A method and system for controlling a multi-process roll cylinder field bus

By using a unified control method based on workpiece status tokens and process constraint diagrams, the problem of data dispersion caused by differences in equipment protocols in roller production was solved. This enabled reliable transmission of equipment collaboration and quality constraints, reduced the risk of erroneous release, shortened the abnormal closed-loop time, and stabilized production quality.

CN123156785APending Publication Date: 2026-11-24DONGHAI COUNTY AGRICULTURAL MACHINERY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611425983.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-15
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

In the existing technology, the controllers, communication protocols and program management methods of heterogeneous equipment in the roller production process are very different, which leads to the dispersion of process parameters, quality measurement and alarm information, making it difficult to form a continuous state. Moreover, when the identification code reading event is misaligned or delayed with the equipment completion event, subsequent processes may still be released incorrectly, resulting in the break of the traceability chain, the extension of the delivery cycle and quality fluctuations.

Method used

By using workpiece status tokens and process constraint diagrams, the data of each workstation is unified into process events that can be submitted or are pending. The control status is verified and advanced using dual anchors and previous event summaries. After the event is submitted, the remaining quality constraint package is recursively calculated and intersected with equipment capacity, flow constraints, and execution resolution to form workstation-parameter permission and handle abnormal tasks.

Benefits of technology

It achieves unified and collaborative control of multi-protocol device data, reduces the risk of false releases caused by code misalignment and signal loss, ensures that scheduling results simultaneously meet subsequent quality budgets and equipment execution boundaries, shortens abnormal loop closure time, and suppresses cross-process quality fluctuations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123156785A_ABST
    Figure CN123156785A_ABST
Patent Text Reader

Abstract

This invention discloses a fieldbus control method and system for multi-process roller operation. It establishes a workpiece-by-workpiece status token and process constraint diagram, converting heterogeneous equipment data into unified process events. Dual-anchor verification is performed using workpiece identity anchors, equipment completion anchors, and preceding event summaries, with supplementary verification and replay in case of verification failure. Remaining quality constraint packages are recursively generated based on submitted events, and their intersection with equipment capabilities and flow constraints forms a candidate workstation-parameter feasible set, which is then issued with versioned permission and control parameters. Based on empty sets, invalid data, or execution anomalies, the system enters retesting, rework, isolation, or scrapping branches. Thus, scheduling, control, anomaly handling, and traceability are driven by the same workpiece status.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of industrial automation control and intelligent manufacturing, and in particular to a fieldbus control method and system for multi-process roller control. Background Technology

[0002] Roller production typically involves CNC turning, machining center processing, stamping, dynamic balancing, shot blasting, powder coating, and high-frequency heating processes sequentially or in combination. Different equipment uses different controllers, communication protocols, and program or formula management methods. Process parameters, quality measurements, and alarm information are scattered across various workstations, making it difficult to establish a continuous process focused on individual rollers.

[0003] Existing line control typically focuses on equipment networking or issuing tasks according to fixed process routes. However, differences in cycle time between workstations, buffer and transportation status, and cross-process quality transfer relationships are not uniformly incorporated into piece-by-piece approval judgments. When identification code reading events are misaligned, delayed, or missing from equipment completion events, subsequent processes may still incorrectly release items. When quality deviations accumulate or equipment capacity is insufficient, it is also difficult to recalculate unstarted tasks in a timely manner and select retesting, rework, isolation, or scrapping branches, resulting in broken traceability chains, extended delivery cycles, and quality fluctuations.

[0004] Therefore, there is a need for a fieldbus control method and system for multi-process roller control that can overcome the shortcomings of the existing technology. Summary of the Invention

[0005] The purpose of this invention is to provide a fieldbus control method and system for multi-process roller control, addressing the problems of inconsistent protocols and process data among heterogeneous equipment, unreliable correspondence between individual piece identity and equipment completion status, inability to continuously transmit quality constraints across processes, and inability to handle abnormal tasks in a coordinated manner. This method uses workpiece status tokens and process constraint diagrams as individual piece status carriers, unifying data from each workstation into process events that can be submitted or are pending. It advances the control status by verifying the status with dual anchors and preceding event summaries, and uses a supplementary verification window to recover late or missing evidence. After event submission, it recursively calculates the remaining quality constraint package, intersecting it with equipment capabilities, flow constraints, standard recipes, and execution resolution to form a workstation-parameter permission, and drives abnormal branches and task recalculation based on the verification, intersection, and execution results.

[0006] This invention provides a fieldbus control method for multi-process drum operation, comprising: S1. Based on the single-piece identification and process route of the roller, establish the workpiece status token and initial process constraint diagram. Collect station data through multi-protocol device adaptation edge nodes and convert it into pending unified process events associated with the workpiece status token, forming workpiece identity anchor and equipment completion anchor. S2. Verify the process and timing of the two anchors within the matching time window, and verify the summary of the preceding events of the pending unified process event and the latest submitted event summary stored in the workpiece status token. Convert the pending unified process event that has passed the verification into a submitted event. If the verification fails, freeze the next process permission, supplement the missing evidence and re-verify. If the re-verification still fails, enter the abnormal flow. S3. Update the process constraint diagram based on the submitted events, and generate a piece-by-piece remaining quality constraint package based on the current measured quality, cross-process quality transfer relationship and finished product quality limit; S4. Map the candidate equipment capacity constraints, workpiece flow constraints and remaining quality constraints to the candidate station-parameter space and find their intersection to form a candidate station-parameter feasible set. Project the standard recipe to the candidate station-parameter feasible set to generate the target station permission and control parameters. S5. Update the workpiece status token and remaining quality constraint package based on the execution results of the target workstation; stop normal flow when re-verification fails, the candidate workstation-parameter feasible set is empty, or execution is abnormal, adjust the affected unstarted tasks, and store piece-by-piece traceability data.

[0007] Optionally, S1 includes: the workpiece status token includes a single piece identifier, a batch identifier, a process route version, the current process, the current status, and the initial quality tolerance; The multi-protocol device adapter edge nodes are connected to CNC lathes, machining centers, stamping equipment, dynamic balancing equipment, shot blasting equipment, powder coating equipment, and high-frequency heating equipment, respectively, and map the equipment status, program version or formula version, process parameters, quality measurement values, alarm signals, and workstation events to the workstation data; The pending unified process event includes a single item identifier, process identifier, equipment identifier, parameter version, acquisition time, parameter vector, quality vector, validity flag, and summary of preceding events.

[0008] Optionally, S2 includes: the workpiece identity anchor includes a single piece identifier, a process identifier, a code reading position, and a code reading time; the equipment completion anchor includes an equipment identifier, a process identifier, a program version or recipe version, a completion edge, a parameter summary, and a completion time. The matching time window is determined by the upper limit of the cycle time of the corresponding process, the upper limit of the transportation time from the code reading position to the equipment position, and the upper limit of the clock deviation of the edge node. When the process identifiers of the two anchors are the same, the time difference between the two anchors is within the matching time window, and the summary of the preceding event is the same as the latest submitted event summary stored in the workpiece status token, the pending unified process event is converted into a submitted event, and the local monotonic sequence number of the submitted event is written into the workpiece status token. Furthermore, it also includes: based on the missing anchor field or summary field when the verification fails, retrieving signals in reverse along the signal index and the transmission edge connected to the corresponding process node in the process constraint diagram, and determining the signal combination that can cover all missing fields and cannot cover all missing fields after deleting any signal as the relevant signal set; In the edge cache, a supplementary verification window is opened, and the sampling period of the relevant signal set is switched to a supplementary verification sampling period that is smaller than the normal sampling period. Workstation data that arrives after the completion time of the device's anchor characterization and before the end of the supplementary verification window is received. The multi-protocol device adapts the edge node to assign local monotonic sequence numbers to the pending unified process event and the supplemented workstation data according to the arrival order of the workstation data. According to the local monotonic sequence number, the supplemented workstation data is inserted after the corresponding pending unified process event and the anchor verification and summary verification are re-executed. At the same time, supplementary signal records and replay verification results are generated.

[0009] Optionally, S3 includes: the initial process constraint diagram uses process nodes to represent process inputs, equipment capability boundaries and quality status, uses directed edges to represent process sequence dependencies, cross-process quality transfer relationships and buffering or transportation relationships, and establishes a signal index for each process node to generate the equipment signal and acquisition signal corresponding to the process field; Extract the quality vector from the submitted event, pass the current quality deviation to the subsequent process node according to the cross-process quality transfer relationship, and record the available interval obtained by deducting the quality deviation and its subsequent transfer amount from the finished product quality limit as the remaining quality constraint package; The remaining quality constraint package includes at least the applicable single-piece identifier, current process, quality component boundary, constraint source, constraint package version, and validity status; Furthermore, it also includes: decomposing the mass vector into size and shape components, residual imbalance components, surface state components, coating components, and heat treatment components; For each quality component, the finished product limit and the transfer coefficient from the completed process to the uncompleted process are read from the process constraint diagram. The deviations that have occurred are converted into finished product occupancy according to the transfer coefficient. The remaining budget for the quality component is obtained by subtracting the cumulative finished product occupancy from the finished product limit. Write the remaining budget, corresponding transfer coefficient version, and submitted event summary of each mass component into the new version of the remaining mass constraint package, so that the new version of the remaining mass constraint package replaces the old version and serves as the input for step S4.

