Multi-source entity association fusion system for industrial data processing

By constructing supporting and excluding evidence and updating the source trust status, the problem of maintaining entity identity when equipment identification changes and location migration occurs in industrial data processing is solved, achieving consistency in identity connection and data accuracy for industrial objects.

CN123158552APending Publication Date: 2026-11-24BAOTOU LIANZHONG BIG DATA TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611461463.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-20
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing technologies struggle to maintain the correctness of entity identities when processing industrial data, especially when there are late reports, omissions, transcriptions, and reuse of identifiers from different information sources. They cannot accurately determine whether attribute differences are caused by changes in the state of the same object or by the mixing of records from different objects.

Method used

By converting multi-source event records into event nodes, supporting and excluding evidence are constructed based on spatiotemporal continuity and business continuity, the source credibility status is updated, and these evidences are used to merge or split candidate entity relationships, forming entity master records and associated evidence indexes, ensuring that the identity connection of industrial objects remains consistent when it changes.

Benefits of technology

It enables the maintenance of identity connections for the same industrial object based on continuous events and source relationships when equipment identification changes or its location is moved, preventing mutually exclusive records from being classified into the same entity master record, thereby improving the accuracy and consistency of industrial data processing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123158552A_ABST
    Figure CN123158552A_ABST
Patent Text Reader

Abstract

This invention relates to the fields of industrial data information retrieval, database organization, and multi-source entity association fusion technology, specifically to a multi-source entity association fusion system for industrial data processing. The system acquires multi-source entity and event records, maps entity records to standard attributes and generates candidate relationships, organizes related events into event chains according to the lifecycle of industrial objects, forms supporting or excluding evidence based on spatiotemporal continuity and business continuity, and updates the source credibility status of each information source. Using the updated source credibility status, event evidence is selected, and candidate relationships are merged or split to form an index of entity master records and associated evidence. The judgment results are then written back to the event chain and source credibility status. This invention can maintain the continuity of entity identity association when there are changes in identifiers, location migrations, or inconsistencies in source records, reduces association deviations caused by duplicate participation of derived records in the judgment, and supports the tracing of changes in fusion criteria and entity relationships.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the fields of industrial data information retrieval, database organization, and multi-source entity association fusion technology, specifically to a multi-source entity association fusion system for industrial data processing. Background Technology

[0002] In industrial production, equipment ledgers, production records, control data, maintenance work orders, and location change records are typically stored separately in enterprise resource planning (ERP) systems, manufacturing execution systems (MES), monitoring and data acquisition (MAGA) systems, and equipment asset management systems (AAS). Existing entity fusion methods usually collect records from various sources via database interfaces or batch file collection. The system cleanses and standardizes the format of equipment names, equipment numbers, models, production lines, installation locations, and manufacturers, and maps fields based on a pre-established master data model. After standardization, the system divides candidate record sets according to plant area, equipment category, or location range. Then, through unique code comparison, text similarity calculation, dictionary mapping, and multi-field combination matching, it determines whether records from different sources point to the same industrial object.

[0003] After candidate records are associated, the existing processing method typically selects the primary record attribute according to a preset data source priority order, record update time, or field completeness, and attaches other records as source records to the primary record. For records with unclear matching results, the system retains the candidate relationship or transfers it to manual review; for records that have been merged, a mapping index between entity identifiers, source identifiers, and original records is established in the relational database or retrieval database. When new data is subsequently received, field standardization and matching rules are usually re-executed, and the primary record is overwritten or supplemented according to the established source order, thereby forming unified entity data for equipment queries, production statistics, and maintenance traceability.

[0004] The above processing method mainly relies on static attributes at a certain point in time and fixed source priority relationships to determine the entity identity. It does not incorporate the temporal continuity and business succession relationships between events such as installation, commissioning, operation, maintenance, relocation, and scrapping into the same identity determination process. When industrial objects undergo number changes or location migrations, or when different information sources have delayed reporting, omissions, copying, or identifier reuse, the field similarity relationship and source priority relationship cannot reflect the true life cycle evolution of the industrial object. The system finds it difficult to determine whether attribute differences are caused by changes in the state of the same object or by the mixing of records from different objects. Therefore, it cannot maintain the correctness of the industrial entity identity association even when source records are inconsistent. Summary of the Invention

[0005] The purpose of this invention is to provide a multi-source entity association and fusion system for industrial data processing, which can effectively solve the problems mentioned in the background art.

[0006] To achieve the above objectives, the technical solution adopted by the present invention is as follows: A multi-source entity association fusion system for industrial data processing includes a processor and a data storage device connected to the processor, wherein the data storage device stores entity records and event records from multiple industrial information sources; The processor is used to: perform standard attribute mapping on the entity records and generate candidate entity relationships, and organize the event records corresponding to each candidate entity relationship into an event chain according to the life cycle sequence of the industrial object; Based on the spatiotemporal continuity and business succession relationships in the event chain, supporting or excluding evidence is formed, and the source credibility status of each industrial information source is updated accordingly. The updated source trust status is used to select event evidence, and the candidate entity relationship is merged or split. Based on the judgment results, the entity master record and associated evidence index are formed, and the event chain and source trust status are written back using the judgment results.

[0007] Preferably, the processor converts each event record into an event node, and the event node is associated with a source identifier, an industrial object reference, an occurrence time period, a spatial node, and a lifecycle state migration; The sequential connection of the event nodes is determined according to the reference relationship between business documents. When there is no direct reference between adjacent event nodes, the end state of the previous event node and the start state of the next event node are extracted. Supplementary connections are established only when the state can be inherited and the spatial change has migration records, forming an event chain that includes the determined connection and the connection to be verified.

[0008] Preferably, the processor forms an event constraint graph by combining event nodes from different industrial information sources that correspond to the same candidate entity relationship; For event nodes in the business document that have reference inheritance, compatible lifecycle states, and continuous spatial nodes, support edges are established in the event constraint graph; For event nodes whose time periods overlap and point to incompatible spatial nodes, or whose life cycle states are mutually exclusive, an exclusion edge is established in the event constraint graph. Each supporting edge and repulsive edge, along with the original record reference and event chain position, is written into the associated evidence index.

[0009] Preferably, the processor saves the source trust status according to the combination of the industrial information source, event category, and lifecycle stage; For the supporting or exclusive edges in the event constraint graph, trace the source of the record participating in the verification along the original record reference, classify the derived records with the same upstream record into the same evidence source, and update the source credibility status according to the consistency relationship between each evidence source and the event chain determination result. The event node used for re-judging the candidate entity relationship is determined according to the updated source credibility status, and the source credibility status of the corresponding combination is updated with the re-judgment result.

