A method for supplying steam to a rice product steaming drawer in layers

By using a layer-by-layer steam supply equalization method, and by measuring and adjusting the valve opening waiting time and steam holding scale with thermometers and mechanical timers, the problem of inconsistent temperature and time when multiple steamers share a common steam supply pipe is solved, thus achieving a uniform heating effect for rice and flour products.

CN123156980APending Publication Date: 2026-11-24ZIJIN JINBA FOOD CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611324032.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-28
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

When multiple steamers share a common steam supply pipe, the time it takes for each layer to reach the first temperature is inconsistent, and the time it takes for each layer to reach the second temperature is inconsistent from the common timing starting point after all manual steam adjustment valves are switched to the steam holding scale. This results in inconsistent effective heating processes for the same batch of rice and flour products.

Method used

By using a layer-by-layer steam supply equalization method, the temperature and time of each layer are measured using thermometers and mechanical timers. The valve opening waiting time and steam holding scale are adjusted round by round to reduce the time difference and time difference of each layer reaching the first temperature to within one time scale. This ensures that after each layer reaches the first temperature under the same steam catalytic scale, the steam holding scale is adjusted round by round according to the time difference until the time difference of reaching the predetermined temperature meets the requirements.

Benefits of technology

This makes the effective heating process of rice and flour products in the same batch more consistent, improves the consistency of steaming degree of each layer, and solves the problem of inconsistent temperature and time when multiple steamers share the same main steam supply pipe.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123156980A_ABST
    Figure CN123156980A_ABST
Patent Text Reader

Abstract

This invention relates to a method for evenly supplying steam to each layer of a steamer for rice and flour products, belonging to the field of rice and flour product steaming and processing technology. First, the time when each layer reaches the first temperature is recorded under the same steam-inducing scale. Then, the valve-opening waiting time for layers that reach the temperature earlier is gradually increased to reduce the initial temperature difference between layers. Next, the valve-opening waiting time is fixed, and based on the time taken for each layer to reach the second temperature from the common timing point, the steam-holding scale for the layer with the longest time taken is gradually increased, and the steam-holding scale for the layer with the shortest time taken is decreased to reduce the time difference for continuous temperature rise. During actual steaming, the calibration results are reproduced, and timing is started separately for each layer when it reaches the second temperature, thereby improving the problem of inconsistent heating of rice and flour products in the same batch.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of steaming and processing technology of rice and flour products, specifically relating to a method for evenly supplying steam to each layer of a rice and flour product steamer. Background Technology

[0002] In the batch steaming of rice and flour products, especially in small and medium-sized processing plants with relatively simple equipment, the same batch of materials is usually loaded into multiple layers of steamers. Each layer of steamers is connected to the same main steam supply pipe through its own steam supply branch, and each steam supply branch is equipped with a manual steam regulating valve with equally spaced graduations. During production, the operator usually opens the manual steam regulating valves of each layer simultaneously and turns them to the same graduation. The steaming time is calculated uniformly from the moment the valves are opened, and then all the manual steam regulating valves of each layer are closed at the same time after the time is up. If a particular layer is frequently undercooked or too soft, the manual steam regulating valve of that layer is opened more or closed by one mark based on past experience. This operation does not require additional complex equipment and is therefore quite common in actual production.

[0003] In actual installation, the length, installation height, number of bends, and amount of condensate remaining after shutdown of each steam supply branch are rarely identical. This results in varying durations of steam travel from the opening of the manual steam regulating valve to entering different steam trays and heating the materials. Consequently, the time it takes for each layer to reach the predetermined initial temperature from the same timing point will differ. After the steam enters the steam trays, the thickness, density, steam penetration resistance, and heat dissipation location of the materials in each layer will also affect the rate of further heating. Therefore, the time it takes for each layer to reach a higher predetermined temperature after entering the continuous steam supply stage will also differ. These two differences, combined, make it easy for uniform valve opening, valve position, and valve closing operations to result in some layers being undercooked while others are overcooked.

[0004] Simply changing the timing of valve opening cannot compensate for subsequent temperature differences. Directly changing the opening of the manual steam regulating valve will simultaneously alter both the initial steam supply stage and the continuous steam supply stage. Furthermore, when the steam supply is limited and all steam supply branches share a common main steam supply pipe, opening one layer larger will also change the steam distribution of the remaining steam supply branches, causing deviations in the already adjusted layers. Existing methods of simultaneously opening valves, supplying steam in the same compartment, or repeatedly adjusting a single manual steam regulating valve based solely on doneness are insufficient to reduce the time difference between each layer reaching the predetermined initial temperature, or the time difference between each layer reaching a higher predetermined temperature after transitioning to the continuous steam supply stage. This results in inconsistent effective heating processes for the same batch of rice and flour products. Therefore, a method for balancing steam supply to each layer of the rice and flour product steamer is proposed. Summary of the Invention

[0005] To address the aforementioned problems in the existing technology, this invention provides a method for balanced steam supply to rice and flour products in a steamer. This method solves the problems of inconsistent times when each layer reaches the first temperature and inconsistent times when each layer reaches the second temperature after all manual steam valves are switched to the common timing point after the steam holding scale is turned on, which in turn causes inconsistent effective heating processes for rice and flour products in the same batch.

