By constructing evidence atoms and graphs, and combining two-stage evidence recall and functional verification, the problem of unified processing of multi-source evidence in enterprise innovation diagnosis is solved, enabling accurate identification and verification of enterprise technology needs, and improving the reliability and confidence of model output.

CN123158076APending Publication Date: 2026-11-24GUANGZHOU UNIVERSITY +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611094660.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-22
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

In enterprise innovation diagnosis, multi-source heterogeneous evidence lacks a unified computable evidence unit, making it difficult to stably trace the model output to a specific source, and making it difficult to backfill and update on-site verification results. Furthermore, conflict detection and confidence calculation are insufficient.

Method used

Employing evidence atoms, evidence graphs, two-stage evidence recall, graph-based path-based counter-evidence recall, slot-based hint constraints, functional output verification, and on-site backfilling and updating mechanisms, the system constructs enterprise technology profiles and graphs through evidence atom sets, executes two-stage evidence recall and large-scale model algorithm orchestration, and performs format verification, evidence chain verification, and comprehensive confidence calculation.

Benefits of technology

It enables accurate identification and verification of enterprise technology needs, ensures the comparability and verifiability of evidence, reduces the generation of no evidence, supports the recall of counter-evidence and on-site verification tasks, and improves the reliability and confidence of the output.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123158076A_ABST
    Figure CN123158076A_ABST
Patent Text Reader

Abstract

The application discloses a kind of enterprise technical demand identification and verification method and system based on large model, method includes: receiving enterprise innovation diagnosis multi-source data, analysis generates evidence atom set;Enterprise technology portrait and evidence atlas are constructed based on evidence atom set;Two-stage evidence recall and large model algorithm arrangement are executed to target enterprise, and candidate technical demand tuple is obtained;Candidate technical demand tuple is executed functional output check and evidence chain verification, and comprehensive confidence is calculated;When comprehensive confidence is lower than preset threshold or there is key contradictory evidence, generate field verification task package;Receive the backfill data of field verification task package, convert into new evidence atom, incrementally update evidence atlas, enterprise technology portrait and comprehensive confidence;The candidate technical demand of comprehensive confidence and no key contradictory evidence is confirmed as verified technical demand.The application realizes accurate identification and dynamic verification of technical demand by deep integration of large model and evidence atlas, effectively improves the accuracy and reliability of demand mining.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the fields of enterprise innovation diagnosis, artificial intelligence, knowledge graph and data verification technology, and specifically relates to a method and system for identifying and verifying enterprise technology needs based on a large model. Background Technology

[0002] Enterprise innovation diagnostics typically involve materials such as questionnaires, interviews, on-site survey logs, equipment lists, on-site photos, R&D project ledgers, patent documents, test reports, supply chain data, and external innovation resources. These materials vary in source, format, timing, and reliability. Technical bottlenecks identified by enterprises may only appear in interview records, equipment status may only be reflected in photos or ledgers, and patents and R&D projects need to be correlated with specific needs through product, process, or indicator fields. If one directly searches by document or generates abstracts, it is difficult to determine which materials support a particular technical requirement, and it is also difficult to identify contradictory materials.

[0003] Existing practices include collecting enterprise technology needs through questionnaires or online platforms, and then matching experts, achievements, and service resources by keywords or classification tags; some use natural language models or large models to generate enterprise diagnostic reports, innovation capability evaluations, or science and technology service suggestions; and some solutions enhance retrieval and generate material summaries and questions and answers. These methods can improve text processing efficiency, but they still have shortcomings in enterprise innovation diagnosis scenarios: multi-source materials lack unified computable evidence units, and model outputs are difficult to reliably trace back to specific sources; conventional retrieval is more likely to recall supporting materials, but pays insufficient attention to highly reliable reverse materials, conflicts in the same indicator fields, and indirect counter-evidence related to the same equipment, project, or product nodes; when conflicts occur between enterprise self-reports, on-site records, photos, project ledgers, and patent materials, there is a lack of a mechanism to automatically locate the source of the conflict and generate on-site verification tasks; after on-site verification, the backfilled materials are also difficult to directly update the original profile, evidence chain, graph edge weights, and demand confidence.

[0004] Therefore, how to objectify multi-source heterogeneous evidence, how to retrieve and compare it in the graph, how to enable large models to generate candidate requirements in a constrained evidence context, and how to integrate counter-evidence, conflict detection, confidence calculation and on-site backfilling into the same processing link are technical problems that urgently need to be solved by those skilled in the art. Summary of the Invention

[0005] The main objective of this invention is to overcome the shortcomings and deficiencies of existing technologies and provide a method and system for identifying and verifying enterprise technology requirements based on a large model. By using evidence atoms, evidence graphs, two-stage evidence recall, graph path-based rebuttal recall, slotted hint constraints, functional output verification, evidence conflict matrix, and on-site backfilling and updating mechanisms, this invention solves the problems of model output generalization, unclear evidence citation, difficulty in locating reverse evidence, and difficulty in backfilling and updating on-site verification results in existing solutions.

[0006] To achieve the above objectives, the present invention adopts the following technical solution:

[0007] In a first aspect, the present invention provides a method for identifying and verifying enterprise technology requirements based on a large model, comprising the following steps:

[0008] S1. Receive multi-source data for enterprise innovation diagnosis, divide the multi-source data into text data, image data, tabular data and external resource data, perform unified analysis, and generate a set of evidence atoms; each evidence atom in the set of evidence atoms includes at least evidence identifier, source type, collection time, associated subject, associated object, semantic vector, structured slot, evidence weight and verification status;

[0009] S2. Construct a corporate technology profile and evidence map based on the set of evidence atoms. The corporate technology profile consists of multiple profile dimensions, including at least two of the following: R&D capabilities, talent team, intellectual property, equipment, industry-academia-research cooperation, digitalization level, product technology roadmap, market urgency, and position in the industrial chain. The evidence map uses enterprises, products, processes, equipment, R&D projects, patents, personnel, institutions, links in the industrial chain, and evidence atoms as nodes, and supports, contradictions, common origins, time sequence, attribution, citation, and resource adaptation as edges.

[0010] S3. Execute a two-stage evidence recall and large-scale model algorithm orchestration for the target enterprise: Recall the first set of evidence based on the semantic similarity, graph path relevance, source reliability, and time decay between the evidence atoms and the target profile dimensions or target technical links; Starting from the evidence atoms in the first set of evidence, perform one to three hop graph expansion along contradictory edges, same indicator field edges, same equipment edges, same project edges, and same product edges, and filter out reverse evidence with opposite factual conclusions, indicator field differences exceeding preset indicator thresholds, or source reliability higher than the corresponding supporting evidence to obtain the second set of evidence; Assemble the first set of evidence, the second set of evidence, missing slots, and observable objects on site into a candidate retrieval context package and input it into the constrained large-scale model to obtain candidate technical requirement tuples;

[0011] S4. Perform functional output verification and evidence chain verification on the candidate technical requirement tuples. The functional output verification includes format verification, evidence citation verification, slot integrity verification, and rebuttal consistency verification. The evidence chain verification includes generating a set of supporting evidence, a set of contradictory evidence, a set of missing evidence, and a set of verification questions, constructing an evidence conflict matrix, and calculating the comprehensive confidence of the candidate technical requirements based on the output quality score of the large model, the strength of rebuttal evidence, the conflict penalty term, as well as the evidence coverage, source reliability, graph path consistency, on-site verifiability, and indicator quantifiability.

[0012] S5. When the overall confidence level is lower than the preset threshold, or when there is key contradictory evidence in the contradictory evidence set, generate an on-site verification task package based on the missing evidence type, the location of the contradictory evidence and the observable objects on site.

[0013] S6. Receive the backfilled data from the on-site verification task package and convert the backfilled data into new evidence atoms. If the new evidence atoms meet the consistency resolution rules, delete or reduce the weight of the corresponding contradictory edges. If the new evidence atoms enhance the original supporting evidence path, increase the weight of the corresponding supporting edge and incrementally update the evidence graph, enterprise technical profile and comprehensive confidence level.

[0014] S7. Candidate technical requirements whose comprehensive confidence level reaches a preset threshold and which do not contain key contradictory evidence are confirmed as verified technical requirements. A verified technical requirement record is generated, including a verified evidence chain, requirement status, quantifiable technical indicators and fields to be re-examined. The verified technical requirement record is written back to the enterprise technical profile and evidence map.

[0015] As a preferred technical solution, in step S1, the multi-source data for enterprise innovation diagnosis includes at least two of the following: enterprise basic data, questionnaire data, interview texts, on-site survey logs, on-site photos, equipment lists, test reports, patent documents, R&D project ledgers, industrial chain information, expert database data, scientific and technological achievement database data, university and research institute data, and innovation platform data.

[0016] The structured slots include the problem object, technical aspects, pain point description, indicator fields, existing capability fields, target capability fields, constraint fields, evidence citation fields, and fields to be verified.

