Intelligent temperature control system for preventing collapse in late stage of vacuum freeze-drying
By acquiring the material temperature and heating rate, and combining the measured heating response, the system predicts continued temperature rise and initiates refrigeration in advance within the collapse critical temperature range. This solves the temperature control problem in the later stages of desorption drying in vacuum freeze-drying equipment, achieves precise control of the material temperature peak, avoids cake collapse and activity loss, and improves drying efficiency.
Patent Information
- Application Number
- CN202611680456.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-28
- Publication Date
- 2026-11-24
AI Technical Summary
Existing vacuum freeze-drying equipment has difficulty effectively controlling the material temperature in the later stages of desorption drying, leading to cake collapse and loss of activity. Fixed margin or hysteresis control schemes cannot simultaneously meet the requirements of preventing over-limit and shortening drying time.
By acquiring the material temperature and heating rate, and combining the measured heating response, the system predicts continued temperature rise and initiates cooling in advance within the collapse critical temperature range, dynamically adjusting the timing of cooling to prevent the material temperature peak from exceeding the safe range.
It achieves precise control of material temperature peak, reduces cake collapse and activity loss, and shortens drying time, thereby improving equipment operating efficiency.
Smart Images

Figure CN123156992A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of vacuum freeze-drying technology, and more specifically, to an intelligent temperature control system for preventing collapse during the later stages of vacuum freeze-drying. Background Technology
[0002] In the desorption drying stage, vacuum freeze-drying equipment heats the material bottle, gradually bringing the material temperature close to the collapse critical temperature. Once this temperature is exceeded, the dried cake softens, shrinks, loses its porous structure, and loses its activity. To prevent this, existing equipment typically sets protective limits around the shelf temperature or material temperature for temperature control.
[0003] Chinese utility model patent CN204678810U discloses a vacuum freeze dryer with temperature control. Temperature sensors are installed on the material rack and the inner wall of the chamber. The pre-freezing process is maintained in the range of 5 to 10 degrees Celsius above the eutectic point by a hysteresis method of stopping and starting the refrigeration. During the heating and drying stage, the heating is constrained by a set upper temperature limit. It belongs to the device scheme that performs protection with fixed hysteresis and fixed upper limit.
[0004] Chinese invention patent application CN116782889A discloses a freeze-drying process in which the temperature of the target product is set about 2 to 3 degrees Celsius below the collapse temperature, and then the process is run according to a pre-designed shelf temperature and chamber pressure program. This is a process scheme that sets the target temperature with a fixed margin and executes the process according to a predetermined program.
[0005] Both of the above-mentioned solutions share the common practice of establishing a protection line based on a pre-set margin, hysteresis, or upper limit. During the later stages of analytical drying, equipment operators encounter the same phenomenon: after issuing a cooling command to the refrigeration system and stopping heating, it takes time for the refrigerant to reach the shelf channel via the pipeline. The energy stored in the shelf and heat transfer oil continues to be released to the material, and the reversal of the heat transfer direction also takes time. The material temperature will continue to rise for a period after cooling begins before reaching its peak. If the margin is too small, the peak temperature will exceed the collapse critical temperature when the material heats up quickly; if the margin is too large, the entire drying process is forced to take place at a lower material temperature, extending the drying time. This continued temperature rise varies depending on the material's heating rate, the shelf's heat storage capacity, and the operating capacity of the refrigeration circuit at the time. It is difficult to simultaneously meet the requirements of preventing exceeding the limit and shortening the drying time with a fixed margin and a fixed hysteresis. Summary of the Invention
[0006] This invention provides an intelligent temperature control system for preventing collapse during the later stages of vacuum freeze-drying, which solves the technical problems mentioned in the background art.
[0007] To achieve the above-mentioned objectives, the present invention provides the following technical solution.
[0008] An intelligent temperature control system for preventing collapse in the later stage of vacuum freeze-drying, used in the analytical drying stage of vacuum freeze-drying, wherein the system is configured as follows: The material temperature and the material heating rate are obtained, whereby the material heating rate indicates how quickly the material temperature rises; the measured heating response is obtained based on the actual change in the material temperature after the system was previously turned on for cooling, and the measured heating response characterizes the degree of lag in the material temperature continuing to rise after the cooling was turned on. The collapse critical temperature is used as the upper limit of the peak temperature of the material. The temperature rise after the cooling is turned on is predicted by combining the material heating rate and the measured heating response. The temperature limit for turning on the cooling in advance is determined according to the collapse critical temperature and the temperature rise, so that the peak temperature of the material formed after the cooling is turned on in advance is within the collapse critical temperature. Heating is stopped and refrigeration is started when the material temperature reaches the temperature limit for early refrigeration activation.
[0009] Compared with the prior art, the present invention has the following substantial features and significant progress: This invention obtains the measured temperature rise response based on the actual temperature change of the material after the machine's cooling was previously activated. Combined with the current material temperature rise rate, it predicts the continued temperature rise after the current cooling is activated. Based on this, along with the collapse critical temperature, it determines the temperature limit for early activation of cooling. When the material temperature reaches this limit, heating is stopped and cooling is activated. This allows the timing of cooling intervention to be automatically adjusted according to the material temperature rise and the equipment's cooling response. It can control the peak material temperature within the collapse critical temperature without relying on a fixed margin, reducing cake collapse and activity loss caused by the material peak exceeding the limit. At the same time, it avoids the need to suppress the drying temperature for a long time to cover unfavorable working conditions, so that the material temperature in the later stage of desorption drying is close to the range allowed by the collapse critical temperature, shortening the drying time. Attached Figure Description
[0010] Figure 1 This is a schematic diagram of the system modules of the present invention; Figure 2 This is a schematic diagram of the method flow of the present invention; Figure 3 This is a graph showing the early cooling threshold and peak material temperature under different heating rates according to the present invention.
