A knowledge graph construction method and system for power transformer state evaluation and decision

By using a top-down knowledge graph construction method, multi-source data of power transformers were collected and defined, and a knowledge graph of entities, relationships and attributes was constructed. This solved the standardization problem of state evaluation and decision-making for UHV transformers, and realized unified data management and intelligent decision support.

CN123157908APending Publication Date: 2026-11-24STATE GRID HUNAN ELECTRIC POWER CO LTD ELECTRIC POWER SCI RES INST +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611302682.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-26
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing technologies lack standardized domain knowledge graph construction methods for condition assessment and decision-making of UHV transformers. It is difficult to effectively transform multi-source heterogeneous equipment information, condition data, assessment basis, assessment level and disposal measures and other professional knowledge into unified, standardized and traceable graph structure data. This results in insufficient structured query of condition assessment knowledge, visualization of assessment logic and intelligent support for maintenance and disposal decisions.

Method used

Multi-source data on power transformers are collected, and a top-down construction approach is adopted to define the knowledge graph knowledge model, including entity types, relation types, attribute information and constraint rules. The entity, relation and attribute information are stored in a graph database to construct a knowledge graph for power transformer status evaluation and decision-making.

Benefits of technology

It has achieved unified management and standardized display of multi-source heterogeneous data, improved the traceability of condition assessment and the intelligent support capability for maintenance decision-making, and ensured the consistency and reliability of assessment results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123157908A_ABST
    Figure CN123157908A_ABST
Patent Text Reader

Abstract

This invention relates to a method and system for constructing a knowledge graph for power transformer condition assessment and decision-making. It involves collecting multi-source data on power transformers; employing a top-down construction approach to define the knowledge graph's knowledge model; extracting entity, inter-entity relationships, and attribute information from the multi-source power transformer data based on the knowledge model; mapping the extraction results to obtain several structured triples; importing each structured triple into a graph database, storing entities as nodes, inter-entity relationships as directed edges, and attribute information as key-value pairs, thus constructing a knowledge graph for power transformer condition assessment and decision-making. This invention addresses the problem in existing technologies where it is difficult to effectively transform multi-source, heterogeneous equipment information, condition data, assessment criteria, assessment levels, and handling measures—professional knowledge—into unified, standardized, and traceable graph structure data.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power equipment condition assessment and knowledge graph technology, and in particular to a method and system for constructing a knowledge graph for power transformer condition assessment and decision-making. Background Technology

[0002] Ultra-high voltage (UHV) transformers are the core main equipment in UHV power transmission and transformation systems, responsible for voltage transformation and energy transfer. Their operational status directly determines the safety and stability of the main grid and the reliable operation of transmission channels. Compared with transformers of conventional voltage levels, UHV transformers are characterized by complex structures, numerous components, and harsh operating conditions. Their insulation systems, mechanical structures, cooling devices, and protection configurations are susceptible to performance degradation due to the coupling effects of electrical, thermal, mechanical, and environmental stresses during long-term operation. Unplanned shutdowns caused by insulation degradation, mechanical defects, abnormal cooling, or failures of non-electrical protection devices directly threaten the continuous transmission capacity of UHV transmission channels and may trigger cascading failures, resulting in significant economic losses and social impact. Therefore, conducting standardized, accurate, and timely condition assessments of UHV transformers and developing scientifically sound maintenance and handling measures accordingly is a crucial step in ensuring the safe and stable operation of the UHV power grid.

[0003] In engineering practice, the condition assessment of ultra-high voltage transformers typically involves multiple functional components and requires comprehensive analysis of various state variables. These state variables are associated with different equipment performance dimensions, types of testing and inspection, evaluation standards, threshold judgment conditions, condition assessment levels, and corresponding maintenance and handling measures, involving a vast and complex multi-level, multi-path evaluation logic network. Maintenance personnel must comprehensively analyze this multi-source heterogeneous information based on current technical standards, electrical test reports, PMS (Power Production Management System) equipment ledgers, and the experience of domain experts to complete the condition assessment and maintenance decisions.

[0004] Furthermore, existing condition assessment and decision-making knowledge is primarily scattered across various technical guidelines, maintenance procedures, test reports, business management systems, and expert experience. These different knowledge sources exhibit significant differences in data format, organization, terminology, and semantic granularity. The same equipment component or condition quantity often exists under multiple alternative names, such as the full standard name, industry abbreviation, or business system field name. Evaluation rules may also be scattered across multiple chapters and clauses of different standard documents. In practice, maintenance personnel typically need to manually search, cross-reference, and logically correlate multiple paper or electronic documents and multiple business information systems. This is not only extremely labor-intensive and inefficient, but the evaluation results are also highly susceptible to the influence of personnel's professional experience, differences in information understanding, and subjective judgment biases, making it difficult to guarantee the consistency and traceability of condition assessment conclusions.

[0005] Furthermore, existing equipment management systems mostly use relational databases or two-dimensional tables to store information such as equipment ledgers, test data, defect records, and maintenance history. While this type of data organization can achieve efficient input, statistical summarization, and conditional querying of structured data, it often requires establishing foreign key relationships through multiple data tables to indirectly express the complex hierarchical semantic relationships between "equipment-component-state quantity-evaluation basis-evaluation level-remedial measures." This makes it difficult to intuitively and completely present the complete evaluation path from the initial state quantity test to the final remedial decision, and it is also not conducive to the unified management, reuse, version traceability, and consistency verification of evaluation knowledge from different sources and versions.

[0006] In recent years, knowledge graph technology has organized scattered domain knowledge into structured semantic networks by defining entities, relationships, and attributes. It leverages graph databases to achieve efficient relational queries and visualization, providing a new technical approach for the unified management and intelligent application of complex domain knowledge. However, the entity types, relationship types, and attribute definitions of general domain knowledge graphs are typically geared towards broad common-sense knowledge. Their knowledge granularity and relational semantics are insufficient to directly meet the technical requirements of the highly specialized scenario of UHV transformer condition evaluation. If a bottom-up, automated information extraction method is directly used to construct a domain knowledge graph, issues such as ambiguous terminology, synonyms, and strong contextual dependencies in evaluation rules can easily lead to quality defects such as entity duplication, relationship mismatch, and inconsistent evaluation logic, ultimately reducing the usability and credibility of the knowledge graph.

[0007] In summary, existing technologies lack a standardized method for constructing domain knowledge graphs for condition assessment and decision-making in UHV transformers. This makes it difficult to effectively transform multi-source, heterogeneous equipment information, condition data, assessment criteria, assessment levels, and handling measures into unified, standardized, and traceable graph-structured data. Consequently, this restricts the structured querying of condition assessment knowledge, the visualization of assessment logic, and the intelligent support capabilities for maintenance and handling decisions. Therefore, a new technical solution is urgently needed to address these technical problems. Summary of the Invention

[0008] Based on this, the purpose of this application is to provide a knowledge graph construction method and system for power transformer condition evaluation and decision-making, so as to solve at least one of the technical problems mentioned in the background art above.

[0009] Firstly, this application provides a knowledge graph construction method for power transformer condition evaluation and decision-making, including: Collect multi-source data of power transformers, including any one or more of the following: condition assessment guidelines, maintenance guidelines, test reports, equipment ledger information, standards and rules, and domain expert experience and knowledge; A top-down construction approach is adopted to define the knowledge graph's knowledge model, including entity types, relationship types, attribute information, and corresponding constraint rules; attribute information includes entity attributes and relationship attributes between entities; Based on the knowledge model, entity, entity relationship and attribute information are extracted from multi-source data of power transformers, and the extraction results are mapped to obtain several structured triples. Each structured triple is imported into a graph database, where entities are stored as nodes, relationships between entities are stored as directed edges, and attribute information is stored as key-value pairs, thus constructing a knowledge graph for power transformer state evaluation and decision-making.

[0010] Furthermore, the entity type includes equipment name, equipment components, equipment performance, equipment status parameters, evaluation basis, evaluation level, handling measures, and testing type; Relationship types include inclusion relationship, belonging relationship, influence relationship, evaluation indicator relationship, evaluation basis relationship, evaluation level relationship, and triggering disposal relationship; Entity attributes include commissioning time, rated parameters, parameter units, evaluation thresholds, and deduction values; Relationship attributes include degree of influence, source of knowledge, confidence level, and effective time interval; Constraint rules include entity type constraints, constraints on the starting and target entity types of relationships, relationship direction constraints, constraints on attribute data types and value ranges, constraints on the mandatory and uniqueness of attributes, and constraints on the logical consistency between equipment components, equipment status quantities, evaluation criteria, evaluation levels, and handling measures.

[0011] Furthermore, the equipment components include any one or more of the following: body, bushing, tap changer, cooling system, and non-electrical protection. Equipment performance, including any one or more of insulation performance, thermal performance and mechanical performance; The evaluation criteria include any one or more of the following: measured values ​​of state variables, initial value differences of state variables, standard limits, trends of change, comparison results with similar equipment, family defect information, adverse operating condition information, importance of state variables, degree of degradation of state variables, evaluation deduction values, and evaluation level mapping relationships. Evaluation levels include normal level, attention level, abnormal level, and severe level; The types of testing include routine inspections, live-line testing, online monitoring, and power outage tests.

