Method, system and device for identifying the structural state of a communication tower

By dynamically scheduling the communication tower structure status identification system and issuing processing tasks in parallel or serially according to the event type, the problems of low identification efficiency and accuracy in the existing technology are solved, and more efficient and accurate structure status identification is achieved.

CN123158433APending Publication Date: 2026-11-24CHINA TOWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611263411.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-19
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing communication tower structural status identification systems suffer from low identification efficiency and accuracy due to their fixed processing procedures, especially when faced with complex or composite structural anomalies.

Method used

By receiving communication tower structure monitoring data collected by sensors, abnormal monitoring information is generated. Based on the event type, processing tasks are sent to the corresponding execution modules in parallel or serial order, and computing resources are dynamically scheduled to achieve multi-task concurrent processing.

Benefits of technology

It improves the efficiency and accuracy of communication tower structure status identification, avoids blocking and response delays caused by task coupling, and enhances the system's flexibility and processing capabilities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123158433A_ABST
    Figure CN123158433A_ABST
Patent Text Reader

Abstract

This application discloses a method, system, and apparatus for identifying the structural state of a communication tower. Relating to the field of structural health monitoring, the method includes: receiving abnormal monitoring information sent by an abnormal event monitoring module; obtaining the event type of the abnormal event from the abnormal monitoring information, and obtaining M first processing tasks under each event type; determining the first execution module to execute each first processing task, obtaining M first execution modules, and distributing the M first processing tasks to the corresponding first execution modules; receiving the first execution results of each first execution module, obtaining M first execution results, and determining the structural state of the communication tower based on the M first execution results. This application solves the problem in related technologies where the use of a fixed process to identify the structural state of a communication tower leads to low efficiency and accuracy in structural state identification.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of structural health detection, and more specifically, to a method, system, and apparatus for identifying the structural condition of a communication tower. Background Technology

[0002] Because communication towers are subjected to complex environments such as wind loads, temperature changes, equipment additions, foundation settlement, corrosion and aging, and extreme weather over long periods of use, their structural condition may gradually change. To monitor the health status of communication towers in real time, strain, vibration, and tilt sensors are typically installed at key locations on the tower structure. The data from these sensors is then analyzed using data acquisition terminals. Furthermore, when structural anomalies are detected, the sensor data can accurately identify the specific structural condition of the communication tower, thereby guiding maintenance personnel in performing necessary repairs.

[0003] However, existing communication tower structural condition identification systems typically employ a processing model of data acquisition, threshold judgment, algorithm calculation, and result uploading. In this model, multiple tasks are coupled within the same processing flow and handled through a pre-defined, single anomaly handling logic. This rigid and inflexible processing mechanism makes the system prone to problems such as task queuing, computational blockage, and response delays. Furthermore, when faced with complex or compound structural anomalies, the accuracy of structural condition identification results is low, ultimately impacting the operational efficiency and effectiveness of communication towers.

[0004] There is currently no effective solution to the problem that the fixed process used in related technologies to identify the structural status of communication towers results in low identification efficiency and accuracy. Summary of the Invention

[0005] The main objective of this application is to provide a method, system, and apparatus for identifying the structural state of a communication tower, in order to solve the problem that the fixed process used in related technologies for identifying the structural state of communication towers results in low efficiency and accuracy in identifying the structural state.

[0006] To achieve the above objectives, according to one aspect of this application, a method for identifying the structural state of a communication tower is provided. The method includes: receiving abnormal monitoring information sent by an abnormal event monitoring module, wherein the abnormal event monitoring module is used to receive communication tower structural monitoring data collected by sensors deployed on the communication tower, and to generate abnormal monitoring information based on the communication tower structural monitoring data and preset identification rules; obtaining the event type of the abnormal event from the abnormal monitoring information, and obtaining M first processing tasks under the event type, where M is a positive integer; determining the first execution module to execute each first processing task, obtaining M first execution modules, and distributing the M first processing tasks to the corresponding first execution modules; receiving the first execution results of each first execution module, obtaining M first execution results, and determining the structural state of the communication tower based on the M first execution results.

[0007] Optionally, sending the M first processing tasks to the corresponding first execution modules includes: determining whether there is a relationship between the M first processing tasks; if there is no relationship between the M first processing tasks, sending the M first processing tasks to the corresponding first execution modules in parallel; if there is a relationship between the M first processing tasks, sending the M first processing tasks to the corresponding first execution modules serially according to the relationship.

[0008] Optionally, serially distributing M first processing tasks to the corresponding first execution modules according to the association relationship includes: for any target first processing task, after the target first processing task is completed, obtaining the task type and target execution result of the target first processing task; obtaining the task triggering condition and final judgment condition according to the task type, and determining whether the target execution result meets the task triggering condition; if the target execution result meets the task triggering condition, executing the next first processing task of the target first processing task according to the target execution result; if the target execution result does not meet the task triggering condition, determining whether the target execution result meets the final judgment condition; if the target execution result does not meet the final judgment condition, executing the next first processing task of the target first processing task according to the target execution result; if the target execution result meets the final judgment condition, terminating the execution of the first processing task after the target first processing task, and determining the structural state of the communication tower according to the target execution result.

[0009] Optionally, determining the structural state of the communication tower based on the M first execution results includes: obtaining the detection requirements for each first execution result to obtain M detection requirements; detecting each first execution result using the M detection requirements to obtain M first detection results; determining whether there are any abnormal detection results among the M first detection results; if there are no abnormal detection results among the M first detection results, sending the abnormality monitoring information and the M first execution results to the target execution module, and receiving the structural state feedback from the target execution module, wherein the target execution module is used to determine the structural state of the communication tower; if there are abnormal detection results among the M first detection results, determining a second processing task based on the abnormal detection results, and determining a second execution module to execute the second processing task; distributing the second processing task to the second execution module to obtain a second execution result, sending the abnormality monitoring information and the second execution result to the target execution module, and receiving the structural state feedback from the target execution module.

[0010] Optionally, before distributing the M first processing tasks to the corresponding first execution modules, the method further includes: obtaining the device information of the target device of the deployment scheduling platform, and determining the operating status of the target device based on the device information; determining the distribution method of the M first processing tasks based on the operating status, and distributing the M first processing tasks to the corresponding first execution modules based on the distribution method.

[0011] Optionally, distributing the M first processing tasks to the corresponding first execution modules according to the distribution method includes: obtaining the task level of each first processing task, and sorting the M first processing tasks according to the task level to obtain a task sequence; in the case of full distribution, distributing the M first processing tasks to the corresponding first execution modules in parallel; in the case of batch distribution, distributing the M first processing tasks to the corresponding first execution modules according to the task sequence.

[0012] Optionally, the method further includes: for any execution module, obtaining the execution data generated when the execution module executes the processing task; determining whether the execution module has an anomaly based on the execution data; if the execution module has an anomaly, terminating the sending of processing tasks to the execution module and activating the backup module of the execution module.

[0013] To achieve the above objectives, according to another aspect of this application, a system for identifying the structural state of a communication tower is provided. The system includes: a sensor deployed on the communication tower for collecting communication tower structural monitoring data and sending the data to an abnormal event monitoring module; an abnormal event monitoring module for receiving the communication tower structural monitoring data sent by the sensor, identifying abnormal events from the monitoring data according to preset identification rules, determining abnormal monitoring information for the abnormal events, and sending the abnormal monitoring information to a scheduling platform; a scheduling platform for receiving the abnormal monitoring information, obtaining the event type of the abnormal event from the monitoring information, obtaining M first processing tasks under the event type, determining the first execution module to execute each first processing task, obtaining M first execution modules, distributing the M first processing tasks to the corresponding first execution modules, receiving the first execution results from each first execution module, obtaining M first execution results, and determining the structural state of the communication tower based on the M first execution results, where M is a positive integer; and the M first execution modules connected to the scheduling platform for executing the corresponding first processing tasks.

[0014] To achieve the above objectives, according to another aspect of this application, a device for identifying the structural state of a communication tower is provided. The device includes: a receiving unit, configured to receive abnormal monitoring information sent by an abnormal event monitoring module, wherein the abnormal event monitoring module receives communication tower structural monitoring data collected by sensors deployed on the communication tower, and generates abnormal monitoring information based on the communication tower structural monitoring data and preset identification rules; a first acquisition unit, configured to acquire the event type of the abnormal event from the abnormal monitoring information, and acquire M first processing tasks under the event type, where M is a positive integer; a first determination unit, configured to determine the first execution module executing each first processing task, obtaining M first execution modules, and distributing the M first processing tasks to the corresponding first execution modules; and a second determination unit, configured to receive the first execution results of each first execution module, obtaining M first execution results, and determining the structural state of the communication tower based on the M first execution results.