[0011] In the diagram: 111, main control unit; 112, material temperature probe; 113, heating module; 114, refrigeration module; 115, electronic expansion valve; 116, integrated heating and cooling shelf; 117, representative bottle; 118, human-machine interaction unit. Detailed Implementation
[0012] The following description is provided in conjunction with the accompanying drawings. It should be understood that the following embodiments are for illustrative purposes only and are not intended to limit the invention; those skilled in the art can make equivalent substitutions or combinations for the specific implementations.
[0013] This embodiment relates to temperature control during the desorption drying stage of vacuum freeze-drying. Heat-sensitive materials such as proteins, peptides, probiotics, fruits and vegetables, traditional Chinese medicine, and biological agents are dispensed into bottles and placed on an integrated heating and cooling shelf 116 inside a freeze-drying chamber, which is kept under vacuum. During the sublimation drying stage, the materials remain frozen, and ice crystals sublimate into water vapor under the heating of the integrated heating and cooling shelf 116. After the ice crystals have sublimated, the desorption drying stage begins. The remaining bound water is gradually removed as the material temperature rises, and the dried material forms a porous cake. During the desorption drying stage, the material loses the support of the ice crystal skeleton, and the porous cake maintains its shape based on the strength of the dried structure. Once the peak temperature of the material exceeds the collapse critical temperature, the strength of the dried structure decreases, and the porous cake softens, shrinks, and collapses, accompanied by surface charring and loss of activity. The maximum allowable temperature of the material is constrained by the collapse critical temperature. Anti-collapse temperature control uses the collapse critical temperature as the upper limit of the peak temperature of the material; the protection target is the peak temperature of the material. The peak temperature of the material occurred during the rise after each cooling cycle was started.
[0014] The specific technical problem this embodiment aims to solve is that, in the later stages of analytical drying, after heating is stopped and refrigeration is turned on, the material temperature continues to rise, and there is a lag between ordering refrigeration to start and the material temperature stopping its rise. After ordering refrigeration to start, the electronic expansion valve 115 opens, allowing the refrigerant to flow through. The refrigerant needs pipeline transport time to be delivered to the refrigeration channel of the integrated heating and cooling shelf 116. During this time, the integrated heating and cooling shelf 116 remains at a relatively high temperature, and the heat transfer oil in the heating channel and the heat stored in the shelf body continue to flow to the material in the representative bottle 117. After the cold energy enters the refrigeration channel, the shelf temperature gradually decreases, the heat transfer direction between the shelf and the material gradually reverses, and the rise in material temperature slows down and eventually stops. These three lags work together in each refrigeration start-up, resulting in the actual temperature rise of the material after that refrigeration start-up. The faster the material heats up, the more heat is stored, and the weaker the actual refrigeration performance, the greater the continued temperature rise after refrigeration is started. The timing of stopping heating and starting cooling determines the effectiveness of peak temperature control: starting cooling too late results in the material temperature peak exceeding the collapse critical temperature; starting cooling too early causes the material temperature to operate at a lower level throughout, extending the drying time. Determining the timing requires predicting the extent of the temperature rise after cooling is started. This extent varies with the material's heating state and is determined by the equipment's piping, heat storage, and heat transfer conditions, changing with the equipment's operating status. This implementation addresses this lag by determining a temperature limit for early cooling activation that is adapted to the current material heating state, ensuring that the peak material temperature after cooling is activated remains within the collapse critical temperature.
[0015] See Figure 1An intelligent temperature control system for preventing collapse during the later stages of vacuum freeze-drying includes a main control unit 111, a material temperature probe 112, a heating module 113, a refrigeration module 114, an electronic expansion valve 115, an integrated heating and cooling shelf 116, a representative bottle 117, and a human-machine interface unit 118. The main control unit 111 acquires the material temperature and the material heating rate, obtains the measured heating response based on the actual temperature change after the system previously activated refrigeration, predicts the continued temperature rise after activating refrigeration this time, determines the temperature limit for early activating refrigeration based on the collapse critical temperature and the continued temperature rise, and judges whether the material temperature has reached this limit. The material temperature probe 112 is inserted into the representative bottle 117 to measure the temperature of the material inside the bottle; the material heating rate is obtained by differentiating the material temperature with respect to time. The heating module 113 includes a circulating pump, heat transfer oil, and a heater. The heater heats the heat transfer oil, and the circulating pump drives the heat transfer oil to circulate through the heating channel. The refrigeration module 114 includes a compressor and a heat exchanger. The refrigeration module 114 is equipped with an electronic expansion valve 115. The compressor, heat exchanger, and electronic expansion valve 115 form the flow path for the refrigerant. The refrigerant output from the refrigeration module 114 enters the integrated heating and cooling shelf 116 via the electronic expansion valve 115. The electronic expansion valve 115 is located on the refrigerant pipeline between the refrigeration module 114 and the integrated heating and cooling shelf 116. The integrated heating and cooling shelf 116 has independent heating and cooling channels. Heat is supplied through the heating channel, and cold is transferred through the cooling channel. Representative bottles 117 are placed on the integrated heating and cooling shelf 116, each containing material. Multiple representative bottles 117 include the bottle with the strongest edge heating. The human-machine interface unit 118 is used to input the collapse critical temperature. In an optional embodiment, the material temperature probe 112 uses a thermocouple or platinum resistance temperature sensing element, the main control unit 111 uses a programmable controller or industrial control computer, and the human-machine interface unit 118 uses a display panel with input function.