[0012] Furthermore, the main body includes any one or more of the following: potential hazards of the whole machine, operation of the whole machine, data of the whole machine, oil conservator and sealed solid insulation, breather, clamps, insulation system, insulating oil, winding, winding neutral point, iron core, oil tank and accessories; The equipment status parameters of the main body include short-circuit damage risk, annual heavy overload duration, noise, vibration, family defect information, equipment operating years, service life of oil tank sealing elements, oil tank sealing status, operating oil level, degree of polymerization of insulating paper, furfural content in oil, breather status, clamp grounding current, partial discharge abnormal signal, insulating oil dielectric loss factor, insulating oil breakdown voltage, insulating oil water content, insulating oil gas content, insulating oil interfacial tension, insulating oil volume resistivity, insulating oil sludge and sediment, insulating oil acid value, total hydrocarbon content in oil, total hydrocarbon gas generation rate, acetylene content in oil, carbon monoxide content in oil, hydrogen content in oil, and oil chromatographic data. The monitoring system includes any one or more of the following parameters: line monitoring alarm status, winding material, winding insulation process, short-circuit impact current, number of short-circuit impacts, duration of short-circuit impacts, winding DC resistance, winding dielectric loss factor, winding capacitance, winding frequency response, short-circuit impedance, winding voltage ratio, winding DC leakage current, winding insulation resistance, winding absorption ratio, winding polarization index, neutral point DC current, neutral point AC current, overexcitation degree, core grounding current, no-load current, no-load loss, core insulation resistance, clamp insulation resistance, core-clamp insulation resistance, oil seepage status, oil leakage status, surface corrosion status, operating oil temperature, and oil tank infrared temperature.

[0013] Furthermore, the bushing includes any one or more of the following: oil-paper capacitor bushing, dry bushing, and pure porcelain bushing. The equipment condition parameters of the bushing include any one or more of the following: appearance of porcelain insulation, hydrophobicity of anti-flashover coating, aging condition of creepage skirt, compliance of external insulation creepage distance, appearance of composite insulation sheath, sealing condition of composite bushing connection, hydrophobicity of composite insulation umbrella sleeve, oil leakage condition of bushing surface, creepage or corona condition of external insulation, bushing oil level indication, grounding condition of end screen, insulation resistance of main screen of bushing, insulation resistance of end screen of bushing, dielectric loss factor of bushing, capacitance of bushing, total hydrocarbon content in bushing oil, gas generation rate of total hydrocarbons in bushing, acetylene content in bushing oil, carbon monoxide content in bushing oil, carbon dioxide content in bushing oil, hydrogen content in bushing oil, methane content in bushing oil, abnormal partial discharge signal of bushing, infrared temperature of bushing joint, hot spot temperature of bushing column, temperature distribution of bushing body, infrared condition of bushing liquid surface, ultraviolet discharge signal of external insulation, voltage of end screen, change in relative dielectric loss factor, difference in initial value of relative capacitance, appearance of umbrella sleeve and sheath, appearance of porcelain parts, and insulation resistance.

[0014] Furthermore, the tap changer includes any one or more of on-load tap changers and off-load tap changers; The equipment status parameters of the tap changer include any one or more of the following: tap changer oil level, breather status, operation counter status, oil leakage status, gas relay operation status, oil flow relay operation status, pressure relief valve operation status, number of operations, interval with the previous maintenance, overdue maintenance status, online oil filter pressure, online oil filter maintenance status, drive motor operation status, three-phase operation synchronization, limit device function status, sliding status, overcurrent lockout status, operation characteristics, tap changer oil breakdown voltage, tap changer oil moisture content, tap-related winding DC resistance, tap position, gear position indication clarity, mechanical lockout status, control circuit status, transmission mechanism jamming status, and corrosion status.

[0015] Furthermore, the cooling system includes any one or more of the following: fan and motor, oil pump, water pump, oil flow relay, control system, control box, heat dissipation device, water cooler, oil circuit and seals, power supply, water cooling system, oil circuit bellows, cooler and monitoring circuit, and radiator and monitoring circuit. The equipment status parameters of the cooling system include any one or more of the following: fan operation status, oil pump operation status, water pump operation status, oil flow relay operation status, cooling device control system status, cooler AC main power supply switching status, single cooler operation mode switching status, cooler branch power supply status, control box water inlet status, surface contamination level of the radiator, inlet and outlet oil temperature difference of the cooling device, cooling water pipe leakage status, cooling system oil seepage status, cooling system oil leakage status, three-phase voltage monitoring device configuration status, independent power supply configuration status, automatic power switching device status, transformer oil pressure and water pressure relationship, oil circuit bellows installation and expansion status, cooler fault signal, cooler complete stop signal, radiator fault signal, and radiator abnormal signal.

[0016] Furthermore, non-electrical protection includes any one or more of the following: thermometer, oil level indicator, pressure relief valve, gas relay, pressure relay, pressure surge relay, oil flow relay, tap changer position indicator, and outdoor protection device. Non-electrical quantity protection equipment status quantities include any one or more of the following: thermometer indication status, remote and local thermometer indication deviation, thermometer secondary circuit insulation resistance, thermometer calibration status, oil level indication status, pressure relief valve leakage status, pressure relief valve malfunction record, pressure relief valve secondary circuit insulation resistance, light gas alarm status, heavy gas operation status, gas relay periodic inspection status, gas relay oil leakage status, gas relay secondary circuit insulation resistance, pressure relay leakage status, pressure relay malfunction record, pressure relay secondary circuit insulation resistance, pressure surge relay leakage status, pressure surge relay malfunction record, pressure surge relay secondary circuit insulation resistance, oil flow relay leakage status, oil flow relay malfunction record, oil flow relay secondary circuit insulation resistance, consistency of remote and local tap position indication, and integrity of rainproof measures.

[0017] Furthermore, when the evaluation level is normal, the handling measures include: conducting inspections of each equipment component every set maintenance cycle and determining whether the inspection results are qualified. If not, the next maintenance cycle is shortened according to the inspection results; if so, the next maintenance cycle is extended according to the inspection results. When the evaluation level is "Caution", the handling measures include: obtaining the difference between the equipment status quantity and the standard limit value of each equipment component, and determining whether it is greater than the threshold. If not, the equipment status quantity is qualified; if so, the equipment status quantity is unqualified. If the number of unqualified equipment status quantities is 1, the next maintenance cycle is shortened and maintenance items corresponding to the unqualified equipment status quantity are added. If the number of unqualified equipment status quantities is greater than 1, the equipment is inspected and monitored online according to the set maintenance cycle, and maintenance items corresponding to the unqualified equipment status quantities are added. When the evaluation level is abnormal, the handling measures include: conducting online monitoring of each equipment component, and, based on the monitoring results, performing one or more of the following on the equipment components whose equipment status does not meet the requirements: lifting cover inspection, lifting core inspection, returning to the factory for repair, or technical upgrade and overhaul. When the evaluation level is severe, the following measures shall be taken: conduct power outage tests on each equipment component and replace the equipment component that fails the test.

[0018] Secondly, this application also provides a computer storage medium storing executable program code; the executable program code is used to execute the knowledge graph construction method for power transformer state evaluation and decision-making as described in any one of the first aspects.

[0019] Thirdly, this application also provides a knowledge graph construction system, including a memory and a processor; the memory stores program code that can be executed by the processor; the program code is used to execute the knowledge graph construction method for power transformer state evaluation and decision-making as described in any one of the first aspects.

[0020] This application provides a method and system for constructing a knowledge graph for power transformer condition assessment and decision-making. It collects multi-source data on power transformers, including any one or more of condition assessment guidelines, maintenance guidelines, test reports, equipment ledger information, standard rules, and domain expert experience. Using a top-down construction approach, it defines the knowledge graph's knowledge model, including entity types, relationship types, attribute information, and corresponding constraint rules. Attribute information includes entity attributes and relationship attributes between entities. Based on the knowledge model, it extracts entity, entity relationship, and attribute information from the multi-source power transformer data and maps the extraction results to several structured triples. Each structured triple is imported into a graph database, storing entities as nodes, entity relationships as directed edges, and attribute information as key-value pairs, thus constructing a knowledge graph for power transformer condition assessment and decision-making. This improves upon existing technologies that struggle to effectively transform multi-source, heterogeneous equipment information, condition data, assessment criteria, assessment levels, and handling measures into unified, standardized, and traceable graph structure data. Attached Figure Description

[0021] Figure 1 A flowchart of an embodiment of the knowledge graph construction method for power transformer condition evaluation and decision-making of the present invention; Figure 2 This is a partial structural diagram of the knowledge graph in an embodiment of the knowledge graph construction method for power transformer condition evaluation and decision-making of the present invention. Figure 3 This is another partial structural diagram of the knowledge graph in an embodiment of the knowledge graph construction method for power transformer condition evaluation and decision-making of the present invention. Figure 4 This is another partial structural diagram of the knowledge graph in an embodiment of the knowledge graph construction method for power transformer condition evaluation and decision-making of the present invention. Detailed Implementation

[0022] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of the present invention.

[0023] It should be noted that if the embodiments of the present invention involve directional indications, such as up, down, left, right, front, back, etc., these directional indications are only used to explain the relative positional relationships and movement of the components in a specific posture. If the specific posture changes, the directional indications will also change accordingly. Furthermore, if the embodiments of the present invention involve descriptions such as "first," "second," "S1," "S2," "step one," "step two," etc., these descriptions are for descriptive purposes only and should not be construed as indicating or implying their relative importance, or implicitly indicating the number of technical features indicated or the execution order of the method. Those skilled in the art will understand that anything that does not violate the inventive concept should be included within the scope of protection of the present invention.

[0024] like Figure 1 As shown, this invention provides a knowledge graph construction method for power transformer condition evaluation and decision-making, including: S1: Collect multi-source data of power transformers, including any one or more of the following: condition assessment guidelines, maintenance guidelines, test reports, equipment ledger information, standard rules and domain expert experience and knowledge; Specifically, structured, semi-structured, or unstructured power transformer-related data can be obtained from any one or more data sources, including power transformer condition assessment guidelines, maintenance guidelines, test reports, equipment ledger information, industry standards and rules, and domain expert experience and knowledge. By integrating multi-source heterogeneous data, it is possible to comprehensively cover the operational status information of power transformers throughout their entire life cycle, encompassing multi-dimensional data such as design and manufacturing, commissioning and operation, testing and inspection, condition assessment, fault diagnosis, and maintenance. This provides a rich, complete, and authoritative data foundation for knowledge graph construction, effectively avoiding information gaps and knowledge blind spots caused by a single data source, and improving the breadth of data coverage, information completeness, and domain professionalism of the knowledge graph.