[0017] As a preferred technical solution, in step S2, when constructing the evidence graph, entity alignment and time merging are performed on evidence atoms under the same enterprise; when the associated subjects and associated objects of two evidence atoms are the same and the collection time interval is less than the preset time window, a common-source edge or a time-series edge is established; when two evidence atoms are associated with the same product, process, equipment, project or patent node and the factual conclusions are opposite, or the numerical difference of the same indicator field exceeds the preset indicator threshold, a contradictory edge is established and the contradictory edge weight is written.

[0018] As a preferred technical solution, in step S3, the candidate retrieval context packets are sorted according to the following comprehensive retrieval scores:

[0019]

[0020] in, The comprehensive retrieval score is represented by , e is the evidence atom, q is the target profile dimension or target technical link, Sem(e,q) is the semantic similarity, and Path(e,q) is the graph path relevance. Path(e,q) is determined as follows: In the candidate subgraph composed of supporting edges, contradictory edges, homologous edges, temporal edges, attribution edges, and referencing edges, find valid paths from the evidence atom to the target profile dimension or target technical link that do not exceed a preset number of hops. For each valid path, calculate the product of the edge type weight and the edge weight of each edge in the path, and decay the product according to the number of hops in the path. The sum of the decayed products is taken as the path relevance. Src(e) is the source reliability determined by the source type and verification status, Time(e) is the time decay determined by the interval between the collection time and the current verification time, and a1, a2, a3, and a4 are non-negative weights that sum to 1.

[0021] As a preferred technical solution, in step S3, the candidate technical requirement tuple is processed as follows:

[0022] Perform format validation, evidence citation validation, slot integrity validation, and proof of contradiction consistency validation on candidate technology requirement tuples.

[0023] If the validation fails, return missing slots, invalid evidence references, missing or conflicting fields of counter-evidence to the large model and trigger regeneration; if the validation passes, reorder the candidate technical requirement tuples according to the output quality score and counter-evidence strength.

[0024] The mass fraction Q(d) satisfies:

[0025]

[0026] Where Slot(d) is the slot completeness rate, Ref(d) is the evidence citation effectiveness rate, Metric(d) is the quantifiable rate of the metric, Reject(d) is the rejection compliance rate, and b1, b2, b3 and b4 are non-negative weights and their sum is 1.

[0027] The strength of the counter-evidence A(d) satisfies:

[0028]

[0029] Where NegSrc(d) represents the reliability of the source of the disproving evidence, NegConflict(d) represents the degree of conflict between the disproving evidence and the candidate technology requirement, NegPath(d) represents the strength of the graph path from the disproving evidence to the node associated with the candidate technology requirement, and c1, c2 and c3 are non-negative weights and their sum is 1.

[0030] As a preferred technical solution, in step S4, the candidate technical requirement tuple includes requirement identifier, requirement name, associated enterprise, associated product or process, pain point type, list of supporting evidence identifiers, list of contradictory evidence identifiers, missing evidence type, quantifiable technical indicators, on-site observable objects, suggested R&D tasks, and resource type tags.

[0031] As a preferred technical solution, in step S4, when performing evidence chain verification on the candidate technical requirement tuple, an evidence conflict matrix M is constructed. The element Mij in M ​​represents the conflict state between the i-th evidence atom and the j-th evidence atom in the same technical link, the same indicator field, or the same factual conclusion. When two evidence atoms are associated with the same product, process, or equipment and their factual conclusions are opposite, Mij takes the first conflict value. When two evidence atoms have the same indicator field and their numerical differences exceed a preset indicator threshold, Mij takes the second conflict value. When high-source reliability evidence negates the conclusion of low-source reliability evidence, Mij takes the third conflict value. When there is no conflict, Mij takes 0. The first, second, and third conflict values ​​are all normalized to the range of 0 to 1 and corrected according to source reliability and time decay. The conflict penalty term Con(d) satisfies:

[0032]

[0033] Where Cnt(d) is the normalized value of the number of conflict matrix elements exceeding the conflict threshold, Weight(d) is the normalized value of the conflict evidence weight, Field(d) is the weighted value of the factual conclusion conflict and the indicator field conflict, and m1, m2 and m3 are non-negative weights and their sum is 1.

[0034] As a preferred technical solution, in step S4, the comprehensive confidence level satisfies:

[0035]

[0036] Wherein, d represents the candidate technical requirement, Cov(d) represents the evidence coverage, Rel(d) represents the source reliability, Cons(d) represents the map path consistency, Ver(d) represents the on-site verifiability, Met(d) represents the indicator quantifiability, Q(d) represents the large model output quality score, Con(d) represents the conflict penalty term, and A(d) represents the strength of the counter-evidence. Cov(d), Rel(d), Cons(d), Ver(d), Met(d), Q(d), Con(d), and A(d) are all normalized to the interval between 0 and 1. w1 to w8 are preset non-negative weight parameters. The weight parameters are determined by the optimization of the verification samples, the expert-annotated samples, or the preset business reliability rules, and are processed according to the preset weight normalization rules. When the calculated value of P(d) is lower than 0, it is taken as 0, and when it is higher than 1, it is taken as 1.

[0037] As a preferred technical solution, in step S5, the on-site verification task package includes a task identifier, a candidate technical requirement identifier, a missing evidence type, a contradictory evidence identifier, a verification object, a verification question, a scene to be observed, a position to be interviewed, images or materials to be collected, backfill fields, passing conditions, and priorities.

[0038] In step S6, after converting the backfilled data into new evidence atoms, if the new evidence atom is associated with the same product, process, or equipment as the original contradictory evidence, and the source reliability of the new evidence atom is not lower than that of the original contradictory evidence, or the new evidence atom is in the on-site verification state, and the factual conclusion of the new evidence atom is consistent with the set of supporting evidence, or the value of the same indicator field falls within the preset allowable deviation range, then the consistency resolution rule is met and the corresponding contradictory edge is deleted or downgraded; if the new evidence atom enhances the original supporting evidence path, then the consistency of the graph path and the source reliability are improved.

[0039] Secondly, the present invention provides a system for identifying and verifying enterprise technology requirements based on a large model, applied to the aforementioned method for identifying and verifying enterprise technology requirements based on a large model, including:

[0040] The multi-source data parsing module is used to receive multi-source data for enterprise innovation diagnosis, and to uniformly parse text data, image data, tabular data and external resource data to generate a set of evidence atoms. Each evidence atom in the set of evidence atoms includes at least evidence identifier, source type, collection time, associated subject, associated object, semantic vector, structured slot, evidence weight and verification status.

[0041] The evidence atom generation and graph construction module is used to construct an enterprise technology profile and evidence graph based on the evidence atom set. The evidence graph uses enterprises, products, processes, equipment, R&D projects, patents, personnel, institutions, industrial chain links and evidence atoms as nodes, and supports, contradictions, common origins, time sequence, attribution, references and resource adaptations as edges.

[0042] The two-stage evidence recall and large-scale model orchestration module is used to perform two-stage evidence recall and large-scale model algorithm orchestration for target enterprises: First, a first set of evidence is recalled based on the semantic similarity, graph path relevance, source reliability, and time decay between evidence atoms and target profile dimensions or target technical links; Second, starting from the evidence atoms in the first set, one to three hops of graph expansion are performed along contradictory edges, edges with the same indicator field, edges with the same equipment, edges with the same project, and edges with the same product, and reverse evidence with contradictory conclusions, indicator field differences exceeding preset indicator thresholds, or source reliability higher than the corresponding supporting evidence is filtered to obtain a second set of evidence; Third, the first set of evidence, the second set of evidence, missing slots, and observable objects on-site are assembled into a candidate retrieval context package and input into the constrained large-scale model to obtain candidate technical requirement tuples;

[0043] The output verification and evidence chain verification module is used to perform functional output verification and evidence chain verification on candidate technical requirement tuples. The functional output verification includes format verification, evidence citation verification, slot integrity verification, and rebuttal consistency verification. The evidence chain verification includes generating a set of supporting evidence, a set of contradictory evidence, a set of missing evidence, and a set of verification questions, constructing an evidence conflict matrix, and calculating the comprehensive confidence of candidate technical requirements based on the output quality score of the large model, the strength of rebuttal evidence, the conflict penalty term, as well as evidence coverage, source reliability, graph path consistency, on-site verifiability, and indicator quantifiability.

[0044] The on-site verification task generation module is used to generate an on-site verification task package based on the type of missing evidence, the location of contradictory evidence, and observable objects on-site when the overall confidence level is lower than a preset threshold or when there is key contradictory evidence in the contradictory evidence set.

[0045] The backfill update module is used to receive backfill data from the on-site verification task package, convert the backfill data into new evidence atoms; if the new evidence atom satisfies the consistency resolution rule, the corresponding contradictory edge is deleted or downweighted; if the new evidence atom enhances the original supporting evidence path, the weight of the corresponding supporting edge is increased, and the evidence graph, enterprise technical profile and comprehensive confidence level are incrementally updated.