[0010] Preferably, the processor identifies installation handover, production confirmation, location relocation, and component replacement events in the event chain, and uses the identified events as connecting nodes for lifecycle stages; When the entity records before and after the connecting node use different industrial object identifiers, the identifier handover relationship is extracted along the business document reference. When the end state of the previous stage is compatible with the start state of the next stage, an identity migration edge is established. The different industrial object identifiers are saved as entity aliases for the corresponding stages, and the identity migration edge is written into the associated evidence index.

[0011] Preferably, when the lifecycle states before and after the connecting node are incompatible, or when there are mutually exclusive spatial nodes in the same time period, the processor generates a mutually exclusive candidate event chain with the conflict event node as the branch starting point. Based on the business document references and source credibility status, event nodes with undetermined affiliation are attached to candidate event chains with succession relationships. When a new event node is added to make one of the candidate event chains form a complete state succession, the entity association corresponding to the candidate event chain is retained, and the remaining candidate event chains, together with the original record references, are marked as branches to be reviewed.

[0012] Preferably, when an exclusion edge appears in the event constraint graph, the processor backtracks from the two endpoints of the exclusion edge along the event chain to the common event node that is connected only by the supporting edge, and traces backward to the event node where the event relationship is reconciled, so that the event nodes between the two form a conflict sub-chain; Cancellation of candidate entity relationships maintained solely by supporting edges within the conflicting subchain; retention of candidate entity relationships with independent supporting edges outside the conflicting subchain; and regeneration of the candidate entity relationships and event constraint graph using the original records corresponding to the cancelled relationships.

[0013] Preferably, the processor constructs a source dependency graph based on the original record identifier, the business document reference, and the data transfer record, and classifies records obtained by copying, converting, or summarizing the same root source record into the same source group; When updating the source trust status, records within the same source group are treated as source evidence. When the source evidence is inconsistent with the event chain determination result, the root source record is located along the source dependency graph, the corresponding inconsistency mark is written into the dependency edge between the root source record and each downstream derived record, and the source trust status of the corresponding source group is updated based on the inconsistency mark.

[0014] Preferably, when a supplementary event record is received, the processor inserts the corresponding event node into each branch to be reviewed based on the occurrence time and the business document reference, and re-verifies the lifecycle status continuity relationship before and after the insertion position; When the supplementary event node connects to an adjacent event node that was originally disconnected in a candidate event chain, and is compatible with the spatial change record of the candidate event chain, the corresponding branch to be reviewed is converted into a determined event chain. A new version of the entity master record and associated evidence index is generated based on the determined event chain, and the entity identifier mapping between the new version and the original version is retained.

[0015] Preferably, when the merging or splitting determination of the candidate entity relationship changes, the processor determines the source group affected by the change determination and the life cycle stage along the associated evidence index, reads the source trust status saved before the relevant source evidence is written for the corresponding life cycle stage, reprocesses the independent source groups in the source dependency graph according to the event chain order, updates the source trust status and the relevant candidate entity relationship in sequence, and writes the updated entity master record, event chain and source trust status together into the same associated version after the reprocessing is completed.

[0016] Compared with the prior art, the beneficial effects of the present invention are as follows: 1. By converting multi-source event records into event nodes arranged according to the lifecycle of industrial objects, and constructing supporting and excluding evidence based on spatiotemporal continuity and business document succession relationships, candidate entity relationships can undergo cross-time period continuity verification. The source credibility status of each industrial information source is updated according to the consistency relationship between event evidence and event chain judgment results. The updated source credibility status then participates in the selection of event evidence and the merging or splitting of candidate entities, transforming a fixed source order into an evidence selection process that changes with record consistency. The judgment results are synchronously written back to the event chain and source credibility status. Thus, when equipment identification changes, location migrates, or source records conflict, the identity connection of the same industrial object is maintained based on continuous events and source relationships, preventing mutually exclusive records from being classified into the same entity master record.

[0017] 2. By storing original record references, event chain positions, supporting relationships, and exclusion relationships through the associated evidence index, it is possible to locate the lifecycle stage of entity relationship changes along the evidence path. The source dependency graph groups derived records formed by copying, transforming, or aggregating the same root record into the same source group, avoiding multiple derived records being repeatedly used as independent supporting evidence. When a conflict occurs, the conflicting sub-chain is limited by exclusion edges and local candidate relationships are regenerated, while entity associations with independent supporting relationships outside the conflicting sub-chain are preserved. For event records whose attribution cannot be determined temporarily, their association status is saved through candidate event chains and branches to be reviewed. After the supplementary event arrives, only the state succession relationship near the insertion position is re-verified, and the entity master record, event chain, and source credibility status are saved synchronously with the associated version. Attached Figure Description

[0018] Figure 1 This is a flowchart illustrating the overall closed-loop process of multi-source entity association and fusion in this invention. Figure 2 This is a flowchart of the event chain construction and constraint evidence generation process of the present invention; Figure 3 This is a diagram illustrating the connection consistency calculation process of the present invention; Figure 4 This is a flowchart of the source credibility status update and conflict re-determination process of the present invention; Figure 5 This is a diagram illustrating the recursive process of the source credibility status of the present invention. Figure 6 This is a diagram illustrating the calculation process of the branch consistency quantity in this invention. Detailed Implementation

[0019] Please refer to Figure 1 In one embodiment, a multi-source entity association fusion system for industrial data processing includes a processor and a data storage device connected to the processor. The data storage device stores entity records and event records from multiple industrial information sources. The processor performs standard attribute mapping on the entity records and generates candidate entity relationships. The event records corresponding to each candidate entity relationship are organized into an event chain according to the life cycle sequence of the industrial objects. Supporting evidence or exclusion evidence is formed based on the spatiotemporal continuity and business succession relationships in the event chain. The source credibility status of each industrial information source is updated based on the supporting evidence and exclusion evidence. Event evidence is selected using the updated source credibility status. The candidate entity relationships are merged or split. Based on the judgment results, entity master records and associated evidence indexes are formed. The event chains and source credibility status are written back using the judgment results.

[0020] In this embodiment, multiple industrial information sources include an enterprise resource planning system, a manufacturing execution system, a monitoring and data acquisition system, an equipment asset management system, a production scheduling system, a quality management system, and a historical record database formed by equipment controllers. The processor obtains entity records and event records through database read interfaces, message subscription interfaces, and structured file read interfaces, and adds information source identifiers, acquisition batch identifiers, original record identifiers, and acquisition times to each batch of input data. Entity records are used to describe the static attributes of equipment, components, workstations, production lines, or sensors in a certain information source. Event records are used to describe the state changes of the corresponding industrial objects during the processes of procurement, warehousing, installation, commissioning, operation, maintenance, relocation, replacement, or scrapping. The original input content is saved in read-only format, and subsequent mapping results are associated with the original input content through the original record identifier.