[0015] To achieve the above objectives, according to another aspect of this application, an electronic device is provided, the electronic device including a memory storing an executable program; and a processor for running the program, wherein the program executes the above-described method for identifying the structural state of a communication tower during runtime.

[0016] In this embodiment, an anomaly monitoring module receives anomaly monitoring information. This module receives communication tower structure monitoring data collected by sensors deployed on the tower and generates anomaly monitoring information based on the monitoring data and preset identification rules. It then obtains the event type of the anomaly from the monitoring information and acquires M first processing tasks under each event type, where M is a positive integer. The module determines the first execution module to perform each first processing task, resulting in M ​​first execution modules, and distributes the M first processing tasks to the corresponding modules. Finally, it receives the first execution results from each first execution module, obtaining M first execution results, and determines the structural state of the communication tower based on these results. This method involves obtaining the event type from the anomaly monitoring information sent by the anomaly monitoring module and acquiring the corresponding M first processing tasks based on the event type. This process involves determining the first execution module for each first processing task and distributing the tasks. Finally, it receives the first execution results from each first execution module and determines the structural state of the communication tower based on the M first execution results. This achieves the goal of matching event types with first processing tasks and first execution modules, and distributing the M first processing tasks in parallel to the corresponding first execution modules for independent execution. This avoids coupling monitoring triggering, algorithm execution, and other tasks into the same processing flow. Furthermore, by determining the processing task and execution module based on the event type, it improves the concurrent processing capability of multiple tasks and the flexibility of the type identification process. This results in improved efficiency and accuracy in identifying the structural state of the communication tower, thus solving the technical problem of low efficiency and accuracy in identifying the structural state of communication towers due to the use of fixed processes in related technologies. Attached Figure Description

[0017] The accompanying drawings, which form part of this application, are used to provide a further understanding of this application. The illustrative embodiments and descriptions of this application are used to explain this application and do not constitute an undue limitation of this application. In the drawings:

[0018] Figure 1 A hardware block diagram of a computer terminal for implementing a method for identifying the structural state of a communication tower is shown.

[0019] Figure 2 This is a flowchart of a method for identifying the structural state of a communication tower according to Embodiment 1 of this application;

[0020] Figure 3 This is a schematic diagram of a communication tower structural state identification system provided according to Embodiment 1 of this application;

[0021] Figure 4 This is a schematic diagram of a communication tower structural state identification device provided according to Embodiment 2 of this application;

[0022] Figure 5 This is a structural block diagram of an electronic device according to an embodiment of this application. Detailed Implementation

[0023] It should be noted that, unless otherwise specified, the embodiments and features described in this application can be combined with each other. This application will now be described in detail with reference to the accompanying drawings and embodiments.

[0024] To enable those skilled in the art to better understand the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present application, and not all embodiments. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative effort should fall within the scope of protection of the present application.

[0025] It should be noted that the terms "first," "second," etc., in the specification, claims, and accompanying drawings of this application are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be interchanged where appropriate so that the embodiments of this application described herein can be implemented in orders other than those illustrated or described herein. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover non-exclusive inclusion; for example, a process, method, system, product, or apparatus that comprises a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to such processes, methods, products, or apparatus.

[0026] It should be noted that the method, system, and apparatus for identifying the structural state of communication towers as defined in this disclosure can be used in the field of structural health detection, or in any field other than structural health detection. The application field of the method, system, and apparatus for identifying the structural state of communication towers as defined in this disclosure is not limited.

[0027] It should be noted that all information, user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, and displayed data) used in this application are information and data authorized by the user or fully authorized by all parties. Furthermore, the collection, storage, use, processing, transmission, provision, disclosure, and application of related data all comply with the relevant regulations and standards of the relevant regions, have taken necessary measures, do not violate public order and good morals, and provide corresponding operation entry points for users to choose to authorize or refuse use. If the user chooses to refuse, the process proceeds to the expert decision-making process. For example, this system has interfaces with relevant users or organizations. Before obtaining relevant information, a request to obtain the information needs to be sent to the aforementioned user or organization through the interface. After receiving consent from the aforementioned user or organization, the relevant information is obtained. Users can view the purpose of data use in real time through the authorization interface and have the right to withdraw authorization or delete data at any time. After authorization is withdrawn, the system will terminate the relevant data processing within 24 hours.

[0028] The embodiments or examples disclosed herein are not exhaustive, but merely illustrative of some embodiments or examples, and are not intended to limit the scope of protection of this disclosure. Unless otherwise specified, each step in a particular embodiment or example can be implemented as an independent embodiment, and the steps can be arbitrarily combined. For example, a solution after removing some steps in a particular embodiment or example can also be implemented as an independent embodiment, and the order of the steps in a particular embodiment or example can be arbitrarily interchanged. Furthermore, optional methods or examples in a particular embodiment or example can be arbitrarily combined; moreover, embodiments or examples can be arbitrarily combined. For example, some or all steps of different embodiments or examples can be arbitrarily combined, and a particular embodiment or example can be arbitrarily combined with optional methods or examples of other embodiments or examples.

[0029] For ease of description, the following explains some of the nouns or terms used in the embodiments of this application:

[0030] CPU: Central Processing Unit.

[0031] Example 1

[0032] According to an embodiment of this application, an embodiment of a method for identifying the structural state of a communication tower is also provided. It should be noted that the steps shown in the flowchart in the accompanying drawings can be executed in a computer system such as a set of computer-executable instructions. Furthermore, although a logical order is shown in the flowchart, in some cases, the steps shown or described may be executed in a different order than that shown here.

[0033] The method embodiment provided in Embodiment 1 of this application can be executed on a mobile terminal, computer terminal, or similar computing device. Figure 1 A hardware block diagram of a computer terminal for implementing a method for identifying the structural status of communication towers is shown. Figure 1 As shown, the computer terminal 10 (or mobile device) may include one or more processors 102 (shown as 102a, 102b, ..., 102n in the figure) 102 (processor 102 may include, but is not limited to, processing devices such as microprocessors or programmable logic devices), a memory 104 for storing data, and a transmission device 106 for communication functions. In addition, it may also include: a display, an input / output interface, a universal serial bus port (which may be included as one of the ports of a BUS bus), a network interface, a power supply, and / or a camera. Those skilled in the art will understand that... Figure 1 The structure shown is for illustrative purposes only and does not limit the structure of the aforementioned electronic device. For example, computer terminal 10 may also include... Figure 1 The more or fewer components shown, or having the same Figure 1 The different configurations shown.

[0034] It should be noted that the aforementioned one or more processors 102 and / or other data processing circuits are generally referred to herein as "data processing circuits". These data processing circuits may be embodied, in whole or in part, in software, hardware, firmware, or any other combination thereof. Furthermore, the data processing circuits may be a single, independent processing module, or may be integrated, in whole or in part, into any other element within the computer terminal 10 (or mobile device). As involved in the embodiments of this application, the data processing circuits serve as a processor control mechanism (e.g., selection of a variable resistor termination path connected to an interface).

[0035] The memory 104 can be used to store software programs and modules of application software, such as the program instructions / data storage device corresponding to the communication tower structural state identification method in this embodiment. The processor 102 executes various functional applications and data processing by running the software programs and modules stored in the memory 104, thereby realizing the aforementioned communication tower structural state identification method. The memory 104 may include high-speed random access memory, and may also include non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some instances, the memory 104 may further include memory remotely located relative to the processor 102, and these remote memories can be connected to the computer terminal 10 via a network. Examples of such networks include, but are not limited to, the Internet, corporate intranets, local area networks, mobile communication networks, and combinations thereof.

[0036] The transmission device 106 is used to receive or send data via a network. Specific examples of the network described above may include a wireless network provided by the communication provider of the computer terminal 10. In one example, the transmission device 106 includes a Network Interface Controller (NIC), which can connect to other network devices via a base station to communicate with the Internet. In another example, the transmission device 106 may be a Radio Frequency (RF) module, used for wireless communication with the Internet.

[0037] The display may be, for example, a touchscreen LCD display that allows the user to interact with the user interface of the computer terminal 10 (or mobile device).

[0038] Under the aforementioned operating environment, this application provides the following: Figure 2 The method for identifying the structural state of the communication tower shown. Figure 2 This is a flowchart of a method for identifying the structural state of a communication tower according to Embodiment 1 of this application, as shown below. Figure 2 As shown, the method includes:

[0039] Step S201: Receive abnormal monitoring information sent by the abnormal event monitoring module. The abnormal event monitoring module is used to receive communication tower structure monitoring data collected by sensors deployed on the communication tower, and generate abnormal monitoring information based on the communication tower structure monitoring data and preset identification rules.

[0040] It should be noted that the execution subject of this embodiment can be a communication tower structural status identification system. This system can be set in the edge terminal equipment at the communication tower site to collect data sent by sensors, determine whether there is any abnormality in the structural status of the communication tower based on the data, and identify the type of abnormality in a timely manner if there is an abnormality, thereby completing the monitoring operation of the communication tower structural status.

