A data analysis driven geological exploration scheme intelligent optimization system
The data analysis-driven intelligent optimization system for geological exploration schemes solves the problem of traditional exploration schemes relying on experience, realizes adaptive scheme generation and conflict detection, improves the reliability and effectiveness of exploration schemes, and provides scientific indicators for multi-objective optimization.
Patent Information
- Application Number
- CN202611396243.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-09
- Publication Date
- 2026-11-24
AI Technical Summary
Traditional geological exploration scheme design relies heavily on personal experience, is highly subjective, difficult to quantify and promote, and is prone to resource and logical conflicts and technical conflicts when combining sub-schemes, making it impossible to achieve the globally optimal solution.
Design a data analysis-driven intelligent optimization system for geological exploration schemes. Through a task decomposition module, a sub-scheme extraction module, a scheme conflict detection module, and an intelligent scheme optimization module, the system utilizes a geological lineage database and an exploration scheme knowledge base to perform adaptive adjustments and multi-objective optimization to generate the optimal exploration scheme.
It achieves standardization, computability, and adaptability of exploration tasks, solves the problems of quantitative evaluation of exploration method knowledge and detection of technical conflicts, improves the technical reliability and information acquisition efficiency of the scheme, and provides scientific indicators for multi-objective optimization.
Smart Images

Figure CN123157791A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of data analysis technology, and more specifically, to a data analysis-driven intelligent optimization system for geological exploration schemes. Background Technology
[0002] Geological exploration is a complex and systematic project aimed at determining underground geological conditions and mineral resource endowments through a series of technical means. A complete exploration plan typically consists of multiple interconnected and mutually restrictive professional stages, such as regional geological surveys, geophysical exploration, geochemical exploration, drilling engineering, sample testing, and comprehensive research. Traditional geological exploration plan design relies heavily on the personal experience of the project leader and the collective deliberation of the expert team, representing a decision-making model based on experience and qualitative judgment. When dealing with complex exploration tasks, this model suffers from strong subjectivity that is difficult to quantify, difficulty in reusing and generalizing experience, and often only yields locally satisfactory solutions rather than globally optimal solutions.
[0003] Therefore, the industry has developed a consensus methodology of "decomposition and integration." This involves breaking down a macro-level exploration task into a series of relatively independent and clearly defined discrete steps according to technical logic. However, in the process of putting this methodology into digital and intelligent practice, there are still key bottlenecks. How to automatically and accurately extract the key performance indicators and multi-dimensional applicability conditions of sub-solutions from the massive amount of text and maps in the guidance solution library is a prerequisite for achieving intelligent and precise matching. Even if the theoretically optimal sub-solution is matched independently for each step, when combining them into a complete technical solution, resource and logical conflicts and technical and effect conflicts will still be faced.
[0004] Therefore, a data analysis-driven intelligent optimization system for geological exploration schemes is designed. Summary of the Invention
[0005] To overcome the aforementioned deficiencies of the prior art and to achieve the above objectives, the present invention provides the following technical solution: a data analysis-driven intelligent optimization system for geological exploration schemes, comprising: The task segment decomposition module is used to receive the exploration task information input by the user, decompose it into a basic segment sequence in combination with the geological lineage database, and make adaptive adjustments in combination with the YiYuan evaluation mechanism. The final determined exploration segment sequence generates a task profile vector based on the constraints. The sub-scheme extraction module, based on the final determined exploration sequence, generates a multi-dimensional attribute vector for each sub-scheme through the exploration scheme knowledge base; and constructs a combined retrieval structure, uses task profile vector retrieval to form a historical project cluster, analyzes the application effect of each sub-scheme, and generates corresponding historical effect evaluation vectors. Scheme Conflict Detection Module: Used to detect inherent technical conflicts between any two different sub-schemes in the set of all candidate sub-schemes, and to construct a global sub-scheme inherent conflict relationship network; Intelligent Scheme Optimization Module: The exploration area is divided into multi-level grid units. The incremental values of information are recorded according to the scheme category. Combined with total cost, total duration and effect indicators as multiple objectives, Pareto front analysis is performed to select the optimal geological exploration scheme.
[0006] Preferably, the method for generating the task profile vector includes: Based on the mineral type and spatial range of the exploration area information, historical mineral types and historical exploration area spatial ranges with the same characteristics are selected from the geological lineage database, thereby obtaining at least one preset exploration step breakdown template. The preset exploration step breakdown template is associated with the historical mineral type and historical exploration area spatial range, and has a pre-set step sequence arranged in the logical order of <regional survey—geophysical exploration—geochemical exploration—engineering—testing—comprehensive research>. Calculate the overall similarity between each selected preset disassembly template and the information of the exploration task to be tested, sort the templates according to the overall similarity, and select the template with the highest overall similarity as the basic step sequence; Based on the YiYuan evaluation mechanism, the basic process sequence is adaptively adjusted to generate the final exploration process sequence: The constraints include topographical conditions, existing work foundation, budget ceiling, construction period limit, available equipment and personnel resources; The finalized sequence of exploration steps is numerically encoded, the constraints are vectorized, and then the two are sequentially concatenated to form a task profile vector. The exploration task information includes the type of mineral, the spatial scope of the exploration area, topographical conditions, existing work foundation, budget limit, time constraints, available equipment and personnel resources.
[0007] Preferably, the method for adaptively adjusting the basic sequence of exploration stages based on the YiYuan evaluation mechanism to generate the final determined sequence of exploration stages includes: If complex terrain or important engineering facilities are identified in the exploration area, a "Geological and Environmental Special Assessment" sub-step is inserted before the "Engineering" sub-step in the basic step sequence. The criteria for judging complex terrain is that the average slope of the exploration area is greater than the preset slope threshold, and the criteria for judging important engineering facilities is that the facility layer and the exploration area have spatial intersection. For the required data of each sub-step in the basic process sequence, based on the existing work, retrieve all existing data records with the same spatial range and data type. Each existing data record includes its actual data precision and specific data coverage. Determine whether each retrieved existing data record meets the required data of the current sub-step, based on the following criteria: Condition 1: The existing data records completely cover the spatial area that needs to be covered; Condition 2: The precision of the existing data record is equal to or higher than the minimum data precision; If at least one existing data record satisfies the judgment condition, the corresponding sub-step is removed from the basic step sequence; otherwise, the sub-step is retained. The required data should include at least the type of data, the minimum required data precision, and the spatial range to be covered. Iterate through each sub-step in the basic step sequence to generate the final exploration step sequence.
[0008] Preferably, the method of numerically encoding the final determined sequence of exploration stages, vectorizing the constraints, and then sequentially concatenating the two to form a task profile vector includes: A blank N-dimensional subvector is pre-defined. Each possible sub-stage is assigned a position in the subvector. If the sub-stage is present in the exploration stage sequence, the corresponding position is marked as 1; otherwise, it is marked as 0. Simultaneously, each sub-stage marked as 1 is assigned a weight coefficient λ. (i-1) , where λ is a preset attenuation factor, i represents the index of the i-th sub-link, and the filled N-dimensional sub-vector is used as the sub-link feature sub-vector; The budget ceiling and time limit are normalized to values between 0 and 1; all equipment types are listed, with 1 for available equipment and 0 for others; the equipment is arranged in a fixed order by job type and grade, and the number of available personnel is recorded respectively; the terrain is categorized and coded; based on the data categories and data precision in the existing work base, the data is converted into an information completeness score of 0-1, and then concatenated to form a constraint sub-vector. The feature vector and constraint vector are concatenated to generate the task profile vector.
