A power equipment temperature rise regulation method based on running state perception

By sensing the real-time current and winding temperature of the parallel unit, calculating the current and temperature deviations, and combining the accumulated running time and cooling response delay, the cooling tilt coefficient is dynamically adjusted, and differentiated cooling commands are output. This solves the problem of inaccurate identification of unit thermal imbalance and achieves precise control and stability improvement of power equipment temperature rise.

CN123156989APending Publication Date: 2026-11-24SHANXI SHENGSHI DINGTAI POWER EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611669161.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-27
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing technologies lack comprehensive perception of current distribution deviations, winding temperature differences, and operating time variation characteristics among parallel units, which reduces the accuracy of identifying unit thermal imbalance states and affects the stability and reliability of power equipment temperature rise control.

Method used

By collecting real-time current and winding temperature data of parallel units, calculating current and temperature deviations between units, generating unit thermal imbalance characteristics, and combining accumulated running time to correct and identify off-center load levels, dynamically adjusting cooling tilt coefficients, outputting differentiated cooling commands, and updating off-center load judgment data based on the adjusted imbalance convergence.

Benefits of technology

It improves the accuracy of temperature rise control under parallel operation of power equipment, realizes refined cooling regulation, and reduces the risk of local temperature rise caused by unit off-center load.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123156989A_ABST
    Figure CN123156989A_ABST
Patent Text Reader

Abstract

This invention discloses a method for temperature rise control of power equipment based on operational status perception, belonging to the field of temperature rise control technology. It addresses the problem of reduced accuracy in identifying unit thermal imbalance states, leading to insufficient matching between cooling regulation and actual temperature rise changes. By collecting real-time current and winding temperature data from parallel units, calculating current and temperature deviations between units, and generating unit thermal imbalance characteristics, the method corrects and identifies off-center load levels based on accumulated operating time. The cooling tilt coefficient is dynamically adjusted according to the off-center load identification results, cooling response delay, and bus load change rate, outputting differentiated cooling commands. The off-center load judgment data is updated based on the adjusted imbalance convergence. This improves the accuracy of temperature rise control under parallel operation of power equipment, achieving refined cooling regulation based on operational status perception and reducing the risk of localized temperature rise caused by unit off-center loads.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of temperature rise control technology, and more specifically, to a method for temperature rise control of power equipment based on operating status perception. Background Technology

[0002] In order to improve the capacity utilization and operational reliability of power equipment, multiple parallel units are usually used to share the load during operation. The power transmission capacity is improved by the power distribution among the parallel units. The existing power equipment temperature rise management method usually controls cooling based on the overall operating parameters of the equipment or preset temperature thresholds. As the operating time of the power equipment increases, the material properties, heat conduction state and load bearing capacity of the parallel units will change. The same degree of off-center load has different effects on the temperature rise state at different operating stages.

[0003] The existing technology has the following shortcomings: Currently, existing technologies typically rely on the overall operating status of the equipment or a fixed temperature rise threshold for cooling control. They lack comprehensive perception of current distribution deviations between parallel units, winding temperature differences, and operating time variation characteristics. This leads to reduced accuracy in identifying unit thermal imbalance states, resulting in insufficient matching between cooling regulation and actual temperature rise changes. Consequently, the stability and reliability of power equipment temperature rise control are affected. Therefore, a power equipment temperature rise regulation method based on operating status perception is proposed.

[0004] The information disclosed in the background section is only intended to enhance the understanding of the background of this disclosure, and therefore may include information that does not constitute prior art known to those skilled in the art. Summary of the Invention

[0005] To overcome the aforementioned deficiencies of the prior art, embodiments of the present invention provide a method for controlling the temperature rise of power equipment based on operational status perception. By employing parallel unit status perception, thermal imbalance characteristic analysis, off-center load dynamic correction, and differentiated cooling control techniques, the method achieves accurate identification and intelligent adjustment of the operational temperature rise status of power equipment, thereby solving the problems mentioned in the background art.

[0006] To achieve the above objectives, the present invention provides the following technical solution: a method for temperature rise control of power equipment based on operating status perception, comprising the following steps: Step S1: Collect the real-time current of each parallel unit and calculate the current deviation between units, obtain the winding temperature of each unit, and generate the unit thermal imbalance characteristics by combining the current deviation between units and the winding temperature of each unit. Step S2: Read the cumulative running time of the unit, retrieve the off-center load determination data, evaluate the off-center load level of each unit based on the unit thermal imbalance characteristics and the off-center load determination data, and generate the corrected unit off-center load identification result after life correction based on the cumulative running time of the unit. Step S3: Detect the current response delay of the cooling system, collect the bus load change rate, allocate the unit-level cooling tilt coefficient according to the corrected unit off-center load identification result, and output differentiated cooling commands after dynamically planning the cooling tilt coefficient through the current response delay of the cooling system and the bus load change rate. Step S4: After executing the differentiated cooling command, evaluate the inter-unit imbalance convergence and correct and update the off-center load judgment data based on the inter-unit imbalance convergence.