[0041] It should be noted that the abnormal event monitoring module refers to the functional unit deployed within the edge monitoring terminal at the communication tower site, specifically responsible for reading monitoring data, identifying anomalies, and generating trigger signals. Communication tower structural monitoring data refers to the raw monitoring data collected by strain sensors, vibration sensors, tilt sensors, temperature and humidity sensors, or other structural condition sensors deployed on the communication tower. Preset identification rules refer to the logical settings used to determine whether the monitoring data meets abnormal conditions, including mechanisms such as threshold judgment, sliding window statistics, sudden change identification, or trend judgment. Anomaly monitoring information refers to the structured trigger signal generated by the abnormal event monitoring module after identifying an anomaly, containing information such as time, location, sensor type, event type, and data fragments.

[0042] For example, when identifying the structural status of a communication tower, the first step is to receive raw communication tower structural monitoring data collected by various sensors deployed in key parts of the communication tower (such as the main tower body, crossbars, node plates, connectors, and near the foundation) through the abnormal event monitoring module. This data includes, but is not limited to, strain data, vibration data, tilt angle data, temperature and humidity data, etc., and is written into the local data buffer pool of the abnormal event monitoring module according to the sensor number, sampling time, and data type.

[0043] Furthermore, the abnormal event monitoring module can analyze the read sensor data according to preset identification rules, and generate abnormal monitoring information when the monitoring data of one or several sensors meets the preset identification rules. The preset identification rules may include, but are not limited to: the monitored value exceeds a preset safety threshold; the monitored value undergoes a sudden change within a sliding window; the monitored value shows an abnormal growth trend over multiple consecutive sampling periods; multiple adjacent measuring points exhibit related anomalies within the same time window; or sensor data quality abnormalities or data missing meet preset conditions.

[0044] Once any of the above rules is detected, the abnormal event monitoring module captures the original data segments of the sensor to which the data that meets the above rules belongs within a few seconds before and after the abnormal moment, and generates structured abnormal monitoring information that includes the time of abnormal occurrence, sensor physical number, measurement point location, sensor type, event type, abnormal data segment, and task priority identifier.

[0045] Furthermore, the abnormal event monitoring module can send the generated abnormal monitoring information to the scheduling platform through local process communication, message queues, local interfaces, or other local communication methods, thereby completing the abnormal monitoring information reception step.

[0046] Step S202: Obtain the event type of the abnormal event from the abnormal monitoring information, and obtain M first processing tasks under the event type, where M is a positive integer.

[0047] It should be noted that "event type" refers to the category of the abnormality carried in the anomaly monitoring information, such as large-amplitude vibration anomaly, continuous excessive strain of key components, or simultaneous anomalies at multiple measuring points. "First processing task" refers to the specific computational task object set for analyzing the structural condition of the communication tower, which may include, but is not limited to, data preprocessing tasks, basic algorithm tasks (including vibration analysis, strain anomaly analysis, tilt trend analysis, etc.), and advanced algorithm tasks (including damage identification, structural health assessment, risk level judgment, etc.).

[0048] For example, after receiving the abnormal monitoring information, the scheduling platform can parse the abnormal monitoring information and extract the event type carried therein. The event type can be used to reflect the type of abnormal state. For example, the abnormal monitoring information can be: "abnormal vibration", "continuous excessive strain of key components" or "data fluctuation".

[0049] Furthermore, based on the parsed event type, the scheduling platform queries the preset task mapping relationship or scheduling strategy to determine the specific task content corresponding to that event type. For example, for a vibration anomaly event, the corresponding task content may include: data preprocessing tasks, used to filter, denoise, resample, synchronize time, or remove outliers from the raw sampled data; basic algorithm tasks, used to perform vibration analysis, strain anomaly analysis, etc.; and possible advanced algorithm tasks, used to perform damage identification or structural health assessment.

[0050] It should be noted that after determining the specific task content corresponding to the event type, the scheduling platform can generate a first processing task corresponding to each task content based on the event type and preset processing strategy. The first processing task includes information such as task content, priority, and required data fragment index, and these M first processing tasks are input into the scheduling queue to wait for execution.

[0051] Step S203: Determine the first execution module for each first processing task, obtain M first execution modules, and distribute the M first processing tasks to the corresponding first execution modules.

[0052] It should be noted that the first execution module refers to the algorithm module responsible for executing the corresponding first processing task.

[0053] For example, after determining M first processing tasks, the scheduling platform can determine the first execution module to execute each first processing task based on the running status, load, and resource usage of each algorithm module recorded by the resource and status management module of the scheduling platform. It can also determine the priority score of each first processing task based on the event type and task type, and uniformly allocate computing resources based on the event type, task type, priority score, and current system load.

[0054] For example, security alarm tasks are of the highest priority, critical component anomaly analysis tasks are of high priority, ordinary monitoring event analysis tasks are of medium priority, and scheduled self-test tasks are of low priority. In this case, computing resources can be allocated to modules that perform security alarm tasks, and the computing resources used by modules that perform scheduled self-test tasks can be controlled, thereby prioritizing the execution of high-priority tasks.

[0055] Furthermore, after determining the first execution module corresponding to each first processing task, M first processing tasks can be distributed to the corresponding first execution module. This distribution process can be implemented through local inter-process communication, message queues, or local interfaces. Upon receiving a task, each first execution module can store the task in its local cache and execute the stored tasks according to priority. For example, data preprocessing tasks are executed by the data preprocessing module, and vibration analysis tasks are executed by the vibration analysis algorithm module. If a first execution module experiences an anomaly, timeout, or excessive resource consumption, the scheduling platform can isolate, destroy, or restart it, ensuring that other tasks are unaffected. This dynamic method of determining and distributing tasks to execution modules enables the parallel or ordered execution of multiple tasks across different execution modules.

[0056] Step S204: Receive the first execution results of each first execution module, obtain M first execution results, and determine the structural state of the communication tower based on the M first execution results.

[0057] It should be noted that the first execution result refers to the calculation result or analysis data output by each first execution module after completing the first processing task. The structural status refers to the specific abnormal nature of the communication tower structure as determined in the final assessment, such as damage identification results (e.g., tilting, component damage, communication tower settlement), health status level (e.g., normal, warning, dangerous), and risk level (e.g., low, medium, high risk).

[0058] For example, after each first execution module completes the first processing task, it returns the calculated first execution result to the scheduling platform. The scheduling platform receives the first execution results sent by each first execution module, summarizes them to obtain M first execution results, and performs a comprehensive analysis on the M first execution results to obtain the structural state of the communication tower, thereby determining the structural state of the communication tower. The specific analysis process can be selected according to different data, and this embodiment does not limit it.

[0059] For example, by combining multi-dimensional features such as modal frequency change rate, vibration skewness value, and residual strain, it can be determined whether there is a risk of damage to the component where the measuring point is located, and the damage probability, health status level, and risk level can be output.

[0060] Furthermore, after determining the structural status, the scheduling platform generates a result upload task, and the result upload module uploads the analysis results, early warning level, abnormal measurement point information, etc. to the cloud platform, thereby completing the identification process of the communication tower's structural status.

[0061] The method for identifying the structural state of a communication tower provided in this application embodiment employs receiving abnormal monitoring information sent by an abnormal event monitoring module. The abnormal event monitoring module receives communication tower structural monitoring data collected by sensors deployed on the communication tower and generates abnormal monitoring information based on the communication tower structural monitoring data and preset identification rules. It then obtains the event type of the abnormal event from the abnormal monitoring information and acquires M first processing tasks under each event type, where M is a positive integer. Next, it determines the first execution module to execute each first processing task, obtaining M first execution modules, and distributes the M first processing tasks to the corresponding first execution modules. Finally, it receives the first execution results from each first execution module, obtaining M first execution results, and determines the structural state of the communication tower based on the M first execution results. This method obtains the event type from the abnormal monitoring information sent by the abnormal event monitoring module and acquires the corresponding... The system identifies M first processing tasks, determines the first execution module for each task, and distributes the tasks. Finally, it receives the first execution results from each execution module and determines the structural state of the communication tower based on the M first execution results. This approach, by matching event types with first processing tasks and execution modules, and distributing the M first processing tasks in parallel to their respective execution modules for independent execution, avoids coupling monitoring triggering and algorithm execution tasks within the same processing flow. Furthermore, by determining the processing task and execution module based on the event type, it improves multi-task concurrent processing capabilities and the flexibility of the type identification process. This achieves the technical effect of improving the efficiency and accuracy of communication tower structural state identification, thus solving the technical problem of low efficiency and accuracy in structural state identification caused by using a fixed process in related technologies.