[0010] Optionally, S4 includes: forming a set of equipment capabilities based on the range of processable parameters, parameter execution resolution, and quality capability boundaries of the candidate equipment for the current process; forming a set of flow constraints based on process dependencies, buffer status, transportation status, and expected completion time; mapping the set of equipment capabilities, the set of flow constraints, and the quality component boundaries of the remaining quality constraint package to the candidate station-parameter space and intersecting them to obtain the feasible set of candidate station-parameters. The version identifier of the process route is read as the process route version. A standard formula with a formula reference version is selected from the approved formula library associated with the process route version. The current program version or formula version of the candidate equipment is read. According to the pre-stored version compatibility mapping, each control parameter of the standard formula is converted into the projection reference of the corresponding candidate equipment. The parameter point with the smallest deviation from the projection reference is determined in the candidate station-parameter feasible set. The parameter point is discretized and corrected according to the parameter execution resolution of the corresponding equipment to form the control parameters. Furthermore, it also includes: the target workstation permit includes a single-piece identifier, a target equipment identifier, a target process identifier, control parameters, parameter allowable ranges, a recipe baseline version, a program version or recipe version of the candidate equipment, a remaining quality constraint package version, a summary of preceding events, a permit validity period, and a permit status; Before the device executes, check whether the recipe baseline version and the program version or recipe version of the candidate device conform to the version compatibility mapping, and check the version of the remaining quality constraint package and the summary of the preceding events. If the versions are compatible and both of the latter two are consistent with the current values ​​saved by the edge node and the license validity period has not expired, issue the control parameters. If any one of them does not meet the requirements, set the license status to frozen and re-form the candidate workstation-parameter feasible set.

[0011] Optionally, S5 includes: the target workstation permission includes a parameter allowance range; When the parameter vector of the execution result is within the parameter allowable range and the mass vector is within the mass component boundary of the remaining mass constraint package, the execution result is submitted and the workpiece is allowed to proceed to the next process. If the re-verification still fails, an exception handling instruction is generated, indicating that the data validity flag is invalid, the submitted event has not been obtained, or the evidence is missing, and the process enters the retesting branch. When the candidate workstation-parameter feasible set is empty, an empty set reason code is generated. When the empty set reason code indicates insufficient equipment capacity or flow constraint conflict, the rework branch is entered. When the empty set reason code indicates insufficient quality budget, the isolation branch is entered. When the execution abnormal information characterization device alarms or the parameter vector exceeds the parameter allowable range, the rework branch is entered; when the execution abnormal information characterization quality vector exceeds the quality component boundary, the isolation branch is entered; and when there is still no candidate workstation-parameter feasible set after retesting or rework, the scrap branch is generated. When multiple abnormal conditions are met simultaneously, the branch selected first is chosen in the order of scrapped branch, isolated branch, reworked branch, and retested branch. Search along the process constraint diagram for tasks that have not yet started but have abnormal process nodes as their predecessor nodes, and mark the found tasks as canceled or recalculated with the updated remaining quality constraint package. The item-by-item traceability data includes dual-anchor verification results, supplementary signal records and replay verification results, remaining quality constraint package versions, target workstation permits, and execution results.

[0012] On the other hand, the present invention also provides a roller multi-process fieldbus control system, comprising: The event construction module is used to establish workpiece status tokens and initial process constraint diagrams, collect station data, generate pending unified process events, and establish workpiece identity anchors and equipment completion anchors. The event verification module is used to verify the two anchors and the summary of the preceding event, and submit the event or generate anomaly handling instructions. The quality constraint module is used to update the process constraint diagram and recursively generate the remaining quality constraint package. The station control module is used to form a candidate station-parameter feasible set and output the target station permission, control parameters, or empty set reason code. The status transition module is used to update the workpiece status tokens and remaining quality constraint packages according to the execution results, associate and store traceability data, stop normal transition, generate abnormal process routes, and cancel or recalculate affected unstarted tasks.

[0013] The beneficial effects of this invention are: 1. By mapping multi-protocol device data to unified process events associated with individual piece identifiers, and recording process, quality, and traceability status by the same workpiece status token, CNC lathes, machining centers, stamping, dynamic balancing, shot blasting, powder coating, and high-frequency heating equipment can collaborate under a unified semantic framework.

[0014] 2. By jointly verifying the workpiece identity anchor, equipment completion anchor, and preceding event summary, as well as supplementing the missing field with the minimum relevant signal and replaying the local monotonic sequence number, the risk of mis-release caused by code reading misalignment, event delay, or signal loss is reduced, and a verifiable chain of evidence is preserved.

[0015] 3. By recursively calculating the remaining quality constraint package for each item and intersecting it with the equipment capacity, flow constraints, and executable parameter range, the scheduling result can simultaneously satisfy the subsequent quality budget and the equipment execution boundary. When the feasible set is empty or execution is abnormal, the task is entered into the retest, rework, isolation, or scrap branch according to the cause and the affected task is processed, thereby shortening the abnormal closed-loop time and suppressing cross-process quality fluctuations. Attached Figure Description

[0016] The accompanying drawings are provided to further illustrate the invention and form part of the specification. They are used in conjunction with embodiments of the invention to explain the invention and do not constitute a limitation thereof. In the drawings: Figure 1 This is a flowchart of the multi-process fieldbus control method for drums according to the present invention.

[0017] Figure 2 This is a flowchart of the S3 residual mass constraint package recursive generation method of the present invention. Detailed Implementation

[0018] The present invention will now be described in further detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, illustrating only the basic structure of the invention, and therefore only show the components relevant to the invention.

[0019] refer to Figures 1-2 A fieldbus control method for multi-process roller control, comprising: S1. Based on the single-piece identification and process route of the roller, establish the workpiece status token and initial process constraint diagram. Collect station data through multi-protocol device adaptation edge nodes and convert it into pending unified process events associated with the workpiece status token, forming workpiece identity anchor and equipment completion anchor. S2. Verify the process and timing of the two anchors within the matching time window, and verify the summary of the preceding events of the pending unified process event and the latest submitted event summary stored in the workpiece status token. Convert the pending unified process event that has passed the verification into a submitted event. If the verification fails, freeze the next process permission, supplement the missing evidence and re-verify. If the re-verification still fails, enter the abnormal flow. S3. Update the process constraint diagram based on the submitted events, and generate a piece-by-piece remaining quality constraint package based on the current measured quality, cross-process quality transfer relationship and finished product quality limit; S4. Map the candidate equipment capacity constraints, workpiece flow constraints and remaining quality constraints to the candidate station-parameter space and find their intersection to form a candidate station-parameter feasible set. Project the standard recipe to the candidate station-parameter feasible set to generate the target station permission and control parameters. S5. Update the workpiece status token and remaining quality constraint package based on the execution results of the target workstation; stop normal flow when re-verification fails, the candidate workstation-parameter feasible set is empty, or execution is abnormal, adjust the affected unstarted tasks, and store piece-by-piece traceability data.

[0020] In this specific embodiment, S1 includes: This specific implementation takes a roller production line including CNC turning, stamping, dynamic balancing, shot blasting, powder coating and high frequency heating stations as the execution object. When the roller blank is first put on the line, the edge node reads the laser QR code to obtain the single piece identifier, and reads the batch identifier and process route version issued by the production execution system. The single piece identifier, batch identifier, process route version, current process, current status and initial quality tolerance are written into the workpiece status token. The current status is initially recorded as pending processing. The initial quality tolerance is stored in five categories of quality components: size and shape, residual imbalance, surface condition, coating and heat treatment. The token is stored in the token library of the edge node with the single piece identifier as the primary key. The edge nodes establish an initial process constraint graph based on the process route version. The process nodes record the process identifier, the set of allowed preceding processes, the process input field, the candidate equipment identifier, the equipment capability boundary, the quality status field, and the current permission status. The directed edges record the preceding and following process identifiers, dependency types, buffer identifiers, transport segment identifiers, transport time limits, and the quality transfer coefficient version. A signal index is established with the process identifier and the signal field name as the joint key, so that each event field can be back located to the equipment signal or acquisition signal that generated the field. After the initial process constraint diagram topology check passes, the edge nodes execute a first-process idempotent start transaction: An initial remaining quality constraint package with version number zero is generated using the initial quality tolerance, finished product quality limit table, process route version, and corresponding quality transfer coefficient version. Since there are no completed processes yet, the cumulative finished product end occupancy of each quality component is set to zero, and the constraint package is only made valid when the unit, upper and lower limits, transfer coefficient version, and validity status of the five types of components are all complete. The module selects a set of first processes with an in-degree of zero and all initial conditions satisfied from the process constraint diagram, and uses the single-piece identifier, process route version, and zero constraint package version to form a unique start idempotent transaction. Within the same database transaction, the token version comparison exchange changes the corresponding permit status from initially frozen to pending generation. An S4 solver message carrying the same token version, graph version, zero constraint package version, and startup idempotent key is written to the transaction outbox, which is then delivered after the transaction is committed. Repeated startups only return the existing outbox address, without repeatedly changing the status or generating permits. If the comparison exchange, constraint package write, or outbox write fails, the process is rolled back and remains frozen. If initial quality data, limits, or transitive coefficients are missing, invalid, or have inconsistent versions, S4 is not started; instead, an initial data recovery task is generated, and after repair, the entire startup transaction is replayed with the same idempotent key. Multi-protocol device adapter edge nodes connect to CNC lathes, machining centers, stamping equipment, dynamic balancing equipment, shot blasting equipment, powder coating equipment, and high-frequency heating equipment via CNC system open protocol, OPC UA, Modbus TCP, or discrete input / output interfaces. The adapter stores the device identifier, protocol type, register or node address, raw field type, engineering units, scaling factor, quality bit interpretation, program version or recipe version field, and acquisition cycle for each device. The device connection configuration is managed using version numbers and updated after line change, program upgrade, or measurement system calibration. The edge node reads the device status, program version or recipe version, process parameters, quality measurement values, alarm signals and workstation events at a normal acquisition cycle of 200 milliseconds. The original timestamps are uniformly converted into the edge node monotonic clock time, the register scaling value is converted according to the engineering units in the configuration, and records with invalid quality bits, missing fields, time rollback or exceeding the range are marked as invalid. The original message, connection configuration version and conversion results are written to the edge cache partitioned by device identifier at the same time. The event construction thread aggregates cached records by device identifier, process identifier, and completion edge. It organizes process parameters into parameter vectors by parameter name, value, unit, and parameter version, and organizes quality measurement values ​​into quality vectors. Each quality component of the quality vector records the quality component name, measured value, engineering unit, measurement time, gauge calibration version, semantic flag, target value and target version, previous test or incremental benchmark value and its corresponding event or model version, conversion rule version, converted process contribution, and validity status. The semantic flag can only be one of the following three: absolute measurement, relative target deviation, or contribution of this process. The event construction thread generates a pending unified process event including single-piece identifier, process identifier, device identifier, parameter version, acquisition time, parameter vector, quality vector, validity flag, and previous event summary. The previous event summary is read from the latest submitted event summary saved in the workpiece status token. For duplicate messages arriving at the same completion edge of the same device, the event building thread uses the device identifier, process identifier, program or recipe version, completion time, and parameter summary as the deduplication key, and retains only the record with the smallest local monotonic sequence number and the most valid fields. The later-arriving record is used as an evidence copy and associated with the pending unified process event. The workpiece status is not advanced due to duplicate messages. For records that are missing a single-piece identifier or process identifier, the thread retains the original message and marks it as pending supplementary evidence, and prohibits the formation of a submitable event. The initial process constraint graph is constructed node by node according to the process sequence in the process route. Each edge node first generates a unique node identifier for each process, then creates directed edges based on the previous process field, and uses a topology traversal with decreasing in-degree to check for cycles. If the number of traversed nodes is less than the total number of nodes in the route, the graph is rejected and the process route version is marked as invalid. Only after the traversal is successful is the node written to the signal index and the edge written to the transport segment index. This ensures that the graph construction, cycle rejection and index generation have a definite execution order. The field mapping configuration uses the device identifier, original address, and program or recipe version as the joint key. The value field includes uniform field name, data type, scaling factor, offset, engineering unit, valid range, and invalid mass bit. A configuration record for dynamic balancing equipment maps the original residual imbalance register to the residual imbalance component in the mass vector and saves the g / cm unit, zero offset, and calibration version. Original fields that do not match the configuration or whose conversion results are outside the valid range are not written to the valid parameter vector or mass vector. Edge nodes store version numbers and effective times for token stores, graph objects, field mapping configurations, and device connection configurations respectively. When an event is constructed, the four types of versions actually used are written into the event evidence list. When a configuration changes within a collection window, a unique effective version is selected based on the collection time. If a unique version cannot be determined, the event is marked as invalid and the license for the next process is frozen to avoid mixing two configuration versions for the same pending event. When the roller reaches the station entrance, the barcode reader writes the single piece identifier, process identifier, barcode reading position, barcode reading time, and the local entrance number assigned by the edge node according to the arrival order as the workpiece identity anchor; at the same time, the edge node establishes an unclosed record in the station occupancy binding table with the equipment identifier and process identifier as the partition key. This record saves the local entrance number, single piece identifier, entrance time, work-in-process slot and occupancy status. The number of work-in-process slots is determined by the allowed number of slots given by the equipment connection configuration. Only one unclosed record is allowed for a single-occupancy equipment. For multi-slot equipment, a one-to-one corresponding unclosed record is established according to the slot number reported by the controller. When the equipment controller changes the completion signal from incomplete to complete, it writes the equipment identifier, process identifier, program version or recipe version, completion edge, parameter summary, completion time and slot number as the equipment completion anchor. Within the same equipment and process partition, the edge node selects the earliest unique record from the records with the same slot number and not yet closed, sorted by the local entry number in ascending order. It writes the single-piece identifier of this record into the binding result of the equipment completion anchor and atomically closes the occupied record. Then, it associates the two types of anchors and the pending unified process event with the binding result and the process identifier. When there are zero or more candidate records, pre-pairing is prohibited, the next process permission is frozen, and the candidate entry number, slot number and original evidence address are sent to S2 for supplementary verification. Edge nodes write the workpiece status token, initial process constraint diagram, pending unified process event, workpiece identity anchor, and equipment completion anchor into the same transaction batch. After the transaction is committed, the pending unified process event identifier, token version, and diagram version are sent to the verification queue of S2. If any object fails to be written, the transaction is rolled back and the token is kept in a pending state, thereby ensuring that the objects read by S2 have consistent single-piece identifiers and versions.