[0007] In a preferred embodiment, in step S1, the real-time current of each parallel unit is collected using a zero-sequence current transformer installed at the output terminal of each parallel unit. Calculate the theoretical average current value of the real-time current of each parallel unit, and take the deviation between the real-time current of each parallel unit and the theoretical average current value as the current deviation between units. Within the same acquisition cycle, the highest temperature point within each acquisition cycle is obtained using an optical fiber temperature measurement system installed inside the windings of each parallel unit, which is then used as the winding temperature of that unit. The average temperature value of the windings of each parallel unit is then calculated.

[0008] In a preferred embodiment, in step S1, the deviation between the winding temperature of each parallel unit and the average temperature value is calculated to generate the inter-unit temperature deviation. The thermal imbalance characteristics of a unit are generated by combining the current deviation between units and the winding temperature of each unit, and the Chebyshev distance algorithm is used to calculate the thermal imbalance characteristics of the unit.

[0009] In a preferred embodiment, in step S2, the cumulative operating time of each parallel unit since commissioning is read from the historical operation database of the substation monitoring system; Retrieve off-center load determination data from the off-center load determination database. The off-center load determination data includes the unit thermal imbalance characteristic threshold range corresponding to each off-center load level. The off-center load determination data is set as mild off-center load, moderate off-center load, and severe off-center load. The off-center load level of each unit is evaluated based on the unit thermal imbalance characteristics and the off-center load determination data. The unit thermal imbalance characteristics of the parallel units are compared with the threshold range in the off-center load determination data to determine the initial off-center load level of the parallel units.

[0010] In a preferred embodiment, in step S2, a logistic regression model is used to quantify and score the off-center load level to obtain the initial off-center load level score of the parallel unit. The off-center load level is corrected for life based on the cumulative running time of the unit, and the life correction coefficient is calculated using a polynomial regression model. The initial off-center load rating is multiplied by the lifetime correction factor to generate the corrected unit off-center load identification result.

[0011] In a preferred embodiment, in step S3, the current response delay of the cooling system is detected, and at the beginning of the current acquisition cycle, a standard test command is sent to the cooling system of each parallel unit. The time interval from the time the command is sent to the time when the actual fan speed reaches the target speed is recorded and used as the current response delay of the cooling system. The bus load change rate is collected by using current transformers installed on the bus side to collect the total bus load current at the beginning and end of the current collection cycle, and then calculating the bus load change rate.

[0012] In a preferred embodiment, in step S3, the unit-level cooling tilt coefficient is assigned based on the corrected unit off-center load identification result, and the cooling tilt coefficient of each unit is calculated using the analytic hierarchy process (AHP). The specific steps are as follows: Step 1: Construct a judgment matrix, compare each parallel unit pairwise, and determine the relative importance of each unit in the allocation of cooling resources based on the size relationship of the corrected unit off-center load identification results. Step 2: Calculate the cooling tilt coefficient of each unit. Use the eigenvalue method to solve for the largest eigenvalue of the judgment matrix A and its corresponding eigenvector. After normalization, each component of the eigenvector is the cooling tilt coefficient of each unit. The cooling tilt coefficient of the parallel unit after dynamic programming is obtained by using the current response delay of the cooling system and the bus load change rate to calculate the cooling tilt coefficient. The calculated cooling tilt coefficients of each unit after dynamic programming are normalized to obtain the final cooling tilt coefficients. Based on the cooling tilt coefficient after dynamic programming, differentiated cooling commands are output. The differentiated cooling commands include the target speed of the cooling fan and the target flow rate of the oil pump for each parallel unit.

[0013] In a preferred embodiment, in step S4, a differentiated cooling command is executed, and the target speed of the cooling fan and the target flow rate of the oil pump of each parallel unit are sent to the cooling controller of each unit through the substation monitoring system. The cooling controller adjusts the fan speed and the oil pump flow rate according to the target values. After setting and waiting for a cooling response cycle, the real-time current and winding temperature of each parallel unit are collected again. The current deviation and temperature deviation between units after executing the cooling command are calculated by using the real-time current and winding temperature of each parallel unit. Based on the current deviation and temperature deviation between units after executing the cooling command, the current dimension convergence and temperature dimension convergence are obtained.

