Aircraft engine fault diagnosis-oriented graph-guided dynamic selection method for sensor measurement data

By dynamically selecting sensor measurement data in aero-engine fault diagnosis, the contradiction between diagnostic utility and normalized resource requirements in existing technologies is resolved, achieving cross-cycle scheduling closed loop and compact diagnostic input, and adapting to graph structure fault diagnosis input.

CN123158318APending Publication Date: 2026-11-24NANJING UNIV OF AERONAUTICS & ASTRONAUTICS
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611200252.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-10
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing technologies struggle to balance diagnostic utility and normalization resource requirements in the diagnosis of graph structure faults in aero-engines, and there is a lack of cross-cycle closed-loop feedback between the dynamic selection of sensor measurement data and graph structure fault diagnosis.

Method used

A graph-guided dynamic selection method for sensor measurement data for aero-engine fault diagnosis is provided. After the candidate sensor measurement data is collected, the combination of measurement data is dynamically determined based on the current status and feedback from the previous diagnosis cycle, coordinating diagnostic utility and normalization requirements to form a cross-cycle scheduling closed loop.

Benefits of technology

It achieves dynamic coordination between diagnostic utility and normalization requirements while maintaining the consistency of the dimensions of the graph structure input matrix, ensuring the compatibility of the measurement data selection results with the graph structure fault diagnosis input, and reducing the timing requirements of normalization input, processing and inference.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123158318A_ABST
    Figure CN123158318A_ABST
Patent Text Reader

Abstract

This invention discloses a graph-guided dynamic selection method for sensor measurement data in aero-engine fault diagnosis, relating to the technical field of aero-engine fault diagnosis and dynamic selection of sensor measurement data. After candidate sensor measurement data is acquired but before graph structure fault diagnosis, the method selects a state based on the current measurement data, operating conditions, and feedback from the previous cycle's graph structure fault diagnosis to form a scheduling observation. After forming an action for a candidate action, the method selects a state and judges preset structural conditions and three types of normalization requirement limits to form a basic action feasibility mask. The actual action is determined by the scheduling strategy combined with the mask. Based on the state after the actual action, the method processes measurement features and graph relationships to form diagnostic input and executes the diagnosis, using the feedback for the next cycle. This invention can coordinate diagnostic utility and normalization requirements, forming a more compact diagnostic input.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of aero-engine fault diagnosis and dynamic selection of sensor measurement data, specifically to a graph-guided dynamic selection method for aero-engine fault diagnosis. Background Technology

[0002] The health status of aero-engine airflow components is typically reflected through combined changes in multiple measurement data, including temperature, pressure, speed, and flow rate. Graphical fault diagnosis methods can utilize the relationships between different measurement items to generate diagnostic results; therefore, the combination of measurement data entering the diagnostic model and the corresponding graphical relationships will affect the organization of the diagnostic input.

[0003] In aero-engine health diagnostic systems, graph-based fault diagnosis methods can improve diagnostic accuracy by leveraging the relationships between different measurement items. In some diagnostic schemes, the diagnostic model uses a pre-determined complete set of measurement items; in others, features, node weights, or graph relationships can be filtered within the model. The former corresponds to a fixed, complete input, while the latter primarily handles the model's internal representation. For data that has already been collected, it remains to be addressed how to determine the actual combination of measurement data entering graph-based fault diagnosis for each diagnostic cycle based on the current state.

[0004] In existing technologies, the combination of measurement data entering a diagnostic model typically employs two strategies: one is to use a fixed set of pre-determined measurement items, and the other is to filter features or weights only within the model. However, while using all candidate measurement data retains sufficient information, it leads to higher requirements for normalization input, processing, and inference timing in each diagnostic cycle; while blindly reducing the number of measurements can lower the corresponding requirements for normalization input, processing, and inference timing, it may weaken key diagnostic information.

[0005] Furthermore, for candidate sensor measurement data that has already been acquired, using all candidate measurements can preserve sufficient diagnostic information and relationships between measurement items. However, this would cause all candidate measurements to enter the subsequent graph structure fault diagnosis process in each diagnostic cycle, corresponding to higher requirements for normalization input, processing, and inference timing. Reducing the number of measurements entering the diagnostic process can create a more compact diagnostic input, but selecting too few may weaken the information available for fault diagnosis. Therefore, given that data acquisition has been completed, it is necessary to determine the combination of measurement data used for graph structure fault diagnosis based on the current diagnostic cycle status, and to coordinate diagnostic utility with the predefined three types of normalization requirements.

[0006] The dynamic selection of periodic sensor measurement data also involves the feasibility of candidate actions before execution. Adding, removing, or retaining measurement items will create different candidate action states. Whether each candidate state meets structural conditions such as the retention of necessary measurement items and the minimum number of selections, as well as whether it meets predefined normalized input requirements, normalized processing requirements, and normalized inference timing requirements, needs to be determined before the actual action is determined. For implementation methods that use training to form scheduling strategies, it is also necessary to ensure that the strategy formed during the training phase corresponds to the subsequent dynamic selection process of sensor measurement data.

[0007] Therefore, a graph-guided dynamic selection method for sensor measurement data is needed for aero-engine fault diagnosis. This method should ensure that the scheduling observations, feasibility judgments before candidate actions are executed, graph structure fault diagnosis inputs after actual actions, and diagnostic feedback for the next diagnostic cycle are continuously connected according to the processing procedure. Furthermore, it should enable the deployment phase to utilize the training-obtained scheduling strategy parameters to perform periodic dynamic selection of sensor measurement data according to the objects and processing relationships corresponding to the training phase. Summary of the Invention

[0008] Purpose of the Invention: Addressing the shortcomings of existing technologies in diagnosing graph-based faults in aero-engines, which struggle to balance diagnostic utility with normalization resource requirements and lack cross-cycle closed-loop feedback between dynamic selection of sensor measurement data and graph-based fault diagnosis, this invention aims to provide a graph-guided dynamic selection method for aero-engine fault diagnosis. This method dynamically coordinates diagnostic utility with three types of normalization requirements while maintaining the consistency of the graph structure input matrix dimensions. Furthermore, for already acquired data, while ensuring the consistency of the graph structure model input dimensions, it dynamically determines the combination of measurement data that meets preset structural conditions and the three types of predefined normalization requirement limits based on the current state, and achieves cross-cycle scheduling closed-loop.