[0046] The verified requirement record generation module is used to identify candidate technical requirements that have reached a preset confidence level and do not contain key contradictory evidence as verified technical requirements, generate verified technical requirement records including verified evidence chains, requirement status, quantifiable technical indicators and fields to be re-examined, and write the verified technical requirement records back to the enterprise technical profile and evidence map.

[0047] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0048] (1) In this invention, the enterprise innovation diagnostic materials are broken down into citationable, comparable and verifiable evidence atoms. Each evidence atom has source, time, vector, slot, weight and verification status, and subsequent identification no longer depends on the entire document summary.

[0049] (2) In this invention, the evidence graph is simultaneously set with supporting edges, contradictory edges, temporal edges, reference edges and resource adaptation edges, so that the model input can be controlled by the graph path and evidence weight, reducing the generation of no evidence and generalization suggestions.

[0050] (3) This invention supports a two-stage recall consisting of evidence recall and counter-evidence recall. Counter-evidence recall is not a simple similarity search, but rather extends along contradictory edges, edges with the same indicator field, edges with the same device, edges with the same project, and edges with the same product. It also combines factual conclusions, indicator thresholds, and source reliability to screen reverse evidence, so that both positive and negative materials can be seen before candidate requirements are generated.

[0051] (4) This invention can constrain the output of large models through context budgeting, slotting hints, functional output verification, failure regeneration, and candidate reordering. Candidate technical requirements need to include supporting evidence, contradictory evidence, missing evidence, observable objects on-site, and quantifiable technical indicators. Invalid or insufficient evidence can be identified.

[0052] (5) This invention can comprehensively consider the confidence level while taking into account evidence coverage, source reliability, path consistency, on-site verifiability, quantifiable indicators, output quality, conflict penalty, and strength of counter-evidence. Among them, the conflict penalty is obtained from the evidence conflict matrix, and the strength of counter-evidence is obtained from the reliability of the counter-evidence source, the degree of conflict, and the path strength, which makes it easier to locate the specific evidence that leads to the demotion.

[0053] (6) Candidate requirements with low confidence or contradictions in this invention will be converted into on-site verification task packages; the on-site backfill materials will then be converted into new evidence atoms to update the supporting edges, contradictory edges, edge weights, and overall confidence of the evidence graph. Project-based decomposition, resource matching, and common requirement clustering are only performed after the requirements have been verified, avoiding the direct generation of diagnostic conclusions based on unverified evidence or free text. Attached Figure Description

[0054] To more clearly illustrate the technical solutions in the embodiments of this application, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0055] Figure 1 This is a flowchart of a method for identifying and verifying enterprise technology requirements based on a large model, according to an embodiment of the present invention.

[0056] Figure 2 This is a flowchart of the evidence atom generation and evidence spectrum construction process according to an embodiment of the present invention;

[0057] Figure 3 This is a flowchart of the large model algorithm orchestration and structured requirement extraction in an embodiment of the present invention;

[0058] Figure 4 This is a flowchart illustrating the calculation of the evidence conflict matrix and overall confidence level in an embodiment of the present invention.

[0059] Figure 5 This is a flowchart illustrating the generation and backfilling / updating process of the on-site verification task package according to an embodiment of the present invention.

[0060] Figure 6 This is a schematic diagram of the structure of an enterprise technology requirement identification and verification system based on a large model, according to an embodiment of the present invention. Detailed Implementation

[0061] To enable those skilled in the art to better understand the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are merely some embodiments of the present application, and not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present application without creative effort are within the scope of protection of the present application.

[0062] In this application, the reference to "embodiment" means that a specific feature, structure, or characteristic described in connection with an embodiment may be included in at least one embodiment of this application. The appearance of this phrase in various places throughout the specification does not necessarily refer to the same embodiment, nor is it a mutually exclusive, independent, or alternative embodiment. It will be explicitly and implicitly understood by those skilled in the art that the embodiments described in this application can be combined with other embodiments.

[0063] Please see Figure 1 This embodiment provides a method for identifying and verifying enterprise technology requirements based on a large model, including the following steps:

[0064] S1. Receive multi-source data for enterprise innovation diagnosis, divide the multi-source data into text data, image data, tabular data, and external resource data, and perform unified analysis to generate a set of evidence atoms. Each evidence atom in the set of evidence atoms includes at least the evidence identifier, source type, collection time, associated subject, associated object, semantic vector, structured slot, evidence weight, and verification status.

[0065] like Figure 2As shown, the data includes at least two of the following: enterprise basic data, questionnaire data, interview transcripts, on-site survey logs, on-site photos, equipment lists, test reports, patent documents, R&D project ledgers, industry chain information, expert database data, scientific and technological achievement database data, university and research institute data, and innovation platform data. The multi-source data for enterprise innovation diagnosis is divided into text data, image data, tabular data, and external resource data for unified analysis to generate a set of evidence atoms.

[0066] The text data undergoes segmentation, noise reduction, entity recognition, indicator field extraction, and semantic encoding; the image data undergoes time watermark recognition, location field recognition, scene classification, text recognition, and image semantic encoding; the table data undergoes header normalization, field mapping, numerical unit conversion, and outlier detection; and the external resource data undergoes resource subject recognition, capability tag extraction, and technical field encoding.

[0067] Each piece of parsed information is converted into an evidence atom. An evidence atom is not the original document, but the smallest data unit that can be cited, compared, and verified later. For example, "the yield of key processes fluctuates greatly" in an interview record can form a textual evidence atom; equipment model, operating years, and failure frequency in the equipment ledger can form a structured evidence atom; equipment nameplates, shooting time, and scene type identified in on-site photos can form image evidence atoms; and the core processes covered by the claims in a patent document can form patent evidence atoms.

[0068] The atomic fields of evidence include evidence identifier, source type, original document location, collection time, associated subject, associated object, industry chain link, technical link, indicator field, factual conclusion, semantic vector, structured slot, evidence weight, and verification status. Evidence weight can be determined based on the reliability and verifiability of the source. Generally, on-site inspection records, time-watermarked on-site photos, enterprise confirmation materials, and R&D project ledgers have higher weights than self-reported questionnaire materials and promotional materials.

[0069] The structured slots include problem objects, technical aspects, pain point descriptions, indicator fields, existing capability fields, target capability fields, constraint fields, evidence citation fields, and fields to be verified; the semantic vectors include at least one of text semantic vectors, image semantic vectors, and structured field vectors.

[0070] S2. Construct a technical profile and evidence map of the enterprise based on the set of evidence atoms.

[0071] The enterprise technology profile consists of multiple dimensions, including R&D capabilities, talent team, intellectual property, equipment, industry-academia-research collaboration, digitalization level, product technology roadmap, market urgency, and position in the industry chain. Each profile dimension is not just a label, but also includes a status value, a list of evidence atoms, update time, and reliability. For example, the equipment profile can record the equipment category, purpose, operating status, correlation with technical bottlenecks, and supporting evidence such as on-site photographs and equipment ledgers.

[0072] The evidence graph comprises a set of nodes, a set of edges, and a set of weights. Nodes can include enterprises, products, processes, equipment, R&D projects, patents, personnel, institutions, links in the industrial chain, and evidence atoms; edges can include supporting edges, contradictory edges, edges of the same origin, temporal edges, attribution edges, referencing edges, and resource-matching edges. When constructing the graph, evidence atoms under the same enterprise are first aligned in terms of entity and time. When two evidence atoms have the same associated subject, the same associated object, and a collection time interval less than a preset time window, edges of the same origin or temporal sequence are established; when two evidence atoms reach contradictory factual conclusions about the same technical aspect, contradictory edges are established.

[0073] Furthermore, when constructing the evidence graph, entity alignment and time merging are performed on evidence atoms under the same enterprise; when two evidence atoms have the same associated subject, the same associated object and the collection time interval is less than the preset time window, a common source edge or time sequence edge is established; when two evidence atoms are associated with the same product, process, equipment, project or patent node and the factual conclusions are opposite, or the numerical difference of the same indicator field exceeds the preset indicator threshold, a contradictory edge is established and the contradictory edge weight is written.

[0074] In a preferred embodiment, each edge is further assigned an edge weight. The weight of a supporting edge is determined by the evidence weight, semantic similarity, and time decay; the weight of a contradictory edge is determined by the degree of conflict between the conclusions, the degree of conflict between the indicator fields, and the reliability of the source; and the weight of a resource-matching edge is determined by the similarity between the demand vector and the resource vector, the resource maturity, and the complementarity of the industrial chain.

[0075] S3. Perform a two-stage evidence recall and large-scale model algorithm orchestration for the target enterprise: Recall the first set of evidence based on the semantic similarity, graph path relevance, source reliability, and time decay between the evidence atoms and the target profile dimensions or target technical links; Starting from the evidence atoms in the first set of evidence, perform one to three hop graph expansion along contradictory edges, same indicator field edges, same equipment edges, same project edges, and same product edges, and filter out reverse evidence with opposite factual conclusions, indicator field differences exceeding preset indicator thresholds, or source reliability higher than the corresponding supporting evidence to obtain the second set of evidence; Assemble the first set of evidence, the second set of evidence, missing slots, and observable objects on site into a candidate retrieval context package and input it into the constrained large-scale model to obtain candidate technical requirement tuples.

