ,get The target value is 0.8627, which is feasible as an integer and consistent with the current best value, so we terminate this node.

[0048] Right child node: , optimal The target value is approximately 12.6505, which is not better than the global upper bound of 0.8627. Prune according to the bound.

[0049] This example processes 3 nodes in total. One node undergoes bounded pruning, and the process terminates at the next node when an integer feasible solution is found. Final output: , , the whole week correction amount The corrected continuous signal is .

[0050] Preferably, this embodiment uses a GNSS receiver as an example for explanation. In a long-baseline multi-station GNSS scenario, multiple receivers output GPS L1 double-difference carrier phase. Defined as the double-difference carrier phase observation value minus the double-difference geometric distance calculated from the precise ephemeris, in meters; For each directional baseline and each non-reference satellite, the integer ambiguity is expressed in weeks. , ( Approximately 0.1903 meters per week); It consists of ionospheric delay, tropospheric delay, and residual error, and is measured in meters.

[0051] Ambiguity closure of a GNSS station triangulation network: In a GNSS station triangulation network, the sum of the integer ambiguities and residuals of the three orientation baselines for the same satellite should be zero. Express atmospheric state constraints and residual closure.

[0052] During implementation, pseudorange and carrier phase observations of each station are first acquired. Satellite clock errors and receiver clock errors are then eliminated through double-difference processing to form the observation residual vector. Then, following the steps of the general implementation process, structural constraint dimensionality reduction, least squares initialization, and branch-bound iterative search are completed sequentially. The results are obtained. Afterwards, the GNSS positioning engine was eliminated. and utilize Continuous error compensation is performed to improve baseline calculation and positioning status estimation.

[0053] Preferably, this embodiment uses InSAR phase unfolding as an example for explanation. In the InSAR phase grid, The wrapped phase gradient between adjacent pixels, in radians; The integer number of winding cycles for each grid edge, in cycles; , . and Constructed by the directed edge association relationship of each basic pixel loop, it is used to ensure that the integer number of cycles and the continuous phase residual are closed along the loop: In the InSAR phase grid, the integer number of cycles and the phase residual accumulated along the predetermined direction of each basic loop should satisfy the closure.

[0054] In practice, the winding phase gradient is first extracted from the interferometric phase of the two SAR images to form the observation residual vector. Then, following the steps of the general implementation process, structural constraint dimensionality reduction, least squares initialization, and branch-bound iterative search are completed sequentially. The results are obtained. Then, use The continuous phase gradient is recovered and then integrated to generate an expanded phase map.

[0055] The method of this invention can be implemented in a computer system. For example... Figure 5 As shown, the system includes the following modules: Data reading module: Receives sensor measurements, reference values, and channel quality information, and forms... and .

[0056] Structural Dimensionality Reduction Module: Construction , , , ,calculate null space basis and null space basis Construct the dimensionality-reduced equality constraint matrix .

[0057] Least Squares Initialization Module: Solves continuous least squares problems, performs rounding, boundary truncation, and structural closure constraint repair on continuous approximate solutions, and generates... , and the initial global upper bound.

[0058] Continuous relaxation solution module: solves the continuous relaxation problem for each branch bound node, and obtains the lower bound of the node and the node relaxation solution.

[0059] Candidate solution repair module: extracts solutions from node relaxation solutions. The relaxation value is used to perform rounding, truncation, and... Closure repair and continuous residual recovery are used to form candidate integer solutions and update the global upper bound.

[0060] Branch pruning control module: Maintains node queue, upper and lower bounds, termination conditions and running statistics, and performs pruning judgments and branch variable selection.

[0061] Result Output Module: Output , The integer correction amount, correction signal and quality indicators are sent to the positioning, phase recovery, calibration or control module.

[0062] The sensor jump error separation and branch-bound least squares solution method provided by this invention can be deployed on various hardware platforms, including but not limited to GNSS receivers, InSAR phase processing equipment, industrial monitoring terminals, UAV positioning modules, and vehicle-mounted positioning terminals. The following description uses typical equipment configurations as examples.