[0009] Technical Solution: A method for dynamically selecting graph-guided sensor measurement data for aero-engine fault diagnosis, the implementation steps of which include: S1. After the candidate sensor measurement data is collected and before the graph structure fault diagnosis is performed, select the state based on the current measurement data. Current operating conditions of aero engines And the diagnostic feedback from the previous diagnostic cycle. This forms the current periodic scheduling observation, represented as ; S2. For each candidate action in the candidate action, select the measurement data selection state corresponding to the candidate action based on the current measurement data selection state; S3. Based on the measurement data after each candidate action, select the state judgment preset structural conditions, and compare the normalized input requirements, normalized processing requirements and normalized inference timing requirements with the corresponding predefined normalized requirement limits to form a basic action feasibility mask. S4. The scheduling strategy generates candidate action selection information based on the current periodic scheduling observations, and determines the actual action from several candidate actions based on the candidate action selection information and the basic action feasibility mask. S5. Select the state based on the measurement data generated after the actual action. ,in This is the actual state used to form the graph-structured fault diagnosis input in the current diagnostic cycle, and it becomes the current measurement data selection state for the next diagnostic cycle. It is an actual action. Represents the state transition function; S6. Based on the measurement data after the actual action, select the state to process the current candidate sensor measurement features and corresponding graph relationships, and use the processed candidate sensor measurement features, processed corresponding graph relationships, current aero-engine operating conditions, and the state selection of measurement data after the actual action to form a graph structure fault diagnosis input, and use the current diagnostic feedback as the diagnostic feedback of the previous diagnostic cycle for the next diagnostic cycle. The graph structure fault diagnosis is performed based on the graph structure fault diagnosis input to obtain the current diagnostic feedback, denoted as follows: ,in This indicates the diagnostic output. This indicates the diagnostic feedback for the current diagnostic cycle. Diagram structure fault diagnosis, and These represent the processed measurement features and the processed graphical relationships, respectively.

[0010] Furthermore, the candidate actions include adding actions, removing actions, and maintaining actions; The target of the added action is candidate sensor measurement data that has not been selected in the current measurement data selection state; The target of the removal action is candidate sensor measurement data that has been selected in the current measurement data selection state and does not belong to the preset required measurement items, and the number of candidate sensor measurement data selected after the removal action is not less than the preset minimum number. The measurement data selection state after the candidate action corresponding to the holding action is the same as the current measurement data selection state, wherein the selection set and number of selections They are represented as follows:

[0011] In the formula, where Indicates the index of candidate measurement items. Indicates the first The selection status of each candidate measurement item express The number of non-zero elements in the neutron; The preset structural conditions include retaining preset necessary measurement items and ensuring that the number of measurement data from the selected candidate sensors is not less than the preset minimum number.

[0012] Furthermore, the present invention sets additional action restrictions in addition to the basic action feasibility mask, the additional action restrictions including dwell restrictions; After the actual action that changes the current measurement data selection state is executed, and before the preset dwell conditions are met, only the hold action that keeps the current measurement data selection state unchanged is allowed to be executed, and the hold action does not re-trigger the dwell restriction; The preset dwell condition is determined after three scheduling decision cycles following the execution of the actual action that changes the current measurement data selection state.

[0013] Furthermore, the current cycle scheduling observation is formed by combining the current measurement data selection status, the current aero-engine operating condition including altitude, flight Mach number, throttle lever angle and inlet total temperature, and the diagnostic feedback from the previous diagnostic cycle; The diagnostic feedback from the previous diagnostic cycle includes the overall health status probability of the aero-engine, the probability of fan failure, the probability of low-pressure compressor failure, the probability of high-pressure compressor failure, the probability of high-pressure turbine failure, the probability of low-pressure turbine failure, and diagnostic uncertainty. The current periodic scheduling observation does not include reference diagnostic labels, rewards, costs, advantage estimates, evaluation network outputs, or PID states.

[0014] Furthermore, the corresponding graph relationship is provided by a fixed graph prior constructed offline, and the fixed graph prior remains unchanged during deployment scheduling and graph structure fault diagnosis; The actual selection matrix is ​​formed by selecting the state based on the measurement data after the actual action, and the full-size zero masking is performed on the candidate sensor measurement feature matrix composed of the current candidate sensor measurement features and the correspondence graph relationship matrix composed of the correspondence graph relationship. The full-size zero masking includes: maintaining the original size of the candidate sensor measurement feature matrix and the correspondence graph relationship matrix, setting the candidate sensor measurement features corresponding to the unselected candidate sensor measurement data to zero, and setting the correspondence graph relationship associated with the unselected candidate sensor measurement data to zero; Processed measurement features Relationship with the processed graph They are represented as follows:

[0015] In the formula, This indicates that the actual selection matrix is ​​formed by selecting states based on measurement data after actual actions. This represents the measurement feature matrix of the candidate sensor. This indicates a fixed graph prior.

[0016] Furthermore, in the first diagnostic cycle, the present invention sets the diagnostic feedback from the previous diagnostic cycle as a preset zero vector, mathematically represented as: And through preset deterministic initialization rules, an initial measurement data selection state is formed that satisfies the preset structural conditions and the corresponding predefined normalization requirement limits.

[0017] Furthermore, the parameters of the scheduling strategy are obtained during the training phase by updating the parameters through PID-Lagrange constraints based on the diagnostic utility of graph structure fault diagnosis and the three normalized costs corresponding to normalized input requirements, normalized processing requirements, and normalized inference timing requirements, respectively. For the The normalized cost channel, in the first After the complete policy update is completed, the multiplier is updated according to the following expression:

[0018] in , and These are proportional gain, integral gain, and derivative gain, respectively. For budget residuals, In the integration state, It is a non-negative differential state. It is the lower limit of the multiplier clipping. The upper limit of the multiplier clipping. Represents the clipping function; During the deployment phase, the parameters of the scheduling strategy obtained from training and the corresponding predefined normalized requirement limits are used. Candidate action selection information is dynamically formed based on the current cycle scheduling observations of each diagnostic cycle, and the actual action is determined. The parameters of the scheduling strategy or the graph structure fault diagnosis model are not updated based on online data.

[0019] Furthermore, during the sampling process in the training phase, a final action feasibility mask is formed and adopted based on the basic action feasibility mask and additional action constraints, and the final action feasibility mask is used when saving the samples. During the policy update process, the policy before and after the update reuses the action support represented by the same final action feasibility mask, and the policy probability is higher than that of the previous policy. Represented as:

[0020] In the formula, Indicates the current policy parameters. This indicates the policy parameters before the update. Indicates the probability of the masking strategy. Indicates actual action.

[0021] On the other hand, the present invention also provides a dynamic selection device for graph-guided sensor measurement data for aero-engine fault diagnosis, comprising a memory and a processor, wherein the memory is used to store a computer program; and the processor is used to execute the computer program to implement the dynamic selection method for graph-guided sensor measurement data for aero-engine fault diagnosis.

