A multi-modal based path planning method for unmanned obstacle removal vessel
By using a multimodal path planning method, combined with the load-energy consumption fusion map of the cleaning unit and dual-constraint judgment, the path planning of the unmanned obstacle clearing vessel is optimized, which solves the problems of power waste, incomplete cleaning and frequent shutdown in the existing technology of unmanned obstacle clearing vessels, and realizes efficient and safe obstacle clearing operation.
Patent Information
- Application Number
- CN202611219319.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-12
- Publication Date
- 2026-11-24
AI Technical Summary
Existing unmanned obstacle clearing vessel path planning methods cannot effectively solve the problems of unmanned obstacle clearing vessels repeatedly running empty in clean areas, wasting electricity, incomplete clearing of high-density aquatic plant areas, being unable to return when the collection compartment is full, and frequent shutdowns when continuously entering high-congestion areas.
A multimodal path planning method is adopted. By dividing the cleanup into cleanup units, a load-energy consumption fusion map is established, cleanup parameters are adjusted in real time, an appropriate cleanup mode is selected, and candidate cleanup units are screened by performing dual constraint judgment. The path planning is optimized by comprehensively considering the cleanup load density, congestion risk, expected cleanup energy consumption and power safety margin.
It effectively reduced energy consumption per unit area, improved energy utilization efficiency, reduced power waste of unmanned obstacle clearing vessels in clean areas and reduced downtime in high-congestion areas, and ensured safe return and thorough cleanup.
Smart Images

Figure CN123156935A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of waterway path planning technology, and relates to unmanned vessels, specifically a path planning method for unmanned obstacle clearing vessels based on multimodal approaches. Background Technology
[0002] Campus lakes, landscaped waterways, and small waterways often accumulate floating debris such as weeds, duckweed, fallen leaves, and plastic bags, making manual cleaning costly and inefficient. While small unmanned obstacle clearing vessels can replace manual labor, current unmanned vessel technology is still in the basic cruising stage and cannot effectively complete the full closed-loop operation of cutting, conveying, compressing, loading, and unloading. Existing technologies offer several path planning schemes for unmanned obstacle clearing vessels, most of which emphasize geometric full coverage, shortest path, or smooth obstacle avoidance, employing methods such as zigzag paths and grid traversal. However, these schemes cannot comprehensively consider factors such as the location of the debris, the actual load on the mechanism, the remaining capacity of the compartment, the remaining power, and the risk of blockage, resulting in shortcomings in both efficiency and safety.
[0003] Common problems include: unmanned obstacle clearing vessels repeatedly running empty in clean areas, wasting power; incomplete clearing of areas with high-density aquatic plants due to heavy cutting loads; collection tanks potentially becoming full before returning to port; being too far from the unloading point when battery is low, preventing safe return; and frequent shutdowns due to continuous entry into highly congested areas. Therefore, further research and improvement of unmanned obstacle clearing vessel path planning methods are needed to address these issues. Summary of the Invention
[0004] To overcome the aforementioned shortcomings of the prior art, the present invention aims to provide a multimodal unmanned obstacle clearing vessel path planning method to address the following issues with existing obstacle clearing paths: unmanned obstacle clearing vessels repeatedly run empty in clean areas, wasting power; high-density aquatic weed areas are not thoroughly cleared due to the large cutting load; the collection compartment may be fully loaded before returning to port; when the battery is low, the unloading point is too far away to return safely; and continuous entry into high-congestion areas leads to frequent shutdowns.
[0005] This invention is achieved using the following technical solution: a multimodal unmanned obstacle clearing vessel path planning method, comprising the following steps:
[0006] S1. Divide the water area to be cleaned into several cleaning units;
[0007] S2. Establish the unit state vector M for each of the cleaning units. i And based on the unit state vector M i Generate a load-energy fusion map containing each of the cleaning units; the unit state vector M i At least includes obstacle clearance load density D i Blockage risk B i Estimated energy consumption for cleaning E iExpected cabin capacity consumption O i , Power safety margin H i ;
[0008] S3. Enter the cleanup unit, based on the unit state vector M. i Adjust cleaning parameters and select a suitable cleaning mode for cleaning; continuously collect multimodal operation data of the cleaning unit during the cleaning process; the multimodal operation data includes at least environmental perception data collected by the external sensing unit, mechanical load data collected by the device load detection unit, navigation status data collected by the navigation status acquisition unit, and cabin capacity and power data collected by the cabin capacity and power detection unit.