[0021] Specifically, the data storage device is configured with an original record area, a standard record area, an event chain storage area, a source trusted state area, an entity master record area, and an associated evidence index area. The original record area stores uncovered data content according to the information source identifier and the original record identifier. The standard record area stores the standard attributes after field mapping and their original field references. The event chain storage area stores the lifecycle sequence using event nodes and the connection relationship between nodes. The source trusted state area stores updatable state values ​​according to the industrial information source, event category, and lifecycle stage. The entity master record area stores the merged entity identifier, current attributes, and historical aliases. The associated evidence index area stores candidate relationships, event connections, evidence types, evidence sources, judgment versions, and write-back locations. Each storage area establishes a bidirectional lookup reference relationship through entity internal identifiers, event internal identifiers, and evidence internal identifiers.

[0022] Furthermore, the standard attribute mapping is accomplished jointly by a data dictionary and field conversion rules. The data dictionary records the correspondence between different information source fields and standard fields, and records synonym mappings for equipment type codes, plant area codes, spatial location codes, and life cycle status codes. The field conversion rules normalize character case, full-width and half-width characters, separators, units of measurement, date representation, and hierarchical paths. The equipment number retains the original value and the normalized value. The name field is split into manufacturer identifier, series identifier, and object category. The location field is parsed into a hierarchical path formed by plant area, building, production line, workstation, and installation point. Fields whose mapping results cannot be determined retain a pending mark and original field references to avoid directly overwriting or discarding data that cannot be confirmed during the standardization stage.

[0023] In a preferred embodiment, candidate entity relationships are generated through blocking keys and attribute association rules. The processor uses equipment category and factory area as basic blocking conditions. Within the basic blocking range, candidate pairs are formed using the normalized value of equipment number, model identifier, sequence identifier, name composition, installation location, and the business object to which it belongs. When the equipment number has a historical reuse mark or the location field has a change record, the entity is not directly determined to merge based on the same single field. Instead, the corresponding record is retained as a candidate entity relationship, and the candidate entity relationship is written with the basis for formation, the standard fields to be compared, the source of the fields, and the set of event records to be associated. The candidate generation process only narrows down the range of records that need to be verified for lifecycle. The entity identity is jointly determined by the subsequent event chain, evidence relationship, and source credibility status.

[0024] Preferably, the processor retrieves event records according to the industrial object identifiers involved in each candidate entity relationship, and obtains the occurrence time, spatial location, event category, lifecycle start state, lifecycle end state, business document identifier, and associated object identifier from the event records. The event records corresponding to the same industrial object identifier are arranged according to the occurrence time, and the order formed solely based on the collection time is adjusted by using business document references and status succession relationships. Each event node in the event chain retains a reference pointing to the original record, and the connection records between event nodes record the connection basis and connection status. The connection status includes confirmed connections that have been confirmed by business documents or status migrations, as well as pending connections formed due to record missingness, time overlap, or source conflict. This ensures that the status changes of the same object in different information sources maintain a traceable sequential relationship.

[0025] In this embodiment, the spatiotemporal continuity relationship is determined based on the occurrence time and spatial nodes of adjacent event nodes. When the occurrence time of the subsequent event is not earlier than the end time of the preceding event, and the two spatial nodes are the same or there is a device migration record between them, a spatiotemporal continuity condition is formed. When two events point to spatial nodes that cannot simultaneously accommodate the same industrial object during the same time period, a spatiotemporal exclusion condition is formed. The business acceptance relationship is determined based on the object references between purchase orders, warehousing orders, installation orders, production confirmation orders, maintenance work orders, relocation orders, and scrap orders. When the subsequent business document references the object identifier or handover identifier in the preceding business document, a business acceptance condition is formed. The processor records the event relationship that satisfies the spatiotemporal continuity condition and has the business acceptance condition as supporting evidence, and records the event relationship that satisfies the spatiotemporal exclusion condition or has a mutually exclusive life cycle state as exclusion evidence.

[0026] Specifically, the source trust status is not set in a single fixed order for the entire industrial information source, but rather forms a combination of states according to the information source, event category, and life cycle stage. For example, the installation location record formed by the equipment asset management system during the installation stage and the online status record formed by the monitoring system during the operation stage each have independent states. The processor updates the corresponding combination of states based on whether the event node is consistent with the confirmed event chain relationship. At the same time, it determines whether multiple records originate from the same upstream record by referencing the original record. Derived content belonging to the same upstream record participates in the update as evidence of the same source. The processor determines the adoption order in conflicting events based on the updated source trust status and retains the original reference and rejection reason of the unadopted events, so that the source trust status can change consistently with the actual records at different life cycle stages.

[0027] During the determination of candidate entity relationships, the processor reads supporting and excluding evidence from the corresponding event chain and selects event nodes that can independently explain the state continuation based on the source credibility status. When there is a business handover relationship that runs through the identifier change point, compatible lifecycle states, and continuous spatial change records between two candidate entity records, the processor makes a merging decision and attaches the two source identifiers to the same entity internal identifier. When two candidate entity records are incompatible spatial nodes during overlapping periods or have mutually exclusive operating states, the processor makes a split decision and assigns different entity internal identifiers to the corresponding source records. When the existing evidence cannot support merging or splitting, the processor retains the candidate state and waits for supplementary events, instead of writing the unresolved relationship as a confirmed entity relationship.

[0028] When forming an entity master record based on a merge decision, the processor retains the attribute values ​​of each source and their effective periods. The current attribute is selected from the source records that correspond to the current lifecycle stage and whose source credibility status meets the adoption conditions. Historical identifiers, historical locations, and historical statuses are saved as attribute versions with effective periods. When forming an entity master record based on a split decision, the processor allocates the previously jointly attached source records to different entity internal identifiers according to the exclusion evidence and updates the mapping from source records to entity internal identifiers. The associated evidence index synchronously records the supporting evidence, exclusion evidence, event chain position, and source credibility status version referenced in this decision. The decision result is written back to the connection status in the event chain and serves as the basis for subsequent source credibility status updates.

[0029] In one specific embodiment, the equipment asset management system records the equipment as pump group A and installed on production line 1. The monitoring and data acquisition system records the location as pump station 1 and continuously generates operating events. After the maintenance system replaces the controller, it uses the new controller identifier. The processor generates candidate entity relationships from the three sets of records through standard attribute mapping and establishes an event chain from the installation order, operation record, and controller replacement work order. The old controller reference and the new controller reference in the replacement work order constitute a business succession relationship. The time when the equipment stops operating and the time when it resumes operation after the replacement constitute a state succession relationship. The event chain forms supporting evidence and updates the corresponding source trusted state accordingly. The processor saves the old and new controller identifiers as entity aliases for different lifecycle stages, merges the equipment records into the same entity master record, and writes the replacement work order, operating status connection, and original location record into the associated evidence index.