[0006] The objective of this invention can be achieved through the following technical solution: a method for evenly supplying steam to each layer of a rice and flour product steamer, wherein each layer of the steamer is connected to the main steam supply pipe via a steam supply branch, and each steam supply branch is equipped with a manually adjustable steam valve with equally spaced graduations, comprising the following steps: S1. Measure the temperature with a thermometer and time it with a mechanical timer, and set a first temperature and a second temperature higher than the first temperature; S2. In the first round, all manual steam regulating valves are opened to the same steam catalytic scale and the timing is started. The steam catalytic scale is maintained until all layers reach the first temperature, and the time when each layer reaches the first temperature is recorded. In subsequent rounds, the valve opening waiting time of the layer that reaches the first temperature earlier is increased by the time difference between the layer that reaches the first temperature latest, and then the corresponding manual steam regulating valve is opened, until the difference between the earliest and latest times of reaching the first temperature does not exceed one time mark of the mechanical timer, and the valve opening waiting time of each layer is fixed. S3. Each manual steam regulating valve is opened to the steam catalytic scale according to a fixed valve opening waiting time. When each layer reaches the first temperature, the manual steam regulating valve of this layer is turned to the steam holding scale. When all manual steam regulating valves are turned to the steam holding scale, the timing starts and the time taken for each layer to reach the second temperature is recorded. In the first round, all layers use the same steam holding scale. In subsequent rounds, the steam holding scale of the layer with the longest time is increased by one division, and the steam holding scale of the layer with the shortest time is decreased by one division. The remaining layers maintain the steam holding scale of the previous round until the difference between the longest and shortest time does not exceed one time mark of the mechanical timer. The steam holding scale of each layer is then fixed. S4. During the formal steaming process, each manual steam regulating valve is opened to the steam catalytic scale according to a fixed valve opening waiting time. When each layer reaches the first temperature, it switches to the fixed steam holding scale for that layer. When each layer reaches the second temperature, the predetermined steaming time for that layer is calculated, and the manual steam regulating valve for that layer is closed when the predetermined steaming time is completed.

[0007] In this system, the starting point for each round is the moment when the mechanical timer returns to zero and begins running. The valve opening waiting time for each layer in the first round is zero. In subsequent rounds, the valve opening waiting time for a layer that reaches the first temperature layer earlier is equal to the valve opening waiting time of the previous round for that layer plus the earlier waiting time relative to the latest arrival at the first temperature layer in the previous round. The valve opening waiting time for the latest arrival at the first temperature layer in the previous round remains unchanged. A time interval refers to the duration between two adjacent time marks on the mechanical timer. Simultaneous opening to the same steam-generating scale means that an operator opens each manual steam-regulating valve to that steam-generating scale sequentially according to a fixed layer order within the same time interval of the mechanical timer. The manual steam-regulating valves use the closed position as a unified reference, with equally divided scales along the direction of increasing opening. Increasing by one division and decreasing by one division respectively turn the valve handle to the adjacent larger opening scale and the adjacent smaller opening scale. The initial steam-maintaining scale is located in the middle of the scale range, with at least two adjacent scales reserved in both the increasing and decreasing opening directions.

[0008] Furthermore, the thermometer is a probe-type bimetallic thermometer; the type, quality, thickness and initial temperature of the material in each layer of each wheel are the same, and each thermometer is inserted into the center of the corresponding layer of material at the same depth.

[0009] Furthermore, the second temperature is at least two divisions higher than the first temperature on the thermometer, and when the last steam regulating valve is turned to the steam preservation scale, the temperature of each layer of material is lower than the second temperature.

[0010] Furthermore, the main steam supply pipe is equipped with a mechanical pressure gauge, which has a pointer and a starting pressure mark; the mechanical timer is started when the pointer reaches the starting pressure mark during each round of trial steaming and formal steaming.

[0011] Furthermore, each steam supply branch is equipped with a manual drain valve at its lowest point; before each round of trial steaming and formal steaming, each manual drain valve is opened to drain the condensate and then closed.

