A multi-agent task planning and resource lease arbitration method for exhibition and recruitment

By constructing verifiable task contracts and temporal-resource-semantic hypergraphs, and combining capability tensors and dual ledger mechanisms, the task planning and resource arbitration problems of multi-agent systems in exhibition and trade fair business are solved, achieving the security and consistency of task execution and improving the stability and adaptability of the system.

CN123157355APending Publication Date: 2026-11-24UNIV OF SCI & TECH BEIJING
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611205687.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-10
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing multi-agent systems in exhibition and trade fair business suffer from problems such as difficulty in machine verification of task constraints, dynamic competition for heterogeneous computing and interface resources, long-term occupation of abnormal resources, inconsistencies in state caused by cross-version and side effect conflicts, and repeated calculations and interface calls caused by global replanning after failure.

Method used

This paper proposes a multi-agent task planning and resource lease arbitration method for competition and exhibition investment promotion. By constructing verifiable task contracts, temporal-resource-semantic hypergraphs, capability tensors, and dual ledger mechanisms, the method realizes task planning and resource arbitration, ensuring the security and consistency of task execution.

Benefits of technology

It improves system stability and auditability, reduces resource starvation, deadlock and cascading timeouts, avoids redundant reasoning and repeated external interface calls, and enhances system adaptability and reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123157355A_ABST
    Figure CN123157355A_ABST
Patent Text Reader

Abstract

This invention discloses a method and apparatus for multi-agent task planning and resource lease arbitration in competition and exhibition investment promotion, relating to the field of multi-agent system technology. The method includes: converting competition and exhibition investment promotion tasks into verifiable task contracts containing data versions, resource requirements, permissions, time limits, idempotent keys, compensation actions, and rollback points; uniformly representing GPUs, model APIs, database connections, caches, network channels, and manually reviewed resources in a constructed temporal-resource-semantic hypergraph; generating task allocation through capability tensors and feasibility gating; arbitrating resource shadow prices and bounded leases; and solving for the minimum repair set only on local repair cones when resource waiting, interface failures, data version conflicts, or side effect conflicts occur, thereby reducing deadlocks, interface overruns, duplicate calls, duplicate writes, and global recalculations, and improving resource utilization, fault recovery efficiency, and state consistency of heterogeneous computing systems.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of multi-agent system technology, and in particular to a method and apparatus for multi-agent task planning and resource lease arbitration in competition and exhibition investment promotion. Background Technology

[0002] The competition and exhibition business comprises multiple stages: competition solicitation, qualification review, technical evaluation, results display, audience interaction, company profiling, resource matching, and investment follow-up. Each stage involves numerous interdependent computational tasks: competition evaluation requires processing application forms, technical attachments, roadshow videos, and scoring rules; exhibition operation requires generating exhibit descriptions, guide content, and compiling interaction data; and the investment promotion stage requires combining company qualifications, product capabilities, park requirements, and negotiation records to generate matching results. These tasks are characterized by cross-stage triggering, strong time constraints, heterogeneous resource requirements, differences in data permissions, and the need for result traceability.

[0003] Existing multi-agent systems typically employ fixed workflows, master-slave scheduling, polling queues, priority queues, auction allocation, or natural language task decomposition based on large models. Fixed workflows are suitable for stable processes but struggle to handle new tracks, temporary rules, and cross-stage triggers; simply relying on large models to decompose tasks may result in results that violate preconditions, permission boundaries, and resource capacity; auction or cooperative game theory methods can allocate tasks, but most are geared towards robots or drones and do not simultaneously model data evidence, model inference resources, external interface quotas, human review resources, and cross-scenario semantic conflicts.

[0004] The competition and exhibition activities exhibit significant peak and off-peak loads. Before the review deadline and during the exhibition's open hours, a large number of tasks concurrently request GPU inference instances, model API tokens, database connections, object storage read bandwidth, retrieval services, message queues, and human review seats. Different tasks have different input sizes, deadlines, degradeable methods, and data permissions. Using first-come, first-served or static priority systems can lead to high-risk tasks waiting, low-value tasks consuming high-cost GPUs, and exceeding interface concurrency limits. Furthermore, the lack of expiring leases and resource wait graphs can cause multiple tasks to form circular waiting patterns.

[0005] Furthermore, different versions of facts and conclusions may arise for the same project during the competition, exhibition, and investment promotion stages. One agent may give a positive judgment based on old materials, while another agent may give a negative judgment based on the latest evidence. Simple majority voting cannot identify the source of evidence, effective time, and differences in agent expertise. Therefore, a technical solution is needed that can uniformly model tasks, evidence, resources, permissions, time, and rollback mechanisms, and perform verifiable planning, resource arbitration, conflict resolution, and local repair in dynamic operation. The problems with the existing technology include: (1) Natural language task decomposition lacks input-output patterns, preconditions, data versions, resource vectors, idempotent keys, and rollback operations that can be checked by the executor, and the generated plan may not be able to be executed safely. (2) The task capabilities, modal capabilities, tool permissions, historical reliability, latency distribution, call costs, and current load of the agent lack a unified machine-computable representation. (3) GPU inference instances, model interface quotas, database connections, caches, network bandwidth, and manual review seats are heterogeneous limited resources, and static priorities cannot reflect real-time capacity, queuing status, and task marginal value. (4) Abnormal agents or external interfaces may still hold resources for a long time after timeout, lacking bounded leases, heartbeats, renewal and reclamation mechanisms, which can easily lead to resource starvation, deadlock and cascading timeouts. (5) Multiple agents reading different data versions or repeatedly calling external interfaces with side effects or repeatedly writing to the business system may lead to old results overwriting new results, duplicate submissions and inconsistent states. (6) When a fault or rule change triggers global replanning, completed GPU inference, cache reading, database query and manual review may be executed repeatedly, increasing computation, network and interface costs. (7) When multiple agents reach opposite conclusions, simple voting cannot distinguish evidence versions, sources, validity periods and the reliability of agents in specific task types. (8) The scheduling parameters are not continuously calibrated based on real running events, making it difficult to adapt to different GPU models, network states, interface rate limiting strategies and activity scales. Summary of the Invention

[0006] To address the technical problems in existing technologies, such as difficulty in machine verification of task constraints during heterogeneous agent collaborative execution, dynamic competition for heterogeneous computing and interface resources, long-term occupation of abnormal resources, state inconsistencies caused by cross-version and side-effect conflicts, and repeated computations and interface calls due to global replanning after a failure, this invention provides a method and apparatus for multi-agent task planning and resource lease arbitration in competition and exhibition investment promotion. The technical solution is as follows: On the one hand, a method for multi-agent task planning and resource lease arbitration in exhibition and investment promotion is provided. This method is implemented by a multi-agent task planning and resource lease arbitration device for exhibition and investment promotion. The method includes: S1. Obtain the business objectives of the exhibition and trade fair, including: rules of the trade fair activities, materials for multimodal projects, exhibition requirements, needs of enterprises and parks, task deadlines, external tool interfaces, status of computing resources and status of manual review resources; S2. Convert the business objective into a verifiable task contract; wherein the task contract is a structured data object, including: target predicate, input / output pattern, preconditions, postconditions, evidence requirements, resource requirement vector, permission boundaries, and rollback actions; S3. Construct a temporal-resource-semantic hypergraph, and based on the task contract, use a constrained hierarchical task network to recursively decompose the composite tasks corresponding to the business objectives to generate a candidate plan family. S4. Construct the capability tensor of each agent, perform feasibility gating screening on task-agent combinations, and exclude task-agent combinations that do not meet hard constraints; calculate the marginal utility quote for task-agent combinations that pass the feasibility gating based on the candidate plan family, conduct resource arbitration through dual ledgers, and issue bounded leases to the matching agents. S5. Multiple execution agents execute tasks in parallel, writing tool calls, evidence citations, state changes, resource consumption, idempotent states, and stage results into the event log; based on the event log, identify resource, data version, semantic conclusion, permission, timing, and tool side effect conflicts, calculate conflict priorities, solve for the minimum repair set, execute repair actions within the local repair cone, and keep unaffected tasks running. S6. Perform evidence-weighted consensus on the candidate conclusions output by the multi-agent team, and submit the results after checking the task contract satisfaction status, permissions, timing, evidence relationship and idempotent state. S7. Update the capability tensor, resource price, task method priority, and version record based on actual execution quality, latency, cost, and business feedback.

