A method and system for intelligent inspection and fault positioning of a power collection line

By constructing joint hypothetical units and hierarchical sorting of the power collection lines, the problem of positioning deviation caused by topological uncertainty in power collection line fault location is solved, achieving efficient and accurate fault location, and reducing errors and repeated data acquisition.

CN123158477APending Publication Date: 2026-11-24CHINA SHANXI SIJIAN GRP
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202611655548.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-26
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

When the line topology is uncertain at the time of a fault in a collector line, it is difficult for the electrical location results and the on-site inspection results to converge, making it difficult to accurately locate the candidate topology and candidate fault section.

Method used

By collecting fault event data, switch status data, and topology-geographic anchor point data, a candidate topology set is generated. A joint hypothesis unit is constructed that binds the candidate fault section, fault location range, candidate fault type, expected transient propagation relationship, and expected on-site evidence. The unit is sorted and filtered level by level, and the mobile inspection terminal is controlled to perform the target inspection action to verify the on-site inspection data and reconstruct the switch status at the time of the fault.

Benefits of technology

This technology enables the retention of candidate results with electrical interpretations when the switch state is unreliable, avoiding location deviations, reducing errors caused by incorrect topology fixation, lowering communication latency and redundant data acquisition, forming a closed loop of electrical screening, differential inspection, and evidence reinjection, and improving the accuracy and efficiency of fault location.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123158477A_ABST
    Figure CN123158477A_ABST
Patent Text Reader

Abstract

This invention discloses a method and system for intelligent inspection and fault location of power collection lines, belonging to the field of power collection line fault monitoring and intelligent inspection. Candidate topologies are generated based on fault event data and switch status data. Under each candidate topology, joint hypothesis units are constructed, binding candidate fault sections, location ranges, fault types, expected transient propagation relationships, and expected on-site evidence. These units are then filtered and sorted based on measured propagation relationships. Differences between retained units are compared to generate candidate inspection actions that meet the conditions for observable evidence. Inspection locations and sensing methods are selected progressively according to the number of distinguishable unit pairs. A mobile inspection terminal with unified time synchronization is controlled to collect on-site evidence. Opposite candidate topologies are deleted using valid equipment status records, and the joint hypothesis units are updated based on other valid on-site evidence until the line topology and fault location results at the time of the fault are output. This method enables the topology state and fault location to converge collaboratively in difference-driven inspection and on-site evidence feedback.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power line fault monitoring, fault location and intelligent inspection technology, and more specifically, to a method and system for intelligent inspection and fault location of power lines. Background Technology

[0002] A collector line typically connects multiple new energy power generation units to a step-up substation. Its structure may include overhead lines, cable lines, box-type transformers, branch switches, tie switches, ring main units, transition points between overhead and cable lines, and line terminals. When grounding, insulation discharge, connection point overheating, or structural damage faults occur, the propagation direction and time of the fault transients can be analyzed based on voltage transient data, current transient data, zero-sequence voltage data, and zero-sequence current data collected from different monitoring nodes, and the fault section can be determined in conjunction with the line topology. However, the switch status in the collector line may not accurately represent the line topology at the time of the fault due to communication delays, lost status messages, switch failures, or post-fault power transfer operations. In this case, the same set of fault transient data may match multiple candidate topologies, thus generating multiple candidate fault sections and increasing the scope of on-site fault location.

[0003] For fault location in power collection lines, Chinese patent application CN117452147A discloses a fault location method and system. This method involves setting current detectors at multiple nodes of the power collection line, determining the fault node based on the change in real-time high-frequency current pulse amplitude relative to the initial high-frequency current pulse amplitude, and further determining the fault location based on the current changes of nodes before and after the fault node. Chinese patent application CN116680635A discloses a power grid fault location inference method and system, which establishes a conditional probability model of the network topology based on multi-source feedback data and determines the fault location through Bayesian networks and sampling inference. Chinese patent application CN112013907A discloses a power grid unmanned aerial vehicle (UAV) inspection path planning method, which determines the inspection route based on on-site survey results, digital elevation maps, take-off and landing points, and waypoints, and collects images and videos while the UAV flies along the inspection route to identify and upload line fault points. These existing technologies improve the efficiency of fault location or on-site inspection from the aspects of electrical measurement, topology inference, and mobile inspection, respectively.

[0004] However, when the actual line topology at the time of a fault is uncertain and multiple candidate fault sections can explain the measured transient data, the existing fault location process usually still requires selecting a topology or fault section with a higher probability, and then conducting inspections according to a preset route or the selected fault section. There is a lack of a collaborative mechanism between the electrical location process and the on-site inspection process to address differences in candidate results. Inspection locations and sensing methods may not be able to effectively distinguish between different candidate topologies and candidate fault sections. Local switch operation records, temperature anomalies, discharge pulses, or structural anomalies obtained on-site are mainly used to confirm the selected fault location and are difficult to use to correct the switch state at the time of the fault. Therefore, when there is a deviation in the initial topology, problems may still arise such as the inspection terminal continuing to inspect along incorrect line branches, on-site evidence failing to narrow down the candidate topology range, and repeated data acquisition failing to converge the fault location. Summary of the Invention

[0005] The purpose of this invention is to provide a method and system for intelligent inspection and fault location of power collection lines, so as to solve the problem that when the line topology is uncertain at the time of fault occurrence, the electrical location results and the on-site inspection results cannot be mutually corrected, which makes it difficult for candidate topologies and candidate fault sections to converge in a coordinated manner.

[0006] This invention achieves the above objective through the following technical solution: a method for intelligent inspection and fault location of power collection lines, comprising: Collect fault event data, switch status data, and topology-geographic anchor point data to determine the start time of the fault event; Based on the fault event start time and switch status data, determine the switches with uncertain status, combine their statuses and filter them according to line operation constraints to generate a candidate topology set. Under each candidate topology, construct a topology-fault joint hypothesis unit that binds candidate fault segments, fault location range, candidate fault type, expected transient propagation relationship and expected on-site evidence; Based on the measured and expected transient propagation relationship, the joint hypothesis units are screened and sorted step by step. The differences in topology, segment, location range and fault type among the retained units are compared, and the variables to be disambiguated are extracted. For the variable to be disambiguated, candidate inspection actions that meet the condition of observable evidence are generated. The number of unit pairs that can be distinguished by each action is compared step by step according to the retained units to determine the target inspection location and sensing mode. Control the mobile inspection terminal to execute the target inspection action and verify the on-site inspection data; reconstruct the switch state at the time of the fault using the equipment state record that has passed the validity verification and delete the candidate topology with the opposite state; update the reserved unit based on other valid on-site evidence. If the location termination condition is met, output the line topology and fault location result at the time of the fault; otherwise, redetermine the target inspection action based on the updated retained unit.

[0007] Furthermore, the fault event data includes voltage transient data, current transient data, bus zero-sequence voltage data, and line branch zero-sequence current data of the monitoring nodes; Based on the moment when the bus zero-sequence voltage exceeds the start-up threshold and the moment when the transient current changes corresponding to the same fault event in at least two monitoring nodes, the fixed acquisition delay of each channel is corrected and channels that exceed the consistency time window are removed to determine the start time of the fault event. The start-up threshold is determined based on the bus zero-sequence voltage fluctuation range and sensor measurement error during a fault-free operation cycle.

[0008] Furthermore, a switch that meets any of the following conditions is identified as a state-determined switch: the possible effective period of the state, determined by the state message time and the upper limit of the communication delay, includes the start time of the fault event and its judgment tolerance range; the control command and the returned state are inconsistent; the state message is missing; or the switch state is inconsistent with the connection state represented by the voltage and current on both sides of the switch before the fault. Keeping the states of the other switches unchanged, the on and off states of the state-determined switches are combined, and state combinations that do not meet the line operation constraints are deleted according to the on / off interlocking relationship, power supply connection relationship and bus energization state.

[0009] Furthermore, among the candidate topologies, the line segments that are electrically connected and can form a fault current propagation path are identified as candidate fault segments; the candidate topology, candidate fault segments, fault location range, candidate fault type, expected transient propagation relationship, and expected on-site evidence are linked together. The expected transient propagation relationship is obtained by calculating the discrete points of the fault location and the combination of candidate fault parameters through a distributed parameter line model calibrated by field propagation data, and includes the set of allowed polarities of the first effective pulse, the order of stable arrival, the direction of branch transient current, and the voltage drop interval. The expected field evidence is determined based on the evidence metadata of candidate fault types and topological-geographic anchors.

