Construction project information management method based on big data analysis

By constructing a three-layer nested dynamic graph database and a cross-modal comparative learning joint feature indexing mechanism, the problems of low cross-modal retrieval coverage and high retrieval time complexity in existing technologies are solved, realizing efficient and accurate cross-modal retrieval and real-time traceability, and meeting the data management needs of engineering sites.

CN123157945APending Publication Date: 2026-11-24SICHUAN JIAJIAN TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611338621.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-31
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

In existing construction project big data management systems, building information model spatial data, Internet of Things time-series data, and graphic semantic data are stored in independent data sources. Cross-database logical associations are established by manual tagging, resulting in low cross-modal retrieval coverage, high maintenance costs, and index structures that are fixed to the entity state at a certain moment, making it impossible to accurately reproduce the spatiotemporal dynamic evolution of the construction process. Cross-modal multi-hop association queries require repeated scanning and matching in the full data, and the retrieval time complexity increases sharply with the number of hops, making it difficult to meet the real-time traceability needs of the construction site.

Method used

A three-layer nested dynamic graph database structure is constructed to directly link building information model spatial data, Internet of Things time-series data, and graph semantic data at the underlying physical storage level. Through a cross-modal contrastive learning joint feature indexing mechanism, a composite index engine is established, consisting of an inverted index, a vector approximate nearest neighbor index, and a graph topology index. Combined with spatiotemporal boundary pruning and graph neural network deep aggregation algorithms, efficient source tracing for cross-modal retrieval is achieved.

Benefits of technology

It improves the completeness and automation of data association, increases the recall and accuracy of cross-modal retrieval, reduces the time complexity of cross-modal multi-hop tracing queries, and has the ability to restore the engineering status at historical moments, meeting the real-time tracing needs of engineering sites.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123157945A_ABST
    Figure CN123157945A_ABST
Patent Text Reader

Abstract

This invention discloses a construction project information management method based on big data analysis, belonging to the field of big data analysis and mining technology. This method abstracts building information model components into spatial backbone nodes, slices IoT time-series data to form time-stream edges and attaches them to the spatial backbone nodes, and performs semantic clustering of unstructured graph and text data to form semantic clusters and attach them to spatiotemporal nodes. A composite index engine is constructed by combining inverted indexes, vector approximate nearest neighbor indexes, and graph topology indexes. Upon receiving a query request, it is parsed into a subquery tree. First, candidate subgraphs are obtained by pruning based on spatiotemporal boundaries. Then, graph neural network aggregation and vector similarity calculation are used for deep matching, and finally, the results are sorted to generate a tracing path. This invention achieves physical-level fusion storage and cross-modal multi-hop tracing retrieval of heterogeneous construction project data, improving retrieval efficiency and historical state restoration capabilities.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of big data analysis and mining technology, specifically a construction project information management method based on big data analysis. Background Technology

[0002] Information management of construction projects involves various heterogeneous data, including spatial data from Building Information Modeling (BIM), time-series data from the Internet of Things (IoT), and unstructured data such as construction logs, supervision reports, and on-site photos. The closest existing technical solution to this invention is a construction project big data management system based on database sharding and table partitioning. This system stores BIM component data in a relational database, IoT time-series data in a time-series database, and unstructured data in a document database or object storage system. Logical relationships between the three types of data are established by manually adding tag fields. When a cross-modal retrieval request is initiated, the system sequentially performs equal-value matching queries by tag in each independent data source, and then the application layer concatenates the results.

[0003] In the above scheme, the relationship between the three types of data relies on manual annotation, the label coverage is limited, a large number of implicit relationships cannot be fully annotated, resulting in missed detections in the retrieval, and the maintenance cost increases with the increase of data volume. At the same time, once the index structure is established, it is fixed to the entity attributes at a certain moment, making it difficult to accurately restore the historical information of the evolution of the component status over time during the construction process. In addition, cross-modal multi-hop association queries require repeated full scans and application layer splicing in multiple independent data sources, which takes a long time and cannot meet the real-time traceability needs of the engineering site. Therefore, we propose a construction engineering information management method based on big data analysis. Summary of the Invention

[0004] The purpose of this invention is to provide a construction project information management method based on big data analysis.

