Railway tail operation data intelligent analysis method and system
By acquiring real-time status parameters and calibrating the time of railway tail-end operation data, a flexible operation window is generated, which solves the problem of time-series matching and causal determination of multi-source heterogeneous data, and realizes efficient and accurate analysis of railway tail-end operation data.
Patent Information
- Application Number
- CN202611403840.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-10
- Publication Date
- 2026-11-24
AI Technical Summary
Existing railway tail-end operation data analysis technology faces difficulties in timing matching and causal determination between multi-source heterogeneous data when the train is in non-constant speed dynamic operation and there is a significant transmission delay in the braking pipeline. This results in a large number of compliant operations being falsely reported or missed, making it difficult to achieve efficient and accurate analysis.
By acquiring real-time status parameters of the train, time calibration is performed on multi-source train tail data based on a unified time reference, the theoretical remaining time is calculated and a basic time window is generated, and delay compensation is performed by combining pipeline conduction and wireless transmission delays to generate an extended time window. Streaming pattern matching is used to determine whether the operation is compliant.
It achieves precise spatiotemporal alignment of events from multi-source heterogeneous devices, avoiding frequent false alarms in traditional systems, possessing scene adaptability, improving analysis efficiency and accuracy, and reducing reliance on manual verification.
Smart Images

Figure CN123158253A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of railway train data analysis, specifically to an intelligent analysis method and system for railway train tail operation data. Background Technology
[0002] Locomotive crew analysis is a crucial aspect of railway safety. It not only identifies and corrects violations and operational errors by reviewing operational history, promoting planned and safer operations, but also serves as a vital guarantee for railway safety and a key means of maintaining a highly qualified and professional driver workforce. With the development of information and intelligent technologies, railway crew safety equipment is constantly being upgraded, generating increasingly more locomotive safety data. This, in turn, places higher demands on the completeness, accuracy, efficiency, and quality of locomotive data management and analysis.
[0003] To achieve standardized control of the tail-end operation process, existing technologies typically attempt to combine onboard data to automatically analyze and determine operational steps such as tail-end connection, air pressure query, and exhaust braking. However, when dealing with complex dynamic operational scenarios (such as: air pressure not being queried before entering the station, air pressure not being queried before and after braking on a long downhill slope, air pressure not being queried before and after stopping and starting at the station), existing data analysis technologies mainly rely on setting static distance thresholds or fixed time windows for rule matching. This approach has the following problems:
[0004] First, static spatial thresholds are unsuitable for non-uniform motion environments. When determining whether items with strong correlation to geographic topology, such as wind pressure, have been queried before braking on a long downhill slope, existing systems typically use a fixed spatial distance (e.g., requiring a query within 3 kilometers of the starting point). However, trains operate in complex, non-constant-speed states in actual operation. For example, the physical operation time span corresponding to the same fixed distance differs significantly between a train running at 80 km / h and 30 km / h. This judgment rule based on static, fixed parameters deviates from the dynamic motion patterns of the train, causing the system's effective judgment window to fluctuate, easily resulting in high-frequency false alarms that classify compliant driver operations as violations.
[0005] Secondly, the current technology fails to consider the aerodynamic transmission delay and the spatiotemporal misalignment of heterogeneous multi-source equipment. In heavy-load, long-formation train operations, the brake lines running through the entire train can extend for several kilometers. When braking or releasing occurs at the front of the train (LKJ monitoring terminal), pressure waves propagate at the speed of sound within the brake lines, often requiring a delay of tens of seconds or even longer to reach the rear of the train. Simultaneously, the rear air pressure data is primarily transmitted via radio frequency, subject to network queuing and environmental interference, resulting in random wireless transmission delays. Existing technologies only perform simple data comparisons at the independent timestamp dimension, failing to incorporate factors such as aerodynamic transmission delays in the train lines, asynchronous clocks between equipment, and wireless communication delays into the calculation model. This directly leads to a severe causal misalignment between the maneuvering events at the front of the train and the air pressure data response at the rear on the system's timeline.
[0006] In summary, existing analytical methods are insufficient to address the issues of timing matching and causal determination among multi-source heterogeneous data when trains are operating at non-constant speeds and there is significant conduction delay in the braking lines. This results in a large number of compliant operations being missed or falsely reported by the system, making the analysis results highly dependent on manual secondary verification and identification. This not only makes it difficult to improve analysis efficiency but also fails to truly form a high-quality closed-loop management system. Summary of the Invention
[0007] To address the technical problems of temporal mismatch and causal misjudgment among multi-source heterogeneous data under conditions of non-constant speed dynamic operation and significant conduction delay in braking lines, the present invention aims to provide an intelligent analysis method and system for railway train tail operation data. The specific technical solution adopted is as follows:
[0008] This invention proposes an intelligent analysis method for railway train tail-end operation data, the method comprising:
[0009] The real-time status parameters of the train are obtained, including at least the current position, current speed and train tube length of the train, and the received multi-source train tail data are time-calibrated based on a unified time reference.