[0025] S2: Adopting a top-down construction approach, it defines the knowledge graph's knowledge model, including entity types, relationship types, attribute information, and corresponding constraint rules; attribute information includes entity attributes and relationship attributes between entities; Specifically, based on professional knowledge and business logic in the field of power transformers, a top-down construction approach can be adopted to predefine entity types, relationship types, attribute information (including entity attributes and relationship attributes between entities), and corresponding constraint rules. Through the standardized definition of knowledge patterns, a unified semantic framework and structured guidance can be provided for subsequent information extraction, ensuring the consistency and standardization of extraction results, reducing extraction errors caused by differences in data formats or semantic ambiguity, and improving the logical rigor and maintainability of the knowledge graph pattern layer. Some mapping relationships contained in the knowledge pattern are shown in Tables 1-5.

[0026] Table 1: Ontology Mapping Relationship Table-1

[0027] Table 1: Ontology Mapping Relationship Table-2

[0028] Table 2: Casing Mapping Relationship Table-1

[0029] Table 2: Casing Mapping Relationship Table-2

[0030] Table 3: Cooling System Mapping Relationship Table

[0031] Table 4: Tap Changer Mapping Relationship Table

[0032] Table 5: Mapping Relationship Table for Non-Electrical Quantity Protection

[0033] In a preferred embodiment, the entity type includes equipment name, equipment component, equipment performance, equipment status quantity, evaluation basis, evaluation level, handling measures, and detection type; Relationship types include inclusion relationship, belonging relationship, influence relationship, evaluation indicator relationship, evaluation basis relationship, evaluation level relationship, and triggering disposal relationship; Entity attributes include commissioning time, rated parameters, parameter units, evaluation thresholds, and deduction values; Relationship attributes include degree of influence, source of knowledge, confidence level, and effective time interval; Constraint rules include entity type constraints, constraints on the starting and target entity types of relationships, relationship direction constraints, constraints on attribute data types and value ranges, constraints on the mandatory and uniqueness of attributes, and constraints on the logical consistency between equipment components, equipment status quantities, evaluation criteria, evaluation levels, and handling measures.

[0034] Specifically, optional but not limited to further refining the definition of entity types, relation types, entity attributes, relation attributes, and corresponding constraint rules in the knowledge schema, by constructing a multi-dimensional entity type system and relation types, the schema layer of the knowledge graph can accurately map the business logic and professional semantics of the power transformer field, ensuring the completeness and domain adaptability of knowledge representation; by defining relation attributes, quantitative description and knowledge traceability of equipment status information can be achieved, improving the information granularity and credibility of the knowledge graph; by introducing various types of constraint rules, multi-dimensional verification and quality control of knowledge extraction results can be performed, effectively identifying and correcting data quality problems such as entity recognition errors, relation direction deviations, and attribute value anomalies, ensuring strict consistency between the data layer and schema layer of the knowledge graph, and supporting automated reasoning and conflict detection based on description logic, enabling the knowledge graph to have knowledge verification and error diagnosis capabilities, thereby enhancing the semantic rigor, data reliability, and effectiveness of subsequent reasoning applications of the knowledge graph; including at least the following technical effects: Although this invention applies knowledge graphs, it addresses the unique engineering scenario of power transformers, characterized by multi-component coupling in equipment structure, multi-dimensional deterioration of operating status, rigorous evaluation standards, and strong correlation in maintenance decisions. It features a specially designed knowledge graph modeling system with specific entity types, relationship types, attribute information, and constraint rules. This system overcomes the inherent shortcomings of traditional general-purpose knowledge graph models in transformer condition evaluation, such as ambiguous entity segmentation, arbitrary relationship associations, missing attribute dimensions, mismatched business logic, inability to quantify condition evaluation indicators, and failure to make timely and accurate decisions. This invention precisely selects eight entities: equipment name, equipment components, equipment performance, equipment state quantities, evaluation basis, evaluation level, handling measures, and detection type. It fully covers the entire business chain of power transformers, from equipment structure, operating performance, condition monitoring, standard evaluation to maintenance and handling, achieving complete and accurate modeling of the core elements of transformer evaluation decisions and avoiding the problems of redundant entities and missing entities in key scenarios found in general-purpose knowledge graphs.

[0035] Meanwhile, this invention configures a unique relationship system encompassing relationships, belonging relationships, influence relationships, evaluation index relationships, evaluation basis relationships, evaluation level relationships, and triggering and handling relationships. This system precisely matches the inherent business logic of power transformers, which states that "components constitute equipment, performance determines state, state corresponds to evaluation, and evaluation triggers handling." This achieves directed and precise correlation mapping between core elements, distinguishing it from the generic, indiscriminate, and logically chaotic modeling approach of general graphs. Furthermore, it includes entity attributes such as commissioning time, rated parameters, parameter units, evaluation thresholds, and deduction values, accurately carrying the inherent parameters of transformer equipment and core data for quantitative evaluation standards. Through relationship attributes such as degree of influence, knowledge source, confidence level, and effective time interval, it achieves refined control over the credibility, applicable scenarios, and timeliness of knowledge associations, aligning with the stringent industry requirements for the authority, accuracy, and timeliness of knowledge in power equipment evaluation.

[0036] More importantly, this invention includes comprehensive constraint rules. These rules, encompassing entity type constraints, initial and target entity type constraints, relationship direction constraints, attribute data type and value range constraints, attribute mandatory and uniqueness constraints, and multi-element logical consistency constraints, fundamentally eliminate engineering problems in power transformer condition assessment, such as cross-component erroneous associations, incorrect assessment thresholds, mismatches between assessment levels and response measures, and interference from invalid knowledge. Example: (1) Entity type constraint: This is used to limit nodes to only the preset entity types and not to allow nodes of entity types not defined in the graph. For example: Graph nodes are only allowed to be eight types of entities: equipment name, equipment component, equipment performance, equipment status quantity, evaluation basis, evaluation level, disposal measures, and detection type; random entities that do not belong to the above types are not allowed to prevent the import of irrelevant noise nodes and ensure that the graph entity system is aligned with the transformer status evaluation business.

[0037] (2) Constraints on the type of the starting entity and the target entity of the relationship: For each type of directed relationship, the allowed entity types of the head entity (starting entity) and the allowed entity types of the tail entity (target entity) are limited, and cross-type incorrect edge construction is prohibited. For example: "Inclusion relationship" only allows the head entity to be the device name and the tail entity to be the device component; "Influence relationship" only allows the head entity to be the device status variable and the tail entity to be the device performance; "Triggering and handling relationship" only allows the head entity to be the evaluation level and the tail entity to be the handling measure; arbitrary establishment of triggering and handling relationships such as "handling measure → device component" is not allowed to avoid the generation of semantically incorrect triples.

[0038] (3) Relationship direction constraint: Limit the semantic flow of directed relations and prohibit the establishment of relations in reverse. For example: "Inclusion relation" means that the equipment contains the component, and it is only allowed to point from the equipment to the component, and the component is not allowed to point back to the equipment; "Evaluation basis relation" means that the state quantity references the evaluation basis, and it is only allowed to point from the equipment state quantity to the evaluation basis, and the evaluation basis is not allowed to point back to the state quantity, so as to ensure that the semantics of the directed edges of the graph conform to the transformer evaluation business logic.

[0039] (4) Attribute data type and value range constraints: Limit the data type and legal value range of each attribute. For example: In entity attributes, the commissioning time is limited to date and time type; the evaluation threshold and deduction value are limited to numeric type; the value range of the deduction value is limited to 0-40; the evaluation threshold is limited to a value greater than 0; in relation attributes, the confidence level is limited to a floating-point value between 0 and 1, and strings and illegal values ​​outside the business scope are rejected from being written into the graph.

[0040] (5) Attribute mandatory and unique constraints: Some core attributes must be filled in, and some attributes cannot be repeated within a specified range. For example: the "parameter unit" of the equipment status entity is a mandatory attribute and cannot be empty; the rated parameters of the same equipment component under the same transformer are unique; the level name of the evaluation level entity is unique, and two evaluation level nodes with the same name but different meanings are not allowed to exist at the same time, so as to avoid knowledge duplication and ambiguity.

[0041] (6) Logical consistency constraints between equipment components, equipment status quantities, evaluation criteria, evaluation levels, and handling measures: These are high-level business logic constraints that ensure the consistency of the entire business chain and prevent mismatches. Examples include: ① The equipment status quantity associated with a certain equipment component must be the actual monitoring parameter corresponding to that component; it is not allowed to attach the status quantity of a bushing to a tap changer component; ② The evaluation criteria corresponding to the same equipment status quantity should match the physical meaning of that status quantity; ③ The deduction value calculated by a specific evaluation criterion can only be mapped to a legal evaluation level; ④ Each evaluation level can only match the handling measures allowed in the business; ⑤ Triads that contradict the business logic of "normal level" being associated with emergency maintenance handling measures are not allowed, ensuring the logical consistency of the entire business chain from component status quantity evaluation criteria evaluation level handling measures.

[0042] In summary, this invention provides a complete modeling system tailored to specific scenarios of power transformers, enabling structured, standardized, and logical modeling of transformer condition assessment knowledge. This significantly improves the accuracy of transformer condition assessment, the logic of defect tracing, and the adaptability of maintenance decisions, highly meeting the engineering application needs of standardized condition assessment, refined operation and maintenance, and intelligent decision-making for power grid transformers.