[0030] In another specific embodiment, different factory areas have conveying equipment with the same number and model. The enterprise resource planning system maps two procurement records to the same standard number due to number reuse. The equipment asset management system and the monitoring and data acquisition system provide installation location and operation records respectively. After the processor generates candidate entity relationships, it finds that two sets of operation events point to spatial nodes that cannot migrate to each other during overlapping periods, and there is no migration document between the two spatial nodes. The event constraint thus forms exclusion evidence. The processor performs a split determination based on the source credibility status of the installation stage and the operation stage, writes the records of the two factory areas into different entity master records, and retains the same standard number as the source attribute rather than the entity unique identifier. When querying the same number later, the corresponding factory area, life cycle stage and original record reference are returned through the associated evidence index.

[0031] Please refer to Figure 2 In a preferred embodiment, the processor converts each event record into an event node. The event node is associated with a source identifier, an industrial object reference, an occurrence time period, a spatial node, and a lifecycle state transition. The source identifier indicates the direct provider and root record reference of the event record. The industrial object reference includes a source object identifier and a candidate entity internal identifier. The occurrence time period consists of the event start time and the event end time. The spatial node adopts a stable internal code in the factory hierarchy. The lifecycle state transition consists of a start state and an end state. The event node also stores business document references, associated component references, data acquisition batches, and parsing status. The parsing status is used to distinguish between event nodes that have obtained a complete state transition and event nodes that have only obtained a one-sided state.

[0032] Specifically, the lifecycle state is expressed using a migration permission table. This table stores the acceptable start state and the acceptable end state for each event category. For example, an installation event accepts the "inventory-ready" state and generates an "installed" state; a production event accepts the "installed" state and generates a "ready to run" state; a maintenance event accepts the "running" or "shutdown" state and generates a "maintaining" state; a maintenance completion event accepts the "maintaining" state and generates a "ready to run" state; a migration event accepts the "installed" state and generates a "migration" state; and a migration completion event accepts the "migration" state and generates an "installed" state. The processor uses the migration permission table to verify the end and start states of adjacent event nodes. Combinations not recorded in the migration permission table are not directly established as deterministic connections.

[0033] During the event node sorting process, the processor first establishes a temporary time sequence based on the occurrence time. When the occurrence times of two event nodes do not overlap, the event node with the earlier end time is placed before the event node with the later start time. When the occurrence times overlap, the processor reads the creation relationship, reference relationship, and object handover relationship of the business documents to determine the order. If a maintenance work order references a downtime event and a maintenance completion order references a maintenance work order, then the downtime event, maintenance event, and maintenance completion event are arranged according to the reference direction. If the collection time is different from the business occurrence time, the business occurrence time is used for lifecycle sorting, and the collection time is only used to record the order in which data enters the system to avoid late data changing the actual event order.

[0034] When there is a lack of direct business references between adjacent event nodes, the processor extracts the end state of the previous event node and the start state of the next event node, and retrieves the spatial nodes and spatial change records corresponding to the two event nodes. Supplementary connections are established between event nodes whose states are compatible and whose spatial nodes are the same. Supplementary connections are also established between event nodes whose states are compatible and whose spatial nodes are different but whose migration records exist. The supplementary connections save the basis for state compatibility and the reference to the migration records. When the state is compatible but there are no corresponding records for spatial changes, a pending connection is established. When the states are incompatible, no supplementary connection is established and an exclusion candidate is generated. The pending connection is re-verified as migration documents, supplementary work orders or other independent source events arrive.

[0035] To quantify the connectivity consistency of adjacent event nodes, in a preferred embodiment, the connectivity consistency quantity is calculated using the following formula: ; in, This represents the consistency of the connection between event node i and event node j. Indicates the timing capacity. Represents a spatially continuous quantity. This indicates the volume of business orders received. This represents the repulsion level; all four values ​​mentioned above take values ​​between 0 and 1. to These represent the configuration weights of the corresponding evidence in the current event category, and their sum is 1. For example, take... , , , and take , , , hour, The corresponding connections are saved as candidate supporting edges. If two events occur at overlapping times and are located at nodes in incompatible spaces, then... If the connection consistency is reduced, it will be transferred to exclusion check. The calculation result is only recorded as the strength of evidence. The connection still needs to meet the conditions of state acceptance and business reference.

[0036] Please refer to Figure 3 , Figure 3 The horizontal axis represents the sample window number, covering the continuous windows formed by connecting candidate events in the processing order in this embodiment; the vertical axis represents the normalized input, deduction, and overall connection result. The solid line in the upper panel represents the connection consistency value. The dashed and dotted lines indicate the first and second reference thresholds, respectively; the middle panel shows the timing capacity. Spatial continuity and business document processing volume Changes; the lower panel uses gray shading to represent the amount of repulsion. The deduction range is defined, and the black boundary line represents the boundary of the exclusion deduction trend.

[0037] from Figure 3 visible, As the sample window increases overall, and stabilizes above the second reference threshold after about the 260th window, it indicates that as event records, spatial migration records, and business document references are gradually completed, the connection evidence between adjacent event nodes changes from a pending verification state to a state that can be saved as supporting edges. and The improvement was more pronounced in the later stages, indicating that time and document consolidation were the driving forces. The main factors that enhance this effect; The curve is relatively flat, indicating that spatial continuity remains stable in most windows. (In the lower panel...) The shadow area remains in the lower range, indicating that the exclusion evidence has a limited deduction effect on the overall result, and only forms a short-term suppressive effect in local windows.

[0038] Furthermore, the business document acceptance quantity is formed based on the verifiable reference path between documents. It is 1 when the documents directly reference the same industrial object and there is a clear handover between the documents. When the documents form continuous references through intermediate work orders, it is a value between 0 and 1 based on the integrity of the reference path. It is 0 when there is no traceable reference. The spatial continuity quantity is 1 when the spatial nodes are the same or there is a complete migration record. It is a value between 0 and 1 when the migration start point or end point is missing. It is 0 when pointing to mutually exclusive spatial nodes in the same time period. The temporal acceptance quantity is determined by the event occurrence time and the state migration order. The exclusion quantity is determined by the combination of time period overlap, spatial mutual exclusion and life cycle state mutual exclusion. Each value, along with the record reference used for calculation, is written into the event connection. When the subsequent supplementary event arrives, the affected adjacent connections are recalculated.