[0076] like Figure 3 As shown, this application does not directly input all enterprise materials into the large model. Instead, it first completes evidence recall, counter-evidence recall, context budget allocation, slot-based hint construction, constrained generation, output validation, failure regeneration, and candidate reordering. The large model mainly undertakes semantic induction and slot filling functions, while the evidence scope, output fields, and regeneration conditions are controlled by the data structure and validation rules in the system.

[0077] First, using the target company, profile dimension, or target technology step as the query object q, a query vector is constructed, and evidence atoms are retrieved from the evidence graph. The comprehensive retrieval score H(e,q) for each evidence atom e is calculated using the following formula:

[0078]

[0079] Where Sem(e,q) represents the semantic similarity between the evidence atom and the query object, Path(e,q) represents the graph path relevance from the evidence atom to the query object, Src(e) represents the source reliability of the evidence atom, Time(e) represents the time decay of the evidence atom, and a1 to a4 are non-negative weights with a sum of 1.

[0080] In one specific implementation, Path(e,q) is determined by the shortest effective path length from the evidence atom to the query object, the edge type weight in the path, and the edge weight. First, effective paths not exceeding a preset number of hops can be found in the candidate subgraph composed of supporting edges, contradictory edges, common-origin edges, temporal edges, attribution edges, and referencing edges. Then, the path relevance is calculated based on path length decay, edge type weight, and the product of edge weights. When an evidence atom is connected to the query object via the same product, process, equipment, project, or patent node, its path relevance is higher than that of evidence atoms connected only via enterprise nodes. Src(e) is set according to the source type and verification status. The source reliability of on-site inspection records, time-watermarked on-site photos, enterprise confirmation materials, R&D project ledgers, and test reports is higher than that of questionnaire self-reported materials and promotional materials; evidence atoms in the on-site verification status are higher than those in the unverified status. Time(e) is calculated based on the interval between the collection time and the current verification time; the closer the collection time, the higher the time decay.

[0081] After sorting by comprehensive search score, the top K evidence atoms are selected as the first evidence set. Next, a counter-evidence recall is performed on the first evidence set. Counter-evidence recall does not continue searching for evidence most similar to the query object, but rather searches the evidence graph for reverse evidence that has contradictory edges, conflicts with the same indicator fields, low semantic similarity but high source reliability, or is connected via the same product, process, equipment, project, or patent node, forming a second evidence set. In this way, the large model can simultaneously access supporting and counter-evidence materials when generating candidate technology requirements.

[0082] In one specific implementation, starting from the evidence atom in the first evidence set Epos, the evidence is extended one to three hops along contradictory edges, edges with the same indicator field, edges with the same device, edges with the same project, and edges with the same product. For the extended evidence atom, if its factual conclusion is contrary to the corresponding evidence atom in Epos, or the numerical difference of the same indicator field exceeds a preset indicator threshold, or its source reliability is higher than the corresponding evidence atom in Epos and its semantic conclusion is contrary, then it is added to the second evidence set Eneg. If the extension path passes through both the same device node and the same indicator field node, the path strength of the counter-evidence is increased; if the extension path only passes through the enterprise node and there is no factual or indicator conflict, then it is not considered counter-evidence.

[0083] Subsequently, the context budget is set according to the available context length of the model. The context budget includes the supporting evidence budget, contradictory evidence budget, missing slot budget, on-site observables budget, and external resource clue budget. The supporting evidence budget is used to place high-scoring evidence atoms; the contradictory evidence budget is used to place rebuttal evidence recall results; the missing slot budget is used to list fields not covered by evidence; the on-site observables budget is used to list objects that can be verified through on-site photos, ledgers, or interviews; and the external resource clue budget is used to place resource tags for experts, achievements, patents, or platforms. Each piece of evidence retains its evidence identifier and original source location.

[0084] Next, a slot-based prompt template is constructed. This template includes system prompts, task prompts, evidence prompts, output patterns, and rejection rules. System prompts restrict the model from outputting conclusions outside of the evidence atoms; task prompts require the model to output candidate technical requirements solely based on the candidate retrieval context; evidence prompts specify the supporting evidence set, contradictory evidence set, and missing evidence set; output patterns require the model to output the candidate technical requirement tuple D={did,name,ent,obj,pain,pos,neg,lack,metric,field,task,res} with fixed fields; and rejection rules require the model to output an "insufficient evidence" status when there is insufficient evidence, invalid evidence identifiers, or key slots cannot be filled.

[0085] The large model, constrained by structured output, is used for semantic induction and slot filling of candidate retrieval context packages. Slot templates require the output of requirement identifiers, requirement names, associated companies, associated products or processes, pain point types, a list of supporting evidence identifiers, a list of contradictory evidence identifiers, missing evidence types, quantifiable technical indicators, observable objects on-site, suggested R&D tasks, and resource type labels. Evidence citation constraints require each candidate technical requirement to cite at least one evidence atom; when no supporting evidence exists in the context package, the model outputs an "insufficient evidence" status.

[0086] In a preferred embodiment, the model output undergoes format validation, evidence citation validation, slot integrity validation, and proof-of-conformity validation. Format validation determines whether the output satisfies the tuple structure; evidence citation validation determines whether the evidence identifiers in pos and neg exist in the candidate retrieval context; slot integrity validation determines whether the metric, field, and lack fields meet preset rules; and proof-of-conformity validation determines whether the model ignores proofs with high source reliability. If the validation fails, missing slots, invalid evidence citations, omitted or conflicting proofs are returned to the model and regeneration is triggered. If the number of consecutive regenerations reaches a preset limit, the candidate is transferred to the manual review queue.

[0087] The large model output quality score Q(d) and the strength of counter-evidence A(d) can also be calculated. Q(d) is obtained based on slot completeness rate, evidence citation efficiency, indicator quantifiability rate, and rejection compliance rate; A(d) is obtained based on the source reliability, conflict degree, and graph path strength of counter-evidence in the second evidence set. Candidate technical requirements are then reordered according to P(d), with high output quality, low counter-evidence strength, and complete evidence chain candidates given priority for subsequent verification processes.

[0088] In this embodiment, the threshold Rmax for the number of failed regenerations can be set to 2 to 5. Each time a new content is generated, instead of randomly regenerating all content, the failed fields, error types, a list of available evidence identifiers, and missing slot names are added to the prompt template. For example, if the evidence identifier is not in the candidate retrieval context, the system will report "Invalid evidence reference"; if no quantifiable technical indicator is filled in, the system will report "Metric field missing"; if high-source reliability counter-evidence is ignored, the system will report "Counter-evidence consistency verification failed". If the verification still fails after the number of regenerations reaches Rmax, the candidate technical requirement is marked for manual review and will not be included in the automatic verification results.

[0089] S4 performs functional output validation and evidence chain verification on the candidate technical requirement tuples. The functional output validation includes format validation, evidence citation validation, slot integrity validation, and rebuttal consistency validation. The evidence chain verification includes generating a set of supporting evidence, a set of contradictory evidence, a set of missing evidence, and a set of verification questions, constructing an evidence conflict matrix, and calculating the comprehensive confidence of the candidate technical requirements based on the large model output quality score, rebuttal strength, conflict penalty term, evidence coverage, source reliability, graph path consistency, on-site verifiability, and indicator quantifiability.

[0090] like Figure 4 As shown, firstly, a set of supporting evidence is extracted from the evidence graph based on the list of supporting evidence identifiers in the candidate technology requirement tuple; then, a set of contradictory evidence is extracted based on contradictory edges and conflict fields; simultaneously, a set of missing evidence is generated based on the slot missing situation and verification rules, and a set of verification questions is generated from the set of missing evidence.

[0091] Subsequently, an evidence conflict matrix M is constructed. The element Mij in M ​​represents the conflict state between the i-th and j-th evidence atoms on the same technical aspect, the same indicator field, or the same factual conclusion. If the factual conclusions of two evidence atoms are contradictory, or the numerical difference of the same indicator field exceeds a preset threshold, or the company's self-report is inconsistent with on-site photos and equipment records, then Mij is set to a high conflict value. When Mij reaches the preset conflict threshold, the corresponding evidence atom is added to the contradictory evidence set.