[0009] S4. Before re-entering the cleanup unit, repeat step S2 based on the multimodal data to update the load-energy fusion map; perform dual-constraint judgment to filter candidate cleanup units based on the latest load-energy fusion map; then, calculate the comprehensive cost function for each candidate cleanup unit that meets the dual-constraint conditions, and select the unit with the lowest comprehensive cost as the next cleanup target; repeat step S3.
[0010] S5. Repeat steps S2 to S4 until no cleaning unit enters the candidate after the double constraint judgment and screening; at this time, no more cleaning units will be entered, and the unmanned obstacle clearing vessel will be planned to return to port for unloading and docking.
[0011] Further preferably, in step S2, the unit state vector M established for each cleaning unit i is... i As shown in formula (1):
[0012] M i ={D i B i E i O i H i} ……(1)
[0013] Among them, D i To clear the load density, B i To mitigate the risk of congestion, E i To predict the energy consumption for cleaning, O i To predict cabin capacity consumption, H i This is a safety margin for battery power.
[0014] Further preferably, in step S3, the cleaning mode includes four types: rapid cleaning mode A, anti-blocking cleaning mode B, energy-saving cleaning mode C, and return unloading mode D; according to the unit state vector M i Remaining cabin capacity C rem and remaining state of charge (SOC) rem Choose one of the cleaning modes to clean.
[0015] Further preferably, the blockage risk B i The value range is 0 to 1, and it can be divided into four levels: 0.00≤B i A value < 0.30 indicates low congestion risk; in this case, normal cleanup should be performed. A value ≤ 0.30 indicates low congestion risk. i A value <0.60 indicates a medium risk of blockage. In this case, adjust the unmanned obstacle clearing vessel to reduce its speed and appropriately increase the cutting speed; 0.60 ≤ B i A value <0.80 indicates a high risk of blockage. In this case, the unmanned clearing vessel should be adjusted to reduce the width of the clearing strip, and anti-blockage clearing mode B should be activated; 0.8≤B i A value ≤1.00 indicates a severe risk of congestion. In this case, entry into the unit should be suspended, and alternative routes should be taken instead.
[0016] Further preferably, in step S4, the specific operation of the dual-constraint judgment to screen candidate cleaning units is as follows: based on the remaining state of charge SOCrem and remaining capacity C obtained from the capacity and power detection units. rem Data; remaining cabin capacity C rem Greater than or equal to the expected cabin capacity consumption O i With cabin capacity safety margin C safe The sum of these, and the corresponding safety margin H of electricity. i Cleanup units with a value greater than or equal to 0 are added to the candidate list; the candidate cleanup unit is denoted as j, and its comprehensive cost function is shown in the following formula (7):
[0017] J j =λ1×L j ′+λ2×T j ′+λ3×R j ′+λ4×E j ′+λ5×B j ′+λ6×O j ′-λ7×H j ' ……(7)
[0018] Among them, L j ′ represents the normalized path distance; T j ′ represents the normalized value of the number of turns; R j ′ represents the normalized value of the duplicate coverage penalty; E j 'To clean up the normalized energy consumption value; B' j ′ represents the normalized value of congestion risk; O j ′ represents the normalized value of expected cabin capacity consumption; H j ′ represents the normalized value of the safety margin for electrical power.
[0019] Further preferred, in step S4, the safety margin of the battery H i The calculation relationship is shown in formula (6):
[0020] H i=SOC rem ×E bat - (E) j +E return +E safe ……(6)
[0021] Among them, SOC rem E represents the current remaining state of charge, with a value ranging from 0 to 1. bat E represents the total usable energy of the battery. j E represents the estimated cleaning energy consumption for candidate cleaning unit j. return Energy consumption for returning from the candidate unit to the unloading point or safe docking point; E safe For return safety margin; E bat State of Charge (SOC) indicates the total battery capacity. rem ×E bat This indicates the current remaining available battery power.
[0022] More preferably, the return safety margin E safe The safety margin C is the greater of 10% of the total available battery energy and 20% of the expected return energy consumption; safe The larger of the standard deviations of the estimated errors between 8% of the total capacity of the collection chamber and the capacity consumption of several recent cleaning units is used.
[0023] Compared with the prior art, the present invention has the following beneficial technical effects:
[0024] This invention divides the water area into several cleaning units, and determines the cleaning load density D of each cleaning unit. i Blockage risk B i Estimated energy consumption for cleaning E i Expected cabin capacity consumption O i , Power safety margin H i Establish the unit state vector M i The collaborative decision-making process for path planning goes beyond just geometric paths, taking into account the actual needs of obstacle removal.