[0062] Optionally, in the method for identifying the structural state of a communication tower provided in this application embodiment, sending M first processing tasks to the corresponding first execution modules includes: determining whether there is a correlation between the M first processing tasks; if there is no correlation between the M first processing tasks, sending the M first processing tasks to the corresponding first execution modules in parallel; if there is a correlation between the M first processing tasks, sending the M first processing tasks to the corresponding first execution modules serially according to the correlation.

[0063] For example, after the scheduling platform determines the first execution module to execute each first processing task, it needs to perform dependency analysis on the M first processing tasks before issuing the tasks to determine whether there is a relationship between the M first processing tasks. The determination of the relationship is based on the data dependency, algorithm logic dependency or business rule dependency of the tasks.

[0064] For example, intermediate feature results generated by basic analysis algorithm tasks may need to be used as input for advanced analysis algorithm tasks, or anomaly analysis of a specific component may need to wait for the data analysis results of multiple adjacent measurement points to be summarized before it can be carried out. These situations can all constitute a correlation.

[0065] If the scheduling platform determines that there is no correlation between the M first processing tasks, meaning that each task is independent and does not depend on the data output or execution status of the others, then the scheduling platform will distribute the M first processing tasks to the corresponding first execution modules in parallel. Specifically, the scheduling platform will simultaneously activate or send task instructions to multiple first execution modules, enabling multiple first execution modules to receive tasks and begin execution at the same time, thereby making full use of computing resources and shortening the overall processing time.

[0066] If the scheduling platform determines that there is a relationship between the M first processing tasks, it will serially distribute the M first processing tasks to the corresponding first execution modules according to the relationship. Specifically, the scheduling platform identifies the execution order in the relationship and first distributes the preceding tasks to the corresponding preceding first execution modules. After the preceding tasks that the downstream tasks depend on are completed and produce results, the scheduling platform then distributes the subsequent tasks to the corresponding subsequent first execution modules. For example, in the trigger-first mechanism, after the abnormal event monitoring module generates a trigger signal, the scheduling platform first generates and distributes the data preprocessing task. After the preprocessing is completed, it generates and distributes the basic algorithm task based on the preprocessing result. If the result of the basic algorithm meets the conditions, it then distributes the advanced algorithm task. This process is the serial distribution based on the relationship.

[0067] This embodiment determines the relationship between the first processing tasks and selects a parallel or serial delivery strategy accordingly, thereby achieving dynamic control of the task execution order and improving the stability of system operation and resource utilization efficiency.

[0068] Optionally, in the method for identifying the structural state of a communication tower provided in this application embodiment, serially distributing M first processing tasks to the corresponding first execution modules according to the association relationship includes: for any target first processing task, after the target first processing task is executed, obtaining the task type and target execution result of the target first processing task; obtaining the task triggering condition and final judgment condition according to the task type, and determining whether the target execution result meets the task triggering condition; if the target execution result meets the task triggering condition, executing the next first processing task of the target first processing task according to the target execution result; if the target execution result does not meet the task triggering condition, determining whether the target execution result meets the final judgment condition; if the target execution result does not meet the final judgment condition, executing the next first processing task of the target first processing task according to the target execution result; if the target execution result meets the final judgment condition, terminating the execution of the first processing task after the target first processing task, and determining the structural state of the communication tower according to the target execution result.

[0069] It should be noted that "task type" refers to the specific processing category to which the target's first processing task belongs, such as vibration analysis task, strain anomaly analysis task, damage identification task, etc. "Target execution result" refers to the calculation result or analysis data returned by the corresponding first execution module after the target's first processing task is completed. "Task triggering condition" refers to the preset judgment conditions for each detection item; based on the task triggering condition, it can be determined whether the next processing task needs to be triggered. "Final judgment condition" is used to determine whether the processing task has been completed. "Next first processing task" refers to the subsequent task immediately following the target's first processing task in the correlation sequence.

[0070] For example, during the serial issuance of M first processing tasks, the scheduling platform monitors the execution status of each task. For any target first processing task, after the corresponding target first execution module completes the task, the scheduling platform obtains the task type of the target first processing task and the target execution result returned by the target first execution module. Based on the obtained task type, the scheduling platform retrieves the corresponding task triggering conditions and final judgment conditions from a preset rule base.

[0071] Furthermore, the scheduling platform compares the target execution result with the task triggering conditions to determine whether the target execution result meets the task triggering conditions. If the target execution result meets the task triggering conditions, the scheduling platform, based on the task triggering conditions, continues to distribute the next first processing task of the target's first processing task to the corresponding next first execution module for execution.

[0072] If the target execution result does not meet the task triggering condition, it indicates that the result of the judgment based on the task triggering condition is that there is no need to continue to call subsequent operations. At this time, it is also necessary to determine whether the target execution result meets the final judgment condition. If the target execution result does not meet the final judgment condition, it indicates that the detection process cannot end at this time, and the next first processing task of the target first processing task needs to be executed according to the target execution result.

[0073] If the target execution result meets the final judgment condition, it indicates that the detection process can end at this time. The structural state of the communication tower can then be determined based on the target execution result, thereby completing the task execution process.

[0074] This embodiment introduces a dynamic judgment mechanism based on task type, task triggering conditions, and final judgment conditions, which enables flexible control of serial task execution. This improves system processing efficiency and response speed, while also providing sufficient data support in scenarios requiring multi-level progressive analysis.

[0075] Optionally, in the method for identifying the structural state of a communication tower provided in this application embodiment, determining the structural state of the communication tower based on M first execution results includes: obtaining the detection requirements for each first execution result to obtain M detection requirements; detecting each first execution result using the M detection requirements to obtain M first detection results; determining whether there are any abnormal detection results among the M first detection results; if there are no abnormal detection results among the M first detection results, sending the abnormal monitoring information and the M first execution results to the target execution module, and receiving the structural state fed back by the target execution module, wherein the target execution module is used to determine the structural state of the communication tower; if there are abnormal detection results among the M first detection results, determining a second processing task based on the abnormal detection results, and determining a second execution module to execute the second processing task; sending the second processing task to the second execution module to obtain a second execution result, sending the abnormal monitoring information and the second execution result to the target execution module, and receiving the structural state fed back by the target execution module.

[0076] It should be noted that the target execution module refers to the core algorithm module or unit specifically responsible for comprehensive evaluation and final determination of the communication tower's structural status. The second processing task refers to the additional processing task added after initial detection of anomalies to obtain more precise or higher-level analysis. The second execution module refers to the algorithm module or processing unit responsible for executing the second processing task. The second execution result refers to the advanced analysis data or final evaluation conclusion output by the second execution module after executing the second processing task.

[0077] For example, after receiving M first execution results, the scheduling platform first obtains the detection requirements corresponding to each first execution result, thus obtaining M detection requirements. These detection requirements may include specific thresholds, feature matching rules, or logical judgment conditions.

[0078] Furthermore, the scheduling platform uses these M detection requirements to detect each first execution result, generating M first detection results. The first detection results reflect the status of each first execution result under the corresponding detection requirement, such as whether it exceeds the normal range or matches a specific fault mode.

[0079] Furthermore, the scheduling platform determines whether there are any abnormal detection results among the M first detection results. If the determination result is that there are no abnormal detection results among the M first detection results, that is, all preliminary detection results are in a normal state, the scheduling platform sends the original anomaly monitoring information and the M first execution results to the target execution module. The target execution module receives the above information, performs comprehensive analysis or confirmation, and feeds back the finally determined structural status of the communication tower, which is received by the scheduling platform.

[0080] If the judgment result indicates that there is an abnormal detection result among the M first detection results, meaning that at least one first execution result triggered an anomaly determination, the scheduling platform determines a second processing task based on this anomaly detection result. The second processing task is typically a higher-level or more targeted analysis task, such as damage identification or structural health assessment. The scheduling platform determines the second execution module to perform this second processing task and distributes the task to it. After executing the task, the second execution module generates a second execution result, and the scheduling platform resends the anomaly monitoring information and the second execution result to the target execution module. The target execution module combines the anomaly monitoring information and the second execution result for comprehensive analysis, ultimately determining the structural status of the communication tower and feeding this type back to the scheduling platform.

[0081] This embodiment uses M detection requirements to initially screen the first execution result, quickly eliminating normal cases. Cases without anomalies are directly processed by the target execution module, simplifying the process. For cases with anomalies, a second processing task is triggered, using the second execution module to obtain deeper analysis results, which are then used by the target execution module for final judgment. This mechanism avoids unnecessary complex calculations when the initial detection result is normal, and automatically upgrades the detection depth when anomalies are detected, improving the accuracy of structural state determination.

[0082] Optionally, in the method for identifying the structural state of a communication tower provided in this application embodiment, before sending the M first processing tasks to the corresponding first execution modules, the method further includes: obtaining the device information of the target device of the deployment scheduling platform, and determining the operating state of the target device based on the device information; determining the sending method of the M first processing tasks based on the operating state, and sending the M first processing tasks to the corresponding first execution modules based on the sending method.