[0016] Figure 1 In the diagram, the material temperature probe 112 provides the material temperature and heating rate to the main control unit 111 along the dashed arrow, while the human-machine interface unit 118 provides the collapse critical temperature to the main control unit 111 along the dashed arrow. The main control unit 111 outputs heating commands and stops heating to the heating module 113 along the solid arrow, and outputs the start of cooling to the electronic expansion valve 115. The heat transfer oil of the heating module 113 enters the integrated heating and cooling shelf 116 along the thickened solid arrow through the heating channel, while the cooling medium of the cooling module 114 enters the cooling channel along the thickened solid arrow through the electronic expansion valve 115. The bidirectional arrow between the integrated heating and cooling shelf 116 and the representative bottle 117 indicates the heat transfer between them, and the direction of heat transfer is determined by the operating state of the heating and cooling channels; the line connecting the material temperature probe 112 and the representative bottle 117 indicates that the probe is inserted into the material inside the bottle.
[0017] See Figure 1 and Figure 2 Multiple material temperature probes 112 are inserted into multiple representative bottles 117, with each probe 112 forming a material temperature measuring point. The representative bottles 117 include those with the strongest edge heating. Each material temperature measuring point covers different heat exchange locations between the center and edge of the shelf, with the material temperature in the bottle with the strongest edge heating being the highest among all representative bottles 117. The main control unit 111 takes the temperature of the hottest material temperature measuring point as the material temperature, denoted as . The rate of material heating is obtained by differentiating the material temperature with respect to time, denoted as . The material heating rate indicates how quickly the material temperature rises. Peak control is applied to the hottest material temperature measuring point, while the temperatures of all other material temperature measuring points are simultaneously monitored by the main control unit 111. The peak material temperature is the highest value reached by the material temperature during the desorption drying stage.
[0018] See Figure 2 The control process begins at step S211. Steps S212 to S219 perform data acquisition, prediction, and judgment cyclically according to the sampling cycle. Steps S220 to S222 execute refrigeration activation and recovery. These two parts are cyclically connected, and the entire analytical drying stage is repeated. After the system is powered on, the temperature probes 112 of each material and the human-machine interface unit 118 begin working. The main control unit 111 completes a self-check, confirming that the independent heating and cooling channels are normally connected and the electrical interlocks are effective. After sublimation drying is completed, the main control unit 111 switches to temperature control operation for the analytical drying stage. The collapse critical temperature is obtained through the human-machine interface unit 118 and recorded as... The collapse critical temperature is determined by the characteristics of the material. Different materials have different collapse critical temperatures. The entered collapse critical temperature serves as the upper limit of the peak temperature of the material during this freeze-drying process. The heating-holding curve of the drying stage is also entered by the human-machine interface unit 118. The heating-holding curve includes the heating rate, target range and holding time of each segment. The main control unit 111 organizes the operation of multiple heating and holding segments according to this curve.
[0019] Step S212 collects the material temperature to obtain the material heating rate. Each material temperature probe 112 samples at a frequency of no less than 5 times per second to ensure the time resolution for differentiating the material heating rate and capturing peak values. The main control unit 111 performs digital filtering and outlier removal on the sampled data to obtain the temperature at each material temperature measuring point. The material temperature is then determined by the temperature of the hottest material temperature measuring point among all material temperature measuring points. Material heating rate The temperature is obtained by differentiating the material temperature with respect to time. Digital filtering and outlier removal ensure that the material temperature sequence used for differentiation remains stable. In an optional implementation, digital filtering employs moving average processing, and outlier removal employs amplitude-limited comparison processing. The material temperature and material heating rate are updated once in each sampling period and continuously used in steps S216 to S219. The hottest material temperature measurement point may change in each sampling period.
[0020] In each heating stage of the analytical drying process, the main control unit 111 outputs low-power stepped heating commands based on the target curve and using a combined feedforward and PID algorithm. The heating power is applied in stages, and the heater heats the heat transfer oil. A circulating pump drives the heat transfer oil to circulate through the heating channel of the integrated heating and cooling shelf 116. The heat carried by the heat transfer oil is transferred to the material in the representative bottle 117 via the integrated heating and cooling shelf 116, causing the material temperature to rise. The heating rate is controlled at 0.1 to 1.0 degrees Celsius per minute, resulting in a stable temperature increase. The heating stage is the heating phase in analytical drying that raises the material temperature. After the material temperature enters the target range, it enters the heat preservation stage. The main control unit 111 reduces the heating duty cycle to perform low-power supplementary heating, maintaining the temperature of the hottest material temperature measuring point within the target range. The power of the low-power supplementary heating is lower than the heating power of the heating stage; these two functions correspond to raising and maintaining the material temperature, respectively. The low-power supplementary heating in the insulation section is compared with the material temperature and the temperature limit of the early start of refrigeration. When the material temperature reaches the limit, the insulation section enters step S220 to stop heating and start refrigeration.
[0021] Each heating section raises the material temperature to the target range for that section. The next heating section starts from the temperature level of the previous insulation section. The structure of multiple sections is determined according to the material characteristics. Within the insulation section, bound water is continuously removed under the influence of temperature and vacuum. Low-power supplementary heating compensates for the heat dissipation of the material to the environment and the heat absorption during dehydration.
[0022] The main control unit 111 obtains the measured temperature rise response from the actual temperature change of the material after the system previously activated cooling. The measured temperature rise response characterizes the lag in the continued rise of the material temperature after cooling is activated. The measured temperature rise response quantifies this lag into a successively acquired value, which comes from the actual measurements taken during each cooling activation of the machine and varies with the actual state of the equipment. The acquisition of the measured temperature rise response precedes its participation in prediction. See also... Figure 2 Step S213 determines whether a measured temperature rise response has been obtained. If the result is no, proceed to step S214; if the result is yes, proceed to step S216.