[0043] In a preferred embodiment, the equipment components include any one or more of the following: body, bushing, tap changer, cooling system, and non-electrical protection. Equipment performance, including any one or more of insulation performance, thermal performance and mechanical performance; The evaluation criteria include any one or more of the following: measured values ​​of state variables, initial value differences of state variables, standard limits, trends of change, comparison results with similar equipment, family defect information, adverse operating condition information, importance of state variables, degree of degradation of state variables, evaluation deduction values, and evaluation level mapping relationships. Evaluation levels include normal level, attention level, abnormal level, and severe level; The types of testing include routine inspections, live-line testing, online monitoring, and power outage tests.

[0044] Specifically, a hierarchical classification method can be adopted to standardize the definitions of equipment components, equipment performance, evaluation criteria, evaluation levels, and testing types. By dividing equipment components into several key components and focusing equipment performance on several core dimensions, and simultaneously adopting evaluation criteria covering multiple indicators, a four-level evaluation level system (normal, attention, abnormal, and severe) and four types of testing (inspection, live-line testing, online monitoring, and power outage testing) can be established. This allows for the construction of a complete, standardized, and scalable classification ontology for the power transformer field. This provides standardized semantic tags and classification frameworks for subsequent information extraction, reducing semantic ambiguity and classification inconsistencies during the extraction process, improving the accuracy of knowledge extraction and the systematic nature of knowledge organization. The mapping relationship between the four evaluation levels and the four types of testing provides clear decision boundaries and testing strategy guidance for state evaluation reasoning. This enables the knowledge graph to not only store static knowledge but also support dynamic state evaluation logic and maintenance strategy recommendations, enhancing the practical value and business relevance of the knowledge graph in power transformer state evaluation and decision support.

[0045] In a preferred embodiment, the main body includes any one or more of the following: overall machine hidden dangers, overall machine operation, overall machine data, oil conservator and sealed solid insulation, breather, clamps, insulation system, insulating oil, windings, winding neutral point, iron core, oil tank and accessories; The equipment status parameters of the main body include short-circuit damage risk, annual heavy overload duration, noise, vibration, family defect information, equipment operating years, service life of oil conservator sealing elements, oil conservator sealing status, operating oil level, degree of polymerization of insulating paper, furfural content in oil, breather status, clamp grounding current, partial discharge abnormal signals, insulating oil dielectric loss factor, insulating oil breakdown voltage, insulating oil water content, insulating oil gas content, insulating oil interfacial tension, insulating oil volume resistivity, insulating oil sludge and sediment, insulating oil acid value, total hydrocarbon content in oil, total hydrocarbon gas generation rate, acetylene (C2H2) content in oil, carbon monoxide (CO) content in oil, and hydrogen (H2) content in oil. The following parameters are considered: oil content, online oil chromatography alarm status, winding material, winding insulation process, short-circuit impact current, number of short-circuit impacts, duration of short-circuit impacts, winding DC resistance, winding dielectric loss factor, winding capacitance, winding frequency response, short-circuit impedance, winding voltage ratio, winding DC leakage current, winding insulation resistance, winding absorption ratio, winding polarization index, neutral point DC current, neutral point AC current, overexcitation degree, core grounding current, no-load current, no-load loss, core insulation resistance, clamp insulation resistance, core-to-clamp insulation resistance, oil seepage status, oil leakage status, surface corrosion status, operating oil temperature, and oil tank infrared temperature.

[0046] Specifically, the composition and corresponding equipment status quantities of the power transformer can be further refined and defined. This can be achieved by dividing the transformer into several sub-components (including sub-components categorized by overall machine potential hazards, overall machine operation, and overall machine data, as well as physical sub-components such as the oil conservator and sealed solid insulation). For each sub-component, multi-dimensional status quantities covering short-circuit damage risk and heavy overload duration can be defined to construct a comprehensive status monitoring index system covering the transformer's electrical, chemical, mechanical, and thermal performance. This allows for a refined, multi-dimensional quantitative assessment of the transformer's health status. Furthermore, the aforementioned status quantities can be correlated with insulation aging... By associating and modeling professional knowledge such as chemical mechanisms, overheating fault modes, discharge fault characteristics, and mechanical deformation risks, the knowledge graph can support ontological fault diagnosis reasoning and insulation remaining life prediction based on multi-state quantity fusion. For example, by jointly analyzing the components of dissolved gases in oil (total hydrocarbons, acetylene, carbon monoxide, and hydrogen) and the gas generation rate, it is possible to infer whether there are partial discharge or overheating faults inside the body. By comparing the correlation between winding frequency response and short-circuit impedance, the degree of winding deformation can be assessed, thereby improving the depth of ontological condition evaluation and the accuracy of fault early warning, and providing high-confidence knowledge support for maintenance decisions.

[0047] In a preferred embodiment, the bushing includes any one or more of the following: oil-paper capacitor bushing, dry bushing, and pure porcelain bushing; The equipment condition parameters of the bushing include: appearance of porcelain insulation, hydrophobicity of anti-flashover coating, aging condition of creepage skirt, compliance of external insulation creepage distance, appearance of composite insulation sheath, sealing condition of composite bushing connection points, hydrophobicity of composite insulation umbrella sleeve, oil leakage condition of bushing surface, creepage or corona condition of external insulation, bushing oil level indication, grounding status of the end screen, insulation resistance of the main screen of the bushing, insulation resistance of the end screen of the bushing, dielectric loss factor of the bushing, bushing capacitance, total hydrocarbon content in the bushing oil, total hydrocarbon gas generation rate in the bushing, and acetylene (C2H2) content in the bushing oil. The following parameters are considered: content of carbon monoxide (CO) in the casing oil, content of carbon dioxide (CO2) in the casing oil, content of hydrogen (H2) in the casing oil, content of methane (CH4) in the casing oil, abnormal partial discharge signal of the casing, infrared temperature of the casing joint, hot spot temperature of the casing column, temperature distribution of the casing body, infrared state of the casing liquid surface, ultraviolet discharge signal of the external insulation, voltage of the end screen, change in relative dielectric loss factor, difference in initial value of relative capacitance, appearance of the shed and sheath, appearance of the ceramic parts, and insulation resistance.

[0048] Specifically, the types and corresponding equipment status quantities of power transformer bushings can be further refined. By distinguishing different insulation structure types such as oil-paper capacitor bushings, dry bushings, and pure porcelain bushings, and defining multi-dimensional status quantities covering porcelain insulation appearance, hydrophobicity of anti-pollution flashover coating, etc., a special status evaluation index system for bushing insulation performance and external insulation operating environment can be constructed. This system comprehensively covers key dimensions such as electrical insulation, sealing oil, thermal performance, and external insulation anti-pollution flashover capability of bushings. At the same time, by linking bushing status quantities with typical bushing fault modes (such as capacitor core moisture, end-screen connection)... Knowledge graphs can be linked to identify bushing insulation defects and locate discharge faults by addressing issues such as grounding problems leading to floating discharge, flashover of external insulation, and oil level drop due to sealing failure. For example, by jointly analyzing the insulation resistance, dielectric loss factor, and capacitance of the main and end screens, it can be determined whether the insulation of the capacitor core is damp or aged. By monitoring the correlation between infrared temperature and ultraviolet discharge signals, surface discharge and hot spots with poor contact in the external insulation can be identified. This improves the pertinence of bushing condition evaluation and the sensitivity of fault diagnosis, and reduces the risk of unplanned transformer outages caused by sudden bushing failures.

[0049] In a preferred embodiment, the tap changer includes any one or more of on-load tap changers and off-load tap changers; The equipment status parameters of the tap changer include any one or more of the following: tap changer oil level, breather status, operation counter status, oil leakage status, gas relay operation status, oil flow relay operation status, pressure relief valve operation status, number of operations, interval with the previous maintenance, overdue maintenance status, online oil filter pressure, online oil filter maintenance status, drive motor operation status, three-phase operation synchronization, limit device function status, sliding status, overcurrent lockout status, operation characteristics, tap changer oil breakdown voltage, tap changer oil moisture content, tap-related winding DC resistance, tap position, gear position indication clarity, mechanical lockout status, control circuit status, transmission mechanism jamming status, and corrosion status.

[0050] Specifically, the types and corresponding equipment status quantities of tap changers for power transformers can be further refined. By distinguishing between different voltage regulation methods such as on-load tap changers and off-load tap changers, and defining multi-dimensional status quantities covering oil level, breather status, etc., for various types of tap changers, a joint monitoring index system for equipment mechanical operation performance, insulating oil status, and control circuit reliability can be constructed. This system comprehensively covers key subsystems such as the tap changer's operating mechanism, contact system, insulating medium, and secondary control. This allows for the correlation between tap changer status quantities and issues such as contact erosion, mechanism jamming, insulating oil deterioration, and synchronization loss. By associating typical fault modes with knowledge graphs, the knowledge graph can support a comprehensive assessment of the reliability of tap changer operation and insulation status. For example, by analyzing the correlation between the number of operations and maintenance intervals, the degree of contact wear and the rationality of maintenance strategies can be evaluated. By jointly monitoring the synchronicity of three-phase operation, the sliding status, and the operating characteristics, mechanism jamming and drive system abnormalities can be identified. By analyzing the changing trends of oil breakdown voltage and micro-moisture content, the degree of moisture absorption of insulating oil can be determined. This improves the systematic nature of tap changer status evaluation and the timeliness of fault early warning, ensuring the reliable operation of transformer voltage regulation function.