[0009] Preferably, the method for generating a multi-dimensional attribute vector for each sub-scheme and constructing a combined retrieval structure includes: Based on the final determined exploration sequence, a set of candidate sub-solutions corresponding to each sub-stage is obtained from the exploration scheme knowledge base; and each sub-solution entry includes its sub-stage, a predefined parameter configuration template, a historical application scenario marker indicating its applicable conditions, and its potential impact relationship identification information; among which, the potential impact relationship identification information is used to identify the possible conflicts or dependencies between the sub-solution and other sub-solutions. From the entry data of each sub-scheme, the detection depth, resolution, applicable lithology, minimum working scale, unit cost and construction time are extracted and quantified into a multi-dimensional attribute vector corresponding to each sub-scheme. The multi-dimensional attribute vectors of all sub-schemes are then mapped to a unified multi-dimensional attribute space to construct an index structure that supports multi-condition combination retrieval.
[0010] Preferably, the method of using task profile vector retrieval to form a historical project cluster, analyzing the application effects of each sub-solution, and generating corresponding historical effect evaluation vectors includes: Supported by the index structure, the task profile vector is matched with the geological lineage database. The matching method includes using the mineral type, spatial range and topographic conditions in the task profile vector as combined search conditions to retrieve several historical projects similar to it, forming a historical project cluster. The actual performance metrics of each sub-scheme when it was adopted in the historical project cluster; the performance metrics include at least the technical success rate, the size of the discovered ore body, the level of cost control, and the deviation from the schedule execution. Generate a historical performance evaluation vector for each sub-scheme under the current task profile vector.
[0011] Preferably, the method for detecting inherent technical conflicts between any two different sub-solutions in all candidate sub-solution sets and constructing a global sub-solution inherent conflict relationship network includes: Iterate through the multidimensional attribute vectors of any two different sub-solutions in the set of all candidate sub-solutions; when two sub-solutions are technically mutually exclusive, it is determined that they have an inherent technical conflict; among them, technical mutual exclusion includes at least chemical property mutual exclusion, physical principle mutual exclusion, and data flow mutual exclusion; All sub-solution pairs with inherent technical conflicts are compiled into a list. Each list entry records a sub-solution pair with inherent technical conflicts and its corresponding technical conflict type, thereby constructing a global sub-solution inherent conflict relationship network. The conflict relationship network includes creating an empty undirected graph, where each sub-solution is a node with a unique identifier. For each record in the list, the two corresponding node identifiers are found, and an undirected edge is added. The technical conflict type is numerically encoded and assigned as an attribute to the undirected edge. The conflict relationship network is stored in the format of a conflict matrix.
[0012] Preferably, the method for dividing the exploration area into multi-level grid units and recording incremental values of information according to the scheme category includes: Based on the spatial range in the task profile vector, the exploration area is divided into multi-level grid units; for each grid unit, its information completeness score is calculated as the baseline state value of that unit. For geophysical and geochemical sub-schemes, based on the detection depth and resolution in their multidimensional attribute vectors, their theoretical effective detection range is simulated, and a potential information increment value is calculated and recorded for each affected grid cell within the range. For drilling and engineering sub-schemes, based on the engineering layout points and their influence radii defined in their multidimensional attribute vectors, a direct exposure information increment value is calculated and recorded for each grid cell within the influence radius. When evaluating a complete exploration plan consisting of multiple sub-plans, the incremental values of each sub-plan are retrieved; according to the final determined sequence of exploration steps, the incremental values of each sub-plan for the same grid cell are virtually superimposed. Based on the virtual overlay results, the total information content after the virtual growth of all grid cells is calculated to obtain the overall new information content of the scheme.
[0013] Preferably, the process of obtaining the information completeness score is as follows: For each existing data category, scores are assigned based on two dimensions: spatial coverage and data precision level. The basic completeness of a single data category is calculated as: Spatial Coverage × Data Precision Level. Spatial coverage refers to the proportion of grid cells effectively covered by this data category out of the total number of grid cells. Data precision level is a quality coefficient between 0 and 1. The weighted comprehensive completeness is calculated as: Σg(Basic Completeness_g × W_g), where basic completeness_g represents the basic completeness of the g-th single data category, and W_g represents the weight of the g-th single data category. Therefore, the final information completeness score is calculated as: Weighted Comprehensive Completeness × Time-Release Coefficient.
[0014] Preferably, the method for selecting an optimal geological exploration scheme includes: Input the set of candidate sub-schemes for each exploration sub-stage, and exhaustively combine the candidate sub-schemes for each stage according to the order of the final determined exploration stage sequence to generate an initial complete set of candidate exploration schemes; Based on the inherent conflict relationship network of sub-schemes, identify whether there are sub-scheme pairs with inherent technical conflicts in the same candidate exploration scheme. If they exist, delete them from the entire set of candidate exploration schemes to obtain a set of feasible schemes that have been pre-screened for conflicts. Obtain the total amount of new information, total cost, and total duration for each feasible solution from the set of feasible solutions; and extract the average vector of the historical effect evaluation vectors of all sub-solutions in the solution to obtain an effect index; The Pareto front analysis was conducted using the total amount of new information, total cost, total duration, and performance indicators as multiple objectives; a final Pareto non-dominated scheme was selected as the optimal geological exploration scheme output.
[0015] The technical effects and advantages of the data analysis-driven intelligent optimization system for geological exploration schemes of this invention are as follows: By constructing task profiles and using dynamic decomposition mechanisms, the problems of traditional scheme design relying on personal experience, being highly subjective, and being difficult to adapt to specific situations are solved. This achieves the standardization, computability, and adaptability of exploration task understanding. By combining exploration task information with the geological lineage database, a digital entity for exploration tasks is created. The EasyElement evaluation mechanism can dynamically add or delete links, ensuring that the scheme design closely fits the actual geological and engineering environment from the very beginning.
[0016] By designing a structured and quantitative evaluation system for sub-schemes, this approach addresses the problem of exploration method knowledge being scattered across unstructured documents such as reports and specifications, making it difficult to effectively utilize and quantify. It achieves knowledge-driven and evidence-driven selection of exploration technologies, quantifying the technical performance, applicability, and historical performance of each method. Scheme optimization is no longer based on vague empirical descriptions but on searchable and comparable quantitative data, shifting the decision-making basis from approximate possibilities to data-driven evidence.
[0017] By employing an inherent technical conflict detection network within the design phase, this approach addresses the industry pain point of traditional design methods, which struggle to anticipate and avoid hidden technical interferences (such as chemical contamination and data incompatibility) between different exploration methods. It achieves pre-emptive security and inherent compatibility of solution combinations at the technical principle level. It can automatically identify and prevent the combination of sub-solutions with fundamental technical conflicts before solution combinations are generated. This eliminates solution defects caused by technical principle conflicts at the source, significantly improving the technical reliability of recommended solutions.