[0022] Thirdly, the present invention also provides a computer-readable storage medium having a computer program stored thereon, wherein the computer program, when executed by a processor, implements the aforementioned method for dynamically selecting graph-guided sensor measurement data for fault diagnosis of aero-engines.

[0023] Beneficial effects: Compared with the prior art, the substantial features and significant advancements of this invention include: (1) After the candidate sensor measurement data is collected and before the graph structure fault diagnosis is performed, the present invention performs periodic dynamic selection of the collected candidate sensor measurement data, and constructs a cross-cycle closed loop by using scheduling observations that include feedback from the previous diagnosis cycle, so that the combination of measurement data in each diagnosis cycle can be dynamically determined according to the current diagnosis status, rather than using the same complete measurement set, thereby ensuring the continuity of diagnosis while adapting to changes in working conditions.

[0024] (2) Before the actual action is determined, the present invention generates the measurement data selection state for each candidate action, and judges the preset structural conditions and three types of predefined normalization requirement limits based on the state to form a basic action feasibility mask. The corresponding judgment is brought forward to before the actual action is determined, so that the determined actual action meets the preset structural conditions and three types of predefined normalization requirement limits, and avoids the execution of candidate actions that do not meet the conditions.

[0025] (3) This invention uses the measurement data selected after actual action to perform full-size zero masking on the candidate sensor measurement features and corresponding graph relationships. Under the premise of keeping the original size of the feature matrix and graph relationship matrix unchanged, the unselected part is set to zero. This not only realizes the compactness of the diagnostic input to reduce the normalization input, processing and inference timing requirements, but also maintains the fixed-dimensional input format required by the graph structure fault diagnosis model, thus realizing the adaptation between the dynamic measurement data selection results and the fixed-dimensional graph structure fault diagnosis input. Attached Figure Description

[0026] Figure 1 This is a schematic diagram of the dynamic selection of sensor measurement data and the graph structure fault diagnosis feedback process in this invention; Figure 2 This is a flowchart of the method described in this invention; Figure 3 This is a schematic diagram of the feasibility mask and the PID-Lagrange constraint strategy update mechanism; Figure 4 This is a graph showing the changes in diagnostic utility and normalized requirement indicators during the training process of this invention. Detailed Implementation

[0027] To make the objectives, technical solutions, and advantages of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of the present invention.

[0028] Example 1: Combination Figure 1 and Figure 2 As shown, this invention provides a graph-guided dynamic selection method for sensor measurement data in aero-engine fault diagnosis. This method is implemented based on the N-CMAPSS dataset and covers the dynamic selection of periodic sensor measurement data during the deployment phase and the strategy optimization process during the training phase. This embodiment aims to address the problem of dynamically coordinating diagnostic utility and normalization resource requirements after candidate sensor measurement data acquisition, while ensuring the consistency of the input dimensions of the graph-structured fault diagnosis model.

[0029] It should be noted that the dynamic selection of sensor measurement data in this invention refers to the process of dynamically determining the combination of measurement data to be used in the current diagnostic cycle from the collected candidate sensor measurement data after the candidate sensor measurement data has been collected and before the graph structure fault diagnosis is executed. In specific implementation, the dynamic selection is achieved through a periodic input scheduling mechanism, and its processing object is the candidate measurement data that has been collected. The activation status of physical sensors, sampling frequency, data acquisition process and avionics communication links are not the data selection objects of this invention.

[0030] The graph guidance mentioned in this invention refers to the scheduling observation of the diagnostic feedback formed by graph structure fault diagnosis into the next diagnostic cycle and its participation in the dynamic selection of subsequent candidate sensor measurement data. The dynamic selection result is further used to form the corresponding graph structure fault diagnosis input, thereby forming a closed loop across diagnostic cycles.

[0031] Reference Figure 1 The dynamic selection process for sensor measurement data in this embodiment includes the following steps: collecting candidate sensor measurement data, forming scheduling observations, judging the feasibility of candidate actions, determining actual actions, updating the measurement data selection status after the actual action, forming graph structure fault diagnosis inputs, and providing diagnostic feedback. The current diagnostic feedback is generated after the graph structure fault diagnosis is completed in the current diagnostic cycle and then proceeds to the next diagnostic cycle to form new scheduling observations.

[0032] The implementation steps of the method described in this invention are as follows: Step S1: After the candidate sensor measurement data is collected and before the graph structure fault diagnosis is performed, the current cycle scheduling observation is formed based on the current measurement data selection status, the current aero-engine operating condition, and the diagnostic feedback from the previous diagnostic cycle. Let the current diagnostic cycle be... The current measurement data selection status is denoted as... This indicates whether each candidate measurement item is selected before the current cycle action is executed; the current operating condition of the aero-engine is denoted as... Feedback from the previous diagnostic cycle is recorded as follows: The three factors together form the current cycle scheduling observation: .

[0033] Specifically, the current cycle scheduling observation is the input for the scheduling strategy to obtain external observation information for the current diagnostic cycle. In this embodiment, the candidate sensor measurement data includes 14 items, namely: low-pressure compressor outlet total temperature T24, high-pressure compressor outlet total temperature T30, high-pressure turbine outlet total temperature T48, low-pressure turbine outlet total temperature T50, bypass channel total pressure P15, fan inlet total pressure P2, fan outlet total pressure P21, low-pressure compressor outlet total pressure P24, high-pressure compressor outlet static pressure Ps30, combustion chamber outlet total pressure P40, low-pressure turbine outlet total pressure P50, fan speed Nf, core engine speed Nc, and fuel flow rate Wf. Current aero-engine operating conditions. The four variables—altitude (alt), flight Mach number (Mach), throttle lever angle (TRA), and fan inlet total temperature (T2)—are used to characterize the engine's current external operating point. These operating condition variables are not part of the candidate sensor measurement data and are not used for scheduling actions such as adding, removing, or maintaining actions. Diagnostic feedback from the previous diagnostic cycle... This includes the overall health status probability of the aero-engine, the probability of fan failure, the probability of low-pressure compressor failure, the probability of high-pressure compressor failure, the probability of high-pressure turbine failure, the probability of low-pressure turbine failure, and diagnostic uncertainty. This feedback information enables the scheduling strategy to dynamically adjust the combination of measurement data selected for the current diagnostic cycle based on the confidence level of the diagnostic results from the previous diagnostic cycle.

[0034] Step S2: For each candidate action among multiple candidate actions, select the measurement data selection state corresponding to the candidate action based on the current measurement data.

[0035] Current measurement data selection status It is the starting point for judging candidate actions and also part of the current cycle scheduling observation.