[0092] The overall confidence level P(d) is calculated using the following formula:

[0093]

[0094] Wherein, d represents the candidate technical requirement; Cov(d) represents the evidence coverage, which can be determined by normalization based on the number of source types, profile dimensions, and number of required slots supporting the evidence coverage; Rel(d) represents the source reliability, which can be determined by weighting the source reliability and evidence weight of each evidence atom in the supporting evidence set; Cons(d) represents the consistency of the graph path, which can be determined by the number of effective supporting paths formed between supporting evidence through product, process, equipment, project, or patent nodes and the path weight; Ver(d) represents the on-site verifiability, which can be determined based on whether the candidate requirement has observable objects, interviewable positions, collectable materials, and clear passing conditions; Met(d) represents the quantifiability of the indicator, which can be determined based on the number, unit completeness, and target value completeness of the core technical indicators in the candidate requirement; Q(d) represents the quality score of the large model output; Con(d) represents the conflict penalty term; and A(d) represents the strength of the counter-evidence. All the above parameters are normalized to the range of 0 to 1. w1 to w8 are preset non-negative weight parameters. The weight parameters can be determined by the optimization of the verification samples, the expert-annotated samples, or the preset business reliability rules. When the calculated value of P(d) is lower than 0, it is taken as 0, and when it is higher than 1, it is taken as 1.

[0095] Q(d) can be calculated as Q(d) = b1 × Slot(d) + b2 × Ref(d) + b3 × Metric(d) + b4 × Reject(d). Slot(d) represents the completeness rate of the required slots in the candidate technical requirement tuple; Ref(d) represents the proportion of valid evidence identifiers in the pos and neg fields relative to the total number of evidence identifiers; Metric(d) represents the proportion of quantifiable technical indicator fields that are effectively filled; and Reject(d) represents the compliance value output by the model according to the rejection rule when evidence is insufficient. Ref(d) is 0 when a candidate technical requirement lacks supporting evidence identifiers; Reject(d) is 0 when the candidate retrieval context package does not contain supporting evidence but the model still outputs a deterministic technical requirement.

[0096] A(d) can be calculated as A(d) = c1 × NegSrc(d) + c2 × NegConflict(d) + c3 × NegPath(d). NegSrc(d) represents the reliability of the source of the counter-evidence, NegConflict(d) represents the degree of conflict between the counter-evidence and the candidate technology requirement, and NegPath(d) represents the path strength of the counter-evidence connected to the candidate technology requirement via product, process, equipment, project, or patent nodes. The more reliable the counter-evidence source, the stronger the conflict, and the shorter the path, the higher A(d). When the second evidence set is empty, A(d) is 0, but the candidate technology requirement still needs to meet the requirements of supporting evidence coverage and evidence citation verification.

[0097] Con(d) can be calculated as Con(d) = m1 × Cnt(d) + m2 × Weight(d) + m3 × Field(d). Cnt(d) is the normalized value of the number of elements in the evidence conflict matrix M that exceed the conflict threshold; Weight(d) is the normalized value of the atomic weights of the evidence involved in the conflict; and Field(d) is the weighted value of factual conclusion conflicts, indicator field conflicts, and the negation of low-reliability source conclusions by high-reliability sources. When conflicting evidence comes from on-site photos, test reports, equipment ledgers, or company confirmation materials, the value of Weight(d) or Field(d) can be increased.

[0098] In this embodiment, key contradictory evidence refers to evidence atoms whose source reliability exceeds a preset reliability threshold, directly contradicts the candidate technology requirement, and is associated with the same product, process, equipment, project, or patent node. Key contradictory evidence originating from on-site photos, test reports, equipment ledgers, or enterprise confirmation materials, and which negates the core factual conclusions or core indicator fields of the candidate technology requirement, can be marked as strong key contradictory evidence. When key contradictory evidence exists, even if the overall confidence level reaches the threshold, the candidate technology requirement is not directly confirmed; instead, an on-site verification task package is generated, or the process enters a manual review state. When strong key contradictory evidence exists, the candidate technology requirement must undergo on-site evidence backfilling and resolution before it can be converted to a verified status.

[0099] Based on the above calculations, candidate technology requirements can be categorized into four states: verified, pending on-site verification, requiring supplementary materials, and eliminated. The verified state is used for subsequent project-based breakdown; the pending on-site verification state is used to generate on-site verification task packages; the requiring supplementary materials state is used to request enterprises to supplement documents or ledgers; and the eliminated state is used to exclude candidate requirements that lack supporting evidence or contain key contradictions.

[0100] S5. When the overall confidence level is lower than the preset threshold, or when there is key contradictory evidence in the contradictory evidence set, generate an on-site verification task package based on the missing evidence type, the location of the contradictory evidence, and the observable objects on site.

[0101] like Figure 5 As shown, the on-site verification task package includes a task identifier, candidate technical requirement identifier, missing evidence type, contradictory evidence identifier, verification object, verification question, required on-site scene to be observed, required interview positions, required image or material collection, backfill fields, passing conditions, and priority. This task package is not a regular to-do list, but rather structured task data generated from missing paths and contradictory edges in the evidence graph.

[0102] For example, for the candidate technical requirement of "insufficient stability of key equipment," if the system finds that there are descriptions of equipment failures in the interview text, but the equipment ledger lacks failure frequencies, and the on-site photos cannot prove the equipment model, then the generated verification task package includes: the verification object is the key equipment of the corresponding production line; the verification issues are the equipment model, runtime, failure frequency, and downtime records; the on-site scenarios to be observed are the equipment operating area and maintenance records; the positions to be interviewed are the equipment engineer, production manager, and quality manager; the materials to be collected are photos of the equipment nameplate, maintenance ledger, downtime records, and quality anomaly data; and the conditions of failure frequency, downtime records, and quality anomaly data can form a supporting path with the candidate requirement.

[0103] S6. Receive the backfilled data from the on-site verification task package and convert the backfilled data into new evidence atoms. If the new evidence atoms meet the consistency resolution rules, delete or reduce the weight of the corresponding contradictory edges. If the new evidence atoms enhance the original supporting evidence path, increase the weight of the corresponding supporting edge and incrementally update the evidence graph, enterprise technical profile and comprehensive confidence level.

[0104] The on-site verification backfill data can include on-site survey logs, photos, video screenshots, interview conclusions, material verification results, enterprise confirmation materials, and expert judgment conclusions. The backfill data is processed according to the evidence atom generation process in step S1 to obtain new evidence atoms. These new evidence atoms are written into the evidence graph and associated with the original candidate technical requirements, the original supporting evidence set, and the original contradictory evidence set.

[0105] If the newly added evidence atom satisfies the consistency resolution rule with the original contradictory evidence, the corresponding contradictory edge is deleted or downweighted; if the newly added evidence atom strengthens the original supporting evidence path, the consistency of the graph path and the reliability of the source are improved; if the newly added evidence atom proves that the original candidate technology requirement lacks a factual basis, the candidate technology requirement is updated to a removed state. Subsequently, the overall confidence level is recalculated, and the updated result is written into the corresponding dimension of the enterprise technology profile.

[0106] In one specific implementation, the consistency resolution rules include: the newly added evidence atom is associated with the same product, process, or equipment as the original contradictory evidence; the source reliability of the newly added evidence atom is not lower than that of the original contradictory evidence, or the newly added evidence atom is in the on-site verification state; the factual conclusion of the newly added evidence atom is consistent with the set of supporting evidence, or the value of the same indicator field of the newly added evidence atom falls within the preset allowable deviation range. When the above conditions are met, the system will downgrade or delete the original contradictory edge; when the above conditions are not met, the system will retain the contradictory edge and increase the priority of the on-site verification task.

[0107] S7. Candidate technical requirements whose comprehensive confidence level reaches a preset threshold and which do not contain key contradictory evidence are confirmed as verified technical requirements. A verified technical requirement record is generated, including a verified evidence chain, requirement status, quantifiable technical indicators and fields to be re-examined. The verified technical requirement record is written back to the enterprise technical profile and evidence map.

[0108] The verified technical requirement record includes requirement identifier, candidate technical requirement tuple, list of supporting evidence identifiers, results of counter-evidence processing, list of on-site backfilled evidence identifiers, overall confidence level, requirement status, quantifiable technical indicators, status update time, and re-examination trigger conditions. Re-examination trigger conditions may include expired evidence, decreased overall confidence level, new projects added by the company, conflicting on-site backfilled evidence, or failure to connect with external resources.

[0109] In one post-processing implementation, using verified technical requirement records, verified evidence chains, and overall confidence levels as inputs, technical requirements are broken down into near-term verification tasks, mid-term R&D projects, and long-term technical directions based on technology maturity, indicator gaps, enterprise capabilities, and implementation cycle. Near-term verification tasks correspond to experimental verification, process parameter optimization, or quality stability improvement that can be initiated within one year; mid-term R&D projects correspond to key technology breakthroughs, equipment upgrades, platform construction, or joint R&D within one to three years; and long-term technical directions correspond to cutting-edge pre-research, standard setting, or common technology platform construction within three years or more. This post-processing step is executed after candidate technical requirements have been verified through the evidence chain and does not participate in the confirmation of unverified candidate technical requirements.