[0005] The technical problem this invention aims to solve is that in existing construction engineering big data management systems, building information model spatial data, Internet of Things time-series data, and graphic semantic data are stored in independent data sources. The reliance on manual tags to establish cross-database logical associations results in low cross-modal retrieval coverage, high maintenance costs, and index structures that are fixed to the entity state at a certain moment, making it impossible to accurately reproduce the spatiotemporal dynamic evolution of the construction process. Cross-modal multi-hop association queries require repeated scanning and matching in the full dataset, and the retrieval time complexity increases sharply with the number of hops, making it difficult to meet the requirements of retrieval efficiency and traceability accuracy in engineering sites.

[0006] To address the aforementioned technical problems, this invention provides a construction project information management method based on big data analysis, comprising: parsing a building information model (BIM) file, extracting the geometric attributes, material attributes, and spatial connections between multiple building components, abstracting each building component as a spatial backbone node in a graph database, and abstracting the spatial connections between components as basic edges between spatial backbone nodes to form a spatial topology backbone network; for each spatial backbone node, acquiring time-series data generated by IoT sensors associated with that building component, slicing the time-series data according to a preset time window, forming a time flow edge for each time slice, with the two ends of the time flow edge connected to state snapshots of the same spatial backbone node in adjacent time slices; performing feature extraction and semantic clustering on unstructured data, aggregating unstructured records with similar semantics and associated with the same spatiotemporal node in both the time and spatial dimensions into a semantic cluster, and attaching the semantic cluster to the corresponding spatiotemporal node, thereby constructing a dynamic graph data consisting of three nested layers: spatial backbone nodes, time flow edges, and semantic clusters. The database structure fine-tunes the parameters of the multimodal large model in the engineering domain. It maps engineering text modal data, construction site image modal data, and 3D topological feature modal data of building information model components to a unified feature vector space. Key entity words are extracted from the original text content corresponding to the engineering text modal data and construction site image modal data to construct an inverted index. Based on the mapped feature vectors, a vector approximate nearest neighbor index is constructed, and the three-layer nested dynamic graph database structure is reused as a graph topology index. Cross-reference relationships between the three types of indexes are established to form a composite index engine. The engine receives query requests and parses them into a subquery tree containing multiple subquery nodes. Based on the time window and spatial boundary range in the query request, boundary filtering is performed in the three-layer nested dynamic graph database structure to obtain candidate subgraphs. On the candidate subgraphs, a graph neural network is used to aggregate neighbor information of candidate nodes to update the feature representation vector. The similarity between the updated feature representation vector and the query vector is calculated to obtain a matching score. Based on the matching score, the candidate nodes are sorted and a source path is generated.

[0007] Compared with the prior art, the beneficial effects of the present invention by adopting the above technical solution are as follows:

[0008] 1. This invention uses a three-layer nested dynamic graph database structure to directly link building information model spatial topology, Internet of Things time-series data, and graphic semantic data at the underlying physical storage level, eliminating the reliance on manual labeling and improving the completeness and automation of data association;

[0009] 2. This invention achieves the mapping of three-dimensional topological features of text, images, and building information models to a unified vector space through a cross-modal contrastive learning joint feature indexing mechanism. Combined with a composite indexing engine formed by the fusion of inverted index, vector approximate nearest neighbor index, and graph topological index, it improves the recall and accuracy of cross-modal retrieval.

[0010] 3. This invention employs a query processing algorithm that combines spatiotemporal boundary pruning with deep aggregation of graph neural networks. This algorithm first narrows down the size of candidate nodes and then performs deep matching, thereby reducing the time complexity of cross-modal multi-hop tracing queries and improving the system's retrieval response speed.