[0010] Furthermore, when the measured polarity of the first effective pulse, the arrival order relationship, or the direction of the branch transient current conflicts with all the allowable results of the corresponding expected transient propagation relationship, or when the line energized state conflicts with the corresponding candidate topology, the corresponding joint assumption unit is deleted; the remaining units are sorted in order of the number of nodes with inconsistent polarity, the number of nodes with inverted arrival relationships, the continuity deviation of branch node current, and the normalized distance from the measured voltage drop to the expected voltage drop interval. When the corrected arrival time difference between two nodes is not greater than the arrival order determination tolerance, the corresponding node pair will not participate in the arrival relationship sorting.

[0011] Furthermore, the variables to be disambiguated include switches with different states among candidate topologies, branch nodes corresponding to candidate fault segments, topological-geographic anchors corresponding to fault location ranges, or physical evidence corresponding to candidate fault types. For each variable to be disambiguated, an inspection action unit is generated. The inspection action unit records the target topology-geographic anchor point, the type of mobile inspection terminal, the target sensor, the collection direction and time period, the observable evidence conditions, the distinguishable joint hypothesis unit pairs, the movement distance, the energy consumption and the data validity judgment conditions.

[0012] Furthermore, when the variable to be disambiguated is the state of the switch at the start of the fault event, an inspection action is generated to read the local action record of the switch and the operation record after the fault. Based on the expected on-site evidence, infrared inspection actions, ultraviolet inspection actions, acoustic inspection actions, and visible light inspection actions are generated respectively. The unit pair is denoted as distinguishable only when the expected evidence for both joint hypothetical units is observable and the expected evidence states are different in a single inspection action. The number of distinguishable unit pairs for each inspection action is compared step by step according to the retained units. When the quantities are all the same, select the inspection actions with shorter travel distances and lower energy consumption in sequence.

[0013] Furthermore, the evidence metadata includes the corresponding fault subtype, evidence necessity, persistence, minimum detectable features, effective detection range, and operating, environmental, and acquisition quality conditions. After the on-site inspection data passes the validity verification, candidate topologies that adopt the opposite switching state are deleted according to the equipment status record; the corresponding joint hypothesis unit is deleted only when the fault subtype, minimum detectable feature, effective detection range and all conditions defined by the evidence metadata are met and the necessary evidence is not detected. The remaining units are sorted in the order of obtaining consistent and valid evidence, not yet obtaining corresponding evidence, and not detecting non-continuous evidence; under the same field evidence conditions, they are sorted in ascending order of the number of nodes with inconsistent polarity, the number of nodes reaching the inverted relationship, the continuity deviation of branch node current, and the normalized distance of the measured voltage drop to the expected range.

[0014] Furthermore, when the remaining joint hypothesis unit corresponds to the only candidate topology and the only candidate fault segment, the length of the fault location range is not greater than the allowable length, the valid on-site evidence is consistent with the first ranked unit, and there is only one joint hypothesis unit left or the difference between the first ranked unit and the second ranked unit calculated according to the superiority or inferiority of the first different ranking index reaches the output threshold, it is determined that the location termination condition is met. After the fault is confirmed, the correspondence between switch communication delay, command and actual action, line section and inspection path, transient propagation time range, and fault type and on-site evidence are updated according to the confirmation results.

[0015] The present invention also provides a fault location system for intelligent inspection of power lines, including a fixed monitoring terminal, a switch status acquisition interface, a topology-geographic anchor database, a mobile inspection terminal, and a fault location processing device; Both the fixed monitoring terminal and the mobile inspection terminal are equipped with a time synchronization module that is synchronized with the same time base and a fixed delay calibration parameter area for the acquisition chain; the switch status acquisition interface acquires switch status, local actions, and time synchronization records; the mobile inspection terminal also includes a positioning module, a communication module, and a field evidence acquisition component, the field evidence acquisition component including at least one of the following: equipment status reading interface, visible light sensor, infrared sensor, ultraviolet sensor, or acoustic sensor; the topology-geographic anchor database stores line topology, fault location range, inspection path, sensing capability, evidence metadata, and propagation parameters; The fault location processing device is communicatively connected to each component, including a processor and a memory storing programs. The processor executes the program to generate candidate topologies and construct a joint hypothesis unit that binds candidate topologies, candidate fault sections, fault location ranges, candidate fault types, expected transient propagation relationships, and expected field evidence. It filters and sorts the candidates according to the measured propagation relationships and determines the target inspection action based on the differences in joint hypotheses and the ability to distinguish at each level. During discharge inspection, it controls two terminals to enter the same acquisition period and matches and corrects the field pulses and electrical pulses of the timestamp. It updates the candidate topologies and joint hypothesis units with valid field evidence and cycles until the line topology and location results at the time of the fault are output.

[0016] The beneficial effects of this invention are as follows: 1. This invention binds candidate topology, candidate fault segment, location range, fault type, expected transient propagation relationship and field evidence into a joint hypothesis unit, and sorts them by pulse polarity, arrival order, current continuity and voltage drop. It can retain candidate results with electrical interpretation when the switching state is unreliable, and avoid positioning deviation due to fixing the wrong topology too early.

[0017] 2. This invention compares and retains the differences between units and selects anchor points and sensing methods according to the step-by-step differentiation capability of the inspection action. Under the same differentiation capability, it compares the moving distance and energy consumption, thereby reducing the need for segment-by-segment scanning and repeated data collection along erroneous branches.

[0018] 3. This invention combines effective switch records, temperature, discharge and structural evidence reinjection with a set of hypotheses, and updates the topology and fault location at the time of the fault, forming a closed loop of electrical screening, differential inspection, evidence reinjection and candidate reconstruction.

[0019] 4. This invention combines non-volatile action recording, mechanism counting, current position, time synchronization, and post-fault operation recording to reconstruct the switch state at the time of the fault, reducing the impact of communication delay, message loss, and subsequent operations on topology recovery.

[0020] 5. Before re-irradiation, this invention verifies the acquisition range, signal quality, operating conditions, and recording consistency. Candidates with undetected results are deleted only when the applicable and detectable conditions of necessary evidence are met. For non-continuous evidence, only the order is adjusted to reduce the risk of false deletion and missed judgment. Attached Figure Description

[0021] The accompanying drawings, which are included to provide a further understanding of this application and form part of this application, illustrate exemplary embodiments and are used to explain this application, but do not constitute an undue limitation of this application. In the drawings: Figure 1 This is a flowchart illustrating the overall method of the present invention; Figure 2 This is a schematic diagram of the system structure and data interaction of the present invention; Figure 3 This is a schematic diagram of the topology-fault joint hypothesis data model and electrical evidence screening of the present invention; Figure 4 This is a schematic diagram of the differential-driven active inspection and on-site evidence reinjection closed loop of the present invention; Figure 5 This is a schematic diagram showing the corrected trigger waveforms of each trigger channel and the determination of false triggering of the M32 reflected pulse in Embodiment 3 of the present invention, as well as a partial magnified view. Figure 6 In Embodiment 3 of the present invention, the first valid pulses of M21, M31, and M22 occur on a unified event time axis. A schematic diagram showing the polarity and order of arrival; Figure 7 is a schematic diagram comparing the polarity of the first effective pulses of M21, M31, and M22 after they are aligned according to their respective arrival times in Embodiment 3 of the present invention. Figure 8 This is a schematic diagram of the transient current continuity back calculation of the B23 branch node in Embodiment 3 of the present invention; Figure 9 This is a schematic diagram showing the voltage drop waveforms of M21 and M31 in Embodiment 3 of the present invention, along with a partially enlarged view. Figure 10 This is a schematic diagram of the matching results between the A23 ultraviolet pulse and the M21 electrical transient pulse in Embodiment 3 of the present invention. Detailed Implementation

[0022] In this manual, the fault event start time refers to the earliest valid start time used to establish fault event versions and capture transient data on a unified timeline of each monitoring terminal. It is not equivalent to the physical arc initiation time of the fault point without propagation delay inversion, nor is it used alone for fault distance calculation. The fault event version refers to the data version that correlates the original waveform, pre-fault switch record, candidate topology, and subsequent evidence of the same dominant transient event. Temporally separate events with unrelated transient characteristics are established separately.

[0023] A state-uncertain switch refers to a switch whose state cannot be uniquely confirmed by state messages and electrical connectivity at the start of a fault event; a topology-fault joint hypothesis unit refers to a bundled candidate topology, candidate fault section, fault location range, candidate fault type, expected transient propagation relationship, and expected field evidence; a reserved unit refers to a joint hypothesis unit that has not been deleted by electrical hard constraints or valid field evidence; a variable to be disambiguated refers to the undetermined differences in topology, section, location range, or fault type among reserved units; and field evidence metadata refers to the fault subtype, necessity, persistence, minimum detectable feature, effective range, and applicable conditions corresponding to the evidence.