[0021] In this specific embodiment, S2 includes: The event verification thread of S2 reads the pending unified process events and their two types of anchors written by S1 from the verification queue, and reads the upper limit of the corresponding process from the cycle time parameter table, the upper limit of the transportation time from the code reading position to the equipment position from the transportation parameter table, and the upper limit of the clock deviation of the edge node used in this acquisition from the clock calibration table. All three tables use the process identifier or edge node identifier as the lookup key. The fields include numerical value, millisecond unit, valid range, version and effective time. The parameters are formed by reviewing the cycle time records, transportation records and network time synchronization calibration records of the last thirty qualified production shifts after taking the 99th percentile. The verification thread follows the formula Determine the matching time window, where This represents the matching time window, in milliseconds, derived from the current calculation and with a value greater than zero. This indicates the upper limit of the cycle time for the corresponding process, in milliseconds, and is derived from the cycle time parameter table. This indicates the upper limit of the transportation time from the code reader location to the device location, in milliseconds, and is sourced from the transportation parameter table. This indicates the upper limit of the clock offset at the edge nodes, in milliseconds, and is derived from a clock calibration table. The number of times the maximum clock deviation of each of the two anchors is covered is represented by a dimensionless fixed coefficient, which is derived from the error synthesis rule that the workpiece identity anchor and the equipment completion anchor each occupy the upper limit of the deviation once. Before dual-anchor and summary verification, S2 first performs hard gating of the validity of pending events, confirming that each event's validity flag is valid, and that all necessary fields such as single-item identifier, process identifier, equipment identifier, acquisition time, parameter version, and previous event summary are complete, that the parameter vector and its unit and version are valid, that the quality vector's quality bit, gauge calibration version, engineering unit, semantic flag, target or pre-test or incremental benchmark, conversion rule version, per-process contribution, and validity status are complete and the benchmark is unique, and that the tokens, graphs, field mappings, and equipment connection configuration versions in the event evidence list are all unique and effective versions at the time of acquisition. If any of these conditions are not met, dual-anchor verification is prohibited, the event is prohibited from being changed to submitted, and token advancement is prohibited. Supplementary verification, data recovery, quality retesting, or manual review tasks are generated based on the failed fields. After obtaining new evidence through supplementary verification or replay, the process must restart from this validity hard gating; simply recalculating the summary or using the original passed result is not allowed. The verification thread first compares the process identifier of the workpiece identity anchor with the process identifier of the equipment completion anchor and the binding result of the S1 station occupancy. Then it calculates the completion time minus the code reading time. The dual-anchor verification is passed only when the process identifiers are the same, the binding result is unique, and the time difference is greater than or equal to zero and less than or equal to the matching time window. If the completion time is earlier than the code reading time, the reverse timing is recorded. If the time difference exceeds the matching time window, the window is recorded. If the binding candidate is not unique, the process identifier is inconsistent, or any anchor validity flag is invalid, the corresponding failure field is recorded, and the next process permission status in the workpiece status token is immediately set to frozen. After the dual-anchor verification is passed, the verification thread uses SHA-256 to calculate the event digest in the fixed field order of event local monotonic sequence number, preceding digest, device identifier, process identifier, parameter version, parameter vector, and quality vector. It then compares the preceding event digest carried by the pending unified process event with the latest submitted event digest stored in the workpiece status token byte by byte. If the two match, the status of the pending unified process event is changed to submitted, its local monotonic sequence number and the new event digest are written to the workpiece status token, and the token version comparison and exchange operation is used to prevent the concurrent submission of two events on the same roller. The verification of the preceding event summary of the pending unified process event and the latest submitted event summary stored in the workpiece status token is specifically carried out by reading the preceding event summary field of the pending unified process event and the latest submitted event summary field stored in the workpiece status token respectively. First, the summary algorithm identifier and summary length are checked, and then the summary values ​​are compared in byte order. If the algorithm identifier, length or any byte is inconsistent, the summary verification is determined to be unsuccessful. Only when the two fields are completely consistent will the event submission transaction be entered. Each record in the cycle time parameter table uses the powder coating process identifier as the key to store the cycle time limit, millisecond unit, sample shift range, percentile calculation method, reviewer, version, and effective time. Each record in the transportation parameter table uses the code reading location and powder coating equipment location as a joint key to store the transportation time limit and millisecond unit. Each record in the clock calibration table uses the edge node identifier as the key to store the clock deviation limit, the most recent successful time synchronization time, and the validity period. If any table entry is not matched or has expired, the matching time window is not calculated and the license is frozen. When the verification of the double anchor field or the summary field fails, the verification thread queries the signal index established by S1 based on the failed field, and searches in reverse along the equipment signal edge, acquisition signal edge and transportation transmission edge connected to the current process node in the process constraint diagram. The signals that can generate each missing field are taken as candidate signals, and are added to the relevant signal set one by one according to the rule of first sorting in descending order by the number of missing fields that can be covered, and then sorting in ascending order by the sampling delay, until all missing fields are covered. After the relevant signal set is formed, the verification thread attempts to delete each signal one by one. If the deletion still covers all missing fields, the signal is permanently deleted and checked again until deleting any remaining signal will cause at least one missing field to no longer be covered. This yields the minimum relevant signal set that satisfies the condition of covering all fields and that the condition of covering no field is satisfied after deleting any signal. When the candidate set is empty, the cause of missing evidence is directly generated and the frozen state is retained. Edge buffers select the supplementary verification window reference according to a fixed priority: the completion time of the device completion anchor is used when the clock is calibrated and there is no backtracking; the arrival time of the original message at the edge node is used when the completion time is missing or invalid; and the edge monotonic clock time of the pending event entering the verification queue is used when the completion edge message is also missing. The first two references open a window five seconds after the reference time. The third reference reads its five-second limited backtracking buffer and opens a five-second window after the reference time. The reference used, the trust level, and the reason for backtracking are written into the supplementary signal record. During the window, the sampling period of the relevant signal set is switched from 200 milliseconds to 50 milliseconds. Each supplementary data saves the signal index version, sampling period, arrival time, original device time, quality bits, and source message address. After the window ends, the normal acquisition period is restored. The supplementary certification window manager saves the window start time, window end time, related signal set, original sampling period, supplementary certification sampling period and received signal bitmap for each pending event. When multiple supplementary certification requests occur simultaneously on the same device, the collection is scheduled according to the earliest window end time and executed with the minimum supplementary certification sampling period. After the window is closed, the original sampling period is only restored when there are no other active supplementary certification windows on the device, so as to avoid interrupting the supplementary certification of another event due to the early end of one event. The multi-protocol device adaptation edge node assigns strictly increasing local monotonic sequence numbers to the original pending unified process events and supplementary workstation data according to the actual arrival order of the workstation data. The replayer sorts the data stably according to the sequence number, inserts the supplementary data after the corresponding pending unified process event, reconstructs the anchor field, parameter digest and preceding event digest using the same mapping configuration as S1, and replays the data in the order of double anchor verification, digest verification and token version comparison and exchange. It is prohibited to use the device timestamp to change the already determined arrival order. Before replay, the replayer verifies that the single item identifier, equipment identifier, process identifier, and configuration version of the supplementary data are compatible with the pending event. Compatible records enter the replay sequence, while incompatible records are only written to the supplementary signal record and marked with the reason for exclusion. The replay transaction uses the pending event identifier and the original token version as the idempotent key. When triggered repeatedly, the saved replay verification result is returned without incrementing the local monotonic sequence number again. When the re-verification passes, the replay unit submits the event and only writes the event submission and verification freeze reason removal flags. It also associates and saves the supplementary signal record, field coverage relationship, replay sequence number range, and replay verification result with the submitted event. S2 must not change the permission status of the next process. The permission remains frozen until S3 successfully replaces the new constraint package, after which S5 performs a single state transition. If the re-verification still fails, the invalid data validity flag, the reason for not obtaining the submitted event, or the missing specific evidence is written into the exception handling instruction, and the instruction is sent to the exception flow queue of S5. After verification, the edge node writes the commit record, which includes the committed event identifier, local monotonic sequence number, event summary, parameter vector, quality vector, dual-anchor verification result, and replay result, to the event log. The commit record that passes verification is only written to the state transition queue of S5 and is not directly called by S2 to S3. The record that fails verification is written to the same queue along with the failure category and must not trigger normal quality budget recursion. The state transition queue uses the single item identifier, the committed event identifier, and the token version after the commit to form the message idempotency key. Only one valid message is allowed to exist with the same idempotency key. If the message is written repeatedly, the original message address is returned.