[0007] On the other hand, a multi-agent task planning and resource lease arbitration device for trade fair promotion is provided. This device is applied to the multi-agent task planning and resource lease arbitration method for trade fair promotion. The device includes: The task entry module is used to obtain the business objectives of the exhibition and investment promotion, including: rules of investment promotion activities, multimodal project materials, exhibition requirements, enterprise and park needs, task time limits, external tool interfaces, computing resource status and manual review resource status; The task contract generation module is used to convert the business objective into a verifiable task contract; wherein the task contract is a structured data object, including: target predicate, input-output pattern, preconditions, postconditions, evidence requirements, resource requirement vector, permission boundaries, and rollback actions; The hypergraph construction and hierarchical task planning module is used to construct a temporal-resource-semantic hypergraph, and based on the task contract, uses a constrained hierarchical task network to recursively decompose the composite tasks corresponding to the business objectives to generate a candidate plan family. The Capability Tensor Construction and Gating Filtering module is used to construct the capability tensor of each agent, perform feasibility gating filtering on task-agent combinations, exclude task-agent combinations that do not meet hard constraints, calculate the marginal utility quote for task-agent combinations that pass the feasibility gating, conduct resource arbitration through dual ledgers, and issue bounded leases to matching agents. The multi-agent execution and conflict detection module is used for multiple executing agents to execute tasks in parallel. It writes tool calls, evidence references, state changes, resource consumption, idempotent states and stage results into the event log; based on the event log, it identifies resource, data version, semantic conclusion, permission, timing and tool side effect conflicts, calculates conflict priority and solves the minimum repair set, executes repair actions within the local repair cone, and keeps unaffected tasks running. The evidence-weighted consensus module is used to perform evidence-weighted consensus on candidate conclusions output by multiple agents, and submit the results after checking the task contract satisfaction, permissions, timing, evidence relationships and idempotent state. The online calibration audit module is used to update the capability tensor, resource price, task method priority, and version record based on actual execution quality, latency, cost, and business feedback.

[0008] On the other hand, a multi-agent task planning and resource lease arbitration device for trade fairs and investment promotion is provided. The multi-agent task planning and resource lease arbitration device for trade fairs and investment promotion includes: a processor; a memory, wherein the memory stores computer-readable instructions, and when the computer-readable instructions are executed by the processor, any one of the methods described above for multi-agent task planning and resource lease arbitration for trade fairs and investment promotion is implemented.

[0009] On the other hand, a computer-readable storage medium is provided, wherein at least one instruction is stored in the storage medium, the at least one instruction being loaded and executed by a processor to implement any of the methods in the above-described multi-agent task planning and resource lease arbitration methods for exhibition and investment promotion.

[0010] The beneficial effects of the technical solutions provided by the embodiments of the present invention include at least the following: This invention transforms natural language business objectives into computational objects containing machine-checkable objectives, evidence, resources, permissions, and rollback conditions through verifiable task contracts, reducing the probability of unexecutable plans entering the execution layer. It enhances the modeling capabilities of complex, continuous business processes by unifying task sequence, evidence versions, resource contention, cross-stage triggering, semantic consistency, and tool side effects through a temporal-resource-semantic hypergraph. Capability tensors and feasibility gating exclude agents with insufficient capabilities, lack of permissions, inability to complete tasks on time, or substandard reliability before task allocation. Resource shadow pricing dynamically reflects the congestion levels of GPUs, model interfaces, databases, networks, and manually reviewed resources, guiding tasks to select resource levels commensurate with their value and risk. Bounded leases, heartbeats, lease renewals, and reclamation mechanisms limit long-term resource occupation, reducing starvation, circular waiting, interface quota exhaustion, and cascading blocking of abnormal tasks.

[0011] This invention avoids resource allocation results with high total utility but violations of permissions, security, deadlines, or irreversible operation constraints through lexicographical arbitration prioritizing hard constraints. By using conflict classification, a minimum repair set, and local repair cones, it recalculates only affected tasks and preserves completed and evidence-valid results, reducing redundant reasoning, repeated external interface calls, duplicate writes, and manual review. Through evidence-weighted consensus, it integrates agent expertise, evidence credibility, timeliness, and consistency, enabling conflict results to output conditions, rebuttal evidence, and supplementary material requirements, rather than forcing majority voting. An independent verification layer prevents the submission of results without evidence, permissions, timing, and idempotent state checks, improving system stability, verifiability, and auditability. Event-driven online calibration continuously updates agent capabilities, resource prices, and planning method success rates, enabling the system to adapt to different tracks, activity scales, and infrastructure load changes. Attached Figure Description

[0012] To more clearly illustrate the technical solutions in the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0013] Figure 1 This is a flowchart of a multi-agent task planning and resource lease arbitration method for trade fair promotion provided by an embodiment of the present invention; Figure 2 This is a schematic diagram of the overall technical architecture provided in an embodiment of the present invention; Figure 3 This is a schematic diagram of a conflict detection and minimum repair set solution process provided by an embodiment of the present invention; Figure 4This is a block diagram of a multi-agent task planning and resource lease arbitration device for trade fair promotion provided in an embodiment of the present invention; Figure 5 This is a schematic diagram of the structure of a multi-agent task planning and resource lease arbitration device for trade fairs and exhibitions provided in an embodiment of the present invention. Detailed Implementation

[0014] The technical solution of the present invention will now be described with reference to the accompanying drawings.

[0015] In embodiments of the present invention, words such as "exemplarily," "for example," etc., are used to indicate that something is an example, illustration, or description. Any embodiment or design described as "exemplary" in the present invention should not be construed as being more preferred or advantageous than other embodiments or designs. Specifically, the use of the word "exemplary" is intended to present the concept in a concrete manner. Furthermore, in embodiments of the present invention, the meaning expressed by "and / or" can be both, or either one.

[0016] In the embodiments of this invention, the terms "image" and "picture" may sometimes be used interchangeably. It should be noted that, without emphasizing the distinction between them, they convey the same meaning. Similarly, the terms "of," "corresponding (relevant)," and "corresponding" may sometimes be used interchangeably. It should be noted that, without emphasizing the distinction between them, they convey the same meaning.

[0017] In this embodiment of the invention, sometimes a subscript such as W1 may be written in a non-subscript form such as W1. When the difference is not emphasized, the meaning they express is the same.

[0018] To make the technical problems, technical solutions and advantages of the present invention clearer, a detailed description will be given below in conjunction with the accompanying drawings and specific embodiments.

[0019] This invention provides a method for multi-agent task planning and resource lease arbitration in trade fairs and exhibitions. This method can be implemented by a device for multi-agent task planning and resource lease arbitration in trade fairs and exhibitions, which can be a terminal or a server. Figure 1 The flowchart shown is for a multi-agent task planning and resource lease arbitration method for trade fair promotion. The processing flow of this method may include the following steps: S1. Obtain the business objectives of the exhibition and trade fair, including: rules for trade fair activities, multimodal project materials, exhibition requirements, enterprise and park needs, task deadlines, external tool interfaces, computing resource status, and manual review resource status.

[0020] In one feasible implementation, this invention addresses continuous business scenarios such as competitions, exhibitions, and industry investment promotion, connecting task access, task contract generation, hypergraph construction, candidate plan generation, agent capability modeling, task allocation, resource arbitration, parallel execution, conflict detection, local repair, evidence consensus, independent verification, and online calibration into a closed loop. For example... Figure 2 The diagram shown is a schematic representation of the overall technical architecture provided by an embodiment of the present invention.

[0021] S2. Convert business objectives into verifiable task contracts; whereby the task contract is a structured data object, including: objective predicate, input / output pattern, preconditions, postconditions, evidence requirements, resource requirement vector, permission boundaries, and rollback actions.

[0022] In this embodiment of the invention, a task contract is generated for each composite task or atomic task. The task contract is not a natural language description, but a structured object that can be read by the rule engine, planner, and executor.

[0023] Optionally, the verifiable task contract includes: an identifier field, a target field, a data field, a constraint field, an evidence field, a resource field, a permission field, a service field, and a recovery field; The fields for identifying the identifier include: task_id, activity_id, scene_stage, and version; The target field includes the following content: target predicate, quality threshold, completion status, and prohibition status. The data fields include: input mode, output mode, data version, and missing data handling rules. The constraint fields include: preconditions, postconditions, temporal relationships, and mutual exclusion relationships. The evidence field includes the following content: required evidence, optional evidence, minimum credibility level, validity period, and citation format; The resource fields include: model level, GPU time, token budget, API quota, database connection, and human seats. The permissions field includes the following: data access domain, tool whitelist, publishing permissions, and de-identification rules. The service field includes the following information: priority, deadline, maximum delay, number of retries, and service level. The recovery field includes the following information: compensation action, rollback point, reversibility, conditions for manual takeover, and conditions for freezing the result.

[0024] The verifiable task contract is formally defined as follows: (1) (1) in, This indicates a verifiable task contract; This represents a unique identifier for the task; Indicates the scene stage; Indicates the target predicate; Indicates the input mode; Indicates the output mode; Indicates a precondition; Indicates a postcondition; Indicates evidentiary constraint; Represents the resource demand vector; Represents a set of permissions; Indicates the deadline; Indicates the level of service; Indicates a compensatory action; Indicates the rollback point.

[0025] Specifically, a task contract can only proceed to plan generation if the target predicate is inspectable, the input / output pattern is resolvable, and there is at least one feasible compensation or manual takeover path.

[0026] S3. Construct a temporal-resource-semantic hypergraph, and use a constraint-layered task network to recursively decompose the composite tasks corresponding to the business objectives, generating a candidate plan family that meets the preconditions, evidence requirements, permission boundaries, and rollback action conditions.

[0027] Optionally, the nodes of the temporal-resource-semantic hypergraph include: task nodes, evidence nodes, resource nodes, agent nodes, and state nodes; The edges of the temporal-resource-semantic hypergraph are used to express temporal dependencies, data version dependencies, resource competition, cross-stage semantic consistency constraints, cross-stage event triggering relationships, and external tool side effect relationships.