[0110] When matching innovation resources, verified technology requirements are converted into requirement vectors, and matching scores are calculated between these requirement vectors and resource vectors of experts, scientific and technological achievements, patents, instruments and equipment, universities and research institutions, and innovation platforms. The matching scores are jointly determined by semantic similarity, industry chain complementarity, resource maturity, accessibility, and historical cooperation credibility. The candidate resource set serves only as a post-processing result of verified technology requirements and is not used to confirm unverified candidate requirements.

[0111] When clustering common needs across enterprises, only verified technology needs are used as input. Verified technology needs can be clustered by industry chain segment, technology theme, pain point type, indicator gap, and resource gap to obtain common industry technology needs and directions for technological breakthroughs. The clustering results can be used for industry innovation mapping, analysis of weak links in the industry chain, and suggestions for innovation resource allocation.

[0112] Those skilled in the art will understand that all or part of the processes in the methods of the above embodiments can be implemented by a computer program instructing related hardware. The program can be stored in a non-volatile computer-readable storage medium, and when executed, it can include the processes of the embodiments of the above methods. Any references to memory, storage, databases, or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM), or flash memory. Volatile memory can include random access memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in various forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), dual data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link DRAM (SLDRAM), RAMbus direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and RAMbus dynamic RAM (RDRAM), etc.

[0113] Example 2:

[0114] This embodiment provides an evidence atom encoding method. An evidence atom can be represented as E={id,type,src,time,sub,obj,slot,vec,w,state}. Wherein, id represents the evidence identifier, type represents the source type, src represents the original source location, time represents the collection time, sub represents the associated subject, obj represents the associated object, slot represents the structured slot, vec represents the semantic vector, w represents the evidence weight, and state represents the verification status.

[0115] Structured slots include the problem object, technical aspects, pain point descriptions, indicator fields, existing capability fields, target capability fields, constraint fields, evidence citation fields, and fields to be verified. For textual evidence atoms, slots are obtained through entity recognition, relation extraction, and indicator field extraction; for image evidence atoms, slots are obtained through image scene recognition, text recognition, watermark parsing, and object detection; for tabular evidence atoms, slots are obtained through field mapping, unit conversion, and outlier detection.

[0116] Example 3:

[0117] This embodiment provides a method for updating an evidence graph. The evidence graph can be represented as G=(V,R,W), where V is the set of nodes, R is the set of edges, and W is the set of edge weights. The node set includes enterprise nodes, product nodes, process nodes, equipment nodes, R&D project nodes, patent nodes, personnel nodes, institution nodes, supply chain link nodes, and evidence atom nodes. The edge set includes supporting edges, contradictory edges, edges of common origin, temporal edges, attribution edges, referencing edges, and resource adaptation edges.

[0118] When new evidence atoms are added to the graph, the system first performs entity alignment to determine whether the new evidence atoms are associated with existing enterprise, product, process, equipment, project, or patent nodes. Then, it determines whether to establish a common-origin edge or a time-series edge based on field similarity and time window. Subsequently, it determines whether to establish a supporting edge or a contradictory edge based on the factual conclusion, indicator fields, and source type. Through this incremental update method, on-site backfilled evidence can directly affect the confidence level of existing candidate technology requirements.

[0119] Example 4:

[0120] This embodiment provides a large-model algorithm orchestration method. The large model is used as a controlled semantic reasoning unit, rather than directly receiving all enterprise materials and outputting free text. The algorithm orchestration includes query vector construction, supporting evidence recall, counter-evidence recall, context budget allocation, slotted hint construction, constrained generation, functional output validation, failure regeneration, and candidate reordering.

[0121] In the query vector construction phase, a query vector q is generated based on the target company, profile dimensions, and technical aspects. The query vector q can be obtained by concatenating the company profile text vector, technical aspect vector, industry chain aspect vector, and keyword sparse vector. Based on the comprehensive retrieval score H(e,q), a first evidence set Epos is retrieved from the evidence graph. This first evidence set Epos is used to provide positive evidence supporting the candidate's technical requirements.

[0122] In the rebuttal evidence recall phase, starting from the evidence atoms in the first evidence set Epos, the evidence graph is expanded one to three hops along contradictory edges, edges with the same indicator field, edges with the same device, edges with the same project, and edges with the same product to obtain a candidate rebuttal evidence set. If a certain evidence atom contradicts the evidence in Epos in terms of factual conclusion, has an indicator field difference exceeding a preset indicator threshold, or has a higher source reliability than Epos but a contradictory semantic conclusion, then the evidence atom is added to the second evidence set Eneg; if the expansion path only passes through enterprise nodes and there is no factual or indicator conflict, then it is not added to Eneg. Through this step, reverse evidence can be explicitly included before candidate requirements are generated.

[0123] During the context budget allocation phase, multiple budget items are set based on the available context length L of the model: support evidence budget Lpos, contradictory evidence budget Lneg, missing slot budget Llack, field object budget Lfield, and resource clue budget Lres, where Lpos + Lneg + Llack + Lfield + Lres ≤ L. Evidence atoms with high source weights, short graph paths, and recent dates are prioritized for retention; when the budget is insufficient, low-weight, duplicate, or outdated evidence atoms are deleted.

[0124] During the slot-based prompt construction phase, a prompt template consisting of five types of fragments is formed: the first type is system prompts, used to limit the model to output conclusions without deviating from the evidence atoms; the second type is task prompts, used to require the model to identify the enterprise's technical needs and provide fields to be verified; the third type is evidence prompts, used to list Epos, Eneg, and missing evidence; the fourth type is output pattern, used to limit the output to D={did,name,ent,obj,pain,pos,neg,lack,metric,field,task,res}; and the fifth type is rejection rules, used to require the output "insufficient evidence" when there is insufficient evidence or invalid evidence citations.

[0125] During the constrained generation phase, the large model outputs a candidate technology requirement tuple D = {did, name, ent, obj, pain, pos, neg, lack, metric, field, task, res}. Here, didi is the requirement identifier, name is the requirement name, ent is the associated company, obj is the associated product or process, pain is the pain point type, pos is the list of supporting evidence identifiers, neg is the list of contradictory evidence identifiers, lack is the type of missing evidence, metric is the quantifiable technical indicator, field is the observable object on-site, task is the suggested R&D task, and res is the resource type label.

[0126] During the functional output validation phase, four types of validations are performed. The first is format validation, used to determine if D contains all required fields. The second is evidence citation validation, used to determine if the evidence identifiers in pos and neg exist in the candidate retrieval context packet. The third is slot integrity validation, used to determine if the metric, field, and lack fields meet preset rules. The fourth is proof-of-conformity validation, used to determine if the model ignores high-source reliability proofs of contradiction in Eneg. If any validation fails, missing slots, invalid evidence citations, omitted or conflicting proof fields, and available evidence identifiers are returned to the model, triggering a failure regeneration.

[0127] During the candidate re-ranking phase, the output quality score Q(d) and the strength of rebuttal A(d) are calculated. The output quality score Q(d) can be expressed as Q(d) = b1 × Slot(d) + b2 × Ref(d) + b3 × Metric(d) + b4 × Reject(d), where Slot(d) is the slot completeness rate, Ref(d) is the evidence citation effectiveness rate, Metric(d) is the quantifiable rate of the indicator, Reject(d) is the rejection compliance rate, and b1 to b4 are non-negative weights that sum to 1. The strength of rebuttal A(d) is calculated based on the reliability of the source of the rebuttal evidence in Eneg, the degree of conflict, and the strength of the graph path; when Eneg is empty, A(d) is 0. Based on P(d), candidate technical requirements are ranked, prioritizing those with high output quality, low rebuttal strength, and complete evidence chains.

[0128] Example 5:

[0129] This embodiment provides a method for constructing an evidence conflict matrix. For a candidate technical requirement d, the set of evidence atoms Ed={e1,e2,...,en} related to d is extracted, and an n×n evidence conflict matrix M is constructed. For any two evidence atoms ei and ej, if they are associated with the same product, process, or equipment, and the factual conclusions are opposite, then Mij takes the first conflict value; if the two have the same indicator fields but the numerical difference exceeds a preset indicator threshold, then Mij takes the second conflict value; if the two have different source types and the evidence with higher source reliability negates the conclusion of evidence with lower source reliability, then Mij takes the third conflict value; if there is no conflict, then Mij takes 0. The first, second, and third conflict values ​​are all normalized to the range of 0 to 1 and can be corrected according to source reliability and time decay. The larger Mij is, the higher the degree of conflict.

[0130] The conflict penalty term Con(d) is calculated based on the number of elements in the evidence conflict matrix M that exceed the conflict threshold, the weight of conflicting evidence, and the weighted values ​​of factual conclusion conflicts and indicator field conflicts. This term is used to reduce the confidence of candidate technical requirements that are supported only by the company's self-report but conflict with on-site evidence or ledger evidence.