[0036] For candidate actions The measurement data selection state after the candidate action is recorded as And formed according to the following formula:

[0037] Candidate states are used to determine whether the structural conditions and three normalized requirement limits are met after the candidate action is executed; the input used for the current diagram structural fault diagnosis is based on the state selection based on the measurement data after the actual action.

[0038] Actual actions are recorded as After the candidate action selection information and the applicable action feasibility mask jointly determine the actual action, a selection status of the measurement data after the actual action is formed: It is the actual state used to form the graph structure fault diagnosis input in the current diagnostic cycle, and becomes the current measurement data selection state for the next diagnostic cycle.

[0039] In practical applications, multiple candidate actions include add actions, remove actions, and hold actions. The target of the add action is candidate sensor measurement data that is not selected in the current measurement data selection state, and it is used to add the corresponding acquired candidate sensor measurement data to the measurement data selection state after the candidate action. The target of the remove action is candidate sensor measurement data that has been selected in the current measurement data selection state but is not a preset required measurement item, and the number of candidate sensor measurement data selected after the remove action is not less than a preset minimum number, and it is used to remove the corresponding acquired candidate sensor measurement data from the measurement data selection state after the candidate action. The measurement data selection state after the hold action is the same as the current measurement data selection state, and it is used to maintain the current measurement data selection state unchanged.

[0040] In this embodiment, the preset required measurement items are set to fan speed Nf and core machine speed Nc, and the preset minimum selection number is set to 4. The total number of candidate actions can be one hold action, 14 add actions, and 14 remove actions. The selection set and selection number are respectively represented as follows: and By traversing all candidate actions and generating corresponding post-action states, the outcome of each possible operation can be predicted before actual execution, providing a basis for subsequent feasibility assessments.

[0041] Step S3: Based on the measurement data after each candidate action, select the preset structural conditions for state judgment, and compare the normalized input requirements, normalized processing requirements, and normalized inference timing requirements with their respective predefined normalized requirement limits to form a basic action feasibility mask. These three types of normalized requirements are dimensionless modeling indicators used to represent resource and timing constraints at an abstract level, rather than directly binding to specific hardware physical quantities. The normalized input requirements are expressed as... Its mathematical expression is as follows ,in For the first Normalized input weights for each candidate measurement item, and .

[0042] In this embodiment, uniform weighting is used, that is Normalization requirements Represented as ,in To maintain a fixed processing overhead ratio, this embodiment uses a value of 0.5. Normalized inference timing requirements are used... It is represented by its mathematical expression as follows: ,in and Both are 0.5.

[0043] For each candidate action, first determine whether the add, remove, or keep action satisfies the corresponding structural conditions, then determine... , and Whether the requirements are not higher than the predefined normalized input requirement limit, normalized processing requirement limit, and normalized inference timing requirement limit, respectively. Preset structural conditions include retaining preset necessary measurement items and ensuring that the number of measurement data from the selected candidate sensors is not less than a preset minimum. An action is marked as feasible only when the state after a candidate action simultaneously satisfies the preset structural conditions and the three types of predefined normalized requirement limits. The feasibility marks of all candidate actions together constitute the basic action feasibility mask. .

[0044] The preset structural condition indicator and the demand condition indicator are respectively and The feasibility mask for basic actions can be represented as:

[0045] The basic action set lists candidate actions that meet the basic conditions. The basic action feasibility mask indicates whether each candidate action belongs to the set and is used to determine the actual action.

[0046] This pre-judgment mechanism ensures that each candidate action is checked against preset structural conditions and three types of predefined normalized requirement limits before the actual action is determined, thus preventing candidate actions that do not meet the corresponding conditions from being determined as actual actions.

[0047] Step S4: The scheduling strategy generates candidate action selection information based on the current periodic scheduling observations, and determines the actual action from multiple candidate actions based on the candidate action selection information and the basic action feasibility mask.

[0048] The scheduling strategy outputs a score or unnormalized output for each candidate action. When determining the actual action, in addition to the basic action feasibility mask, additional action restrictions can be set, such as dwell restrictions. The dwell restriction stipulates that after an actual action that changes the current measurement data selection state is executed, only hold actions that maintain the current measurement data selection state are allowed to be executed until the preset dwell conditions are met, and these hold actions do not re-trigger the dwell restriction.

[0049] In this embodiment, the preset dwell condition is three scheduling decision cycles after the actual action that changes the current measurement data selection state is executed. This mechanism is used to limit frequent changes in the measurement data selection state within a short period of time, which helps maintain the temporal continuity of diagnostic input. The basic action feasibility mask and additional action constraints such as dwell restrictions together form the final action feasibility mask. The output of the scheduling strategy is normalized only within the support of non-empty actions limited by the final action feasibility mask, thereby determining the actual action. .

[0050] In the implementation that uses only the basic action feasibility mask, the actual action is determined from the candidate actions based on the candidate action selection information and the basic action feasibility mask. The basic action feasibility mask excludes candidate actions that do not belong to the set of basic feasible actions before the actual action is determined.

[0051]

[0052] in, This represents the action feasibility mask component currently used to determine the action; when only the basic action feasibility mask is used, In an alternative implementation that enables additional action restrictions, .

[0053] In an alternative implementation that enables additional action restrictions, the basic action feasibility mask and the enabled additional action restrictions form the final action feasibility mask:

[0054] The actual action is then determined based on the candidate action selection information and the final action feasibility mask. When only basic conditions are used, the basic action feasibility mask directly participates in the determination of the actual action; when additional action restrictions are enabled, the corresponding restrictions are superimposed on the basic action feasibility mask to form the final action feasibility mask.

[0055] When the additional action restriction is a dwell restriction, after the actual action that changes the measurement data selection state is executed, only actions that keep the measurement data selection state unchanged are allowed to be executed before the preset dwell conditions are met, and the dwell restriction is not retried.

[0056] Step S5: Select the state based on the measurement data generated after the actual action.

[0057] Once the actual actions are determined, Forming the actual choice matrix:

[0058] The current diagram structure fault diagnosis input selects the state and its corresponding actual selection matrix based on the measurement data after the actual action. The current measurement data selection state before the action is executed, as well as candidate states that have not yet become actual action results, are only used for pre-action judgment and do not enter the current graph structure fault diagnosis input. This invention processes the current candidate sensor measurement features and corresponding graph relationships based on the measurement data selection state after the actual action, and uses the processed candidate sensor measurement features, processed corresponding graph relationships, current aero-engine operating conditions, and the measurement data selection state after the actual action together to form the graph structure fault diagnosis input.