[0083] It should be noted that "target device" refers to the device on which the scheduling platform and other modules in the identification system are deployed. "Device information" refers to a set of data reflecting the target device's current resource configuration, load level, available resources, and performance indicators. "Operating status" refers to the real-time working condition of the target device based on the device information, such as idle, busy, overloaded, abnormal, or healthy status. "Deployment method" refers to the task distribution strategy selected based on the target device's operating status, including parallel deployment, serial deployment, priority scheduling, or resource-limited scheduling.

[0084] For example, after determining the M initial processing tasks, a resource assessment step is also required. The scheduling platform first obtains the device information of the target device, which includes, but is not limited to, the target device's CPU utilization, memory usage, number of currently running tasks, communication bandwidth availability, and historical fault records.

[0085] Furthermore, based on the acquired device information, the scheduling platform analyzes and determines the real-time operating status of the target device. For example, if the CPU utilization rate of the target device exceeds a preset threshold, it is determined to be in an overloaded state; if resources are sufficient and there are no abnormal records, it is determined to be in a healthy or idle state.

[0086] Furthermore, based on the determined operating status, the scheduling platform selects an appropriate delivery method for the M first processing tasks. If the target device is operating well and has sufficient resources, the scheduling platform can use a parallel delivery method to send multiple first processing tasks to multiple target devices simultaneously to maximize computational efficiency. If the target device's operating status indicates resource scarcity or overload risk, the scheduling platform may use a serial delivery method or queue scheduling based on task priority, prioritizing the execution of high-priority tasks and limiting or suspending the concurrent number of low-priority tasks.

[0087] Finally, after determining the distribution method, the scheduling platform distributes the M first processing tasks to the corresponding first execution modules according to the method, so that the tasks can be executed in a suitable resource environment and avoid resource contention or system blocking.

[0088] This embodiment effectively avoids computational blocking, response delays, or single-point overload problems caused by unreasonable resource allocation in high-concurrency detection scenarios with multiple measurement points and multiple algorithms by introducing a resource awareness and dynamic scheduling mechanism based on device operating status.

[0089] Optionally, in the method for identifying the structural state of a communication tower provided in this application embodiment, distributing M first processing tasks to the corresponding first execution modules according to the distribution method includes: obtaining the task level of each first processing task, and sorting the M first processing tasks according to the task level to obtain a task sequence; when the distribution method is full distribution, distributing the M first processing tasks to the corresponding first execution modules in parallel; when the distribution method is batch distribution, distributing the M first processing tasks to the corresponding first execution modules according to the task sequence.

[0090] It should be noted that task level refers to the priority assigned based on the importance, urgency, or resource consumption of the primary task. Task sequence refers to an ordered list formed by arranging the M primary tasks in descending order of task level.

[0091] For example, after determining the distribution method, the scheduling platform first obtains the task level of each of the M first processing tasks, and then sorts the M first processing tasks according to the obtained task levels to obtain a task sequence. This task sequence clarifies the relative order of execution or grouping of each task.

[0092] Furthermore, the scheduling platform executes the specific distribution operation according to the previously determined distribution method. If the distribution method is full distribution, it indicates that the system currently has sufficient resources or there are no strict order or resource restrictions on the batch of tasks. The scheduling platform will distribute the M first processing tasks in parallel to the corresponding first execution modules, that is, all tasks will start execution at the same time to maximize the utilization of computing resources and shorten the overall response time.

[0093] If the task distribution method is batch distribution, it indicates that the system needs to control the number of concurrent tasks. In this case, the scheduling platform, based on the task sequence, distributes the M first processing tasks to the corresponding first execution modules in batches or sequentially according to the sorted order or grouping. During this process, tasks with higher task levels are distributed first or occupy priority queues, while tasks with lower task levels are executed or queued when resources allow, thereby achieving dynamic resource balance and orderly management of task execution.

[0094] This embodiment introduces task-level sorting and differentiated execution strategies based on the distribution method. In the full distribution mode, the system can fully leverage the advantages of parallel computing to improve processing efficiency in high-concurrency scenarios. In the batch distribution mode, the system can effectively control concurrency pressure, avoid resource overload, and ensure stable system operation.

[0095] Optionally, in the method for identifying the structural state of a communication tower provided in the embodiments of this application, the method further includes: for any execution module, obtaining the execution data generated when the execution module performs a processing task; determining whether the execution module is abnormal based on the execution data; if the execution module is abnormal, terminating the sending of processing tasks to the execution module and activating the backup module of the execution module.

[0096] It should be noted that "execution module" refers to any one of the first or second execution modules in the above steps. "Execution data" refers to runtime information generated by the execution module during task processing, including but not limited to execution time, resource utilization (such as CPU and memory), output format, running status identifiers, and error logs. "Backup module" refers to a pre-configured backup algorithm module, process, or container with the same or compatible functions for a given execution module, used to take over its tasks when the main module fails, ensuring continuous system operation.

[0097] For example, during operation, the scheduling platform also needs to monitor each execution module in real time. For any given execution module, the scheduling platform obtains the execution data generated by that module while it is processing tasks. The execution data includes the lifecycle information of the execution module, such as task start time, end time, intermediate status updates, resource consumption metrics, and the final output data format.

[0098] Furthermore, the scheduling platform, based on preset judgment rules, determines whether the execution module is abnormal based on the acquired execution data. The judgment logic includes: checking whether the execution module's process is still responding; comparing the actual execution time with the preset maximum allowed execution time, and judging it as abnormal if it times out; parsing the output format of the execution module, and judging it as abnormal if it does not conform to the preset data structure requirements; monitoring the system resources occupied by the execution module, and judging it as abnormal if it exceeds the safety threshold; counting the number of consecutive failures of the execution module, and judging it as abnormal if it reaches the threshold.

[0099] When the judgment indicates that an execution module is abnormal, the scheduling platform immediately takes fault isolation measures. First, it stops sending any new processing tasks to the abnormal execution module to prevent the fault from spreading or further wasting resources. Next, the scheduling platform activates the backup module for that execution module. Activating the backup module includes activating a pre-registered backup process or container and reallocating tasks originally handled by the abnormal execution module or subsequent pending tasks to the backup module for execution. This may also trigger logging, status marking, or restart attempts for the abnormal execution module, thereby ensuring the continuity of detection services and the stability of the system.

[0100] This embodiment significantly improves the high availability and robustness of the communication tower structural health monitoring system by establishing a real-time monitoring and fault isolation mechanism based on execution data. By acquiring execution data and identifying anomalies, the system can promptly detect operational failures in individual algorithm modules or execution units, preventing faulty modules from affecting the execution of other normal tasks or causing overall system crashes.

[0101] Figure 3 This is a schematic diagram of a communication tower structural state identification system provided in Embodiment 1 of this application, as shown below. Figure 3 As shown, the system includes:

[0102] Sensor 31 is installed on the communication tower to collect communication tower structure monitoring data and send the communication tower structure monitoring data to the abnormal event monitoring module 32.

[0103] It should be noted that, since multiple sensors 31 are installed on the communication tower, for management purposes, these multiple sensors 31 can be uniformly connected to the sensor data acquisition and buffering unit. Through the sensor data acquisition and buffering unit, the raw detection data collected by strain sensors, vibration sensors, tilt sensors, temperature and humidity sensors or other structural condition sensors deployed on the key components of the communication tower can be received, and the raw detection data can be written into the local data buffer pool according to the sensor number, sampling time and data type, thereby performing unified data acquisition and storage.

[0104] The abnormal event monitoring module 32 is used to receive communication tower structure monitoring data sent by sensor 31, identify abnormal events from the communication tower structure monitoring data according to preset identification rules, determine the abnormal monitoring information of the abnormal events, and send the abnormal monitoring information to the dispatch platform 33.

[0105] It should be noted that the abnormal event monitoring module 32 can also read the detection data in the local data buffer pool of the sensor data acquisition and buffer unit at a preset frequency, and identify abnormal events by means of threshold judgment, sliding window statistics, mutation recognition or trend judgment, and obtain the abnormal monitoring information of the abnormal events, and send the abnormal monitoring information to the scheduling platform 33.

[0106] The scheduling platform 33 is used to receive anomaly monitoring information, obtain the event type of the anomaly event from the anomaly monitoring information, obtain M first processing tasks under the event type, determine the first execution module 34 to execute each first processing task, obtain M first execution modules 34, send the M first processing tasks to the corresponding first execution modules 34, receive the first execution results of each first execution module 34, obtain M first execution results, and determine the structural state of the communication tower based on the M first execution results, where M is a positive integer.

[0107] M first execution modules 34 are connected to the scheduling platform 33 and are used to execute the corresponding first processing tasks.