[0010] Based on the train's current position and the operational baseline position of the preset work items ahead, the theoretical remaining time for the train to reach the operational baseline position is calculated in conjunction with the real-time status parameters, and a basic time window is generated.
[0011] The pipeline conduction delay of the train is calculated based on the length of the train pipeline, and the wireless transmission delay is obtained. The cutoff time of the basic time window is compensated for by delay based on the pipeline conduction delay and the wireless transmission delay, and an extended time window is generated.
[0012] Within the extended time window, streaming pattern matching is performed on the timestamped multi-source column tail data to determine whether the operation corresponding to the preset job item is compliant.
[0013] Furthermore, the time calibration of the received multi-source column tail data based on a unified time benchmark includes:
[0014] Extract the satellite time stamp recorded by the train operation monitoring device as the reference time;
[0015] The difference between the reference time and the internal time of the tail receiver is used as the clock offset.
[0016] The calibrated absolute timestamp is obtained by adding the clock offset to the local reception timestamp of the multi-source tail data arriving at the tail receiver.
[0017] Furthermore, before calculating the theoretical remaining time for the train to reach the operational baseline position, the process also includes:
[0018] A railway line basic data table containing the start and end points of the slopes along the line is preloaded. Taking the current position of the train as the starting point, the target nodes in the railway line basic data table that meet the preset operation points are detected within a preset distance sliding window.
[0019] Calculate the relative distance between the current position of the train and the target node. When the relative distance is less than or equal to a preset distance activation threshold and the train's running direction is pointing towards the target node, the train switches to the operation monitoring state.
[0020] Furthermore, the theoretical remaining time for the calculated train to reach the operational baseline position includes:
[0021] The train switches to operation monitoring mode, extracts the speed of the train at each time in the preset historical period before the current time, and performs linear fitting on the speed at all times in the preset historical period. The slope of the fitted line is used as the overall acceleration of the train at the current time.
[0022] Extract the baseline position of the preset task points, and combine the distance between the current position of the train and the baseline position, the overall acceleration, and the current speed of the train. Based on the displacement formula of uniformly accelerated linear motion and solve for the positive root, obtain the theoretical remaining time.
[0023] Furthermore, the generation of the basic time window includes:
[0024] Starting from the current moment, add the current moment to the theoretical remaining time to calculate the cutoff time of the basic time window;
[0025] Obtain the maximum allowable advance operation time for the preset task item, subtract the maximum advance operation time from the deadline of the basic time window, and calculate the start time of the basic time window.
[0026] Furthermore, the calculation of the train's pipe conduction delay based on the train pipe length includes:
[0027] Divide the length of the train tube by the equivalent wave velocity of the braking and decompression wave propagating inside the train tube to obtain the ideal duration of the braking and decompression wave propagating inside the train tube.
[0028] The pipeline conduction delay is equal to the preset pipeline damping coefficient multiplied by the ideal duration, plus the sampling delay constant of the wind pressure sensor inside the tail unit.
[0029] Furthermore, obtaining the wireless transmission latency includes:
[0030] A network transmission latency tester is used to test and record the wireless transmission latency in real time while the train is running. The wireless transmission latency represents the transmission time from when a message is sent from the tail antenna to when it is received by the train receiver.
[0031] Furthermore, the generation of the extended time window includes:
[0032] The start time of the base time window is used as the start time of the extended time window;
[0033] The cutoff time of the basic time window is added to the pipeline conduction delay and the wireless transmission delay to calculate the cutoff time of the extended time window.
[0034] Furthermore, determining whether the operation corresponding to the preset task item is compliant includes:
[0035] Instantiate a sliding listener window in the memory of the complex event processing engine with a lifespan equal to that of the extended time window;
[0036] The multi-source column tail data stream, which has been calibrated by timestamp, is connected to the sliding listening window, and data packets with wind pressure query request and wind pressure legal response feature bit codes are found by pattern matching;
[0037] If a data packet for wind pressure query and wind pressure response is matched within the lifecycle of the sliding listening window, and the wind pressure measurement value carried by the wind pressure response data packet is within the normal safety threshold range, then the judgment task is terminated and no violation alarm is generated.
[0038] If no valid wind pressure response data packet is matched when the sliding listening window is destroyed due to the end of its life cycle, the operation of the corresponding preset work item is determined to be in violation, an alarm is triggered, and the status data at the trigger time is extracted to generate a structured data packet. The structured data packet includes at least the name of the violation item, the train number and train number, the train speed at the time of triggering the judgment, and the extended time window.