[0025] During the cleaning process, this invention can determine the cleaning method based on the unit state vector M. i Adjust the cleaning parameters and select the appropriate cleaning mode; set four modes: fast cleaning mode A, anti-blockage cleaning mode B, energy-saving cleaning mode C, and return unloading mode D. This reduces the risk of blockage while effectively reducing energy consumption per unit area and improving energy utilization efficiency.
[0026] This invention employs a dual-constraint judgment to screen candidate cleaning units. Before entering a candidate unit, it performs dual predictions on cargo capacity and power consumption, and plans unloading or docking routes and energy consumption in advance, thereby reducing the risk of full-load interruption and return failure.
[0027] This invention collects multimodal operation data from the cleaning unit to establish a load-energy consumption fusion map, which can monitor load-energy consumption changes in real time, preventing unmanned clearing vessels from repeatedly running empty in clean areas and wasting electricity; and avoids continuous entry into high-congestion areas during the planning process to reduce frequent shutdowns. Attached Figure Description
[0028] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, for those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0029] Figure 1 This is a flowchart illustrating the overall process of the multimodal unmanned obstacle clearing vessel path planning method of the present invention.
[0030] Figure 2 This diagram illustrates the relationship between multimodal operation data and the load-energy consumption fusion map.
[0031] Figure 3 This is a flowchart illustrating the selection process for candidate cleanup units under constraints of remaining cabin capacity and remaining power.
[0032] Figure 4 This diagram illustrates the energy-saving adaptive path of the present invention in high / low load regions.
[0033] Figure 5 This is a logic diagram showing the switching of the unmanned obstacle clearing vessel's clearing mode. Detailed Implementation
[0034] To better understand the above-mentioned objectives, features, and advantages of the present invention, the solutions of the present invention will be further described below. It should be noted that, unless otherwise specified, the embodiments of the present invention and the features thereof can be combined with each other.
[0035] Many specific details are set forth in the following description in order to provide a full understanding of the invention, but the invention may also be practiced in other ways different from those described herein; obviously, the embodiments in the specification are only some embodiments of the invention, and not all embodiments.
[0036] The specific embodiments of the present invention will now be described in detail with reference to the accompanying drawings.
[0037] refer to Figure 1-5 As shown, a path planning method for an unmanned obstacle clearing vessel based on multimodal methods includes the following steps:
[0038] (1) Divide the water area to be cleaned into several regular cleaning units, such as rectangular grids, parallel strips, or polygonal areas, such as Figure 4 As shown.
[0039] (2) Establish the unit state vector M for each of the cleaning units. i And based on the unit state vector M i Generate a load-energy fusion map containing all the aforementioned cleaning units. The load-energy fusion map is updated in real time as the load-energy consumption of the unmanned obstacle removal vessel changes, such as... Figure 1-2 As shown.
[0040] The unit state vector M established for each cleaning unit i i As shown in formula (1):
[0041] M i ={D i B i E i O i H i} ……(1)
[0042] Among them, D i To clear the load density, B i To mitigate the risk of congestion, E i To predict the energy consumption for cleaning, O i To predict cabin capacity consumption, H i This is a safety margin for battery power.
[0043] 1.1 Obstacle Clearance Load Density D i Calculation
[0044] Obstacle clearing load density D i This characterizes the overall load intensity exerted on the unmanned obstacle removal vessel's cleaning mechanism by floating debris such as aquatic plants, duckweed, fallen leaves, and plastic bags within cleaning unit i. D i The value ranges from 0 to 1. The larger the value, the higher the obstacle removal load of the cleaning unit.
[0045] Obstacle clearing load density D i It is calculated by fusing mechanical load characteristics, speed decay characteristics, load increment characteristics per unit distance, and visual load characteristics. As shown in formula (2):
[0046] D i =ω1×F im +ω2×F iv +ω3×F io +ω4×F ig ...(2)
[0047] in:
[0048] F im The load characteristics of the mechanism are mainly calculated from the average and peak currents of the cutting motor, conveying motor, and compression motor, as shown in formula (2.1):
[0049] F im =0.6×[(I i (average - I0) / (I) max -I0)]+0.4×[(I i Peak value - I0) / (I max -I0)] ……(2.1)
[0050] In the formula, I i The average value is the average motor current within cleaning unit i, I i The peak value is the peak value of the motor current in cleaning unit i, and I0 is the no-load current. max To allow the maximum operating current.