[0024] Example 1:

[0025] Please see Figure 1 , Figure 3 and Figure 4 This embodiment discloses in detail the method steps, underlying data structure, equations (1)-(3), threshold parameters, and judgment rules.

[0026] I. Unified Data Structure The collection line is modeled as a line diagram consisting of nodes and sections. Nodes include busbars, branches, switches, ring main units, box-type transformers, towers, cable joints, overhead-to-cable transition points, and line terminals, and record node type, adjacent sections, connecting switches, fixed monitoring terminals, and anchor point identifiers; sections record the nodes at both ends, type, length, rated parameters, allowable operating status, and calibrated transient propagation time range.

[0027] The topology-geographic anchor point establishes a mapping between electrical sections and field locations, and records node and adjacent section identifiers, geographic coordinates, inspection paths, reachable directions, available status reading interfaces or sensors, observable fault subtypes, as well as evidence necessity, persistence, minimum detectable features, effective range, operating / load / environment / acquisition quality conditions, and allowed deletion conditions.

[0028] All types of data are bound to the fault event version; the original waveform recording and the switch record before the fault remain unchanged after they are established, and the operation, inspection and maintenance results after the fault are written as subsequent evidence without overwriting the original records.

[0029] II. Fault Event Establishment The fixed monitoring terminal continuously collects three-phase voltage, three-phase current, bus zero-sequence voltage, and line branch zero-sequence current. Before commissioning, each acquisition channel determines a fixed acquisition delay through a synchronization calibration pulse. This fixed acquisition delay includes sensor delay, analog conditioning delay, analog-to-digital conversion delay, and local triggering algorithm delay.

[0030] When the bus zero-sequence voltage or the transient current of the line branch meets the trigger criteria in the threshold parameter table of this embodiment, the fixed monitoring terminal freezes the high sampling rate data before and after the fault.

[0031] Perform the same event verification on each trigger channel. The verification content includes sampling integrity and timing status, first pulse amplitude / duration / rising edge, normalized cross-correlation within the allowed time shift, adjacent pulse interval and polarity sequence; each criterion and related threshold are executed according to the threshold parameter table, and those that fail are not included in the calculation of formula (1).

[0032] The initial trigger channel set is composed of the bus zero-sequence voltage trigger channel and the transient current trigger channel verified by the same event. The original trigger time of each channel is reduced by the corresponding fixed acquisition delay, and channels with delayed triggering or those that misidentify reflected pulses as the first valid pulse are eliminated according to the consistency time window. The fault event start time is determined according to the following formula:

[0033] In the formula, This is the initial set of trigger channels that have passed the same event verification. This is the set of valid trigger channels after being filtered through a consistency time window; and All are trigger channel numbers; For the first Each trigger channel records the original trigger time, in seconds; For the first Each trigger channel records the original trigger time, in seconds; For the first The fixed acquisition delay for each trigger channel, in seconds; For the first The fixed acquisition delay of each trigger channel, in seconds; med represents the median value of the corrected trigger time for each channel. This is a consistency time window, measured in seconds. The time of the fault event is in seconds; min indicates the earliest correction trigger time selected from the set of valid trigger channels; the symbol "|·|" represents the absolute value of the time difference.

[0034] When the number of correction trigger moments involved in the median calculation is even, the median value is taken as the arithmetic mean of the two middle correction trigger moments after being sorted by time.

[0035] The consistency time window is determined according to the acquisition rules in the threshold parameter table of this embodiment.

[0036] A fault event version is automatically created only if the bus zero-sequence voltage trigger channel and at least two transient current trigger channels are retained in the set of valid trigger channels. If this condition is not met, the fault event is marked as pending data supplementation, and the candidate topology is not automatically deleted.

[0037] After determining the start time of the fault event, the relative arrival time of each monitoring channel is obtained by subtracting the start time of the fault event from the channel correction trigger time. Subsequent calculations only use the sequential relationship between the relative arrival times, and do not directly substitute the start time of the fault event into the fault distance calculation.

[0038] III. Candidate Topology Generation The system includes information on the last confirmed status of each switch, the time of receiving the master station status message, the time of recording the status on the device side, the time of issuing the control command, the return result of the control command, the local action record of the switch, and the upper limit of the communication delay.

[0039] When the status message only contains the master station's reception time, the upper limit of the communication delay is traced back from the master station's reception time to form the possible effective period of the status. When the status message contains the device-side status recording time, the device-side status recording time is extended according to the upper limit of the device clock error to form the possible effective period of the status.

[0040] Switches whose status may be effective during periods including the start time and tolerance of the fault event, inconsistent control commands and returned status, missing status messages within the update cycle, or inconsistent recorded status with the connectivity relationship before the fault or the energized status of adjacent sections are identified as status uncertain switches.

[0041] Keeping the switches with confirmed states unchanged, only setting the on and off states for switches with uncertain states generates switch state combinations. For each state combination, check the on / off interlocking relationship, power supply connection relationship, bus energization status, conditions prohibiting parallel operation, and maintenance interlocking conditions. Delete state combinations that violate line operation constraints, and convert the remaining state combinations into candidate topologies.

[0042] Each candidate topology is assigned a unique topology version identifier. The candidate fault section, expected transient propagation relationship, expected on-site evidence, and subsequent inspection evidence are all bound to the topology version identifier.

[0043] IV. Joint Hypothesis Data Structure and Expected Quantity Generation In each candidate topology, the line segments that are electrically connected and can form a path for the propagation of fault current are identified as candidate fault segments by traversing outward from the energized bus along the conducting line.

[0044] Adjacent topological-geographic anchor points are used as the boundaries of the candidate fault location range. For line sections where the distance between two adjacent anchor points exceeds the allowable inspection length, the sections are further divided according to poles, cable joints, or line terminals, so that each candidate fault location range corresponds to a clear on-site inspection entry point.

[0045] Based on the equipment type of the candidate section, establish the fault type: abnormal contact resistance, insulation surface discharge or breakdown corresponding to cable joints and terminals; broken conductor strands, loose hardware, damaged insulators or surface discharge corresponding to overhead lines; overheating, discharge or connection damage corresponding to box-type transformers and ring main units; uncertain status or abnormal mechanism corresponding to branch and tie switches.

[0046] The expected transient propagation relationship is generated using a distributed parameter line model calibrated with field propagation data. Model inputs include candidate topology, line segment length, type, propagation velocity, attenuation coefficient, and equivalent surge impedance, power supply equivalent impedance and grounding method, sensor installation direction and fixed acquisition delay, discrete points of candidate fault locations, and fault resistance, initial phase angle, and duration range corresponding to the candidate fault type. When complete unit length parameters are missing, the propagation velocity, attenuation coefficient, and equivalent surge impedance obtained from pre-commissioning synchronization pulse tests are used to replace the uncalibrated nominal values.

[0047] During the pre-commissioning synchronization pulse calibration, a synchronization calibration pulse is injected at one end of the line section to be calibrated, and the first incident pulse and reflected pulse are recorded at both ends of the section. The propagation speed is taken as the ratio of the known section length to the time difference between the arrival of the first wave at both ends; the attenuation coefficient is taken as the natural logarithm of the ratio of the amplitude of the first wave at the injected end to the amplitude of the first wave at the far end, divided by the section length; under the calibration wiring with known terminal impedance, the ratio of the corrected reflected wave amplitude to the incident wave amplitude is used as the reflection coefficient, and the equivalent wave impedance is calculated according to the transmission line reflection relationship. Each line section is calibrated at least ten times, and the median value of each parameter is used as the nominal value, forming a parameter range from the minimum to the maximum value.

[0048] For each fault location and fault parameter combination, the model calculates the propagation, reflection, and transmission of transient traveling waves in each line segment, based on the current continuity condition at the nodes according to the candidate topology. Using the same filtering, sampling, and first effective pulse extraction rules as the fixed monitoring terminal, the model obtains the polarity, arrival time, voltage drop, and branch current direction of each monitoring node. The spacing between discrete fault location points is no greater than one-tenth of the length of the corresponding location range and no greater than five meters.

[0049] The polarity of all valid calculated operating conditions constitutes the set of permissible polarities, with the polarity of the operating condition at the midpoint of the location range and the median of the fault parameter interval being the preferred polarity; the node pair is retained only when the arrival order of all operating conditions is consistent and the minimum time difference is greater than the arrival order judgment tolerance; the minimum and maximum values ​​of the voltage drop for each operating condition are expanded by the measurement uncertainty to form the expected voltage drop range; the branch current direction is a hard constraint when it is consistent across all operating conditions, otherwise only a set of permissible directions is formed.