[0028] Among them, the hyperedge allows the connection of multiple nodes to express the sequential relationship of tasks, multiple tasks sharing the same evidence, multiple agents competing for the same resource, multiple stages of facts must be consistent, and an event can trigger multiple subsequent tasks at the same time.

[0029] In one feasible implementation, the temporal-resource-semantic hypergraph is represented by the following formula (2): (2) in, Representing a temporal-resource-semantic hypergraph; Represents a set of task nodes; Represents the set of evidence nodes; Represents a set of resource nodes; Represents a set of agent nodes; Represents a set of state nodes; Indicates timing and sequence constraints; Indicates version dependency of evidence and data; This indicates competition for resources; This indicates semantic consistency constraints across agents or phases. This indicates that a cross-stage event has been triggered. This indicates non-repeatable side effects generated by external tool calls.

[0030] For tasks with side effects, the event log records idempotent keys and compensation actions to avoid duplicate submissions caused by retries.

[0031] In one feasible implementation, the specific process of recursively decomposing a composite task using a constrained hierarchical task network includes: Establish a method library for competition and exhibition sponsorship tasks. Each composite task can correspond to multiple decomposition methods. For example, "generating a competition evaluation report" can employ methods such as "structured rule review + model interpretation," "independent evaluation by two agents + merging of verification agents," or "low-risk automatic evaluation + high-risk manual review." The decomposition methods record applicable conditions, sub-task networks, resource lower bounds, expected latency, quality priors, failure rates, and rollback methods.

[0032] The recursive decomposition begins with a planner based on the task contract. Each decomposition first generates candidate subtasks from the task method library, then supplements the scenario parameters using a large model or semantic parser. Subsequently, a deterministic validator checks whether the subtask output satisfies the parent task's objective, covers necessary evidence, avoids circular waits, satisfies permissions, and has an executable tool. Unvalidated natural language plans are not allowed to enter the execution layer.

[0033] The candidate plan consists of a set of atomic tasks and their partial order relations. The planner calculates the critical path length, resource peak, data missing amount, risk exposure, and robustness margin, and filters out plans that violate hard constraints. The process of generating the candidate plan is represented by the following formula (3): (3) in,

[0034] in, This indicates that the prerequisites for the candidate plan are met; This indicates that the permission constraint satisfies the instruction. Indicates the coverage of evidence; Indicates the minimum evidence coverage threshold; This represents the peak demand of the candidate plan for the k-th type of resource; This represents the maximum available capacity of the k-th type of resource; Indicates the feasibility of a compensation or rollback path.

[0035] The candidate program score is represented by the following formula (4): (4) in, Indicate candidate plans Fraction; Indicates the weight of the quality item; Indicates the weight of the completion time item; Indicates the weight of the execution cost item; Indicates the weight of the execution risk item; Indicates the weight of the robust margin term; Indicates the weight of critical subsequent task blocking items; Indicates the expected quality of the candidate program; Indicates the estimated completion time of the candidate plan; This indicates the estimated execution cost of the candidate plan; This indicates the anticipated implementation risks of the candidate plan; This indicates the robustness margin of the candidate plan; This represents the blocking cost of the candidate plan for critical follow-up tasks.

[0036] Among them, in all Among the candidate plans with a score of 1, the highest-scoring plans are retained to form a plan family. During execution, if environmental changes render the master plan infeasible, a switch to a candidate plan with the same completed prefix is ​​prioritized to reduce recalculation.

[0037] In one feasible implementation method, the specific implementation process of generating task contracts and candidate plans includes: 1. Input business requests, activity rules, and resource snapshots to generate the root task contract, and complete the input / output, evidence, resources, permissions, and rollback fields; 2. Retrieve applicable decomposition methods from the constructed task method library and recursively generate subtask contracts; 3. Construct a temporal-resource-semantic hypergraph and check for loops, permissions, and tool side effects; 4. Calculate the critical path, peak resources, evidence coverage, and robustness margin for each plan; 5. Delete plans that violate hard constraints or lack a compensation path; 6. Sort by quality, delay, cost, risk, congestion, and margin, and output candidate plan families.

[0038] S4. Construct the capability tensor of each agent, perform feasibility gating screening on task-agent combinations, and exclude task-agent combinations that do not meet hard constraints; calculate the marginal utility price of task-agent combinations that pass the feasibility gating, arbitrate resources through dual ledgers, and issue bounded leases to matching agents.

[0039] The capability tensor includes the following dimensions: task capability, modal capability, tool capability, reliability, latency, cost, permission, concurrency limit, and current load.

[0040] The system constructed in this embodiment of the invention adopts a global coordination layer, a local execution layer, and an independent verification layer. The global coordination agent does not directly generate the final business facts, but is mainly responsible for contract verification, plan selection, task allocation, resource arbitration, and conflict resolution. The competition, exhibition, investment promotion, and tool agents are responsible for local tasks. The independent verification agent uses the prompts, rules, or model check results that are separated from the execution agent.

[0041] The tensor dimension includes at least the following: task type capability, modal capability such as text / image / video / speech, tool call capability, data domain permissions, historical accuracy, confidence calibration error, average latency, P95 latency, unit call cost, concurrency limit, current load, failure rate, recovery time and latest version.

[0042] In one feasible implementation, the capability tensor of agent j is represented as: ;in Representational capability and modal components; Indicates the tools and permissions components; Indicates performance components; Represents the running state components; in, ;in This represents the ability score of agent j for task type m; This indicates the ability of agent j to support mode n; in, ;in This indicates the ability of agent j to invoke tool p; This indicates the permissions of agent j to the data domain or tool q; in, ;in Indicates the historical reliability of agent j; This represents the confidence calibration error of agent j; This represents the expected execution delay of agent j; This represents the unit execution cost of agent j; in, ;in This represents the current load of agent j; This represents the maximum concurrency limit or remaining concurrency capacity of agent j; This represents the historical failure rate of agent j.

[0043] Prior to task allocation, a feasibility gating process is implemented. If the agent lacks the necessary tools, has no access to task data, the estimated completion time exceeds the deadline, resource requirements exceed the current allocable limit, or historical reliability is below the high-risk task threshold, then... =0, no entry into bidding and arbitration.

[0044] In one feasible implementation method, It can be expressed by the following formula (5): (5) in,

[0045]

[0046]

[0047]

[0048]

[0049] in, This represents the degree of matching between the capabilities of task i and agent j; Indicates the minimum capability matching threshold; This represents the set of permissions required for task i; This represents the set of permissions held by agent j; Indicates the current moment; This represents the estimated delay for task i to be executed by agent j; Indicates the deadline for task i; Represents the resource requirement vector for task i; Represents the available resource capacity vector of agent j; Indicates the historical reliability of agent j; This represents the minimum reliability threshold determined based on the risk level of task i.

[0050] Among them, for =1 Task—Agent combination calculation of marginal utility quotes. The quote is not an arbitrary value declared autonomously by the agents, but is determined by the coordination layer based on the capability tensor, task contract, resource price, and plan dependency.

[0051] Optionally, the calculation process for marginal utility pricing is expressed by the following formula (6): (6) in, Indicates the marginal utility price; Indicates the business value of the task; Indicates the expected quality; Indicates the urgency of the deadline; Indicates reliability; Indicates the shadow price of resources; This indicates an expected delay; This indicates a blocking penalty for critical subsequent tasks; Indicates the cost of switching models, contexts, or tools; Indicates execution risk; This represents the weighting coefficient of the product term of the task's business value and the expected quality; This represents the weighting coefficient for the deadline urgency item; The weighting coefficients for the agent's reliability term; This represents the expected demand for resource type k when task i is assigned to agent j; This indicates the expected weighting coefficient for delayed penalties; This represents the weighting coefficient of the blocking penalty for critical successor tasks; Indicates the cost weighting coefficient for switching models, contexts, or tools; This represents the weighting coefficient for execution risk penalties.

[0052] In one feasible implementation, the present invention provides a dual ledger, wherein the dual ledger separates the processing of "who should receive the resources" from "who currently holds the resources and when they will be reclaimed".

[0053] Optionally, the dual ledgers include: a resource shadow price ledger and a bounded lease ledger; The resource shadow price ledger stores the capacity, committed usage, forecasted demand, and shadow price of various resources in different time slices. The resource shadow price is a congestion cost that is dynamically updated based on the difference between forecasted resource demand and available capacity, and is used to represent the marginal impact of new resource consumption on the overall system objective. The bounded lease ledger stores the occupancy certificates of specific tasks for resources; a bounded lease is a temporary resource occupancy certificate with resource type, limit, holder, start time, expiration time, heartbeat cycle, renewal conditions, and recovery action.

[0054] In each scheduling cycle, the resource shadow price is updated based on resource demand and capacity. When resources are in short supply, the price rises, causing low-value or degradeable tasks to be redirected to lower-cost models, delayed, or cached; when resources are idle, the price falls, improving utilization.

[0055] In one feasible implementation, the process of iteratively updating resource shadow prices is represented by the following formula (7): (7) in, ;in, Represents the shadow price of the resource at time t+1; This represents the intermediate update value of the resource shadow price before performing non-negative projection; Represents the shadow price of the resource at time t; Indicates the update step size; Representing resources Predicted demand at time t; Indicates available capacity.