[0051] F iv This indicates the speed reduction characteristic, used to reflect the degree of speed decrease caused by obstacle clearing load. As shown in formula (2.2):
[0052] F iv = (v cmd -v i ) / v cmd ... (2.2)
[0053] In the formula, v cmd The desired speed set for the controller, v i The actual average speed within clearing unit i.
[0054] F io This represents the characteristic of load increment per unit distance, used to reflect the increase in the load capacity of the collection compartment per unit travel distance. As shown in formula (2.3):
[0055] F io = (ΔC) i / Δs i ) / q max ... (2.3)
[0056] In the formula, ΔC i To determine the change in the occupancy of the internal compartment of cleaning unit i, Δs i q represents the distance traveled within the cleanup unit. max The maximum design loading increment per unit distance.
[0057] F ig The visual load characteristic is represented by the proportion of pixels containing floating objects, aquatic plants, or debris in the image. As shown in formula (2.4):
[0058] F ig =A debrisi / A wateri ... (2.4)
[0059] In the formula, A debrisi A represents the area of floating debris, aquatic plants, or garbage obtained from image recognition. wateri This represents the area of the water surface in the image corresponding to the cleaning unit.
[0060] All the above features are normalized to 0-1. By default, the weights can be set as follows:
[0061] ω1=0.35, ω2=0.20, ω3=0.25, ω4=0.20.
[0062] Among them, the mechanical load characteristics accounted for the highest proportion, followed by the load increment per unit distance, while speed decay and visual load characteristics were used as auxiliary judgments.
[0063] 1.2 Blockage Risk B i Calculation
[0064] Congestion Risk B i This characterizes the likelihood of blockages in the cutting, conveying, or compressing mechanisms within cleaning unit i due to factors such as long strips of aquatic plants, rope-like debris, or tangled plastic bags. B i The value ranges from 0 to 1; the larger the value, the higher the risk of congestion.
[0065] Congestion Risk B i The result is calculated by combining the characteristics of sudden increase in cutting current, decrease in conveying speed, and increase in compression chamber pressure. As shown in formula (3):
[0066] B i =μ1×G iI +μ2×G is +μ3×G ip ... (3)
[0067] in:
[0068] G iI This indicates a sudden increase in the current of the cutting motor. As shown in formula (3.1):
[0069] G iI = (I cuti -I cutw (Average) / I cutw Average value... (3.1)
[0070] In the formula, I cuti To clear the current current of the cutting motor within unit i, I cutwThe average value is the average value of the cutting motor current within a preset sliding time window; the sliding time window is used to smooth the instantaneous fluctuations of the cutting motor current and uses the recent operating current as a dynamic benchmark to identify abnormal current surges relative to the recent operating state, thereby reducing misjudgments caused by instantaneous noise or single-point fluctuations.
[0071] When the instantaneous current I of the cutting motor cuti Exceeding the average current I of the sliding window cutw A sudden increase in current is considered to occur when the current exceeds 1.35 times the average value, or exceeds 1.2 times the average value of the sliding window for 3 consecutive seconds.
[0072] G is This indicates a decrease in conveying speed. As shown in formula (3.2):
[0073] G is = (s ref -s i ) / s ref ... (3.2)
[0074] In the formula, s ref For normal conveying speed, s i This represents the current delivery speed.
[0075] G ip This indicates the characteristic of pressure increase in the compression chamber. As shown in formula (3.3):
[0076] G ip = (P i -P0) / (P max -P0)……(3.3)
[0077] In the formula, P i P is the current compression chamber pressure, P0 is the normal operating pressure, and P max To the maximum allowable pressure. P max For maximum allowable pressure; G iI G is and G ip All values are limited to the range of 0 to 1, with 0 being less than 0 and 1 being greater than 1, to ensure that B... i The value range is 0 to 1.
[0078] By default, the weights can be set as follows:
[0079] μ1=0.40, μ2=0.30, μ3=0.30.
[0080] Congestion risk levels can be classified as follows:
[0081]
[0082] 1.3 Estimated cleanup energy consumption Ei Calculation
[0083] Estimated cleanup energy consumption E i This includes not only the energy consumption of the obstacle removal mechanism, but also the additional energy consumption of the propulsion motor within the clearing unit. i The sum of the energy consumption of the propulsion motor, cutting motor, conveying motor, compression motor, controller, and sensor auxiliary energy consumption within unit i is calculated as shown in formula (4).