[0108] It should be noted that each first execution module 34 can be an algorithm module that performs structural analysis on the detection data in the first processing task. The algorithm module can be configured with a basic analysis algorithm module and an advanced analysis algorithm module.

[0109] It should be noted that this system may also include: a result upload module, used to upload the algorithm analysis results, early warning levels, abnormal measurement point information and system operation status output by the scheduling platform 33 to the cloud platform; a timed self-check module, used to detect the sensor connection status, data transmission status, sampling quality, algorithm operation status and task scheduling status according to a preset period; and a resource and status management module, used to record the operation status of each algorithm module, thread, process or computing task, and to isolate, destroy, restart or downgrade the system when there are algorithm anomalies, computing timeouts or abnormal resource usage.

[0110] The following are the steps of the communication tower structural status identification process executed by each component of this system:

[0111] Sensor 31, configured on the communication tower, collects data and stores it in the local data buffer pool of the sensor data acquisition and buffering unit. The local data buffer pool can establish a data index according to sensor type, sensor number, measurement point location and sampling time, which is used to save real-time sampling data and historical sampling data within a certain time range.

[0112] The abnormal event monitoring module 32 reads the data buffer at a preset frequency. For vibration data, the abnormal event monitoring module 32 can use a sliding window method to calculate the peak value, root mean square value, skewness value, kurtosis value, or frequency change within the window; for strain data, the abnormal event monitoring module 32 can calculate the strain increment, strain change rate, duration of exceeding the limit, or residual strain; for tilt angle data, the abnormal event monitoring module 32 can calculate the tilt angle change, change rate, or offset trend.

[0113] The abnormal event monitoring module 32 generates a trigger signal when the detection data meets any of the following conditions:

[0114] (1) The detected value exceeds the preset safety threshold;

[0115] (2) The detected value changes abruptly within the sliding window;

[0116] (3) The detected value showed an abnormal increasing trend for multiple consecutive sampling periods;

[0117] (4) Multiple adjacent measuring points exhibit related anomalies within the same time window;

[0118] (5) Sensor data quality is abnormal or data is missing, which meets the preset conditions.

[0119] The trigger signal includes at least: the time of the anomaly, the sensor physical number, the measurement point location, the sensor type, the event type, the abnormal data segment, the original sampling data within the time window before and after the anomaly, and the task priority identifier. The abnormal event monitoring module 32 generates a structured trigger signal in the edge detection terminal at the communication tower site and sends it to the scheduling platform 33 through local process communication, message queue, local interface, or other local communication methods.

[0120] Through this design, the abnormal event monitoring module 32 completes abnormal identification and trigger signal generation locally, eliminating the need to upload all continuous raw detection data such as strain, vibration, and tilt angle to a remote platform for abnormal judgment. Given the large number of communication towers, measurement points, and high sensor sampling frequencies, relying entirely on a remote platform for monitoring and triggering would increase communication link bandwidth usage and cloud data processing pressure, and affect the response speed to abnormal events during network fluctuations. This system uses local monitoring and triggering, generating a structured trigger signal containing time, location, sensor type, event type, and abnormal data fragments only when an abnormal event occurs. The scheduling platform 33 then distributes subsequent tasks, thereby reducing remote transmission pressure and improving the real-time response to abnormal events and the stability of unattended operation.

[0121] After receiving the trigger signal, the scheduling platform 33 parses the trigger signal and generates a task object based on the measurement point location, event type, sensor type, and task priority.

[0122] Task objects may include:

[0123] (1) Data preprocessing tasks are used to filter, denoise, resample, synchronize time, or remove outliers from the original sampled data;

[0124] (2) Basic algorithm tasks, used to perform basic analyses such as vibration analysis, strain anomaly analysis, tilt trend analysis, and modal parameter identification;

[0125] (3) Advanced algorithm tasks, used to perform damage identification, structural health assessment, risk level judgment or life trend analysis;

[0126] (4) Result upload task, used to send analysis results and early warning information to the cloud platform;

[0127] (5) Status recording task, used to record the current triggering event, task execution status, algorithm call results and exception information.

[0128] The scheduling platform 33 writes tasks into the corresponding task queue according to task type and priority. For high-risk events, such as large-amplitude vibration anomalies, continuous excessive strain of key components, or simultaneous anomalies at multiple measurement points, the scheduling platform 33 prioritizes the allocation of computing resources and starts advanced algorithm modules; for general data fluctuation events, it prioritizes the execution of basic algorithms and determines whether to enter the advanced analysis process based on the results of the basic algorithms.

[0129] When the scheduling platform 33 receives multiple abnormal events, it can simultaneously schedule multiple algorithm modules to run. Different algorithm modules operate independently; the basic algorithm module, advanced algorithm module, upload module, and self-check module can all run in different threads, processes, or containers. Furthermore, after the basic algorithm module completes its calculations, it does not directly call other algorithm modules but instead returns the calculated secondary feature results to the scheduling platform 33. Upon receiving the secondary feature results, the scheduling platform 33 determines whether to generate subsequent algorithm tasks based on preset rules, event type, measurement point location, task priority, and secondary feature thresholds. When the subsequent analysis conditions are met, the scheduling platform 33 then triggers the corresponding advanced algorithm module to execute calculations.

[0130] For example, after the vibration analysis algorithm module completes its calculations, it returns the vibration energy, dominant frequency change, and vibration skewness value as result 1 to the scheduling platform 33. The scheduling platform 33 analyzes result 1; if it determines that the sudden increase in vibration energy exceeds a preset threshold, it generates a modal analysis task and triggers the modal analysis algorithm module to execute the calculations. After the modal analysis algorithm module completes its calculations, it returns the modal frequency change rate as result 2 to the scheduling platform 33. The scheduling platform 33 analyzes result 2; if it determines that the modal frequency change rate exceeds a preset threshold, it generates a damage identification task and triggers the damage identification algorithm module to execute the calculations. After the damage identification algorithm module completes its calculations, it returns the damage probability as result 3 to the scheduling platform 33. The scheduling platform 33 analyzes result 3; if it determines that the damage probability exceeds a preset threshold, it triggers the structural health assessment algorithm module and the risk warning algorithm module, and generates a result upload task.

[0131] In this way, the algorithm modules do not directly call each other. Instead, the scheduling platform 33 uniformly receives the algorithm output, judges the subsequent triggering conditions, and distributes new algorithm tasks, thus forming a chain-like collaborative analysis process with the scheduling platform 33 as the core.

[0132] It should be noted that the scheduling platform 33 can also uniformly allocate computing resources based on the resource requirements of the algorithm modules, task priorities, and the current system load. Resources include CPU resources, memory resources, the number of algorithm processes, the number of threads, data read bandwidth, and upload bandwidth.

[0133] When the system load is low, the scheduling platform 33 allows multiple algorithm modules to run in parallel; when the system load is high, the scheduling platform 33 can limit the number of low-priority tasks running concurrently, suspend non-urgent tasks, and prioritize high-risk event analysis tasks and result uploading tasks.

[0134] When multiple measuring points trigger anomalies simultaneously, the scheduling platform 33 can determine the task execution order based on the importance of the component to which the measuring point belongs, the magnitude of the anomaly, the duration, and historical risk records. For anomalies triggered by measuring points near the main tower material, node plates, connectors, guy wires, or foundation, the scheduling platform 33 can set a higher priority.

[0135] It should be noted that after the scheduling platform 33 generates the detection results, the algorithm calculation results, abnormal event information, risk level, measurement point location, original data fragment index, algorithm version number and task execution status can also be uploaded to the cloud platform through the result upload module via a preset transmission protocol.

[0136] The cloud platform can be used to display the structural health status of communication towers, lists of abnormal events, historical trend curves, algorithm analysis reports, and operation and maintenance records.

[0137] When the cloud platform receives a high-risk warning, it can further notify operations and maintenance personnel to conduct on-site verification, temporary control, or repair. The result upload module can also write the upload task to a local cache queue when the network is abnormal, and automatically re-upload it after communication is restored to avoid loss of detection events.

[0138] It should be noted that a timed self-test module can also be used to perform routine checks on the system's operational status according to a preset cycle. The self-test content includes:

[0139] (1) Sensor connection status detection to determine whether the sensor is online, whether there is a long period of no data or abnormal disconnection;

[0140] (2) Data transmission quality detection to determine whether there is packet loss, delay, duplicate data or timestamp anomalies;

[0141] (3) Data quality inspection, to determine whether the sampled data has drift, sudden noise, long-term constant value or obvious outlier;

[0142] (4) Algorithm module status detection: determine whether the algorithm module is running normally, and whether there is a calculation timeout or abnormal exit;

[0143] (5) Task scheduling status detection: determine whether the task queue is piling up, whether the thread is blocked, and whether the uploaded task is delayed.