[0012] Furthermore, each steamer is numbered from bottom to top, and the thermometer is read and the steam regulating valve is turned in order of number each round; when the last steam regulating valve is turned to the steam holding scale, the mechanical timer is reset to zero and the timing is restarted.

[0013] Furthermore, when there are two or more longest time layers or two or more shortest time layers, only the longest time layer and the shortest time layer with the smallest layer number are adjusted in each round.

[0014] Furthermore, each steam regulating valve is equipped with a movable limit card next to its valve handle; during formal steaming, after the steam regulating valve of this layer is turned to the steam holding scale, the corresponding limit card is pressed against the valve handle of the steam regulating valve, and the corresponding limit card is moved away before closing the valve.

[0015] Furthermore, each steamer is equipped with a label that records the valve opening waiting time, steam ignition scale, and steam retention scale for that layer.

[0016] Furthermore, if the material type, quality, thickness of the material, initial temperature, or steam supply branch changes, steps S1 to S3 should be repeated.

[0017] The beneficial effects of this invention are as follows: This invention first adjusts the valve opening waiting time of each layer in turn under the same steam catalytic scale, reducing the time difference between each layer reaching the first temperature to within one time increment. Then, while keeping the valve opening waiting time unchanged, it adjusts the steam holding scale of each layer in turn, reducing the time difference between each layer reaching the second temperature from the common timing starting point to within one time increment. This separates the initial temperature arrival time difference from the subsequent temperature rise time difference. During the actual steaming process, the fixed valve opening waiting time, steam catalytic scale, and steam holding scale are reproduced, and the predetermined steaming time is calculated separately from when each layer reaches the second temperature. This makes the effective heating process of rice and flour products in the same batch more similar, improves the consistency of the steaming degree of each layer, and solves the problem of inconsistent times when each layer reaches the first temperature when multiple steamers share a common steam supply pipe and use manual steam adjustment valves, as well as the inconsistent time from the common timing starting point after all manual steam adjustment valves are switched to the steam holding scale to when each layer reaches the second temperature, thus causing inconsistent effective heating processes of rice and flour products in the same batch. Attached Figure Description

[0018] To facilitate understanding by those skilled in the art, the present invention will be further described below with reference to the accompanying drawings.

[0019] Figure 1 This is a flowchart of the method for balanced steam supply to each layer of a rice and flour product steamer according to the present invention. Detailed Implementation

[0020] To further illustrate the technical means and effects of the present invention in achieving its intended purpose, the following detailed description of the specific implementation methods, structures, features, and effects of the present invention, in conjunction with the accompanying drawings and preferred embodiments, is provided.

[0021] Please see Figure 1 As shown, this embodiment provides a method for evenly supplying steam to each layer of a rice and flour product steamer. Each layer of the steamer is connected to the main steam supply pipe via a steam supply branch. Each steam supply branch is equipped with a manually adjustable steam valve with equally spaced graduations. The method includes the following steps: S1. Measure the temperature with a thermometer and time it with a mechanical timer. Set a first temperature and a second temperature that is higher than the first temperature. S2. In the first round, all steam regulating valves are opened to the same steam catalytic scale and timed. The scale is maintained until all layers reach the first temperature, and the time when each layer reaches the first temperature is recorded. In subsequent rounds, the valve opening waiting time of the layer that reaches the temperature earlier is increased by the time difference between the layer that reaches the temperature latest before the valve is opened, until the time difference between the earliest and latest temperature reaches the temperature does not exceed one time increment, and the valve opening waiting time of each layer is fixed. S3. Each steam regulating valve is opened to the steam catalytic scale according to a fixed opening waiting time. When each layer reaches the first temperature, the steam regulating valve of this layer is turned to the steam holding scale. When all steam regulating valves are turned to the steam holding scale, the time taken for each layer to reach the second temperature is recorded. In the first round, all layers use the same steam holding scale. In each round, the steam holding scale of the layer with the longest and shortest time is increased and decreased by one division respectively. The remaining layers maintain the steam holding scale of the previous round until the difference between the longest and shortest time does not exceed one time increment. The steam holding scale of each layer is then fixed. S4. During the formal steaming process, each steam regulating valve is opened to the steam catalytic scale according to the fixed opening waiting time. When each layer reaches the first temperature, it switches to the fixed steam holding scale for that layer. When each layer reaches the second temperature, the timing starts. When the predetermined steaming time is completed, the steam regulating valve for that layer is closed.