[0063] The device embodiment of the present invention includes a signal receiving unit, a data processing unit, a storage unit, and an output interface unit.

[0064] The signal receiving unit is used to receive the observation signal output by the periodic phase measurement equipment. Depending on the type of equipment, the signal receiving unit may include a GNSS RF front-end module, an InSAR data interface module, or an industrial sensor acquisition module, and its output is a pre-processed observation residual vector and channel quality information.

[0065] The data processing unit is the computing core of the device and can be implemented by one or more processors. Processor types include, but are not limited to, digital signal processors, general-purpose microprocessors, embedded processors, graphics processing units, or field-programmable gate arrays. The data processing unit executes the following steps of the method of this invention: constructing a mixed-integer programming model; calculating the null basis of the structural closure constraints and reducing the dimensionality of the variable space; solving the continuous least squares problem based on the dimensionality-reduced model and obtaining initial continuous approximations of the discrete periodic components; performing integer feasibility repair on the initial continuous approximations to obtain initial integer candidate solutions and initializing the global upper bound based on the initial integer candidate solutions; adding the root node to the set of nodes to be processed and then performing a branch-and-bound iterative search; during the iterative search process, extracting the relaxation value of the discrete periodic components from the continuous relaxation solution for each unpruned node and performing integer feasibility repair to generate candidate integer solutions and continuously improve the global upper bound; and outputting the optimal estimates of the discrete periodic components and continuous residual components.

[0066] The storage unit is used to store computer programs executed by the data processing unit, as well as intermediate data and final results during the data processing process. The storage unit can be non-volatile memory or volatile memory, including but not limited to read-only memory, flash memory, random access memory, hard disk or solid-state drive.

[0067] The output interface unit is used to output the optimal estimate obtained by the data processing unit to external devices via wired or wireless means. External devices include signal compensation modules, state estimation modules, or closed-loop control modules. Output interface types include serial peripheral interfaces, universal asynchronous transceivers, controller area network interfaces, Ethernet interfaces, or wireless communication interfaces.

[0068] In a specific application, the device is a GNSS receiver, whose signal receiving unit is a GNSS RF front-end, data processing unit is an embedded processor, storage unit is flash memory and random access memory, output interface is a universal asynchronous transceiver interface or a controller area network interface, and external device is a GNSS positioning engine. The double-difference carrier phase observations output by the GNSS receiver are processed by the data processing unit using the method of this invention to obtain a fixed integer ambiguity solution and a continuous error estimate, which are then output to the GNSS positioning engine for centimeter-level positioning calculation.

[0069] In another specific application, the device is an industrial monitoring terminal, whose signal receiving unit is an industrial sensor acquisition module, data processing unit is a digital signal processor, storage unit is a non-volatile memory, output interface is an Ethernet interface or a wireless communication interface, and external device is an industrial controller. The periodic phase measurement value output by the industrial monitoring terminal is processed by the data processing unit using the method of this invention to obtain the periodic jump error separation result and the continuous residual estimate, which are then output to the industrial controller for equipment condition monitoring or closed-loop control.

[0070] Those skilled in the art should understand that the above-described device embodiments are merely preferred embodiments of the present invention and are not intended to limit the present invention. The specific type of data processing unit, the specific form of storage unit, and the specific type of output interface can all be adjusted according to actual application scenarios. The specific structure of the device and the program deployment method can be appropriately modified and replaced by those skilled in the art without departing from the concept of the present invention, and all such modifications and replacements fall within the protection scope of the present invention.