[0144] The self-inspection results are fed back to the dispatch platform 33. If a sensor is found to be disconnected, the data quality is abnormal, or the algorithm module is abnormal, the dispatch platform 33 can generate a system operation and maintenance alarm and upload the alarm information to the cloud platform.

[0145] It should be noted that this system can also be configured with fault isolation and recovery mechanisms to prevent the failure of a single algorithm module or task from affecting the operation of the entire system.

[0146] When the scheduling platform 33 detects the following situation in a certain algorithm module, it determines that the algorithm module is abnormal:

[0147] (1) The algorithm process is unresponsive;

[0148] (2) The algorithm execution time exceeds the preset upper limit;

[0149] (3) The algorithm output format is incorrect;

[0150] (4) The algorithm consumes more resources than a preset threshold;

[0151] (5) The algorithm failed to run multiple times in a row.

[0152] For the exception algorithm module, the scheduling platform 33 can perform the following processing:

[0153] (1) Stop assigning new tasks to this algorithm module;

[0154] (2) Mark the current task of the algorithm module as failed or transfer it to the standby algorithm module;

[0155] (3) Isolate or destroy abnormal processes;

[0156] (4) Release the computing resources it occupies;

[0157] (5) Restart the algorithm module according to the preset strategy;

[0158] (6) Upload the fault information to the cloud platform.

[0159] Through the above mechanism, even if a certain algorithm module malfunctions, other algorithm modules, trigger listening tasks, result uploading tasks, and self-checking tasks can still continue to run, thereby improving the overall reliability of the system.

[0160] It should be noted that the steps shown in the flowchart in the accompanying drawings can be executed in a computer system such as a set of computer-executable instructions, and although a logical order is shown in the flowchart, in some cases the steps shown or described may be executed in a different order than that shown here.

[0161] Example 2

[0162] This application also provides a device for identifying the structural state of a communication tower. It should be noted that this device can be used to execute the communication tower structural state identification method provided in the above embodiments. The following describes the communication tower structural state identification device provided in this application.

[0163] According to an embodiment of this application, an apparatus for implementing the above-described method for identifying the structural state of a communication tower is also provided. Figure 4 This is a schematic diagram of a communication tower structural state identification device according to Embodiment 2 of this application, as shown below. Figure 4 As shown, the device includes:

[0164] The receiving unit 41 is used to receive abnormal monitoring information sent by the abnormal event monitoring module. The abnormal event monitoring module is used to receive communication tower structure monitoring data collected by sensors deployed on the communication tower, and generate abnormal monitoring information according to the communication tower structure monitoring data and preset identification rules.

[0165] The first acquisition unit 42 is used to acquire the event type of the abnormal event from the abnormal monitoring information, and acquire M first processing tasks under the event type, where M is a positive integer.

[0166] The first determining unit 43 is used to determine the first execution module that executes each first processing task, obtain M first execution modules, and send the M first processing tasks to the corresponding first execution modules.

[0167] The second determining unit 44 is used to receive the first execution results of each first execution module, obtain M first execution results, and determine the structural state of the communication tower based on the M first execution results.

[0168] The communication tower structural status identification device provided in this application obtains event types from abnormal monitoring information sent by an abnormal event monitoring module, and obtains M corresponding first processing tasks according to the event types. Then, it determines the first execution module to execute each first processing task and sends the tasks down. Finally, it receives the first execution results of each first execution module and determines the structural status of the communication tower based on the M first execution results. This achieves the goal of matching event types with first processing tasks and first execution modules, and sending the M first processing tasks in parallel to the corresponding first execution modules for independent execution. This avoids coupling monitoring triggering, algorithm execution, and other tasks in the same processing flow. Furthermore, by determining the processing tasks and execution modules used according to the event types, it improves the multi-task concurrent processing capability and the flexibility of the type identification process. This achieves the technical effect of improving the identification efficiency and accuracy of the communication tower structural status, and solves the technical problem of low identification efficiency and accuracy of the structural status in related technologies that use fixed processes to identify the structural status of communication towers.

[0169] Optionally, in the communication tower structural state identification device provided in this application embodiment, the first determining unit 43 includes: a first judging module, used to judge whether there is a correlation between the M first processing tasks; a first sending module, used to send the M first processing tasks in parallel to the corresponding first execution module when there is no correlation between the M first processing tasks; and a second sending module, used to send the M first processing tasks serially to the corresponding first execution module according to the correlation when there is a correlation between the M first processing tasks.

[0170] Optionally, in the communication tower structural state identification device provided in this application embodiment, the second issuing module includes: an acquisition submodule, used to acquire the task type and target execution result of any target first processing task after the target first processing task is executed; a first judgment submodule, used to acquire the task triggering condition and final judgment condition according to the task type, and judge whether the target execution result meets the task triggering condition; a first execution submodule, used to execute the next first processing task of the target first processing task according to the target execution result if the target execution result meets the task triggering condition; a second judgment submodule, used to judge whether the target execution result meets the final judgment condition if the target execution result does not meet the task triggering condition; a second execution submodule, used to execute the next first processing task of the target first processing task according to the target execution result if the target execution result does not meet the final judgment condition; and a determination submodule, used to terminate the execution of the first processing task after the target first processing task if the target execution result meets the final judgment condition, and determine the structural state of the communication tower according to the target execution result.

[0171] Optionally, in the communication tower structural state identification device provided in this application embodiment, the second determining unit 44 includes: a first acquiring module, used to acquire the detection requirements of each first execution result to obtain M detection requirements; a detection module, used to detect each first execution result through the M detection requirements to obtain M first detection results; a second judging module, used to judge whether there are abnormal detection results among the M first detection results; a sending module, used to send abnormal monitoring information and M first execution results to a target execution module when there are no abnormal detection results among the M first detection results, and receive the structural state fed back by the target execution module, wherein the target execution module is used to determine the structural state of the communication tower; a determining module, used to determine a second processing task based on the abnormal detection results when there are abnormal detection results among the M first detection results, and determine a second execution module to execute the second processing task; and a third sending module, used to send the second processing task to the second execution module to obtain a second execution result, send the abnormal monitoring information and the second execution result to the target execution module, and receive the structural state fed back by the target execution module.

[0172] Optionally, in the communication tower structural status identification device provided in this application embodiment, before sending the M first processing tasks to the corresponding first execution modules, the device further includes: a second acquisition unit, used to acquire the device information of the target device of the deployment scheduling platform, and determine the operating status of the target device according to the device information; and a third determination unit, used to determine the sending method of the M first processing tasks according to the operating status, and send the M first processing tasks to the corresponding first execution modules according to the sending method.

[0173] Optionally, in the communication tower structural state identification device provided in this application embodiment, the third determining unit includes: a second acquisition module, used to acquire the task level of each first processing task, and sort the M first processing tasks according to the task level to obtain a task sequence; a fourth distribution module, used to distribute the M first processing tasks in parallel to the corresponding first execution module when the distribution method is full distribution; and a fifth distribution module, used to distribute the M first processing tasks to the corresponding first execution module according to the task sequence when the distribution method is batch distribution.

[0174] Optionally, in the communication tower structural status identification device provided in the embodiments of this application, the device further includes: a third acquisition unit, used to acquire execution data generated when the execution module performs a processing task for any execution module; a judgment unit, used to judge whether there is an abnormality in the execution module based on the execution data; and a processing unit, used to terminate sending processing tasks to the execution module and enable the backup module of the execution module when there is an abnormality in the execution module.

[0175] It should be noted that the receiving unit 41, the first acquiring unit 42, the first determining unit 43, and the second determining unit 44 mentioned above correspond to steps S201 to S204 in Embodiment 1. The instances and application scenarios implemented by each of the above units and the corresponding steps are the same, but are not limited to the content disclosed in Embodiment 1. It should be noted that the above modules or units can be hardware or software components stored in memory (e.g., memory 104) and processed by one or more processors (e.g., processors 102a, 102b, ..., 102n). The above modules can also be part of a device and can run in the computer terminal 10 provided in Embodiment 1.

[0176] Example 3

[0177] Embodiments of this application may provide an electronic device. Figure 5 This is a structural block diagram of an electronic device according to an embodiment of this application. Figure 5 As shown, the electronic device may include: one or more ( Figure 5 (Only one is shown) processor 1002, memory 1004, memory controller, and peripheral interface, wherein the peripheral interface is connected to the radio frequency module, audio module and display.

[0178] The memory can be used to store software programs and modules, such as the program instructions / modules corresponding to the methods and apparatus in the embodiments of this application. The processor executes various functional applications and data processing by running the software programs and modules stored in the memory, thereby implementing the above-described methods. The memory may include high-speed random access memory, and may also include non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some instances, the memory may further include memory remotely located relative to the processor, and these remote memories can be connected to the terminal via a network. Examples of such networks include, but are not limited to, the Internet, corporate intranets, local area networks, mobile communication networks, and combinations thereof.

