A soft ground operation safety determination method for a tracked engineering machine based on dynamic ground pressure stress peak value

By using a dynamic grounding pressure peak safety determination method, combined with multibody dynamics-discrete element simulation and foundation bearing capacity, the accuracy of safety determination for tracked engineering machinery in soft soil operations is solved. This enables differentiated safety assessments and equipment operation restrictions based on working conditions, preventing track subsidence accidents.

CN123158399APending Publication Date: 2026-11-24詹雪晗
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202611326762.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-30
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

In the existing technology, when tracked engineering machinery operates on soft foundations, the static average ground pressure stress cannot reflect the non-uniformity of the ground pressure stress distribution, the difference in working conditions and the transient impact effect, resulting in inaccurate safety judgment and easy occurrence of track sinking or whole machine overturning accidents.

Method used

A safety determination method based on dynamic grounding pressure peak stress is adopted. A dynamic peak coefficient database is established through multibody dynamics-discrete element coupled numerical simulation. The safety factor is dynamically adjusted in combination with the ultimate bearing capacity of the foundation and the type of working condition to achieve safety determination based on different working conditions. When the condition is determined to be unsafe, equipment operation restrictions are implemented.

Benefits of technology

It improves the accuracy of safety assessment for tracked engineering machinery operating on soft soil, and can dynamically adjust the safety factor in emergency situations to prevent subsidence accidents, which has important engineering application value.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123158399A_ABST
    Figure CN123158399A_ABST
Patent Text Reader

Abstract

This invention discloses a method for determining the safety of tracked engineering machinery operating on soft soil based on the peak value of dynamic grounding compressive stress, belonging to the technical field of engineering machinery safety operation. The method includes: obtaining the ultimate bearing capacity q of the foundation. ult Determine the static average ground pressure stress p avg Determine the working condition type based on the task; call the corresponding dynamic peak coefficient k. D Determine the safety factor α based on the urgency of the task; according to max[p d [(t)]=k D × p avg ≤ α × q ult The invention introduces dynamic grounding pressure stress peak value into the safety assessment of soft soil foundation operations for the first time, solving the technical problem that traditional static average value assessment cannot reflect differences in working conditions. It achieves accurate safety assessment based on working condition differences, which can effectively reduce the risk of subsidence accidents for tracked engineering machinery in soft soil foundation operations.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of engineering machinery safety operation technology, specifically to a method for determining the safety of tracked engineering machinery operating on soft foundations based on the peak value of dynamic grounding compressive stress. It is applicable to the safety assessment of tracked excavators, tracked bulldozers and other engineering machinery operating in soft foundation environments such as swamps, debris flow deposits, collapsible loess areas and shallow water-covered areas. Background Technology

[0002] Accidents involving tracked construction machinery sinking or even overturning on soft foundations are frequent when operating on such machinery. Ground pressure stress is a core mechanical parameter for evaluating the performance of tracked vehicles on soft foundations. In existing technologies, the safety assessment for soft foundation operations is typically based on the static average ground pressure stress p. avg = G / A (G is the total weight of the machine, A is the total contact area of ​​the tracks) is used as the basis for judgment, and p is the condition. avg ≤α·q ult .

[0003] However, the above-mentioned determination method has the following technical defects: First, the static average ground compressive stress masks the non-uniformity of the compressive stress distribution on the grounding surface. The compressive stress distribution along the length and width of the track grounding surface is not uniform, and there is significant local stress concentration in the drive wheel area under traction load.

[0004] Secondly, the static average ground pressure stress cannot reflect the fundamental changes in the pressure stress distribution caused by different operating conditions. The stress state of the whole machine is completely different in the four states of parking, driving, digging, and turning, and the amplitude and spatial distribution of the ground pressure stress are essentially different.

[0005] Third, the static average ground pressure stress cannot characterize the transient impact effect during operation. The inertial load during the slewing and braking phase and the impact load during the excavation and cutting phase will both generate instantaneous spikes in ground pressure stress on a short time scale, which may reach more than twice the static average.