[0022] To address the issues of inconsistent times when each layer reaches the first temperature and inconsistent time taken from the common starting point after all manual steam valves are switched to the steam-holding scale to the second temperature when multiple layers of steamers share a common steam supply pipe and use manual steam regulating valves, thus causing inconsistent effective heating processes for the same batch of rice and flour products, this embodiment treats each fixed layer of steamer, its corresponding steam supply branch, and its corresponding manual steam regulating valve as a group. A thermometer is installed at each layer's material location, and a mechanical timer with return parts and a starter is placed at the operating position. The mechanical timer used to determine the common starting point and valve opening waiting time during each round of trial steaming and formal steaming, and which records the temperature arrival time or time taken in steps S2 and S3, is referred to as the shared mechanical timer. The mechanical timer used in step S4 to calculate the predetermined steaming time for each layer is referred to as the layer-specific mechanical timer.

[0023] In step S1, a first temperature is selected based on the existing mature process of the steamed material before steaming is completed, and a second temperature higher than the first temperature is selected. The second temperature must be within the temperature measurement range and lower than the material temperature when the rice or flour product is completed steaming. Time must also be allowed for the operator to turn all manual steam regulating valves and return the shared mechanical timer to zero so that the last manual steam regulating valve is turned to the common timing starting point of the steam holding scale. If each layer has not yet reached the second temperature during the trial steaming, and if one layer has reached the second temperature before the common timing starting point, the second temperature is increased within the range and the material temperature when steaming is completed, and the trial steaming is repeated. If the above conditions cannot be met simultaneously after increasing the temperature, the first temperature is reduced and the first and second temperatures are reselected. In step S2, in the first round, all manually operated steam regulating valves are opened sequentially to the same catalytic steam scale within the same time interval, and the time when each layer reaches the first temperature is recorded. The layer that reaches the first temperature last is selected, and the advance time of each layer relative to the last layer is added to the valve opening waiting time for that layer in the next round. The next round starts timing from the common starting point, and each layer opens to the catalytic steam scale only after its respective valve opening waiting time has expired. This process is repeated round by round until the difference between the earliest and latest times of reaching the first temperature does not exceed one time interval. To illustrate the correction relationship, if the temperature arrival times of the three layers in the first round are four minutes, four minutes and thirty seconds, and five minutes respectively, and one time interval is thirty seconds, then the valve opening waiting times for the three layers in the next round are one minute, thirty seconds, and zero respectively. This value is only used to illustrate the time addition method; the next round will continue to correct based on the actual recorded results. When implementing step S3, maintain the fixed valve opening waiting time. Once each layer reaches the first temperature, turn the manual steam regulating valve of that layer to the steam holding scale. When the last manual steam regulating valve is turned, reset the shared mechanical timer to zero and restart the timing. The layer with the longest time indicates that the layer's temperature rise was slower after the common timing start point, and the steam holding scale of that layer will be increased by one mark in the next round. The layer with the shortest time indicates that the layer's temperature rise was faster, and the steam holding scale of that layer will be decreased by one mark in the next round. The remaining layers remain unchanged, and this process is repeated round by round until the longest and shortest times are found. The difference should not exceed one timing increment; if a layer has reached the larger opening end of the steam protection scale range but still does not meet the stopping condition, then a common steam protection scale is reselected in the direction of smaller opening; if a layer has reached the smaller opening end, then a common steam protection scale is reselected in the direction of larger opening, and step S3 is executed again; if layers reach the end at both ends in the same round, then manual steam regulating valves of the same specification with the same connection size and more available equal division scales are used on each steam supply branch, and steps S1 to S3 are executed again. When implementing step S4, the operator completes the formal steaming according to the fixed valve opening waiting time, steam catalysis scale, and steam holding scale. To facilitate separate timing for each layer, each layer is equipped with a mechanical timer of the same specification, and each layer's mechanical timer adopts a spring-loaded structure. The predetermined steaming time adopts the time determined by the existing mature process for this material. All layers in the same batch adopt the same predetermined steaming time. When each layer reaches the second temperature, the mechanical timer for that layer is started. When the predetermined steaming time is completed, the corresponding manual steam regulating valve is closed, so that the time difference for the initial temperature reaching the first stage and the time difference for the temperature rise after the common starting point are no longer mixed in the single empirical valve regulation.