[0051] In a preferred embodiment, the cooling system includes any one or more of the following: fan and motor, oil pump, water pump, oil flow relay, control system, control box, heat dissipation device, water cooler, oil circuit and seal, power supply, water cooling system, oil circuit bellows, cooler and monitoring circuit, and radiator and monitoring circuit. The equipment status parameters of the cooling system include any one or more of the following: fan operation status, oil pump operation status, water pump operation status, oil flow relay operation status, cooling device control system status, cooler AC main power supply switching status, single cooler operation mode switching status, cooler branch power supply status, control box water inlet status, surface contamination level of the radiator, inlet and outlet oil temperature difference of the cooling device, cooling water pipe leakage status, cooling system oil seepage status, cooling system oil leakage status, three-phase voltage monitoring device configuration status, independent power supply configuration status, automatic power switching device status, transformer oil pressure and water pressure relationship, oil circuit bellows installation and expansion status, cooler fault signal, cooler complete stop signal, radiator fault signal, and radiator abnormal signal.

[0052] Specifically, the composition and corresponding equipment status variables of the power transformer cooling system can be further refined. By dividing the cooling system into subsystems such as fans, motors, and oil pumps, and defining multi-dimensional status variables covering fan operation status, oil pump operation status, etc. for each subsystem, a thermal management status monitoring index system covering multiple modes of cooling systems such as air cooling, water cooling, and oil cooling can be constructed. This system comprehensively evaluates the heat exchange efficiency, control logic reliability, and sealing integrity of the cooling system. By associating the cooling system status variables with typical fault modes such as transformer thermal faults, cooling efficiency decline, and oil circuit blockage, the knowledge graph can support the comprehensive evaluation of the cooling system's thermal management effectiveness and the correlation analysis of thermal faults. For example, by jointly analyzing the temperature difference between the inlet and outlet oil of the cooling device and the degree of contamination on the surface of the heat dissipation device, the heat dissipation efficiency can be evaluated and cleaning and maintenance can be guided. By monitoring the correlation between the cooler's full stop signal and the power switching status, control loop faults and power reliability issues can be identified. By dynamically tracking the relationship between the expansion and contraction status of the oil circuit bellows and the oil pressure, oil circuit blockage and sealing failure can be prevented, thereby improving the accuracy of the cooling system status evaluation and the ability to ensure the thermal safety of the transformer.

[0053] In a preferred embodiment, the non-electrical protection includes any one or more of the following: a thermometer, an oil level indicator, a pressure relief valve, a gas relay, a pressure relay, a pressure surge relay, an oil flow relay, a tap changer position indicator, and an outdoor protection device. Non-electrical quantity protection equipment status quantities include any one or more of the following: thermometer indication status, remote and local thermometer indication deviation, thermometer secondary circuit insulation resistance, thermometer calibration status, oil level indication status, pressure relief valve leakage status, pressure relief valve malfunction record, pressure relief valve secondary circuit insulation resistance, light gas alarm status, heavy gas operation status, gas relay periodic inspection status, gas relay oil leakage status, gas relay secondary circuit insulation resistance, pressure relay leakage status, pressure relay malfunction record, pressure relay secondary circuit insulation resistance, pressure surge relay leakage status, pressure surge relay malfunction record, pressure surge relay secondary circuit insulation resistance, oil flow relay leakage status, oil flow relay malfunction record, oil flow relay secondary circuit insulation resistance, consistency of remote and local tap position indication, and integrity of rainproof measures.

[0054] Specifically, the composition and corresponding equipment status quantities of non-electrical quantity protection for power transformers can be further refined. By dividing non-electrical quantity protection into key secondary devices such as thermometers and oil level indicators, and defining multi-dimensional status quantities for each protection device, including thermometer indication status and remote and local indication deviation, a special monitoring index system can be constructed for the status of the non-electrical quantity protection device itself and the reliability of its secondary circuit. This system comprehensively covers the measurement accuracy, operational reliability, sealing integrity, and secondary circuit insulation performance of the protection device. Furthermore, by knowledge-based association between non-electrical quantity protection status quantities and typical risks such as protection maloperation, failure to operate, and degradation of secondary circuit insulation, a knowledge link can be established. This enables knowledge graphs to support comprehensive assessments and risk warnings of the reliability of non-electrical quantity protection systems. For example, by jointly analyzing the indication deviations of various protection devices such as thermometers, oil level gauges, and gas relays with the insulation resistance of secondary circuits, measurement distortions caused by secondary circuit grounding or insulation aging can be identified. By monitoring the correlation between the malfunction records of pressure relief valves and gas relays and leakage status, the mechanical reliability and sealing performance of the protection devices themselves can be evaluated. By dynamically tracking the integrity of rainproof measures and the status of outdoor protection devices, protection failures caused by environmental factors can be prevented, thereby improving the systematic nature of non-electrical quantity protection status evaluation and the reliability of transformer non-electrical fault protection.

[0055] S3: Based on the knowledge model, extract entity, entity relationship and attribute information from multi-source data of power transformers, and map the extraction results to obtain several structured triples; Specifically, guided by a defined knowledge model, information extraction techniques based on rules, statistical models, or deep learning can be employed to automatically identify relevant entities (such as equipment name, equipment components, equipment performance, equipment status variables, evaluation basis, evaluation level, handling measures, and detection type), relationships between entities (such as inclusion relationship, belonging relationship, influence relationship, evaluation index relationship, evaluation basis relationship, evaluation level relationship, and triggering handling relationship), and attribute information (including entity attributes such as commissioning time, rated parameters, parameter units, and evaluation thresholds, as well as relationship attributes such as influence degree, knowledge source, confidence level, and effective time interval) from multi-source heterogeneous data. The extraction results are then mapped to structured triples such as "entity-relationship-entity" or "entity-attribute-attribute value." Through the constraints and guidance of the knowledge model, noisy data and irrelevant information can be effectively filtered, improving the accuracy of entity identification and relationship extraction, and ensuring a high degree of fit between the triple structure and the knowledge model.

[0056] In a preferred embodiment, the steps of extracting entities, relationships between entities, and attribute information from multi-source data of power transformers include: S31: Obtain the difference between each device status value and the corresponding standard limit value, and determine the basic deduction value based on the difference; S32: Obtain the influence factors of each equipment status quantity, and weight the basic deduction values ​​of each equipment status quantity according to the influence factors to obtain the individual deduction value of each equipment status quantity; S33: Obtain the sum of the individual deduction values ​​of the equipment status variables of each equipment component to obtain the status deduction value of each equipment component; S34: When the status deduction value is less than the first threshold, the evaluation level of the corresponding equipment component is normal; when the status deduction value is not less than the first threshold and less than the second threshold, the evaluation level of the corresponding equipment component is attentive; when the status deduction value is not less than the second threshold and less than the third threshold, the evaluation level of the corresponding equipment component is abnormal; when the status deduction value is not less than the third threshold, the evaluation level of the corresponding equipment component is severe.

[0057] Specifically, standard limits can be set based on the normal operating status or factory parameters of different equipment components, as well as the importance of different equipment components in the system and the importance of different equipment state quantities of different equipment components to the equipment component. The influence factors of each equipment state quantity are comprehensively determined. Then, in the information extraction and mapping process of the knowledge graph, a state evaluation and level determination process based on deduction value quantification is further introduced. The basic deduction value is determined by obtaining the difference between each equipment state quantity and the corresponding standard limit. The basic deduction value is weighted according to the state quantity influence factor to obtain the individual deduction value of each equipment state quantity. The individual deduction values ​​of the equipment state quantities of each equipment component are accumulated to obtain the state deduction value of each equipment component. Based on the first threshold, the second threshold, and the third threshold, the component status is divided into four levels: normal, attention, abnormal, and severe. This can transform qualitative state descriptions into a quantitative scoring system, so that the state evaluation process has clear mathematical logic and reproducible calculation standards, reduce the subjectivity and experience dependence of manual evaluation, and improve the objectivity, consistency, and comparability of state evaluation.

[0058] More specifically, since individual equipment components cannot be repaired or replaced in some equipment, the overall evaluation level of the equipment is determined by the evaluation level of the component with the highest deduction value.

[0059] In a preferred embodiment, the handling measures corresponding to different evaluation levels include: S35: When the evaluation level is normal, the handling measures include: conducting inspections of each equipment component every set maintenance cycle and judging whether the inspection results are qualified. If not, the next maintenance cycle is shortened according to the inspection results; if so, the next maintenance cycle is extended according to the inspection results. Specifically, when the evaluation level is normal, it means that the corresponding equipment components are all in normal operating condition. Therefore, it is only necessary to conduct inspections on each equipment component every set maintenance cycle and determine whether the inspection results are qualified. Since the evaluation level is normal at this time, only simple maintenance is performed on the equipment components during the inspection. Therefore, the inspection accuracy and judgment standards are low, and there are fewer inspection items. Even if the inspection results are unqualified, it will not affect the overall system operation. Therefore, the staff only needs to dynamically adjust the next maintenance cycle based on the inspection results to improve maintenance efficiency.