[0018] By designing a gridded coverage contribution, this approach addresses the challenges of traditional scheme evaluation methods, such as the difficulty in quantifying the contribution of each method to the incremental information in the exploration area and the inability to accurately measure redundancy. It achieves spatial visualization and precise quantification of the scheme's information acquisition effectiveness. This upgrades scheme evaluation from qualitative judgment to quantitative measurement, providing crucial scientific indicators for multi-objective optimization. Attached Figure Description
[0019] Figure 1 This is a schematic diagram of the data analysis-driven intelligent optimization system for geological exploration schemes according to the present invention. Figure 2 This is a schematic diagram illustrating the generation of the final exploration sequence determined in this invention. Detailed Implementation
[0020] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0021] Please see Figure 1 and Figure 2 In this embodiment of the invention, a data analysis-driven intelligent optimization system for geological exploration schemes includes: Although the industry has developed a consensus methodology of "decomposition and integration"—that is, breaking down a macro-level exploration task into a series of relatively independent and clearly defined discrete steps according to technical logic—for each step, the industry has accumulated a rich "knowledge base" through long-term practice. This knowledge base includes a library of predictive guidance solutions for different geological targets, geographical environments, and technical conditions (for example, in the "geophysical exploration" step, for finding deep concealed metal ore bodies, the knowledge base may recommend multiple sub-solutions such as "high-power induced polarization sounding" and "wide-area electromagnetic method"). This method reduces the dimensionality of complex problems, allowing experts to focus on technical decisions for individual steps.
[0022] However, key bottlenecks remain in applying this methodology to digital and intelligent practices. A prerequisite for achieving intelligent and precise matching is the ability to automatically and accurately extract key performance indicators and multi-dimensional applicability conditions (such as terrain slope requirements, climate limitations, and minimum work scale) from the massive amounts of text and maps in the guidance scheme library. Even if each stage independently matches the theoretically optimal sub-scheme, combining them into a complete technical solution still faces resource and logical conflicts (schemes at different stages may compete for equipment, personnel, and budget, or create logical contradictions in construction sequence (e.g., certain measurements must be completed before drilling)) and technology and effect conflicts (a more implicit problem is the cancellation or interference of geological effects. For example, a certain geochemical method may react chemically with specific drilling fluid additives, leading to sample contamination; or the data processing workflows of two geophysical methods may be incompatible, making effective joint inversion impossible. Existing knowledge bases are mostly "siloed," lacking a "conflict rule base" describing the horizontal correlations and constraints between schemes, making it difficult to anticipate and avoid these risks during automatic combination).
[0023] Based on this, the specific design is as follows: The task segment decomposition module is used to receive the exploration task information input by the user, decompose it into a basic segment sequence in combination with the geological lineage database, and make adaptive adjustments in combination with the YiYuan evaluation mechanism. The final determined exploration segment sequence generates a task profile vector based on the constraints. The sub-scheme extraction module, based on the final determined exploration sequence, generates a multi-dimensional attribute vector for each sub-scheme through the exploration scheme knowledge base; and constructs a combined retrieval structure, uses task profile vector retrieval to form a historical project cluster, analyzes the application effect of each sub-scheme, and generates corresponding historical effect evaluation vectors. Scheme Conflict Detection Module: Used to detect inherent technical conflicts between any two different sub-schemes in the set of all candidate sub-schemes, and to construct a global sub-scheme inherent conflict relationship network; Intelligent Scheme Optimization Module: The exploration area is divided into multi-level grid units. The incremental values of information are recorded according to the scheme category. Combined with total cost, total duration and effect indicators as multiple objectives, Pareto front analysis is performed to select the optimal geological exploration scheme.
[0024] Methods for generating task profile vectors include: Based on the mineral type and spatial range of the exploration area information, historical mineral types and historical exploration area ranges with the same characteristics are selected from the geological lineage database, thereby obtaining at least one preset exploration step breakdown template. The preset exploration step breakdown template is associated with the historical mineral type and historical exploration area spatial range, and has a pre-set step sequence arranged in the logical order of <regional survey—geophysical exploration—geochemical exploration—engineering—testing—comprehensive research>. Regional surveys refer to field and laboratory studies that preliminarily determine the stratigraphy, structure, igneous rock characteristics and metallogenic background of a region, such as 1:50,000 regional geological mapping. Geophysical exploration refers to exploration techniques that apply the principles of physics to detect differences in the physical fields of underground geological bodies, such as high-precision magnetic surveying and induced polarization gradient surveying. Geochemical exploration refers to the technique of systematically measuring the content of geochemical elements in natural materials in order to discover anomalies related to mineralization, such as soil geochemical measurement and rock geochemical measurement. Engineering refers to exploration methods that use mechanical means to reveal and verify underground geological bodies and mineralization phenomena, such as drilling, trenching, and shallow wells; Testing refers to the technical process of conducting physical and chemical analyses on collected samples to determine their composition and properties, such as rock and mineral identification and multi-element chemical analysis. Comprehensive research refers to the work of integrating and analyzing various types of exploration data, summarizing metallogenic regularities, estimating resource quantities, and compiling exploration reports, such as three-dimensional geological modeling and mineral resource potential evaluation; The comprehensive similarity between each selected preset disassembly template and the information of the exploration task to be tested is calculated, and the templates are sorted according to the comprehensive similarity. The template with the highest comprehensive similarity is selected as the basic step sequence. The comprehensive similarity is calculated by calculating the semantic similarity between the mineral type and the historical mineral type in the preset disassembly template, and the spatial overlap between the spatial range of the target exploration area and the spatial range of the historical exploration area in the preset disassembly template (the spatial overlap refers to the ratio of the intersection area and the union area of the geometric objects of two spatial ranges). The semantic similarity and spatial matching degree are weighted and summed to obtain the comprehensive similarity. The weight allocation is based on the statistical regression analysis of historical successful matching cases. Typically, the semantic similarity weight is set to 0.4 and the spatial overlap weight is set to 0.6. Based on the YiYuan evaluation mechanism, the basic process sequence is adaptively adjusted to generate the final exploration process sequence: The constraints include topographical conditions, existing work foundation, budget ceiling, construction period limit, available equipment and personnel resources; The finalized sequence of exploration stages is numerically encoded, the constraints are vectorized, and then the two are sequentially concatenated to form a unified task profile vector that represents the full-dimensional needs and constraints of the current task. The exploration task information includes the type of mineral, the spatial scope of the exploration area, topographical conditions, existing work foundation, budget limit, time constraints, available equipment and personnel resources.
[0025] Mineral type refers to the specific type of mineral resources to be sought in this exploration work, as defined in the national "Detailed Classification of Mineral Resources" or industry standards. Examples include: metallic minerals (such as gold, copper, and lithium), non-metallic minerals (such as fluorite and graphite), and energy minerals (such as uranium and geothermal energy), which are identified by standardized codes or names.
[0026] The spatial extent of an exploration area refers to a polygonal region enclosed by a set of closed geographic coordinates (such as latitude and longitude), or a circular region defined by the coordinates of its center point and its radius. This extent is represented by spatial geometric objects (such as WKT format) and associated with its administrative divisions, tectonic units, and metallogenic belts.
[0027] Topographic and geomorphological conditions refer to the digital description of the surface morphology and characteristics of the exploration area. They mainly include: topographic slope classification (e.g., plains <5°, hills 5-15°, mountains >15°), geomorphological type (e.g., karst landforms, glacial landforms, loess landforms), surface cover (e.g., vegetation, water bodies, glaciers, buildings), and the distribution of "obstacles" (e.g., cliffs, rivers, settlements, important infrastructure).