[0059] Specifically, the correspondence graph relationships are based on a fixed graph prior constructed offline. Provided and remains constant during deployment scheduling and graph structure fault diagnosis. The actual selection matrix is ​​formed by selecting states based on measurement data after actual actions. And use this actual selection matrix to form a candidate sensor measurement feature matrix composed of the current candidate sensor measurement features. Perform full-size zero-masking on the correspondence graph relation matrix formed by the correspondence graph relations. The formula for calculating full-size zero-masking is:

[0060] The key to this process is maintaining the original dimensions of the candidate sensor measurement feature matrix and the corresponding graph relation matrix, setting only the candidate sensor measurement features corresponding to the measurement data of unselected candidate sensors to zero, and setting the corresponding graph relations associated with the measurement data of unselected candidate sensors to zero. This approach achieves both compactness of the diagnostic input and maintenance of the fixed-dimensional input format required by the graph-structured fault diagnosis model, thus achieving adaptation between the dynamic measurement data selection results and the fixed-dimensional graph-structured fault diagnosis input.

[0061] Step S6: Execute graph-based fault diagnosis based on graph structure input to obtain current diagnostic feedback. The current diagnostic feedback will be used as the diagnostic feedback for the previous diagnostic cycle in the next diagnostic cycle. Current diagnostic feedback It includes the confidence information of the diagnosis results and passes it in a closed loop to the scheduling observation of the next cycle, so that the scheduling strategy can adjust the combination of measurement data selection in subsequent diagnosis cycles based on the certainty of the diagnosis results.

[0062] For the first diagnostic cycle, since there is no real feedback from the previous diagnostic cycle, the diagnostic feedback from the previous diagnostic cycle is set as a preset zero vector. Furthermore, by using preset deterministic initialization rules, an initial measurement data selection state is formed that satisfies preset structural conditions and corresponding predefined normalization requirement limits, so as to ensure that the system can operate normally during the cold start phase.

[0063] Combination Figure 3 During the training phase, the parameters of the scheduling strategy are updated through PID-Lagrange constraints based on the diagnostic utility of graph structure fault diagnosis and the three normalized costs corresponding to normalized input requirements, normalized processing requirements, and normalized inference timing requirements, respectively.

[0064] In one implementation, the training environment is constructed according to the objects and processing relationships used in the aforementioned periodic input scheduling. This ensures that the current periodic scheduling observations formed during the training phase, the measurement data selection status after candidate actions, the basic feasibility judgment determined by structural conditions and three types of normalized requirement limits, the measurement data selection status after actual actions, the graph structure fault diagnosis input, and the current diagnostic feedback correspond to the corresponding objects and processing relationships in the deployment phase. The basic action feasibility relationship refers to the processing relationship that, based on the measurement data selection status after candidate actions, performs basic feasibility judgments according to preset structural conditions and three types of normalized requirement limits, forming a set of basic feasible actions and a basic action feasibility mask.

[0065] During the training phase, the diagnostic loss can be calculated based on the diagnostic output and reference diagnostic labels of the graph-structured fault diagnosis model. The normalized diagnostic utility can be expressed as... .

[0066] In a specific training implementation, the diagnostic loss is formed by combining the binary cross-entropy loss of the overall health status of the aero-engine and the binary cross-entropy loss of five types of component faults with weights of 0.5 and 0.5 respectively, wherein the losses of the five types of component faults are first averaged according to the five types. The diagnostic loss of the full measurement window of the training engine unit is used to determine the 5th percentile (0.01303769713267684) and the 95th percentile (1.2896143376827238), and the diagnostic loss is clipped and normalized to the interval of 0 to 1 using 10 to the power of negative 8 as a stability constant to form the aforementioned normalized diagnostic loss; the normalization reference value is determined by the training data, the validation data is used for the validation and selection of scheduling strategy parameters, and the test data is used for subsequent test evaluation.

[0067] In this specific training implementation, the state switching amount is formed by selecting the norm of the difference between the selected states based on the actual measurement data of two adjacent scheduling cycles; the switching amount corresponding to the action is kept at 0, and the switching amount corresponding to adding or removing the action is 1. Using 0.02 as the switching coefficient, the penalty term corresponding to the switching amount is deducted from the diagnostic utility to form the training reward; the switching penalty only participates in the calculation of the training reward, and the feasibility of the action is still judged by the structural conditions and the three types of normalized demand limits, and the three normalized cost channels remain independent.

[0068] Reference diagnostic labels can be used to form supervised diagnostic loss during the training phase of the graph structure fault diagnosis model, to calculate diagnostic loss and diagnostic utility and form training reward during the scheduling strategy training phase, and to calculate diagnostic loss and diagnostic utility during the verification or evaluation phase. During the deployment phase, the current cycle scheduling observation, diagnostic feedback, action feasibility judgment, actual action and three normalized demand indicators are all formed from the aforementioned information available during the deployment phase, without calling reference diagnostic labels.

[0069] against Demand channels, predefined demand limits Used for feasibility assessment of candidate actions, normalized cost initial threshold Used to determine the level of demand at which normalized costs begin to increase, cost budgeting The three methods (normalized cost, normalized cost, and normalized cost) are used to constrain the average normalized cost during training, and they have different responsibilities. The normalized cost mapping is expressed as:

[0070] This results in normalized input cost, normalized processing cost, and normalized inference time-series cost. In one specific implementation, the budget for all three average normalized costs is 0.05; this value represents the average normalized cost constraint target during training, and is independent of the action-by-action judgment of whether candidate actions meet the feasibility limit.

[0071] Based on the reward advantage, the three normalized cost advantages, and the current multiplier used in this complete policy update, a Lagrange constraint advantage is constructed; based on the Lagrange constraint advantage and the policy probability ratio formed under the same action support, a pruning agent objective for near-end policy optimization is constructed, and the scheduling policy parameters are updated accordingly.

[0072] Update the index according to the complete strategy during the training phase. Organization. For the first The normalized cost channel, by the first The sampling trajectory batch used in this complete policy update The cost of effective training time forms the average cost of the current batch. During the initial smoothing process, let And let the non-negative differential state From the time of subsequent complete strategy updates, smoothing costs will be implemented according to... Perform an exponential moving average. Budget residuals are calculated according to... calculate.

[0073] Current multiplier For the This complete policy update. After this complete policy update, the non-negative differential state is processed according to... Formation; Integral state according to Accumulate and trim. This is then formed from the budget residual, integral state, and differential state. ,in This indicates the upper limit of the multiplier clipping.

[0074] Next vehicle It will take effect at the start of the next full policy update. The current batch cost statistics used in a full policy update remain fixed within that full update and are not recalculated with individual mini-batch updates or changes in policy parameters after the update.