[0039] This invention also proposes an intelligent analysis system for railway train tail operation data. The system includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, it implements any one of the steps of an intelligent analysis method for railway train tail operation data.
[0040] The present invention has the following beneficial effects:
[0041] 1. Existing technologies mostly rely on static spatial distance or fixed time thresholds for control. When trains are accelerating or decelerating, or in heavy-load, long-formation conditions, causal timing misalignment can easily occur due to aerodynamic transmission delays in the train's control system, leading to misjudgments of compliant operations as violations. This invention introduces LKJ dynamic physical parameters (real-time train speed, geographic topology) and an aerodynamic compensation mechanism. For time-dependent operation items such as querying wind pressure before and after braking on long downhill slopes, the system can dynamically stretch and generate a high-precision elastic operation window based on the train formation length and current kinematic state. This achieves accurate alignment of multi-source heterogeneous device events in the spatiotemporal domain, avoiding the technical problem of frequent false alarms in traditional systems.
[0042] 2. Traditional solutions often require software engineers to hard-code and debug parameters for each specific section in the background when dealing with differences in signal layout at different stations and gradients on different lines. This results in extremely poor system scalability and compatibility. The elastic window generation model of this invention is a general situational awareness algorithm. Whether the wind pressure is not checked before entering the station or before stopping and starting, the system can automatically deduce the operating section based on the real-time target distance ahead and the current speed provided by the LKJ (Train Operation Monitoring Device). There is no need to manually configure the static parameters of each station in advance. This gives the system a strong scene adaptability and can be compatible with the complex geographical topology of different lines. Attached Figure Description
[0043] To more clearly illustrate the technical solutions and advantages in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0044] Figure 1A flowchart of an intelligent analysis method for railway train tail operation data provided in one embodiment of the present invention;
[0045] Figure 2 This is a framework diagram of a railway train tail operation data intelligent analysis system provided in one embodiment of the present invention. Detailed Implementation
[0046] To further illustrate the technical means and effects adopted by the present invention to achieve its intended purpose, the following, in conjunction with the accompanying drawings and preferred embodiments, details the specific implementation, structure, features, and effects of a railway train tail operation data intelligent analysis method and system proposed according to the present invention. In the following description, different "one embodiment" or "another embodiment" do not necessarily refer to the same embodiment. Furthermore, specific features, structures, or characteristics in one or more embodiments can be combined in any suitable form.
[0047] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention pertains.
[0048] Example 1
[0049] The following description, in conjunction with the accompanying drawings, details the specific scheme of the intelligent analysis method and system for railway tail-end operation data provided by this invention.
[0050] Please see Figure 1 The diagram illustrates a flowchart of an intelligent analysis method for railway train tail operation data according to an embodiment of the present invention. The method includes:
[0051] Step S1: Obtain real-time train status parameters and perform time calibration on multi-source train tail data based on a unified time reference.
[0052] Because the train's onboard LKJ (Train Operation Monitoring Device) and the tail-end host belong to different hardware systems, their internal crystal oscillator aging levels and timing mechanisms differ, resulting in uncontrollable asynchronous drift in the log timestamps recorded by the two. Without strict absolute time reference alignment, any subsequent causal judgment based on time series (such as before braking or after braking) will lose its correct basis. Therefore, it is necessary to construct a unified absolute time axis to eliminate clock errors between heterogeneous devices, providing a reliable time measurement benchmark for subsequent spatiotemporal mapping and delay compensation, and avoiding causal inversion misjudgments caused by device local clock drift.
[0053] Since the reception time of the train tail data depends on the local time of the ground host or train receiver, and the LKJ has a high-precision satellite time synchronization module, the LKJ time must be used as the standard reference system. The system in this embodiment of the invention accesses multiple train tail data sources that have undergone unified parsing and format standardization. The satellite time synchronization timestamp is extracted from the LKJ record as the reference time. When the tail receiver captures the wind pressure query response message sent by the tail host, it extracts the local timestamp of the message arriving at the receiver. The system periodically compares the receiver's internal time. With LKJ satellite time Calculate the dynamic clock offset. Then, timestamp calibration and correction are performed on all input column tail data, and the corrected absolute timestamp is... After time alignment, local clock errors between heterogeneous devices are eliminated, enabling spatial distance, tail movement and train trajectory to be precisely anchored on the same time axis, providing a metric for subsequent dynamic window generation and temporal causal matching.