[0028] Existing work foundation refers to the collective term for all types of geological work and their results data that have been completed and submitted within the target exploration area. This includes, but is not limited to: regional geological maps at different scales, geophysical exploration data (aeromagnetic, gravity, etc.), geochemical exploration data (soil and rock measurements), mineral inspection reports, borehole data, and sample test results, along with corresponding work accuracy, completion year, and reliability evaluation.
[0029] The budget ceiling refers to the maximum amount of funding approved to complete this exploration task, expressed in RMB or another agreed-upon currency. It serves as a constraint parameter for cost calculation and selection during the scheme optimization phase.
[0030] Schedule constraints refer to the total time required from project initiation to report submission, typically measured in months or days. They are also used as constraints to estimate the cumulative time required for different combinations of exploration phases.
[0031] Available equipment refers to the list of exploration instruments and equipment currently available for this project, along with their status. For example: the model, quantity, availability, and expected available time window for geophysical equipment (high-power induced polarization instrument, transient electromagnetic instrument), geochemical equipment (field spectrometer, sampling tools), and drilling equipment (core drilling rig, multi-functional drilling rig).
[0032] Available personnel resources refer to the professional and technical personnel and their skill configuration that can be invested in this project. This includes: the number of engineers, skill levels, qualification certificates, and expected number of working months in each specialty (geology, geophysics, geochemistry, drilling, and laboratory), which constitute the human resource constraint vector.
[0033] Based on the YiYuan evaluation mechanism, methods for adaptively adjusting the basic process sequence to generate the final exploration process sequence include: If complex terrain or important engineering facilities are identified in the exploration area, a "Geological and Environmental Special Assessment" sub-step is inserted before the "Engineering" sub-step in the basic step sequence. The criteria for judging complex terrain is that the average slope of the exploration area is greater than a preset slope threshold (which can be set to 25° according to the industry standard "General Safety Specifications for Geological Exploration Operations"). The criteria for judging important engineering facilities (including railways, reservoirs, pipelines, etc.) is that the facility layer and the exploration area have spatial intersection (e.g., the reservoir intersects with the permanent basic farmland layer). The average slope and facility layer are accessed through the platform interface by calling the digital elevation model and the vector layer of the important engineering facilities within the spatial range of the target exploration area. The purpose of this technique is to identify the relevant sub-step during subsequent conflict detection and automatically load associated additional constraint rules (e.g., prohibiting the initiation of subsequent projects until this step is completed and safety is confirmed), thereby influencing the selection and optimization of subsequent project sub-schemes and demonstrating the logical linkage between modules. Geological and environmental special assessments refer to independent work steps for complex terrain and sensitive areas, involving stability evaluation, environmental impact prediction, and social risk assessment. These are conducted by qualified engineering geology and environmental geology professional teams through on-site investigation, simulation calculations, and report preparation.
[0034] For the required data of each sub-step in the basic sequence, in the existing working foundation of the geological lineage database, all existing data records with the same spatial range and data type are retrieved. Each existing data record includes its actual data accuracy and specific data coverage. Each retrieved existing data record is then judged to determine whether it meets the required data of the current sub-step. The judgment criteria include: Condition 1: The existing data records completely cover the spatial area that needs to be covered; Condition 2: The precision of the existing data record is equal to or higher than the minimum data precision; If at least one existing data record simultaneously meets the judgment condition, it is determined that the data requirement of the current exploration sub-stage has been satisfied by the existing work foundation, and the corresponding sub-stage is deleted from the basic stage sequence; otherwise, the sub-stage is retained. The required data includes at least the required data type (data type refers to the data category classified according to the "Geological Information Classification and Coding Standard"), the minimum required data accuracy, and the spatial range to be covered; and is pre-defined and bound to each sub-stage.
[0035] Iterate through each sub-step in the basic step sequence to generate the final exploration step sequence; The geological lineage database is a structured knowledge base that stores the "task-stage-outcome" triple relationships of historical exploration projects. Each record associates a completed exploration project, its related exploration task information, the final adopted stage decomposition sequence (which will be used as a preset exploration stage decomposition template for new tasks and is associated with corresponding existing data records), and the project's outcomes (such as the size of the discovered ore body and cost efficiency).
[0036] Example: Recorded in the information of the exploration task to be surveyed: Mineral type: Gold mine.
[0037] Spatial extent of the exploration area: a polygonal region located in the mountainous area of western Hunan.
[0038] Topographical and geomorphological conditions: The exploration area is divided into steep mountainous areas with an average slope of 30°.
[0039] Important engineering facilities: According to the overlay analysis of the geographic information system (GIS), there is a spatial overlap between the southern part of the exploration area and the protected area of a medium-sized reservoir.
[0040] Existing work foundation: A 1:50,000 regional geological survey and a 1:25,000 soil geochemical survey have been completed in this exploration area.
[0041] Based on the gold mine and its spatial extent, the most similar historical project templates are matched from the geological lineage database to generate a basic sequence of steps, such as: <Geological regional survey—Geophysical exploration—Geochemical exploration—Engineering (drilling)—Testing—Comprehensive research>; The YiYuan evaluation mechanism will be activated to adjust this basic process sequence: The average slope of the survey area is 30°. Compared with the preset slope threshold of 25°, since 30° > 25°, it is determined that there is complex terrain. By performing spatial overlay analysis between the facility layer and the exploration area, it was found that the reservoir protection area and the exploration area overlap in space, thus indicating the presence of important engineering facilities. If any of the above conditions are met, the system will automatically insert the <Geological and Environmental Special Assessment> sub-stage before the <Engineering (Drilling)> sub-stage in the basic stage sequence; The adjusted sequence is <Geological Regional Survey—Geophysical Exploration—Geochemical Exploration—Geological and Environmental Special Assessment—Engineering (Drilling)—Testing—Comprehensive Research>. The system then iterates through the adjusted sequence to check whether the required data for each sub-step has been met by existing work. Taking the <Geological Regional Survey> sub-step as an example, its required data is: a 1:50,000 regional geological map (data type), covering the entire exploration area (spatial range), with an accuracy of not less than 1:50,000 (minimum data accuracy).
[0042] Searching the existing work, we found an existing data record. Its data type is a regional geological map, the data coverage area completely covers the exploration area, and the data accuracy is 1:50,000.
[0043] Judgment conditions: If both conditions 1 and 2 are met, the requirement for this step has been satisfied. Therefore, the <Geological Regional Survey> sub-step is removed from the sequence.
[0044] After traversing and judging all sub-steps, assume the final determined sequence of exploration steps is generated as follows: <Geological Regional Survey—Special Geological and Environmental Assessment—Engineering (Drilling)—Testing—Comprehensive Study>.
[0045] The method of numerically encoding the finalized sequence of exploration stages, vectorizing the constraints, and then sequentially concatenating the two to form a task profile vector includes: A blank N-dimensional subvector is pre-defined (N being the number of all possible exploration stages). Each possible sub-stage is assigned a position within this subvector. If the exploration stage sequence contains that sub-stage, the corresponding position is marked as 1; otherwise, it is marked as 0. The purpose of this step is to determine which exploration sub-stages are included in the final determined exploration stage sequence. Simultaneously, each sub-stage marked as 1 is assigned a weight coefficient λ. (i-1) , where λ is a preset decay factor, 0 < λ ≤ 1, and i represents the index of the i-th sub-stage. The weight coefficient adopts exponential decay weight encoding, not only to determine the order of each sub-stage in the sequence based on its weight, but also because exponential decay weight plays an irreplaceable role in subsequent scheme optimization. The padded N-dimensional sub-vector is used as the stage feature sub-vector; The budget ceiling and time limit are normalized to values between 0 and 1; all equipment types are listed, with available equipment assigned a value of 1 and otherwise 0; equipment is arranged in a fixed order by job type and level, and the number of available personnel is recorded accordingly; terrain is categorized and coded, for example, plains = 1, hills = 2, mountains = 3, etc., mapping text to numbers. Based on the data categories and precision in the existing work, an information completeness score of 0-1 is generated, and then concatenated to form a constraint sub-vector; By concatenating the feature vectors and constraint vectors, a unified task profile vector is generated that represents the full-dimensional requirements and constraints of the current task.