[0131] Example 6:

[0132] This embodiment provides a method for generating on-site verification task packages. The task type is determined based on the set of missing evidence and the set of contradictory evidence. When the missing evidence type is equipment status, the task package requires collecting equipment photos, operation records, and maintenance ledgers; when the missing evidence type is technical specifications, the task package requires collecting test reports, quality anomaly records, or experimental records; when contradictory evidence comes from inconsistencies between interviews and ledgers, the task package requires interviewing the relevant personnel and verifying the original ledgers; when contradictory evidence comes from inconsistencies between photos and the company's self-report, the task package requires re-collecting photos with time and location watermarks.

[0133] The backfilled fields of the on-site verification task package correspond to the candidate technical requirement tuples and evidence atom fields. After the on-site visit is completed, the backfilled data is converted into new evidence atoms according to the task package fields. The consistency of the new evidence atoms with the original supporting evidence set and the original contradictory evidence set, the reliability of the source, and the index deviation are used to determine whether to resolve contradictory edges. Then, the overall confidence level is recalculated. In this way, the on-site verification result is not just a free text description, but can be incorporated into the graph update and confidence level calculation.

[0134] Example 7:

[0135] like Figure 6 As shown, another embodiment of the present invention also provides a large-model-based enterprise technology requirement identification and verification system, applied to the large-model-based enterprise technology requirement identification and verification method, including:

[0136] The multi-source data parsing module is used to receive multi-source data for enterprise innovation diagnosis, and to uniformly parse text data, image data, tabular data and external resource data to generate a set of evidence atoms. Each evidence atom in the set of evidence atoms includes at least evidence identifier, source type, collection time, associated subject, associated object, semantic vector, structured slot, evidence weight and verification status.

[0137] The evidence atom generation and graph construction module is used to construct an enterprise technology profile and evidence graph based on the evidence atom set. The evidence graph uses enterprises, products, processes, equipment, R&D projects, patents, personnel, institutions, industrial chain links and evidence atoms as nodes, and supports, contradictions, common origins, time sequence, attribution, references and resource adaptations as edges.

[0138] The two-stage evidence recall and large-scale model orchestration module is used to perform two-stage evidence recall and large-scale model algorithm orchestration for target enterprises: First, a first set of evidence is recalled based on the semantic similarity, graph path relevance, source reliability, and time decay between evidence atoms and target profile dimensions or target technical links; Second, starting from the evidence atoms in the first set, one to three hops of graph expansion are performed along contradictory edges, edges with the same indicator field, edges with the same equipment, edges with the same project, and edges with the same product, and reverse evidence with contradictory conclusions, indicator field differences exceeding preset indicator thresholds, or source reliability higher than the corresponding supporting evidence is filtered to obtain a second set of evidence; Third, the first set of evidence, the second set of evidence, missing slots, and observable objects on-site are assembled into a candidate retrieval context package and input into the constrained large-scale model to obtain candidate technical requirement tuples;

[0139] The output verification and evidence chain verification module is used to perform functional output verification and evidence chain verification on candidate technical requirement tuples. The functional output verification includes format verification, evidence citation verification, slot integrity verification, and rebuttal consistency verification. The evidence chain verification includes generating a set of supporting evidence, a set of contradictory evidence, a set of missing evidence, and a set of verification questions, constructing an evidence conflict matrix, and calculating the comprehensive confidence of candidate technical requirements based on the output quality score of the large model, the strength of rebuttal evidence, the conflict penalty term, as well as evidence coverage, source reliability, graph path consistency, on-site verifiability, and indicator quantifiability.

[0140] The on-site verification task generation module is used to generate an on-site verification task package based on the type of missing evidence, the location of contradictory evidence, and observable objects on-site when the overall confidence level is lower than a preset threshold, or when there is key contradictory evidence in the contradictory evidence set.

[0141] The backfill update module is used to receive backfill data from the on-site verification task package, convert the backfill data into new evidence atoms; if the new evidence atom satisfies the consistency resolution rule, the corresponding contradictory edge is deleted or downweighted; if the new evidence atom enhances the original supporting evidence path, the weight of the corresponding supporting edge is increased, and the evidence graph, enterprise technical profile and comprehensive confidence level are incrementally updated.

[0142] The verified requirement record generation module is used to identify candidate technical requirements that have reached a preset confidence level and do not contain key contradictory evidence as verified technical requirements, generate verified technical requirement records including verified evidence chains, requirement status, quantifiable technical indicators and fields to be re-examined, and write the verified technical requirement records back to the enterprise technical profile and evidence map.

[0143] The technical features of the above embodiments can be combined in any way. For the sake of brevity, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0144] The above embodiments are preferred embodiments of the present invention, but the embodiments of the present invention are not limited to the above embodiments. Any changes, modifications, substitutions, combinations, or simplifications made without departing from the spirit and principle of the present invention shall be considered equivalent substitutions and shall be included within the protection scope of the present invention.

Claims

1. A method for identifying and verifying enterprise technology requirements based on a large model, characterized in that, Includes the following steps: S1. Receive multi-source data for enterprise innovation diagnosis, divide the multi-source data into text data, image data, tabular data and external resource data, perform unified analysis, and generate a set of evidence atoms. Each evidence atom in the evidence atom set includes at least the evidence identifier, source type, collection time, associated subject, associated object, semantic vector, structured slot, evidence weight, and verification status; S2. Construct a corporate technology profile and evidence map based on the set of evidence atoms. The corporate technology profile consists of multiple profile dimensions, including at least two of the following: R&D capabilities, talent team, intellectual property, equipment, industry-academia-research cooperation, digitalization level, product technology roadmap, market urgency, and position in the industrial chain. The evidence map uses enterprises, products, processes, equipment, R&D projects, patents, personnel, institutions, links in the industrial chain, and evidence atoms as nodes, and supports, contradictions, common origins, time sequence, attribution, citation, and resource adaptation as edges. S3. Execute a two-stage evidence recall and large-scale model algorithm orchestration for the target enterprise: Recall the first set of evidence based on the semantic similarity, graph path relevance, source reliability, and time decay between the evidence atoms and the target profile dimensions or target technical links; Starting from the evidence atoms in the first set of evidence, perform one to three hop graph expansion along contradictory edges, same indicator field edges, same equipment edges, same project edges, and same product edges, and filter out reverse evidence with opposite factual conclusions, indicator field differences exceeding preset indicator thresholds, or source reliability higher than the corresponding supporting evidence to obtain the second set of evidence; Assemble the first set of evidence, the second set of evidence, missing slots, and observable objects on site into a candidate retrieval context package and input it into the constrained large-scale model to obtain candidate technical requirement tuples; S4. Perform functional output verification and evidence chain verification on the candidate technical requirement tuples. The functional output verification includes format verification, evidence citation verification, slot integrity verification, and rebuttal consistency verification. The evidence chain verification includes generating a set of supporting evidence, a set of contradictory evidence, a set of missing evidence, and a set of verification questions, constructing an evidence conflict matrix, and calculating the comprehensive confidence of the candidate technical requirements based on the output quality score of the large model, the strength of rebuttal evidence, the conflict penalty term, as well as the evidence coverage, source reliability, graph path consistency, on-site verifiability, and indicator quantifiability. S5. When the overall confidence level is lower than the preset threshold, or when there is key contradictory evidence in the contradictory evidence set, generate an on-site verification task package based on the missing evidence type, the location of the contradictory evidence and the observable objects on site. S6. Receive the backfilled data from the on-site verification task package and convert the backfilled data into new evidence atoms. If the new evidence atoms meet the consistency resolution rules, delete or reduce the weight of the corresponding contradictory edges. If the new evidence atoms enhance the original supporting evidence path, increase the weight of the corresponding supporting edge and incrementally update the evidence graph, enterprise technical profile and comprehensive confidence level. S7. Candidate technical requirements whose comprehensive confidence level reaches a preset threshold and which do not contain key contradictory evidence are confirmed as verified technical requirements. A verified technical requirement record is generated, including a verified evidence chain, requirement status, quantifiable technical indicators and fields to be re-examined. The verified technical requirement record is written back to the enterprise technical profile and evidence map.

2. The method for identifying and verifying enterprise technology requirements based on a large model according to claim 1, characterized in that, In step S1, the multi-source data for enterprise innovation diagnosis includes at least two of the following: basic enterprise data, questionnaire data, interview texts, on-site survey logs, on-site photos, equipment lists, test reports, patent documents, R&D project ledgers, industrial chain information, expert database data, scientific and technological achievement database data, university and research institute data, and innovation platform data. The structured slots include the problem object, technical aspects, pain point description, indicator fields, existing capability fields, target capability fields, constraint fields, evidence citation fields, and fields to be verified.

3. The method for identifying and verifying enterprise technology requirements based on a large model according to claim 1, characterized in that, In step S2, when constructing the evidence graph, entity alignment and time merging are performed on evidence atoms under the same enterprise; when two evidence atoms have the same associated subject, the same associated object and the collection time interval is less than the preset time window, a common source edge or time sequence edge is established; when two evidence atoms are associated with the same product, process, equipment, project or patent node and the factual conclusions are opposite, or the numerical difference of the same indicator field exceeds the preset indicator threshold, a contradictory edge is established and the contradictory edge weight is written.