[0022] In this specific embodiment, S3 includes: The S3 quality constraint module reads the submitted events and the current process constraint graph version output by S2, locates the corresponding process node by process identifier, writes the parameter version, quality vector, completion time and event summary of the event into the completed state of the node, and updates the subsequent nodes that meet all the preceding conditions to the pending state according to the sequential dependency relationship of the directed edges, while the nodes that do not meet the preceding conditions remain locked. The quality constraint module decomposes the quality vector into five types of quality components: size and form / position, residual imbalance, surface condition, coating, and heat treatment. For each component, the following information is read: quality component identifier, target value and target version, measured value, engineering unit, measurement time, gauge calibration version, semantic flag, previous or incremental benchmark value and corresponding event or model version, conversion rule version, converted per-process contribution, and validity status. S3 only accepts fields whose semantic flag is the contribution of this process and whose per-process contribution is valid. Absolute measurement or relative target deviation must have been converted by S5 according to the unique benchmark and passed in as is with the submitted event. Among them, size and form / position are expressed in millimeters or millimeters per meter, residual imbalance is expressed in grams per centimeter, surface roughness is expressed in micrometers, coating thickness is expressed in micrometers, and heat treatment hardness is expressed in the corresponding hardness scale. Subsequent calculations of the same component always use the same unit. The process constraint diagram stores the lower and upper limits of the finished product for each quality component. The dimensionless transfer coefficient, effective range, test batch, version and effective time are stored in the quality transfer coefficient table according to the quality component identifier, completed process identifier and finished product inspection node identifier. The transfer coefficient is obtained by robustly linearly fitting the historical qualified parts and process verification parts of the same process route and then verifying it with reserved samples. In this specific implementation, coefficients that exceed the range of 0 to 1.5 are marked as invalid and the budget recursion of that component is stopped. For mass components The quality constraint module follows the formula Calculate the cumulative finished product end occupancy of this component, where Represents mass components The cumulative finished product end occupancy, with the same unit as the mass quantity, is derived from this recursion; This represents the mass component index. The index itself is an identifier without units. It is derived from the mass component field of the residual mass constraint package and its value range includes five categories: size and shape, residual imbalance, surface condition, coating and heat treatment. This represents the set of currently completed processes. The set of objects has no units and originates from the process constraint diagram. express The index of completed processes in the process constraint diagram is a unitless identifier, and its source and traversal range are the currently completed nodes in the process constraint diagram. This represents the finished product inspection node index. The index itself is an identifier without units. It is derived from the unique terminal node in the current process route that has an out-degree of zero and whose node type is finished product inspection. The value is limited to this terminal node. Indicates that the process has been completed. To the finished product inspection point The dimensionless mass transfer coefficient is derived from the corresponding version of the mass transfer coefficient table. Its effective range is from zero to 1.5. If it exceeds this range, this formula will not participate in the recursion. Indicate process mass components The converted process contribution amount is in the same unit as the quality component and its source is limited to the process contribution amount field in the submitted event quality vector whose semantic marker is the contribution amount of this process and which is valid. The quality constraint module then follows the formula This creates a remaining quality range that can be occupied by unfinished processes, among which... Represents mass components The remaining mass range, with units at both endpoints being the same as that mass component, originates from this recursion; The mass component defined in the immediately preceding formula is explicitly adopted. Cumulative finished product inventory, same project unit, and source of this inference; The mass component index definition, unitless attribute, source, and five value ranges are adopted from the formula for the cumulative finished product occupancy immediately preceding the previous one. Represents mass components The lower limit of the permissible deviation of the finished product relative to the target value, with the same unit as that mass component. This indicates the upper limit of the permissible deviation of the finished product relative to the target value, with the same unit as the mass component. and All values ​​are derived from the finished product quality limit version referenced in the process constraint diagram and meet the requirements. ; The above recursion is to convert the unique per-process contribution of each completed process into the finished product's occupancy based on the aforementioned transfer coefficient. The quality constraint module reads the converted per-process contribution and corresponding transfer coefficient for each completed process, multiplies them, and accumulates them under the same quality component and the same engineering unit. It is not allowed to substitute absolute measured values, cumulative deviations relative to the target, or contributions already included in previous processes, nor is it allowed to add dimensional, residual imbalance, surface, coating, or heat treatment components together. If any semantic flag, unique benchmark event, model version, conversion rule version, or per-process contribution is missing or invalid, the module freezes the permission for the next process and creates a data recovery or quality retest task, does not execute this recursion, and writes the cumulative result along with the identifier of the process with the largest contribution into the constraint source. The module subtracts the cumulative finished product end occupancy from the finished product limit to obtain the remaining budget for the quality component. The remaining budget is stored in the data object as the lower endpoint, upper endpoint, engineering unit, and valid status. When a positive deviation occurs in the subsequent process, it is compared with the upper endpoint; when a negative deviation occurs, it is compared with the lower endpoint. Any endpoint equal to the boundary is considered acceptable. If the boundary is exceeded, a quality budget insufficient state is formed. When the measured value of a certain component is missing, the gauge calibration version is invalid, or the transfer coefficient record is mismatched, the quality constraint module does not use other components to replace the component, but instead sets the boundary state of the component to invalid and freezes its subsequent normal permission; when the lower end of the remaining quality interval is greater than the upper end, the insufficient quality budget is written into the constraint source and an empty interval flag is generated for S4 to generate the empty set reason code for insufficient quality budget. The quality transfer coefficient table and the finished product quality limit table are maintained uniformly by the quality engineering terminal. The records in the table include the process route version, applicable equipment family, mass component, engineering unit, calibration sample batch, effective range, version and effective time. A record for the dynamic balancing process uses the residual unbalance component, dynamic balancing process and finished product inspection node as the joint key, and saves the finished product limit in grams per centimeter and the dimensionless transfer coefficient. A new version calibration is triggered when the process route is changed, the gauge calibration is changed, or the deviation of 20 consecutive pieces exceeds the verification limit. The quality constraint module will write the applicable single-piece identifier, current process, five types of quality component boundaries, engineering units of each boundary, constraint source, transfer coefficient version, finished product quality limit version, submitted event summary, constraint package version and validity status into the new version of the remaining quality constraint package, and save it with the single-piece identifier and incremental version number as the joint key, and set the overall status of the constraint package to valid only when all required components are valid; The new version of the remaining quality constraint package replaces the old version through token version comparison and exchange. The workpiece status token is synchronously written to the constraint package version and the submitted event summary. After the replacement is successful, S3 only returns the result to S5, which includes the single part identifier, the token version after the advancement, the process constraint diagram version, the set of subsequent processes to be permitted, the new constraint package identifier, and the replacement success flag. It does not submit the result directly to S4, nor does it change the permission status. When there is a replacement conflict, the latest token and the submitted event are read again to perform a recursion. If there is still a conflict, the permission is frozen and the version conflict is recorded.