[0024] Furthermore, it should be noted that the reason for adopting the above-mentioned order of first calibrating the valve opening waiting time and then calibrating the steam holding scale is because the two parameters correspond to different on-site reasons and functional sections: the steam catalytic section before the first temperature includes processes such as steam charging of the steam supply branch, heating of the condensate, and steamer heating. The combined differences caused by the length, height, and bends of the steam supply branch will be reflected in the order in which each layer reaches the first temperature. Therefore, this section only maintains the same steam catalytic scale and changes the valve opening waiting time; the steam holding section between the first temperature and the second temperature has crossed the initial temperature observation point. The rate of continued temperature rise caused by the material steam penetration resistance, layer heat dissipation, and steam distribution status of the steam supply branch is more easily revealed by comparing the time taken after the common starting point. Therefore, this section maintains the fixed valve opening waiting time and only changes the steam holding scale. If only the valve opening is staggered, the rate of temperature rise in the later stage will not be corrected. If the waiting time and opening degree are changed simultaneously from the beginning, it is impossible to determine which change caused the difference in this round. Moreover, a large change in the opening degree of one steam supply branch will also change the amount of steam distributed from the main steam supply pipe to the other steam supply branches. Based on this practical constraint, in this embodiment, the longest time layer is opened by one increment and the shortest time layer is closed by one increment in each round, and the results after mutual influence are observed again in the next round. Using a time increment as the stopping condition is to adapt to the manual discernment ability of workers in reading the meter and turning the valve. On-site workers only need to record the temperature arrival time of each layer, subtract the advance time from the latest time, wait for the corresponding time, and turn an adjacent increment. There is no need to measure the resistance of the steam supply branch or calculate the steam flow. Therefore, the two sections and their operation sequence are based on the actual needs under the conditions of a shared main steam supply pipe and manual operation, which makes it easy for experienced workers to repeat the implementation according to the recorded results.

[0025] One point that needs further explanation is that, by gradually increasing the valve opening waiting time of the advance layer while maintaining the same steam catalytic scale on all manual steam regulating valves, the time it takes for each layer to reach the first temperature can be gradually approached. Conversely, by gradually changing the steam holding scale of the longest and shortest time-consuming layers while keeping the valve opening waiting time fixed, the time it takes for each layer to reach the second temperature from the common timing starting point can be gradually approached. Fixing these two parameters sequentially reduces confusion caused by simultaneous changes in multiple factors within the same round. Replicating these fixed parameters during the actual steaming process and calculating the predetermined steaming time for each layer when it reaches the second temperature reduces the difference in the effective heating process of each layer and improves the consistency of the steaming degree of the same batch of rice and flour products. Furthermore, this process can be completed using a thermometer, a mechanical timer, and a manually regulating valve with equally divided scales, facilitating repeated execution on-site.

[0026] To avoid interference from differences in loading conditions and temperature measurement locations during the two-stage calibration, the comparison conditions for each round and layer must be kept consistent. This is because changes in material type alter the heat absorption and gelatinization characteristics, changes in loading quality or layer thickness change the steam penetration distance, changes in initial temperature change the time required to reach the first and second temperatures, and differences in thermometer insertion position or depth can result in different readings for the same layer. If these conditions vary between different layers or rounds, operators may mistake differences in loading for differences in steam supply. In practice, it is essential to first determine the loading quality, layer thickness, and initial temperature of a single material and each layer before proceeding with the entire calibration process. Each round and each layer in the process is prepared according to the following conditions: the mass of the material is weighed using the same mechanical scale, and the material is leveled in each steamer at the same height; each layer uses a probe-type bimetallic thermometer of the same specification. First, an insertion depth mark is set on each probe at the same distance from the probe tip. Then, each probe is vertically inserted into the center of the material from the upper surface until the insertion depth mark is flush with the upper surface of the material, and the dial is facing the operator. Then, it is left to stand until the pointers of each thermometer reach the same predetermined initial temperature scale. In this way, the loading status and temperature measurement position can be turned into repeatable artificial conditions, so that the round-by-round recording can better reflect the steam supply differences of each fixed layer.

[0027] After standardizing the loading and temperature measurement conditions, sufficient observation time must be ensured in the second stage. Even if the time it takes for each layer to reach the first temperature is compressed to within a single timing scale, the operator still needs to sequentially turn each manual steam regulating valve to the steam-holding scale. If the second temperature is too close to the first temperature, the layer that turned its valve earlier may have already reached the second temperature before the last manual steam regulating valve is turned, resulting in a loss of time recorded from the common timing starting point. Therefore, in one embodiment, the second temperature is set to be at least two scales higher than the first temperature on the probe-type bimetallic thermometer. During the pre-test, the moment the last manual steam regulating valve turns to the steam-holding scale is observed. Only when the temperature of each layer is lower than the second temperature at that moment does the formal steam-holding scale calibration begin. If any layer has already reached the second temperature, the second temperature is moved up one thermometer scale and the pre-test is repeated. This creates a visually identifiable temperature rise range, ensuring that the time taken for each layer to reach the second temperature from the same common starting point can be completely recorded.