[0054] In subsequent steps, the generation of the dynamic elastic window depends on the current operating status of the train. If the current instantaneous speed, geographical kilometer marker, and train tube length cannot be extracted in real time, the spatial location and operating rhythm of the train cannot be perceived. Therefore, this embodiment of the invention needs to continuously extract the train's current position from the LKJ data stream at a set sampling frequency (e.g., once per second). Various state parameters, including at least the current speed (unit: m / s), current position (i.e., kilometer marker, unit: m), and train tube length. (Unit: m).
[0055] Step S2: Calculate the theoretical remaining time for the train to reach the bottom line position and generate the basic time window.
[0056] During the operation of a train on a railway line, most sections are in a normal cruising state. Only specific operational aspects need to be analyzed and judged, such as "failure to check wind pressure before entering the station" and "failure to check wind pressure before and after braking on a long downhill slope". These aspects are highly dependent on the geographical and signal topology ahead. If the window calculation is performed indiscriminately for the entire section, it will not only waste computing resources, but also generate a lot of invalid logical conflicts and background noise in irrelevant straight sections. Therefore, it is necessary to use forward-looking perception technology to accurately identify whether the train is about to enter the specified operation assessment area, so as to provide a clear spatial endpoint for subsequent flexible window calculations.
[0057] This invention first pre-loads a railway line basic data table of the same origin as LKJ into the system memory. This table contains precise kilometer marker data for all signals, turnouts, and the start and end points of gradients along the line. The system uses the current train time... kilometer marker Starting from the current location, a pre-defined look-ahead scanning distance is used. (Usually set to 5000 meters or more), and set the current distance sliding window. Within the sliding window, the system continuously detects whether there are target nodes that meet the definition of the operation item. For example, for the operation item "no wind pressure was queried before and after braking on a long downhill slope", the system detects slope segments in the railway line basic data table where the continuous downhill slope exceeds the preset slope threshold (e.g., greater than 12‰) and the continuous length exceeds the preset slope length threshold (e.g., greater than 3000 meters), and extracts the starting kilometer marker of the slope segment, marking it as the target node. By pre-identifying high-risk topology nodes through a distance sliding window, the system can accurately eliminate invalid calculation intervals, greatly improving the efficiency and targeting of the core backend algorithm.
[0058] Although the target node is locked through the above steps, if the train speed is extracted too early (for example, 10 kilometers away from the target) for window calculation, the extracted train speed will inevitably deviate from the actual speed when the train finally arrives at the target, resulting in serious distortion of the time window calculated later.
[0059] Therefore, embodiments of the present invention require further real-time calculation of the train's current position. With the target node relative distance between The system presets a distance activation threshold. (This distance activation threshold is typically maintained between 3000 and 5000 meters). When the relative distance between the train's current position and the target node is less than or equal to the distance activation threshold and the train's direction of travel is pointing towards the target node, the system state machine switches from cruise monitoring state to operation monitoring state.
[0060] Once the system enters the operation monitoring state, it knows the distance between the train and the target node ahead (such as the starting point of a long downhill slope). However, railway regulations require operators to complete the operation before braking or entering the station. Since the train may be traveling at 80 km / h or 30 km / h, traditional static spatial distance (such as querying within 3 kilometers before the starting point) usually becomes invalid in non-uniform speed operation environments. Therefore, it is necessary to ensure that regardless of the train's current speed, whether it is accelerating or decelerating, the system can accurately analyze the theoretical remaining time required for the train's front to reach the target node, thereby defining the allowable basic operation time range for the operator.
[0061] Different operational tasks have different operational baseline positions. Taking the task of "failure to check air pressure before braking on a long downhill slope" as an example, according to the locomotive safety operation standards, the operational baseline position is defined as follows: the train head must not be checked only after passing the starting point of the slope. Therefore, the operational baseline position for this task is the starting point of the long downhill slope.
[0062] Therefore, when the train switches to operation monitoring mode, this embodiment of the invention first extracts the operation baseline position of the operation item detected within the distance sliding window. Simultaneously, the speed of the train at each moment in the preset historical period before the current moment T is extracted, and a straight line is fitted to the speed at all moments in the preset historical period (specifically, the least squares method or other fitting methods can be used), and the slope of the fitted straight line is used as the overall acceleration of the train at the current moment. The preset historical period is usually in the range of 30 to 60 seconds. In one embodiment of the present invention, the preset historical period is set to 30 seconds.
[0063] Since the train's acceleration remains relatively constant in the near term, based on the displacement formula for uniformly accelerated linear motion, and considering the distance between the train's current position and the operational baseline position, the overall acceleration, and the current speed, the theoretical remaining time for the train's cab to reach the operational baseline position of the work item after switching to work monitoring mode is calculated:
[0064]
[0065] in, This indicates the bottom line position of the detected work items; This indicates the position of the train at the current time T; Indicates the distance between the train's current position and the operating baseline position; This represents the speed of the train at the current time T; This represents the theoretical remaining time for the train locomotive to reach the operational baseline position of the work item, and is the unknown quantity that needs to be solved. This represents the overall acceleration of the train at the current time T.