[0084] (4)
[0085] Among them: I prop (t) represents the current of the propulsion motor; Icut(t) represents the current of the cutting motor; I conv (t) represents the current of the transmission motor; I comp (t) represents the compressor motor current; I ctrl (t) represents the current of the controller and auxiliary equipment such as sensors; U(t) represents the battery output voltage; t1 to t2 represents the time period corresponding to the unmanned obstacle clearing vessel completing the operation of clearing unit i.
[0086] To facilitate comparison between different cleaning units, E can be used. i Energy consumption per unit area for cleaning e i As shown in formula (4.1):
[0087] e i =E i / A i ... (4.1)
[0088] In the formula, A i To clean up the area of cell i.
[0089] Under different operating modes, E i This can be multiplied by a mode correction factor. For example, propulsion energy consumption is higher in the rapid cleaning mode, lower in the energy-saving cleaning mode, and higher in the cutting and conveying modes in the anti-blocking cleaning mode.
[0090] 1.4 Expected cabin capacity consumption O i Calculation
[0091] Expected cabin capacity consumption O i Used to estimate the collection compartment capacity that cleaning unit i will occupy after being cleaned. i It can be calculated by fusing historical average loading volume, current cabin capacity change rate, and visual recognition results. As shown in formula (5):
[0092] O i =η1×O ih +η2×O ir +η3×O ig... (5)
[0093] Among them, O ih The historical average load of similar cleaning units; O ir This refers to the loading capacity calculated in real time based on the current rate of change in cargo capacity; O ig This is the load capacity estimated based on the visual recognition area.
[0094] By default, the weights can be set as follows:
[0095] eta1=0.25, eta2=0.45, eta3=0.30
[0096] In actual operation, the current cargo hold change rate can more directly reflect the real-time loading status of the clearing vessel, therefore O ir The weight is relatively high. If image recognition is affected by lighting, water reflection, or camera obstruction, the O value will be reduced. ig The weight.
[0097] 1.5 Safety margin of power H i Calculation
[0098] Battery safety margin H i This represents the remaining battery power of the unmanned obstacle clearing vessel after it has completed clearing the candidate units and returned safely. As shown in formula (6):
[0099] H i =SOC rem ×E bat - (E) i +E return +E safe ……(6)
[0100] Among them, SOC rem E represents the current remaining state of charge, with a value ranging from 0 to 1. bat E represents the total usable energy of the battery. i E represents the estimated cleaning energy consumption for cleaning unit i. return Energy consumption for returning from cleaning unit i to the unloading point or safe docking point; E safe For a safety margin during return flight. E bat SOC (State of Charge) is the total usable energy of the battery. rem ×E bat This indicates the current remaining available power, thus H i E i E return and E safe They use the same energy units.
[0101] Return energy consumption E return It can be calculated according to the following formula (6.1):
[0102] E return =d return ×e nav ×(1+α w +α c +α l )+E turn ... (6.1)
[0103] Where, d return e is the length of the return route. nav Average energy consumption per unit distance; α w α is the wind speed correction factor. c α is the flow correction factor; l E is the load correction factor. turn Additional energy consumption for steering and obstacle avoidance.
[0104] Return safety margin E safe The value is determined by a combination of fixed and dynamic values, and is the larger of 10% of the total available battery energy and 20% of the expected return energy consumption.
[0105] E safe =max(0.10×E) bat 0.20×E return )
[0106] Among them, E bat This refers to the total battery capacity. In other words, the system should retain at least 10% of the total battery capacity, or a safety margin of no less than 20% of the expected return energy consumption. In situations with strong winds, rapid currents, large positioning errors, or complex routes, this safety margin can be increased to 15%–20% of the total battery capacity.
[0107] Among them, E bat This refers to the total usable battery energy. In other words, the system should retain at least 10% of the total usable battery energy, or a safety margin of no less than 20% of the expected return energy consumption. In situations with strong winds, rapid currents, large positioning errors, or complex routes, this safety margin can be increased to 15%–20% of the total usable battery energy.
[0108] (3) Before entering the cleanup unit for the first time, a dual-constraint judgment and screening will be performed based on the initial load-energy consumption fusion map. However, at this time, the unmanned obstacle clearing vessel is in a full-load state and completely empty, so it is an empty candidate. The comprehensive cost function is calculated for all cleanup units, and the cleanup unit with the lowest comprehensive cost is selected as the initial cleanup target.
[0109] Upon entering the initial cleanup target, adjust the cleanup parameters, such as speed, strip width, cutting speed, compression frequency, and bypass opening, according to the unit state vector Mi (Di, Bi, Ei, Oi, Hi). Then select a suitable cleanup mode for cleanup, such as... Figure 5As shown; the cleaning modes include four types: fast cleaning mode A, anti-blockage cleaning mode B, energy-saving cleaning mode C, and return unloading mode D; based on the unit state vector Mi, remaining cabin capacity Crem, and remaining charge state SOCrem, one of the cleaning modes is selected for cleaning.