[0056] For discrete resources such as manual review or external paid APIs, segmented pricing can be used; for continuous resources such as GPU time, tokens, and connection counts, gradient updates can be used.

[0057] In one feasible implementation, the task acquires resources but does not permanently occupy them; instead, it obtains a bounded lease. The bounded lease includes a limit, start time, expiration time, heartbeat cycle, renewal conditions, maximum number of renewals, and a reclamation action. During the heartbeat cycle, the agent reports progress, remaining workload, and evidence status. If the agent fails to report on time or is not expected to complete the task within the lease period, the resources are reclaimed, triggering a partial repair.

[0058] Bounded leases can be applied to GPU time, token quotas, model instances, database connections, API concurrency, retrieval quotas, manual review seats, file locks, and message channels.

[0059] Among them, bounded leases It can be expressed by the following formula (8): (8) in, Indicates task i; Represents agent j; Represents the k-th type of resource; Indicates the amount of resources in the lease; Indicates the start time of the lease; Indicates the expiration date of the lease; Indicates the heartbeat cycle; Indicates the maximum number of lease renewals; This indicates the resource recovery action taken when the lease expires or there is an abnormality.

[0060] In one feasible implementation, the system constructed in this embodiment of the invention maintains a resource waiting graph. If a waiting cycle is detected, a sacrifice lease is selected and its recovery is performed based on task risk, deadline urgency, completed percentage, and compensation cost, ensuring that the waiting graph is cycle-free. For external interfaces with non-repeatable side effects, an idempotency check or compensation action is performed before lease recovery.

[0061] The arbitration shall be conducted in the following specific order: The first layer satisfies permissions, data security, hard deadlines, and irreversible operation constraints; the second layer safeguards evidence and human review resources for high-risk tasks; the third layer minimizes critical path delays; the fourth layer maximizes total marginal utility; and the fifth layer minimizes model switching and context migration under the condition of equal utility. This sequence avoids allocation results with high total utility but violating security or deadline constraints.

[0062] In one feasible implementation method, the specific implementation process of task allocation and dual-ledger arbitration includes: 1. Input candidate plan families, agent sets, shadow price ledgers, and lease ledgers; 2. Select the currently feasible plan and read the various task contracts; 3. Calculation based on capability, permissions, deadline, reliability, and resource limits. ; 4. =1 Calculate the marginal utility price of the combination; 5. Implement lexicographical arbitration based on hard constraints, high-risk safeguards, critical path, total utility, and migration cost; 6. Examine the resource capacity and waiting chart, and cancel the lease with the lowest retention value when a loop is formed; 7. Update resource shadow prices and generate bounded leases for selected tasks; 8. Write the allocation, price snapshot, and lease to the event log, and output the current schedule, task allocation, and resource lease.

[0063] S5. Multiple execution agents execute tasks in parallel, writing tool calls, evidence references, state changes, resource consumption, idempotent states, and stage results into the event log; based on the event log, identify resource, data version, semantic conclusions, permissions, timing, and tool side effect conflicts, calculate conflict priorities, solve for the minimum repair set, execute repair actions within the local repair cone, and keep unaffected tasks running.

[0064] Among them, the minimum conflict repair set can be achieved using integer programming, A... Search, SAT / SMT solving, constraint satisfaction, or heuristic algorithm solving. The conflict minimum fix set refers to the set of fix actions that satisfy all hard constraints and minimize recalculation, migration, delay, cost, and risk after a conflict occurs.

[0065] In one feasible implementation, the system constructed in this embodiment of the invention can identify resource conflicts, data version conflicts, semantic conclusion conflicts, permission conflicts, timing conflicts, and tool side effect conflicts from execution event streams and hypergraph state differences.

[0066] Optionally, conflicts include: resource conflicts, data version conflicts, semantic conclusion conflicts, permission conflicts, timing conflicts, and tool side effect conflicts; The resource conflict is determined as follows: multiple tasks request more GPUs, APIs, database connections, or manual seats than their capacity is available within an overlapping time window. The method for determining data version conflicts is as follows: the agent reads different versions of the same project material, or the old result overwrites the new result; The method for determining semantic conflict is as follows: different agents give opposite or incompatible judgments on the same atom claim; The method for determining permission conflicts is as follows: the plan requires the agent to access a data domain it does not have permission to access or to call an unauthorized tool; The timing conflict is determined by the following methods: the subsequent task is executed ahead of schedule, the deadline expires, or a loop of waiting occurs. The method for determining tool side effect conflicts is as follows: duplicate submission, duplicate sending, duplicate modification of external system status, or incorrect order of compensation actions.

[0067] Optionally, the calculation process for conflict priority is expressed by the following formula (9): (9) in, Indicates conflict priority; It represents the combined product of the impact, urgency, irreversibility, and risk of the conflict; This represents the conflict repair cost plus a stability constant; Indicates pending conflicts; in, The calculation process is expressed by the following formula (10): (10) in, A normalized value representing the scope of the conflict's impact; Indicates the urgency of the deadline; Indicates the irreversibility coefficient; Indicates the conflict risk coefficient; in, The calculation process is expressed by the following formula (11): (11) in, Indicates the cost of conflict resolution; This represents the positive stability constant to prevent the denominator from being zero.

[0068] Specifically, a set of remedial actions is generated for high-priority conflicts, including: reallocating agents, splitting tasks, adjusting timing, switching models, reducing modality resolution, using caching, replacing APIs, supplementing evidence, reversing side effects, delaying execution, and transferring to manual intervention. When selecting remedial actions, results that have already been completed and still meet the evidence and version requirements are kept unchanged.

[0069] Among them, the optimal minimum set of repair actions This can be expressed by the following formula (12): (12) Among them, the objective function is repaired. This can be expressed by the following formula (13): (13) in, Indicates the recalculation cost weight; Indicates the migration cost weight; Indicates the weight of the delay cost; Indicates the execution cost weight; Indicates the risk weight for repair; This represents the amount of recalculation caused by the set of repair actions; This represents the migration amount caused by the set of repair actions; This indicates the amount of delay caused by the set of repair actions; This represents the execution cost of the set of repair actions; This indicates the execution risk of the set of repair actions.

[0070] The constraints include: the repaired plan must satisfy all hard constraints; each incomplete task must be assigned to at most one main execution agent; resource usage must not exceed capacity; non-repeatable side-effect tasks must not be executed repeatedly; and frozen results must only be unfrozen when their evidence becomes invalid or is explicitly refuted.

[0071] The local repair cone includes: anomalous tasks, their temporal successors, shared data versioning tasks, resource contention tasks, and semantic consistency-related tasks.

[0072] The local repair cone is obtained through incremental traversal of the hypergraph. Specifically, it starts from the conflict node and expands along temporal successor edges, data dependency edges, resource contention edges, and semantic consistency edges; it stops when it reaches a frozen node with valid evidence, a node without shared resources, or a node with an isolation boundary set. This method reduces the number of global replanning iterations and repeated model calls.

[0073] One feasible implementation method is, for example Figure 3The diagram shown is a schematic representation of a conflict detection and minimum repair set solution process provided by an embodiment of the present invention; wherein, the specific implementation process of conflict detection and local repair includes: 1. Input execution event flow, time-resource-semantic hypergraph, and current plan; 2. Identify resource, version, semantic, permission, timing, and side effect conflicts from state differences; 3. Calculate the scope of impact, urgency, irreversibility, risks, and repair costs of each conflict; 4. Sort conflicts by priority and construct local repair cones, generating migration, splitting, delaying, downgrading, cache reuse, alternative interfaces, supplementary certification, and manual takeover actions; 5. Find the minimum repair set that satisfies hard constraints and minimizes recalculation, migration, delay, cost, and risk; 6. Freeze tasks outside the cone, update tasks, assignments, and leases inside the cone; have the validator check the repaired plan and submit an incremental version, outputting a partial repair plan.

[0074] S6. Implement evidence-weighted consensus on the candidate conclusions output by the multi-agent system. The independent verification layer checks the task contract satisfaction, permissions, timing, evidence relationships, and idempotent states before submitting the results.

[0075] In one feasible implementation, each executing agent's output consists of an atomic claim, evidence identifier, evidence location, confidence level, data version, validity period, and suggested action. High-risk results with only natural language conclusions but no evidence identifier are not accepted. Supporting and opposing opinions for the same claim are aggregated into the consensus module.

[0076] In one feasible implementation, the agent provides support strength for candidate claims. The system determines the evidence weight based on the agent's historical reliability, credibility of evidence sources, timeliness of evidence, consistency of evidence, and calibration error for that task type. The evidence weight is expressed by the following formula (14): (14) in, Indicates the weight of evidence; This indicates the agent's historical reliability for this task type; Indicate the credibility of the source of the evidence; Indicates the statute of limitations for evidence; This indicates consistency of evidence; Indicates calibration error; In one feasible implementation, the process of aggregating all evidence weights using a log-odds fusion rule is represented by the following formula (15): (15) in, This represents the posterior log-probability of a candidate claim within the aggregated evidence set; Indicate the candidate's claim; Indicates the aggregation of evidence sets; This represents the prior logarithmic probability of a candidate claim; Represents intelligent agents Provide the support strength.