[0066] Solve for the positive root of the above quadratic equation to obtain the theoretical remaining time for the train locomotive to reach the bottom line position of the operation item.
[0067] After obtaining the theoretical remaining time, the operator does not necessarily operate one second before reaching the operational baseline. Regulations allow the operator to check the item points a certain amount of time in advance to ensure safety. Therefore, it is also necessary to set an upper limit (i.e., the maximum allowable advance operation time) based on the maximum advance amount allowed by the business, thereby defining a reasonable basic time window for the operator to initiate actions at the locomotive.
[0068] First, starting from the current time T, add the current time to the theoretical remaining time to calculate the cutoff time of the basic time window. ,in, This is the theoretical remaining time calculated above.
[0069] Then, combine this with the maximum allowable advance operation time for each task item. The maximum advance operation time represents the earliest allowed operation time before the train head reaches the operation baseline position, typically maintained at 2-3 minutes. Converted to seconds, this embodiment of the invention sets the maximum advance operation time to 180 seconds. Subtracting the deadline time from the maximum advance operation time yields the start time of the basic time window. This allows us to obtain the train's base time window at the current moment. .
[0070] Step S3: Perform back-delay compensation based on pipeline conduction delay and wireless transmission delay to generate an extended time window.
[0071] The aforementioned basic time window represents the situation at the very front of the train. Since this embodiment of the invention targets railway train tail operation data, and the train's braking lines are extremely long, any air pressure change command issued from the front of the train needs to undergo a transmission process to reach the tail. For a train as long as 1.5 kilometers, the pressure wave generated by the braking decompression at the front takes several seconds to travel to the tail. After the tail host measures the pressure change, it sends it back to the front via radio, which incurs network latency. Traditional methods ignore these existing delay factors, resulting in a serious causal misalignment between the control events at the front of the train and the air pressure data response at the tail. This can easily lead to the driver's compliant operation being judged as a violation (e.g., the operator performed a compliant operation, but the data has not yet been transmitted to the tail). Therefore, it is necessary to analyze and construct an air wave speed transmission and communication queuing compensation mechanism to elastically stretch the basic time window, which was originally only applicable to the front of the train, onto the time axis, adjusting it to an elastic operation time window applicable to tail data observation.
[0072] First, the time required for air pressure to propagate in a slender pipe is quantified. Since the propagation speed of the braking and decompression wave within the train tube is not a constant speed of sound, but rather an equivalent wave speed damped and attenuated by factors such as pipe wall friction and the inflation of the auxiliary air reservoir, this is crucial. Under standard railway operating conditions, the pressure relief wave velocity is typically calibrated to be 230 m / s to 260 m / s. In this embodiment of the invention, an equivalent wave velocity is set. Then, combined with the length of the train tube The train's pipeline conduction delay was calculated:
[0073]
[0074] in, Indicates the pipeline conduction delay of the train; This represents the damping coefficient of the pipeline, which is usually taken as 1.05; The length of the train hose refers to the actual total length of the entire brake hose (train hose) from the front of the train to the rear of the train (where the main engine is installed). This represents the equivalent wave velocity of the braking and decompression wave propagating within the train tube. This represents the sampling delay constant of the wind pressure sensor inside the main unit at the tail of the train, typically taken as 2.5 seconds.
[0075] in, This represents the ideal time required for the pressure wave to travel the required distance. While the wave speed is constant in an ideal state, in actual propagation, the wave crest front slows down due to viscous resistance from the pipe wall, and there may be slight leaks in the train pipe or local resistance at bends or plugs. Multiplying this by the damping coefficient... This is equivalent to adding an extra 5% tolerance to pure physical time, ensuring that the compensation time is sufficient to cover these difficult-to-model microscopic resistances; This represents the sensor's response delay.
[0076] Since the tail-end air pressure data needs to be transmitted back to the locomotive wirelessly, network queuing, packet loss, and retransmission will cause significant communication delays in complex railway electromagnetic environments (such as tunnels and under viaducts). If this delay is not compensated, data timeouts caused by network lag will be mistakenly identified as operator violations. Therefore, it is also necessary to consider compensation for radio communication queuing and retransmission delays.
[0077] This invention provides an embodiment of the wireless transmission delay for trains based on current wireless network benchmark test data from the locomotive depot. Specifically, an NDT (Network Transmission Delay Tester) can be used to test and record the wireless transmission delay in real time while the train is running. This delay represents the transmission time from when a message is sent from the tail antenna to when it is received by the train receiver.