[0075]

[0076] After determining the scheduling strategy parameters for deployment based on the verification results, the deployment phase loads and fixes the determined scheduling strategy parameters. During the deployment phase, candidate action selection information is dynamically generated based on the current cycle scheduling observations of each diagnostic cycle, and the actual action is determined. At the same time, three predefined normalized requirement limits are fixed. The reward value network, cost value network, and PID-Lagrange multiplier update are retained in the training phase.

[0077] In another implementation, when sampling during the training phase actually uses the final action feasibility mask formed by the basic action feasibility mask and enabled additional constraints, the actual final action feasibility mask used is saved during sampling. During policy updates, the saved action support is reused between the pre-update and post-update policies.

[0078] In this implementation, the mask policy probabilities in both the numerator and denominator are formed based on the action support defined by the same final action feasibility mask saved during sampling. This approach allows the sampling and policy update phases to calculate policy probabilities based on the same action support saved during sampling; the mask reconstructed during the update phase is only used to verify the consistency of the saved action support and does not replace the final action feasibility mask saved during sampling. The saved final action feasibility mask is only used for policy updates during the training phase; the deployment phase still determines the actual action based on the action feasibility mask formed in the current diagnostic cycle.

[0079] In implementations employing a cyclic scheduling strategy, the scheduling strategy maintains a cyclical state of updates across scheduling cycles. For the first... Each scheduling cycle will be determined by the current cycle's scheduling observations. Cyclic state with the previous scheduling cycle The current loop state resulting from the update is denoted as The current cyclic state is used to form candidate action selection information. During the training phase, each training sequence is limited to the same aero-engine unit and the same diagnostic round; the cyclic hidden state is reinitialized at the start of training and when entering a new aero-engine unit or a new diagnostic round. For training segments extracted from continuous sampling trajectories, the cyclic hidden state saved before the first effective training moment of the training segment is used as the starting cyclic hidden state of the training segment, thereby maintaining the continuity of cyclic states in continuous sampling trajectories. To ensure that training segments in the same training batch are organized with uniform length, positions with insufficient length are padded and identified using effective position masks. Loss calculation and cost statistics are only performed at effective training moments. The above-mentioned cyclic hidden state initialization and continuity, training segment processing, and effective position masks are only used in the training process. The deployment phase still uses an input scheduling closed loop consisting of current scheduling observations, action determination, and graph structure fault diagnosis feedback.

[0080] In one specific training implementation, the recurrent scheduling strategy employs a gated recurrent unit network (GRU) with an input dimension of 25 and a hidden state dimension of 128, and a single recurrent structure. The action output layer generates candidate action selection information corresponding to 29 candidate actions based on the 128-dimensional hidden representation. During the training phase, one reward value network and three independent cost value networks are set up, each corresponding to a normalized cost channel. The pruning parameter for proximal policy optimization is 0.16, the sampling trajectory length is 256, each training mini-batch contains a maximum of 64 effective training times, and each policy update performs two rounds of proximal policy optimization training with a learning rate of [missing information]. In this embodiment, the proportional gain Integral gain Differential gain upper limit of multiplier clipping The network structure, training parameters, and gains described above constitute the current specific training implementation method, used to form the scheduling strategy parameters loaded during the deployment phase.

[0081] In one validation embodiment, multiple subsets of the publicly available N-CMAPSS (New Commercial Modular Aero-Propulsion System Simulation) dataset for condition monitoring and remaining life of aero-engines are employed. The N-CMAPSS dataset contains aero-engine operating trajectories to failure derived from real flight conditions and provides health status or fault category information that can be used for fault diagnosis. Training, validation, and testing utilize non-overlapping engine units, with each measurement window containing 50 consecutive samples. The diagnostic loss is calculated using the label of the last sample, and diagnostic utility is derived accordingly. The graph-structured fault diagnosis model is trained before scheduling strategy training and remains fixed during scheduling strategy training, validation, and test evaluation.

[0082] In this embodiment, the candidate measurement item set includes 14 candidate sensor measurement data items, and the required measurement item is... and The minimum number of selections is 4; the operating conditions of the aero-engine are represented by alt, Mach, TRA, and T2, corresponding to altitude, flight Mach number, throttle lever angle, and inlet total temperature, respectively. Fixed diagram prior. The candidate measurement items are formed offline based on their correspondences and remain fixed during the deployment phase. The cyclic scheduling strategy adopts the aforementioned gated cyclic unit network structure, and the training phase uses the aforementioned specific proximal strategy to optimize parameters and PID gain configuration. For a given aero-engine fault diagnosis object, the candidate measurement item set, required measurement items, minimum selection quantity, and aero-engine operating condition variables are predetermined before training and deployment, and their definitions remain consistent under the corresponding deployment configuration. The measurement data selection state after the actual action is used to synchronously process the candidate measurement features and corresponding graph relationships. The processed measurement features, processed graph relationships, current aero-engine operating conditions, and the measurement data selection state after the actual action together form the graph structure fault diagnosis input, and the current diagnostic feedback is formed accordingly.

[0083] Training and evaluation use random seeds 0, 1, 2, and 3. This embodiment sets up a stricter requirement configuration, a baseline requirement configuration, and a more lenient requirement configuration. Following the order of normalized input requirements, normalized inference timing requirements, and normalized processing requirements, three sets of predefined normalization requirement limits are (0.5000, 0.6250, 0.7500), (0.6500, 0.9000, 0.9000), and (0.7857, 0.8393, 0.8929), respectively; the corresponding normalization cost starting thresholds are (0.4286, 0.5714, 0.7143), (0.5714, 0.6786, 0.7857), and (0.7143, 0.7857, 0.8571), respectively. All three configurations have a mean normalized cost budget of 0.05. Under the condition of simultaneously meeting the corresponding three types of predefined normalization requirement limits, the maximum number of selectable candidate measurement items are 7, 9, and 11, respectively. The three levels of names are determined based on the maximum number of selectable candidate measurement items, rather than indicating that the three limit components increase sequentially. Subsequent main comparison results and... Figure 4 Based on baseline requirements configuration.

[0084] In this embodiment, the complete input using all 14 candidate measurement data is used as the deterministic reference, and PPO, Masked-PPO, Penalty-PPO, PPO-Lagrangian, and PI-Lagrangian-PPO are used as comparative scheduling methods. Each learning method employs the same data partitioning, fixed graph prior, graph structure fault diagnosis model, cyclic scheduling strategy structure, near-end policy optimization training framework, training budget, and testing and evaluation process. The main differences lie in the handling of action feasibility and the handling of requirement constraints during the training phase.