[0077] When both supporting and rebuttal evidence have high weight, a binary conclusion is not mandatory; instead, a conditional conclusion, conflicting evidence, and supplementary requirements are output. For example, if the technical capability is met but the delivery certificate has expired, the output would be "Conditional approval; proceed to investment promotion and matchmaking after supplementing with the latest production capacity certificate."

[0078] The process of independent verification agents or deterministic verifiers includes: whether the task contract objective is met; whether the evidence is accessible and not expired; whether the output violates permissions and publication boundaries; whether the temporal state allows submission; whether the side effects of external tools have idempotent records; and whether the claim confidence level reaches the corresponding risk threshold. If verification fails, specific failure predicates and optional repair actions are returned, without directly restarting the entire process.

[0079] S7. Update the capability tensor, resource price, task method priority, and version record based on actual execution quality, latency, cost, and business feedback.

[0080] Each task execution generates an event sequence, including: task acquisition, lease issuance, tool invocation, evidence reading, stage output, conflict, repair, manual repair, and final business result; the agent's capabilities, task method success rate, resource requirement prediction, and conflict prior are updated based on the event sequence.

[0081] In one feasible implementation, the reliability of the agent on task type m is updated using a decaying Bayesian or exponential weighted method. Successful tasks that pass independent verification increase the number of valid successes; failed tasks that require significant manual modification or have erroneous evidence increase the number of failures; wherein, the error weight for high-risk tasks is greater than that for low-risk tasks.

[0082] The reliability of the agent on task type m is updated using a decay-weighted update process, as expressed by the following formula (16): (16) in, Indicates the reliability of agent j after updating on task type m; Indicates the historical reliability decay coefficient; Indicates the reliability before the update; This represents the normalized quality score for this task; This indicates that independent verification has passed the indicator or score; This indicates that the instructed quantity or score was completed on time.

[0083] In one feasible implementation, the prior parameters of the task method library are updated based on the actual planned quality, delay, cost, and conflict rate, and the weights of quality, delay, blocking, switching, and risk in the quotation formula are adjusted in a limited manner. The update only takes effect after regression testing is passed, to avoid accidental feedback from a certain activity from disrupting historical scenarios.

[0084] In one feasible implementation method, the specific implementation process of evidence-weighted consensus includes: 1. Input candidate claims, evidence packages, and agent reliability; 2. Decompose the output of each agent into atomic claims and remove duplicates, and verify the source, version, validity period, access permissions and location information of each piece of evidence; 3. Calculate weights based on mission expertise reliability, evidence credibility, timeliness, consistency, and calibration error; 4. Based on the weighted aggregation of support and refutation strengths, the posterior confidence of the candidate claims is obtained; 5. When high conflict occurs, generate conditional conclusions or supplementary verification tasks without enforcing a majority vote; independently verify the task contract, permissions, timing, and side effects, then submit the results and output consensus claims, confidence levels, conditions, and missing items.

[0085] Each time the agent executes a task, it records the task contract version, hypergraph version, plan version, agent version, model version, prompt template version, resource price snapshot, lease record, evidence version, and repair record. The final result is bound to these version numbers, allowing the same input to be replayed under the same resource snapshot and model version.

[0086] In one feasible implementation, let =1 indicates a task Assigned to intelligent agents , Indicates task Resources are occupied during time slice t The process of maximizing task value and completion quality while minimizing delay, cost, risk, and recalculation under the constraints of task contract and resources is expressed by the following formula (17): (17) in, This represents the 0-1 decision variable for assigning task i to agent j; This represents the business value of task i; This represents the expected quality of task i being performed by agent j; This represents the estimated cost of task i being performed by agent j; This represents the expected risk cost of task i being performed by agent j; This represents the expected delay loss for task i; This represents the recalculation cost of task i; The resource constraints are expressed by the following formulas (18)-(21): (18) (19) (20) (twenty one) in, This represents the demand for the k-th type of resource when task i is assigned to agent j. `start_v` represents the 0-1 variable representing the resource `k` occupied by task `i` in time slice `t`; `start_v` represents the start time of the subsequent task `v`. Indicates the completion time of the precursor mission u; Represents the set of temporally dependent edges; This indicates the evidence or data version node corresponding to downstream task v; This indicates the evidence or data version node corresponding to upstream task u; Represents a node Data version number; This represents the set of edges that depend on data versions. This indicates the data version number of the node eu.

[0087] In one feasible implementation, robustness is calculated using risk quantiles or scenario sampling to reduce plan failures caused by latency prediction errors and interface fluctuations.

[0088] In one feasible implementation, the robustness score of the candidate plan is represented by the following formula (22): (twenty two)

[0089] in, This indicates the robustness score of the candidate plan; This represents the probability that the candidate plan satisfies the robust event. This indicates a penalty for latency fluctuations; in, (twenty three) (twenty four) (25) (26) (27) in, This represents the variance penalty coefficient; This represents the variance of the candidate plan's completion time. Indicates the completion time of the candidate plan; Indicates the project deadline; Indicates the quality of candidate plans; Indicates the minimum quality threshold; This represents the total cost of the candidate program; This indicates the upper limit of the planned budget.

[0090] Among them, under the premise of satisfying high-risk tasks and critical path priority, the system constructed by the present invention can add an agent load fairness term to prevent a single agent from being overloaded for a long time.

[0091] In one feasible implementation, under the premise of satisfying high-risk tasks and critical path priority, the Jain fairness index is used to measure the load fairness of participating agents, and is expressed by the following formula (28): (28) in, Indicates the load fairness of participating agents; This indicates the utilization rate or allocated load of agent j; Indicates the set of participating intelligent agents; Represents the agent index.

[0092] In one feasible implementation, local repairs preferentially select schemes with lower repair ratios that satisfy all hard constraints. The repair ratio is expressed by the following formula (29): (29) in, Indicates the repair ratio; This represents the set of incomplete task nodes that are affected by the conflict and need to be recalculated or repaired. This represents the set of unfinished task nodes in the entire plan.

[0093] The embodiments of the present invention can be applied to various stages of digital business, such as science and technology project review, government investment promotion, achievement transformation, supply chain collaboration, cultural tourism exhibitions, educational competitions, and multi-department approvals.

[0094] In one feasible implementation, Embodiment 1 of this invention provides a batch evaluation of competition entries. In a batch evaluation cluster scenario, the task entry receives 300 competition materials. The document parsing task requires CPU and database connection, the video parsing task requires GPU decoding and object storage bandwidth, and the model evaluation task requires different levels of GPU inference instances and model API quotas. The root task contract records the input version, lower bound of video memory, token budget, database connection, deadline, and evidence requirements for each type of subtask. The scheduler performs feasibility gating based on GPU model, current video memory, model resident status, and historical P95 latency. Resource shadow prices reflect the congestion level of each time slice, and bounded leases are issued to selected tasks.

[0095] The planner generates two candidate plans: Plan A uses a single high-capability model to complete feature extraction, scoring interpretation, and report generation; Plan B uses a lightweight extraction agent to process fields in parallel, with the high-capability assessment agent handling only innovative and high-risk items, and the verification agent handling merging. Resource shadow prices indicate congestion in the high-capability model's inference pool. Plan B has lower resource peaks and can be completed within the deadline, therefore it is selected as the primary plan.

[0096] During task allocation, lightweight extraction agents receive low-cost model leases, while high-risk assessment tasks are reserved for high-capability models and human review slots. If an agent fails to reach the progress threshold in the lease heartbeat due to video parsing timeout, the system reclaims its video resource lease, migrates the affected video evidence task to a backup agent, and freezes the completed text extraction results. Each score in the final assessment report is linked to rule clauses and evidence locations.

[0097] In the edge-cloud collaborative tour guide scenario of an exhibition, edge nodes store exhibit description caches and lightweight models, while cloud nodes store high-capacity models and a complete evidence library. Regular tour guide task contracts allow the use of edge caching and set short deadlines; tasks involving authentication, parameters, and external publication must access and verify cloud evidence. Network bandwidth, edge caching, cloud GPUs, and API concurrency are all written to the Hypergraph as resource nodes. When network jitter or cloud interfaces are unavailable, the local repair cone only contains question-and-answer and cache update tasks that depend on that resource, while other exhibit tasks continue to execute. The system increases GPU shadow prices based on real-time demand. Regular tour guide tasks are penalized by resource prices in the bidding process and automatically redirect to caches and lightweight models; high-risk parameter queries still receive high-capacity model leases due to their business value and risk protection priority. After an exhibitor uploads a new version of technical materials, the Hypergraph's data version edge marks the old exhibit content as invalid; the local repair cone only contains content nodes referencing that material and related question-and-answer caches, while other exhibit tasks are unaffected.

[0098] In scenarios where enterprise data interfaces and databases are consistent, demand structuring, candidate recall, qualification verification, capacity verification, and recommendation generation are executed by different intelligent agents. The qualification and credit interface task contracts carry the interface idempotent key, request version, maximum concurrency, cache expiration, and compensation action; the database writes the expected version number of the task record. If an interface times out, the system first checks the idempotent record and valid cache, then decides on an alternative interface, delayed retry, or manual verification to avoid duplicate calls and overwriting of old results. Specifically, the event intelligent agent supports a company's participation in investment promotion based on a technical evaluation report, the exhibition intelligent agent gives high market attention based on audience interaction data, and the investment promotion intelligent agent finds that the company's capacity certificate has expired and provides an objection. The consensus module calculates the posterior result based on the intelligent agent's task expertise and evidence validity, and instead of using a two-to-one majority vote, outputs "Technical and market conditions are met, latest capacity certificate is missing, formal connection will proceed after supplementary certification." The system automatically generates a supplementary certification task and assigns a limited lease to the enterprise data interface.