[0078] Since there is no risk of delay or misjudgment when operating in advance (operators query the work items in advance, wind pressure is stable, and the tail of the train can respond immediately), the start time of the extended time window obtained after stretching the basic time window remains unchanged, i.e., the start time of the extended time window remains unchanged. ,in, Indicates the start time of the base time window.
[0079] Due to the presence of conduction delay in pipelines and wireless transmission delay, the operator's response will be severely delayed when approaching the cutoff point. Therefore, the cutoff time of the basic time window must be extended backward as compensation. ,in, Indicates the end time of the base time window. Indicates the transmission delay in the pipeline of the train. This represents the wireless transmission delay of the train, thus obtaining the extended time window. .
[0080] Thus, the extended time window of the train at the current moment is obtained. This extended time window not only takes into account the train's speed and position, but also the propagation of pressure waves and network transmission delays, and has strong fault tolerance.
[0081] Step S4: Determine whether the job operation is compliant based on streaming pattern matching within the extended time window.
[0082] This invention abandons the traditional database periodic polling comparison (which easily leads to funnel effect and performance bottleneck), and adopts memory-level streaming event matching to achieve millisecond-level judgment response and extremely high accuracy. This eliminates the reliance on manual review of waveform diagrams, automatically filters out real violations, and pushes structured data with complete on-site parameters (such as the incident kilometer marker, speed, and delay compensation duration). Analysts only need to confirm the data and do not need to recalculate, which greatly improves the quality and efficiency of safety analysis in the locomotive depot.
[0083] First, the CEP (Complex Event Processing) engine is deployed at the system bottom layer. After the extended time window is generated, the CEP engine immediately instantiates a sliding listening window in memory with a lifespan equal to that of the extended time window. Within this lifespan, the engine accesses the standardized data stream at the tail of the column after the unified time calibration in step S1 in real time. The engine uses pattern matching rules to find data packets with the characteristic bit codes of "wind pressure query request" and "wind pressure legal response".
[0084] If, within the extended time window, data packets for wind pressure query and wind pressure response are successfully captured, and the wind pressure measurement value carried by the wind pressure response data packet is within the normal safety threshold range, the system will immediately terminate the current judgment task and determine that "the operator has queried the tail wind pressure of the train as required before braking on the long downhill slope," indicating that the operation is compliant and no alarm will be generated.
[0085] If the sliding listener window is destroyed due to the end of its lifecycle before the system's internal clock crosses the deadline of the extended time window, and the system still has not matched any legitimate wind pressure query data packets in the data stream, then the false lag caused by fluid delay or network delay can be ruled out. At this point, the system can determine that the operator has indeed violated regulations and formally trigger a violation alarm. At the same time, the system immediately collects the data at the trigger time and assembles it into a unified and standardized JSON data format. The data packet's fields include at least the name of the violation item, train number and train number, the train speed at the time of triggering the judgment, and the extended time window, so that the auditors can directly understand the judgment basis, greatly reducing the cognitive load and time cost of manual review.
[0086] This invention also provides an intelligent analysis system for railway train tail-end operations data; please refer to [link / reference]. Figure 2 The diagram illustrates a framework of an intelligent analysis system for railway tail-end operations data according to an embodiment of the present invention. The system may include: a memory 201, a processor 202, and a computer program stored in the memory 201 and executable on the processor 202. When the processor 202 executes the program, it implements the intelligent analysis method for railway tail-end operations data provided in the above embodiment.
[0087] Furthermore, the system also includes a communication interface 203 for communication between the memory 201 and the processor 202.
[0088] The memory 201 may include high-speed RAM memory, and may also include nonvolatile memory, such as at least one disk storage.
[0089] If the memory 201, processor 202, and communication interface 203 are implemented independently, then the communication interface 203, memory 201, and processor 202 can be interconnected via a bus to complete communication between them. The bus can be an Industry Standard Architecture (ISA) bus, a Peripheral Component Interconnect (PCI) bus, or an Extended Industry Standard Architecture (EISA) bus, etc. The bus can be divided into address bus, data bus, control bus, etc. For ease of representation, Figure 2 The bus is represented by a single line, but this does not mean that there is only one bus or one type of bus.
[0090] Optionally, in a specific implementation, if the memory 201, processor 202, and communication interface 203 are integrated on a single chip, then the memory 201, processor 202, and communication interface 203 can communicate with each other through an internal interface.
[0091] The processor 202 may be a central processing unit (CPU), an application-specific integrated circuit (ASIC), or one or more integrated circuits configured to implement embodiments of the present invention.