[0011] 4. The three-layer nested structure of this invention naturally preserves the hierarchical information of the time dimension, enabling the system to restore the engineering state at historical moments and solving the problem that static indexes cannot trace the dynamic evolution of the construction process. Attached Figure Description

[0012] Figure 1 This is a schematic diagram of the three-level nested dynamic graph database construction process in an embodiment of the present invention;

[0013] Figure 2 This is a schematic diagram of the composite index engine construction process in an embodiment of the present invention;

[0014] Figure 3 This is a schematic diagram of the query pruning and source retrieval process in an embodiment of the present invention. Detailed Implementation

[0015] The following is in conjunction with the appendix Figure 1-3 The specific embodiments of the present invention will be further described below. It should be noted that the description of these embodiments is for the purpose of helping to understand the present invention, but does not constitute a limitation of the present invention.

[0016] Furthermore, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0017] The following describes the construction project information management method based on big data analysis provided by the present invention in conjunction with specific embodiments. This embodiment takes a high-rise building under construction as the application scenario. The project includes various building components such as beams, columns, slabs, and walls. Various IoT sensors such as temperature, humidity, stress, and vibration are deployed on site, and unstructured data such as construction logs, supervision reports, and on-site pictures are continuously generated.

[0018] I. Construction of a three-level nested dynamic graph database structure:

[0019] First, construct the spatial backbone nodes, parse the building information model file of the project, and extract the geometric attributes, material attributes, and spatial connection relationships between the building components. The spatial connection relationships include load-bearing relationships, assembly relationships, and adjacency relationships. Each building component is abstracted as a basic node in the graph database, namely the spatial backbone node, and the connection relationships between components are abstracted as basic edges between nodes. This constitutes the spatial topology backbone network of the entire project, denoted as the backbone graph. The backbone graph is composed of several spatial backbone nodes and the basic edges connecting these nodes. For example, a column component is abstracted as a spatial backbone node, and the load-bearing relationship between it and the adjacent beam component is abstracted as the basic edge connecting the column node and the corresponding beam node.

[0020] Secondly, a time flow edge is attached. For each spatial backbone node, high-frequency time-series data generated by IoT sensors associated with the component is acquired and sliced ​​according to a preset time window. For example, the stress sensor data of a column component is sliced ​​with an hourly time window. Each time slice forms a time flow edge. The two ends of the time flow edge are connected to the state snapshots of the same spatial backbone node in adjacent time slices, thereby superimposing a dynamic link that extends with time on the spatial backbone node to characterize the evolution of the component's attributes from design state, construction state to acceptance state, etc. After the time flow edge is attached, the state of the spatial backbone node in each specific time slice constitutes a spatiotemporal node.

[0021] Semantic clusters are formed and attached again. For unstructured data such as construction logs, supervision reports, and on-site photos, feature extraction is performed using a multimodal large model, and clustering is performed according to the degree of semantic similarity. Unstructured records that are semantically similar and related to the same spatiotemporal node in both the time and spatial dimensions are aggregated into a semantic cluster, and this semantic cluster is attached as an additional node to the corresponding spatiotemporal node. For example, inspection records and on-site photos written by multiple supervisors for the same component at the same construction stage within a certain period are merged into the same semantic cluster after semantic clustering and attached to the spatiotemporal node of the corresponding period of the component.

[0022] Finally, a dynamic association index is established between the three-layer structure. After the above three-layer structure is constructed, a bidirectional association index pointer is established between the spatial backbone node, the time flow edge, and the semantic cluster. This enables the system to quickly locate the elements in the other two layers of the structure associated with any layer, forming a complete spatiotemporal-semantic-topological closed-loop association network, and realizing physical-level fusion storage of building information model spatial data, Internet of Things time-series data, and graphic semantic data.

[0023] II. Construction of a joint feature indexing mechanism based on cross-modal contrastive learning:

[0024] Based on the completion of the underlying data structure construction, a cross-modal joint feature indexing mechanism is further constructed. First, multimodal data preprocessing and modality division are carried out, and the data in the system is divided into three types: engineering-specific text modality, construction site image modality, and three-dimensional topological feature modality of building information model components.