[0099] When the competition evaluation task is completed and the conditions of "score exceeding the threshold, no major risks, and materials authorized for display" are met, the cross-stage trigger edge in the hypergraph generates exhibition content tasks; when the exhibition interaction rate reaches the threshold and enterprises clearly express their intention to attract investment, the enterprise profiling and park matching tasks are triggered. Each trigger generates a new task contract and inherits the evidence identifier, data version, and permissions that can be shared, without directly copying the entire context, thus reducing the spread of irrelevant data.

[0100] When the investment promotion task calls the enterprise credit interface, consecutive timeouts occur. The conflict module identifies this as a tool resource failure. The impact is calculated to only affect qualification verification and the final recommendation that relies on this result; it does not affect completed technical matching and market analysis. The system generates four remedial actions: alternative interface, delayed retry, cache reuse, and manual verification. If the cache is still valid, cache reuse is selected, and manual spot checks are added; if the cache has expired, manual verification is initiated. After the remediation, only qualification-related tasks are re-executed.

[0101] This invention transforms natural language business objectives into computational objects containing machine-checkable objectives, evidence, resources, permissions, and rollback conditions through verifiable task contracts, reducing the probability of unexecutable plans entering the execution layer. It enhances the modeling capabilities of complex, continuous business processes by unifying task sequence, evidence versions, resource contention, cross-stage triggering, semantic consistency, and tool side effects through a temporal-resource-semantic hypergraph. Capability tensors and feasibility gating exclude agents with insufficient capabilities, lack of permissions, inability to complete tasks on time, or substandard reliability before task allocation. Resource shadow pricing dynamically reflects the congestion levels of GPUs, model interfaces, databases, networks, and manually reviewed resources, guiding tasks to select resource levels commensurate with their value and risk. Bounded leases, heartbeats, lease renewals, and reclamation mechanisms limit long-term resource occupation, reducing starvation, circular waiting, interface quota exhaustion, and cascading blocking of abnormal tasks.

[0102] This invention avoids resource allocation results with high total utility but violations of permissions, security, deadlines, or irreversible operation constraints through lexicographical arbitration prioritizing hard constraints. By using conflict classification, a minimum repair set, and local repair cones, it recalculates only affected tasks and preserves completed and evidence-valid results, reducing redundant reasoning, repeated external interface calls, duplicate writes, and manual review. Through evidence-weighted consensus, it integrates agent expertise, evidence credibility, timeliness, and consistency, enabling conflict results to output conditions, rebuttal evidence, and supplementary material requirements, rather than forcing majority voting. An independent verification layer prevents the submission of results without evidence, permissions, timing, and idempotent state checks, improving system stability, verifiability, and auditability. Event-driven online calibration continuously updates agent capabilities, resource prices, and planning method success rates, enabling the system to adapt to different tracks, activity scales, and infrastructure load changes.

[0103] Figure 4 This is a block diagram of a multi-agent task planning and resource lease arbitration device for trade fair promotion provided by an embodiment of the present invention. This device is used for multi-agent task planning and resource lease arbitration methods in trade fair promotion. (Refer to...) Figure 4 The device includes a task entry module 410, a task contract generation module 420, a hypergraph construction and hierarchical task planning module 430, a capability tensor construction and gating screening module 440, a multi-agent execution and conflict detection module 450, an evidence-weighted consensus module 460, and an online calibration and auditing module 470. Among them: Task entry module 410 is used to obtain the business objectives of the exhibition and investment promotion, including: rules of investment promotion activities, multimodal project materials, exhibition requirements, enterprise and park needs, task time limit, external tool interface, computing resource status and manual review resource status; The task contract generation module 420 is used to convert the business objective into a verifiable task contract; wherein the task contract is a structured data object, including: target predicate, input-output pattern, preconditions, postconditions, evidence requirements, resource requirement vector, permission boundaries, and rollback actions; The hypergraph construction and hierarchical task planning module 430 is used to construct a temporal-resource-semantic hypergraph, and based on the task contract, uses a constrained hierarchical task network to recursively decompose the composite tasks corresponding to the business objectives to generate a candidate plan family. The Capability Tensor Construction and Gating Module 440 is used to construct the capability tensor of each agent, perform feasibility gating screening on task-agent combinations, exclude task-agent combinations that do not meet hard constraints, calculate the marginal utility quote for task-agent combinations that pass the feasibility gating based on the candidate plan family, conduct resource arbitration through dual ledgers, and issue bounded leases to matching agents. The multi-agent execution and conflict detection module 450 is used for multiple executing agents to execute tasks in parallel. It writes tool calls, evidence references, state changes, resource consumption, idempotent states and stage results into the event log; based on the event log, it identifies resource, data version, semantic conclusion, permission, timing and tool side effect conflicts, calculates conflict priority and solves the minimum repair set, executes repair actions within the local repair cone, and keeps unaffected tasks running. The evidence-weighted consensus module 460 is used to perform evidence-weighted consensus on the candidate conclusions output by multiple agents, and submit the results after checking the task contract satisfaction, permissions, timing, evidence relationship and idempotency state. The online calibration audit module 470 is used to update the capability tensor, resource price, task method priority, and version record based on actual execution quality, latency, cost, and business feedback.

[0104] Optionally, the nodes of the temporal-resource-semantic hypergraph include: task nodes, evidence nodes, resource nodes, agent nodes, and state nodes; The edges of the temporal-resource-semantic hypergraph are used to express temporal dependencies, data version dependencies, resource competition, cross-stage semantic consistency constraints, cross-stage event triggering, and external tool side effects.

[0105] Optionally, the verifiable task contract includes: an identifier field, a target field, a data field, a constraint field, an evidence field, a resource field, a permission field, a service field, and a recovery field; The verifiable task contract is formally defined as follows (30): (30) in, This indicates a verifiable task contract; This represents a unique identifier for the task; Indicates the scene stage; Indicates the target predicate; Indicates the input mode; Indicates the output mode; Indicates a precondition; Indicates a postcondition; Indicates evidentiary constraint; Represents the resource demand vector; Represents a set of permissions; Indicates the deadline; Indicates the level of service; Indicates a compensatory action; Indicates the rollback point.

[0106] Optionally, the calculation process of the marginal utility quote is expressed by the following formula (31): (31) in, Indicates the marginal utility price; Indicates the business value of the task; Indicates the expected quality; Indicates the urgency of the deadline; Indicates reliability; Indicates the shadow price of resources; This indicates an expected delay; This indicates a blocking penalty for critical subsequent tasks; Indicates the cost of switching models, contexts, or tools; Indicates execution risk; This represents the weighting coefficient of the product term of the task's business value and the expected quality; This represents the weighting coefficient for the deadline urgency item; The weighting coefficients for the agent's reliability term; This represents the expected demand for resource type k when task i is assigned to agent j; This indicates the expected weighting coefficient for delayed penalties; This represents the weighting coefficient of the blocking penalty for critical successor tasks; Indicates the cost weighting coefficient for switching models, contexts, or tools; This represents the weighting coefficient for execution risk penalties.

[0107] Optionally, the conflicts include: resource conflicts, data version conflicts, semantic conclusion conflicts, permission conflicts, timing conflicts, and tool side effect conflicts; The resource conflict is determined as follows: multiple tasks request more GPUs, APIs, database connections, or manual seats than their capacity is available within an overlapping time window. The method for determining data version conflicts is as follows: the agent reads different versions of the same project material, or the old result overwrites the new result; The method for determining semantic conflict is as follows: different agents give opposite or incompatible judgments on the same atom claim; The method for determining permission conflicts is as follows: the plan requires the agent to access a data domain it does not have permission to access or to call an unauthorized tool; The timing conflict is determined by the following methods: the subsequent task is executed ahead of schedule, the deadline expires, or a loop of waiting occurs. The method for determining tool side effect conflicts is as follows: duplicate submission, duplicate sending, duplicate modification of external system status, or incorrect order of compensation actions.

[0108] Optionally, the dual ledgers include: a resource shadow price ledger and a bounded lease ledger; The resource shadow price ledger stores the capacity, committed usage, forecasted demand, and shadow price of various resources in different time slices. The resource shadow price is a congestion cost that is dynamically updated based on the difference between forecasted resource demand and available capacity, and is used to represent the marginal impact of new resource consumption on the overall system objective. The bounded lease ledger stores the occupancy certificates of specific tasks for resources; a bounded lease is a temporary resource occupancy certificate with resource type, limit, holder, start time, expiration time, heartbeat cycle, renewal conditions, and recovery action.

[0109] Optionally, the calculation process for the conflict priority is expressed by the following formula (32): (32) in, Indicates conflict priority; It represents the combined product of the impact, urgency, irreversibility, and risk of the conflict; This represents the conflict repair cost plus a stability constant; Indicates pending conflicts; in, The calculation process is expressed by the following formula (33): (33) in, A normalized value representing the scope of the conflict's impact; Indicates the urgency of the deadline; Indicates the irreversibility coefficient; Indicates the conflict risk coefficient; in, The calculation process is expressed by the following formula (34): (34) in, Indicates the cost of conflict resolution; This represents the positive stability constant to prevent the denominator from being zero.