[0179] Those skilled in the art will understand that Figure 5 The structure shown is for illustrative purposes only. Electronic devices can also be smartphones, tablets, handheld computers, mobile internet devices (MIDs), PADs, and other terminal devices. Figure 5 This does not limit the structure of the aforementioned electronic device. For example, electronic devices may also include components that are more... Figure 5 The more or fewer components shown (such as network interfaces, display devices, etc.), or having the same Figure 5 The different configurations shown.

[0180] Those skilled in the art will understand that all or part of the steps in the various methods of the above embodiments can be implemented by a program instructing the hardware related to the terminal device. The program can be stored in a computer-readable storage medium, which may include: flash drive, read-only memory (ROM), random access memory (RAM), disk or optical disk, etc.

[0181] Example 4

[0182] Embodiments of this application also provide a storage medium. Optionally, in this embodiment, the storage medium can be used to store the program code executed by the communication tower structural state identification method provided in Embodiment 1.

[0183] Optionally, in this embodiment, the storage medium may be located in any computer terminal in a group of computer terminals in a computer network, or in any mobile terminal in a group of mobile terminals.

[0184] Embodiments of this application also provide a computer program product, including a non-volatile computer-readable storage medium storing a computer program, which, when executed by a processor, implements the aforementioned method for identifying the structural state of a communication tower.

[0185] Embodiments of this application also provide a computer-readable storage medium, which includes a stored executable program, wherein, when the executable program is running, it controls the device where the computer-readable storage medium is located to execute the above-described method for identifying the structural state of a communication tower.

[0186] The sequence numbers of the embodiments in this application are for descriptive purposes only and do not represent the superiority or inferiority of the embodiments.

[0187] In the above embodiments of this application, the descriptions of each embodiment have different focuses. For parts not described in detail in a certain embodiment, please refer to the relevant descriptions of other embodiments.

[0188] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. The device embodiments described above are merely illustrative; for example, the division of units is only a logical functional division, and in actual implementation, there may be other division methods. For example, multiple units or components may be combined or integrated into another system, or some features may be ignored or not executed. Furthermore, the displayed or discussed mutual coupling, direct coupling, or communication connection may be through some interfaces; the indirect coupling or communication connection between units or modules may be electrical or other forms.

[0189] The units described as separate components may or may not be physically separate. The components shown as units may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the units can be selected to achieve the purpose of this embodiment according to actual needs.

[0190] Furthermore, the functional units in the various embodiments of this application can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The integrated unit can be implemented in hardware or as a software functional unit.

[0191] If the integrated unit is implemented as a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of this application, in essence, or the part that contributes to the prior art, or all or part of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods described in the various embodiments of this application. The aforementioned storage medium includes various media capable of storing program code, such as a USB flash drive, read-only memory (ROM), random access memory (RAM), portable hard drive, magnetic disk, or optical disk.

[0192] The above description is only a preferred embodiment of this application. It should be noted that for those skilled in the art, several improvements and modifications can be made without departing from the principle of this application, and these improvements and modifications should also be considered within the scope of protection of this application.

Claims

1. A method for identifying the structural state of a communication tower, applied to a scheduling platform, characterized in that, include: The system receives abnormal monitoring information sent by an abnormal event monitoring module, wherein the abnormal event monitoring module is used to receive communication tower structure monitoring data collected by sensors deployed on the communication tower, and generate the abnormal monitoring information according to the communication tower structure monitoring data and preset identification rules. Obtain the event type of the abnormal event from the abnormal monitoring information, and obtain M first processing tasks under the event type, where M is a positive integer; The first execution module for each first processing task is determined, resulting in M ​​first execution modules, and the M first processing tasks are distributed to the corresponding first execution modules; The system receives the first execution results from each first execution module, obtains M first execution results, and determines the structural state of the communication tower based on the M first execution results.

2. The method according to claim 1, characterized in that, Distributing the M first processing tasks to the corresponding first execution modules includes: Determine whether there is a correlation between the M first processing tasks; If there is no correlation between the M first processing tasks, the M first processing tasks will be sent to the corresponding first execution modules in parallel. If there is a relationship between the M first processing tasks, the M first processing tasks are serially distributed to the corresponding first execution modules according to the relationship.

3. The method according to claim 2, characterized in that, According to the aforementioned association, serially distributing the M first processing tasks to the corresponding first execution modules includes: For any target first processing task, after the target first processing task is completed, obtain the task type and target execution result of the target first processing task; Based on the task type, obtain the task triggering conditions and final judgment conditions, and determine whether the target execution result meets the task triggering conditions; If the target execution result meets the task triggering condition, the next first processing task of the target first processing task is executed according to the target execution result; If the target execution result does not meet the task triggering condition, determine whether the target execution result meets the final determination condition; If the target execution result does not meet the final determination condition, the next first processing task of the target first processing task is executed according to the target execution result; If the target execution result meets the final determination condition, the execution of the first processing task after the target first processing task is terminated, and the structural state of the communication tower is determined according to the target execution result.

4. The method according to claim 1, characterized in that, Determining the structural state of the communication tower based on the M first execution results includes: Obtain the detection requirements for each first execution result, resulting in M ​​detection requirements; Each first execution result is detected by the M detection requirements to obtain M first detection results; Determine whether there are any abnormal detection results among the M first detection results; If no abnormal detection result is found among the M first detection results, the abnormal monitoring information and the M first execution results are sent to the target execution module, and the structural status fed back by the target execution module is received, wherein the target execution module is used to determine the structural status of the communication tower; If an abnormal detection result exists among the M first detection results, a second processing task is determined based on the abnormal detection result, and a second execution module is determined to execute the second processing task. The second processing task is sent to the second execution module to obtain the second execution result. The anomaly monitoring information and the second execution result are sent to the target execution module, and the structural status fed back by the target execution module is received.

5. The method according to claim 1, characterized in that, Before distributing the M first processing tasks to the corresponding first execution modules, the method further includes: Obtain device information of the target device on which the scheduling platform is deployed, and determine the operating status of the target device based on the device information; The method for issuing the M first processing tasks is determined based on the operating status, and the M first processing tasks are issued to the corresponding first execution modules according to the method.

6. The method according to claim 5, characterized in that, The method of distributing the M first processing tasks to the corresponding first execution modules according to the distribution method includes: Obtain the task level of each first processing task, and sort the M first processing tasks according to the task level to obtain a task sequence; When the distribution method is full distribution, the M first processing tasks are distributed in parallel to the corresponding first execution modules; When the distribution method is batch distribution, the M first processing tasks are distributed to the corresponding first execution modules according to the task sequence.

7. The method according to any one of claims 1 to 6, characterized in that, The method further includes: For any given execution module, obtain the execution data generated when the execution module performs the processing task; Determine whether the execution module has any abnormalities based on the execution data; If the execution module malfunctions, the sending of processing tasks to the execution module will be terminated, and the backup module of the execution module will be activated.

8. A system for identifying the structural state of a communication tower, characterized in that, include: Sensors are deployed on the communication tower to collect communication tower structure monitoring data and send the communication tower structure monitoring data to the abnormal event monitoring module; The abnormal event monitoring module is used to receive the communication tower structure monitoring data sent by the sensor, identify abnormal events from the communication tower structure monitoring data according to a preset identification rule, determine the abnormal monitoring information of the abnormal event, and send the abnormal monitoring information to the dispatch platform. The scheduling platform is configured to receive the anomaly monitoring information, obtain the event type of the anomaly event from the anomaly monitoring information, obtain M first processing tasks under the event type, determine the first execution module to execute each first processing task, obtain M first execution modules, distribute the M first processing tasks to the corresponding first execution modules, receive the first execution results of each first execution module, obtain M first execution results, and determine the structural state of the communication tower based on the M first execution results, where M is a positive integer; The M first execution modules are connected to the scheduling platform and are used to execute the corresponding first processing tasks.

9. A device for identifying the structural state of a communication tower, characterized in that, include: A receiving unit is used to receive abnormal monitoring information sent by an abnormal event monitoring module, wherein the abnormal event monitoring module is used to receive communication tower structure monitoring data collected by sensors deployed on the communication tower, and generate the abnormal monitoring information according to the communication tower structure monitoring data and preset identification rules. The first acquisition unit is used to acquire the event type of the abnormal event from the abnormal monitoring information, and acquire M first processing tasks under the event type, where M is a positive integer; The first determining unit is used to determine the first execution module that executes each first processing task, obtain M first execution modules, and distribute the M first processing tasks to the corresponding first execution modules; The second determining unit is used to receive the first execution results of each first execution module, obtain M first execution results, and determine the structural state of the communication tower based on the M first execution results.

10. An electronic device, characterized in that, include: Memory, which stores executable programs; A processor for running the program, wherein the program executes the method for identifying the structural state of a communication tower as described in any one of claims 1 to 7.