[0110] During the cleanup process, multimodal operational data from the cleanup units is continuously collected. This includes environmental perception data collected by external sensing units, such as surface images, radar, ultrasound, and water flow sensors; device load detection units that detect and collect load data from the cutting motor, conveying motor, compressor motor, and propulsion motor; navigation status acquisition units that collect navigation status data such as speed, inertia, and positioning of the unmanned clearing vessel; and cabin capacity and power detection units, including a cabin capacity detection module and a battery management system, to obtain the remaining state of charge (SOC). rem and remaining cabin capacity C rem Data, such as Figure 2 As shown.
[0111] (4) Before re-entering the cleaning unit, such as Figure 3 As shown, the operation of step (2) is repeated based on the multimodal data to update the load-energy fusion map; candidate cleanup units are selected based on the latest load-energy fusion map using a dual-constraint judgment. Then, the comprehensive cost function is calculated for the candidate cleanup units that meet the dual-constraint conditions, and the unit with the lowest comprehensive cost is selected as the next cleanup target. The operation of step (3) is repeated to clean up the next cleanup unit.
[0112] 4.1 Dual-constraint judgment and screening of candidate cleanup unit
[0113] like Figure 3 As shown, the remaining state of charge SOCrem and remaining capacity C are obtained from the capacity and power detection unit. rem Data; remaining cabin capacity C rem Greater than or equal to the expected cabin capacity consumption O i With cabin capacity safety margin C safe The sum of these, and the corresponding safety margin H of electricity. i Cleanup units with a value greater than or equal to 0 are added to the candidate list.
[0114] Among them, the remaining state of charge SOCrem and the remaining cabin capacity C rem Data collected from multimodal operations; estimated cabin capacity consumption O i Estimated energy consumption for cleaning E i Return energy consumption E return and the safety margin of power H i Referring to step (2); cabin capacity safety margin C safe As shown below.
[0115] Safety margin of cabin capacity C safeThe larger of the standard deviations of the estimated errors between 8% of the total capacity of the collection chamber and the capacity consumption of several recent cleaning units is used.
[0116] C safe =max(0.08×C) max , σ O )
[0117] Where, σ O This represents the standard deviation of the estimation error for the capacity consumption of several recent cleanup units. Typically, the capacity safety margin C... safe Take 8% to 15% of the total capacity of the collection chamber; when the error in the chamber capacity estimation increases, it can be appropriately increased according to the preset safety strategy, but not exceeding the upper limit of the safe margin of the chamber capacity set by the system.
[0118] 4.2 Constructing the comprehensive cost function
[0119] like Figure 3 As shown, the comprehensive cost function consists of path distance, number of turns, duplicate coverage penalty, and congestion risk B. i Estimated energy consumption for cleaning E i Expected cabin capacity consumption O i and the safety margin of power H i The result is obtained by normalizing the values to the range of 0 to 1.
[0120] Let the candidate cleanup unit be denoted as j, and its comprehensive cost function is shown in the following formula (7):
[0121] J j =λ1×L j ′+λ2×T j ′+λ3×R j ′+λ4×E j ′+λ5×B j ′+λ6×O j ′-λ7×H j ' ……(7)
[0122] Among them, L j ′ represents the normalized path distance; T j ′ represents the normalized value of the number of turns; R j ′ represents the normalized value of the duplicate coverage penalty; E j 'To clean up the normalized energy consumption value; B' j ′ represents the normalized value of congestion risk; O j ′ represents the normalized value of expected cabin capacity consumption; H j ′ represents the normalized value of the safety margin for electrical power.
[0123] For example: L j ′=L j / L max E j′=E j / E max ;O j ′=O j / O max .
[0124] By default, the weights can be set as follows:
[0125] λ1=0.18, λ2=0.09, λ3=0.11, λ4=0.22, λ5=0.20, λ6=0.13, λ7=0.07.
[0126] This invention balances energy saving, clog prevention, and coverage efficiency; therefore, path distance, cleaning energy consumption, and clog risk are given high weights. Energy safety margin H j In the cost function, a negative term indicates that the larger the safety margin, the more suitable the candidate cleanup unit is as the next cleanup target.