[0060] S36: When the evaluation level is "Caution", the handling measures include: obtaining the difference between the equipment status quantity and the standard limit value of each equipment component, and determining whether it is greater than the threshold. If not, the equipment status quantity is qualified; if so, the equipment status quantity is unqualified. If the number of unqualified equipment status quantities is 1, the next maintenance cycle is shortened and maintenance items corresponding to the unqualified equipment status quantity are added. If the number of unqualified equipment status quantities is greater than 1, the equipment is inspected and monitored online according to the set maintenance cycle, and maintenance items corresponding to the unqualified equipment status quantities are added. Specifically, as described in step S33, the sum of the individual deduction values ​​of the equipment status quantities of each equipment component is obtained to obtain the status deduction value of each equipment component. Then, the evaluation level of the corresponding equipment component is determined based on the status deduction value. Therefore, the evaluation level of each equipment component is determined by the sum of the individual deduction values ​​of all corresponding equipment status quantities. At this time, all corresponding equipment status quantities of each equipment component are considered separately. Based on the difference between the equipment status quantity of each equipment component and the standard limit, it is determined whether each equipment status quantity is qualified. If the equipment component with the evaluation level of "Caution" contains multiple unqualified equipment status quantities, it means that the deduction value is averaged across each unqualified equipment component. After the status variables are determined, the severity of each non-compliant equipment status variable is insufficient to affect the operation of the overall system. It is only necessary to conduct routine inspections and online monitoring of the equipment according to the set maintenance cycle, and add maintenance items corresponding to the non-compliant equipment status variables. If an equipment component with an evaluation level of "attention" contains only one non-compliant equipment status variable, it means that the evaluation level of the corresponding equipment component has been downgraded to "attention" based solely on the deduction value of that one equipment status variable. The severity of this equipment status variable is too high, and the next maintenance cycle needs to be shortened significantly immediately, and maintenance items corresponding to the non-compliant equipment status variable need to be added to avoid affecting the operation of the overall system.

[0061] S37: When the evaluation level is abnormal, the handling measures include: conducting online monitoring of each equipment component, and, based on the monitoring results, performing one or more of the following on the equipment components whose equipment status does not meet the requirements: lifting cover inspection, lifting core inspection, returning to the factory for repair, or technical upgrade and overhaul. Specifically, when the evaluation level is abnormal, it indicates that there are equipment components with serious operational problems that may not be able to withstand the next inspection. Therefore, it is necessary to conduct online monitoring of each equipment component and, based on the monitoring results, conduct cover inspection, core inspection, return to the factory for repair or technical upgrade and overhaul of equipment components whose equipment status does not meet the requirements. This is to avoid abnormal equipment components affecting other normal equipment components and the overall system operation during system operation.

[0062] S38: When the evaluation level is severe, the handling measures include: conducting power outage tests on each equipment component and replacing the equipment components that fail the test.

[0063] Specifically, when the evaluation level is severe, it means that the corresponding equipment component is on the verge of being scrapped or has already been scrapped and is completely unable to support the overall operation of the system. Furthermore, this equipment component will put great pressure on related equipment components. Therefore, it is necessary to immediately stop the entire system and conduct power outage tests on each equipment component to mark all affected equipment components. Finally, equipment components that fail the test should be replaced to minimize losses.

[0064] In this embodiment, differentiated handling strategies are defined for four evaluation levels: normal, attention, abnormal, and severe. Under the normal level, the maintenance cycle is dynamically adjusted based on the maintenance results. Under the attention level, the cycle is shortened or maintenance items are added based on the threshold judgment of the difference between the state quantity and the standard limit. Under the abnormal level, online monitoring is carried out and the hoisting cover inspection, hoisting core inspection, return to factory maintenance or technical transformation and overhaul are performed. Under the severe level, power outage test is performed and unqualified parts are replaced. This enables closed-loop management from the state evaluation results to maintenance decision-making actions, so that the knowledge graph not only has the ability to recognize the state, but also the ability to recommend decisions, thereby improving the synergy and business continuity between state evaluation and maintenance decision-making.

[0065] In a preferred embodiment, since the extracted data comes from different data sources, after mapping the extraction results to obtain several structured triples, it is necessary to perform optimization steps such as entity alignment, entity disambiguation, synonym expression normalization, duplicate fact merging, consistency verification, and knowledge reasoning completion to solve the problems that the same data may have different names in different data sources, the same fact may have redundant descriptions, multiple source attribute values ​​may conflict with each other, and the knowledge graph structure may be incomplete.

[0066] Specifically, an entity standard name table and a synonym mapping table can be established using the standardized terminology in the condition assessment guidelines and maintenance guidelines, and abbreviations and other expressions in test reports and equipment ledgers can be recorded. Candidate entities obtained from knowledge extraction are compared according to entity type, equipment component, parameter unit, contextual relationship, and attribute value. Candidate entities with the same entity type, consistent component path, compatible units, and the same contextual semantics are assigned the same standard entity identifier, and the different names of candidate entities are unified into the standard name of the standard entity, thus completing entity alignment and synonym expression unification. Candidate entities with the same name but different components, relational neighborhoods, or attribute characteristics are mapped to different standard entities, thus completing entity disambiguation.

[0067] During entity disambiguation, the system retrieves possible corresponding standard entities based on the candidate entity name, and then matches them sequentially by entity type, equipment / component path, parameter unit, contextual relationship, and attribute value. Specifically, equipment / component is used to define the equipment location corresponding to the state quantity; parameter unit is used to determine the physical quantity represented by the candidate entity; contextual relationship is used to determine the semantic connection between the candidate entity and the equipment / component, detection type, and evaluation criteria; and attribute value is used to verify data type and value characteristics. Disambiguation is complete when all features point to a unique standard entity; otherwise, it proceeds to manual review.

[0068] For candidate fact triples after name unification, duplicate facts are merged based primarily on the consistency of the standardized subject entity, relation, and object entity. When two candidate fact triples have the same subject entity standard identifier, relation type and direction, and object entity standard identifier, and there are no conflicts in the applicable equipment components, parameter units, and attribute values, they are determined to describe the same fact and are merged. After merging, the relation attributes such as knowledge source, confidence level, and validity period of each triple are retained to ensure knowledge traceability. If two triples have the same subject entity, relation, and object entity, but different evaluation thresholds, deduction values, or other attribute values, the attribute values ​​are not directly overwritten or merged; instead, the process proceeds to the consistency verification step.

[0069] Consistency checks are used to determine whether attribute values, parameter units, evaluation thresholds, deduction values, or grade mappings given by different sources for the same fact conflict with each other. Specifically, the entity identifiers, relation types, relation directions, attribute formats, and parameter units of candidate fact triples are standardized; candidate fact triples are grouped according to the main entity, relation, object entity, applicable conditions, and effective time; the attribute values, evaluation thresholds, deduction values, evaluation grade mappings, and handling measures of candidate fact triples in the same group are compared; candidate fact triples with consistent standardized content are merged, candidate fact triples with different applicable conditions are saved separately, and candidate fact triples with different attribute values ​​or evaluation logic under the same applicable conditions are marked as conflicting triples and transferred to the review process.

[0070] Knowledge reasoning completion is used to generate new candidate fact triples based on existing fact triple sets, thereby improving the structured representation of knowledge graphs. Specifically, it represents the relation transitive rules and state quantity evaluation logic rules as premises and reasoning conclusions; it retrieves fact triples that satisfy the rule premises from the existing triple set; it substitutes the matched entities into the rules to generate new candidate fact triples; and it then determines whether the reasoning result can be written into the canonical triple set based on schema layer constraints and quality verification rules.

[0071] For example, the "bushing dielectric loss" in the test report and the "bushing dielectric loss factor" in the guidelines express the same state quantity, and after entity alignment, they are unified as "bushing dielectric loss factor". For the "voltage ratio" appearing alone in the report, based on its component being "body winding" and its contextual relationship with the evaluation criteria, it is mapped to the standard entity "winding voltage ratio". The unification of synonymous expressions of relationships is accomplished using a relationship synonym mapping table. For example, expressions such as "belonging to" and "belonging to" are uniformly mapped to "belonging to relationship", and expressions such as "corresponding measures" and "triggering maintenance" are uniformly mapped to "triggering handling relationship".

[0072] When disambiguating entities, "insulation resistance" is mapped to "winding insulation resistance" when it appears in the winding test chapter and is associated with the winding entity; it is mapped to "bushing end screen insulation resistance" when it appears in the bushing end screen test chapter and is associated with the bushing end screen.

[0073] When merging repeated fact triplets, if both candidate triplets describe the fact that "the winding voltage ratio belongs to the main winding" and there is no conflict in the parameter units and attribute values, they are merged into a single canonical triplet, while retaining their respective knowledge sources and validity periods.

[0074] During consistency verification, if the values ​​of "0.005" and "0.5%" are the same after unit unification, they are considered consistent. If the two thresholds "0.5%" and "1%" appear under the same equipment and applicable conditions, they are marked as conflict. If they are applicable to different voltage levels or different standard versions, they are saved separately and are not considered as conflict.

[0075] When completing the knowledge reasoning, if the facts "the entity contains the entity winding" and "the winding voltage ratio belongs to the entity winding" already exist, the association "the winding voltage ratio belongs to the entity" is completed according to the inheritance rule of inclusion relationships. For the state evaluation logic, if the facts such as "the winding voltage ratio is associated with the evaluation basis," "the evaluation basis maps to the evaluation level," and "the evaluation level triggers the handling measures" already exist, then when the winding voltage ratio meets the corresponding evaluation basis, its evaluation level is inferred, and further associated with and tracked handling measures such as online monitoring, power outage testing, or technical upgrades and overhauls.

[0076] S4: Import each structured triple into a graph database, store entities as nodes, store relationships between entities as directed edges, and store attribute information in key-value pairs to construct a knowledge graph for power transformer state evaluation and decision-making.

[0077] Specifically, graph databases such as Neo4j and JanusGraph can be used as storage engines. Entities in structured triples are stored as nodes, relationships between entities are stored as directed edges, and attribute information is stored as key-value pairs in the attribute sets of nodes or edges. This allows for the construction of a knowledge graph for power transformer state evaluation and decision-making. Figure 2-4 As shown, this approach integrates equipment status information, evaluation rules, maintenance strategies, and expert experience scattered across different data sources into a graph structure, enabling visualized expression and computable storage of knowledge. This supports fault propagation path tracing based on graph traversal, equipment status correlation reasoning, potential defect prediction, and maintenance decision recommendation, thereby improving the intelligence level of power transformer status evaluation and the accuracy of decision support. At the same time, the flexibility of the graph structure gives the knowledge graph good scalability, facilitating the dynamic updating, incremental maintenance, and cross-system knowledge sharing of newly added entity types, relationship types, and attribute information.