[0023] In this specific embodiment, S4 includes: The S4 workstation control module only consumes the solution message written in the same transaction where the S5 regular progress transaction or the S1 first operation idempotent start transaction's permission status has been successfully changed to "pending generation" and delivered after the transaction is committed. The input consists of the set of pending operations, the valid remaining quality constraint package, and the operation constraint diagram carried in the message. The entry point first reads the permission status using the single-item identifier and token version. Only when the status is "pending generation" and the token version, operation constraint diagram version, and constraint package version in the message are all consistent with the current values ​​will the status be changed to "generating" and the solution continue via version comparison and exchange. If the status is still "frozen," the versions are inconsistent, or there is a comparison and exchange conflict, neither generation nor permission is issued; instead, expired messages are discarded or the latest transaction outbound record is reread. The S1 start message and the S5 regular message are separated. Do not carry idempotent keys for initiation or submitted events. S4 uses these keys to establish a registration table for processing the same entry point. Duplicate messages only return existing solution results. The workstation control module reads candidate equipment capable of performing the current process from the equipment capability library. The equipment capability record includes equipment identification, applicable process, lower and upper limits of processable parameters, parameter execution resolution, quality capability boundary, program version or recipe version, current status, calibration version, and capability record validity period. If the equipment capability boundary permanently does not cover the requirements of the current process, record a permanent equipment capability deficiency. If the equipment is alarmed, calibration expired, or in maintenance status, it will not be included in the candidate set for this round, and the alarm temporary unavailability, calibration temporary unavailability, or maintenance temporary unavailability, along with the equipment identification, status version, and estimated recovery time, will be recorded respectively. The workstation control module forms a set of flow constraints based on process dependencies, cache status, transportation status, and estimated completion time. Specifically, the estimated completion time calculated based on the completion of all preceding nodes, the target cache area not being full, the transportation segment being available, and the estimated completion time being no later than the process route time limit, is used as the reserved predicate. Candidate equipment that does not meet any of the conditions is recorded for deletion reasons. Equipment with the same estimated completion time is determined to have a stable order in ascending order of equipment identifier. For each candidate device, the module maps the processable parameter range, parameter execution resolution, and quality capability boundary to a candidate workstation-parameter space with the device identifier and control parameter vector as coordinates. The device capability model predicts the local increment of each quality component in this process based on the control parameters. The device capability model adopts a piecewise linear response model obtained from the pre-deployment process test. The input is the normalized control parameters and the current quality component, and the output is the local predicted increment of this process in the same unit as each quality component. The model record includes the piecewise boundary, coefficients, upper limit of verification error, applicable device, process, version, and validity period. S4 then reads the coefficients from the quality transfer coefficient table with the same version as the remaining quality constraint package from the current process to the finished product inspection node. The local predicted increment is multiplied by the coefficient to obtain the predicted increment at the finished product end. If the coefficient is missing, invalid, or the version is inconsistent, it is not defaulted to one, and the candidate is marked as invalid model or constraint data. Candidate devices The candidate workstation-parameter continuous feasible set is calculated according to the formula. Build, in This indicates the candidate devices formed by this intersection. A continuous set of feasible parameter points, the set of objects is unitless, and the source is the intersection of continuous processing domain, quality constraints and flow constraints; This represents the candidate device index. The index itself is an identifier without units, and its source and value range are the candidate devices obtained from the current round of device capability library screening. This represents a control parameter vector, with the unit of each component given by the equipment capacity record. Indicates equipment The Cartesian product of the continuous processable intervals of each control parameter, the set object adopts the corresponding unit of each component, and the boundary source is the equipment capability library and has not yet been discretized according to the execution resolution; Indicates equipment The set of control parameter component indices is a unitless set derived from the list of parameter fields in the device capability record. express The control parameter component index in the list has no unit and iterates through all components in the list. Represents the parameter vector The Each component, with the unit given by the corresponding parameter field; and They represent the first The lower and upper limits of the processability of each parameter, with the same units as the parameter, are derived from the equipment capability library; This represents the set of indices of all constrained mass components within the remaining mass constraint package S3. The set itself is unitless and originates from this constraint package. express The mass component index in the index is unitless and iterates through all constrained components. This represents the equipment capability model for the mass component. The predicted increment of the local process is converted into the predicted increment of the finished product after being converted by the quality transfer coefficient from the current process to the finished product inspection node. The unit is the same as that of the quality component. The local predicted quantity comes from the equipment capacity model and the transfer coefficient and its version come from the same quality transfer coefficient table as S3. The definition, units, and source of the S3 finished product end remaining mass range formula are adopted; This represents the flow constraint judgment value, which is a dimensionless binary quantity derived from the flow predicate calculation; This represents a dimensionless fixed state value that indicates all flow conditions are met, and is fixedly set by the control logic. The module employs a continuous interval pruning search for piecewise linear response models to calculate the continuous feasible parameter region for each candidate device: first, an initial interval box is formed using the upper and lower bounds of the parameters; then, the intersection of the predicted incremental boundary of each mass component at the finished product end and the remaining mass interval at the finished product end is calculated, and disjoint intervals are recursively eliminated until a continuous feasible region satisfying all parameter components and all mass component constraints is obtained; the module saves all failure predicates, data validity, and recoverability for each device, and does not use a single failure category of a single device to represent the global cause; as long as a feasible device exists, an empty set of causes is not generated; when there is no feasible device, if any candidate device may still form a feasible set after data or device recovery due to invalid model or constraint data, missing compatible mapping, or unavailable temporary device, then the following causes are sequentially considered: invalid model or constraint data, missing compatible mapping, unavailable temporary device, etc. The primary cause is selected using a fixed recoverable priority order and kept frozen, preventing it from being overridden by other candidate deterministic failures. Global deterministic infeasibility is determined only when all candidate data and mappings are valid and no recoverable candidates exist. Specifically, if all candidates contain quality budget failure predicates, it is classified as insufficient quality budget; if all candidates contain permanent capability failure predicates, it is classified as insufficient permanent equipment capability; if all candidates contain flow conflict predicates, it is classified as flow constraint conflict; and if all candidates contain discretization failure predicates, it is classified as discretization failure. If the deterministic failure predicates are mixed and no category covers all candidates, it is classified as composite deterministic infeasibility, and sent to manual rework planning along with the device-by-device complete predicate matrix. All primary cause selections are executed according to the above cross-device quantification conditions and fixed category order, while other causes are saved as subordinate evidence. The workstation control module reads the process route version from the workpiece status token, and uses the version, the current process, and the roller product specification as a joint key to read the standard recipe with the recipe benchmark version from the approved recipe library. Then, according to the version compatibility mapping, the parameter names, units, and dimensions of the standard recipe are converted into the projection benchmark corresponding to the current program version or recipe version of each candidate device. The version compatibility mapping record includes source parameters, target parameters, scaling factor, offset, unit conversion relationship, applicable version range, and review status. Candidate devices that cannot find the approved mapping do not participate in the projection. The remaining quality constraint package read by S4 has been converted into finished product end occupancy by S3 according to the transfer coefficient of the deviation that has occurred. The remaining budget of each quality component is obtained by deducting the cumulative finished product end occupancy from the finished product limit. The module keeps the component identifier, endpoint unit, transfer coefficient version and submitted event summary of the budget unchanged. It only maps the same unit quality increment predicted by the equipment capability model to the corresponding budget interval, and does not repeat the calculation or change the finished product end occupancy in S4. To eliminate the influence of different parameter units on distance calculation, the module reads the positively normalized scale for each parameter component, determined by the equipment capability range width or process verification standard deviation, and calculates it according to the formula. Calculate the projection deviation, where Indicates candidate device Upper parameter point The dimensionless deviation function relative to the projection reference, and the smaller the value, the closer it is to the standard formula, sign... It is used only for this deviation function and does not represent any set of indices; The candidate device index definition, unitless attribute, source, and value range are based on the above continuous feasible set formula. The above definition of the control parameter vector will be used; Continue using the above-mentioned equipment The control parameter component index set has no unitary attribute or source, and its sign is similar to that of the deviation function. They are independent of each other; express The parameter component index in the record has no unit. It is derived from the list of parameter fields in the device capability record and sums and traverses all components in the list. Represents parameter points The Each component, with the unit given by the corresponding parameter field; Indicates the first The dimensionless weights of the parameters are derived from the approved formula library and satisfy the conditions that they are non-negative and the sum of the weights is one. This indicates the conversion of standard formulations to equipment. The next Each projection reference parameter has the same unit as the parameter. Indicates the first The positive normalized scale of each parameter, with the same unit as the parameter, is derived from the width of the equipment capability range or the standard deviation of process verification. The squared exponent is a dimensionless fixed constant derived from a fixed rule that uses weighted squared distance to measure projection bias. The module selects the parameter point with the smallest projection deviation from each feasible set, and processes the same results first by ascending projection deviation, then by expected completion time, and finally by equipment identification, thereby obtaining the target equipment and continuous parameter points; the parameter weight table records the parameter name, positive process importance, dimensionless weight, applicable product specifications, formula baseline version and review time. When the formula changes or the quality capability verification results change, the weights are renormalized and a new version is generated. For the Each control parameter, the module follows the formula Discretization correction is performed, where The unitless attribute of the parameter component index, the source of the field list, and the traversal range in the above projection deviation formula are used; This indicates the final number issued. Each control parameter has the same unit as the parameter. Using the above formula for continuous feasible sets, the first... The definition, units, and equipment capability library sources for the lower limit of each parameter's processability; The point representing the parameter with the minimum projection deviation. Each continuous parameter value, with the same unit as the parameter, is derived from the minimization result on the continuous feasible set; Indicates the candidate device for the first The positive execution resolution of each parameter, with the same unit as the parameter and derived from the device capability library; This represents a dimensionless function that rounds down to the nearest integer. When the input is exactly the midpoint of two adjacent integers, positive inputs are rounded down in the direction of positive infinity, and negative inputs are rounded down in the direction of negative infinity. All candidate devices use the same rule. After discretization, the module re-executes the equipment capability, flow, and remaining quality interval checks. If the correction point is not in the feasible set, it searches for adjacent grid points in ascending order of normalized distance from continuous parameter points and selects the first point that passes all checks. If no passing point is found after the search, the device is recorded as discretization failed and the next candidate device is projected again. If all devices fail, the module still generates a unique main empty set reason code from all deletion reasons according to the aforementioned global fixed priority order, without deciding the handling based on the order of candidate device traversal or the first reason that appears by chance. For the finally selected device, the module generates a finite discrete grid with the upper and lower limits of each parameter in the equipment capability library and the positive execution resolution. For each parameter vector in the grid, the same equipment capability, flow, and remaining quality interval checks as the final control point are performed according to the parameter index order. All passing grid points are encoded into a joint allowable domain according to the lexicographical order of the parameter vectors. The minimum and maximum values ​​of the joint allowable domain on the corresponding parameter coordinates are taken for each parameter allowable interval and are only used as fast pre-check boundaries. The Cartesian product of each interval is not considered as an executable domain. The joint allowable domain must contain at least the final control parameter point; otherwise, it is treated as a discretization failure. The workstation control module writes the single-piece identifier, target equipment identifier, target process identifier, final control parameters, allowable ranges for each parameter, sorted grid point code or equivalent bitmap object address and summary of the joint allowable domain, grid index order, parameter execution resolution, equipment capability model version, flow constraint version, remaining quality constraint package version, joint allowable domain generation algorithm version, recipe baseline version, candidate equipment program version or recipe version, preceding event summary, license validity period, and license status into the target workstation license. In this specific implementation, the license validity period is set to the upper limit of the cycle time of one process after the generation time. The license and control parameters are written to the license library of the edge node in the same transaction, and the license status is changed from generating to generated by token version comparison and exchange. If the license library transaction or status comparison and exchange fails, the control parameters are not issued, the unsubmitted license object is deleted, and the entry gate is re-entered with the latest status. Before the device executes, the edge node checks each item to ensure that the license status is generated, the recipe baseline version and the candidate device program version or recipe version are compatible with the version mapping, the version of the remaining quality constraint package carried by the license is equal to the current value of the token, the digest of the preceding event is equal to the digest of the latest submitted event, the digest of the joint allowed domain object is recalculated, and the license validity period has not expired. Only when all items pass the check will the control parameters be written to the device controller and the license status be set to issued. If any item fails the check, the device will be frozen, the control parameters for this operation will be invalidated, and a new candidate workstation-parameter feasible set will be formed with the latest token, constraint package, and device status. The execution result reception identifier will then be sent to S5.