[0110] This invention transforms natural language business objectives into computational objects containing machine-checkable objectives, evidence, resources, permissions, and rollback conditions through verifiable task contracts, reducing the probability of unexecutable plans entering the execution layer. It enhances the modeling capabilities of complex, continuous business processes by unifying task sequence, evidence versions, resource contention, cross-stage triggering, semantic consistency, and tool side effects through a temporal-resource-semantic hypergraph. Capability tensors and feasibility gating exclude agents with insufficient capabilities, lack of permissions, inability to complete tasks on time, or substandard reliability before task allocation. Resource shadow pricing dynamically reflects the congestion levels of GPUs, model interfaces, databases, networks, and manually reviewed resources, guiding tasks to select resource levels commensurate with their value and risk. Bounded leases, heartbeats, lease renewals, and reclamation mechanisms limit long-term resource occupation, reducing starvation, circular waiting, interface quota exhaustion, and cascading blocking of abnormal tasks.

[0111] This invention avoids resource allocation results with high total utility but violations of permissions, security, deadlines, or irreversible operation constraints through lexicographical arbitration prioritizing hard constraints. By using conflict classification, a minimum repair set, and local repair cones, it recalculates only affected tasks and preserves completed and evidence-valid results, reducing redundant reasoning, repeated external interface calls, duplicate writes, and manual review. Through evidence-weighted consensus, it integrates agent expertise, evidence credibility, timeliness, and consistency, enabling conflict results to output conditions, rebuttal evidence, and supplementary material requirements, rather than forcing majority voting. An independent verification layer prevents the submission of results without evidence, permissions, timing, and idempotent state checks, improving system stability, verifiability, and auditability. Event-driven online calibration continuously updates agent capabilities, resource prices, and planning method success rates, enabling the system to adapt to different tracks, activity scales, and infrastructure load changes.

[0112] Figure 5 This is a schematic diagram of the structure of a multi-agent task planning and resource lease arbitration device for trade fair promotion provided in an embodiment of the present invention, such as... Figure 5 As shown, the multi-agent task planning and resource lease arbitration equipment for exhibition and trade fair promotion can include the above-mentioned... Figure 4 The illustrated multi-agent task planning and resource lease arbitration device for esports and trade fair promotion is shown. Optionally, the multi-agent task planning and resource lease arbitration device 510 may include a first processor 2001.

[0113] Optionally, the multi-agent task planning and resource lease arbitration device 510 may also include a memory 2002 and a transceiver 2003.

[0114] The first processor 2001, memory 2002, and transceiver 2003 can be connected via a communication bus.

[0115] The following is combined with Figure 5 A detailed introduction to each component of the 510 multi-agent task planning and resource lease arbitration device for exhibition and trade fair promotion: The first processor 2001 is the control center of the multi-agent task planning and resource leasing arbitration device 510 for exhibition and investment promotion. It can be a single processor or a collective term for multiple processing elements. For example, the first processor 2001 can be one or more central processing units (CPUs), application-specific integrated circuits (ASICs), or one or more integrated circuits configured to implement embodiments of the present invention, such as one or more digital signal processors (DSPs), or one or more field-programmable gate arrays (FPGAs).

[0116] Optionally, the first processor 2001 can perform various functions of the multi-agent task planning and resource lease arbitration device 510 by running or executing software programs stored in the memory 2002 and calling data stored in the memory 2002.

[0117] In a specific implementation, as one example, the first processor 2001 may include one or more CPUs, for example... Figure 5 CPU0 and CPU1 are shown in the diagram.

[0118] In a specific implementation, as one example, the exhibition and investment promotion multi-agent task planning and resource lease arbitration device 510 may also include multiple processors, for example... Figure 5 The first processor 2001 and the second processor 2004 are shown in the diagram. Each of these processors can be a single-core processor or a multi-core processor. Here, a processor can refer to one or more devices, circuits, and / or processing cores used to process data (such as computer program instructions).

[0119] The memory 2002 is used to store the software program that executes the present invention, and is controlled by the first processor 2001 to execute it. The specific implementation method can be referred to the above method embodiment, and will not be repeated here.

[0120] Optionally, the memory 2002 may be a read-only memory (ROM) or other type of static storage device capable of storing static information and instructions, random access memory (RAM) or other type of dynamic storage device capable of storing information and instructions, or electrically erasable programmable read-only memory (EEPROM), compact disc read-only memory (CD-ROM) or other optical disc storage, optical disc storage (including compressed optical discs, laser discs, optical discs, digital universal optical discs, Blu-ray discs, etc.), magnetic disk storage media or other magnetic storage devices, or any other medium capable of carrying or storing desired program code in the form of instructions or data structures and accessible by a computer, but not limited thereto. The memory 2002 may be integrated with the first processor 2001 or may exist independently, and may be connected via the interface circuit of the multi-agent task planning and resource leasing arbitration device 510. Figure 5 (Not shown in the image) is coupled to the first processor 2001, and this embodiment of the invention does not specifically limit this.

[0121] The transceiver 2003 is used to communicate with network devices or with terminal devices.

[0122] Alternatively, transceiver 2003 may include a receiver and a transmitter. Figure 5 (Not shown separately). The receiver is used to implement the receiving function, and the transmitter is used to implement the transmitting function.

[0123] Optionally, the transceiver 2003 can be integrated with the first processor 2001, or it can exist independently, and can be connected to the interface circuit of the multi-agent task planning and resource leasing arbitration device 510. Figure 5 (Not shown in the image) is coupled to the first processor 2001, and this embodiment of the invention does not specifically limit this.

[0124] It should be noted that, Figure 5 The structure of the multi-agent task planning and resource lease arbitration device 510 shown in the figure does not constitute a limitation on the multi-agent task planning and resource lease arbitration device. The actual multi-agent task planning and resource lease arbitration device may include more or fewer components than shown, or combine certain components, or have different component arrangements.

[0125] Furthermore, the technical effects of the multi-agent task planning and resource lease arbitration device 510 for exhibition and investment promotion can be referred to the technical effects of the multi-agent task planning and resource lease arbitration method for exhibition and investment promotion described in the above method embodiments, and will not be repeated here.

[0126] It should be understood that the first processor 2001 in the embodiments of the present invention may be a central processing unit (CPU), or it may be other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor may be a microprocessor, or it may be any conventional processor, etc.

[0127] It should also be understood that the memory in the embodiments of the present invention can be volatile memory or non-volatile memory, or may include both volatile and non-volatile memory. The non-volatile memory can be read-only memory (ROM), programmable read-only memory (PROM), erasable programmable read-only memory (EPROM), electrically erasable programmable read-only memory (EEPROM), or flash memory. The volatile memory can be random access memory (RAM), which is used as an external cache. By way of example, but not limitation, many forms of random access memory (RAM) are available, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate synchronous DRAM (DDR SDRAM), enhanced synchronous DRAM (ESDRAM), synchronous linked DRAM (SLDRAM), and direct rambus RAM (DR RAM).

[0128] The above embodiments can be implemented, in whole or in part, by software, hardware (such as circuits), firmware, or any other combination thereof. When implemented using software, the above embodiments can be implemented, in whole or in part, as a computer program product. The computer program product includes one or more computer instructions or computer programs. When the computer instructions or computer programs are loaded or executed on a computer, all or part of the processes or functions described in the embodiments of the present invention are generated. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions can be stored in a computer-readable storage medium or transmitted from one computer-readable storage medium to another. For example, the computer instructions can be transmitted from one website, computer, server, or data center to another website, computer, server, or data center via wired or wireless means. The computer-readable storage medium can be any available medium that a computer can access or a data storage device such as a server or data center that includes one or more sets of available media. The available medium can be a magnetic medium (e.g., floppy disk, hard disk, magnetic tape), an optical medium (e.g., DVD), or a semiconductor medium. A semiconductor medium can be a solid-state drive.

[0129] It should be understood that the term "and / or" in this article is merely a description of the relationship between related objects, indicating that three relationships can exist. For example, A and / or B can represent: A existing alone, A and B existing simultaneously, or B existing alone. A and B can be singular or plural. Additionally, the character " / " in this article generally indicates an "or" relationship between the preceding and following related objects, but it can also represent an "and / or" relationship. Please refer to the context for a more accurate understanding.

[0130] In this invention, "at least one" means one or more, and "more than one" means two or more. "At least one of the following" or similar expressions refer to any combination of these items, including any combination of a single item or a plurality of items. For example, at least one of a, b, or c can represent: a, b, c, ab, ac, bc, or abc, where a, b, and c can be a single item or multiple items.

[0131] It should be understood that, in various embodiments of the present invention, the sequence number of each process does not imply the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present invention.

[0132] Those skilled in the art will recognize that the units and algorithm steps of the various examples described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are implemented in hardware or software depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementations should not be considered beyond the scope of this invention.

[0133] Those skilled in the art will clearly understand that, for the sake of convenience and brevity, the specific working processes of the devices, apparatuses, and units described above can be referred to the corresponding processes in the foregoing method embodiments, and will not be repeated here.