[0085] In this comparison, this method focuses on two types of effects: first, whether the number of selected measurement data, the three types of normalization requirements, and the violation statistics can be reduced while keeping the average diagnostic utility similar; second, whether the dispersion of the number of selected measurements and the three types of normalization requirements under four random seeds can be reduced, and whether the results of the complete method can be reproduced after controlled simplification of the action feasibility processing or multiplier adjustment method. If only the final diagnostic utility is reported without simultaneously explaining the measurement usage, requirement constraints, and cross-random seed variations, it is difficult to reflect the implementation differences of the input scheduling and training constraint mechanisms relative to different comparative scheduling methods. Therefore, this invention uses the feasibility processing before candidate action execution and the PID-Lagrange constraint adjustment during the training phase as the key mechanism differences in the comparison, while using specific numerical values ​​and training curves to illustrate the implementation effects.

[0086] Under the aforementioned baseline requirement configuration, when using a deterministic reference method that consistently employs all 14 candidate measurement data, the mean diagnostic utility is 0.6537, and the normalized input requirement, normalized inference timing requirement, and normalized processing requirement are all 1. In the testing and evaluation, this method selected an average of 5.1129 measurements, with a mean diagnostic utility of 0.6233, mean normalized requirements of 0.3652, 0.5239, and 0.6826 respectively, and a mean violation rate of 0.

[0087] Compared to the PPO-Lagrangian comparative scheduling method, our method shows a difference of 0.0059 in average diagnostic utility, while selecting approximately 0.81 fewer measurements on average, and exhibiting lower requirements for all three types of normalization. When any of the three types of normalization requirements exceeds the corresponding predefined limits, our method's average violation rate is 0, while PPO-Lagrangian's is 0.1403. Under four random seeds, the standard deviation of the number of selected measurements and the three types of normalization requirements in our method is approximately 13% of the corresponding values ​​in PPO-Lagrangian. These results demonstrate that, under this validation configuration, our method can generate more compact diagnostic inputs with a smaller difference in average diagnostic utility, and achieve lower requirements for modeling inputs, processing, and inference timing, as well as less dispersion of results across random seeds.

[0088] Furthermore, Masked-PPO and PI-Lagrangian-PPO both exhibit slightly higher average diagnostic utility under this validation configuration, but their average number of selected measurements and the three-class normalization requirements are both higher than those of this method. The standard deviations of the number of selected measurements and the three-class normalization requirements across random seeds for Masked-PPO and PI-Lagrangian-PPO are approximately 5.3 times and 5.8 times the corresponding values ​​of this method, respectively, while the standard deviation for Penalty-PPO is approximately 3.4 times the corresponding value of this method. This controlled simplification comparison illustrates that, under this validation configuration, neither using action feasibility masking, simplifying full multiplier regulation to PI regulation, nor using fixed requirement penalty can reproduce the combined result of the full method simultaneously forming a more compact measurement set, lower modeling requirements, and smaller dispersion across random seeds.

[0089] In experiments using stricter, baseline, and more lenient requirement configurations, the maximum number of selectable candidate measurements for the three configurations were 7, 9, and 11, respectively. The average number of measurements selected by this method was 4.3489, 5.1129, and 7.2225, respectively, with average diagnostic utility of 0.6224, 0.6233, and 0.6299. As the maximum number of selectable candidate measurements for the three configurations increased, the number of selected measurements and the average value of the three types of normalized requirements also increased accordingly. The average violation statistics obtained under the above evaluation criteria for all three configurations were 0. These results demonstrate that, within the scope of this validation, this method can generate different combinations of measurement data based on predefined requirement conditions, rather than using the same number of measurement data, while maintaining a basic trade-off between diagnostic utility and the timing requirements for modeling input, processing, and inference.

[0090] Figure 4 The training process of the method described in this embodiment under a baseline requirement configuration is illustrated. The diagnostic utility subplot and the selected measurement quantity subplot show the mean and minimum-maximum range of the four random seeds, while the normalized requirement index subplot shows the mean curves and predefined limits of the three types of normalized requirements. Each subplot contains 390 complete training windows, with training steps ranging from 256 to 99984. Compared to the earlier training windows, the average selected measurement quantity is lower in the later windows, and the average trajectory of the three types of normalized requirements is also correspondingly reduced, while the average diagnostic utility remains within a generally similar range. This indicates that under this specific training configuration, a more compact use of measurements and a lower modeling requirement are formed during the training process, while the diagnostic utility remains at a generally similar level.

[0091] It should be noted that the above comparison results, controlled simplification results, predefined requirement configuration results, and... Figure 4The training process shown is used to illustrate the specific implementation effect in this embodiment, and the specific comparison values ​​and training curves are not intended to limit the scope of protection of the claims.

[0092] The core technical solution of this invention lies in the dynamic selection of periodic sensor measurement data after the candidate sensor measurement data is collected and before graph structure fault diagnosis: based on the current state, a scheduling observation and a state after candidate actions are formed; before the actual action is determined, a feasibility judgment is made based on structural conditions and three types of predefined normalized requirement limits; based on the measurement data after the actual action, a state is selected to form the graph structure fault diagnosis input, and the current diagnosis feedback is used for the next diagnosis cycle; the action feasibility processing and PID-Lagrange constraint adjustment in the training phase are used to form scheduling strategy parameters for use in the deployment phase.

[0093] The above description is merely a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the technical scope disclosed in the present invention should be included within the scope of protection of the present invention. Therefore, the scope of protection of the present invention should be determined by the scope of the claims.

Claims

1. A method for dynamically selecting sensor measurement data guided by a graph for aero-engine fault diagnosis, characterized in that, The implementation steps of this method include: S1, after the candidate sensor measurement data is completed and before the execution of the graph structure fault diagnosis, selecting a state according to the current measurement data , the current aero-engine operating condition , and the diagnostic feedback of the previous diagnostic cycle , forming a current cycle scheduling observation, denoted as ; S2. For each candidate action in the candidate action, select the measurement data selection state corresponding to the candidate action based on the current measurement data selection state; S3. Based on the measurement data after each candidate action, select the state judgment preset structural conditions, and compare the normalized input requirements, normalized processing requirements and normalized inference timing requirements with the corresponding predefined normalized requirement limits to form a basic action feasibility mask. S4. The scheduling strategy generates candidate action selection information based on the current periodic scheduling observations, and determines the actual action from several candidate actions based on the candidate action selection information and the basic action feasibility mask. S5, actual action forming actual action after measurement data selection state wherein is the actual state used to form the graph structure fault diagnosis input for the current diagnosis cycle and becomes the current measurement data selection state for the next diagnosis cycle, is the actual action, denotes the state transition function; S6. Based on the measurement data after the actual action, select the state to process the current candidate sensor measurement features and corresponding graph relationships, and use the processed candidate sensor measurement features, processed corresponding graph relationships, current aero-engine operating conditions, and the state selection of measurement data after the actual action to form a graph structure fault diagnosis input, and use the current diagnostic feedback as the diagnostic feedback of the previous diagnostic cycle for the next diagnostic cycle. The graph-based fault diagnosis input is used to perform graph-based fault diagnosis to obtain the current diagnostic feedback, which is mathematically represented as follows: ,in This indicates the diagnostic output. This indicates the diagnostic feedback for the current diagnostic cycle. Diagram structure fault diagnosis, and These represent the processed measurement features and the processed graphical relationships, respectively.