[0024] In this specific embodiment, S5 includes: The S5 state transition module receives the execution result returned by the target device in S4. The execution result includes the unit identifier, target process identifier, target device identifier, actual program or recipe version, parameter vector, quality vector, start time, completion time, alarm signal, and target station permission identifier. The module first reads the parameter allowable range, joint allowable domain object address and summary, grid index order, parameter execution resolution, joint allowable domain generation algorithm version, and remaining quality constraint package version using the permission identifier, and then verifies that the unit identifier, process identifier, and device identifier are consistent with the permission record. The state transition module forms a unique local contribution for each quality component of the execution result: when the semantics are absolute measurements, the measured value after unification of units is subtracted from the absolute measured value of the most recently submitted valid event for the same quality component; for the first measurable process, the initial benchmark value specified by the process route version is subtracted. When the semantics are relative target deviations, the relative deviation is subtracted from the relative deviation of the most recently submitted valid event under the same target version. When the equipment capability model directly outputs the increment of this process, only the local increment result consistent with the actual model version is used, and no further difference is made. The module saves the semantic flag selected at the input as the original measurement semantic evidence, and after completing the unique benchmark conversion, it uniformly sets the normalized semantic flag of the undetermined event quality vector as the contribution of this process, and writes the converted local contribution of each process, target value and target version, previous test or incremental benchmark value and corresponding event or model version, conversion rule version, engineering unit and valid status. S1 only sets the normalized semantic flag and local contribution. Write the pending event quality vector as is. The original measurement semantics, original values, and benchmarks are separately associated as traceable evidence. S3 and the normal progress section described later only read the normalized fields that are valid and whose semantic markers are the contribution of this process, and calculate them once after submission. In order to perform pre-inspection after execution, S5 reads the coefficients from the current process to the finished product inspection node from the quality transfer coefficient table of the same version as the current remaining quality constraint package. Multiply the local contribution by the coefficient to form the finished product end increment used only for pre-inspection. Then compare it with the corresponding finished product end component boundary of the remaining quality constraint package, and retain the original measurement semantics and original values, normalized local contribution, finished product end pre-inspection quantity, transfer coefficient version, and comparison results respectively. If there is a lack of unique target, benchmark, unit conversion, valid transfer coefficient, or consistent version, keep the next process permission frozen and create a data recovery or quality retest task. Do not build a submitable pending event, do not send it to S3, do not default the transfer coefficient to one, and do not directly compare the cumulative deviation of the absolute measured value or relative target with the finished product end deviation budget. When each component of the actual parameter vector is within the corresponding parameter allowable range, and the discrete grid index calculated according to the grid index order of the license record and the execution resolution does exist in the joint allowable domain that has passed the summary verification, and the pre-inspection increments of each quality component formed according to the aforementioned rules are all within the corresponding finished product boundary of the remaining quality constraint package, the actual program or recipe version is consistent with the license record, and the equipment does not generate an alarm, the status transition module returns the execution result along with the target workstation license identifier to the event construction thread of S1; the component-by-component interval comparison is only used for rapid pre-inspection, and the joint allowable domain member verification is the final criterion for maintaining parameter coupling constraints. If any component cannot be uniquely converted into a grid index according to the license resolution or the grid index is not in the joint allowable domain, it shall not enter the normal branch; S1 reads the latest submitted event summary from the workpiece status token, and reads the latest submitted event summary from the workstation status token. The binding table is used to read the workpiece identity anchor corresponding to the single piece, and the equipment completion anchor is constructed using the completion edge, completion time, parameter summary, and equipment field of the execution result. Then, a pending unified process event is generated according to the mapping configuration of the currently unique effective field. The pending event, the two types of anchors, the preceding summary, and the evidence list are written to S2 in the same transaction batch and sent to S2. After S2 verifies the submission, it only writes a submission message to the status flow queue once. S5 consumes the message and performs a comparison exchange using the single piece identifier, the submitted event identifier, and the submitted token version as idempotent keys. If successful, the current process is advanced and a constraint update message containing the advanced token version is sent to S3. Duplicate messages only return the original constraint update message address. S3 establishes a processing registration table with the same idempotent key. Processed messages only return the existing constraint package and do not repeatedly update the process constraint diagram or generate a new version constraint package. The comparisons of parameter ranges, finished product pre-inspection increments, and finished product quality component boundaries are all performed under their respective recorded engineering units. If the equipment return unit differs from the licensed unit, it is first converted according to the unit conversion relationship in the S4 version compatibility mapping. If the conversion relationship is missing, the current and subsequent licenses are frozen, and a unit mapping repair task referencing the equipment version, licensed unit, return unit, and original message address is generated. If the quality bit is invalid or the gauge calibration version is expired, the current and subsequent licenses are frozen, and a quality data re-acquisition task or a gauge calibration retest task is generated respectively, and the token status is set to retest. All three types of tasks are... Record the original event identifier, original license identifier, failure field, responsible workstation, number of retries, and completion time limit of the two process cycle limits; after obtaining a valid conversion relationship or valid measurement data, do not directly restore the license, but associate the new evidence with the original event identifier and return to S1 to reconstruct the pending event, and then enter S3 through S2 verification and the above unique idempotent advancement chain; each type of task can automatically retry a maximum of two times. If it still fails or times out, a manual quality review task containing all original evidence and repair records is generated and the roller is placed in isolation. The manual terminal can only choose to repair or retest, rework, continue isolation, or scrap. For records that fail S2 re-verification, the module reads the failure category from the exception handling instruction, freezes all permits after the current process, and creates a unique master task according to the failure evidence type: a quality re-measurement task is created when a quality measurement field is missing, a quality bit is invalid, or a gauge calibration fails; an identity verification task is created when a single-piece identity anchor fails; a controlled evidence reconstruction task is created when equipment completes anchor or slot binding or timing fails; and an evidence chain verification task is created when the preceding summary or summary algorithm field fails. Each task saves the original pending event identifier, the original process node, and supplementary signals. Record the address, replay the verification result address, and the alternative event identifier; identity verification and controlled evidence reconstruction restore the unique dual anchor from the original code reading, occupation binding, and completion edge evidence; evidence chain verification restores the continuous preceding summary from the immutable event log; when unique evidence cannot be formed, it is converted to the original process redo or manual confirmation; after successful recovery, the original pending event is marked as replaced; the new event references the original event identifier in S1 and reconstructs two types of anchors, parameter summary, and preceding summary; only after the new event is submitted in S2 can the original process node be marked as completed and enter S3 through the unique idempotent advancement chain; For the unique primary empty set reason code returned by S4 based on the cross-device predicate matrix, an isolation task is generated and the roller is sent to the isolation buffer only if all candidates are determined to contain quality budget failure predicates. If all candidates are determined to contain permanent equipment capacity insufficiency, flow constraint conflict, or discretization failure predicates, a corresponding rework task is generated. If composite determinism is not feasible, a manual rework planning task carrying a complete per-device predicate matrix is ​​generated. The rework task references the original process route version, abnormal process nodes, and a set of alternative preceding processes. If compatibility mapping is missing or the model or constraint data is invalid, a corresponding data recovery or retest task is generated. After repair, S4 is re-executed with the latest token, valid mapping, and valid constraint package. If temporary equipment is unavailable, the next process permission is frozen, and alarm recovery, calibration, maintenance waiting, or equipment reassignment tasks are created according to sub-reasons. The task records the unavailable equipment, status version, and recovery conditions. If the estimated recovery time is two cycle lengths and there is a timeout, the alarm is cleared and stabilized for one sampling cycle. The calibration version becomes valid again or the maintenance status ends and S4 is re-executed with the latest equipment status. If the timeout still fails to recover, manual scheduling is upgraded and the system remains frozen. If any other qualified equipment becomes available, it is immediately reassigned and S4 is re-executed. Empty set messages first perform branch qualification judgment in the order of data recovery, temporary equipment recovery or reassignment, and deterministic infeasibility. If there are any recoverable candidates with invalid data, missing mappings, or temporary unavailability, the isolation or rework conditions that depend on the validity of the candidate remain unconfirmed and are prohibited from entering the corresponding final state. Only when there are no recoverable or unknown candidates does the corresponding deterministic predicate become a valid condition. Empty set messages also save all subordinate reasons. The qualification judgment itself does not replace the unified arbitration of all valid conditions described below. Isolation status tokens cannot obtain normal workstation permission. When an abnormal information characterization device alarms, the actual program or recipe version is inconsistent, the parameter vector exceeds the parameter allowable range, a unique grid index cannot be formed at the permitted resolution, or the parameter vector does not belong to the joint allowed domain that has passed the digest verification, the module enters the rework branch and retains the original parameter message, the joint allowed domain object address, and the alarm sequence; only when the pre-inspection increment of a certain quality component formed according to the aforementioned unique benchmark, normalized local contribution, and same version quality transfer coefficient exceeds the corresponding finished product boundary of the remaining quality constraint package does it enter the isolation branch, and record the original quality vector, normalized local contribution, transfer coefficient version, and finished product pre-inspection increment. The original absolute value or cumulative relative deviation of the quantity, outbound component, outbound direction and outbound quantity must not directly trigger the comparison; after the retest or rework is completed, the execution result is returned to S1 as new workstation data to rebuild the pending events and two types of anchors. After S2 verifies and submits, S5 promotes it with a unique idempotent key and calls S3 uniquely. Only when the new constraint package of S3 is successfully replaced and the version is consistent will it be delivered to S4 by the transaction outbox of S5. It is forbidden to directly call S3 or S4 from the retest or rework task; only when the maximum number of times specified by the rework rule is reached or the clear termination condition is cleared and there is still no feasible set of candidate workstations and parameters will a scrapped task be generated and the token status be set to scrapped. If the same execution result or the same empty set message contains multiple exception reasons, the module first verifies the validity of the evidence item by item and forms a branch qualification matrix: the scrap condition is met when the maximum number of rework or retest failures or other explicit termination conditions are reached; the isolation condition is met when the quality exceeds the limit is confirmed by valid and independent pre-inspection evidence from the finished product; the rework condition is met when the valid equipment alarm, parameter, version, or deterministic empty set predicate is confirmed; the retest condition is met when the measurement, mapping, model, or constraint evidence is invalid and there are no conditions that have been confirmed by other valid evidence, and the retest condition includes the corresponding data recovery and evidence repair tasks; invalid data only keeps the judgment that depends on the invalid data unconfirmed and does not suppress the prior branches that have been confirmed by other valid evidence; for empty set messages, there are recoverable or unrecoverable branches. When candidates are known, isolation or rework conditions that are definitively infeasible based on all candidates are kept unconfirmed according to the aforementioned qualification gating, and are not listed as established branches at the same time as retest conditions; the module then selects a unique main branch for all established conditions in the qualification matrix in the order of scrap, isolation, rework, and retest. Scrap cannot be listed as an established condition if the maximum number of failures or other termination conditions have not been reached, and initial empty set messages cannot directly establish scrap conditions; both types of messages only create one main exception task, and the remaining established or unconfirmed conditions are written as subordinate reasons into this task. Within the same priority, a unique main reason is selected according to the reason code dictionary order. State transitions use token version comparison and exchange. When there is a version conflict, the latest exception state is reread, and a later branch cannot overwrite an established earlier branch; Quality retesting is only used when quality measurement evidence is invalid or quality components are out of bounds and require confirmation. The quality inspection station reads the quality component to be retested, the original measurement unit, the original gauge calibration version, and the original event identifier. After completing no-load calibration, three consecutive measurements are collected. If the range of the three measurements does not exceed the corresponding gauge repeatability limit, the median is taken to form the retested quality vector. This vector, along with the original event association identifier, is returned to S1 as new station data. The entire process then proceeds along S2, S5 with unique idempotency, S3 constraint package replacement, and transaction outsourcing to S4, requiring reprocessing. Identity anchors, completion anchors, slot bindings, timing, or summary failures cannot be replaced by quality retesting; instead, the aforementioned identity verification, evidence reconstruction, or... Evidence chain verification task; when the range exceeds the limit, the failure count is incremented by one and the license is frozen. The first failure leads to the second retest after recalibration or replacement of the measuring instrument. If the second failure still occurs or the cycle time limit of two corresponding processes is exceeded since the task was generated, a manual quality verification task containing all original measurement values, calibration records and failure reasons is generated and the roller is isolated. The manual quality terminal can only choose retest, rework, continue isolation or scrap as the final state disposal. The results of retest and rework must be returned to S1 as new workstation data and reprocessed along the above complete chain according to the latest token and constraint package. No manual decision may directly call S3 or S4, nor may the original license be directly restored. The rework task reads the allowed rework start point, the set of process nodes that must be redone, the maximum number of reworks, and the return node from the rework rule table based on the abnormal process node and the process route version. The rework rule table is formed by the process verification record and saves the version and effective time. In this specific implementation, the maximum number of reworks for the same abnormal node on the same roller is set to two. If a feasible set cannot be formed after reaching the number of times, the rework will no longer be repeated and will be promoted to a scrap branch. The isolation task allocates an isolation buffer bit to the roller and writes a flag to prohibit automatic outbound. The task record saves the outbound quality component, measured value, allowable boundary, engineering unit, related event summary and disposal responsibility group. State migration is only allowed after the quality disposal terminal submits a signed release, rework or scrap decision. The release decision still needs to be re-executed with the latest constraint package and the original permission cannot be directly restored. Once an abnormal task is identified, the module performs a breadth-first traversal along the sequential dependency edges from the abnormal process node in the process constraint diagram. It filters tasks that are not yet started and have the abnormal node as their predecessor node. Tasks that have been issued but have not yet started the equipment are marked as canceled and their permissions are withdrawn. The remaining tasks that have not yet started are recalculated using the updated remaining quality constraint package. Tasks that have already started are not automatically canceled but are written into the manual handling queue. The task adjustment record saves the affected task identifier, original target workstation, original permit identifier, discovery path, adjustment action, action time, and new task identifier item by item. The cancellation operation first changes the permit status to cancellation and then sends a cancellation command to the target device. The cancellation is completed after the device is confirmed not to be started. If the device has been started or the confirmation timeout has expired, the task is transferred to the manual handling queue and the system is prohibited from automatically overwriting its execution result. For normal execution results, after consuming the S2 commit message and successfully advancing the token, the module sends the quality vector, event digest, and advanced token version in the committed event (which semantically indicates the contribution of this process) as a single constraint update message to S3, according to the aforementioned unique idempotent key. This allows S3 to recalculate the cumulative finished product end occupancy and remaining budget of the five quality components based solely on the converted process-by-process contribution and the original constraint package version. The sending mentioned in this section refers to the single S3 call mentioned above, not another triggering source. Neither the S2 commit nor the S5 advance changes the license freeze state. After S3 completes the replacement of the new constraint package, it only returns the replacement result to S5. S5 then verifies and returns the result. Once the token version, process constraint diagram version, constraint package version, and replacement success flag in the result are all consistent with the current values, the next process permission status is changed from frozen to pending generation by token version comparison exchange within the same database transaction. The S4 solver message carrying the same version and unique idempotent key is written to the transaction outgoing box. Only after the transaction is successfully committed can the outgoing box submitter deliver to S4. If the status comparison exchange fails, the outgoing box write fails, or the returned version expires, the process remains frozen and cannot be delivered. Duplicate messages that have already been delivered are discarded by the S4 entry idempotent gate. If the new constraint package contains empty intervals, the pending generation conversion is not executed. The subsequent permission that has not yet been issued is immediately withdrawn and the process enters the isolation branch. The status transition module stores item-by-item traceability data using the item identifier and the local monotonic sequence number of the event as a joint key. The fields include double anchor verification results, supplementary signal records and replay verification results, submitted event summary, remaining quality constraint package version, target workstation permission, control parameters, execution results, abnormal reasons, branch priority, undo or recalculate task list and version of each object. The original message is associated with the above records through immutable evidence address. The trace writer concatenates the previous summary and the current record summary of each trace record according to the local monotonic sequence number. When querying, it recalculates and compares the summaries from the first record in sequence, and checks whether the token version, constraint package version and license version form a continuous sequence. If a summary is broken, the version is rolled back or the object address is missing, the trace status is marked as incomplete and the subsequent licenses of that roller are frozen. The evidence chain is not repaired by rewriting the history. Normal submission, retesting, rework, isolation, or scrapping status changes are all updated within the same transaction, updating the workpiece status token, task status, and traceability index. After a successful transaction, a status event containing the single-piece identifier, current status, next process, constraint package version, and disposal task identifier is published to the production execution system. If the transaction fails, the original token version is maintained and the transaction is retried. If the transaction fails three times in a row, all subsequent permissions are frozen and a system alarm is generated, thus ensuring that the scheduling, control, anomaly handling, and traceability of the roller are always driven by the same single-piece status.