[0046] The normalization of the budget ceiling is achieved by dividing the actual value by a preset baseline budget. For example, if the budget is 10 million yuan and the construction period is limited to a maximum of 12 months, normalization is achieved by dividing the actual value by a baseline construction period (such as 24 months), which is then converted into a value between 0 and 1.
[0047] Based on the finalized exploration sequence, a method for generating multi-dimensional attribute vectors for each sub-scheme using an exploration scheme knowledge base and constructing a combined retrieval structure includes: Based on the finalized exploration sequence, the system retrieves a set of candidate sub-solutions for each sub-stage from the exploration scheme knowledge base. Each sub-solution entry includes its corresponding sub-stage, a predefined parameter configuration template, historical application scenario markers indicating its applicability, and potential impact relationship information. The exploration scheme knowledge base uses historical project technical solutions, industry technical specifications, typical project reports, and expert experience documents as data sources. These are organized by personnel into structured entries and stored in a database. Specifically, each sub-solution entry in the knowledge base is pre-labeled with its corresponding sub-stage, with the type corresponding to the sub-stage. By matching the sub-stage name with the sub-stage, the system can filter out all candidate sub-solutions applicable to that stage, forming a candidate sub-solution set.
[0048] Predefined parameter configuration templates refer to a series of standardized technical parameter forms that need to be filled in or selected when implementing a sub-scheme. For example, for a scheme corresponding to a drilling engineering sub-stage, its template may be configured with borehole diameter, design depth, core sampling rate requirements, casing procedures, etc.
[0049] Historical application scenario markers are used to indicate in which types of geological tasks the sub-scheme has been applied in the past. For example, it may be marked as "suitable for sedimentary sandstone uranium exploration" or "suitable for hilly terrain gold prospecting".
[0050] Potential impact relationship identification information is used to identify potential conflicts or dependencies between this sub-scheme and other sub-schemes. For example, there is a risk of geochemical sample contamination with the drilling sub-scheme using bentonite slurry, or the sub-scheme must be implemented before the drilling sub-scheme.
[0051] From the entry data of each sub-scheme, the detection depth, resolution, applicable lithology, minimum working scale, unit cost and construction time are extracted and quantified into a multi-dimensional attribute vector corresponding to each sub-scheme. The multi-dimensional attribute vectors of all sub-schemes are then mapped to a unified multi-dimensional attribute space to construct an index structure that supports multi-condition combination retrieval.
[0052] The detection depth refers to the maximum vertical depth to which the exploration method used in this sub-scheme can effectively detect or reveal underground geological bodies, usually measured in meters (m). For example, the detection depth of a certain type of induced polarization sounding method is 300m.
[0053] Resolution refers to the scale of the smallest geological anomaly that the exploration method used in the sub-scheme can identify or distinguish, and is divided into vertical resolution and lateral resolution. For example, the vertical resolution of a certain seismic exploration method can reach 10m.
[0054] Applicable lithology refers to the sensitivity or applicability limitations of the exploration methods used in this sub-scheme to the lithology (such as limestone, granite, clay) of the surrounding rock or target body. It is usually represented by a list of lithology categories.
[0055] Minimum work scale refers to the minimum amount of work required to achieve the basic technical effect when implementing the exploration method used in this sub-scheme, such as the minimum survey line length (km), the minimum number of sampling points (units), or the minimum exploration area (km²).
[0056] Unit cost: refers to the cost estimate corresponding to the standardized unit workload of implementing the sub-plan, such as "cost per kilometer of survey line (yuan / km)" or "cost per meter of drilling (yuan / m)".
[0057] Construction duration refers to the average time required to complete a standard unit of work, such as "5 kilometers of survey lines can be completed per day" or "each drilling rig advances 300 meters per month".
[0058] Quantification of the multidimensional attribute vector corresponding to each sub-scheme refers to converting all indicators into numerical values. Qualitative indicators (such as applicable lithology) are converted into a set of 0 or 1 values through unique thermal coding; quantitative indicators (such as detection depth of 500m) are directly used or normalized. All numerical values are assembled into a one-dimensional array according to a preset dimensional order (e.g., [detection depth, resolution, lithology code 1, lithology code 2, ..., minimum work scale, unit cost, construction time]), which is the multidimensional attribute vector of the sub-scheme.
[0059] Each sub-solution's multi-dimensional attribute vector is treated as a point in a multi-dimensional coordinate system. All points from the sub-solutions collectively form and map to a unified multi-dimensional attribute space. Using the multi-dimensional attribute vectors of all sub-solutions as input data points, an index building algorithm (such as R-Tree's batch loading algorithm) is invoked to automatically generate a tree-shaped index. Each node in the tree represents a hyperrectangular region in the attribute space, and leaf nodes store the specific multi-dimensional attribute vectors of the sub-solutions. When a multi-condition combined query is initiated, the query conditions are transformed into a query range box in the attribute space. The index structure can quickly exclude a large number of nodes that are not within the box, traversing only branches that may fall within the box, thereby greatly improving retrieval efficiency and achieving second-level multi-dimensional filtering of quantum solutions.
[0060] Methods for leveraging task profile vector retrieval to form historical project clusters, analyzing the application effects of each sub-solution, and generating corresponding historical effect evaluation vectors include: Supported by the index structure, the task profile vector is matched with the geological lineage database. The matching method includes using mineral type, spatial extent, and topographical conditions from the task profile vector as combined search criteria to retrieve several similar historical projects, forming a historical project cluster. Here, similarity is defined as the weighted sum of mineral type similarity, topographical condition similarity, and spatial extent similarity. The weights are pre-set before calculation and can be determined using historical data. Topographical condition similarity is based on its category code, such as: plains=1, hills=2, mountains=3. If the categories are the same, the similarity is 1.0; if the categories are adjacent, the similarity is 0.5; otherwise, it is 0. Spatial extent similarity uses spatial overlap as the calculation value. The quantitative value of mineral type similarity is obtained as follows: Level 1: If two minerals are completely identical, then the similarity is 1.0, such as gold mine and gold mine.
[0061] Level 2: Based on the first or second level classification in the national "Detailed Classification of Mineral Resources", if two mineral types do not belong to Level 1 but belong to the same basic category, then the similarity = 0.6. For example, sandstone-type uranium deposits and mudstone-type uranium deposits both belong to the uranium deposit category. Level 3: If the first, second, and fourth levels are not met, the similarity is 0.3. Level 4: If two minerals belong to basic categories that do not interfere with each other, then the similarity is 0, such as gold mines and copper mines.