[0028] Furthermore, even if the temperature observation window is determined, the steam supply status at the start of each cycle may still differ. The duration of shutdown, heating time, and steam usage intervals will cause variations in the pressure of the main steam supply pipe before the start of a particular cycle. If the start time is determined solely by the operator's hearing or estimation, the moment the first temperature is reached will be influenced by changes in the initial steam source condition. To reduce this variation, mechanical pressure gauges are installed before the main steam supply pipe branches into individual steam supply lines. These gauges have pointers, and a visible starting pressure mark is placed next to the pressure scale where the pointer repeatedly and stably reaches during normal preheating. Before each trial steaming and formal steaming cycle, all manual steam regulating valves are closed. When the pointer of the mechanical pressure gauge reaches the starting pressure mark, the operator resets the shared mechanical timer to zero and starts it. Using the same pointer position as the common starting point for each cycle allows for comparison of valve opening waiting times and temperature arrival times under more similar steam source conditions.

[0029] Meanwhile, the condensate remaining in each steam supply branch after shutdown will also alter the initial temperature reach time. Liquid condensate easily accumulates at the lowest point of each steam supply branch. During the next round of steam supply, the steam first heats and pushes this condensate, and the amount of accumulated water varies with shutdown time and pipeline slope. Therefore, the same valve opening waiting time may result in different temperature reach times. To address this, a manual drain valve is installed at the actual lowest point of each steam supply branch, with the drain outlet facing a safe water inlet position. Before each round of trial steaming and formal steaming, the manual drain valves are opened one by one, with the main steam supply pipe not yet pressurized or already depressurized. They are closed after liquid condensate no longer flows continuously from the drain outlet before steam supply begins. This drainage process makes the initial water accumulation state of each steam supply branch more similar, reducing the interference of random water accumulation on the valve opening waiting time calibration.

[0030] Even after eliminating the random effects of condensate, the sequential inspection of multiple steamers by a single worker still introduces errors in the order of operations. If one round starts from the top layer and the next round from the bottom layer, or if a worker observes a layer reaching the first temperature and then waits for other layers, the recording time and valve turning time will vary depending on the inspection habits. To standardize manual actions, each steamer layer is numbered sequentially from bottom to top, and each layer number corresponds to a fixed steam supply branch and manual steam regulating valve. The worker reads each thermometer cyclically from bottom to top, and when a layer reaches the first temperature, the worker immediately turns the manual steam regulating valve of that layer to the steam-holding scale, instead of waiting for a lower layer to reach the first temperature first. After the last manual steam regulating valve is turned to the steam-holding scale, the shared mechanical timer is immediately reset to zero and the timing restarts. Fixing the inspection direction and clearly defining the zeroing point reduces the recording differences caused by changes in the manual order between rounds and provides a consistent starting point for timing the second temperature.

[0031] After recording according to a fixed layer sequence, there may still be situations where two or more layers have the longest or shortest time, and these layers are parallel. If all parallel longest time layers are simultaneously increased and all parallel shortest time layers are simultaneously decreased, the steam distribution state from the main steam supply pipe to multiple steam supply branches will change significantly in the same round, making it difficult to determine which layer's adjustment has an effect in the next round. Therefore, when the difference between the longest and shortest times still exceeds one time increment, only the layer with the smallest layer number among the parallel longest time layers is selected, and its steam protection scale is increased by one increment; only the layer with the smallest layer number among the parallel shortest time layers is selected, and its steam protection scale is decreased by one increment. The remaining parallel layers remain unchanged, and the comparison is repeated in the next round based on the new records. If the difference between the longest and shortest times no longer exceeds one time increment, the adjustment is stopped. This step-by-step processing method reduces the number of steam supply branches changed in a single round, making the object of each adjustment clear and easy for workers to record.

[0032] With the steam retention scale fixed at each level, it is necessary to prevent the valve handle, which is already in place, from deviating from the scale due to vibration or accidental contact during formal steaming. Manual steam regulating valves typically rely on threads or friction to maintain the valve handle position. Heating of the valve body, steam vibration, and accidental contact after the operator leaves can all cause the valve handle, which is already aligned with the steam retention scale, to move slightly back. If the valve handle deviates from the fixed steam retention scale, the aforementioned calibration results cannot be reproduced. To address this, a guide plate with an arc-shaped guide groove is fixed around the valve shaft of each manual steam regulating valve. The movable limit lock includes a retainer that slides along the arc-shaped guide groove, a U-shaped retainer fixed on the retainer with its opening facing the valve handle, and a hand-tightening screw for locking the retainer. Before opening the valve, move the movable limit stop to a position that does not obstruct the rotation of the valve handle. After the manual steam regulating valve on this floor is turned to the steam holding scale, move the retainer along the arc-shaped guide groove so that the valve handle enters the U-shaped bayonet and tighten the hand screw. The inner walls on both sides of the U-shaped bayonet should abut against both sides of the valve handle's rotation path. Before closing the valve, loosen the hand screw and move the retainer to allow the valve handle to exit the U-shaped bayonet. This mechanical retainer can limit the bidirectional return of the valve handle after it is in position, reducing the deviation of the steam holding scale caused by vibration or accidental contact.