[0050] For each candidate topology, candidate segment, and fault type combination, record the allowed / preferred polarity of the first pulse of the monitoring node, the stable arrival sequence, the direction of the branch transient current, the expected voltage drop range, the expected field evidence of the corresponding anchor point, and its current observability.

[0051] The arrival order determination tolerance is determined according to the threshold parameter table in this embodiment; only when the arrival order of all calculated working conditions is consistent and the minimum time difference is greater than the tolerance, the corresponding node pairs are used for sorting. Node pairs whose measured corrected arrival time difference is not greater than the tolerance are not included in the sorting.

[0052] A candidate topology, a candidate fault segment, a fault location range, a candidate fault type, the corresponding expected transient propagation relationship, and expected on-site evidence are bound together as a topology-fault joint hypothesis unit. Each topology-fault joint hypothesis unit is assigned a unique unit identifier.

[0053] V. Electrical Hard Constraints First, perform electrical hard constraint screening. Only if, after taking into account sensor orientation error, timing error, line propagation time range, and measurement error, the measured data still conflicts with all the allowable results of a joint assumption unit, will that joint assumption unit be deleted.

[0054] The corresponding unit will be deleted if any of the following conflicts occur: the measured polarity of the first pulse does not belong to the allowed set; the measured arrival sequence exceeds the allowed propagation relationship; the branch current forms an impossible inflow / outflow relationship; the section of the candidate topology that is determined to be de-energized shows a live response that exceeds the upper limit of coupling and error; or the candidate topology requires the switch to be turned on, but the voltage and current before the fault indicate that the two sides are not connected.

[0055] For the calculation of the continuity of current at branch nodes, the data from each channel is first deducted from the fixed acquisition delay, converted to a unified positive inflow and outflow direction according to the sensor installation direction, and shifted to the same node time axis by the median propagation time from each channel to the branch node. When the sampling rates are inconsistent, the data is resampled to the common sampling time. Data that cannot cover the common first effective pulse time window is not included in the common branch node set.

[0056] For the joint assumption cell that has not triggered the hard deletion condition, a sorting vector is formed according to polarity preference, arrival order, branch node current continuity, and voltage drop deviation:

[0057] In the formula, For the first The sorting vector of the topology-fault joint hypothesis unit; The number of effective monitoring nodes with inconsistent polarity, dimensionless; The number of valid node pairs whose arrival order is reversed is dimensionless; The normalized branch node current continuity deviation is dimensionless. The normalized voltage drop deviation is dimensionless. The unit number is the joint topology-fault hypothesis cell number. It is a set of common monitoring nodes that have valid first pulse polarity data; and All are monitoring node serial numbers; This represents an indicator function; it takes the value 1 if the condition within the parentheses is true, and 0 otherwise. For the first The measured polarity of the first effective pulse at each monitoring node, with positive polarity denoted as 1 and negative polarity as -1, dimensionless; For the first The first joint hypothesis unit corresponding to the first The preferred polarity of the first effective pulse at each monitoring node is dimensionless. The set of common monitoring node pairs for which each retained joint hypothesis unit can provide an expected order relationship that does not change with the candidate position, and the absolute value of the measured corrected arrival time difference is greater than the arrival order determination tolerance; and The first The monitoring node and the first The corrected arrival time of each monitoring node relative to the start time of the fault event, in seconds; sgn represents the sign function; For the first In the joint hypothesis unit, the first The monitoring node is relative to the first The expected arrival sequence identifier for each monitoring node, with a value of -1 or 1, is dimensionless.

[0058] A common set of branch nodes with complete inflow and outflow transient current data; | represents the number of nodes in the set of common branch nodes, dimensionless; The branch node number; For the first The first effective pulse time window corresponding to each branch node; The sampling time within the first valid pulse time window, in seconds; For the first Each branch node at the sampling time The transient current flowing in, measured in amperes; For the first Under the candidate topology, the first The set of valid outflow paths for each branch node; The valid outgoing line number; For the first The effective outflow lines at the sampling time The outflow transient current, measured in amperes; For the first The rated reference current of each branch node, in amperes.

[0059] A common voltage observation set with effective voltage dip data; | represents the number of observations in the common voltage observation set, which is dimensionless; This is the voltage observation sequence number; For the first The measured voltage drop at each voltage observation location, in volts; For the first The first joint hypothesis unit corresponding to the first The expected voltage drop at each voltage observation location, in volts; For the first The rated reference voltage at each voltage observation location, in volts; max represents the maximum absolute current imbalance selected within the first effective pulse time window; the symbol "|·|" indicates the number of elements in the set when used for sets, and the absolute value when used for numerical values.

[0060] To unify the definition of Equation (2) with the expected voltage drop interval, for the i-th joint assumption unit and the q-th voltage observation position, the expected voltage drop value in the equation is taken as the value closest to the measured value within the corresponding expected interval: the measured value is taken when the measured value is within the interval, the lower limit of the interval is taken when it is below the lower limit of the interval, and the upper limit of the interval is taken when it is above the upper limit of the interval. Therefore, the fourth term of Equation (2) represents the normalized distance from the measured voltage drop to the expected voltage drop interval.

[0061] The first and second terms of equation (2) are both dimensionless counts; the third term is divided by amperes, and the fourth term is divided by volts, so there is no dimensional mixing among the four ordering terms.

[0062] The sorting process does not use a weighted sum of the four sorting items, but instead employs a step-by-step comparison. First, the first item is compared, and the joint assumption unit with the smaller first item is ranked first. If the first items are the same, the second item is compared; if the first two items are the same, the third item is compared; if the first three items are the same, the fourth item is compared.

[0063] When the common branch node set is empty, the third item is not included in this sorting; when the common voltage observation set is empty, the fourth item is not included in this sorting; missing sorting items are not set to zero.

[0064] VI. Data Structure for Undisambiguated Variables and Inspection Actions The comparison retains the variables to be eliminated, including switches with different states, branch nodes corresponding to candidate sections, cable joints / towers / box transformers / line terminals corresponding to location ranges, and temperature, discharge or structural evidence corresponding to different fault types.

[0065] For each variable to be disambiguated, an inspection action unit is generated. The inspection action unit records the target topology-geographic anchor point, mobile inspection terminal type, target sensor, acquisition direction, acquisition time period, observable evidence conditions, distinguishable joint hypothesis unit pairs, travel distance, expected energy consumption, and inspection data validity judgment conditions.

[0066] When the variable to be disambiguated is in a switch state, an inspection action is generated to read the switch non-volatile action record, mechanism action count, current position indication, post-fault operation record, and switch controller time calibration record. The local action completion time is extended into a time interval according to the upper limit of the controller clock error; only when the upper limit of this interval is earlier than the lower limit of the interval determined by the fault event start time, and no switch operation occurs thereafter, is the fault time state reconstructed using the records.

[0067] When the expected on-site evidence is temperature anomaly, an infrared inspection action will only be generated if the target connection point and the reference connection point are in comparable load conditions and the temperature anomaly is still observable within the expected inspection arrival time.

[0068] When the expected on-site evidence is a discharge pulse, an ultraviolet inspection or acoustic inspection action is generated only if the target line remains energized, on-site operation permits are valid, and environmental conditions meet the sensor acquisition requirements. During the execution of this action, the fault location processing device simultaneously controls the corresponding fixed monitoring terminal to enter a synchronous inspection and acquisition period. The on-site discharge pulse acquired by the mobile inspection terminal is matched with the electrical transient pulse acquired by the fixed monitoring terminal within the same acquisition period. The discharge pulse obtained at the inspection moment is not directly time-matched with the initial fault pulse that occurred several minutes earlier.

[0069] The fixed monitoring terminal and the mobile inspection terminal use the unified time reference mark described in Example 2 to collect data; the time synchronization status, the upper limit of clock error and the most recent time synchronization record are returned with the data, and microsecond-level correspondence is not performed when the expected error exceeds the pulse matching allowable value.

[0070] Before commissioning, the ultraviolet or acoustic acquisition chain of the mobile inspection terminal uses standard optical or acoustic pulses triggered by the same source and electrical calibration pulses to measure the fixed delay from the physical pulse input to the local timestamp output; after replacing the sensor, conditioning circuit, analog-to-digital conversion circuit, or pulse extraction program, it is recalibrated. The on-site pulse correction time is obtained by subtracting the fixed delay from the local timestamp.

[0071] The overall time uncertainty is determined according to the threshold parameter table in this embodiment. For each field pulse, electrical pulses are searched only within the window after the uncertainty expansion of the expected propagation time interval from the candidate anchor point to the fixed monitoring node, and one-to-one matching with the smallest correction time difference residual is used; the same electrical pulse must not be matched repeatedly. If the residual difference between two candidate pulses is not greater than the overall time uncertainty, it is marked as a matching ambiguity and is not included in the number of valid corresponding pulses.