[0062] The actual performance indicators of each sub-scheme when it was adopted in the historical project cluster; the performance indicators include at least the technical success rate (the percentage of technical projects actually completed out of the preset technical projects), the size of the discovered ore body, the cost control level (the ratio of the average unit cost in actual execution to the budgeted unit cost in the project design), and the schedule execution deviation (the ratio of the average schedule actually consumed to the planned schedule); the four values are concatenated to generate the historical performance evaluation vector of each sub-scheme in the specific task context represented by the current task profile vector. This vector is used to represent the expected performance and risks of the sub-scheme in subsequent scheme optimization.
[0063] When performing conflict detection on various sub-schemes, in a traditional linear workflow, if resources are released and reacquired sequentially, conflicts between different schemes within the same stage seem unimportant because only one will ultimately be selected. However, in actual engineering, resources (especially expensive or scarce specialized equipment and highly skilled personnel) are often not infinitely reusable. They may have maintenance cycles, scheduling gaps, or be shared by multiple stages within the project cycle. Moreover, scheme conflicts are not limited to resource conflicts but also include technical effect conflicts, such as the incompatibility between geochemical methods and drilling flushing fluids (geochemical method A requires the use of cyanide reagents, while drilling flushing fluid B contains acidic components; their interaction will inevitably lead to a dangerous chemical reaction. This conflict is inherent to the scheme. Even if the two schemes belong to different stages, as long as they are combined in the same final exploration scheme, this inherent conflict will cause the entire scheme to fail. Therefore, schemes with inherent conflicts must be marked before combination to prevent them from being selected simultaneously). This conflict is an inherent technical attribute of the scheme and is unrelated to the execution order. Therefore, conflict detection here is hierarchical, including technical compatibility checks of various sub-solutions within the same stage, as well as resource scheduling feasibility checks across stages.
[0064] Iterate through the multidimensional attribute vectors of any two different sub-schemes in the set of all candidate sub-schemes; when two sub-schemes are technically mutually exclusive, it is determined that they have an inherent technical conflict; where technical mutual exclusion refers to a fundamental incompatibility defined by domain knowledge that is unrelated to the execution sequence or resource allocation of the scheme, including at least chemical property mutual exclusion (e.g., used to determine that the reaction between the reagents used in a specific geochemical method and the components of a specific drilling flushing fluid will cause sample contamination or failure), physical principle mutual exclusion (e.g., used to determine that the field source excitation methods of two geophysical methods interfere with each other, resulting in signal shielding or data distortion), and data flow mutual exclusion (e.g., used to determine that the data processing flow and parameter standards of two methods are incompatible, resulting in the inability to effectively combine or comprehensively interpret their results); A list is created of all sub-scheme pairs with inherent technical conflicts. Each entry in the list records a sub-scheme pair with inherent technical conflicts and its corresponding technical conflict type, thus constructing a global sub-scheme inherent conflict relationship network. This network serves as a mandatory constraint during the subsequent exploration scheme combination generation and optimization process: it prohibits combining any sub-scheme pair with inherent conflicts into the same complete exploration scheme. The conflict relationship network involves creating an empty undirected graph, where each sub-scheme is a node with a unique identifier. For each record in the list, its two corresponding node identifiers are found, and an undirected edge is added. The technical conflict type is numerically encoded (e.g., chemical property mutual exclusion = 100, physical principle mutual exclusion = 010, data flow mutual exclusion = 001, etc.) and assigned as an attribute to the undirected edge. The conflict relationship network is stored in the format of a conflict matrix M. Specifically, an F×F Boolean matrix is created (F is the total number of sub-solutions). If the element M[a][b] = true in the matrix, it indicates that sub-solution a and sub-solution b conflict. This method can quickly determine whether any two sub-solutions conflict, and the query speed is extremely fast.
[0065] Based on the spatial extent of the task profile vector, the exploration area is divided into multi-level grid units. It's important to note that a standard spatial grid coding system (such as a latitude and longitude grid) can be used, and a suitable baseline grid scale can be selected. For example, for an exploration area of approximately 100 square kilometers, a grid with a side length of 1 kilometer (or 500 meters) might be chosen as the baseline level. Starting from the selected baseline level grid, the spatial extent is recursively subdivided. If the terrain within a certain grid unit is complex, further subdivision is performed until none of the grids meet the criteria for complex terrain. This ultimately forms a multi-level grid system, which allows large grids to carry macroscopic information while smaller grids are used for fine-grained characterization of key areas. Each grid unit is assigned a unique spatial code, which implicitly contains its geographical location and hierarchical information. The purpose of gridding here is not only to transform the continuous and difficult-to-calculate geological space into a series of discrete and assignable computational units, but also to enable the coverage of sub-schemes to be accurately calculated (i.e., which units are affected), to clearly determine whether different sub-schemes have repeatedly investigated the same unit in space, and to provide intuitive indicators for subsequent optimization, such as the merits of Scheme 1 and Scheme 2, which can be judged by the set of grids they affect.
[0066] For each grid cell, its information completeness score is calculated and used as the baseline state value S_x for that cell; where, when determining the spatial coverage of the cell, there is only one option: 1 or 0.
[0067] For geophysical and geochemical sub-schemes, based on the detection depth and resolution R in their multidimensional attribute vectors, their theoretical effective detection range is simulated (specifically, a three-dimensional geometric body used to characterize the effective influence space of its physical or chemical field; for example, in aeromagnetic and regional geochemical exploration, the theoretical effective detection range is a plate extending downward from the surface, the projection of this plate onto the plane has a depth of SD, and is composed of a distance of R / 2 extending outward from the layout of measuring points, indicating that each measuring point can effectively distinguish anomalies within its surrounding R / 2 range; for example, in electrical sounding, the theoretical effective detection range is a strip laid out along the survey line with a width of L and a lower limit of depth of TD). For each affected grid cell within the range, a potential information increment value = α × (1 - S_x) × exp(-d_i ÷ R) is calculated and recorded, where α is the information contribution coefficient, which is a constant preset according to the sub-scheme type, and d_i is the distance from the center of the grid cell to the nearest measuring point or survey line;
[0068] For drilling and engineering sub-schemes, based on the engineering layout points (such as borehole coordinates and trench endpoints) defined in their multidimensional attribute vectors and their influence radius r (an empirical parameter characterizing the spatial influence range of the engineering point's exposure effect, such as the influence radius of a core borehole: 50 meters), a direct exposure information increment value = β × (1 - S_x) × (1 - d_j ÷ r) is calculated and recorded for each grid cell within the influence radius. β is the exposure quality coefficient, a preset constant that reflects the reliability of the engineering exposure information, such as β = 0.8 for core boreholes and β = 0.5 for hydrological observation wells. d_j is the distance from the center of the grid cell to the engineering point.
[0069] When evaluating a complete exploration plan consisting of multiple sub-plans, the pre-calculated incremental values for all grid cells in each sub-plan are retrieved (here, the incremental value is a two-dimensional mapping table: incremental value [sub-plan ID][grid cell ID] = numerical value. For geophysical and geochemical sub-plans, this value is the potential information incremental value; for drilling and engineering sub-plans, this value is the direct exposure information incremental value). Following the final determined sequence of exploration stages, the incremental values of each sub-plan for the same grid cell are virtually superimposed in memory (the purpose is to evaluate the overall effect of the plan combination without modifying the grid cell baseline values). (Specifically, for the plan combination being evaluated, the incremental value mapping table for each sub-plan is retrieved, and for the same grid cell, the incremental values of all sub-plans in this combination for that cell are summed. All calculations are performed in memory variables, and the baseline state value of the grid cell remains unchanged, thus supporting rapid, parallel evaluation of massive plan combinations.)