[0127] (5) Repeat steps (2) to (4) until no cleaning unit enters the candidate after the double constraint judgment screening; at this time, no more cleaning units are entered, and the unmanned obstacle clearing vessel is planned to return to unload and safely dock.
[0128] A comparative test was conducted on the above methods:
[0129] 1. Simulation Environment Setup
[0130] The simulated water area was set to 40m × 30m, divided into 2m × 2m cleaning units, totaling 300 cleaning units. Low-load, medium-load, high-load, and high-congestion-risk zones were set within the water area. The high-load zone accounted for approximately 25%, and the high-congestion-risk zone accounted for approximately 12%. The unmanned clearing vessel's initial battery level was set to 100%, the collection compartment was initially empty, and the unloading point was located at a fixed position on the shore.
[0131] 2. Quantitative comparison
[0132] Example: The multimodal load-energy consumption fusion map energy-saving coverage path planning method proposed in this invention.
[0133] Comparative Example 1: Traditional bow-shaped full-coverage path planning.
[0134] Comparative Example 2: A-Star path planning with only energy consumption constraints.
[0135] Comparative Example 3: Q-Learning path planning with only cabin capacity constraints.
[0136] Each method was simulated 30 times, and the average value was used for comparison, as shown in Table 1.
[0137] Table 1. Quantitative comparison results between the method of this invention and existing path planning methods.
[0138]
[0139] As can be seen from the comparison results in Table 1, compared with Comparative Examples 1-3, the method of the present invention has the lowest total energy consumption per unit area, lowest repeated coverage rate, lowest number of full-load interruptions, and lowest low-battery return failure rate, while the success rate of clearing high-congestion areas is higher than that of existing technologies. The planning method of the present invention has a significant improvement in technical effectiveness.
[0140] 3. Safe return test
[0141] like Figure 4 As shown in the simulation scenario, with 25% remaining battery power and the current location approximately 80m from the unloading point, the system estimates that the return energy consumption is about 15% of the total battery power. With a safety margin of 10%, the total demand is approximately 25%. Continuing to the next high-load unit at this point could lead to return failure. The method of this invention uses a dual-constraint pre-screening mechanism to determine that further cleaning is not advisable, immediately terminating the current cleaning task and planning the shortest safe return path.
[0142] In 50 low-power simulation tests, Comparative Example 1 (traditional bow-shaped full-coverage path) failed to return to base 4 times; Comparative Example 2 (A-Star path planning with only energy consumption constraints) failed to return to base 3 times; Comparative Example 3 (Q-Learning path planning with only cabin capacity constraints) failed to return to base 3 times; while the method of the present invention did not show any obvious return to base failures.
[0143] 4. Anti-blocking test
[0144] In a landscape fishpond scenario with complex shorelines and abundant aquatic plants and rope-like debris, when the cutting motor current suddenly increases, the conveying speed decreases, and the compression chamber pressure increases, the system calculates a higher risk of blockage, B. i It then automatically switches to anti-blockage clearing mode B. In this mode, the unmanned obstacle clearing vessel reduces its speed, narrows the strip width, and performs short-term reverse rotation of the cutter group, bypass drainage, or material retraction actions.
[0145] Compared with the fixed path scheme, the method of the present invention can avoid continuous entry into high congestion areas, reduce the average number of downtimes from 4 to 5 times / 100 units to about 1 time / 100 units, and increase the success rate of clearing high congestion areas from about 73% to about 92%.
[0146] The above description is merely a specific embodiment of the present invention, enabling those skilled in the art to understand or implement the present invention. Although detailed descriptions have been provided with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some or all of the technical features therein; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments, and they should all be covered within the protection scope of the claims.
Claims
1. A path planning method for an unmanned obstacle clearing vessel based on multimodal methods, characterized in that: Includes the following steps: S1. Divide the water area to be cleaned into several cleaning units; S2, establishing a unit state vector M of each of the cleaning units i ; and generating a load-energy fusion map containing each of the cleaning units according to the unit state vector M i ; the unit state vector M i at least contains a barrier removal load density D i , a blockage risk B i , a predicted cleaning energy consumption E i , a predicted cabin capacity consumption O i , and an electric quantity safety margin H i ; S3, entering the cleaning unit, according to the unit state vector M i Adjust the cleaning parameters and select the appropriate cleaning mode; continuously collect multi-modal operation data of the cleaning unit during the cleaning process; the multi-modal operation data at least includes environmental perception data collected by the external perception unit, mechanism load data collected by the device load detection unit, navigation state data collected by the navigation state collection unit, and cabin capacity and power data collected by the cabin capacity and power detection unit; S4. Before re-entering the cleanup unit, repeat step S2 based on the multimodal data to update the load-energy fusion map; perform dual-constraint judgment to filter candidate cleanup units based on the latest load-energy fusion map; then, calculate the comprehensive cost function for each candidate cleanup unit that meets the dual-constraint conditions, and select the unit with the lowest comprehensive cost as the next cleanup target; repeat step S3. S5. Repeat steps S2 to S4 until no cleaning unit enters the candidate after the double constraint judgment and screening; at this time, no more cleaning units will be entered, and the unmanned obstacle clearing vessel will be planned to return to shore after unloading.