[0071] Through the above implementation methods, this invention can efficiently separate the periodic integer jumps of sensors from continuous measurement residuals while ensuring integerity, variable boundaries, and physical closure constraints of the equipment. Experimental results show that, compared with the ordinary branch-and-bound method, the average number of expanded nodes in this invention is reduced from 60.35 to 12.45, a reduction of approximately 79.37%; the average runtime is reduced from 85.31 ms to 49.83 ms, a reduction of approximately 41.59%, effectively reducing the processor's computational load and memory storage overhead. The solution results are used to generate the integer correction amount. , Restore the continuous signal after correction and will , The objective function value and operational quality indicators are output to the sensor calibration module, GNSS positioning engine, InSAR phase recovery module, or industrial controller, thereby implementing the solution results into actual equipment signal compensation and state control. Furthermore, this invention automatically satisfies the physical closure condition through zero-space dimensionality reduction of C1 and C2, avoiding topological inconsistencies caused by simple rounding; the output can be directly used to eliminate sensor integer jumps and restore continuous measurement signals.

[0072] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, and not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some or all of the technical features therein; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the technical solutions of the embodiments of the present invention.

Claims

1. A sensor jump error separation and branch-and-bound least squares solution method, characterized by, include: The observation residual vector and system mapping matrix of the periodic phase measurement device are obtained. The observation residual vector includes discrete periodic components and continuous residual components. The system mapping matrix includes a first mapping matrix that maps the discrete periodic components to physical observations and a second mapping matrix that maps the continuous residual components to each observation channel. A mixed integer programming model is constructed based on the observed residual vector and the system mapping matrix. The model aims to minimize the weighted sum of squares of the continuous residual components, and is constrained by the structural closure constraints and principal equality constraints corresponding to the discrete periodic components and the continuous residual components, respectively. Calculate the null basis of the structural closure constraints, and use the null basis to reduce the dimensionality of the variable space of the mixed integer programming model; Solving the continuous least squares problem based on the dimensionality-reduced mixed integer programming model, obtaining initial continuous approximations of discrete periodic components, performing integer feasible repair on the initial continuous approximations to obtain initial integer candidate solutions, and initializing the global upper bound based on the initial integer candidate solutions; After adding the root node of the mixed integer programming model to the set of nodes to be processed, perform iterative search, and stop iterative search when the preset termination condition is met, and output the optimal estimates of discrete periodic components and continuous residual components. The iterative search includes: Solve the dimension-reduced continuous relaxed subproblem for the current node to obtain the lower bound and continuous relaxed solution for the current node; If the lower bound is greater than or equal to the global upper bound, then prune the current node; If the lower bound is less than the global upper bound, then the relaxation value of the discrete periodic component is extracted from the continuous relaxation solution, and integer feasible repair is performed to generate candidate integer solutions for the current node. The current target value is calculated based on the candidate integer solutions. If the current target value is less than the global upper bound, the global upper bound is updated. Then, based on the deviation between the continuous relaxation solution and the integer feasible region, branch variables are selected and two child nodes are generated and added to the set of nodes to be processed.

2. The sensor jump error separation and branch and bound least squares solution method of claim 1, wherein, Dimensionality reduction of the variable space in a mixed-integer programming model is achieved using a null basis, including: The discrete periodic components are represented by a linear transformation using the first null basis of the first structural constraint matrix corresponding to the discrete periodic components, and the continuous residual components are represented by a linear transformation using the second null basis of the second structural constraint matrix corresponding to the continuous residual components. Based on the result of the linear transformation, a dimension-reduced equality constraint matrix is ​​constructed for solving the continuous relaxation subproblem at each node.

3. The sensor jump error separation and branch-and-bound least squares solution method of claim 1, wherein, Performing integer feasibility repair on the initial continuous approximation values ​​yields initial integer candidate solutions, including: Perform a rounding operation on each component of the initial continuous approximation; The rounded components are restricted to the upper and lower bounds of the discrete periodic components. The solution vector, after rounding and boundary constraints, is projected into the feasible region of the structural closure constraint corresponding to the discrete periodic component to obtain the initial integer candidate solution that satisfies the structural closure constraint condition. After fixing the initial integer candidate solutions, the corresponding continuous residual component values ​​are obtained by inverse solving under the structural closure constraints corresponding to the continuous residual components, and the objective function value is calculated based on the continuous residual component values, with the objective function value as the initial global upper bound.