[0014] In a preferred embodiment, in step S4, the inter-unit imbalance convergence is calculated using the modified geometric mean method based on the convergence of the current dimension and the convergence of the temperature dimension. The off-center load determination data is corrected and updated based on the convergence of the inter-unit imbalance. Set a threshold for judging the inter-unit imbalance convergence. When the inter-unit imbalance convergence is less than the threshold, the off-load judgment data needs to be corrected and updated. When the inter-unit imbalance convergence is greater than or equal to the inter-unit imbalance convergence judgment threshold, the off-center load judgment data is deemed reasonable, and the unit thermal imbalance characteristic threshold range corresponding to each off-center load level remains unchanged. The corrected and updated off-center load determination data is written into the off-center load determination database for use in the next control cycle.

[0015] The technical effects and advantages of this invention are as follows: This invention collects real-time current and winding temperature data of parallel units, calculates current and temperature deviations between units, generates unit thermal imbalance characteristics, and corrects and identifies off-center load levels based on accumulated operating time. It dynamically adjusts the cooling tilt coefficient according to the off-center load identification results, cooling response delay, and bus load change rate, outputs differentiated cooling commands, and updates the off-center load judgment data based on the adjusted imbalance convergence. This improves the accuracy of temperature rise control under parallel operation of power equipment, achieves refined cooling adjustment based on operating status perception, and reduces the risk of localized temperature rise caused by unit off-center load. Attached Figure Description

[0016] Figure 1 This is a flowchart illustrating the implementation of a power equipment temperature rise control method based on operational status perception according to the present invention.

[0017] Figure 2 This is a schematic diagram illustrating the steps of a power equipment temperature rise control method based on operational status sensing according to the present invention. Detailed Implementation

[0018] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0019] This invention collects real-time current and winding temperature data of parallel units, calculates current and temperature deviations between units, generates unit thermal imbalance characteristics, and corrects and identifies off-center load levels based on accumulated operating time. It dynamically adjusts the cooling tilt coefficient according to the off-center load identification results, cooling response delay, and bus load change rate, outputs differentiated cooling commands, and updates the off-center load judgment data based on the adjusted imbalance convergence, thereby improving the accuracy of temperature rise control under parallel operation of power equipment.

[0020] Example 1

[0021] Please see Figures 1 to 2 A method for controlling the temperature rise of power equipment based on operational status perception, the specific operation process is as follows: Step S1: Collect the real-time current of each parallel unit and calculate the current deviation between units, obtain the winding temperature of each unit, and generate the unit thermal imbalance characteristics by combining the current deviation between units and the winding temperature of each unit. Step S2: Read the cumulative running time of the unit, retrieve the off-center load determination data, evaluate the off-center load level of each unit based on the unit thermal imbalance characteristics and the off-center load determination data, and generate the corrected unit off-center load identification result after life correction based on the cumulative running time of the unit. Step S3: Detect the current response delay of the cooling system, collect the bus load change rate, allocate the unit-level cooling tilt coefficient according to the corrected unit off-center load identification result, and output differentiated cooling commands after dynamically planning the cooling tilt coefficient through the current response delay of the cooling system and the bus load change rate. Step S4: After executing the differentiated cooling command, evaluate the inter-unit imbalance convergence and correct and update the off-center load judgment data based on the inter-unit imbalance convergence.

[0022] The specific implementation is as follows: In step S1, 60 seconds is selected as the single acquisition period. During this period, the real-time current of each parallel unit is acquired by using the zero-sequence current transformer installed at the output terminal of each parallel unit. Suppose there are N transformer units operating in parallel along a common busbar. During the current data acquisition period, the real-time current of the i-th parallel unit is denoted as... ,in .

[0023] It should be added that the zero-sequence current transformer adopts a through-core structure and is installed at the outgoing busbar of each unit. The measurement accuracy class is 0.2S, and the sampling frequency is set to 100Hz. In each acquisition cycle, the current of each unit is continuously sampled, and the arithmetic mean is taken as the real-time current of that unit in the current cycle. .

[0024] Calculate the theoretical average current value of each parallel unit's real-time current:

[0025] in, To theoretically share the current equally, Let be the real-time current of the i-th parallel unit, and N be the total number of parallel units.

[0026] Calculate the deviation between the real-time current of each parallel unit and the theoretical average current value, and generate the inter-unit current deviation. The inter-unit current deviation of the i-th parallel unit is... The calculation formula is:

[0027] in, Let be the inter-unit current deviation of the i-th parallel unit. Let be the real-time current of the i-th parallel unit. The current is theoretically evenly distributed.