[0092] Example 2
[0093] To further verify the effectiveness and technical advantages of the present invention in complex dynamic scenarios, this embodiment provides a set of comparative tests based on real heavy-haul train operating conditions. This embodiment compares and explains the data intelligent analysis method provided by the present invention with traditional static rule-based analysis methods.
[0094] 1. Test conditions and parameter settings
[0095] A heavy-haul long-formation train in operation was selected for monitoring the assessment point of "failure to check wind pressure before braking on a long downhill slope". The system's input parameters are as follows:
[0096] Train tube length: 1500 meters;
[0097] The equivalent wave velocity of the braking and decompression wave in the train tube is 250 m / s.
[0098] Pipeline damping coefficient: 1.05;
[0099] Sampling delay constant of the tail sensor: 2.5 seconds;
[0100] Measured radio transmission delay in the current section: 4 seconds;
[0101] The train's current speed is 72 km / h (20 m / s), and it is set to maintain a constant speed for a short period of time (overall acceleration is 0).
[0102] The relative distance between the starting point of the long downhill slope ahead (the bottom line of operation) and the current position of the train head is 2000 meters.
[0103] The maximum advance operation time allowed by business regulations: 180 seconds;
[0104] Assume the current system base timestamp is 10:00:00.
[0105] 2. Actual cabin crew operation process (real and compliant operation)
[0106] The train driver legally pressed the wind pressure query button 40 meters from the starting point of the long downhill slope (2 seconds before the expected arrival time, at 10:01:38). At this time, the wind pressure query command was sent through the locomotive radio, and the main unit at the rear of the train measured and transmitted a response. Due to the 4-second network queuing and radio transmission delay, the locomotive receiver actually received the complete response message at 10:01:42 (at this time, the front of the train had already passed the starting point of the long downhill slope 2 seconds ago, and its actual position was 40 meters inside the slope).
[0107] 3. Traditional method determination process and results
[0108] Traditional methods employ static time thresholds or spatial distance controls. When the system retrieves the receiver's local records, it finds that the timestamp of the wind pressure response (10:01:42) is later than the time the train crossed the starting point of the long downhill slope (10:01:40). Because traditional methods lack compensation mechanisms for fluid dynamics transmission and wireless communication delays, the engine directly compares the received time with the baseline time, concluding that the response occurred after crossing the baseline, thus triggering a system alarm. The system determines this operation as either "failure to check wind pressure before braking on the long downhill slope" or "delayed and unauthorized check."
[0109] Judgment result: Serious false alarm. Compliant operations affected by physical delays were judged as violations, resulting in a sharp increase in the workload of manual investigation in the later stage.
[0110] 4. The determination process and results of the method of the present invention
[0111] (1) Calculation of basic time window: Based on the displacement formula, the theoretical remaining time is calculated. The base time window ends at 10:00:00 plus 100 seconds, which is 10:01:40. Combined with the maximum advance operation time of 180 seconds, the base time window starts at 09:58:40. This generates a base time window that is only applicable to situations where the locomotive has no delay.
[0112] (2) Derivation of flexible expansion window: First, calculate the pipeline conduction delay. Seconds. Based on the measured wireless transmission latency of 4 seconds, the system dynamically extends the cutoff time of the basic time window: The final result is an extended job window that can accommodate data with physical lag at the end of the column. .
[0113] (3) Streaming matching judgment: The underlying CEP engine compares the timestamp of the actual wind pressure response received (10:01:42) with the extended time window in memory. If the timestamp falls precisely within the extended time window and the wind pressure value carried in the message is normal, the system immediately terminates the judgment task, directly deems the operation legal, and does not generate a violation alarm.
[0114] Judgment result: The judgment result is completely consistent with the actual compliant operation of the on-site operator, eliminating the timing misalignment problem caused by data heterogeneity and transmission time.
[0115] It should be noted that the order of the above embodiments of the present invention is merely for descriptive purposes and does not represent the superiority or inferiority of the embodiments. The processes depicted in the accompanying drawings do not necessarily require a specific or sequential order to achieve the desired result. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.
[0116] The various embodiments in this specification are described in a progressive manner. The same or similar parts between the various embodiments can be referred to each other. Each embodiment focuses on describing the differences from other embodiments.
Claims
1. A method for intelligent analysis of railway train tail-end operation data, characterized in that, The method includes: The real-time status parameters of the train are obtained, including at least the current position, current speed and train tube length of the train, and the received multi-source train tail data are time-calibrated based on a unified time reference. Based on the train's current position and the operational baseline position of the preset work items ahead, the theoretical remaining time for the train to reach the operational baseline position is calculated in conjunction with the real-time status parameters, and a basic time window is generated. The pipeline conduction delay of the train is calculated based on the length of the train pipeline, and the wireless transmission delay is obtained. The cutoff time of the basic time window is compensated for by delay based on the pipeline conduction delay and the wireless transmission delay, and an extended time window is generated. Within the extended time window, streaming pattern matching is performed on the timestamped multi-source column tail data to determine whether the operation corresponding to the preset job item is compliant.