[0023] The system lacked a measured temperature rise response during the initial desorption drying stage. Step S214 involved heating and refrigeration within a safe zone where the material temperature was below the collapse critical temperature, resulting in the first measured temperature rise response. Within this safe zone, the material temperature had sufficient margin to reach the collapse critical temperature. This heating and refrigeration was performed far from the collapse critical temperature: initial heating increased the material temperature rate to above zero, followed by stopping heating and refrigeration. The material temperature continued to rise after refrigeration was initiated and then subsequently fell back, following the same pattern as the subsequent refrigeration cycles in the later stages of desorption drying.
[0024] Step S215 records the material temperature at the time the refrigeration command is issued, the material heating rate at the time the refrigeration command is issued, and the peak material temperature after the refrigeration is issued. The first coasting time is calculated and used as the first measured temperature rise response. The measured temperature rise response is the coasting time. In any given refrigeration operation, the material temperature at the time the refrigeration command is issued is recorded as follows: The rate at which the material heats up when the refrigeration is turned on is recorded as . After the refrigeration is turned on, the material temperature continues to rise, reaching the peak temperature formed after the refrigeration is turned on, and then falls back. This peak temperature is denoted as _____. The three values are taken from the material temperature and its derivative with respect to time after digital filtering and outlier removal. The main control unit 111 records these values during the sampling period when the cooling is commanded to start. and Record within the sampling period after the peak occurs .
[0025] in, Indicates the gliding time, in seconds; This indicates the material temperature at which the refrigeration is activated. This indicates the rate at which the material heats up when the refrigeration is activated. This indicates the peak temperature of the material after the refrigeration is turned on. and The difference represents the actual temperature rise of the material after the refrigeration was initiated. This temperature rise, divided by the material's temperature rise rate at the time the refrigeration was initiated, is converted into an equivalent time. All lags in pipeline transport, heat storage and release, and the reversal of heat transfer direction are included in this equivalent time. The greater the sum of these lags, the longer the equivalent time. When the material's temperature rise rate gradually decreases after the refrigeration was initiated, this equivalent time differs from the actual elapsed time from the time the refrigeration was initiated to the peak value. For each refrigeration initiation used to calculate the coasting time, the material's temperature rise rate at the time the refrigeration was initiated was greater than zero, thus the denominator is positive. The coasting time is calculated from the measured change in material temperature. Differences in pipeline length, heat storage capacity, and refrigeration capacity are all reflected in the length of the coasting time. Changes in equipment status are reflected in the calculation for the next refrigeration initiation. The three values used in the calculation come from the same refrigeration initiation.
[0026] The actual changes in material temperature after the system previously started cooling include the first start of cooling within the safe zone and each start of cooling during the desorption drying process. Each start of cooling provides a record of the material temperature change from the order to start cooling to the peak value. This record is converted into a coasting time and stored in the main control unit 111. The first coasting time and the coasting times converted from each start of cooling during the desorption drying process are stored together to form the stored coasting times. The records of each start of cooling are independent of each other.
[0027] After the first measured temperature rise response is obtained, the judgment in step S213 changes to yes. Each heating segment and heat preservation segment enters the prediction in step S216 with the reserved sliding time. The protection in the later stage of analysis drying continues to run from the time the first sliding time is obtained. Heating and cooling in the safe zone are only executed once when the system lacks a measured temperature rise response.
[0028] In step S216, the predicted material heating rate is the largest material heating rate that occurred within the most recently obtained sliding time, and the predicted sliding time is the longest sliding time among all retained sliding times. In the later stages of drying, free water in the material has been removed, and the remaining bound water is more tightly bound to the material, requiring a higher material temperature for removal, thus slowing down the removal of bound water. Moisture removal absorbs heat, forming a phase change self-cooling effect, which inhibits the rise in material temperature. As the bound water content decreases, the phase change self-cooling weakens, and the material heating rate increases. The length of the window is the most recently obtained sliding time. Up to the current moment, when the material heating rate fluctuates within the window, the maximum value is taken, covering the fastest heating rate that has occurred within the window. The window varies with the measured sliding time; the greater the lag, the longer the window, and the larger the area covered by the accelerated heating. When the actual cooling performance slows down, the coasting time calculated for the next cooling cycle increases, and the longest coasting time in all previous cycles is updated accordingly. The coasting time used for prediction is thus extended, ensuring the prediction covers the largest lag in any previous cooling cycle. If there is a difference between the largest material heating rate observed within the window and the material heating rate at the end of the window, the former is used in the prediction.
[0029] Step S217 combines the material heating rate and the measured heating response to predict the continued temperature rise after the cooling system is activated. The measured heating response is the coasting time, the material heating rate used in the prediction is the maximum material heating rate, and the coasting time used in the prediction is the longest coasting time. The continued temperature rise... Predict using the following formula: in, This indicates a continued temperature rise, expressed in degrees Celsius. This indicates the material heating rate involved in the prediction, which is the largest material heating rate that occurred during the most recent gliding time. This indicates the coasting time included in the prediction, which is the longest coasting time among all retained coasting times. The continued temperature rise is the temperature at which the material temperature will continue to rise after the current cooling order is activated. The greater the current material temperature rise rate and the longer the coasting time, the greater the continued temperature rise.
[0030] Step S218 determines the temperature limit for early activation of cooling based on the critical collapse temperature and the continued temperature rise. : in, This indicates the temperature limit at which cooling should be activated in advance. Indicates the critical temperature for collapse. This indicates continued temperature rise. The temperature limit for early activation of cooling is equal to the collapse critical temperature minus the continued temperature rise, and is below the collapse critical temperature. When the material temperature reaches this limit, cooling is activated. The material temperature then rises further through the continued temperature rise to reach the peak material temperature formed after cooling was activated, which is within the collapse critical temperature. The difference between the material temperature and the temperature limit for early activation of cooling is the continued temperature rise at that time, and this difference changes periodically with the rate of material temperature rise. During the period when the material temperature is below this limit, the system maintains the current heating or low-power supplemental heating; if cooling is activated earlier than this limit, the peak material temperature is further below the collapse critical temperature, and the material temperature operates at a lower level throughout; if cooling is activated later than this limit, the peak material temperature formed after cooling is activated exceeds the collapse critical temperature.