[0028] Inter-cell current deviation This reflects the degree of deviation between the actual current carried by the i-th unit and the theoretical average value. The larger the value, the greater the circulating current component that the unit experiences.

[0029] Within the same acquisition cycle, the temperature of each unit winding is obtained using an optical fiber temperature measurement system installed inside each parallel unit winding. The fiber optic temperature measurement system employs distributed fiber optic temperature sensors. The fibers are laid between the high-voltage and low-voltage windings of each unit. The temperature resolution is 0.1℃, and the spatial resolution is 1 meter. Within each acquisition cycle, the winding temperature is continuously measured, and the highest temperature point is recorded as the winding temperature of that unit. The winding temperature of the i-th parallel unit is denoted as... .

[0030] Calculate the average temperature value of each parallel unit winding. :

[0031] in, The average winding temperature, Let N be the winding temperature of the i-th parallel unit, and N be the total number of parallel units.

[0032] Calculate the deviation between the winding temperature of each parallel unit and the average temperature value to generate the inter-unit temperature deviation. The inter-unit temperature deviation of the i-th parallel unit is... The calculation formula is:

[0033] in, Let be the temperature deviation between units of the i-th parallel unit. Let be the winding temperature of the i-th parallel unit. Average winding temperature; inter-unit temperature deviation This reflects the degree of deviation of the heat load of the i-th unit winding from the average level. The larger the value, the higher the thermal stress of the unit winding.

[0034] The thermal imbalance characteristics of a unit are generated by combining the current deviation between units and the winding temperature of each unit. The Chebyshev distance algorithm is used to calculate the unit thermal imbalance characteristics, specifically the thermal imbalance characteristics of the i-th parallel unit. The calculation formula is:

[0035] in, The thermal imbalance characteristics of the i-th parallel unit are given. Let be the inter-unit current deviation of the i-th parallel unit. This is the normalized reference value for the current deviation. Let be the temperature deviation between units of the i-th parallel unit. This serves as the normalized baseline value for temperature deviation. This indicates taking the maximum value of the two items within the parentheses.

[0036] It needs to be explained that the normalized reference value for current deviation Take 10% of the rated current of each parallel unit, and normalize the temperature deviation to a reference value. Take 15℃. The larger or When the size is larger, the unit thermal imbalance characteristics The larger the value, the more severely the unit deviates from the average level in terms of current distribution or temperature rise.

[0037] In step S2, the cumulative operating time of each parallel unit since its commissioning is read from the historical operation database of the substation monitoring system. The cumulative operating time of the i-th parallel unit is denoted as . Cumulative runtime This is obtained by summing all the hours the unit was in operation between its commissioning date and the current date.

[0038] Retrieve off-center load determination data from the off-center load determination database. The off-center load determination data includes the unit thermal imbalance characteristic threshold range corresponding to each off-center load level. This data is obtained by statistical analysis of historical test data during the system initialization phase and stored in the database.

[0039] The off-center load determination data is set to three levels: slight off-center load, moderate off-center load, and severe off-center load, with corresponding unit thermal imbalance characteristic threshold ranges as follows: When the unit thermal imbalance characteristics When the load falls within a certain threshold range, the unit's off-center load level is determined to be the corresponding level.

[0040] The off-center load level of each unit is evaluated based on the unit thermal imbalance characteristics and off-center load determination data. The unit thermal imbalance characteristics of the i-th parallel unit are then analyzed. The initial off-center load level of the unit is determined by comparing it with the threshold range in the off-center load determination data.

[0041] The logistic regression model is used to quantify and score the off-center load level. The initial off-center load level score of the i-th parallel unit is given. The calculation formula is:

[0042] in, The initial off-center load rating of the i-th parallel unit is given, with a value range of [0, 1]. Let be the thermal imbalance characteristic of the i-th parallel unit, α be the logistic regression slope parameter, α=5; β be the logistic regression intercept parameter, β=-2.5; exp() represents the exponential function with the natural constant e as the base.

[0043] It needs to be explained that when the unit has thermal imbalance characteristics When it is larger, The larger the value, the better. The smaller the initial off-center load rating, the higher the initial off-center load rating. The closer the value is to 1, the more severe the off-center loading of the unit. The logistic regression slope parameter and the logistic regression intercept parameter mentioned above can be set according to the actual accuracy requirements. For example, the logistic regression slope parameter can be set to 5 and the logistic regression intercept parameter can be set to -2.5, etc., which will not be elaborated here.

[0044] The off-center load level is corrected based on the cumulative operating time of the unit. During long-term operation, factors such as aging of insulation materials and increased contact resistance of contacts lead to a greater temperature rise under the same current load. Therefore, units with a longer cumulative operating time have a higher risk of thermal imbalance.