[0039] In a preferred embodiment, the processor forms an event constraint graph by combining event nodes from different industrial information sources that correspond to the same candidate entity relationship. The vertices in the event constraint graph correspond to event nodes, and the vertex attributes include source identifier, occurrence time period, spatial node, start state, end state, and original record reference. The directed temporal edges in the graph represent the sequential relationship within the same event chain. Supporting edges indicate that two event nodes from different sources can jointly support the candidate entity relationship, and repulsive edges indicate that two event nodes cannot belong to the same industrial entity. The processor maintains the event constraint graph according to the candidate entity relationship so that the modification of a certain candidate relationship does not change the graph structure of unrelated candidate relationships.

[0040] For event nodes in business documents that have reference inheritance, compatible lifecycle states, and continuous spatial nodes, the processor establishes support edges in the event constraint graph. The start and end points of the support edges are determined according to the lifecycle sequence. The support edges store the paths formed by direct or indirect document references, compatible items in the state transition table, spatial node or migration record references, and the source groups involved in the connection. If the object identifier in the equipment installation order is different from the object identifier in the commissioning confirmation order, but the handover order references both identifiers, then a support edge is established between the installation event node and the commissioning event node. The two identifiers are retained as source identifiers of the same candidate entity relationship in adjacent stages, and no new entity internal identifiers are generated due to different characters.

[0041] For event nodes that overlap in time periods and point to incompatible spatial nodes, or event nodes whose lifecycle states are mutually exclusive, the processor establishes exclusion edges in the event constraint graph. Incompatible spatial nodes are determined based on the factory spatial hierarchy and equipment migration records. Two operating events of the same indivisible equipment located in different factory areas at the same time period form spatial exclusion. When the same equipment has an operating event that has not been reactivated during the scrapped state, it forms state exclusion. When the same sequence identifier corresponds to two manufacturing batches and there is no component disassembly / assembly relationship, it forms object exclusion. Exclusion edges store the exclusion category, the conflict occurrence interval, the original record references of the two endpoints, and the spatial hierarchy or state migration table entries used to confirm the exclusion relationship.

[0042] When the event constraint graph is written to the associated evidence index, the processor generates an internal evidence identifier for each supporting edge and repulsive edge, and establishes a composite index from the internal evidence identifier to the candidate entity relationship, the original record, the event chain position, and the judgment version. The event chain position is jointly expressed by the life cycle stage, the internal identifier of the predecessor event, and the internal identifier of the successor event. When querying a master record of a certain entity, the supporting edges that form the merge judgment and the repulsive edges that participate in excluding other candidate relationships can be obtained along the composite index. When querying an original record, the candidate entity relationship and event constraint graph in which the original record participates can be obtained in reverse. When a record is corrected, the graph edge that needs to be reprocessed is located according to the reverse index, without traversing all entity records.

[0043] In this embodiment, supporting and excluding evidence are grouped according to the independence of their sources. Records from the same business database and repeatedly collected through different interfaces cannot form multiple independent supporting evidence. The running events directly generated by the device controller and the online records formed by the device asset management system based on the running events have a derivative relationship and are grouped into the same source group. Evidence formed by independent installation orders, migration orders and controller running records belong to different source groups. The processor establishes references for the source groups in the event constraint graph so that the number of evidences does not increase due to the copying or summarizing process. The determination of candidate entity relationships is based on the independent source groups and their position in the event chain.

[0044] Please refer to Figure 4In a preferred embodiment, the processor stores the source trust status according to the combination of industrial information source, event category and life cycle stage. The industrial information source corresponds to the recorded direct source and root source. The event category corresponds to installation, commissioning, operation, maintenance, migration, replacement or scrapping. The life cycle stage is divided according to the confirmed connection nodes. The source trust status includes the current status value, the status effective version, the internal identifier of the evidence on which the most recent update is based, and the status value before the update. The same industrial information source has mutually independent status items in different event categories or different life cycle stages. The source conflict in the previous stage will not directly cover the source status that has been confirmed by independent evidence in the later stage.

[0045] For supporting or exclusive edges in the event constraint graph, the processor traces the source of the record participating in the verification along the original record reference. The original record reference points to the immutable record saved when the data enters the system. If the record is imported from another information source, the processor continues to trace along the data transfer record to the upstream record until it reaches the root source record without an upstream reference. Derived records with the same root source record are grouped into the same evidence source. The processor compares the consistency relationship between each evidence source and the event chain judgment result. It supports independent sources that have been confirmed to be connected to form consistent records, and sources that form exclusive edges or conflict with the confirmed state transition form inconsistent records. Each update of the source's trusted state saves the source group and judgment version involved in the calculation.

[0046] The source credibility status can be recursively calculated using the following formula: ; in, Indicates information source For event categories and life cycle stage The source trust status in the nth determination version. This indicates the updated source trust status. Indicates the historical state retention coefficient. This represents the set of independent source groups participating in the verification for the current version, where g represents one of these independent source groups. This indicates the completeness of the evidence corresponding to the source group. The value is 1 when the source evidence matches the event chain determination, and 0 when they do not. For example, the old state is 0.8. Take 0.6, 3 independent source groups Take 1, 1 and 2 respectively and When the values ​​are 1, 0, and 1 respectively, the current evidence consistency value is 0.75, the updated source credibility value is 0.78, the derived record has been assigned to the corresponding source group and will not be repeatedly entered into the summation, and the resulting value is used for the selection order of conflicting evidence of the same type.

[0047] Please refer to Figure 5 , Figure 5 The horizontal axis represents the version number of the source trusted state, and the vertical axis represents the normalized state value. The top panel displays the recursive source trusted state. It also provides two reference thresholds; the middle panel shows the state before the update. The panel below shows the weighted consistency values ​​for independent source groups, where... Indicates the completeness of the evidence from the source group. This indicates whether the source group matches the event chain determination result.

[0048] from Figure 5 visible, With most windows remaining in a high range, when the weighted consensus value of the lower panel decreases, the upper panel experiences a corresponding temporary pullback, but the magnitude of the pullback is limited. The retention of historical states is limited, and the system did not immediately drop to a low-confidence range. This indicates that when handling source conflicts, the system does not directly negate an information source based on a single inconsistent record, but rather updates its state based on the continuous performance of the independent source group. (The middle panel...) The periodic fluctuations reflect that the state bases of different event categories and lifecycle stages are not the same; the segmented changes in the lower panel correspond to the process of the source group changing from consistency, partial consistency to obvious conflict.

[0049] When determining the event nodes used for re-judging candidate entity relationships based on the updated source credibility status, the processor first reads the corresponding status items according to the event category and lifecycle stage. Then, event nodes with the same root source record are merged into a source group. The source group with a higher source credibility status and complete original record is used as the benchmark source for state inheritance. Other source groups are compared with the benchmark source respectively. If different source groups support adjacent stages that do not conflict with each other, they together form an event chain. If different source groups form an exclusion relationship in the same stage, a merge judgment, split judgment, or pending judgment is formed by combining business document references, spatiotemporal continuity, and source credibility status. The processor updates the corresponding combination status participating in this judgment with the re-judgment result, without modifying the status of other event categories and stages that did not participate in the judgment.