[0006] Existing patents, such as "A Dynamic Measurement Device for Ground Pressure Specificity of Tracked Vehicles" (CN112113694A), focus on the hardware measurement of ground pressure specificity; "A Dynamic Ground Pressure Specificity Measurement System and Method for Tracked Vehicles" (CN122084178A), focuses on the acquisition and reconstruction of dynamic data. Neither of these patents addresses the technical problem of applying the peak value of dynamic ground pressure stress to actual operational safety assessments, nor do they establish a safety assessment system differentiated by operating conditions. Summary of the Invention

[0007] (a) Technical problems to be solved To address the shortcomings of existing methods for determining the safety of soft ground operations, which fail to reflect the dynamic amplification effect of ground pressure stress under different operating conditions and lead to "stable judgment being feasible, but vehicle getting stuck during dynamic operation," this invention provides a method for determining the safety of tracked engineering machinery operating on soft ground based on the peak value of dynamic ground pressure stress, thereby achieving accurate safety determination based on different operating conditions.

[0008] (II) Technical Solution This invention is achieved through the following technical solution: A method for determining the safety of tracked engineering machinery operating on soft ground based on dynamic ground compressive stress peak value includes the following steps: Step 1: Obtain the ultimate bearing capacity q of the foundation in the work area. ult Specifically, static cone penetration tests, portable micro-penetrator tests, or standard penetration tests can be used to obtain foundation bearing capacity data. For layered foundations that are "hard on the surface and soft on the inside," the bearing capacity of the underlying weak layer should be used as the standard.

[0009] Step 2: Determine the static average ground pressure stress p of the tracked construction machinery. avg = G / A, where G is the total weight of the machine and A is the sum of the contact areas of the two tracks.

[0010] Step 3: Determine the current working condition type based on the work task of the tracked construction machinery. The working condition types include static parking condition, straight-line travel condition, digging operation condition, and slewing operation condition.

[0011] Step 4: Call the corresponding dynamic peak coefficient k according to the work condition type. D The dynamic peak coefficient k D The maximum ground compressive stress (max) on the track grounding surface across the entire time and space under various operating conditions. d (t) and static average ground pressure stress p avg The ratio, i.e., k D = max[p d (t)] / p avg .

[0012] The dynamic peak coefficients for each working condition are pre-calibrated as follows: A complete dynamic model of the tracked engineering machinery and a particle model of the soft soil foundation are established using a multibody dynamics-discrete element coupled numerical simulation method. Simulations are performed on four typical working conditions, and the compressive stress time history data of the track contact surface under each condition are extracted to calculate k for each condition. D The value is then stored in the database.

[0013] Therefore, k in the static stationary condition D The value is 1.05 to 1.10; k for straight-line driving conditions. DThe value is 1.15 to 1.40; k for excavation operation conditions. D The value is 1.35 to 1.75; k for rotary operation conditions. D It ranges from 1.50 to 2.50. Specifically, when the operating condition is rotary operation with a fully loaded bucket and a rotary speed ≥ 6 r / min, k... D Take 2.20 to 2.50.

[0014] Step 5: Determine the safety factor α based on the urgency of the task. Take α = 0.7 when sufficient geological exploration is available; take α = 0.5 when exploration information is limited; take α = 0.4 under extremely urgent conditions.

[0015] Step Six: Conduct a safety assessment according to the following criteria: max[p d [(t)] = k D ×p avg ≤α×q ult If the above inequality holds true, the operation is deemed safe; if the above inequality does not hold true, the operation is deemed unsafe, and a warning signal or a prohibition order is issued. Warning signals include one or more of the following: audible and visual alarm signals, cab display screen alerts, and signals pushed by the remote monitoring platform.

[0016] When it is determined that operation is not safe, at least one of the following shall also be performed: limit the swing speed to less than 60% of the rated value, limit the bucket load to less than 60% of the rated bucket capacity, and limit the travel speed to less than 2 km / h.

[0017] (III) Beneficial Effects Compared with the prior art, the present invention has the following advantages: (1) For the first time, the peak value of dynamic grounding pressure stress was introduced into the safety assessment of soft foundation operation, which solved the technical defect that the traditional static average assessment method could not reflect the differences in working conditions.