[0078] This invention provides a knowledge graph construction method for power transformer condition evaluation and decision-making. Specifically designed for power transformer applications, it employs a four-stage progressive analysis framework: "multi-source heterogeneous data full-domain acquisition - top-down knowledge pattern definition - pattern constraint information extraction and triple mapping - native graph database storage and knowledge graph construction." This forms a multi-level, multi-path evaluation logic network involving "equipment - components - state variables - evaluation basis - evaluation level - handling measures." Compared to traditional knowledge management methods based on a single data source, lacking a unified semantic framework, or simply storing data in relational databases, this method offers unique technical advantages such as comprehensive data coverage, standardized semantic definitions, precise extraction and mapping, native graph storage and query capabilities, and intelligent reasoning and decision-making. Specifically, these advantages include: 1. Comprehensive Collection and Cross-Domain Integration of Multi-Source Heterogeneous Data to Construct a Data-Driven Knowledge Foundation for the Entire Lifecycle of Power Transformers: Traditional transformer knowledge management methods typically rely on a single data source (such as test reports or equipment ledgers) for knowledge summarization, neglecting the complementarity and correlation between multiple sources of information, such as condition assessment guidelines, maintenance guidelines, standard rules, and domain expert experience. This results in fragmented knowledge representation and a single information dimension, making it difficult to support complex condition assessments and cross-domain decision-making reasoning. This invention collects multi-source heterogeneous data, including power transformer condition assessment guidelines, maintenance guidelines, test reports, equipment ledger information, standard rules, and domain expert experience, and comprehensively integrates structured, semi-structured, and unstructured data, covering the entire lifecycle dimensions of design and manufacturing, commissioning, testing, condition assessment, fault diagnosis, and maintenance. Through cross-validation and information complementarity of multi-source data, the data layer of the knowledge graph possesses a complete equipment condition profile capability and authoritative knowledge source traceability capability. This comprehensive collection and cross-domain fusion of multi-source heterogeneous data enables the model to accurately capture the multi-dimensional state characteristics and expert decision-making logic of power transformers in different operating stages and business scenarios. Even in complex engineering scenarios with large differences in data source formats, discrete information distribution, and implicit expert experience, the model can maintain the completeness, authority, and domain professionalism of the knowledge base.

[0079] 2. Standardized Definition and Constraint Rule Design of Top-Down Knowledge Patterns to Achieve Standardized Construction of Semantic Framework in the Power Transformer Domain: Traditional knowledge graph construction methods often adopt a bottom-up data-driven approach, lacking predefined unified semantic patterns and business logic constraints. This leads to inconsistent entity recognition standards, ambiguous relational semantics, arbitrary attribute definitions, structural deviations between extraction results and domain specifications, and loose logic and poor maintainability of the knowledge graph's pattern layer. This invention adopts a top-down ontology engineering approach, based on professional knowledge and business logic in the power transformer domain. It predefines entity types covering equipment name, equipment components, equipment performance, equipment status quantities, evaluation basis, evaluation level, handling measures, and detection types, including relation types such as relationships, belonging relationships, influence relationships, evaluation index relationships, evaluation basis relationships, evaluation level relationships, and trigger handling relationships, as well as entity attributes, relation attributes, and corresponding constraint rules. Through the standardized definition of knowledge patterns, a unified semantic framework and structured guidance are provided for subsequent information extraction. This top-down knowledge model's standardized definition and constraint rule design enable entity type constraints, relation direction constraints, attribute data type constraints, and logical consistency constraints to automatically verify the extraction results, significantly improving the logical rigor, domain standardization, and maintainability of the knowledge graph model layer, and laying the model foundation for complex reasoning and consistency checks based on descriptive logic.

[0080] 3. Information extraction and structured triple mapping under knowledge pattern constraints achieve accurate transformation from multi-source heterogeneous data to unified semantic representation: Traditional information extraction methods often deviate from the guidance of upper-level semantic patterns, relying solely on simple rule matching or general named entity recognition models for isolated extraction. This fails to effectively handle the ambiguity resolution of professional terms in the power transformer field, the semantic recognition of complex relationships between entities, and the unified representation of multimodal heterogeneous information, resulting in high extraction noise, serious relationship omissions, and a disconnect between the triple structure and domain knowledge. This invention, guided by a defined knowledge pattern, employs rule-based, statistical model-based, or deep learning-based information extraction techniques to automatically identify power transformer-related entities, inter-entity relationships, and attribute information from multi-source heterogeneous data. The extraction results are mapped to structured triples such as "entity-relationship-entity" or "entity-attribute-attribute value." Through the constraints and guidance of the knowledge pattern, noisy data and irrelevant information are effectively filtered, achieving a structured fusion of quantitative data (such as dissolved gas component content in oil, winding DC resistance imbalance rate) and qualitative descriptions (such as condition evaluation level, defect qualitative conclusions) in test reports. This knowledge pattern-constrained information extraction and triple mapping significantly improves the accuracy of entity recognition and relation extraction, ensures a high degree of fit between the triple structure and the knowledge pattern, and enhances the information density, semantic richness, and computability of the knowledge graph.

[0081] 4. Native Graph Database Storage and Directed Relational Graph Construction Enable Efficient Retrieval and Computable Reasoning of Complex Knowledge Associations: Traditional knowledge storage methods typically employ relational or document-based databases for flattened storage, decomposing entities and relationships into two-dimensional tables or document sets. This results in multi-hop relationship queries requiring numerous table join operations, and inefficient complex path traversal and subgraph matching, making it difficult to support real-time intelligent applications with high requirements, such as power transformer fault propagation path tracing and state association reasoning. This invention imports structured triples into a graph database, storing entities as nodes, relationships between entities as directed edges, and attribute information as key-value pairs. Through the native graph storage structure of the graph database, it efficiently supports complex relationship queries, multi-hop path traversal, and subgraph matching. By integrating equipment status information, evaluation rules, maintenance strategies, and expert experience scattered across different data sources into a graph structure, it achieves visualized expression and computable storage of knowledge. This native storage of graph databases and construction of directed relational graphs makes fault propagation path tracing, equipment status association reasoning, potential defect prediction, and maintenance decision recommendation based on graph traversal possible, significantly improving the efficiency of knowledge retrieval, association analysis, and reasoning computation. At the same time, the flexibility of the graph structure ensures that the knowledge graph has good scalability and incremental maintenance capabilities.

[0082] 5. A full-process model driven by a graph-structured closed loop, achieving a high-fidelity knowledge link from multi-source data perception to intelligent decision support: Traditional transformer knowledge management methods often employ an architecture that separates data storage from knowledge application, lacking a fully integrated design from data acquisition, semantic definition, information extraction to knowledge storage. This results in a semantic gap between the data layer and the knowledge layer, making it difficult for knowledge to directly drive state evaluation reasoning and maintenance decisions. This invention achieves data perception and full-domain coverage of transformer state information through the full-domain acquisition of multi-source heterogeneous data; achieves consistency and normative constraints in domain semantics through the standardized definition of top-down knowledge models; achieves accurate transformation from heterogeneous data to structured knowledge through information extraction and triple mapping under knowledge model constraints; and achieves efficient retrieval and computable reasoning of complex knowledge associations through native graph database storage and directed relational graph construction. This end-to-end model, driven by data perception, semantic definition, information extraction, knowledge storage, and reasoning applications, and the graph-structured closed loop, significantly improves the spatial utilization of state data, the normative constraints of the semantic framework, the accuracy of knowledge extraction, and the query efficiency of knowledge storage. It provides end-to-end technical support for improving the intelligence level of power transformer condition assessment and ensuring the precision of maintenance decision support.

[0083] On the other hand, the present invention also provides a computer storage medium storing executable program code; the executable program code is used to execute the knowledge graph construction method for any of the above-mentioned power transformer state evaluation and decision-making methods.

[0084] On the other hand, the present invention also provides a knowledge graph construction system, including a memory and a processor; the memory stores program code that can be executed by the processor; the program code is used to execute the knowledge graph construction method for any of the above-mentioned power transformer state evaluation and decision-making methods.

[0085] For example, the program code can be divided into one or more modules / units, which are stored in the memory and executed by the processor to complete the present invention. The one or more modules / units can be a series of computer program instruction segments capable of performing a specific function, which describe the execution process of the program code in the knowledge graph construction system.

[0086] The knowledge graph construction system can be a computing device such as a desktop computer, laptop, handheld computer, or cloud server. The knowledge graph construction system may include, but is not limited to, processors and memory. Those skilled in the art will understand that the knowledge graph construction system may also include input / output devices, network access devices, buses, etc.

[0087] The processor can be a Central Processing Unit (CPU), or other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor can be a microprocessor or any conventional processor.

[0088] The memory can be an internal storage unit of the knowledge graph construction system, such as a hard drive or RAM. Alternatively, it can be an external storage device, such as a plug-in hard drive, SmartMediaCard (SMC), SecureDigital (SD) card, or FlashCard. Furthermore, the memory can include both internal and external storage units. The memory is used to store the program code and other programs and data required by the knowledge graph construction system. It can also be used to temporarily store data that has been output or will be output.

[0089] The aforementioned computer storage medium and knowledge graph construction system are created based on the aforementioned knowledge graph construction method for power transformer state evaluation and decision-making. Its technical functions and beneficial effects will not be elaborated here. The technical features of the above embodiments can be combined arbitrarily. For the sake of brevity, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0090] The embodiments described above are merely illustrative of several implementations of the present invention, and while the descriptions are relatively specific and detailed, they should not be construed as limiting the scope of the invention patent. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of the present invention, and these all fall within the protection scope of the present invention. Therefore, the protection scope of this invention patent should be determined by the appended claims.