[0072] When the line is de-energized or the operation permit does not allow live inspection, instead of generating ultraviolet inspection or acoustic inspection actions that rely on continuous discharge, generate equipment status reading, visible light structure inspection, or other inspection actions that can obtain continuous physical evidence.

[0073] When the expected on-site evidence is structural anomaly, a visible light inspection action is generated, and the acquisition distance, image resolution, and acquisition direction are determined based on the size of the target component and the smallest defect to be identified.

[0074] VII. Ability to differentiate inspection actions The retained joint hypothesis units are numbered sequentially according to the sorting result of equation (2). For each candidate inspection action, it is determined whether each joint hypothesis unit can obtain valid expected evidence under the current operating conditions and environmental conditions.

[0075] The ability to differentiate candidate inspection actions step by step is determined by the following formula:

[0076] In the formula, For the first The distinguishing vector of each candidate inspection action; The candidate inspection action number; The number of units that retain the topology-fault joint hypothesis, dimensionless; For the first The candidate inspection action can be ranked as number one. The number of units that can be distinguished from subsequent units of joint hypothesis is dimensionless; Sort the joint hypothesis unit currently being compared by the sequence number; To sort in the th order The joint hypothesis unit number following the position; For the first The candidate inspection actions are ranked according to the order. The observable indicator of evidence for the joint hypothesis unit takes a value of 1 when valid expected evidence can be obtained under the current operating and environmental conditions, and a value of 0 otherwise. It is dimensionless. For the first The candidate inspection actions are ranked according to the order. The observable evidence for the unit of the joint hypothesis is dimensionless. For the first The candidate inspection action is ranked as follows: The expected category of on-site evidence under the joint assumption unit is dimensionless. For the first The candidate inspection action is ranked as follows: The expected on-site evidence category under the joint hypothesis unit is dimensionless; I represents the indicative function, which takes the value of 1 when the two expected on-site evidence categories are different and takes the value of 0 when they are the same.

[0077] The expected on-site evidence category in Equation (3) adopts the expected evidence state coding. The expected evidence state is jointly determined by the evidence type, target object, spatial location, detection direction or numerical range and expected detection state. Even if the same type of sensor is used, as long as the above evidence states are different and both joint hypothetical units can be observed, the corresponding unit pair is still recorded as distinguishable.

[0078] If an inspection action cannot produce valid observable results for two joint hypothesis units under the current conditions, then the two joint hypothesis units are not included in the distinction count of the inspection action.

[0079] When comparing the distinguishing vectors of different candidate inspection actions, the first item is compared first, with the inspection action having the larger value taking precedence. If the first item is the same, the second item is compared, and so on for subsequent items. If all distinguishing items are the same, the inspection action with the shorter travel distance is selected first; if the travel distance is still the same, the inspection action with the lower expected energy consumption is selected.

[0080] Travel distance is uniformly expressed in meters, and expected energy consumption is uniformly expressed in watt-hours. The two are not directly weighted and added together.

[0081] When only one joint hypothesis unit remains, Equation (3) is no longer calculated, and the location termination condition is directly determined. When the discrimination vectors of all candidate inspection actions are zero, the inspection actions are first expanded to the adjacent topological-geographic anchor points to regenerate; if they still cannot be distinguished after expansion, the joint hypothesis units that have not been eliminated and the evidence to be supplemented are output, and the unique fault location is not output.

[0082] VIII. Inspection Data Validity and Threshold Parameter Table The fault location processing device sends the action number, target anchor point identifier, inspection path, target sensor, data collection direction, data collection period, and validity judgment conditions to the mobile inspection terminal.

[0083] Once the mobile inspection terminal reaches the target anchor point, it verifies the geographical location, device tag, and anchor point image features. If all three match, the target sensor is activated.

[0084] Visible light data verification ensures the target device is fully visible, the inspected component is unobstructed, the spatial resolution is sufficient to identify the preset minimum defect, and the clarity reaches the calibrated lower limit.

[0085] Infrared data verification shows that the target and reference connection point are under comparable loads, the line current difference does not exceed the comparable load threshold, the emissivity parameters match the material, and there is no interference from reflected heat sources.

[0086] The UV / acoustic data verification requires the target area to be completely within the acquisition range, the number of pulses to exceed the background limit, the correction timestamp to meet the expected propagation interval and the one-to-one matching rule; the acoustic data must also meet the signal-to-noise ratio and direction of arrival conditions.

[0087] The switch status data verifies the action time and direction, controller time calibration and error, mechanism count, consistency between the current position and the last action, and confirms that there are no unrecorded operations from the start time of the event to the reading time.

[0088] When on-site inspection data fails validity verification, the data is not used to delete or adjust the joint hypothesis unit. Instead, the acquisition location, acquisition direction, acquisition time period, or target sensor is changed and the data is reacquired.

[0089] The thresholds, tolerances, allowable lengths, and their update conditions mentioned in this specification are listed in the table below; Example 3 only lists the values ​​taken this time and the back-calculation results.

[0090]

[0091] IX. Rules for Updating On-Site Evidence Each joint hypothesis unit records the evidence metadata and status at the site. First, it performs hard deletion of switch status and necessary evidence, and then sorts the evidence by a composite sorting method based on the site evidence status and electrical sorting vector.

[0092] When the effective switch local record can reconstruct the state at the start of the event, delete the opposite topology and all its joint hypothesis units; when valid evidence consistent with the fault subtype is detected, mark the corresponding unit as having obtained consistent valid evidence.

[0093] If a defect in a certain anchor point is detected in a positive test and other candidate fault types cannot be ruled out, other anchor point units will not be deleted accordingly.

[0094] Only when the fault subtype, necessity, minimum detectable feature, effective range and operating, environmental and quality conditions in the evidence metadata are all met, will the corresponding unit be deleted if necessary evidence is not detected; if non-continuous evidence is not detected, it will only be marked and its ranking will be reduced, and the ranking will continue to follow formula (2) under the same evidence status.

[0095] 10. Termination of Location and Model Update After the evidence update is completed, if the remaining unit corresponds to a unique topology and fault segment, the location range is not greater than the allowable length, the valid on-site evidence is consistent with the first unit, and there is only one unit remaining, or the difference between the first and second units on the first different indicator reaches the output threshold, then the positioning is terminated. The allowable length and the output threshold are determined according to the threshold parameter table of this embodiment, and the difference is calculated according to the superiority or inferiority of the corresponding indicator.

[0096] The fault location results include the event start time, fault topology, line branches and sections, location range or anchor point, fault type, electrical and on-site evidence, and the basis for selecting inspection actions.

[0097] After maintenance confirmation, the system updates communication delay, the correspondence between control commands and actual actions, the mapping between sections and inspection paths, the transient propagation range, and the relationship between fault type and on-site evidence; unconfirmed automatic results are only saved in the event log.

[0098] Example 2:

[0099] This embodiment uses the fault event data structure, topology-fault joint hypothesis unit, inspection action unit, threshold parameter table and equations (1)-(3) established in embodiment 1. The following only combines the fault event data structure, topology-fault joint hypothesis unit, inspection action unit, threshold parameter table and equations (1)-(3) established in embodiment 1. Figure 2 Describe the hardware components, interfaces, connections, data flow, and deployment methods used to execute the method.

[0100] I. Hardware Components and Deployment The system includes fixed monitoring terminals, switch status acquisition interfaces, a topology-geographic anchor database, mobile inspection terminals, and fault location processing devices. Fixed monitoring terminals are deployed at the substation busbars, branch heads, important branch nodes, or line terminals, and include voltage / current acquisition, conditioning, analog-to-digital conversion, transient processing, timing, calibration parameters, cyclic storage, and communication units. Mobile inspection terminals include air and ground terminals, configured with positioning, timing, communication, path execution, status reading, and visible light, infrared, ultraviolet, or acoustic sensors. The fault location processing device is deployed on a station-side edge computing device or server, and includes a processor, memory, and communication interface.

[0101] II. Interfaces and Connection Relationships Fixed monitoring terminals connect to the fault location and processing device via wired or wireless communication interfaces; station-side switch status interfaces connect to the monitoring master station, protection and control devices, and switch controllers respectively, while the field status reading interface is read-only connected to the switch controller maintenance port; the fault location and processing device is bidirectionally connected to the topology-geographic anchor database and communicates bidirectionally with the mobile inspection terminal. Fixed monitoring terminals and mobile inspection terminals are connected to the same satellite time synchronization or station-side precision clock, and the delay calibration parameters of the fixed acquisition channel and the ultraviolet / acoustic acquisition chain are stored in their respective calibration parameter areas.