[0050] To prevent the same judgment result from being repeatedly used as its own supporting basis, the processor reads the evidence dependency path in the associated evidence index before updating the source trust status. If the current judgment is only formed by the derived record of the information source to be updated, the corresponding judgment is not treated as an independent and consistent record. If the current judgment also has business documents or event records from other root sources, only the independent source group is counted in the status update. After the status update is completed, a new status version is generated and the status before the update is retained. The candidate entity relationship re-judgment references the new status version. The re-judgment result is written back through the new evidence internal identifier without rewriting the evidence content of the old version, thus forming an update link that can be traced back and does not accumulate self-evidence.

[0051] In a preferred embodiment, the processor identifies installation handover, production confirmation, location migration, and component replacement events in the event chain, and uses the identified events as connecting nodes for lifecycle stages. The connecting nodes include pre-stage object identifiers, post-stage object identifiers, handover business documents, start status, end status, and space change records. Installation handover is used to connect the procurement or warehousing stage with the installation stage; production confirmation is used to connect the installation stage with the operation stage; location migration is used to connect the pre-migration operation stage with the post-migration installation stage; and component replacement is used to connect the pre-replacement configuration with the post-replacement configuration. The processor divides the continuous event chain into stage intervals that can respectively store the source trusted status and entity aliases using connecting nodes.

[0052] When entity records before and after a connection node use different industrial object identifiers, the processor extracts the identifier handover relationship along the business document reference. For example, a relocation order saves both the equipment number before the migration and the management number after the migration; a component replacement order saves both the old component sequence identifier and the new component sequence identifier; and a production confirmation order references both the procurement object identifier and the control system point identifier. The processor binds the before and after identifiers that appear together in the handover document to the object items inside the document and verifies whether the end state of the previous stage can inherit the start state of the next stage. When the states are compatible and the document object items point to the same handover object, an identity migration edge is established between the event nodes of the two stages.

[0053] The identity migration edge stores the entity identifier before migration, the entity identifier after migration, the stage boundary event, the business document reference, the status inheritance item, the spatial change reference, and the source group. The processor saves the different industrial object identifiers before and after migration as entity aliases for the corresponding stages. The entity alias records the effective start event and effective end event. When a maintenance record using a historical identifier is received, the corresponding stage is located according to the occurrence time and mapped to the same entity's internal identifier. When an operation record using a new identifier is received, it is mapped to the stage after migration. The identity migration edge is written as supporting evidence into the associated evidence index and forms a bidirectional reference with the alias version in the entity master record.

[0054] In component replacement scenarios, the processor distinguishes between whole machine identity migration and component changes. If the replacement work order instructs the controller to change from the old sequence identifier to the new sequence identifier while the device body identifier remains unchanged, the device entity master record remains continuous. The lifecycle of the old controller entity ends at the removal event, and the lifecycle of the new controller entity begins at the installation event. The composition relationship between the device and the controller generates versions before and after according to the event time period. If the replacement work order instructs the whole machine to be moved out and replaced by another device, the original device and the new device form different internal identifiers. The occupancy relationship between the workstation and the device undergoes a version switch. The processor determines whether to establish an entity alias or establish a composition relationship version based on the object hierarchy in the handover document.

[0055] In a preferred embodiment, when the lifecycle states before and after the connecting node are incompatible, or when there are mutually exclusive spatial nodes in the same time period, the processor generates mutually exclusive candidate event chains with the conflict event node as the branch starting point. Each candidate event chain copies the common event connection that has been confirmed before the conflict starting point, and connects the subsequent event nodes provided by different source groups from the conflict starting point. The candidate event chain saves the internal identifier of the branch, the common predecessor event, the conflict event, the branch source group, the state inheritance status and the spatial change status. The mutual exclusion relationship is written into the branch constraints between each branch, so that only one candidate event chain can be converted into a deterministic event chain in the same conflict interval.

[0056] Based on the business document reference and source trust status, the processor attaches unassigned event nodes to candidate event chains with succession relationships. The attachment process first checks whether the business document of the event node references an existing object identifier in the branch, then checks whether the start state succeeds the end state of the branch end, and checks whether the spatial node is the same as the branch end or has a migration record. Event nodes that meet the requirements of business reference and state succession are written to the corresponding branch. Event nodes that can be attached to multiple branches retain multiple candidate references. Event nodes that cannot be attached to any branch form a new branch to be attached to the core. Branch attachment does not modify the common event chain before the conflict starting point.

[0057] When a new event node causes one of the candidate event chains to form a complete state, the processor checks whether there are any unexplained exclusion edges between the conflict origin and the new event node, and checks whether the spatial change record covers the corresponding positional change. Candidate event chains that meet the above conditions are retained as entity association paths, and the remaining candidate event chains, along with the original record references, are marked as branches to be reviewed. The branches to be reviewed are not written into the current entity master record's definite attributes, but are retained in the associated evidence index. Subsequent supplementary documents can reactivate the branches to be reviewed. The branches that have already been determined also retain the source trusted state version on which the determination was based, to avoid losing the original judgment basis when new data enters.

[0058] Candidate event chains can be used to form branch consistency variables using the following formula: ; in, Indicates candidate branches Consistent quantity, This indicates the completeness of the lifecycle state transition. Indicates the coverage of business document references. Indicates the level of support from independent source groups. This indicates that the degree of rejection was not explained. to This represents the configuration weights of the four types of branch evidence, and their sum is 1. For example, take... , , , and take , , , hour, The corresponding branch enters the complete state to undergo verification. If another branch has spatial exclusion that cannot be explained by the migration record, it will cause... The consistency quantity decreases accordingly. The branch consistency quantity is used to determine the verification order. The branch transition still takes the state inheritance as complete, the space change is compatible and there are no unexplained exclusion edges as common conditions.

[0059] Please refer to Figure 6 , Figure 6 The horizontal axis represents the candidate branch window number, and the vertical axis represents the normalized value of each branch indicator. From top to bottom, each panel corresponds to the branch consistency rate. Completeness of lifecycle status inheritance Business document reference coverage Independent source group support And the degree of rejection was not explained. The dashed and dotted lines in the first panel are reference thresholds used in the branching process.