[0031] Step S219 determines whether the material temperature has reached the temperature limit for prematurely activating refrigeration. Material temperature Temperature limits for early activation of cooling satisfy If the material temperature reaches the threshold for early refrigeration activation, proceed to step S220; otherwise, return to step S212 via a negative branch, forming a continuous judgment loop in the heating and heat preservation process: after returning, the material temperature and material heating rate are re-collected for each sampling cycle, and the threshold for early refrigeration activation is updated cycle by cycle. The judgment is made between the updated material temperature and the updated threshold, always based on the current material heating state. When the material heating rate increases, the threshold for early refrigeration activation decreases, and the timing of refrigeration activation is correspondingly advanced; when the material heating rate decreases, the threshold increases, reducing unnecessary cooling.
[0032] Step S220: Stop heating and start cooling: When the material temperature reaches the temperature limit for pre-starting cooling, the main control unit 111 controls the heating module 113 to stop heating and controls the cooling module 114 to start cooling. (See also...) Figure 1When heating is stopped, the control flow output from the main control unit 111 to the heating module 113 is stopped, and the heating module 113 stops supplying heat. When refrigeration is started, the control flow output from the main control unit 111 to the electronic expansion valve 115 is started, and the electronic expansion valve 115 opens. The refrigerant output from the refrigeration module 114 enters the refrigeration channel of the integrated heating and cooling shelf 116 through the electronic expansion valve 115. The refrigerant flows in the refrigeration channel, and the cooling energy is transferred from the surface of the integrated heating and cooling shelf 116 to the bottom of each representative bottle 117, and then to the material inside the bottle, suppressing the continued rise in material temperature. The lag in pipeline transportation, heat storage and release, and the reversal of heat transfer direction are included in the sliding time of this refrigeration start-up. The material temperature continues to rise before the cooling energy fully arrives. When heating is stopped, the heat transfer oil in the heating channel stops receiving heat, and the stored heat is gradually released with heat transfer. The cooling energy transfer and heat storage release of the refrigerant through the refrigeration channel are mutually inverse, and the rise in material temperature stops when the two are in equilibrium. The refrigeration control operates uniformly on the entire integrated heating and cooling shelf 116, allowing each representative bottle 117 to receive cooling simultaneously. During this refrigeration activation, the main control unit 111 records the command to activate the refrigeration. and This is used for updating the reserved coasting time in step S222.
[0033] Step S221 determines whether the peak material temperature formed after refrigeration is turned on has appeared and whether the material temperature has dropped. After refrigeration is turned on, the material temperature continues to rise, but the rate of increase gradually decreases as the cooling capacity arrives. After reaching the peak material temperature formed after refrigeration is turned on, it drops. The peak material temperature formed after refrigeration is turned on is the highest material temperature during this refrigeration process, taken from the temperature of the hottest material temperature measuring point during this process. The material heating rate then changes from a positive value to zero or a negative value. The material heating rate is equivalent to the material temperature. Regarding time The derivative of the peak value, and the determination of when the material temperature drops, are expressed as: When the material heating rate satisfies the above formula, it is determined that the peak material temperature formed after the refrigeration is turned on has appeared and the material temperature has begun to fall, and the process proceeds to step S222; if the material heating rate does not satisfy the above formula, the process remains at this step to continue judging. During the waiting period, heating remains stopped, refrigeration remains on, the material temperature and material heating rate are continuously updated, and the rise in material temperature gradually slows down, forming a waiting loop for the peak to appear and fall after the refrigeration is turned on. After the peak appears, the main control unit 111 records the peak material temperature formed after the refrigeration is turned on this time. This is used for conversion in step S222.
[0034] Step S222 involves resuming low-power supplementary heating after an interlock delay, and updating the retained sliding time based on the sliding time calculated from the current cooling start. The system has an electrical interlock and an interlock delay between heating and cooling. The electrical interlock prevents heating and cooling from occurring simultaneously, and the interlock delay is the time interval between starting cooling and resuming heating to prevent the impact caused by simultaneous heating and cooling. After the peak material temperature occurs and then drops after the cooling starts, the suppression of the material temperature rise by the cooling start is complete. The main control unit 111 resumes low-power supplementary heating after the interlock delay. The heating duty cycle of the low-power supplementary heating is taken from the heating duty cycle of the insulation section, and the temperature of the integrated heating and cooling shelf 116 is maintained near the material temperature, returning the material temperature to the operating level of the insulation section. The restoration of low-power supplementary heating and the update of the retained sliding time are completed together in step S222. The main control unit 111 updates the reserved sliding time based on the time recorded from the current cooling start. , and The coasting time for this cooling activation is calculated, and the retained coasting time is updated based on the calculated result. After the update, the coasting time used for prediction is still the longest coasting time among the retained coasting times. The next cycle starting from step S212 is based on the updated coasting time. Step S222 returns to step S212, forming a protective cycle of successively activating the cooling and successively updating the retained coasting time.
[0035] In parallel with the judgment in step S219, the main control unit 111 monitors the temperature of each material temperature measuring point during each sampling cycle of step S212. When the temperature of any material temperature measuring point reaches the collapse critical temperature, regardless of the comparison result between the material temperature of the hottest material temperature measuring point and the temperature limit for early cooling activation, the system stops heating and activates cooling, and its execution path is the same as that of step S220. The judgment of the temperature limit for early cooling activation is based on the hottest material temperature measuring point. The decision to stop heating and activate cooling when the temperature of any material temperature measuring point reaches the collapse critical temperature is executed separately from this judgment, as an additional protection for peak material temperature control.