[0025] Subsequently, cross-modal contrastive learning feature mapping is performed to fine-tune the parameters of the pre-trained multimodal large model in the engineering domain. This ensures that the original data from the three modalities—text, image, and 3D topology—are all mapped to a unified high-dimensional feature vector space. The fine-tuning process employs a contrastive learning loss function, which brings cross-modal data pairs describing the same engineering activity closer together in the vector space, while widening the distance between cross-modal data pairs describing different engineering activities. This loss function is expressed as:

[0026] ;

[0027] In the above formula, Indicates the first The contrastive loss value for each training sample pair. Indicates the first Each sample in modality Feature vectors extracted under (e.g., text modality) Indicates the first Each sample in modality Feature vectors extracted from (e.g., image modalities) The cosine similarity function represents the similarity between two vectors. This represents a temperature coefficient, used to adjust the smoothness of the similarity distribution. This represents the total number of samples in a training batch. Used as the index for traversing samples within a batch;

[0028] The cosine similarity function is specifically defined as follows:

[0029] ;

[0030] In the above formula, and These represent the two eigenvectors to be compared. Represents the dot product of two vectors. and Let these represent the magnitudes of the two vectors respectively;

[0031] After completing the feature vector mapping, a composite index engine is constructed. Specifically, an inverted index is built for the extracted key entity words, such as component number and process name, for precise keyword matching. A vector approximate nearest neighbor index is built for the mapped high-dimensional feature vector. In this embodiment, a hierarchical navigable small-world graph index structure is used for fuzzy semantic similarity retrieval. The aforementioned three-layer nested dynamic graph database structure itself is reused as a graph topology index for relation traversal retrieval. A cross-reference table is established between the three types of indexes through unique node identifiers, so that the result hit by any type of index can quickly locate its corresponding entry in the other two types of indexes. This forms a composite index engine that integrates the inverted index, the vector approximate nearest neighbor index, and the graph topology index.

[0032] III. Implementation of Vector Intelligent Query Routing and Pruning Source Tracing Algorithm:

[0033] When a user initiates a cross-modal retrieval request, the system first performs query request parsing and subquery tree generation. The system receives multi-source query requests input by the user, which can be text descriptions, on-site images, component numbers, or a combination of the above. The system calls the aforementioned feature extraction module to convert the query request into feature vectors or structured conditions for the corresponding modality. Based on the multi-hop associations implicit in the query semantics, the system parses the overall query request into an ordered subquery tree. Each subquery node in the subquery tree corresponds to a one-hop operation in the query path. For example, a query initiated by a photo of an on-site crack can be parsed into three sequentially connected subquery nodes: first, locating the relevant component; second, tracing the IoT data of the pouring of the component during the corresponding time period; and finally, associating the supervision log at that time.

[0034] Next, the first level of spatiotemporal boundary pruning is performed. For subquery nodes in the subquery tree that involve time and space constraints, boundary filtering is performed in the three-level nested dynamic graph database structure based on the time window and spatial coordinate range explicitly or implicitly given in the query request. Candidate nodes that do not meet the spatiotemporal constraints are removed, and only the set of nodes falling within the specified spatiotemporal boundary is retained. This pruning condition is expressed as:

[0035] ;

[0036] In the above formula, This represents the set of candidate nodes that remain after spatiotemporal pruning. This represents any node in the graph database. This represents the set of all nodes in a three-level nested graph database. Represents a node The corresponding time tag, and These represent the start and end times of the time window given in the query request. Represents the 3D spatial bounding box given by the query request, where , , These represent the boundary coordinates of the bounding box along the three coordinate axes, with the symbols... This represents the logical AND operation, meaning that a node must satisfy both temporal and spatial conditions to be retained.