Claims

1. A method for constructing a knowledge graph for power transformer condition evaluation and decision-making, characterized in that, include: Collect multi-source data of power transformers, including any one or more of the following: condition assessment guidelines, maintenance guidelines, test reports, equipment ledger information, standards and rules, and domain expert experience and knowledge; A top-down construction approach is adopted to define the knowledge graph's knowledge model, including entity types, relationship types, attribute information, and corresponding constraint rules; attribute information includes entity attributes and relationship attributes between entities; Based on the knowledge model, entity, entity relationship and attribute information are extracted from multi-source data of power transformers, and the extraction results are mapped to obtain several structured triples. Each structured triple is imported into a graph database, where entities are stored as nodes, relationships between entities are stored as directed edges, and attribute information is stored as key-value pairs, thus constructing a knowledge graph for power transformer state evaluation and decision-making.

2. The method according to claim 1, characterized in that, Entity type, including equipment name, equipment components, equipment performance, equipment status parameters, evaluation basis, evaluation level, handling measures, and detection type; Relationship types include inclusion relationship, belonging relationship, influence relationship, evaluation indicator relationship, evaluation basis relationship, evaluation level relationship, and triggering disposal relationship; Entity attributes include commissioning time, rated parameters, parameter units, evaluation thresholds, and deduction values; Relationship attributes include degree of influence, source of knowledge, confidence level, and effective time interval; Constraint rules include entity type constraints, constraints on the starting and target entity types of relationships, relationship direction constraints, constraints on attribute data types and value ranges, constraints on the mandatory and uniqueness of attributes, and constraints on the logical consistency between equipment components, equipment status quantities, evaluation criteria, evaluation levels, and handling measures.

3. The method according to claim 2, characterized in that, The equipment components include any one or more of the following: body, bushing, tap changer, cooling system, and non-electrical protection. Equipment performance, including any one or more of insulation performance, thermal performance and mechanical performance; The evaluation criteria include any one or more of the following: measured values ​​of state variables, initial value differences of state variables, standard limits, trends of change, comparison results with similar equipment, family defect information, adverse operating condition information, importance of state variables, degree of degradation of state variables, evaluation deduction values, and evaluation level mapping relationships. Evaluation levels include normal level, attention level, abnormal level, and severe level; The types of testing include routine inspections, live-line testing, online monitoring, and power outage tests.

4. The method according to claim 3, characterized in that, The main body includes any one or more of the following: potential hazards of the whole machine, operation of the whole machine, data of the whole machine, oil conservator and sealed solid insulation, breather, clamps, insulation system, insulating oil, windings, winding neutral point, iron core, oil tank and accessories; The equipment status parameters of the main body include short-circuit damage risk, annual heavy overload duration, noise, vibration, family defect information, equipment operating years, service life of oil tank sealing elements, oil tank sealing status, operating oil level, degree of polymerization of insulating paper, furfural content in oil, breather status, clamp grounding current, partial discharge abnormal signal, insulating oil dielectric loss factor, insulating oil breakdown voltage, insulating oil water content, insulating oil gas content, insulating oil interfacial tension, insulating oil volume resistivity, insulating oil sludge and sediment, insulating oil acid value, total hydrocarbon content in oil, total hydrocarbon gas generation rate, acetylene content in oil, carbon monoxide content in oil, hydrogen content in oil, and oil chromatographic data. The monitoring system includes any one or more of the following parameters: line monitoring alarm status, winding material, winding insulation process, short-circuit impact current, number of short-circuit impacts, duration of short-circuit impacts, winding DC resistance, winding dielectric loss factor, winding capacitance, winding frequency response, short-circuit impedance, winding voltage ratio, winding DC leakage current, winding insulation resistance, winding absorption ratio, winding polarization index, neutral point DC current, neutral point AC current, overexcitation degree, core grounding current, no-load current, no-load loss, core insulation resistance, clamp insulation resistance, core-clamp insulation resistance, oil seepage status, oil leakage status, surface corrosion status, operating oil temperature, and oil tank infrared temperature.

5. The method according to claim 3, characterized in that, Bushings include any one or more of the following: oil-paper capacitor bushings, dry bushings, and pure porcelain bushings. The equipment condition parameters of the bushing include any one or more of the following: appearance of porcelain insulation, hydrophobicity of anti-flashover coating, aging condition of creepage skirt, compliance of external insulation creepage distance, appearance of composite insulation sheath, sealing condition of composite bushing connection, hydrophobicity of composite insulation umbrella sleeve, oil leakage condition of bushing surface, creepage or corona condition of external insulation, bushing oil level indication, grounding condition of end screen, insulation resistance of main screen of bushing, insulation resistance of end screen of bushing, dielectric loss factor of bushing, capacitance of bushing, total hydrocarbon content in bushing oil, gas generation rate of total hydrocarbons in bushing, acetylene content in bushing oil, carbon monoxide content in bushing oil, carbon dioxide content in bushing oil, hydrogen content in bushing oil, methane content in bushing oil, abnormal partial discharge signal of bushing, infrared temperature of bushing joint, hot spot temperature of bushing column, temperature distribution of bushing body, infrared condition of bushing liquid surface, ultraviolet discharge signal of external insulation, voltage of end screen, change in relative dielectric loss factor, difference in initial value of relative capacitance, appearance of umbrella sleeve and sheath, appearance of porcelain parts, and insulation resistance.

6. The method according to claim 3, characterized in that, Tap changers include any one or more of on-load tap changers and off-load tap changers; The equipment status parameters of the tap changer include any one or more of the following: tap changer oil level, breather status, operation counter status, oil leakage status, gas relay operation status, oil flow relay operation status, pressure relief valve operation status, number of operations, interval with the previous maintenance, overdue maintenance status, online oil filter pressure, online oil filter maintenance status, drive motor operation status, three-phase operation synchronization, limit device function status, sliding status, overcurrent lockout status, operation characteristics, tap changer oil breakdown voltage, tap changer oil moisture content, tap-related winding DC resistance, tap position, gear position indication clarity, mechanical lockout status, control circuit status, transmission mechanism jamming status, and corrosion status.

7. The method according to claim 3, characterized in that, The cooling system includes any one or more of the following: fan and motor, oil pump, water pump, oil flow relay, control system, control box, heat dissipation device, water cooler, oil circuit and seals, power supply, water cooling system, oil circuit bellows, cooler and monitoring circuit, and radiator and monitoring circuit. The equipment status parameters of the cooling system include any one or more of the following: fan operation status, oil pump operation status, water pump operation status, oil flow relay operation status, cooling device control system status, cooler AC main power supply switching status, single cooler operation mode switching status, cooler branch power supply status, control box water inlet status, surface contamination level of the radiator, inlet and outlet oil temperature difference of the cooling device, cooling water pipe leakage status, cooling system oil seepage status, cooling system oil leakage status, three-phase voltage monitoring device configuration status, independent power supply configuration status, automatic power switching device status, transformer oil pressure and water pressure relationship, oil circuit bellows installation and expansion status, cooler fault signal, cooler complete stop signal, radiator fault signal, and radiator abnormal signal.

8. The method according to claim 3, characterized in that, Non-electrical protection includes any one or more of the following: thermometer, oil level indicator, pressure relief valve, gas relay, pressure relay, pressure surge relay, oil flow relay, tap changer position indicator, and outdoor protection device; Non-electrical quantity protection equipment status quantities include any one or more of the following: thermometer indication status, remote and local thermometer indication deviation, thermometer secondary circuit insulation resistance, thermometer calibration status, oil level indication status, pressure relief valve leakage status, pressure relief valve malfunction record, pressure relief valve secondary circuit insulation resistance, light gas alarm status, heavy gas operation status, gas relay periodic inspection status, gas relay oil leakage status, gas relay secondary circuit insulation resistance, pressure relay leakage status, pressure relay malfunction record, pressure relay secondary circuit insulation resistance, pressure surge relay leakage status, pressure surge relay malfunction record, pressure surge relay secondary circuit insulation resistance, oil flow relay leakage status, oil flow relay malfunction record, oil flow relay secondary circuit insulation resistance, consistency of remote and local tap position indication, and integrity of rainproof measures.

9. The method according to claim 3, characterized in that, When the evaluation level is normal, the handling measures include: conducting inspections of each equipment component every set maintenance cycle and judging whether the inspection results are qualified. If not, the next maintenance cycle is shortened according to the inspection results; if so, the next maintenance cycle is extended according to the inspection results. When the evaluation level is "Caution", the handling measures include: obtaining the difference between the equipment status quantity and the standard limit value of each equipment component, and determining whether it is greater than the threshold. If not, the equipment status quantity is qualified; if so, the equipment status quantity is unqualified. If the number of unqualified equipment status quantities is 1, the next maintenance cycle is shortened and maintenance items corresponding to the unqualified equipment status quantity are added. If the number of unqualified equipment status quantities is greater than 1, the equipment is inspected and monitored online according to the set maintenance cycle, and maintenance items corresponding to the unqualified equipment status quantities are added. When the evaluation level is abnormal, the handling measures include: conducting online monitoring of each equipment component, and, based on the monitoring results, performing one or more of the following on the equipment components whose equipment status does not meet the requirements: lifting cover inspection, lifting core inspection, returning to the factory for repair, or technical upgrade and overhaul. When the evaluation level is severe, the following measures shall be taken: conduct power outage tests on each equipment component and replace the equipment component that fails the test.

10. A knowledge graph construction system for power transformer condition evaluation and decision-making, characterized in that, It includes a memory and a processor; the memory stores program code that can be executed by the processor; the program code is used to execute the knowledge graph construction method for power transformer condition evaluation and decision-making as described in any one of claims 1 to 9.