[0036] The analytical drying stage is executed segment by segment according to a preset multi-segment heating-holding curve. Within each heating and holding segment, steps S212 to S222 are repeated: material temperature and heating rate are continuously collected; the temperature limits for continued heating and early refrigeration are determined sequentially; heating stops and refrigeration is activated when the material temperature reaches the limit; after the peak material temperature appears and falls back, low-power supplementary heating is restored after an interlock delay; the coasting time calculated each time refrigeration is activated updates the retained coasting time. The material heating state is different in each segment, and the determined early refrigeration temperature limits are different accordingly; the recording of material temperature, heating rate, and coasting time within a segment continues across segments, and the retained coasting time remains valid between segments. During the repeated operation of each segment, the judgment and execution methods of the protective cycle are the same, the difference lies in the material heating state and target range of each segment. During the segment-by-segment execution, the bound water of the material is gradually removed. After analytical drying is completed, the main control unit 111 exits temperature control operation and enters the sterilization, gas filling, or unloading process.
[0037] The temperature limit for early refrigeration activation is determined sequentially by the collapse critical temperature, the maximum material heating rate, and the longest sliding time. The collapse critical temperature is input via the human-machine interface unit 118, while the latter two values are derived from actual measurements taken during each refrigeration activation. The retained sliding time is continuously supplemented as the desorption and drying process progresses, and the protection is always based on the most recent actual measurements. The determination of the temperature limit for early refrigeration activation is entirely based on measured values. The collapse critical temperature serves as the benchmark for the temperature limit, the maximum material heating rate reflects the current heating state, and the longest sliding time reflects the degree of lag in previous refrigeration activations. When the material heating rate increases, the temperature rise continues to increase, the temperature limit for early refrigeration activation decreases, and the timing of refrigeration activation is advanced. When the actual refrigeration performance slows down, the longest sliding time lengthens, and the temperature limit for early refrigeration activation also decreases. The system's temperature control output consists of two actions: when the material temperature reaches the temperature limit for early refrigeration activation, heating stops and refrigeration is activated; after the peak material temperature formed after refrigeration activation appears and falls, low-power supplementary heating is resumed after an interlock delay. Both actions are based on actual material temperature measurements. The timing of activating cooling is adapted to the current material temperature rise, ensuring the peak material temperature is below the collapse critical temperature. The material temperature within the insulation section is maintained at a relatively high level, reducing unnecessary cooling. This implementation method thus addresses the lag in material temperature rise after heating is stopped and cooling is activated, achieving anti-collapse temperature control in the later stages of analytical drying.
[0038] Example 1: For example, the freeze-drying of a protein-probiotic complex heat-sensitive preparation in vials was carried out using a vacuum freeze dryer. This type of complex preparation is temperature-sensitive; the upper limit of the allowable material temperature in the later stages of drying, i.e., the collapse critical temperature, is taken as... The temperature (in degrees Celsius) is entered via the human-machine interface unit 118. The formulation is dispensed into vials and placed on the integrated heating and cooling shelf 116, with a vacuum maintained inside the freeze-drying chamber. Five material temperature probes 112 are inserted into representative vials located in the center and at the four corners, forming five material temperature measurement points. These representative vials cover the heat exchange areas in the center and at the edges of the shelf. The temperature at each material temperature measurement point is digitally filtered and outlier-removed before being selected for the hottest setting. The temperature of the hottest material temperature measuring point among the five measuring points is recorded, and this hottest point is re-determined within each sampling cycle. The material temperature sampling frequency is 10 times per second, which is higher than the lower limit of 5 times per second; the slope of the heating section is 0.3 degrees Celsius per minute, falling within the range of 0.1 to 1.0 degrees Celsius per minute; the heating duty cycle of the low-power supplementary heating in the heat preservation section is 15%; and the interlock delay is 3 seconds.
[0039] See Figure 2 After entering the desorption and drying stage, the system has no sliding time yet, so step S213 is judged as no. Step S214 performs one heating and starts cooling within a safe range where the material temperature is about 25.0 degrees Celsius and there is still a 10.0 degree Celsius margin before the collapse critical temperature: the main control unit 111 first outputs a heating command to the heating module 113 to perform a small heating, so that the material temperature rise rate when the cooling command is issued reaches 0.010 degrees Celsius per second, or 0.6 degrees Celsius per minute. Then, heating is stopped and cooling is started, and the material temperature when the cooling command is issued is recorded. The temperature was 25.0 degrees Celsius. After the cooling system was turned on, the material temperature continued to rise, reaching the peak temperature established after the cooling system was activated. After reaching 25.8 degrees Celsius, the temperature dropped. Step S215 calculates the first glide time using the following formula: The first sliding time was 80 seconds, and the first measured temperature rise response was retained in the main control unit 111. The material temperature throughout the entire execution was far below the critical collapse temperature.
[0040] In the later stage of a certain heating-holding phase, the heating slope of this phase is 0.3 degrees Celsius per minute. Combined with slower water removal and reduced self-cooling of the phase change, the material heating rate increases. In step S216, the most recently obtained sliding time is the first sliding time of 80 seconds. The main control unit 111 takes the largest material heating rate that has appeared within this window as 0.013 degrees Celsius per second, or 0.78 degrees Celsius per minute. The sequence of material heating rates within this window is obtained by sampling 10 times per second, and 0.013 degrees Celsius per second is the maximum value among them. The longest sliding time retained from all sliding times is 80 seconds. Step S217 predicts continued temperature rise: The temperature continues to rise to 1.04 degrees Celsius. Step S218 determines the temperature limit for early activation of cooling: The temperature limit for turning on the cooling in advance is 33.96 degrees Celsius.