2. The intelligent analysis method for railway train tail operation data according to claim 1, characterized in that, The time calibration of the received multi-source column tail data based on a unified time benchmark includes: Extract the satellite time stamp recorded by the train operation monitoring device as the reference time; The difference between the reference time and the internal time of the tail receiver is used as the clock offset. The calibrated absolute timestamp is obtained by adding the clock offset to the local reception timestamp of the multi-source tail data arriving at the tail receiver.
3. The intelligent analysis method for railway train tail operation data according to claim 1, characterized in that, Before calculating the theoretical remaining time for the train to reach the operational baseline position, the process also includes: A railway line basic data table containing the start and end points of the slopes along the line is preloaded. Taking the current position of the train as the starting point, the target nodes in the railway line basic data table that meet the preset operation points are detected within a preset distance sliding window. Calculate the relative distance between the current position of the train and the target node. When the relative distance is less than or equal to a preset distance activation threshold and the train's running direction is pointing towards the target node, the train switches to the operation monitoring state.
4. The intelligent analysis method for railway train tail operation data according to claim 1, characterized in that, The theoretical remaining time for the train to reach the operational baseline position includes: The train switches to operation monitoring mode, extracts the speed of the train at each time in the preset historical period before the current time, and performs linear fitting on the speed at all times in the preset historical period. The slope of the fitted line is used as the overall acceleration of the train at the current time. Extract the baseline position of the preset task points, and combine the distance between the current position of the train and the baseline position, the overall acceleration, and the current speed of the train. Based on the displacement formula of uniformly accelerated linear motion and solve for the positive root, obtain the theoretical remaining time.
5. The intelligent analysis method for railway train tail operation data according to claim 1, characterized in that, The generation of the base time window includes: Starting from the current moment, add the current moment to the theoretical remaining time to calculate the cutoff time of the basic time window; Obtain the maximum allowable advance operation time for the preset task item, subtract the maximum advance operation time from the deadline of the basic time window, and calculate the start time of the basic time window.
6. The intelligent analysis method for railway train tail operation data according to claim 1, characterized in that, The calculation of the train's pipe conduction delay based on the train pipe length includes: Divide the length of the train tube by the equivalent wave velocity of the braking and decompression wave propagating inside the train tube to obtain the ideal duration of the braking and decompression wave propagating inside the train tube. The pipeline conduction delay is equal to the preset pipeline damping coefficient multiplied by the ideal duration, plus the sampling delay constant of the wind pressure sensor inside the tail unit.
7. The intelligent analysis method for railway train tail operation data according to claim 1, characterized in that, The acquisition of wireless transmission latency includes: A network transmission latency tester is used to test and record the wireless transmission latency in real time while the train is running. The wireless transmission latency represents the transmission time from when a message is sent from the tail antenna to when it is received by the train receiver.
8. The intelligent analysis method for railway train tail operation data according to claim 5, characterized in that, The generation of the extended time window includes: The start time of the base time window is used as the start time of the extended time window; The cutoff time of the basic time window is added to the pipeline conduction delay and the wireless transmission delay to calculate the cutoff time of the extended time window.
9. The intelligent analysis method for railway train tail operation data according to claim 1, characterized in that, The determination of whether the operation corresponding to the preset task item is compliant includes: Instantiate a sliding listener window in the memory of the complex event processing engine with a lifespan equal to that of the extended time window; The multi-source column tail data stream, which has been calibrated by timestamp, is connected to the sliding listening window, and data packets with wind pressure query request and wind pressure legal response feature bit codes are found by pattern matching; If a data packet for wind pressure query and wind pressure response is matched within the lifecycle of the sliding listening window, and the wind pressure measurement value carried by the wind pressure response data packet is within the normal safety threshold range, then the judgment task is terminated and no violation alarm is generated. If no valid wind pressure response data packet is matched when the sliding listening window is destroyed due to the end of its life cycle, the operation of the corresponding preset work item is determined to be in violation, an alarm is triggered, and the status data at the trigger time is extracted to generate a structured data packet. The structured data packet includes at least the name of the violation item, the train number and train number, the train speed at the time of triggering the judgment, and the extended time window.
10. A railway train tail-end operation data intelligent analysis system, the system comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that, When the processor executes the computer program, it implements the steps of the method as described in any one of claims 1 to 9.