[0037] On the candidate subgraph, which has been significantly reduced in size after pruning, a graph neural network is used to aggregate neighbor information of candidate nodes, and the representation vector of each node is updated layer by layer. The aggregation and update formula is as follows:

[0038] ;

[0039] In the above formula, Represents a node In the The feature representation obtained after layer aggregation Represents a node On the next level (the first The characteristic representation of the layer, Represents a node The set of neighbor nodes in the candidate subgraph express Any neighboring node in the list, This represents the aggregation function of neighbor features; in this embodiment, the mean value is used. This represents a vector concatenation operation. Indicates the first The learnable weight matrix of the layer, This represents a non-linear activation function. After obtaining the aggregated node representations, the cosine similarity between these representations and the query vector is further calculated, using the method described above. The formula is the same, and the similarity score is used as the matching score between the node and the current query;

[0040] Finally, the results are sorted and a tracing path is generated. Based on the previously calculated matching score, the candidate nodes are sorted in descending order, and the top-ranked candidate nodes are selected as the search results. At the same time, along the parent-child relationship between each subquery node in the subquery tree, the search results of each jump are connected in sequence to generate a complete tracing path. This path, along with the spatiotemporal tags and semantic cluster content corresponding to each jump, is returned to the application interaction layer for display. Taking the aforementioned crack photo query as an example, the system finally returns the component number associated with the crack photo, the stress and vibration time series data of the component during the pouring stage, and the corresponding supervision log content at that time, and presents the relationship between the three in the form of a path.

[0041] IV. Other implementation methods:

[0042] In other embodiments, in addition to using dynamic edges mounted on spatial backbone nodes, the aforementioned time flow edges can also be implemented by independently maintaining a version linked list structure ordered by time for each spatial backbone node. Each version node records the attribute snapshot at that moment and a pointer to the next version node. The same time dimension tracing effect can be achieved through the version linked list structure. This implementation method has relatively low implementation complexity.

[0043] In other embodiments, in addition to directly reusing the original topology structure of the graph database, the graph topology index in the aforementioned composite index engine can also pre-encode the topological relationships in the graph structure into structured path feature vectors, store them uniformly in the vector database, and approximate the effect of graph traversal query through vector retrieval, thereby simplifying the composite index engine into a two-level structure of inverted index and unified vector index, reducing the heterogeneous complexity of the system architecture.

[0044] The above-described specific embodiments are only some examples of the present invention. Those skilled in the art can make appropriate adjustments to the specific implementation of each step without departing from the principle of the technical solution of the present invention, and such adjustments should still fall within the protection scope of the present invention.

[0045] Although the present invention has been disclosed above with reference to preferred embodiments, it is not intended to limit the present invention. Any person skilled in the art can make possible changes and modifications without departing from the spirit and scope of the present invention. Therefore, any modifications, equivalent changes and alterations made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention shall fall within the protection scope defined by the claims of the present invention.