[0041] At this point, the temperature of the hottest material temperature measuring point is 33.6 degrees Celsius, which is lower than 33.96 degrees Celsius. Step S219 is deemed incorrect, and the process returns to step S212. The insulation section continues low-power supplemental heating at a 15% duty cycle, while the heating and insulation sections operate normally. Between 33.6 degrees Celsius and 33.96 degrees Celsius, steps S212 to S219 continue, and the temperature limits for continued temperature rise and early activation of cooling are determined cyclically based on the material's heating rate. When the temperature of the hottest material temperature measuring point rises to 33.96 degrees Celsius, the material temperature meets the requirements. If step S219 is satisfied, proceed to step S220. The main control unit 111 stops heating and starts cooling simultaneously. The refrigerant enters the cooling channel via the electronic expansion valve 115. The main control unit 111 records the material temperature at the time the cooling command is given. The material temperature rise rate when the refrigeration is turned on is 33.96 degrees Celsius. It is 0.013 degrees Celsius per second.
[0042] After the cooling system was activated, the material temperature continued to rise slowly as predicted. The actual performance of the refrigeration system was better than the conservative estimate of the longest gliding time. The material temperature actually rose by approximately 0.90 degrees Celsius before reaching its peak value of approximately 34.86 degrees Celsius, which is 0.14 degrees Celsius below the collapse critical temperature, and then fell back. The actual temperature increase of 0.90 degrees Celsius after the refrigeration system was activated was less than the predicted continued temperature rise of 1.04 degrees Celsius, leaving a margin for error in the prediction.
[0043] The material heating rate meets the requirements Afterwards, step S222, after a 3-second interlock delay, restores low-power supplemental heating with a 15% duty cycle. The peak material temperature formed after the cooling was activated was 34.86 degrees Celsius, which is 0.90 degrees Celsius different from the material temperature of 33.96 degrees Celsius when the cooling was activated. The calculated coasting time for this operation is... That is, approximately 69 seconds, shorter than the retained 80 seconds. After updating the retained taxiing time with the taxiing time obtained from this calculation, the longest taxiing time in all previous taxiing times remains 80 seconds, and subsequent segment predictions will continue to use 80 seconds. Then, return to step S212 to enter the next heating-heating protection cycle.
[0044] Subsequently, each heating-holding stage repeats steps S212 to S222, removing bound water stage by stage. If the gliding time calculated from a single cooling activation exceeds the 80-second holding time, the longest gliding time is updated accordingly, the temperature threshold for early cooling activation decreases, and the timing of cooling activation is advanced. After each stage is completed, the desorption and drying process ends, the porous cake of the entire batch of material remains intact, no collapse or coking occurs in any of the bottles, and the appearance and rehydration properties remain stable.
[0045] In contrast, in the approach of starting cooling with a fixed margin below the collapse critical temperature, to keep the peak temperature below the collapse critical temperature even when the material's temperature rises fastest (approximately 0.018 degrees Celsius per second), and assuming an 80-second coasting time, the material temperature will still rise after starting cooling. With a fixed margin of approximately 1.5 degrees Celsius, the material temperature must be at approximately 33.5 degrees Celsius to initiate refrigeration, which is about 0.46 degrees Celsius lower than the earlier refrigeration threshold of 33.96 degrees Celsius in this embodiment. The entire material temperature operates at a lower level, extending the drying time. The fixed margin is set to cover the fastest heating condition; refrigeration is initiated with the same margin for other slower heating stages. When the fixed margin is 0.5 degrees Celsius, refrigeration is initiated at a material temperature of 34.5 degrees Celsius. With a material heating rate of 0.018 degrees Celsius per second, the material temperature will still rise by about 1.44 degrees Celsius after refrigeration is initiated, reaching a peak of approximately 35.94 degrees Celsius, exceeding the collapse critical temperature. The material in the bottle with the strongest edge heating will collapse and coke. When the fixed margin is small, the peak material temperature exceeds the collapse critical temperature; when it is large, the overall operating temperature is suppressed. In this embodiment, the temperature limit for early activation of cooling changes gradually with the material's heating rate. The limit decreases accordingly when the temperature rises the fastest in the later stages, while the limit remains relatively high in other stages, thus balancing peak control and operating temperature.
[0046] The above operation is completed collaboratively by various entities in the system, constituting the system implementation method corresponding to steps S211 to S222. The main control unit 111 acquires and calculates the material temperature and the material heating rate, calculates the sliding time for each cooling activation, determines the temperature limits for continued temperature rise and early cooling activation, judges whether the material temperature has reached the limit, outputs heating commands, stops heating, and activates cooling. The main control unit 111 saves the collapse critical temperature, the heating-holding curve, and the saved sliding times. The material temperature probe 112 is inserted into the representative bottle 117, providing the temperature of each material temperature measurement point to the main control unit 111 along the data flow. The human-machine interaction unit 118 provides the entered collapse critical temperature and heating-holding curve to the main control unit 111 along the data flow. Under the heating command of the main control unit 111, the heating module 113 uses a circulating pump to drive heat transfer oil through the heating channel of the integrated heating and cooling shelf 116 to heat the material. After the main control unit 111 outputs a stop heating command, the heating module 113 stops heating. The cooling medium output by the cooling module 114 enters the cooling channel of the integrated heating and cooling shelf 116 through the electronic expansion valve 115 to transfer cooling to the material. The heating channel and the cooling channel are independent of each other, and there is an electrical interlock and interlock delay between heating and cooling. The judgment and calculation in steps S211 to S222 are handled by the main control unit 111, the material temperature is obtained by the material temperature probe 112, the heating is handled by the heating module 113, the flow of the cooling medium is handled by the cooling module 114 and the electronic expansion valve 115, the material is supported by the representative bottle 117 and the integrated heating and cooling shelf 116, and the input of the collapse critical temperature and the heating-holding curve is handled by the human-machine interaction unit 118. Data flow between main control unit 111 and material temperature probe 112 and human-machine interface unit 118; control flow between main control unit 111 and heating module 113 and electronic expansion valve 115; medium flow between heating module 113, refrigeration module 114 and integrated heating and cooling shelf 116; and... Figure 1 The connections shown correspond one-to-one. The system stops heating and starts cooling when the material temperature reaches the temperature limit for premature cooling activation, thus completing the anti-collapse temperature control during the desorption and drying stage.