[0018] (2) A dynamic peak coefficient database for four typical working conditions was established, which enabled accurate safety judgment based on working condition differences and significantly improved the accuracy of the judgment.

[0019] (3) The safety factor can be dynamically adjusted according to the urgency of the operation, taking into account the balance between the time urgency and safety of the emergency operation.

[0020] (4) When it is determined that the operation is not safe, the equipment operation restrictions can be implemented in conjunction to prevent subsidence accidents from the source, which has important engineering application value. Attached Figure Description

[0021] Figure 1 This is a flowchart of the method of the present invention.

[0022] Figure 2 This is a bar chart comparing the dynamic peak coefficients for different operating conditions. The horizontal axis represents the four typical operating conditions, and the vertical axis represents the dynamic peak coefficient k. D The figure shows the k values ​​for each working condition. D Numerical range.

[0023] Figure 3 This is a schematic diagram of the ground pressure stress time history curve of a 21t crawler excavator under slewing conditions. The horizontal axis represents time, and the vertical axis represents ground pressure stress. Detailed Implementation

[0024] I. Ultimate bearing capacity of foundation q ult Acquisition method The core of this step is to obtain parameter values ​​that accurately reflect the bearing capacity of the foundation, especially the bearing capacity of the weak layer. For layered foundations that are "hard on the surface and soft on the inside," the bearing capacity of the underlying weak layer must be used as the basis for judgment.

[0025] (a) On-site testing methods This embodiment preferably uses a portable miniature penetrator for rapid on-site testing. The specific operation is as follows: Select no fewer than three test points in the work area. These test points should cover the expected operating range of the machinery, and the distance between each test point should not exceed 10 meters. Remove surface vegetation and loose cover. Vertically press the probe of the penetrator into the foundation soil at a uniform speed (approximately 0.5 cm / s to 1.0 cm / s). Record the penetration resistance value every 0.1 m of penetration until the penetration depth reaches 1.5 m or the probe can no longer penetrate. Take the lowest penetration resistance value within a depth range of 0.5 m to 1.0 m below the surface at each test point as the underlying layer penetration resistance q. ult .

[0026] When using a Dutch cone static cone penetrometer with a cone angle of 60° and a base area of ​​10 cm², the cone is driven at a constant speed of 1.0 cm / s to 2.0 cm / s. The cone tip resistance is automatically recorded every 0.2 m of penetration. The minimum cone tip resistance within a depth range of 0.5 m to 1.0 m below the surface is taken as q. ult .

[0027] (ii) Indirect calculation method For situations where on-site testing is not possible, indirect estimation methods based on soil parameters can be used: For saturated soft clay, q ult = N c ·c u Where, N c The bearing capacity coefficient is 5.14 for tracked strip foundations; c uThe undrained shear strength can be determined on-site using a pocket vane shear test or a portable shear tester. When c u When the value is below 10 kPa, the bearing capacity of the foundation is extremely low, and it should be carefully evaluated.

[0028] For sandy soil, q ult = 0.5·γ·B·N γ +γ·D f ·N q Where γ is the soil weight (kN / m³), B is the track width (m), and D is the soil density (kN / m³). f Foundation burial depth (m), N γ N q The bearing capacity coefficient is determined by referring to a table based on the internal friction angle.

[0029] (III) Engineering Example Parameters In a case study of a swamp foundation engineering project in Jiangxi Province, q was measured using a portable miniature penetrator. ult The value is 18 kPa; in a flood control and disaster relief project in Inner Mongolia, the value q was obtained using static cone penetration testing. ult The value is 15 kPa.

[0030] II. Static average grounding pressure p avg The determination The static average ground pressure stress is determined by the ratio of the total weight of the machine to the total ground contact area of ​​the tracks: p avg = G / A Where G = m·g, m is the working mass of the whole machine (kg), g is the gravitational acceleration (9.81m / s²); A is the sum of the ground contact areas of the two tracks, A = 2·L·b, L is the ground contact length of the track (m), and b is the width of the track plate (m).