[0025] The above description is only a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any equivalent substitutions or modifications made by those skilled in the art within the scope of the technology disclosed in the present invention, based on the technical solution and inventive concept of the present invention, should be covered within the scope of protection of the present invention.

[0026] This invention uses the workpiece status token and process constraint diagram of each roller as a unified state basis, combining heterogeneous equipment data conversion, process event verification, cross-process quality constraint recursion, candidate station and parameter solving, and abnormal flow handling into an interconnected closed-loop algorithm system. Specifically, by jointly verifying the determined unified process event through workpiece identity anchors, equipment completion anchors, and preceding event summaries, the equipment execution results can be accurately associated with the corresponding individual roller and process status. By converting the occurred quality deviation into finished product occupancy according to the cross-process quality transfer relationship and recursively generating the remaining quality constraint package, the selection of stations and control parameters for subsequent processes no longer depends solely on fixed process routes or standard formulas, but is constrained by the real-time remaining quality budget of the individual roller. Furthermore, the remaining quality constraints, candidate equipment capability constraints, and workpiece flow constraints are mapped to the same candidate station-parameter space for intersection calculation, thereby ensuring that the generated target station permits and control parameters simultaneously meet equipment executability, process flow requirements, and finished product quality limit requirements, achieving piece-by-piece, dynamic, and closed-loop control of the multi-process production of rollers.