2. The path planning method for unmanned obstacle clearing vessels based on multimodal operation according to claim 1, characterized in that: In step S2, each cleaning unit i establishes a unit state vector M i As shown in equation (1): M i ={D i ,B i ,E i ,O i ,H i} ……(1) Where D i is the density of the load to be cleared, B i is the risk of blockage, E i is the estimated energy consumption for clearing, O i is the estimated volume consumption for the tank, H i is the safety margin for the electric power.
3. The path planning method for unmanned obstacle clearing vessels based on multimodal operation according to claim 1, characterized in that: In step S3, the cleaning modes include four types: rapid cleaning mode A, anti-blocking cleaning mode B, energy-saving cleaning mode C, and return unloading mode D; according to the unit state vector M i Remaining cabin capacity C rem and remaining state of charge (SOC) rem Choose one of the cleaning modes to clean.
4. The path planning method for unmanned obstacle clearing vessels based on multimodal operation according to claim 1, characterized in that: The blockage risk B i The value range is 0 to 1, and it can be divided into four levels: 0.00≤B i A value <0.30 indicates low risk of congestion; in this case, normal cleanup should be performed. 0.30≤B i A value <0.60 indicates a medium risk of blockage. In this case, adjust the unmanned obstacle clearing vessel to reduce its speed and appropriately increase the cutting speed; 0.60 ≤ B i A value <0.80 indicates a high risk of blockage. In this case, adjust the unmanned clearing vessel to reduce the width of the strip and activate the anti-blockage clearing mode B. 0.8≤B i A value ≤1.00 indicates a severe risk of congestion. In this case, entry into the unit should be suspended, and alternative routes should be taken instead.
5. The path planning method for unmanned obstacle clearing vessels based on multimodal operation according to claim 1, characterized in that: In step S4, the specific operation of the dual-constraint judgment to screen candidate cleanup units is as follows: based on the remaining state of charge SOCrem and remaining capacity C obtained from the capacity and power detection units. rem Data; remaining cabin capacity C rem Greater than or equal to the expected cabin capacity consumption O i With cabin capacity safety margin C safe The sum of these, and the corresponding safety margin H of electricity. i Cleanup units with a value greater than or equal to 0 are added to the candidate list; the candidate cleanup unit is denoted as j, and its comprehensive cost function is shown in the following formula (7): J j =λ1×L j ′+λ2×T j ′+λ3×R j ′+λ4×E j ′+λ5×B j ′+λ6×O j ′-λ7×H j ′ ……(7) Among them, L j ′ represents the normalized path distance; T j ′ represents the normalized value of the number of turns; R j ′ represents the normalized value of the duplicate coverage penalty; E j 'To clean up the normalized energy consumption value; B' j ′ represents the normalized value of congestion risk; O j ′ represents the normalized value of expected cabin capacity consumption; H j ′ represents the normalized value of the safety margin for electrical power.
6. The path planning method for unmanned obstacle clearing vessels based on multimodal operation according to claim 5, characterized in that: In step S4, the safety margin of the battery H i The calculation relationship is shown in formula (6): H i =SOC rem ×E bat -(IN j +E return +E safe ) ……(6) Among them, SOC rem E represents the current remaining state of charge, with a value ranging from 0 to 1. bat E represents the total usable energy of the battery. j E represents the estimated cleaning energy consumption for candidate cleaning unit j. return Energy consumption for returning from the candidate unit to the unloading point or safe docking point; E safe For return safety margin; E bat State of Charge (SOC) indicates the total battery capacity. rem ×E bat This indicates the current remaining available battery power.
7. The path planning method for unmanned obstacle clearing vessels based on multimodal operation according to claim 6, characterized in that: The return safety margin E safe The safety margin C is the greater of 10% of the total available battery energy and 20% of the expected return energy consumption; safe The larger of the standard deviations of the estimated errors between 8% of the total capacity of the collection chamber and the capacity consumption of several recent cleaning units is used.