Claims

1. A construction project information management method based on big data analysis, characterized in that, include: The building information model file is parsed to extract the geometric properties, material properties, and spatial connection relationships between multiple building components. Each building component is abstracted as a spatial backbone node in the graph database, and the spatial connection relationships between components are abstracted as basic edges between spatial backbone nodes, thus forming a spatial topology backbone network. For each spatial backbone node, the time-series data generated by the IoT sensors associated with the building component is acquired, and the time-series data is sliced ​​according to a preset time window. Each time slice is formed into a time flow edge, and the two ends of the time flow edge are respectively connected to the state snapshots of the same spatial backbone node in adjacent time slices. Feature extraction and semantic clustering are performed on unstructured data. Unstructured records with similar semantics and associated with the same spatiotemporal node in both time and space dimensions are aggregated into a semantic cluster. The semantic cluster is then attached to the corresponding spatiotemporal node, thereby forming a dynamic graph database structure with three nested layers of spatial backbone nodes, time flow edges, and semantic clusters. The spatiotemporal node is the state of the spatial backbone node under a specific time slice. Fine-tuning of engineering domain parameters for multimodal large models, mapping engineering text modal data, construction site image modal data, and 3D topological feature modal data of building information model components to a unified feature vector space; This application extracts key entity words from the original text content corresponding to the engineering text modal data and construction site image modal data to construct an inverted index. Based on the mapped feature vectors, it constructs a vector approximate nearest neighbor index and reuses the three-layer nested dynamic graph database structure as a graph topology index. It establishes a cross-reference relationship between the inverted index, the vector approximate nearest neighbor index, and the graph topology index to form a composite index engine. Existing index structures are fixedly bound to entity attributes at a certain moment once established, which has the technical bias of being unable to restore the historical evolution of component states during the construction process. This application uses node unique identifiers to cross-reference the inverted index, the vector approximate nearest neighbor index, and the graph topology index reused from the three-layer nested dynamic graph database structure, so that the three types of indexes are directly and physically associated with the time flow edges that extend over time. This achieves the synergistic effect of cross-modal retrieval and historical state restoration without adding an independent historical storage structure, and overcomes the technical bias of existing index structures that are fixedly bound to attributes at a single moment. Receive a query request and parse the query request into a subquery tree containing multiple subquery nodes, where each subquery node corresponds to a one-hop operation in the query path; Based on the time window and spatial boundary range in the query request, boundary filtering is performed in the three-layer nested dynamic graph database structure to retain nodes whose time labels fall within the time window and whose spatial coordinates fall within the spatial boundary range, thus obtaining candidate subgraphs; A graph neural network is used to aggregate neighbor information of candidate nodes on the candidate subgraph, update the feature representation vector of each candidate node, calculate the similarity between the updated feature representation vector and the query vector corresponding to the query request, and obtain the matching score. The candidate nodes are sorted according to the matching score, and the candidate node with the highest ranking is selected as the retrieval result. Then, the hop retrieval results are concatenated in sequence along the parent-child relationship between each subquery node in the subquery tree to generate the source path.

2. The construction project information management method based on big data analysis according to claim 1, characterized in that, The spatial connection relationships between components include load-bearing relationships, assembly relationships, and adjacency relationships.

3. The construction project information management method based on big data analysis according to claim 1, characterized in that, It also includes establishing a bidirectional association index among the spatial backbone node, the temporal flow edge, and the semantic cluster, so that starting from any one of the three layers of the spatial backbone node, the temporal flow edge, and the semantic cluster, it is possible to locate the elements in the other two layers of the associated structure.

4. The construction project information management method based on big data analysis according to claim 1, characterized in that, In the process of fine-tuning the parameters of a multimodal large model in the engineering domain, a comparative learning approach is adopted to bring cross-modal data pairs describing the same engineering activity closer together in the unified feature vector space, and to widen the distance between cross-modal data pairs describing different engineering activities in the unified feature vector space.

5. The construction project information management method based on big data analysis according to claim 1, characterized in that, The conditions for boundary filtering are: the time label corresponding to the candidate node is not earlier than the start time of the time window and not later than the end time of the time window, and the spatial coordinates corresponding to the candidate node are located within the three-dimensional spatial bounding box given by the query request.

6. The construction project information management method based on big data analysis according to claim 1, characterized in that, The method of using graph neural networks to aggregate neighbor information of candidate nodes is as follows: the feature representation vector of the candidate node in the previous layer is concatenated with the aggregated result of the feature representation vectors of its neighbor nodes in the previous layer, and after weight matrix transformation and nonlinear activation processing, the feature representation vector of the candidate node in the current layer is obtained.

7. The construction project information management method based on big data analysis according to claim 1, characterized in that, The similarity is the cosine similarity between the updated feature representation vector and the query vector.

8. The construction project information management method based on big data analysis according to claim 1, characterized in that, The cross-reference relationship is established through a unique node identifier, so that the result hit by any of the three indices—the inverted index, the vector approximate nearest neighbor index, and the graph topology index—can locate the corresponding entry in the other two types of indices.

9. An electronic device, comprising a memory and a processor, wherein the memory stores a computer program, characterized in that, When the processor executes the computer program, it implements the construction project information management method based on big data analysis as described in any one of claims 1 to 8.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that, When the computer program is executed by the processor, it implements the construction project information management method based on big data analysis as described in any one of claims 1 to 8.