[0047] Example 2: See Figure 3Using the aforementioned 35.0°C collapse critical temperature, and with the longest retained sliding time remaining at 80 seconds, the predicted material heating rate is plotted on the x-axis (°C / min), and temperature on the y-axis (°C). The solid line represents the early cooling threshold, with thresholds of approximately 34.60, 34.20, 33.96, and 33.56°C at heating rates of approximately 0.30, 0.60, 0.78, and 1.08°C / min, respectively. The dashed line illustrates small, irregular fluctuations with peak values ranging from approximately 34.82 to 34.88°C. The peak value of 34.86°C is used at 0.78°C / min, while other peak values are used to indicate non-ideal fluctuations under different cooling responses and are not considered new measured conclusions. Under the conditions shown in the figure, the actual continued temperature rise in each instance did not exceed the corresponding predicted continued temperature rise. The main control unit continuously selects the hottest measuring point, the maximum heating rate within the most recent sliding time window, and the longest sliding time in history. When the material temperature reaches the dynamic limit, heating is stopped and cooling is turned on, so that the cooling limit in the figure decreases as the heating rate increases and the peak value is still lower than the collapse critical temperature. After the peak value appears and falls back, low-power heating is restored and the sliding time record is updated after the aforementioned interlock delay.
[0048] Although embodiments of this application have been described in conjunction with the accompanying drawings, those skilled in the art can make various modifications and variations without departing from the spirit and scope of this application, and all such modifications and variations fall within the scope defined by the appended claims.
Claims
1. An intelligent temperature control system for preventing collapse in the later stage of vacuum freeze-drying, used in the analytical drying stage of vacuum freeze-drying, characterized in that, The system is configured as follows: The material temperature and the material heating rate are obtained, whereby the material heating rate indicates how quickly the material temperature rises; the measured heating response is obtained based on the actual change in the material temperature after the system was previously turned on for cooling, and the measured heating response characterizes the degree of lag in the material temperature continuing to rise after the cooling was turned on. The collapse critical temperature is used as the upper limit of the peak temperature of the material. The temperature rise after the cooling is turned on is predicted by combining the material heating rate and the measured heating response. The temperature limit for turning on the cooling in advance is determined according to the collapse critical temperature and the temperature rise, so that the peak temperature of the material formed after the cooling is turned on in advance is within the collapse critical temperature. Heating is stopped and refrigeration is started when the material temperature reaches the temperature limit for early refrigeration activation.
2. The intelligent temperature control system for preventing collapse during the later stage of vacuum freeze-drying according to claim 1, characterized in that, The material temperature is measured by a material temperature probe inserted into multiple representative bottles, including the bottle with the strongest edge heating. The material temperature is taken as the temperature of the hottest material temperature measuring point among the material temperature measuring points where each material temperature probe is located.
3. The intelligent temperature control system for preventing collapse in the later stage of vacuum freeze-drying according to claim 1, characterized in that, The measured temperature rise response is the coasting time, which is calculated based on the material temperature when the refrigeration is turned on, the material temperature rise rate when the refrigeration is turned on, and the peak material temperature formed after the refrigeration is turned on.
4. The intelligent temperature control system for preventing collapse in the later stage of vacuum freeze-drying according to claim 3, characterized in that, The material heating rate is the largest material heating rate that occurred during the most recent gliding time; the system retains the gliding time calculated from each cooling activation and uses the longest gliding time as the measured heating response to predict the continued temperature rise; the gliding time calculated after each cooling activation is used to update the retained gliding time.
5. The intelligent temperature control system for preventing collapse in the later stage of vacuum freeze-drying according to claim 1, characterized in that, When the system lacks the measured temperature rise response, heating is performed once and cooling is activated within the safe zone where the material temperature is below the collapse critical temperature to obtain the first measured temperature rise response.
6. The intelligent temperature control system for preventing collapse in the later stage of vacuum freeze-drying according to claim 1, characterized in that, The system is equipped with an electrical interlock and an interlock delay between heating and cooling. The electrical interlock is used to prevent heating and cooling from occurring simultaneously. After the material temperature peaks after cooling is turned on and then drops, low-power supplementary heating is restored after the interlock delay. The power of the low-power supplementary heating is lower than the heating power of the heating stage. The heating stage is the heating phase in the desorption drying process that raises the temperature of the material.
7. The intelligent temperature control system for preventing collapse in the later stage of vacuum freeze-drying according to claim 2, characterized in that, When the temperature at any of the material temperature measuring points reaches the collapse critical temperature, the system stops heating and starts cooling.
8. The intelligent temperature control system for preventing collapse in the later stage of vacuum freeze-drying according to claim 1, characterized in that, The system includes a main control unit, a heating module, a refrigeration module, and an integrated heating and cooling shelf. The integrated heating and cooling shelf has independent heating and refrigeration channels. The heating module drives heat transfer oil through the heating channel to heat the material via a circulating pump. The refrigeration module is equipped with an electronic expansion valve. When the material temperature reaches the temperature limit for early refrigeration activation, the main control unit controls the heating module to stop heating and controls the refrigeration module to activate refrigeration. When refrigeration is activated, the refrigerant enters the refrigeration channel through the electronic expansion valve.
Citation Information
Patent Citations
Enhanced formulation stability and improved lyophilization process
CN116782889A
Take temperature control's vacuum freezing desiccator
CN204678810U