[0102] III. Data Flow The fixed monitoring terminal uploads a fault data packet containing terminal / node identifier, sensor direction, sampling rate, original trigger time, calibration parameters, timing status, and transient data; the switch status interface uploads status messages, local actions, and timing records; the fault location processing device reads the line topology, propagation parameters, anchor points, inspection paths, and sensing capabilities from the database, and sends the action number, target anchor point, path, sensor, direction, and time period to the mobile inspection terminal; the mobile inspection terminal returns on-site data, calibration timestamp, location, direction, operating environment, and self-test results; after maintenance confirmation, the processing device writes the confirmation data back to the database. The processor calls the program in memory to execute the method described in Example 1, without repeating the algorithm steps in this example.

[0103] Example 3:

[0104] This embodiment adopts the system deployment method described in Embodiment 2, and uses the data structure, threshold parameter table, judgment rules and equations (1)-(3) of Embodiment 1. The following only gives the input data, necessary intermediate quantities, calculation results and maintenance confirmation results of the 35 kV mountain wind farm fault event.

[0105] I. Specific route and data acquisition configuration The line includes three branches, with a total length of 21.6 kilometers, of which 14.2 kilometers are overhead lines and 7.4 kilometers are cable lines; it is equipped with 12 box-type transformers, three branch switches, tie switch K23, two ring main units, 36 poles, eight cable joints and two overhead-to-cable conversion points.

[0106] The second and third line branches are connected by a tie switch K23. Under normal operating conditions, tie switch K23 is in the open state; when the second line branch is used for power transfer, tie switch K23 is allowed to close.

[0107] A zero-sequence voltage monitoring channel U0 is set up on the busbar of the substation. A fixed monitoring terminal M21 is set up at the beginning of the second line branch and a fixed monitoring terminal M22 is set up at the end of the second line branch. A fixed monitoring terminal M31 is set up at the beginning of the third line branch and a fixed monitoring terminal M32 is set up at the end of the third line branch.

[0108] Each fixed monitoring terminal samples at five million sampling points per second; the minimum transient propagation speed is 170 meters per microsecond. The propagation speed, attenuation coefficient, and equivalent wave impedance are calibrated by the synchronization pulse before commissioning and updated after maintenance confirmation. The parameters remain unchanged after the establishment of this event version.

[0109] Anchor points were established at K23, A23, J24, and P32. This was to provide early warning of intermittent grounding transients that did not trip; the line remained energized, and non-contact ultraviolet and visible light inspections were permitted.

[0110] II. Recalculating the start time of the event Following the rules for obtaining the consistency time window in the threshold parameter table of Example 1, substituting the longest electrical path of 21.6 km, the lowest transient propagation speed of 170 m / µs, the upper limit of timing error of 2 µs, and the upper limit of first pulse extraction jitter of 20 µs, we obtain 127.1 µs + 2 µs + 20 µs = 149.1 µs. This time, we select the consistency time window. The acquisition delay is 150 microseconds. The fixed acquisition delay for each channel is obtained through pre-event synchronous calibration.

[0111] The input data for equation (1) for each trigger channel are as follows:

[0112] The median of the five correction trigger times is 10 hours, 14 minutes, 28.316321 seconds.

[0113] The deviations of U0, M21, M31 and M22 from the median value are 43 microseconds, 61 microseconds, 0 microseconds and 33 microseconds respectively, none of which are greater than 150 microseconds.

[0114] The deviation of M32 from the median value is 299 microseconds, which is greater than 150 microseconds; its original first pulse did not meet the effective triggering condition, and the subsequent reflected pulse was identified as a trigger pulse by the local algorithm. Therefore, M32 does not enter the set of effective triggering channels.

[0115] Substituting U0, M21, M31, and M22 into equation (1), we obtain the start time of the fault event. The earliest correction trigger time in the effective channel is 10 hours, 14 minutes, 28.316260 seconds corresponding to M21.

[0116] Based on this time, the relative arrival times of M21, M31 and M22 are 0 microseconds, 61 microseconds and 94 microseconds respectively, and the relative start time of U0 is 18 microseconds.

[0117] Figure 5 The above-mentioned effective trigger waveform and M32 false trigger results are shown. The lower part is a partial enlarged view of the area in the upper box. The M32 reflected pulse is 360 microseconds relative to the event start time, and the deviation from the median value of the five corrected trigger times is 299 microseconds.

[0118] III. Generating Candidate Topologies Before the fault, the master station sent a closing command to K23, but no confirmation was received before the start time of the fault event. The closing status message arrived at 10:14:29.636000. Considering the upper limit of communication delay, the fault status at the time of the fault cannot be confirmed by the master station time.

[0119] Set K23 as a state-determined switch, and keep the other switches unchanged; both the closed and open combinations satisfy the operating constraints, forming candidate topologies T_C (K23 closed) and T_O (K23 open).

[0120] IV. Generate joint hypotheses and perform hard constraint screening Following step four of Example 1, candidate fault segments and candidate fault types are generated under T_C and T_O, initially forming six topology-fault joint hypothesis units.

[0121] One of the joint assumption units required that the first valid pulse of M21 could only be negative, but the first valid pulse of M21 was measured to be positive, and the sensor direction and channel polarity both passed the self-test. Therefore, this joint assumption unit was deleted.

[0122] Another joint assumption unit identified the section where M22 was located as the section that was de-energized at the time of the fault, but M22 detected a post-fault voltage response of 2.9 kV. The upper limit of capacitive coupling and measurement error during fault-free operation of this section is 0.3 kV, therefore this joint assumption unit was removed.

[0123] After hard constraint screening, four joint hypothesis units are retained: H1: Candidate topology T_C, tie switch K23 closed; candidate fault section is the cable terminal section where switching point A23 is located; candidate fault type is surface discharge of cable terminal insulation.

[0124] H2: Candidate topology T_O, tie switch K23 is open; candidate fault section is the cable terminal section where switching point A23 is located; candidate fault type is surface discharge of cable terminal insulation.

[0125] H3: Candidate topology T_C, tie switch K23 closed; candidate fault section is the overhead line section where tower P32 is located; candidate fault type is visible external structural damage to insulator assembly, the damage is limited to cracks on the outer surface of the insulator with a width of not less than two millimeters, missing skirts, or loose exposed hardware.

[0126] H4: Candidate topology T_O, tie switch K23 is open; candidate fault section is the section where cable joint J24 is located; candidate fault type is abnormal joint contact resistance.

[0127] According to the distributed parameter line model of Example 1, 13 fault location points are set at 3-meter intervals within an 18-meter range before and after A23. The fault resistances are 80 ohms, 150 ohms and 300 ohms, the initial phase angles of the faults are 30 degrees, 60 degrees and 90 degrees, and the equivalent discharge pulse duration is 1.2 microseconds. 117 calculation conditions are formed under T_C and T_O respectively.

[0128] For all calculation cases in H1, the initial polarities of M21, M31, and M22 are positive, positive, and negative, respectively, with M21 preceding M31 and M31 preceding M22. The minimum adjacent time differences are 41 microseconds and 18 microseconds, respectively, and the expected voltage drop ranges for M21 and M31 are 4.4–4.6 kV and 2.9–3.1 kV, respectively. For all calculation cases in H2, the polarities are the same, with M31 preceding M21 and M22. The minimum time differences are 17 microseconds and 20 microseconds, respectively, corresponding to voltage drop ranges of 3.5–3.7 kV and 2.7–2.9 kV. All of the above minimum time differences are greater than the arrival order determination tolerance of 6 microseconds.

[0129] Using the same model and their respective fault parameter ranges, the expected voltage drop range for H3 at M21 and M31 is 3.9–4.1 kV, and the corresponding range for H4 is 4.1–4.3 kV and 3.1–3.5 kV. The expected field evidence for H1 to H4 is determined by the anchor point evidence metadata.

[0130] V. Calculate the sorting vector According to step five and formula (2) of Example 1, the common polarity nodes are M21, M31 and M22, and the measured polarity of the first pulse is (positive, positive, negative); the first sorting term of H1, H2 and H3 is 0, and H4 is measured as negative because M22 is preferred to be positive, so the first sorting term is 1. The common sequence node pairs are (M21, M31) and (M31, M22), and the measured order is M21 before M31 and M31 before M22. Figure 6 The upper part shows the polarity of the first pulse and the order of arrival on the unified event timeline. Figure 7 The polarity comparison is shown after alignment according to their respective arrival times.