4. The method for identifying and verifying enterprise technology requirements based on a large model according to claim 1, characterized in that, In step S3, the candidate retrieval context packets are sorted according to the following comprehensive retrieval scores: in, The comprehensive retrieval score is represented by , e is the evidence atom, q is the target profile dimension or target technical link, Sem(e,q) is the semantic similarity, and Path(e,q) is the graph path relevance. Path(e,q) is determined as follows: In the candidate subgraph composed of supporting edges, contradictory edges, homologous edges, temporal edges, attribution edges, and referencing edges, find valid paths from the evidence atom to the target profile dimension or target technical link that do not exceed a preset number of hops. For each valid path, calculate the product of the edge type weight and the edge weight of each edge in the path, and decay the product according to the number of hops in the path. The sum of the decayed products is taken as the path relevance. Src(e) is the source reliability determined by the source type and verification status, Time(e) is the time decay determined by the interval between the collection time and the current verification time, and a1, a2, a3, and a4 are non-negative weights that sum to 1.

5. The method for identifying and verifying enterprise technology requirements based on a large model according to claim 1, characterized in that, In step S3, the candidate technology requirement tuples are processed as follows: Perform format validation, evidence citation validation, slot integrity validation, and proof of contradiction consistency validation on candidate technology requirement tuples. If the validation fails, return missing slots, invalid evidence references, missing or conflicting fields of counter-evidence to the large model and trigger regeneration; if the validation passes, reorder the candidate technical requirement tuples according to the output quality score and counter-evidence strength. The mass fraction Q(d) satisfies: Where Slot(d) is the slot completeness rate, Ref(d) is the evidence citation effectiveness rate, Metric(d) is the quantifiable rate of the metric, Reject(d) is the rejection compliance rate, and b1, b2, b3 and b4 are non-negative weights and their sum is 1. The strength of the counter-evidence A(d) satisfies: Where NegSrc(d) represents the reliability of the source of the disproving evidence, NegConflict(d) represents the degree of conflict between the disproving evidence and the candidate technology requirement, NegPath(d) represents the strength of the graph path from the disproving evidence to the node associated with the candidate technology requirement, and c1, c2 and c3 are non-negative weights and their sum is 1.

6. The method for identifying and verifying enterprise technology requirements based on a large model according to claim 1, characterized in that, In step S4, the candidate technology requirement tuple includes requirement identifier, requirement name, associated enterprise, associated product or process, pain point type, list of supporting evidence identifiers, list of contradictory evidence identifiers, missing evidence type, quantifiable technical indicators, on-site observable objects, suggested R&D tasks, and resource type tags.

7. The method for identifying and verifying enterprise technology requirements based on a large model according to claim 1, characterized in that, In step S4, when performing evidence chain verification on the candidate technology requirement tuples, an evidence conflict matrix M is constructed. The element Mij in M ​​represents the conflict state between the i-th and j-th evidence atoms in the same technical stage, the same indicator field, or the same factual conclusion. When two evidence atoms are associated with the same product, process, or equipment and their factual conclusions are opposite, Mij takes the first conflict value. When two evidence atoms have the same indicator field and their numerical differences exceed a preset indicator threshold, Mij takes the second conflict value. When high-source reliability evidence negates the conclusion of low-source reliability evidence, Mij takes the third conflict value. When there is no conflict, Mij takes 0. The first, second, and third conflict values ​​are all normalized to the range of 0 to 1 and corrected according to source reliability and time decay. The conflict penalty term Con(d) satisfies: Where Cnt(d) is the normalized value of the number of conflict matrix elements exceeding the conflict threshold, Weight(d) is the normalized value of the conflict evidence weight, Field(d) is the weighted value of the factual conclusion conflict and the indicator field conflict, and m1, m2 and m3 are non-negative weights and their sum is 1.

8. The method for identifying and verifying enterprise technology requirements based on a large model according to claim 1, characterized in that, In step S4, the overall confidence level satisfies: Wherein, d represents the candidate technical requirement, Cov(d) represents the evidence coverage, Rel(d) represents the source reliability, Cons(d) represents the map path consistency, Ver(d) represents the on-site verifiability, Met(d) represents the indicator quantifiability, Q(d) represents the large model output quality score, Con(d) represents the conflict penalty term, and A(d) represents the strength of the counter-evidence. Cov(d), Rel(d), Cons(d), Ver(d), Met(d), Q(d), Con(d), and A(d) are all normalized to the interval between 0 and 1. w1 to w8 are preset non-negative weight parameters. The weight parameters are determined by the optimization of the verification samples, the expert-annotated samples, or the preset business reliability rules, and are processed according to the preset weight normalization rules. When the calculated value of P(d) is lower than 0, it is taken as 0, and when it is higher than 1, it is taken as 1.

9. The method for identifying and verifying enterprise technology requirements based on a large model according to claim 1, characterized in that, In step S5, the on-site verification task package includes task identifier, candidate technical requirement identifier, missing evidence type, contradictory evidence identifier, verification object, verification question, on-site scene to be observed, positions to be interviewed, images or materials to be collected, backfill fields, pass conditions and priority. In step S6, after converting the backfilled data into new evidence atoms, if the new evidence atom is associated with the same product, process, or equipment as the original contradictory evidence, and the source reliability of the new evidence atom is not lower than that of the original contradictory evidence, or the new evidence atom is in the on-site verification state, and the factual conclusion of the new evidence atom is consistent with the set of supporting evidence, or the value of the same indicator field falls within the preset allowable deviation range, then the consistency resolution rule is met and the corresponding contradictory edge is deleted or downgraded; if the new evidence atom enhances the original supporting evidence path, then the consistency of the graph path and the source reliability are improved.

10. A system for identifying and verifying enterprise technology requirements based on a large model, characterized in that, The enterprise technology requirement identification and verification method based on a large model, applied to any one of claims 1-9, includes: The multi-source data parsing module is used to receive multi-source data for enterprise innovation diagnosis, and to uniformly parse text data, image data, tabular data and external resource data to generate a set of evidence atoms. Each evidence atom in the set of evidence atoms includes at least evidence identifier, source type, collection time, associated subject, associated object, semantic vector, structured slot, evidence weight and verification status. The evidence atom generation and graph construction module is used to construct an enterprise technology profile and evidence graph based on the evidence atom set. The evidence graph uses enterprises, products, processes, equipment, R&D projects, patents, personnel, institutions, industrial chain links and evidence atoms as nodes, and supports, contradictions, common origins, time sequence, attribution, references and resource adaptations as edges. The two-stage evidence recall and large-scale model orchestration module is used to perform two-stage evidence recall and large-scale model algorithm orchestration for target enterprises: First, a first set of evidence is recalled based on the semantic similarity, graph path relevance, source reliability, and time decay between evidence atoms and target profile dimensions or target technical links; Second, starting from the evidence atoms in the first set, one to three hops of graph expansion are performed along contradictory edges, edges with the same indicator field, edges with the same equipment, edges with the same project, and edges with the same product, and reverse evidence with contradictory conclusions, indicator field differences exceeding preset indicator thresholds, or source reliability higher than the corresponding supporting evidence is filtered to obtain a second set of evidence; Third, the first set of evidence, the second set of evidence, missing slots, and observable objects on-site are assembled into a candidate retrieval context package and input into the constrained large-scale model to obtain candidate technical requirement tuples; The output verification and evidence chain verification module is used to perform functional output verification and evidence chain verification on candidate technical requirement tuples. The functional output verification includes format verification, evidence citation verification, slot integrity verification, and rebuttal consistency verification. The evidence chain verification includes generating a set of supporting evidence, a set of contradictory evidence, a set of missing evidence, and a set of verification questions, constructing an evidence conflict matrix, and calculating the comprehensive confidence of candidate technical requirements based on the output quality score of the large model, the strength of rebuttal evidence, the conflict penalty term, as well as evidence coverage, source reliability, graph path consistency, on-site verifiability, and indicator quantifiability. The on-site verification task generation module is used to generate an on-site verification task package based on the type of missing evidence, the location of contradictory evidence, and observable objects on-site when the overall confidence level is lower than a preset threshold or when there is key contradictory evidence in the contradictory evidence set. The backfill update module is used to receive backfill data from the on-site verification task package, convert the backfill data into new evidence atoms; if the new evidence atom satisfies the consistency resolution rule, the corresponding contradictory edge is deleted or downweighted; if the new evidence atom enhances the original supporting evidence path, the weight of the corresponding supporting edge is increased, and the evidence graph, enterprise technical profile and comprehensive confidence level are incrementally updated. The verified requirement record generation module is used to identify candidate technical requirements that have reached a preset confidence level and do not contain key contradictory evidence as verified technical requirements, generate verified technical requirement records including verified evidence chains, requirement status, quantifiable technical indicators and fields to be re-examined, and write the verified technical requirement records back to the enterprise technical profile and evidence map.