[0070] Based on the virtual overlay results, the total information content after the virtual growth of all grid cells is calculated to obtain the overall new information content of the scheme.
[0071] The process of obtaining the information completeness score is as follows: For each existing data category (e.g., geological maps, geophysical exploration, geochemical exploration), scores are assigned based on two dimensions: spatial coverage and data accuracy level. The basic completeness of a single data category = spatial coverage × data accuracy level. Spatial coverage refers to the proportion of grid cells effectively covered by this data category out of the total number of grid cells. Data accuracy level refers to a quality coefficient between 0 and 1, preset according to industry standards, for data of different accuracies; the higher the accuracy, the closer the coefficient is to 1. Example of preset values: P=1.0: Large-scale data (greater than 1:50,000); P=0.7: Data at small to medium scales (1:200,000 to 1:50,000); P=0.4: Small-scale data (1:200,000 to 1:700,000 range); P=0.1: Extremely low precision data (less than 1:700,000 range); Different data categories have different values for exploration and need to be assigned different weights W. Therefore, a data category-weight rule mapping table is preset. During calculation, the weight of each data category is read. Then, the weighted comprehensive completeness S = Σg(basic completeness_g × W_g), where basic completeness_g represents the basic completeness of the g-th single data category, and W_g represents the weight of the g-th single data category read from the data category-weight rule mapping table. Data has time sensitivity, and the reliability of old data will decrease. However, geological exploration itself is a very long-term cycle. Therefore, the collected data is also long-term data accumulated over many years. Therefore, a time-sensitivity decay coefficient needs to be introduced, defined as: Time-sensitivity decay coefficient T = e^(-u × data age), where u is the decay rate constant (e.g., set to 0.1, indicating an annual decay of about 10%). The data age is in years, represented by the number of years since the most recent update of all data. Therefore, the final information completeness score = weighted comprehensive completeness S × time-sensitivity decay coefficient T.
[0072] Input the set of candidate sub-schemes for each exploration sub-stage, and exhaustively combine the candidate sub-schemes for each stage according to the order of the final determined exploration stage sequence to generate an initial complete set of candidate exploration schemes; Based on the inherent conflict relationship network of sub-schemes, identify whether there are sub-scheme pairs with inherent technical conflicts in the same candidate exploration scheme. If they exist, delete them from the entire set of candidate exploration schemes to obtain a set of feasible schemes that have been pre-screened for conflicts. Obtain the set of feasible solutions, including the total amount of new information, total cost (the sum of unit costs of all sub-solutions in the solution), and total construction period (the sum of construction time of all sub-solutions in the solution) for each solution; and extract the average vector of the historical effect evaluation vectors of all sub-solutions in the solution to obtain an effect index; the effect index refers to the average value or weighted sum of the values of each dimension in the average vector, and the specific method is determined based on the exploration experience of the actual exploration area.
[0073] The Pareto front analysis was conducted using the total amount of new information, total cost, total duration, and performance indicators as multiple objectives; a final Pareto non-dominated scheme was selected as the optimal geological exploration scheme output.
[0074] The principle of Pareto front analysis is a decision-making method that selects the optimal set of balanced solutions from multiple conflicting objectives.
[0075] This is because the evaluation of geological exploration plans involves multiple objectives, which often fluctuate in value, such as: Objective 1: Keep costs low.
[0076] Objective 2: Short construction period.
[0077] Objective 3: Good mineral exploration results are expected.
[0078] Objective 4: Acquire a large amount of new information.
[0079] Clearly, the lowest-cost solution may not be the most effective in mineral exploration; the most effective solution may be very expensive and therefore may not exist. No single solution can be the best in all aspects.
[0080] The purpose of Pareto front analysis is to find a set of optimal equilibrium solutions, also known as the non-dominated solution set, from all candidate solutions.
[0081] Domination and non-domination can be understood as follows: if a solution S is no worse than solution D in all objectives and is strictly better than solution D in at least one objective, then solution S is said to dominate solution D; if a solution is not dominated by any other solution, then it is located on the Pareto front and is a worthwhile candidate for winning.
[0082] Although embodiments of the invention have been shown and described, those skilled in the art will understand that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the claims and their equivalents.
Claims
1. A data analysis driven geological exploration program intelligent optimization system, characterized in that, include: The task segment decomposition module is used to receive the exploration task information input by the user, decompose it into a basic segment sequence in combination with the geological lineage database, and make adaptive adjustments in combination with the YiYuan evaluation mechanism. The final determined exploration segment sequence generates a task profile vector based on the constraints. The sub-scheme extraction module, based on the final determined exploration sequence, generates a multi-dimensional attribute vector for each sub-scheme through the exploration scheme knowledge base; and constructs a combined retrieval structure, uses task profile vector retrieval to form a historical project cluster, analyzes the application effect of each sub-scheme, and generates corresponding historical effect evaluation vectors. Scheme Conflict Detection Module: Used to detect inherent technical conflicts between any two different sub-schemes in the set of all candidate sub-schemes, and to construct a global sub-scheme inherent conflict relationship network; Intelligent Scheme Optimization Module: The exploration area is divided into multi-level grid units. The incremental values of information are recorded according to the scheme category. Combined with total cost, total duration and effect indicators as multiple objectives, Pareto front analysis is performed to select the optimal geological exploration scheme.
2. The data analytics driven intelligent optimization of geological exploration program system as claimed in claim 1 wherein, The method for generating task profile vectors includes: Based on the mineral type and spatial range of the exploration area information, historical mineral types and historical exploration area ranges with the same characteristics are selected from the geological lineage database, thereby obtaining at least one preset exploration step breakdown template. The preset exploration step breakdown template is associated with the historical mineral type and historical exploration area spatial range, and has a pre-set step sequence arranged in the logical order of <regional survey—geophysical exploration—geochemical exploration—engineering—testing—comprehensive research>. Calculate the overall similarity between each selected preset disassembly template and the information of the exploration task to be tested, sort the templates according to the overall similarity, and select the template with the highest overall similarity as the basic step sequence; Based on the YiYuan evaluation mechanism, the basic process sequence is adaptively adjusted to generate the final exploration process sequence: The constraints include topographical conditions, existing work foundation, budget ceiling, construction period limit, available equipment and personnel resources; The finalized sequence of exploration steps is numerically encoded, the constraints are vectorized, and then the two are sequentially concatenated to form a task profile vector. The exploration task information includes the type of mineral, the spatial scope of the exploration area, topographical conditions, existing work foundation, budget limit, time constraints, available equipment and personnel resources.
3. The data analytics driven intelligent optimization of geological exploration program system as claimed in claim 2 wherein, The method for adaptively adjusting the basic sequence of exploration stages based on the YiYuan evaluation mechanism to generate the final exploration stage sequence includes: If complex terrain or important engineering facilities are identified in the exploration area, a "Geological and Environmental Special Assessment" sub-step is inserted before the "Engineering" sub-step in the basic step sequence. The criteria for judging complex terrain is that the average slope of the exploration area is greater than the preset slope threshold, and the criteria for judging important engineering facilities is that the facility layer and the exploration area have spatial intersection. For the required data of each sub-step in the basic process sequence, based on the existing work, retrieve all existing data records with the same spatial range and data type. Each existing data record includes its actual data precision and specific data coverage. Determine whether each retrieved existing data record meets the required data of the current sub-step, based on the following criteria: Condition 1: The existing data records completely cover the spatial area that needs to be covered; Condition 2: The precision of the existing data record is equal to or higher than the minimum data precision; If at least one existing data record satisfies the judgment condition, the corresponding sub-step is removed from the basic step sequence; otherwise, the sub-step is retained. The required data should include at least the type of data, the minimum required data precision, and the spatial range to be covered. Iterate through each sub-step in the basic step sequence to generate the final exploration step sequence.