[0131] The expected order and number of inversions are as follows: H1, M21 precedes M31, M31 precedes M22, and the number of inversions is zero; H2, M31 precedes both M21 and M22, and the number of inversions is one; H3, M21 precedes M31 and M22 precedes M31, and the number of inversions is one; H4, M21 precedes M31, M31 precedes M22, and the number of inversions is zero.

[0132] The common branch node used for current continuity assessment is B23, with a rated reference current of 600 amperes. Within the first effective pulse time window, the inflow transient current is 285 amperes, the outflow transient current from the main line is 243 amperes, and the transient current from the tie branch is 24 amperes.

[0133] exist The effective outflow lines include the main line and the connecting branch, and the maximum current imbalance is 18 amperes. The third term of equation (2) is 18 / 600 = 0.0300.

[0134] exist Below, the effective outflow line does not include the connecting branch, the maximum current imbalance is 42 amperes, and the third term of equation (2) is 42 / 600 = 0.0700.

[0135] The transient current of 24 amps in the connecting branch is less than the 36 amps threshold for the live response of the power-off section in the threshold parameter table, therefore... No hard delete is triggered.

[0136] Figure 8 The current continuity calculation under T_C is shown: the sum of the outflow currents of the main line and the connecting branch is 267 amps, and the difference between this and the inflow current of 285 amps is 18 amps; the lower part is a partial enlarged view of the area in the upper box.

[0137] The common observation locations used for voltage dip assessment are M21 and M31, both with rated phase voltages of 20.2 kV. The measured voltage dip values ​​for M21 and M31 are 4.8 kV and 3.2 kV, respectively.

[0138] Figure 9The voltage data for M21 and M31 are shown: the phase voltages before the fault were both 20.2 kV, and the stable values ​​after the fault were approximately 15.4 kV and 17.0 kV, respectively, corresponding to a drop of 4.8 kV and 3.2 kV; the lower part is a partial magnified view of the amplified results of the same source data from 0.90 ms to 1.15 ms.

[0139] The expected voltage drop range for each joint assumption unit and the average normalized distance from the measured value to the range are as follows:

[0140] Substituting the above inputs and the expected voltage drop ranges listed in the table below into equation (2), we obtain the following sorting vector: The sorting vector for H1 is (0, 0, 0.0300, 0.0074). The sorting vector for H3 is (0, 1, 0.0300, 0.0347). The sort vector for H2 is (0, 1, 0.0700, 0.0347). The sort vector for H4 is (1, 0, 0.0700, 0.0124).

[0141] According to the step-by-step comparison rules specified in Example 1, the sorting results are H1, H3, H2, and H4.

[0142] VI. Select the first inspection action The candidate actions are A1 (reading the non-volatile record of K23), A2 (UV inspection of A23 and simultaneous acquisition of M21), and A3 (visible light structural inspection of P32). The expected evidence for A1 is to distinguish whether K23 was closed / open at the time of the fault; the expected evidence for A2 is to distinguish whether there is a discharge pulse corresponding to the electrical pulse in A23; and the expected evidence for A3 is to distinguish whether there is external visible structural damage of at least 2 mm in width in P32. All three pieces of evidence are observable under the current conditions.

[0143] Substituting the expected evidence state into equation (3), the discrimination vectors of A1, A2 and A3 are (2, 2, 0), (2, 1, 1) and (1, 2, 0) respectively. After comparing them step by step, A1 is selected.

[0144] VII. Feedback of evidence regarding switch status At 10:18:42, the ground mobile inspection terminal read K23: the closing completion time was 10:14:28.036020 seconds, the controller time synchronization was effective and the error was ±2 milliseconds, the extended upper limit of the closing completion time was still more than 278 milliseconds earlier than the lower limit of the fault event start time; the mechanism count increased by 1 time, the current position was closed, and there were no other opening and closing records during the period.

[0145] According to the switch state validity rule of Example 1, the above records are consistent with each other, confirming that K23 is closed at the time of the fault. T_O and H2, H4 are deleted, while H1 and H3 are retained.

[0146] VIII. Collection of Discharge Evidence and Second Action Substituting H1 and H3 back into equation (3), the distinguishing vectors for A2 and A3 are both (1); the path and energy consumption to A23 are 1200 meters and 36 watt-hours, which are lower than the 3800 meters and 74 watt-hours to P32, so A2 is chosen.

[0147] The mobile aerial inspection terminal arrived at switch point A23 at 10:26:10. The fault location and processing device simultaneously controlled the fixed monitoring terminal M21 to enter the twenty-second synchronous inspection and data collection period.

[0148] The upper limit of clock error for both the fixed and mobile ends in this synchronous acquisition is 1 microsecond. The delay calibration errors of M21 and the ultraviolet acquisition chain are 0.5 microseconds and 0.8 microseconds, respectively, and the half-sampling periods are 0.1 microseconds and 0.5 microseconds, respectively. According to the rules of the threshold parameter table, the overall time uncertainty is 3.9 microseconds, and the expected propagation time range from A23 to M21 is 17 microseconds to 24 microseconds.

[0149] According to the threshold parameter table in Example 1, the effective ultraviolet pulse threshold is determined by 30 background windows; the maximum background value is 3 / 20 seconds, and the threshold is 4 / 20 seconds, resulting in 14 ultraviolet pulses in the target area.

[0150] Of the 14 ultraviolet pulses, 11 were unambiguously matched one-to-one with the M21 electrical pulse according to the correction timestamp, extended window and minimum residual rule, with propagation time differences ranging from 18.4 microseconds to 22.7 microseconds, all within the expected range of 17 microseconds to 24 microseconds; the remaining 3 were not included. Figure 10 The matching results are shown in sequence numbers 1 to 14, and the overall time uncertainty of 3.9 microseconds and the number of valid matches of 11 / 14 are marked on the same figure.

[0151] The target terminal is fully visible in the image, the sensor, timing and delay calibration status is valid, the number of pulses exceeds the threshold and the matching result meets the propagation range and uncertainty, so the data passes the verification; H1 record is to obtain consistent and valid evidence, H3 is not directly deleted because of this positive discharge evidence.

[0152] IX. Termination of Structural Evidence Collection and Location A2 has been executed effectively and will not be generated again; A3 can still distinguish between H1 and H3, so A3 is selected.

[0153] The air terminal arrived at P32 at 10:31:50 and performed imaging from the front, back, and sides. The target component was fully visible and unobstructed, with a spatial resolution of 0.6 mm / pixel and a Laplacian variance of 146, which met the 2 mm crack recognition threshold and the sharpness threshold of 120, respectively.

[0154] No cracks with a width of not less than two millimeters were found on the outer surface of the insulator in the image, no missing insulator skirts were found, and no loose exposed hardware was found.

[0155] According to the necessary evidence rule of Example 1, the three-directional, resolution and sharpness conditions are all met and no external surface cracks, missing skirts or loose exposed hardware are detected, so H3 is deleted; this result is not used to exclude internal defects or other fault types smaller than 2 mm.

[0156] After deleting H3, only H1 remains. H1 corresponds to the only candidate topology. The location has a unique fault section and a unique fault type. The total length of the location range within 18 meters before and after A23 is 36 meters, which is less than the allowable length of 40 meters in the threshold parameter table. Moreover, the ultraviolet evidence is consistent with H1. Therefore, the location termination condition is met.

[0157] 10. Positioning Output and Maintenance Confirmation The fault location and processing device outputs the following at 10:33:12: the event start time is 10:14:28.316260; the fault topology is T_C (K23 closed); the fault is located in the cable terminal section where the second line branch A23 is located, with a location range of 18 meters before and after A23; the fault type is cable terminal insulation surface discharge.

[0158] The electrical evidence includes the polarity and sequence of the first pulses of M21, M31 and M22, the current continuity of B23 and the voltage drops of M21 and M31; the field evidence includes the local closed record of K23 and the ultraviolet pulse at A23 corresponding to the synchronous electrical pulse.

[0159] During maintenance, a 34 mm carbonized discharge channel and moisture marks were found on the outer insulation surface of the A23 cable terminal. After replacement and cleaning, operation was restored. Re-inspection did not obtain ultraviolet pulses with background or corresponding M21 high-frequency transient pulses, confirming the location results.

[0160] After inspection and confirmation, update the K23 communication delay sample, the propagation time range from A23 to M21, the correspondence between the fault and the ultraviolet / electric pulse, and the A23 path and energy consumption records; update the records by binding the confirmation number, time and event version, and do not write unconfirmed intermediate units into the model.

[0161] The above implementation methods are for illustration and not for limiting the scope of protection; without changing the technical concept of candidate topology-fault joint modeling, difference-driven inspection and field evidence reverse update, the sampling, time window, propagation parameters, threshold, terminal or sensor parameters can be adjusted according to the rules of this specification.