[0134] In the several embodiments provided by this invention, it should be understood that the disclosed devices, apparatuses, and methods can be implemented in other ways. For example, the apparatus embodiments described above are merely illustrative; for instance, the division of units is only a logical functional division, and in actual implementation, there may be other division methods. For example, multiple units or components may be combined or integrated into another device, or some features may be ignored or not executed. Furthermore, the coupling or direct coupling or communication connection shown or discussed may be through some interfaces; the indirect coupling or communication connection between devices or units may be electrical, mechanical, or other forms.

[0135] The units described as separate components may or may not be physically separate. The components shown as units may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the units can be selected to achieve the purpose of this embodiment according to actual needs.

[0136] In addition, the functional units in the various embodiments of the present invention can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit.

[0137] If the aforementioned functions are implemented as software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art, or a portion of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods described in the various embodiments of the present invention. The aforementioned storage medium includes various media capable of storing program code, such as USB flash drives, portable hard drives, read-only memory (ROM), random access memory (RAM), magnetic disks, or optical disks.

[0138] The above description is merely a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the technical scope disclosed in the present invention should be included within the scope of protection of the present invention. Therefore, the scope of protection of the present invention should be determined by the scope of the claims.

Claims

1. A method for multi-agent task planning and resource lease arbitration in a trade show, characterized in that, The method includes: S1. Obtain the business objectives of the exhibition and trade fair, including: rules of the trade fair activities, materials for multimodal projects, exhibition requirements, needs of enterprises and parks, task deadlines, external tool interfaces, status of computing resources and status of manual review resources; S2. Convert the business objective into a verifiable task contract; wherein the task contract is a structured data object, including: target predicate, input / output pattern, preconditions, postconditions, evidence requirements, resource requirement vector, permission boundaries, and rollback actions; S3. Construct a temporal-resource-semantic hypergraph, and based on the task contract, use a constrained hierarchical task network to recursively decompose the composite tasks corresponding to the business objectives to generate a candidate plan family. S4. Construct the capability tensor of each agent, perform feasibility gating screening on task-agent combinations, and exclude task-agent combinations that do not meet hard constraints; calculate the marginal utility quote for task-agent combinations that pass the feasibility gating based on the candidate plan family, conduct resource arbitration through dual ledgers, and issue bounded leases to the matching agents. S5. Multiple execution agents execute tasks in parallel, writing tool calls, evidence citations, state changes, resource consumption, idempotent states, and stage results into the event log; based on the event log, identify resource, data version, semantic conclusion, permission, timing, and tool side effect conflicts, calculate conflict priorities, solve for the minimum repair set, execute repair actions within the local repair cone, and keep unaffected tasks running. S6. Perform evidence-weighted consensus on the candidate conclusions output by the multi-agent team, and submit the results after checking the task contract satisfaction status, permissions, timing, evidence relationship and idempotent state. S7. Update the capability tensor, resource price, task method priority, and version record based on actual execution quality, latency, cost, and business feedback. 2.The method according to claim 1, wherein, The nodes of the temporal-resource-semantic hypergraph include: task nodes, evidence nodes, resource nodes, agent nodes, and state nodes; The edges of the temporal-resource-semantic hypergraph are used to express temporal dependencies, data version dependencies, resource competition, cross-stage semantic consistency constraints, cross-stage event triggering, and external tool side effects. 3.The method according to claim 1, wherein, The verifiable task contract includes: an identifier field, a target field, a data field, a constraint field, an evidence field, a resource field, a permission field, a service field, and a recovery field; The verifiable task contract is formally defined as follows: (1) (1) wherein, represents a verifiable task contract; represents a task unique identification; represents a scenario phase; represents a target predicate; represents an input mode; represents an output mode; represents a precondition; represents a postcondition; represents an evidence constraint; represents a resource requirement vector; represents a permission set; represents a deadline; represents a service level; represents a compensating action; represents a rollback point.

4. The method of claim 1, wherein, The calculation process of the marginal utility quote is expressed by the following formula (2): (2) wherein, represents marginal utility offer; represents task service value; represents expected quality; represents deadline urgency; represents reliability; represents resource shadow price; represents expected delay; represents blocking penalty for critical successor tasks; represents model, context, or tool switching cost; represents execution risk; represents weight coefficient for task service value and expected quality product term; represents weight coefficient for deadline urgency term; represents weight coefficient for agent reliability term; represents expected demand of k-th type of resource when task i is assigned to agent j; represents expected delay penalty weight coefficient; represents critical successor task blocking penalty weight coefficient; represents model, context, or tool switching cost weight coefficient; represents execution risk penalty weight coefficient.

5. The method of claim 1, wherein, The conflicts include: resource conflicts, data version conflicts, semantic conclusion conflicts, permission conflicts, timing conflicts, and tool side effect conflicts. The resource conflict is determined as follows: multiple tasks request more GPUs, APIs, database connections, or manual seats than their capacity is available within an overlapping time window. The method for determining data version conflicts is as follows: the agent reads different versions of the same project material, or the old result overwrites the new result; The method for determining semantic conflict is as follows: different agents give opposite or incompatible judgments on the same atom claim; The method for determining permission conflicts is as follows: the plan requires the agent to access a data domain it does not have permission to access or to call an unauthorized tool; The timing conflict is determined by the following methods: the subsequent task is executed ahead of schedule, the deadline expires, or a loop of waiting occurs. The method for determining tool side effect conflicts is as follows: duplicate submission, duplicate sending, duplicate modification of external system status, or incorrect order of compensation actions.

6. The multi-agent task planning and resource lease arbitration method for exhibition and recruitment according to claim 1, characterized in that, The dual ledgers include: a resource shadow price ledger and a bounded lease ledger; The resource shadow price ledger stores the capacity, committed usage, forecasted demand, and shadow price of various resources in different time slices. The resource shadow price is a congestion cost that is dynamically updated based on the difference between forecasted resource demand and available capacity, and is used to represent the marginal impact of new resource consumption on the overall system objective. The bounded lease ledger stores the occupancy certificates of specific tasks for resources; a bounded lease is a temporary resource occupancy certificate with resource type, limit, holder, start time, expiration time, heartbeat cycle, renewal conditions, and recovery action.

7. The method of claim 1, wherein, The calculation process for the conflict priority is expressed by the following formula (3): (3) wherein, represents the conflict priority; represents the combined product of the impact, urgency, irreversibility, and risk of the conflict; represents the conflict repair cost plus a stability constant; represents the conflict to be handled; wherein The calculation process of the above formula (4) is represented by the following formula (5). (4) wherein, represents a normalized magnitude of the conflict impact range; represents a cutoff urgency; represents an irreversibility coefficient; represents a conflict risk coefficient; wherein, The calculation process of the above equation (5) is represented by the following equation (6). (5) wherein, represents the cost of conflict resolution; represents a positive stability constant that prevents the denominator from being zero.

8. A multi-agent task planning and resource lease arbitration device for exhibition marketing, the multi-agent task planning and resource lease arbitration device is used to realize the multi-agent task planning and resource lease arbitration method for exhibition marketing as claimed in any one of claims 1 to 7, characterized in that, The device includes: The task entry module is used to obtain the business objectives of the exhibition and investment promotion, including: rules of investment promotion activities, multimodal project materials, exhibition requirements, enterprise and park needs, task time limits, external tool interfaces, computing resource status and manual review resource status; The task contract generation module is used to convert the business objective into a verifiable task contract; wherein the task contract is a structured data object, including: target predicate, input-output pattern, preconditions, postconditions, evidence requirements, resource requirement vector, permission boundaries, and rollback actions; The hypergraph construction and hierarchical task planning module is used to construct a temporal-resource-semantic hypergraph, and based on the task contract, uses a constrained hierarchical task network to recursively decompose the composite tasks corresponding to the business objectives to generate a candidate plan family. The Capability Tensor Construction and Gating Filtering module is used to construct the capability tensor of each agent, perform feasibility gating filtering on task-agent combinations, exclude task-agent combinations that do not meet hard constraints, calculate the marginal utility quote for task-agent combinations that pass the feasibility gating, conduct resource arbitration through dual ledgers, and issue bounded leases to matching agents. The multi-agent execution and conflict detection module is used for multiple executing agents to execute tasks in parallel. It writes tool calls, evidence references, state changes, resource consumption, idempotent states and stage results into the event log; based on the event log, it identifies resource, data version, semantic conclusion, permission, timing and tool side effect conflicts, calculates conflict priority and solves the minimum repair set, executes repair actions within the local repair cone, and keeps unaffected tasks running. The evidence-weighted consensus module is used to perform evidence-weighted consensus on candidate conclusions output by multiple agents, and submit the results after checking the task contract satisfaction, permissions, timing, evidence relationships and idempotent state. The online calibration audit module is used to update the capability tensor, resource price, task method priority, and version record based on actual execution quality, latency, cost, and business feedback.

9. A multi-agent task planning and resource lease arbitration device for exhibition marketing, characterized in that, The multi-agent task planning and resource lease arbitration equipment for the competition and exhibition investment promotion includes: processor; A memory storing computer-readable instructions that, when executed by the processor, implement the method as described in any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that, The computer-readable storage medium stores program code that can be invoked by a processor to perform the method as described in any one of claims 1 to 7.