[0060] from Figure 6 visible, The distribution of high and low values ​​is observed among different branch windows, with windows above the second reference threshold typically also exhibiting high values. , and This indicates that such candidate event chains possess complete state continuity, traceable document references, and relatively independent source support, making them suitable for retention as definitive event chains or priority entry into the merging decision. Conversely, Lower windows are often accompanied by or Lower, and A high rejection rate in the panel indicates that the corresponding branch still has unresolved space or state conflicts that have not been explained by migrated records, replaced records, or supplementary events. This can be addressed by... and , , , The faceted display shows that the branch order is not simply determined by the strength of a single piece of evidence, but is formed by a combination of factors such as the completeness of the evidence, the coverage of documents, the independence of the source, and the deduction of conflicts.

[0061] In a preferred embodiment, when an exclusion edge appears in the event constraint graph, the processor backtracks forward along the event chain from the two endpoints of the exclusion edge until it obtains a confirmed event node that is commonly referenced by both endpoints and connected only by a supporting edge. Then, it traces backward from the two endpoints until it obtains an event node where the event relationship is reconciled. All event nodes between the aforementioned commonly confirmed event node and the reconciled event node form a conflict subchain. The conflict subchain records the left and right boundaries, internal supporting edges, internal exclusion edges, the candidate entity relationships involved, and the source group. Event connections outside the boundaries remain in their original state to avoid the local record conflict from extending to the entire lifecycle of the industrial object.

[0062] The processor revokes candidate entity relationships maintained solely by supporting edges within the conflicting subchain. When determining whether a candidate entity relationship is maintained solely by the conflicting subchain, it searches all its supporting edges along the associated evidence index. If all supporting edges are located within the conflicting subchain and there is no independent source evidence outside the boundary, the corresponding relationship is restored to the candidate state. If there are still independent supporting edges outside the boundary, the corresponding candidate entity relationship and its confirmed stage are retained. The processor uses the original record corresponding to the revoked relationship to regenerate the blocking key and candidate entity relationship, reconstructs the event constraint graph within the conflicting subchain, and writes the reconstructed supporting edges, exclusion edges, and candidate relationships into the new judgment version.

[0063] Specifically, when an erroneous location record creates spatial exclusion during equipment operation, the processor traces back from the exclusion edge endpoint to the most recent location event that has been jointly confirmed by the installation order and operation record, and then traces backward to the location where subsequent maintenance work orders and operation records point to the same spatial node again. A conflict sub-chain is formed between the two boundaries. If the erroneous location record originates from a ledger copy and is not supported by an independent migration order, the processor cancels the internal connection formed by the erroneous location record, retains the pre-installation history and the operation association after the conflict ends, and regenerates candidate relationships for the ledger records in the conflict sub-chain. The source trust status is only updated within the corresponding event category and lifecycle stage.

[0064] In a preferred embodiment, the processor constructs a source dependency graph based on the original record identifier, business document reference, and data transfer record. The vertices of the source dependency graph include root records and derived records. The data transfer record is used to describe the process of a record being exported from one industrial information source and imported by another industrial information source. The business document reference is used to describe the original business document referenced by the summary record. Copying, field transformation, or summarization relationships form dependency edges from upstream records to downstream records. The dependency edges store the transformation category, input field reference, output field reference, and collection batch. Input records that cannot be traced to upstream records are stored as independent root records. Records that can be traced to the same root record are aggregated along the dependency edges.

[0065] The processor assigns records obtained by copying, transforming, or aggregating from the same root record to the same source group. The source group uses the internal identifier of the root record as the group identifier and saves all downstream derived record references. When updating the source trust status, records within the same source group are used as source evidence. If there are inconsistent field values ​​within the source group, the fields before and after transformation are compared along the dependency edges. Differences that can be explained by standard field transformation are retained as mapping differences. Differences that cannot be explained by transformation relationships form inconsistency markers within the source group. Inconsistency markers within the source group prevent the corresponding derived records from participating in the current event chain verification, while retaining the root record as an input that can be independently verified.

[0066] When the source evidence is inconsistent with the event chain determination result, the processor traces the source dependency graph backward from the inconsistent derived record to locate the root record and the dependency edge where the content has changed. The inconsistency mark is written into the dependency edge between the root record and each downstream derived record. The inconsistency mark includes the conflict field, conflict event node, corresponding lifecycle stage and determination version. If the root record itself conflicts with an independent source event, the source credibility state of the entire source group under the corresponding combination is updated. If the root record is consistent with the event chain but a downstream derived record has a transformation difference, only the dependency edge where the difference occurs is marked, and the corresponding derived record is excluded from the evidence selection in this instance, without changing the state of the root source on other records.

[0067] In data aggregation scenarios, the equipment asset management system periodically imports maintenance completion status from the maintenance system, and the reporting system aggregates equipment availability status from the equipment asset management system. The processor establishes a source dependency graph between the original maintenance work order, the imported record, and the summary record based on the data transfer records. When three records jointly support the same maintenance completion event, the three records are grouped into the same source group and used as one source evidence. When the summary record writes the maintenance completion time to another day due to an error in the conversion rule, the processor locates the summary conversion edge along the dependency graph and writes an inconsistency mark. The original maintenance work order and the imported record still participate in the event chain according to the same source group, and the summary record no longer reinforces the corresponding support relationship.

[0068] In a preferred embodiment, when a supplementary event record is received, the processor performs a duplicate record check according to the information source identifier and the original record identifier. For the supplementary content that has not been written to the original record area, an event node is generated. Then, based on the occurrence time and business document reference, the corresponding entity master record, candidate entity relationship and branch to be reviewed are retrieved. When the occurrence time falls into the life cycle interval of a certain branch and the business document references the internal object identifier of the branch, the event node is inserted into the corresponding branch to be reviewed. When multiple branches can be corresponding, candidate insertion references are established respectively. The processor only re-verifies the state inheritance and spatial continuity relationship between the previous event node, the supplementary event node and the next event node at the insertion position.

[0069] When a supplementary event node connects to an adjacent event node that was previously disconnected in a candidate event chain, and is compatible with the spatial change record of the candidate event chain, the processor checks whether the source group referenced by the supplementary event node is independent of the original branch evidence. Independent source groups form new support edges, and derived source groups are used to supplement fields without repeatedly forming support edges. The connection to be verified before and after the supplementary event node is converted into a definite connection, and the corresponding branch to be verified is converted into a definite event chain. The remaining branches that are still mutually exclusive with the definite event chain remain in the state of being to be verified. The processor redetermines the effective range of each attribute and the entity alias range based on the definite event chain.

[0070] When generating a new version of the entity master record and associated evidence index based on the determined event chain, the processor copies the entity attributes and evidence references from the previous version that were not affected by the supplementary events. It writes new event connections, source credibility status, and attribute validity ranges for the lifecycle stages involved in the insertion position. The new version saves the version internal identifier, generation time, previous version reference, supplementary original record reference, and change range. The original version remains read-only. The new version saves the entity identifier mapping between the original and the original versions. When the entity has not been split, the mapping is the version succession relationship of the same entity internal identifier. When the entity is split, the allocation relationship from the original entity internal identifier to multiple new entity internal identifiers and the corresponding evidence paths are saved respectively.