[0045] The lifetime correction factor is calculated using a polynomial regression model. The lifetime correction factor for the i-th parallel unit is... The calculation formula is:

[0046] in, Let be the lifetime correction factor for the i-th parallel unit, with a value range of [1, +∞); Let be the cumulative runtime of the i-th parallel unit. γ is the baseline value for the equipment's design life, and γ is the preset weighting coefficient for the impact of aging.

[0047] It needs to be explained that when the cumulative runtime... When it is larger, The larger the value, the higher the lifespan correction factor. The larger the value, the higher the risk of thermal imbalance due to aging in the unit. The design life benchmark value of the equipment is given by professionals in the field based on the actual situation and will not be analyzed here.

[0048] The initial off-center load level score is multiplied by the life correction factor to generate the corrected unit off-center load identification result. The corrected unit off-center load identification result for the i-th parallel unit is shown below. The calculation formula is:

[0049] in, The corrected unit off-center load identification result is for the i-th parallel unit. The initial off-center load level score for the i-th parallel unit is given. Let be the lifetime correction factor for the i-th parallel unit, and be the result of the unit off-center load identification after correction. This comprehensively reflects the combined impact of the current thermal imbalance level of the unit and the aging level of the equipment on the risk of off-center loading. The larger the value, the more intense the cooling resources required for that unit.

[0050] In step S3, the current response delay of the cooling system is detected. At the beginning of the current acquisition cycle, a standard test command is sent to the cooling system of each parallel unit. The command is to increase the speed of the cooling fan by 100 revolutions per minute. The time interval from the time the command is sent to the time when the actual speed of the fan reaches the target speed is recorded. This time interval is the current response delay of the cooling system.

[0051] The current response delay of the cooling system of the i-th parallel unit is denoted as . Current response delay of the cooling system The speed is obtained by real-time monitoring of the fan speed change by a speed sensor installed at the fan bearing. The speed sensor adopts a photoelectric encoder with a speed measurement accuracy of ±1 rpm and a sampling frequency of 10 Hz.

[0052] Collect the bus load change rate at the start of the current collection cycle. and the end time The total load current of the busbar is collected using current transformers installed on the busbar side, and denoted as . and Bus load change rate The calculation formula is:

[0053] in, The bus load change rate, This represents the total bus load current at the end of the current data acquisition cycle. This represents the total bus load current at the start of the current acquisition cycle. For the duration of the data collection period, take .

[0054] It should be noted that the bus load change rate It reflects the rate of change of the total load current of the busbar. A positive value indicates an increase in load. A negative value indicates a decrease in load. The larger the value, the more drastic the load change.

[0055] Based on the corrected unit off-center load identification results, unit-level cooling tilt coefficients are assigned, and the cooling tilt coefficients of each unit are calculated using the analytic hierarchy process (AHP). The specific steps are as follows: Step 1: Construct a judgment matrix, compare each parallel unit pairwise, and determine the relative importance of each unit in the cooling resource allocation based on the magnitude relationship of the corrected unit off-center load identification results; let the relative importance of the i-th unit and the j-th unit be denoted as . ,when hour, ;when hour, ;when hour, The reciprocal of . Construct an N×N judgment matrix A, where the element in the i-th row and j-th column of A is . .

[0056] Step 2: Calculate the cooling tilt coefficient of each unit, and use the eigenvalue method to solve for the largest eigenvalue of the judgment matrix A. and its corresponding eigenvectors eigenvectors The components of are normalized to obtain the cooling tilt coefficients of each unit. The cooling tilt coefficient of the i-th parallel unit is denoted as . ,satisfy .

[0057] Cooling tilt coefficient This reflects the weight proportion that the i-th unit should be allocated in the total cooling resources. The larger the value, the more cooling resources the unit needs.

[0058] The cooling tilt coefficient is dynamically planned by using the current response delay of the cooling system and the bus load change rate. When the response delay of the cooling system is large, the actual execution of the cooling command is delayed, and feedforward compensation is needed for the cooling tilt coefficient. When the bus load change rate is large, the unit heat load is in a rapid change stage, and the cooling tilt coefficient needs to be dynamically amplified.

[0059] Dynamic programming post-cooling tilt coefficient of the i-th parallel unit The calculation formula is:

[0060] in, Let be the dynamic programming post-cooling tilt coefficient of the i-th parallel unit. Let be the cooling tilt coefficient of the i-th parallel unit. The current response delay of the cooling system for the i-th parallel unit. As the baseline value for the cooling system response delay, take ; The bus load change rate, The benchmark value for the bus load change rate is taken as follows: ; For response delay compensation coefficient, This is the load change rate amplification factor.