2. The method for dynamic selection of graph-guided sensor measurement data for fault diagnosis of aero-engines according to claim 1, characterized in that, Several candidate actions include adding actions, removing actions, and keeping actions; The target of the added action is candidate sensor measurement data that has not been selected in the current measurement data selection state; The target of the removal action is candidate sensor measurement data that has been selected in the current measurement data selection state and does not belong to the preset required measurement items, and the number of candidate sensor measurement data selected after the removal action is not less than the preset minimum number. The measurement data selection state after the candidate action corresponding to the holding action is the same as the current measurement data selection state, wherein the selection set and number of selections They are represented as follows: In the formula, where Indicates the index of candidate measurement items. Indicates the first The selection status of each candidate measurement item express The number of non-zero elements in the neutron; The preset structural conditions include retaining preset necessary measurement items and ensuring that the number of measurement data from the selected candidate sensors is not less than the preset minimum number.

3. The method for dynamic selection of graph-guided sensor measurement data for aero-engine fault diagnosis according to claim 2, characterized in that, In addition to the basic action feasibility mask, additional action restrictions are set, including dwell restrictions; After the actual action that changes the current measurement data selection state is executed, and before the preset dwell conditions are met, only the hold action that keeps the current measurement data selection state unchanged is allowed to be executed, and the hold action does not re-trigger the dwell restriction; The preset dwell condition is determined after three scheduling decision cycles following the execution of the actual action that changes the current measurement data selection state.

4. The method for dynamic selection of map-guided sensor measurement data for aero-engine fault diagnosis according to claim 1, characterized in that, The current cycle scheduling observation is formed by combining the current measurement data selection status, including the current aero-engine operating condition, including altitude, flight Mach number, throttle lever angle, and inlet total temperature, with the diagnostic feedback from the previous diagnostic cycle. The diagnostic feedback from the previous diagnostic cycle includes the overall health status probability of the aero-engine, the probability of fan failure, the probability of low-pressure compressor failure, the probability of high-pressure compressor failure, the probability of high-pressure turbine failure, the probability of low-pressure turbine failure, and diagnostic uncertainty. The current periodic scheduling observation does not include reference diagnostic labels, rewards, costs, advantage estimates, evaluation network outputs, or PID states.

5. The method for dynamic selection of graph-guided sensor measurement data for fault diagnosis of aero-engines according to claim 1, characterized in that, The corresponding graph relationships are provided by a fixed graph prior constructed offline, and the fixed graph prior remains unchanged during deployment scheduling and graph structure fault diagnosis; The actual selection matrix is ​​formed by selecting the state based on the measurement data after the actual action, and the full-size zero masking is performed on the candidate sensor measurement feature matrix composed of the current candidate sensor measurement features and the correspondence graph relationship matrix composed of the correspondence graph relationship. The full-size zero masking includes: maintaining the original size of the candidate sensor measurement feature matrix and the correspondence graph relationship matrix, setting the candidate sensor measurement features corresponding to the unselected candidate sensor measurement data to zero, and setting the correspondence graph relationship associated with the unselected candidate sensor measurement data to zero; Processed measurement features Relationship with the processed graph They are represented as follows: In the formula, This indicates that the actual selection matrix is ​​formed by selecting states based on measurement data after actual actions. This represents the measurement feature matrix of the candidate sensor. This indicates a fixed graph prior.

6. The method for dynamic selection of graph-guided sensor measurement data for aero-engine fault diagnosis according to claim 1, characterized in that, In the first diagnostic cycle, the diagnostic feedback from the previous diagnostic cycle is set as a preset zero vector, mathematically represented as: And through preset deterministic initialization rules, an initial measurement data selection state is formed that satisfies the preset structural conditions and the corresponding predefined normalization requirement limits.

7. The method for dynamic selection of graph-guided sensor measurement data for fault diagnosis of aero-engines according to claim 1, characterized in that, The parameters of the scheduling strategy are obtained during the training phase by updating them through PID-Lagrange constraints based on the diagnostic utility of graph structure fault diagnosis and the three normalized costs corresponding to normalized input requirements, normalized processing requirements, and normalized inference timing requirements, respectively. For the The normalized cost channel, in the first After the complete policy update is completed, the multiplier is updated according to the following expression: in, Indicates the first The next multiplier formed by the normalized cost channel after the above complete strategy update is, and in the th... This will take effect at the start of the next full policy update. , and These are proportional gain, integral gain, and derivative gain, respectively. For budget residuals, In the integration state, It is a non-negative differential state. It is the lower limit of the multiplier clipping. The upper limit of the multiplier clipping. Represents the clipping function; During the deployment phase, the parameters of the scheduling strategy obtained from training and the corresponding predefined normalized requirement limits are used. Candidate action selection information is dynamically formed based on the current cycle scheduling observations of each diagnostic cycle, and the actual action is determined. The parameters of the scheduling strategy or the graph structure fault diagnosis model are not updated based on online data.

8. The method for dynamic selection of graph-guided sensor measurement data for aero-engine fault diagnosis according to claim 7, characterized in that, During the sampling process in the training phase, a final action feasibility mask is formed and adopted based on the basic action feasibility mask and additional action constraints. The final action feasibility mask is used when saving the samples. During the policy update process, the policy before and after the update reuses the action support represented by the same final action feasibility mask, and the policy probability is higher than that of the previous policy. Represented as: In the formula, Indicates the current policy parameters. This indicates the policy parameters before the update. Indicates the probability of the masking strategy. Indicates actual action.

9. A dynamic selection device for image-guided sensor measurement data for aero-engine fault diagnosis, characterized in that, include: Memory, used to store computer programs; A processor, configured to implement, when executing the computer program, the graph-guided sensor measurement data dynamic selection method for fault diagnosis of aero-engines as described in any one of claims 1 to 8.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that, When the computer program is executed by the processor, it implements the graph-guided sensor measurement data dynamic selection method for fault diagnosis of aero-engines as described in any one of claims 1 to 8.