4. The sensor jump error separation and branch and bound least squares solution method of claim 1 wherein, Performing integer feasibility repair on the relaxation value to generate candidate integer solutions for the current node includes: Extract the values ​​of each component corresponding to the discrete periodic component from the continuous relaxation solution of the current node; Perform integer operations on each component value; Based on the branch constraint boundary corresponding to the current node, perform boundary truncation on each rounded component. The solution vector after boundary truncation is restored to the feasible region of the structural closure constraint corresponding to the discrete periodic component, and candidate integer solutions for the current node are generated. After fixing the candidate integer solutions, the corresponding continuous residual component values ​​are restored, and the objective function value is calculated based on the continuous residual component values ​​as the current objective value.

5. The sensor jump error separation and branch-and-bound least squares solution method of claim 1, wherein, Branch variables are selected based on the deviation between the continuous relaxation solution and the integer feasible region, including: Calculate the absolute value of the deviation between each component of the discrete periodic component in the continuous relaxation solution and its nearest integer value; Select the discrete periodic variable corresponding to the component with the largest absolute value of deviation as the branch variable; Get the current relaxation value of the branch variable in the continuous relaxation solution; When generating two child nodes, add a first boundary constraint of not greater than the current relaxation value and rounded down to the branch variable in one child node, and add a second boundary constraint of not less than the current relaxation value and rounded up to the branch variable in the other child node.

6. The sensor jump error separation and branch and bound least squares solution method of claim 1 wherein, The structural closure constraint includes the sum of the periodic jump values ​​accumulated along the closed loop between stations or between pixels being zero, and the sum of the continuous residual values ​​accumulated along the closed loop being zero.

7. The sensor jump error separation and branch-and-bound least squares solution method of claim 1, wherein, The projection of the feasible region of the structural closure constraint in the integer feasible repair is to project the solution vector of the discrete variable to be repaired onto the solution space of the homogeneous equation system of the structural constraint corresponding to the discrete periodic components using the least squares criterion.

8. The sensor jump error separation and branch and bound least squares solution method of claim 1 wherein, Also includes: The integer correction is generated by multiplying the optimal estimate of the discrete periodic component with the first mapping matrix. The corrected continuous signal is generated based on the difference between the observed residual vector and the integer correction amount; The optimal estimates of the discrete periodic components, the optimal estimates of the continuous residual components, the integer correction, and the corrected continuous signal are output to the signal compensation module, state estimation module, or closed-loop control module of the periodic phase measurement device.

9. A sensor jump error separation and branch and bound least squares solver device, characterized by, include: One or more processors; Storage device for storing one or more programs; When the one or more programs are executed by the one or more processors, the one or more processors implement a sensor jump error separation and branch-bound least squares solution method as described in any one of claims 1 to 8.

10. A sensor jump error separation and branch and bound least squares solution system, characterized by, include: The data reading module is used to read the observation residual vector and system mapping matrix of the periodic phase measurement equipment; The structural dimensionality reduction module is used to calculate the null basis of structural closure constraints and reduce the dimensionality of the variable space; The initialization module is used to solve the continuous least squares problem and perform integer feasibility repair on the continuous approximations to obtain the initial integer candidate solutions and the initial global upper bound. The continuous relaxation solution module is used to solve the dimensionality-reduced continuous relaxation subproblem of the current node to obtain the lower bound and continuous relaxation solution; The candidate solution repair module is used to perform integer feasible repair on relaxation values ​​when nodes are not pruned in order to generate candidate integer solutions and update the global upper bound. The branch pruning control module is used to perform node pruning, select branch variables to generate child nodes, and control iterative search. The results output module is used to output the optimal estimates of the discrete periodic components and the continuous residual components.