4. The data analytics driven intelligent optimization of geological exploration program selection system as claimed in claim 3 wherein, The method of numerically encoding the final determined sequence of exploration stages, vectorizing the constraints, and then sequentially concatenating the two to form a task profile vector includes: Pre-set a blank N-dimensional sub-vector, assign a position in the sub-vector for each possible sub-episode, mark the corresponding position as 1 if the episode sequence contains the sub-episode, otherwise mark it as 0; at the same time, for each sub-episode with a position marked as 1, give a weight coefficient λ (i-1) Where λ is a pre-set attenuation factor, i represents the index of the i-th sub-episode, and the filled N-dimensional sub-vector is used as the episode feature sub-vector; The budget ceiling and time limit are normalized to values between 0 and 1; all equipment types are listed, with 1 for available equipment and 0 for others; the equipment is arranged in a fixed order by job type and grade, and the number of available personnel is recorded respectively; the terrain is categorized and coded; based on the data categories and data precision in the existing work base, the data is converted into an information completeness score of 0-1, and then concatenated to form a constraint sub-vector. The feature vector and constraint vector are concatenated to generate the task profile vector.
5. The data analysis-driven intelligent optimization system for geological exploration schemes according to claim 4, characterized in that, The generation of a multidimensional attribute vector for each sub-scheme; Methods for constructing combined retrieval structures include: Based on the final determined exploration sequence, a set of candidate sub-solutions corresponding to each sub-stage is obtained from the exploration scheme knowledge base; and each sub-solution entry includes its sub-stage, a predefined parameter configuration template, a historical application scenario marker indicating its applicable conditions, and its potential impact relationship identification information; among which, the potential impact relationship identification information is used to identify the possible conflicts or dependencies between the sub-solution and other sub-solutions. From the entry data of each sub-scheme, the detection depth, resolution, applicable lithology, minimum working scale, unit cost and construction time are extracted and quantified into a multi-dimensional attribute vector corresponding to each sub-scheme. The multi-dimensional attribute vectors of all sub-schemes are then mapped to a unified multi-dimensional attribute space to construct an index structure that supports multi-condition combination retrieval.
6. The data analysis-driven intelligent optimization system for geological exploration schemes according to claim 5, characterized in that, The method of using task profile vector retrieval to form a historical project cluster, analyzing the application effect of each sub-solution, and generating corresponding historical effect evaluation vectors includes: Supported by the index structure, the task profile vector is matched with the geological lineage database. The matching method includes using the mineral type, spatial range and topographic conditions in the task profile vector as combined search conditions to retrieve several historical projects similar to it, forming a historical project cluster. The actual performance metrics of each sub-scheme when it was adopted in the historical project cluster; the performance metrics include at least the technical success rate, the size of the discovered ore body, the level of cost control, and the deviation from the schedule execution. Generate a historical performance evaluation vector for each sub-scheme under the current task profile vector.
7. The data analysis-driven intelligent optimization system for geological exploration schemes according to claim 6, characterized in that, The method for detecting inherent technical conflicts between any two different sub-solutions in all candidate sub-solution sets and constructing a global sub-solution inherent conflict relationship network includes: Iterate through the multidimensional attribute vectors of any two different sub-solutions in the set of all candidate sub-solutions; when two sub-solutions are technically mutually exclusive, it is determined that they have an inherent technical conflict; among them, technical mutual exclusion includes at least chemical property mutual exclusion, physical principle mutual exclusion, and data flow mutual exclusion; All sub-solution pairs with inherent technical conflicts are compiled into a list. Each list entry records a sub-solution pair with inherent technical conflicts and its corresponding technical conflict type, thereby constructing a global sub-solution inherent conflict relationship network. The conflict relationship network includes creating an empty undirected graph, where each sub-solution is a node with a unique identifier. For each record in the list, the two corresponding node identifiers are found, and an undirected edge is added. The technical conflict type is numerically encoded and assigned as an attribute to the undirected edge. The conflict relationship network is stored in the format of a conflict matrix.
8. The data analysis-driven intelligent optimization system for geological exploration schemes according to claim 7, characterized in that, The method of dividing the exploration area into multi-level grid units and recording incremental values of information according to the scheme category includes: Based on the spatial range in the task profile vector, the exploration area is divided into multi-level grid units; for each grid unit, its information completeness score is calculated as the baseline state value of that unit. For geophysical and geochemical sub-schemes, based on the detection depth and resolution in their multidimensional attribute vectors, their theoretical effective detection range is simulated, and a potential information increment value is calculated and recorded for each affected grid cell within the range. For drilling and engineering sub-schemes, based on the engineering layout points and their influence radii defined in their multidimensional attribute vectors, a direct exposure information increment value is calculated and recorded for each grid cell within the influence radius. When evaluating a complete exploration plan consisting of multiple sub-plans, the incremental values of each sub-plan are retrieved; according to the final determined sequence of exploration steps, the incremental values of each sub-plan for the same grid cell are virtually superimposed. Based on the virtual overlay results, the total information content after the virtual growth of all grid cells is calculated to obtain the overall new information content of the scheme.
9. The data analysis-driven intelligent optimization system for geological exploration schemes according to claim 8, characterized in that, The process of obtaining the information completeness score is as follows: For each existing data category, scores are assigned based on two dimensions: spatial coverage and data precision level. The basic completeness of a single data category is calculated as: Spatial Coverage × Data Precision Level. Spatial coverage refers to the proportion of grid cells effectively covered by this data category out of the total number of grid cells. Data precision level is a quality coefficient between 0 and 1. The weighted comprehensive completeness is calculated as: Σg(Basic Completeness_g × W_g), where basic completeness_g represents the basic completeness of the g-th single data category, and W_g represents the weight of the g-th single data category. Therefore, the final information completeness score is calculated as: Weighted Comprehensive Completeness × Time-Release Coefficient.
10. A data analysis-driven intelligent optimization system for geological exploration schemes, characterized in that, The method for selecting an optimal geological exploration scheme includes: Input the set of candidate sub-schemes for each exploration sub-stage, and exhaustively combine the candidate sub-schemes for each stage according to the order of the final determined exploration stage sequence to generate an initial complete set of candidate exploration schemes; Based on the inherent conflict relationship network of sub-schemes, identify whether there are sub-scheme pairs with inherent technical conflicts in the same candidate exploration scheme. If they exist, delete them from the entire set of candidate exploration schemes to obtain a set of feasible schemes that have been pre-screened for conflicts. Obtain the total amount of new information, total cost, and total duration for each feasible solution from the set of feasible solutions; and extract the average vector of the historical effect evaluation vectors of all sub-solutions in the solution to obtain an effect index; The Pareto front analysis was conducted using the total amount of new information, total cost, total duration, and performance indicators as multiple objectives; a final Pareto non-dominated scheme was selected as the optimal geological exploration scheme output.