[0061] When the cooling system currently has a response delay When it is larger, The larger the value, the greater the cooling tilt coefficient after dynamic programming. The larger the value, the earlier the cooling command for that unit needs to be issued to compensate for the response lag; when the bus load change rate... When it is larger, The larger the value, the greater the cooling tilt coefficient after dynamic programming. The larger the value, the more aggressive the cooling strategy needs to be during periods of drastic load changes.

[0062] It should be noted that the response delay compensation coefficient and the load change rate amplification coefficient can be preset according to the actual situation. In this example, the response delay compensation coefficient is set to 0.15 and the load change rate amplification coefficient is set to 0.10.

[0063] The calculated units Perform normalization processing, so that ,by As the final cooling tilt coefficient.

[0064] Based on the cooling tilt coefficient after dynamic programming, differentiated cooling commands are output. These differentiated cooling commands include the target speed of the cooling fans in each parallel unit and the target flow rate of the oil pump; the target speed of the i-th parallel unit cooling fan... With the target flow rate of the oil pump The calculation formula is:

[0065] in, Let i be the target speed of the cooling fan in the i-th parallel unit. The reference speed of the cooling fan is taken as... ; For the maximum speed adjustment range of the cooling fan, take ; Let i be the target flow rate of the i-th parallel unit oil pump. For the oil pump reference flow rate, take ; For the maximum flow rate adjustment range of the oil pump, take... ; Let be the final cooling tilt coefficient of the i-th parallel unit.

[0066] For example, the cooling tilt coefficient after dynamic programming of a parallel unit. The target speed of the cooling fan Oil pump target flow rate .

[0067] In step S4, a differentiated cooling command is executed, and the target speed of the cooling fan and the target flow rate of the oil pump of each parallel unit are sent to the cooling controller of each unit through the substation monitoring system. The cooling controller adjusts the fan speed and oil pump flow rate according to the target values.

[0068] After waiting for a cooling response cycle, which is 180 seconds, the real-time current and winding temperature of each parallel unit are collected again at the end of the cycle.

[0069] Calculate the inter-cell current deviation and inter-cell temperature deviation after executing the cooling command. Let the inter-cell current deviation of the i-th parallel unit before executing the cooling command be... After executing the cooling command, the inter-unit current deviation of the i-th parallel unit is The temperature deviation between units of the i-th parallel unit before executing the cooling command is: After executing the cooling command, the temperature deviation between the i-th parallel unit is... .

[0070] The inter-cell imbalance convergence is evaluated. Inter-cell imbalance convergence reflects the reduction in current and temperature deviations between cells after executing differentiated cooling commands. The corrected geometric mean method is used to calculate the inter-cell imbalance convergence.

[0071] Where C is the inter-element imbalance convergence, and its value ranges from [0, 1]. For the current dimension convergence, For the convergence of the temperature dimension, For dimensionality difference modulation coefficients, in this example, Set to -0.3.

[0072] Current dimension convergence Convergence with temperature dimension The calculations are as follows:

[0073] in, For the current dimension convergence, This is the sum of the inter-unit current deviations of all parallel units after the cooling command is executed. This is the sum of the inter-unit current deviations of all parallel units before the cooling command is executed. For the convergence of the temperature dimension, This is the sum of the temperature deviations between all parallel units after the cooling command is executed; This is the sum of the temperature deviations between all parallel units before the cooling command is executed.

[0074] when Compared to The greater the reduction, the lower the convergence of the current dimension. The closer it is to 1, the more significant the decrease in current deviation after the cooling command is executed; Similarly, when Compared to The greater the reduction, the higher the convergence of the temperature dimension. The closer it is to 1, the more significant the decrease in temperature deviation after the cooling command is executed.

[0075] when and When the difference is large, Larger Negative values ​​will lower the inter-unit imbalance convergence. This reflects an imbalance in the overall control effect when the convergence speeds of the two dimensions are inconsistent.

[0076] The off-center load determination data is corrected and updated based on the inter-unit imbalance convergence. The threshold range of the unit thermal imbalance characteristics corresponding to each off-center load level in the off-center load determination data needs to be dynamically adjusted according to the actual control effect. When the inter-unit imbalance convergence is low, it indicates that the current off-center load determination threshold is set too wide, and the actual off-center load degree of some units is not fully identified. The threshold range boundary should be adjusted upward. When the inter-unit imbalance convergence is high, it indicates that the current off-center load determination threshold is set reasonably and should remain unchanged.