[0033] To ensure accurate reproduction of the aforementioned fixed parameters by workers on different shifts, it is necessary to address the issue of incorrect layer and parameter writing due to reliance on memorization. The valve opening waiting time for each layer is derived from that fixed layer and its steam supply branch, and the steam ignition and steam retention scales must also correspond to the same layer. If the steamer is removed for cleaning and then moved, or if values ​​are only verbally communicated during shift handover, parameters from one layer may be used for another. Specifically, a label with a permanent layer number is fixed to the outer wall of each steamer. The label sequentially includes three recording columns: valve opening waiting time, steam ignition scale, and steam retention scale. The valve opening waiting time also specifies the time unit. The corresponding fixed layer is also marked with the same permanent layer number. After calibration, the label is immediately filled out, and after recalibration, the old value is overwritten. After cleaning, the steamer is returned to its original fixed layer according to the permanent layer number. This binds the three fixed parameters, the steamer, and the corresponding steam supply branch together, allowing workers to operate according to the label without needing to recall the information.

[0034] Finally, the aforementioned calibration results only apply to specific materials and steam supply branch conditions. Using the old parameters after production conditions change will introduce new deviations. Differences in material type compared to the previous calibration will alter heat absorption characteristics; differences in loading quality or layer thickness will change steam penetration resistance; differences in initial temperature will change the time required for temperature rise; and differences in the length, pipe diameter, bends, or manual steam valve status of the steam supply branch compared to the previous calibration will change the steam supply process. Any difference in any of these will objectively lead to the conclusion that the original valve opening waiting time or steam holding scale no longer corresponds to the current conditions. When any of these changes occur, stop using the previously fixed parameters, restore the valve opening waiting time for each layer to zero, restore the initial steam holding scale to the middle scale with the allowance for adjustment, and re-execute steps S1 to S3, using the newly fixed valve opening waiting time and steam holding scale. This avoids indiscriminately applying a single calibration result to different production conditions, allowing the method to be re-implemented as on-site mechanical conditions change.

[0035] Working principle and usage process of this invention: This invention divides the observable heating differences between multiple layers of steamers into two consecutive stages. In the first stage, all manual steam control valves maintain the same steam-inducing scale. The valve opening waiting time of each layer is accumulated sequentially based on the order in which they reach the first temperature, ensuring that the valve opens later for the layer that reaches the first temperature, until the time difference between each layer reaching the first temperature is recorded as a timing interval. In the second stage, the fixed valve opening waiting time remains unchanged. After each layer reaches the first temperature, it switches to the steam-holding scale. Starting from the common timing point after the last manual steam control valve has finished switching, the time taken for each layer to reach the second temperature is compared. Then, sequentially, the layer with the longest time takes one increment and the layer with the shortest time takes one increment. Each round only changes the parameters that need correction, and the results formed after all steam supply branches share the main steam supply pipe are observed again in the next round. Therefore, the time difference between the first and second stages can be compressed separately, rather than being mixed together by a single large valve adjustment.

[0036] In actual use, workers first load the same type, weight, thickness, and initial temperature of material into fixed layers. They then insert probe-type bimetallic thermometers to the center of each layer, draining condensate from the lowest point of each steam supply branch under unpressurized or depressurized conditions. The shared mechanical timer is then reset to zero when the mechanical pressure gauge reaches the initial pressure mark. Subsequently, according to… Figure 1 First, complete the calibration of the valve opening waiting time round by round. Then, while maintaining the fixed valve opening waiting time, complete the calibration of the steam holding scale round by round. Write the final valve opening waiting time, steam catalytic scale, and steam holding scale on the corresponding nameplate on the outer wall of the fixed steaming tray. Mark the position of the movable limit card corresponding to the steam holding scale next to the guide plate, and first move the movable limit card to a position that does not obstruct the rotation of the valve handle. During the actual steaming, the worker opens the valve according to the valve opening waiting time recorded on the nameplate. When the first temperature of the current layer is reached, the valve is rotated to the recorded steam holding scale, and the movable limit card is moved to the marked position and pressed against the valve handle. When the second temperature of the current layer is reached, the corresponding mechanical timer for the current layer is started. After the predetermined steaming time is completed, the movable limit card is removed and the manual steam regulating valve of the current layer is closed. If the material type, quality, material thickness, initial temperature, or steam supply branch changes, stop using the original nameplate parameters and repeat steps S1 to S3.