[0031] Taking a reinforced wetland tracked excavator as an example: Working mass m = 21000kg, track ground contact length L = 3.8m, track width b = 0.8m, then G = 21000 × 9.81 = 206010N, A = 2 × 3.8 × 0.8 = 6.08m², p avg = 206010 / 6.08 ≈ 33.88 kPa.

[0032] When auxiliary devices such as hydraulic breakers or hydraulic shears are added to construction machinery, calculations should be performed based on the actual working weight after the addition. When the working device is in its extreme extended position, the shift in the machine's center of gravity may increase the average ground pressure stress on one side of the track by 15% to 25%. The average ground pressure stress on both sides of the track should be calculated separately according to the actual center of gravity position, and the larger value should be taken as p. avg .

[0033] III. Determination of Working Condition Type and Dynamic Peak Coefficient k D calibration (a) Automatic identification of working condition type In this embodiment, the work condition type is automatically identified in the following way: Static parking condition: The whole machine is not moving, the engine is idling, the hydraulic system has no working pressure output, and the duration is ≥10s. Straight driving condition: The left and right travel motors operate simultaneously, the steering sensor signal is zero or close to zero, the vehicle speed is ≥0.5km / h and the duration is ≥3s; Excavation operation conditions: The working pressure of the boom cylinder or bucket cylinder is ≥30% of the rated pressure, and the duration is ≥1s; Rotation operation condition: The rotary motor is activated, and the change rate of the rotary angle sensor signal is ≥5° / s.

[0034] (ii) Dynamic peak coefficient k D calibration method Dynamic peak coefficient k D Pre-calibration is performed using a multibody dynamics-discrete element coupled numerical simulation method. The specific implementation method is as follows: 1) Establish a complete multibody dynamics model of the tracked engineering machinery in RecurDyn multibody dynamics software, including all kinematic pairs and mass parameters of the vehicle body, working device, traveling mechanism, and track system (including track plates, drive wheels, idler wheels, track rollers, and carrier rollers).

[0035] 2) Establish a particle model of soft soil foundation in EDEM discrete element software. The foundation size is 10m×6m×3m (length×width×height), the particle size is 5mm~15mm, and the contact parameters between particles are calibrated according to the triaxial test results of soil samples in the field.

[0036] 3) Two-way data exchange was achieved through the RecurDyn-EDEM coupling interface, and time-domain simulations were performed for four typical working conditions. The simulation time step was set to 0.001s, and the total simulation time was: 10s for stationary condition, 20s for traveling condition, 15s for excavating condition, and 12s for slewing condition.

[0037] 4) Extract the normal contact force time history data of each grounding point on the track grounding surface over the entire simulation duration, and calculate the dynamic grounding compressive stress time history under each working condition using the following formula: p d (i, t) = F n (i, t) / A p Among them, F n(i, t)Let A be the normal contact force (N) of the i-th track grounding unit at time t. p The area (m²) of a single grounding unit.

[0038] Take the maximum value for all grounding units and all time history data: max[p d [(t)] = max{p d (i, t) | i = 1,2,...,N; t ∈ [0, T]} Dynamic peak coefficient: k D = max[p d (t)] / p avg 5) Perform at least 3 independent simulations for each working condition, and take k as the value. D The average value is used as the calibration value.