[0077] Set the threshold for determining inter-unit imbalance convergence. , Pick When there is imbalance between units, the convergence is... When determining the off-center load, the data needs to be corrected and updated. The correction rules are as follows: The lower bound of the characteristic threshold range of unit thermal imbalance corresponding to mild off-center loading is set to... Adjusted to The upper boundary is Adjusted to ; The lower bound of the unit thermal imbalance characteristic threshold interval corresponding to moderate off-center loading is changed from... Adjusted to The upper boundary is Adjusted to ; The lower bound of the threshold interval for the thermal imbalance characteristic of the unit corresponding to severe off-center loading is... Adjusted to .

[0078] in, and Threshold correction magnitude:

[0079] in, The adjustment range for the thresholds of mild and moderate off-center loads. The adjustment range for the thresholds of moderate and severe off-center loads. The threshold for determining the convergence degree of inter-unit imbalance is set as follows: C represents the inter-unit imbalance convergence degree, and the threshold correction magnitude. and Convergence with inter-unit imbalance The decrease in the threshold and the increase in the threshold reflect that when the control effect is worse, the downward adjustment of the off-center load judgment threshold is greater, so that more units are identified as off-center load units, and thus more cooling resources are allocated in the next round of control.

[0080] When the inter-unit imbalance convergence At that time, the data for determining the off-center load is reasonable, and the threshold range of the unit thermal imbalance characteristics corresponding to each off-center load level remains unchanged.

[0081] Write the corrected and updated off-center load determination data into the off-center load determination database for use in step S2 of the next control cycle.

[0082] It should be noted that in this embodiment, the data acquisition period is set to 60 seconds and the cooling response period is set to 180 seconds. These can be adjusted by those skilled in the art based on the actual equipment response characteristics and load change frequency of the substation. Furthermore, this embodiment is applicable to multiple transformers, parallel reactors, or parallel reactive power compensation units operating in parallel on a common busbar. The number of parallel units... It can be flexibly configured according to the actual substation configuration.

[0083] Finally, it should be noted that in this paper, relational terms such as first and second are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations.

[0084] Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.

[0085] In this document, the singular forms “a,” “an,” and “the” may also include the plural forms unless the context clearly indicates otherwise. It should also be understood that terms such as “comprising / including” or “having” specify the presence of the stated features, integrals, steps, operations, components, parts, or combinations thereof, but do not preclude the possibility of the presence or addition of one or more other features, integrals, steps, operations, components, parts, or combinations thereof. Meanwhile, the term “and / or” as used in this specification includes any and all combinations of the associated listed items.

[0086] The various embodiments in this specification are described in a progressive manner. Each embodiment focuses on the differences from other embodiments. The various embodiments can be combined as needed, and the same or similar parts can be referred to each other.

[0087] The above description of the disclosed embodiments enables those skilled in the art to make or use this application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of this application. Therefore, this application is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A method for regulating temperature rise of power equipment based on operating state awareness, characterized in that: Includes the following steps: Step S1: Collect the real-time current of each parallel unit and calculate the current deviation between units, obtain the winding temperature of each unit, and generate the unit thermal imbalance characteristics by combining the current deviation between units and the winding temperature of each unit. Step S2: Read the cumulative running time of the unit, retrieve the off-center load determination data, evaluate the off-center load level of each unit based on the unit thermal imbalance characteristics and the off-center load determination data, and generate the corrected unit off-center load identification result after life correction based on the cumulative running time of the unit. Step S3: Detect the current response delay of the cooling system, collect the bus load change rate, allocate the unit-level cooling tilt coefficient according to the corrected unit off-center load identification result, and output differentiated cooling commands after dynamically planning the cooling tilt coefficient through the current response delay of the cooling system and the bus load change rate. Step S4: After executing the differentiated cooling command, evaluate the inter-unit imbalance convergence and correct and update the off-center load judgment data based on the inter-unit imbalance convergence.

2. The method for temperature rise control of power equipment based on operating status perception according to claim 1, characterized in that: In step S1, the real-time current of each parallel unit is collected using the zero-sequence current transformer installed at the output terminal of each parallel unit. Calculate the theoretical average current value of the real-time current of each parallel unit, and take the deviation between the real-time current of each parallel unit and the theoretical average current value as the current deviation between units. Within the same acquisition cycle, the highest temperature point within each acquisition cycle is obtained using an optical fiber temperature measurement system installed inside the windings of each parallel unit, which is then used as the winding temperature of that unit. The average temperature value of the windings of each parallel unit is then calculated.