[0037] The above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention in any way. Although the present invention has been disclosed above with reference to preferred embodiments, it is not intended to limit the present invention. Any person skilled in the art can make some modifications or alterations to the above-disclosed technical content to create equivalent embodiments without departing from the scope of the present invention. Any simple modifications, equivalent changes and alterations made to the above embodiments based on the technical essence of the present invention without departing from the scope of the present invention shall still fall within the scope of the present invention.

Claims

1. A method for equalizing the steam supply to each layer of a rice product steamer, each layer of the steamer being connected to a main steam supply line by a steam supply branch, each steam supply branch being provided with a manually operated steam regulating valve having equally spaced graduations, characterized in that, Includes the following steps: S1. Measure the temperature with a thermometer and time it with a mechanical timer. Set a first temperature and a second temperature that is higher than the first temperature. S2. In the first round, all steam regulating valves are opened to the same steam catalytic scale and timed. The scale is maintained until all layers reach the first temperature, and the time when each layer reaches the first temperature is recorded. In subsequent rounds, the valve opening waiting time of the layer that reaches the temperature earlier is increased by the time difference between the layer that reaches the temperature latest before the valve is opened, until the time difference between the earliest and latest temperature reaches the temperature does not exceed one time increment, and the valve opening waiting time of each layer is fixed. S3. Each steam regulating valve is opened to the steam catalytic scale according to a fixed opening waiting time. When each layer reaches the first temperature, the steam regulating valve of this layer is turned to the steam holding scale. When all steam regulating valves are turned to the steam holding scale, the time taken for each layer to reach the second temperature is recorded. In the first round, all layers use the same steam holding scale. In each round, the steam holding scale of the layer with the longest and shortest time is increased and decreased by one division respectively. The remaining layers maintain the steam holding scale of the previous round until the difference between the longest and shortest time does not exceed one time increment. The steam holding scale of each layer is then fixed. S4. During the formal steaming process, each steam regulating valve is opened to the steam catalytic scale according to the fixed opening waiting time. When each layer reaches the first temperature, it switches to the fixed steam holding scale for that layer. When each layer reaches the second temperature, the timing starts. When the predetermined steaming time is completed, the steam regulating valve for that layer is closed.

2. The rice product steamer layer-by-layer steam supply equalization method according to claim 1, characterized by, The thermometer is a probe-type bimetallic thermometer; the type, quality, thickness and initial temperature of the material in each layer of each wheel are the same, and each thermometer is inserted into the center of the corresponding layer of material at the same depth.

3. The rice product steamer layer-by-layer steam supply equalization method according to claim 1, characterized by, The second temperature is at least two divisions higher than the first temperature on the thermometer, and when the last steam regulating valve is turned to the steam preservation scale, the temperature of each layer of material is lower than the second temperature.

4. The rice product steamer layer-by-layer steam supply equalization method according to claim 1, wherein, The main steam supply pipe is equipped with a mechanical pressure gauge, which has a pointer and a starting pressure mark; the mechanical timer is started when the pointer reaches the starting pressure mark for each round of trial steaming and formal steaming.

5. The rice product steamer layer-by-layer steam supply equalization method according to claim 1, wherein, Each steam supply branch is equipped with a manual drain valve at its lowest point; before each round of trial steaming and formal steaming, each manual drain valve is opened to drain the condensate and then closed.

6. The rice product steamer layer-by-layer steam supply equalization method according to claim 1, wherein, Each steamer is numbered from bottom to top. The thermometer is read and the steam regulating valve is turned in the order of the numbers in each round. When the last steam regulating valve is turned to the steam holding scale, the mechanical timer is returned to zero and the timing is restarted.

7. The rice product steamer layer-by-layer steam supply equalization method according to claim 6, characterized by, When there are two or more longest time layers or two or more shortest time layers, only the longest time layer and the shortest time layer with the smallest layer number are adjusted in each round.

8. The method for evenly supplying steam to each layer of a rice and flour product steamer according to claim 1, characterized in that, Each steam regulating valve has a movable limit card next to its handle. During the actual steaming process, after the steam regulating valve of this layer is turned to the steam holding scale, the corresponding limit card is pressed against the valve handle of the steam regulating valve. Before closing the valve, the corresponding limit card is moved away.

9. The method for evenly supplying steam to each layer of a rice and flour product steamer according to claim 1, characterized in that, Each steamer has a label on the outside, which records the valve opening waiting time, steam ignition scale, and steam retention scale for that layer.

10. The method for evenly supplying steam to each layer of a rice and flour product steamer according to claim 2, characterized in that, If the material type, quality, thickness of the material, initial temperature, or steam supply branch changes, repeat steps S1 to S3.