[0039] (III) Typical range of values ​​for dynamic peak coefficient under various operating conditions Based on the above calibration method, the typical range of dynamic peak coefficient values ​​for each working condition is as follows: Operating conditions <![CDATA[dynamic peak coefficient k D > illustrate Static parking 1.05~1.10 The main source is the concentration of ground pressure at the front end along the track length. driving in a straight line 1.15~1.40 Additional traction force concentrated load is generated at the drive wheel. Excavation work 1.35~1.75 The cutting resistance of the bucket is transmitted to the chassis via the working device, resulting in concentrated ground pressure on the front tracks. Slewing operation (no load) 1.50~2.00 The inertial load during slewing and braking causes concentrated track ground pressure in the direction of deflection. Rotation operation (full load, speed ≥ 6 r / min) 2.20~2.50 The combination of the fully loaded bucket's inertial load and the centrifugal force of rotation constitutes the most dangerous working condition. IV. Rules for Selecting the Safety Factor α The safety factor α is determined comprehensively based on the completeness of the geological exploration data and the urgency of the operation, as follows: (a) Applicable conditions for α = 0.7 When all of the following conditions are met, α = 0.7 is taken: (1) Detailed geological survey of the work area has been completed, the distance between survey points is ≤20m, and the survey depth is ≥2m; (2) No less than 6 sets of valid geotechnical test data have been obtained; (3) The coefficient of variation of the foundation bearing capacity is ≤0.15.

[0040] (ii) Applicable conditions for α = 0.5 α = 0.5 is taken when any of the following conditions are met: (1) Only preliminary geological survey is completed and the distance between survey points is ≤ 50m; (2) There is existing regional geological data available for reference but no specific field test data; (3) The coefficient of variation of foundation bearing capacity is between 0.15 and 0.30.

[0041] (iii) Applicable conditions for α = 0.4 α = 0.4 is taken when the following conditions are met: (1) There is only surface observation or very little field test data; (2) The coefficient of variation of foundation bearing capacity is > 0.30; (3) The operation belongs to an extremely urgent situation such as flood control and disaster relief or earthquake relief.

[0042] V. Implementation of Judgment Criteria and Subsequent Control Strategies (a) Execution of the judgment process The judgment criterion is expressed as: k D ×p avg ≤α× q ult The values ​​on both sides of the above inequality are calculated in real time on the vehicle-mounted terminal or remote monitoring platform. When the left-side value is less than or equal to the right-side value, it is determined that the operation is safe, and the display shows a "safe" status with a green indicator light. When the left-side value is greater than the right-side value, it is determined that the operation is unsafe, and an early warning is triggered immediately.

[0043] (ii) Output method of early warning signal Warning signals are issued simultaneously or selectively in one of the following three ways: 1) Cabin-mounted audible and visual alarm: emits intermittent buzzing sounds (frequency 1Hz) in conjunction with flashing red indicator lights; 2) Cab display screen: A full-screen warning interface pops up, displaying "Insufficient foundation bearing capacity, operation prohibited" and a comparison of the current values ​​on the left and right sides; 3) Remote monitoring platform: The early warning information is pushed to the monitoring platform and the on-site administrator's mobile APP through the 4G / 5G communication module.

[0044] (III) Active safety control strategy When an operation is deemed unsafe, the control system automatically executes at least one of the following proactive safety control strategies: 1) Rotation speed limit: Limit the flow rate of the rotary motor to within 60% of the rated flow rate, so that the rotation speed does not exceed 60% of the rated value; 2) Bucket loading limit: By reducing the upper limit of the working pressure of the boom and bucket cylinder, the actual bucket loading capacity is limited to no more than 60% of the rated bucket capacity (no more than 60% of the rated load capacity by mass). 3) Driving speed limit: Limit the oil supply flow of the travel motor to the maximum flow in the low speed gear so that the driving speed does not exceed 2km / h; 4) Automatic shutdown: When a sinking trend is detected (vehicle tilt angle change rate ≥ 0.5° / s or track sinking speed ≥ 5cm / s), the engine will be automatically shut down and all hydraulic actions will be locked.

[0045] The execution permissions of the above control strategy are set as follows: the operator can temporarily lift the restriction by pressing and holding the "forced overreach" switch in the cab for more than 3 seconds, but the operation will be recorded in the black box data of the equipment for subsequent safety audits.

[0046] VI. Complete Implementation Examples Taking a 25t tracked excavator operating on a swamp foundation in Jiangxi Province as an example: 1) Using a portable miniature penetrator, three-point tests were conducted in the field. The minimum penetration resistance within a depth range of 0.5m to 1.0m below the ground surface was 18kPa. Let q be the value of this value. ult = 18kPa.