Claims

1. A method for intelligent inspection and fault location of power collection lines, characterized in that, include: Collect fault event data, switch status data, and topology-geographic anchor point data to determine the start time of the fault event; Based on the fault event start time and switch status data, determine the switches with uncertain status, combine their statuses and filter them according to line operation constraints to generate a candidate topology set. Under each candidate topology, construct a joint topology-fault hypothesis unit that binds candidate fault segments, fault location range, candidate fault type, expected transient propagation relationship, and expected on-site evidence; Based on the measured and expected transient propagation relationship, the joint hypothesis units are screened and sorted step by step. The differences in topology, segment, location range and fault type among the retained units are compared, and the variables to be disambiguated are extracted. For the variable to be disambiguated, candidate inspection actions that meet the condition of observable evidence are generated. The number of unit pairs that can be distinguished by each action is compared step by step according to the retained units to determine the target inspection location and sensing method. Control the mobile inspection terminal to execute target inspection actions and verify on-site inspection data; The switch state at the time of the fault is reconstructed from the equipment state record that has passed the validity verification, and the candidate topology with the opposite state is deleted. The retained unit is updated based on other valid field evidence. If the location termination condition is met, output the line topology and fault location result at the time of the fault; otherwise, redetermine the target inspection action based on the updated retained unit.

2. The intelligent inspection and fault location method for power collection lines according to claim 1, characterized in that, The fault event data includes voltage transient data, current transient data, bus zero-sequence voltage data, and line branch zero-sequence current data of the monitoring nodes. Based on the moment when the bus zero-sequence voltage exceeds the start-up threshold and the moment when the transient current changes corresponding to the same fault event in at least two monitoring nodes, the fixed acquisition delay of each channel is corrected and channels that exceed the consistency time window are removed to determine the start time of the fault event. The start-up threshold is determined based on the bus zero-sequence voltage fluctuation range and sensor measurement error during a fault-free operation cycle.

3. The intelligent inspection and fault location method for power collection lines according to claim 1, characterized in that, A switch that meets any of the following conditions is identified as a state-determined switch: the possible effective period of the state, determined by the state message time and the upper limit of the communication delay, includes the start time of the fault event and its judgment tolerance range; the control command and the returned state are inconsistent; the state message is missing; or the switch state is inconsistent with the connection state represented by the voltage and current on both sides of the switch before the fault. Keeping the states of the other switches unchanged, the on and off states of the state-determined switches are combined, and state combinations that do not meet the line operation constraints are deleted according to the on / off interlocking relationship, power supply connection relationship and bus energization state.

4. The intelligent inspection and fault location method for power collection lines according to claim 3, characterized in that, Among the candidate topologies, the line segments that are electrically connected and can form a path for the propagation of fault current are identified as candidate fault segments; the candidate topology, candidate fault segments, fault location range, candidate fault type, expected transient propagation relationship, and expected on-site evidence are linked together; The expected transient propagation relationship is obtained by calculating the discrete points of the fault location and the combination of candidate fault parameters through a distributed parameter line model calibrated by field propagation data, and includes the set of allowed polarities of the first effective pulse, the order of stable arrival, the direction of branch transient current, and the voltage drop interval. The expected field evidence is determined based on the evidence metadata of candidate fault types and topological-geographic anchors.

5. The intelligent inspection and fault location method for power collection lines according to claim 4, characterized in that, When the measured polarity of the first effective pulse, the arrival order, or the direction of the branch transient current conflicts with all the allowable results of the corresponding expected transient propagation relationship, or when the line energized state conflicts with the corresponding candidate topology, the corresponding joint assumption unit is deleted; the remaining units are sorted in order of the number of nodes with inconsistent polarity, the number of nodes with inverted arrival relationships, the continuity deviation of the branch node current, and the normalized distance from the measured voltage drop to the expected voltage drop interval. When the corrected arrival time difference between two nodes is not greater than the arrival order determination tolerance, the corresponding node pair will not participate in the arrival relationship sorting.

6. The intelligent inspection and fault location method for power collection lines according to claim 5, characterized in that, The variables to be disambiguated include switches with different states between candidate topologies, branch nodes corresponding to candidate fault segments, topology-geographic anchors corresponding to fault location ranges, or physical evidence corresponding to candidate fault types. For each variable to be disambiguated, an inspection action unit is generated. The inspection action unit records the target topology-geographic anchor point, the type of mobile inspection terminal, the target sensor, the collection direction and time period, the observable evidence conditions, the distinguishable joint hypothesis unit pairs, the movement distance, the energy consumption and the data validity judgment conditions.

7. The intelligent inspection and fault location method for power collection lines according to claim 6, characterized in that, When the variable to be disambiguated is the state of the switch at the start of the fault event, an inspection action is generated to read the local action record of the switch and the operation record after the fault. Based on the expected on-site evidence, infrared inspection actions, ultraviolet inspection actions, acoustic inspection actions, and visible light inspection actions are generated respectively. The unit pair is denoted as distinguishable only when the expected evidence for both joint hypothetical units is observable and the expected evidence states are different in a single inspection action. The number of distinguishable unit pairs for each inspection action is compared step by step according to the retained units. When the quantities are all the same, select the inspection actions with shorter travel distances and lower energy consumption in sequence.

8. The intelligent inspection and fault location method for power collection lines according to claim 7, characterized in that, The evidence metadata includes the corresponding fault subtype, evidence necessity, persistence, minimum detectable features, effective detection range, and operating, environmental, and data acquisition quality conditions. After the on-site inspection data passes the validity verification, candidate topologies that adopt the opposite switching state are deleted according to the equipment status record; the corresponding joint hypothesis unit is deleted only when the fault subtype, minimum detectable feature, effective detection range and all conditions defined by the evidence metadata are met and the necessary evidence is not detected. The remaining units are sorted in the order of obtaining consistent and valid evidence, not yet obtaining corresponding evidence, and not detecting non-continuous evidence; under the same field evidence conditions, they are sorted in ascending order of the number of nodes with inconsistent polarity, the number of nodes reaching the inverted relationship, the continuity deviation of branch node current, and the normalized distance of the measured voltage drop to the expected range.

9. The intelligent inspection and fault location method for power collection lines according to claim 8, characterized in that, When the remaining joint hypothesis unit corresponds to the only candidate topology and the only candidate fault segment, the length of the fault location range is not greater than the allowable length, the valid field evidence is consistent with the first ranked unit, and there is only one remaining joint hypothesis unit or the difference between the first ranked unit and the second ranked unit calculated according to the superiority or inferiority of the first different ranking index reaches the output threshold, the location termination condition is determined to be met. After the fault is confirmed, the correspondence between switch communication delay, command and actual action, line section and inspection path, transient propagation time range, and fault type and on-site evidence are updated according to the confirmation results.

10. A fault location system for intelligent inspection of power collection lines, applicable to the method described in any one of claims 1-9, characterized in that, Includes fixed monitoring terminals, switch status acquisition interfaces, topology-geographic anchor database, mobile inspection terminals, and fault location and processing devices; Both the fixed monitoring terminal and the mobile inspection terminal are equipped with a time synchronization module that is synchronized with the same time base and a fixed delay calibration parameter area for the acquisition chain; the switch status acquisition interface acquires switch status, local actions, and time synchronization records; the mobile inspection terminal also includes a positioning module, a communication module, and a field evidence acquisition component, the field evidence acquisition component including at least one of the following: equipment status reading interface, visible light sensor, infrared sensor, ultraviolet sensor, or acoustic sensor; the topology-geographic anchor database stores line topology, fault location range, inspection path, sensing capability, evidence metadata, and propagation parameters; The fault location processing device is communicatively connected to each component, including a processor and a memory that stores programs; The processor executes the program to generate candidate topologies and construct joint hypothesis units that bind candidate topologies, candidate fault sections, fault location ranges, candidate fault types, expected transient propagation relationships, and expected on-site evidence. It then filters and sorts these units according to measured propagation relationships and determines target inspection actions based on the differences in joint hypotheses and the ability to distinguish between different levels. During discharge inspection, the two terminals are controlled to enter the same acquisition period, and the field pulses and electrical pulses of the correction timestamp are matched one by one; the candidate topology and joint hypothesis unit are updated with valid field evidence, and the cycle continues until the line topology and location results at the time of the fault are output.

Citation Information

Patent Citations

  • Electric unmanned aerial vehicle patrol inspection path planning method

    CN112013907A

  • Power grid fault location inference method and system

    CN116680635A

  • Current collection line fault positioning method and positioning system

    CN117452147A