3. The method for temperature rise control of power equipment based on operating status perception according to claim 2, characterized in that: In step S1, the deviation between the winding temperature of each parallel unit and the average temperature value is calculated to generate the temperature deviation between units; The thermal imbalance characteristics of a unit are generated by combining the current deviation between units and the winding temperature of each unit, and the Chebyshev distance algorithm is used to calculate the thermal imbalance characteristics of the unit.

4. The method for temperature rise control of power equipment based on operating status perception according to claim 1, characterized in that: In step S2, the cumulative operating time of each parallel unit since commissioning is read from the historical operation database of the substation monitoring system; Retrieve off-center load determination data from the off-center load determination database. The off-center load determination data includes the unit thermal imbalance characteristic threshold range corresponding to each off-center load level. The off-center load determination data is set as mild off-center load, moderate off-center load, and severe off-center load. The off-center load level of each unit is evaluated based on the unit thermal imbalance characteristics and the off-center load determination data. The unit thermal imbalance characteristics of the parallel units are compared with the threshold range in the off-center load determination data to determine the initial off-center load level of the parallel units.

5. The method for temperature rise control of power equipment based on operating status perception according to claim 4, characterized in that: In step S2, a logistic regression model is used to quantify and score the off-center load level to obtain the initial off-center load level score of the parallel unit. The off-center load level is corrected for life based on the cumulative running time of the unit, and the life correction coefficient is calculated using a polynomial regression model. The initial off-center load rating is multiplied by the lifetime correction factor to generate the corrected unit off-center load identification result.

6. The method for temperature rise control of power equipment based on operating status perception according to claim 5, characterized in that: In step S3, the current response delay of the cooling system is detected. At the beginning of the current acquisition cycle, a standard test command is sent to the cooling system of each parallel unit. The time interval from the time the command is sent to the time when the actual fan speed reaches the target speed is recorded and used as the current response delay of the cooling system. The bus load change rate is collected by using current transformers installed on the bus side to collect the total bus load current at the beginning and end of the current collection cycle, and then calculating the bus load change rate.

7. The method for temperature rise control of power equipment based on operating status perception according to claim 6, characterized in that: In step S3, the cooling tilt coefficient at the unit level is assigned based on the corrected unit off-center load identification results, and the cooling tilt coefficient of each unit is calculated using the analytic hierarchy process (AHP). The specific steps are as follows: Step 1: Construct a judgment matrix, compare each parallel unit pairwise, and determine the relative importance of each unit in the allocation of cooling resources based on the size relationship of the corrected unit off-center load identification results. Step 2: Calculate the cooling tilt coefficient of each unit. Use the eigenvalue method to solve for the largest eigenvalue of the judgment matrix A and its corresponding eigenvector. After normalization, each component of the eigenvector is the cooling tilt coefficient of each unit. The cooling tilt coefficient of the parallel unit after dynamic programming is obtained by using the current response delay of the cooling system and the bus load change rate to calculate the cooling tilt coefficient; The calculated cooling tilt coefficients of each unit after dynamic programming are normalized to obtain the final cooling tilt coefficients. Based on the cooling tilt coefficient after dynamic programming, differentiated cooling commands are output. The differentiated cooling commands include the target speed of the cooling fan and the target flow rate of the oil pump for each parallel unit.

8. The method for temperature rise control of power equipment based on operating status perception according to claim 7, characterized in that: In step S4, a differentiated cooling command is executed, and the target speed of the cooling fan and the target flow rate of the oil pump of each parallel unit are sent to the cooling controller of each unit through the substation monitoring system. The cooling controller adjusts the fan speed and oil pump flow rate according to the target values. After setting and waiting for a cooling response cycle, the real-time current and winding temperature of each parallel unit are collected again. The current deviation and temperature deviation between units after executing the cooling command are calculated by using the real-time current and winding temperature of each parallel unit. Based on the current deviation and temperature deviation between units after executing the cooling command, the current dimension convergence and temperature dimension convergence are obtained.

9. A method for controlling the temperature rise of power equipment based on operational status perception according to claim 8, characterized in that: In step S4, the inter-unit imbalance convergence is calculated using the modified geometric mean method based on the convergence in the current dimension and the convergence in the temperature dimension. The off-center load determination data is corrected and updated based on the convergence of the inter-unit imbalance. Set a threshold for judging the inter-unit imbalance convergence. When the inter-unit imbalance convergence is less than the threshold, the off-load judgment data needs to be corrected and updated. When the inter-unit imbalance convergence is greater than or equal to the inter-unit imbalance convergence judgment threshold, the off-center load judgment data is deemed reasonable, and the unit thermal imbalance characteristic threshold range corresponding to each off-center load level remains unchanged. The corrected and updated off-center load determination data is written into the off-center load determination database for use in the next control cycle.