[0047] 2) The machine has a working mass of 25t, a track ground contact length of 3.6m, and a track plate width of 0.6m. Calculations yield p. avg ≈56.8 kPa.

[0048] 3) The current task is slewing loading, the bucket is fully loaded, the slewing speed is approximately 6 r / min, the working condition is identified as "slewing operation (full load)", and k is called. D = 2.30.

[0049] 4) Preliminary geological survey has been completed on site, with the survey points spaced approximately 30m apart. α = 0.5.

[0050] 5) Make a judgment: k D ×p avg = 2.30×56.8 = 130.6kPa; α×q ult = 0.5 × 18 = 9.0 kPa. 130.6 kPa > 9.0 kPa, deemed unsafe for operation, issuing a red warning and automatically limiting the swing speed to below 60% of the rated value and the bucket load to no more than 60% of the rated bucket capacity. If the load is recalculated after the limit, the working mass of the machine is approximately 23 tons based on 60% bucket capacity. avg ≈52.3 kPa, k D If we take the value of 1.75 for no-load slewing, then k D ×p avg = 1.75×52.3≈91.5kPa, which is still greater than 9.0kPa. It is recommended to lay the roadbed box before operation or to switch to another type of wetland excavator.

Claims

1. A method for determining the safety of tracked engineering machinery operating on soft ground based on dynamic grounding compressive stress peak value, characterized in that, Includes the following steps: Step one, obtain the ultimate bearing capacity of the foundation q of the working area ult ; Step two, determining a static average ground pressure stress p of the tracked engineering vehicle avg ; Step 3: Determine the current working condition type based on the work task of the tracked construction machinery. The working condition types include static parking condition, straight-line travel condition, digging operation condition, and slewing operation condition. Step 4: Call the corresponding dynamic peak coefficient k according to the work condition type. D The dynamic peak coefficient k D The maximum ground pressure stress and the static average ground pressure stress p on the track grounding surface over the entire spatiotemporal range under various operating conditions. avg The ratio; Step 5: Determine the safety factor α based on the urgency of the task. The safety factor α ranges from 0.4 to 0.

7. Step Six: Conduct a safety assessment according to the following criteria: max[p d(t) ] = k D × p avg ≤ α × q ult If the above inequality holds true, the operation is deemed safe; if the above inequality does not hold true, the operation is deemed unsafe, and a warning signal or a prohibition order is issued.

2. The method according to claim 1, characterized in that, The dynamic peak coefficient k of the static stop condition D The value is 1.05 to 1.10; the dynamic peak coefficient k for the straight-line driving condition is... D The value is 1.15 to 1.40; the dynamic peak value k of the excavation operation condition is... D The value is 1.35 to 1.75; the dynamic peak coefficient k of the rotary operation condition is... D It ranges from 1.50 to 2.

50.

3. The method according to claim 1, characterized in that, In step one, the ultimate bearing capacity q of the foundation ult Obtained through static penetration testing, portable miniature penetrator testing, or standard penetration testing.

4. The method according to claim 1, characterized in that, The safety factor α is determined according to the following rules: 0.7 when sufficient geological exploration conditions are available; 0.5 when exploration information is limited; and 0.4 under extremely urgent conditions.

5. The method according to claim 1, characterized in that, In step four, when the operating condition is a slewing operation with a fully loaded bucket and a slewing speed ≥ 6 r / min, the dynamic peak coefficient k D Take 2.20 to 2.

50.

6. The method according to claim 1, characterized in that, The warning signals in step six include one or more of the following: audible and visual alarm signals, driver's cab display screen prompt signals, and remote monitoring platform push signals.

7. The method according to claim 1, characterized in that, When the determination criteria determine that the operation is not safe, at least one of the following operations shall also be performed: limiting the swing speed to less than 60% of the rated value, limiting the bucket load to less than 60% of the rated bucket capacity, and limiting the travel speed to less than 2 km / h.

Citation Information

Patent Citations

  • Crawler belt device grounding specific pressure dynamic measuring device

    CN112113694A

  • System and method for measuring dynamic grounding specific pressure of tracked vehicle

    CN122084178A