[0027] To address the issues of misalignment or delay between code reading events and equipment completion events in multi-process roller applications, difficulty in transmitting preceding quality deviations, and the inability of abnormal impacts to be promptly disseminated to subsequent tasks, this invention provides targeted improvements: In the event processing structure, a hierarchical state transition mechanism of "pending event - dual anchor and summary verification - submitted event" is established. When verification fails, the minimum relevant signal set is retrieved in reverse based on the missing field, and the event evidence chain is restored through a supplementary verification window, local monotonic sequence number, and event replay. In the quality control structure, a versioned remaining quality constraint package serves as the dynamic constraint interface between preceding and following processes, ensuring that each submitted event triggers subsequent quality budget updates. In the control decision structure, the standard recipe is projected onto the candidate workstation-parameter feasible set, and discretization correction is performed in conjunction with the equipment parameter execution resolution. Simultaneously, pre-execution consistency verification is conducted using the recipe version, equipment program version, constraint package version, preceding event summary, and license validity period. The above structure establishes a hierarchical and mutually verified relationship between event credibility, quality constraints, and equipment control parameters. This reduces the risks of workpiece cross-contamination, incorrect release, and the issuance of expired parameters. It also enables timely entry into retesting, rework, isolation, or scrapping branches when the feasible set is empty, data is invalid, or execution is abnormal. At the same time, it cancels or recalculates affected unstarted tasks, thereby improving the reliability of production control, quality consistency, and the ability to handle abnormalities in a closed loop.

Claims

1. A fieldbus control method for multi-process roller control, characterized in that, include: S1. Based on the single-piece identification and process route of the roller, establish the workpiece status token and initial process constraint diagram. Collect station data through multi-protocol device adaptation edge nodes and convert it into pending unified process events associated with the workpiece status token, forming workpiece identity anchor and equipment completion anchor. S2. Verify the process and timing of the two anchors within the matching time window, and verify the summary of the preceding events of the pending unified process event and the latest submitted event summary stored in the workpiece status token. Convert the pending unified process event that has passed the verification into a submitted event. If the verification fails, freeze the next process permission, supplement the missing evidence and re-verify. If the re-verification still fails, enter the abnormal flow. S3. Update the process constraint diagram based on the submitted events, and generate a piece-by-piece remaining quality constraint package based on the current measured quality, cross-process quality transfer relationship and finished product quality limit; S4. Map the candidate equipment capacity constraints, workpiece flow constraints and remaining quality constraints to the candidate station-parameter space and find their intersection to form a candidate station-parameter feasible set. Project the standard recipe to the candidate station-parameter feasible set to generate the target station permission and control parameters. S5. Update the workpiece status token and remaining quality constraint package based on the execution results of the target station; If the re-verification fails, the candidate workstation-parameter feasible set is empty, or an execution error occurs, the normal workflow is stopped, the affected unstarted tasks are adjusted, and item-by-item traceability data is stored.

2. The multi-process fieldbus control method for rollers according to claim 1, characterized in that, S1 includes: The workpiece status token includes a single-piece identifier, batch identifier, process route version, current process, current status, and initial quality tolerance; the multi-protocol device adapter edge nodes are connected to CNC lathes, machining centers, stamping equipment, dynamic balancing equipment, shot blasting equipment, powder coating equipment, and high-frequency heating equipment, respectively, mapping equipment status, program version or formula version, process parameters, quality measurement values, alarm signals, and station events to the station data; the pending unified process event includes a single-piece identifier, process identifier, equipment identifier, parameter version, acquisition time, parameter vector, quality vector, validity flag, and previous event summary.

3. The multi-process fieldbus control method for rollers according to claim 1, characterized in that, S2 includes: the workpiece identity anchor includes a single piece identifier, a process identifier, a code reading position, and a code reading time; the equipment completion anchor includes an equipment identifier, a process identifier, a program version or recipe version, a completion edge, a parameter summary, and a completion time; the matching time window is jointly determined by the upper limit of the cycle time of the corresponding process, the upper limit of the transportation time from the code reading position to the equipment position, and the upper limit of the clock deviation of the edge node; when the process identifiers of the two anchors are the same, the time difference between the two anchors is within the matching time window, and the summary of the preceding event is the same as the latest submitted event summary stored in the workpiece status token, the pending unified process event is converted into a submitted event, and the local monotonic sequence number of the submitted event is written into the workpiece status token.

4. The multi-process fieldbus control method for rollers according to claim 1, characterized in that, S3 includes: The initial process constraint graph uses process nodes to represent process inputs, equipment capability boundaries, and quality status, and directed edges to represent process sequence dependencies, cross-process quality transfer relationships, and buffering or transportation relationships. It also establishes signal indexes for each process node to the equipment signals and acquisition signals that generate the corresponding process fields. A quality vector is extracted from the submitted events, and the current quality deviation is transferred to subsequent process nodes according to the cross-process quality transfer relationships. The available interval obtained by subtracting the occurrence of quality deviations and their subsequent transfer amounts from the finished product quality limit is recorded as the remaining quality constraint package. The remaining quality constraint package includes at least the applicable single-piece identifier, the current process, the quality component boundary, the constraint source, the constraint package version, and the validity status.

5. The multi-process fieldbus control method for rollers according to claim 1, characterized in that, S4 includes: forming a set of equipment capabilities based on the processable parameter range, parameter execution resolution, and quality capability boundary of the candidate equipment for the current process; forming a set of flow constraints based on process dependencies, buffer status, transportation status, and expected completion time; mapping the set of equipment capabilities, the set of flow constraints, and the quality component boundaries of the remaining quality constraint package to the candidate station-parameter space and intersecting them to obtain the candidate station-parameter feasible set; reading the version identifier of the process route as the process route version; selecting a standard formula with a formula reference version from the approved formula library associated with the process route version; reading the current program version or formula version of the candidate equipment; converting each control parameter of the standard formula into the projection reference of the corresponding candidate equipment according to the pre-stored version compatibility mapping; determining the parameter point with the smallest deviation from the projection reference in the candidate station-parameter feasible set; and discretizing and correcting the parameter point according to the parameter execution resolution of the corresponding equipment to form the control parameters.

6. The multi-process fieldbus control method for rollers according to claim 1, characterized in that, S5 includes: The target workstation permission includes a parameter allowance range; When the parameter vector of the execution result is within the parameter allowable range and the mass vector is within the mass component boundary of the remaining mass constraint package, the execution result is submitted and the workpiece is allowed to proceed to the next process; when the re-verification still fails, an exception handling instruction is generated carrying the reason that the data validity flag is invalid, the submitted event is not obtained, or the evidence is missing, and the retest branch is entered. When the candidate workstation-parameter feasible set is empty, an empty set reason code is generated. When the empty set reason code indicates insufficient equipment capacity or flow constraint conflict, the rework branch is entered. When the empty set reason code indicates insufficient quality budget, the isolation branch is entered. When the execution abnormal information characterization device alarms or the parameter vector exceeds the parameter allowable range, the rework branch is entered; when the execution abnormal information characterization quality vector exceeds the quality component boundary, the isolation branch is entered; and when there is still no candidate workstation-parameter feasible set after retesting or rework, the scrap branch is generated. When multiple abnormal conditions are met simultaneously, the branch selected first is selected in the order of scrapped branch, isolated branch, rework branch, and retest branch; the task that has not yet started is found along the process constraint diagram with the abnormal process node as the preceding node, and the found task is marked as canceled or recalculated with the updated remaining quality constraint package; the item-by-item traceability data includes the double anchor verification results, supplementary signal records and replay verification results, remaining quality constraint package version, target workstation permission, and execution results.

7. The multi-process fieldbus control method for rollers according to claim 4, characterized in that, Step S2 further includes: based on the missing anchor field or summary field when the verification fails, retrieving signals in reverse along the signal index and the transmission edge connected to the corresponding process node in the process constraint diagram, and determining the signal combination that can cover all missing fields and cannot cover all missing fields after deleting any signal as the relevant signal set; opening a supplementary verification window in the edge cache, switching the sampling period of the relevant signal set to a supplementary verification sampling period that is less than the normal sampling period, and receiving workstation data that arrives after the completion time of the anchor representation by the device and before the end of the supplementary verification window; the multi-protocol device adaptation edge node assigns local monotonic sequence numbers to the pending unified process event and the supplemented workstation data according to the arrival order of the workstation data, inserts the supplemented workstation data after the corresponding pending unified process event according to the local monotonic sequence number, re-executes the anchor verification and summary verification, and generates supplementary signal records and replay verification results.

8. The multi-process fieldbus control method for rollers according to claim 4, characterized in that, Step S3 further includes: decomposing the mass vector into size and shape components, residual imbalance components, surface condition components, coating components, and heat treatment components; for each mass component, reading the finished product limit and the transfer coefficient from completed processes to uncompleted processes from the process constraint diagram, converting the deviations that have occurred into finished product occupancy according to the transfer coefficient, and subtracting the cumulative finished product occupancy from the finished product limit to obtain the remaining budget for that mass component; writing the remaining budget, corresponding transfer coefficient version, and submitted event summary of each mass component into a new version of the remaining mass constraint package, so that the new version of the remaining mass constraint package replaces the old version and serves as the input for step S4.

9. The fieldbus control method for multi-process roller control according to claim 5, characterized in that, Step S4 further includes: the target workstation permit includes a single-piece identifier, a target equipment identifier, a target process identifier, control parameters, a parameter allowable range, a recipe baseline version, a candidate equipment program version or recipe version, a remaining quality constraint package version, a prior event summary, a permit validity period, and a permit status; before the equipment executes, it checks whether the recipe baseline version and the candidate equipment program version or recipe version conform to the version compatibility mapping, and checks the remaining quality constraint package version and the prior event summary. If the versions are compatible and both are consistent with the current values ​​stored in the edge node and the permit validity period has not expired, the control parameters are issued; if any one of them does not conform, the permit status is frozen and a new candidate workstation-parameter feasible set is formed.

10. A roller multi-process fieldbus control system, used to execute the roller multi-process fieldbus control method according to any one of claims 1 to 9, characterized in that, include: The event building module is used to establish workpiece status tokens and initial process constraint diagrams, collect workstation data, generate pending unified process events, and establish workpiece identity anchors and equipment completion anchors. The event verification module is used to verify the summaries of the two anchors and preceding events, and to submit the event or generate exception handling instructions; The quality constraint module is used to update the process constraint diagram and recursively generate the remaining quality constraint package; the workstation control module is used to form a candidate workstation-parameter feasible set and output the target workstation permission, control parameters, or empty set reason code. The status transition module is used to update the workpiece status token and remaining quality constraint package based on the execution results, associate and store traceability data, stop normal transition, generate abnormal process routes, and cancel or recalculate affected unstarted tasks.