[0071] In the case of supplementing the migration form, the original event chain forms two branches to be reviewed because the equipment is transferred from station 1 to station 2 but the intermediate record is missing. The supplemented migration form simultaneously references the equipment identifier before migration, the equipment identifier after migration, the space node to be migrated out, and the space node to be migrated in. The processor inserts the corresponding migration event node between the shutdown event and the installation event of station 2. After re-verification, a continuous connection is formed between the shutdown state, the migration state, the installed state, and the ready-to-run state, and a migration path is formed between the space nodes. The branch containing the migration event is converted into a deterministic event chain. The new version of the entity master record saves the effective range of station 1 and station 2 respectively, as well as the entity alias mapping of the front and back identifiers.

[0072] In a preferred embodiment, when the merging or splitting determination of the candidate entity relationship changes, the processor queries the supporting edges, exclusion edges, and original records referenced by the old determination along the associated evidence index, and then locates the source group and lifecycle stage affected by the changed determination based on the internal identifier of the evidence. The affected scope includes the source group that directly participates in the change determination, the downstream derived records that depend on the corresponding source group, and the event connections that reference the changed entity relationship. The source group and lifecycle stage that do not fall within the aforementioned scope maintain their original state. The processor reads the source credibility state saved by the corresponding lifecycle stage before the relevant source evidence is written, as the starting state for reprocessing.

[0073] The processor reprocesses independent source groups in the source dependency graph according to the event chain order. The reprocessing order is based on the time period of the event and corrected by the order of business document acceptance. The derived content of the same root source record is processed one by one with the root source group. The processor reconstructs the supporting edges and repulsive edges within the affected range in sequence, updates the source trust status and related candidate entity relationships. After completing the reprocessing of all independent source groups, the updated entity master record, event chain and source trust status are written together into the same associated version, and the initial state version, replay source group order and new judgment evidence path are saved in the associated evidence index.

[0074] During reprocessing, the currently queryable version remains unchanged. The processor completes the synchronous writing of event connections, entity mapping, and source trust status in the temporary associated version. Once there are no unprocessed edges in the event constraint graph within the affected range and the entity master record and event chain reference are consistent, the temporary associated version is marked as the current version. If it is found during the reprocessing process that the supplementary record is missing the original reference or the source dependency path is broken, the original current version is retained and the temporary associated version is marked as pending review to avoid partial updates causing the entity master record, event chain, and source trust status to be in different judgment versions.

Claims

1. A multi-source entity association and fusion system for industrial data processing, characterized in that, It includes a processor and a data storage device connected to the processor, the data storage device storing entity records and event records from multiple industrial information sources; The processor is used to: perform standard attribute mapping on the entity records and generate candidate entity relationships, and organize the event records corresponding to each candidate entity relationship into an event chain according to the life cycle sequence of the industrial object; Based on the spatiotemporal continuity and business succession relationships in the event chain, supporting or excluding evidence is formed, and the source credibility status of each industrial information source is updated accordingly. The updated source trust status is used to select event evidence, and the candidate entity relationship is merged or split. Based on the judgment results, the entity master record and associated evidence index are formed, and the event chain and source trust status are written back using the judgment results.

2. The multi-source entity association and fusion system for industrial data processing according to claim 1, characterized in that, The processor converts each event record into an event node, and the event node is associated with a source identifier, an industrial object reference, an occurrence time period, a spatial node, and a lifecycle state migration. The sequential connection of the event nodes is determined according to the reference relationship between business documents. When there is no direct reference between adjacent event nodes, the end state of the previous event node and the start state of the next event node are extracted. Supplementary connections are established only when the state can be inherited and the spatial change has migration records, forming an event chain that includes the determined connection and the connection to be verified.

3. The multi-source entity association and fusion system for industrial data processing according to claim 1, characterized in that, The processor forms an event constraint graph from event nodes corresponding to the same candidate entity relationship in different industrial information sources; For event nodes in the business document that have reference inheritance, compatible lifecycle states, and continuous spatial nodes, support edges are established in the event constraint graph; For event nodes whose time periods overlap and point to incompatible spatial nodes, or whose life cycle states are mutually exclusive, an exclusion edge is established in the event constraint graph. Each supporting edge and repulsive edge, along with the original record reference and event chain position, is written into the associated evidence index.

4. The multi-source entity association and fusion system for industrial data processing according to claim 3, characterized in that, The processor saves the source trust status according to the combination of the industrial information source, event category, and life cycle stage; For the supporting or exclusive edges in the event constraint graph, trace the source of the record participating in the verification along the original record reference, classify the derived records with the same upstream record into the same evidence source, and update the source credibility status according to the consistency relationship between each evidence source and the event chain determination result. The event node used for re-judging the candidate entity relationship is determined according to the updated source credibility status, and the source credibility status of the corresponding combination is updated with the re-judgment result.

5. The multi-source entity association and fusion system for industrial data processing according to claim 1, characterized in that, The processor identifies installation handover, production confirmation, location relocation, and component replacement events in the event chain, and uses the identified events as connecting nodes for lifecycle stages; When the entity records before and after the connecting node use different industrial object identifiers, the identifier handover relationship is extracted along the business document reference. When the end state of the previous stage is compatible with the start state of the next stage, an identity migration edge is established. The different industrial object identifiers are saved as entity aliases for the corresponding stages, and the identity migration edge is written into the associated evidence index.

6. The multi-source entity association and fusion system for industrial data processing according to claim 5, characterized in that, When the lifecycle states before and after the connecting node are incompatible, or when there are mutually exclusive spatial nodes in the same time period, the processor generates a mutually exclusive candidate event chain with the conflict event node as the branch starting point. Based on the business document references and source credibility status, event nodes with undetermined affiliation are attached to candidate event chains with succession relationships. When a new event node is added to make one of the candidate event chains form a complete state succession, the entity association corresponding to the candidate event chain is retained, and the remaining candidate event chains, together with the original record references, are marked as branches to be reviewed.

7. The multi-source entity association and fusion system for industrial data processing according to claim 3, characterized in that, When a repulsive edge appears in the event constraint graph, the processor backtracks from the two endpoints of the repulsive edge along the event chain to the common event node that is connected only by the supporting edge, and traces backward to the event node where the event relationship is reconciled, so that the event nodes between the two form a conflict sub-chain; Cancellation of candidate entity relationships maintained solely by supporting edges within the conflicting subchain; retention of candidate entity relationships with independent supporting edges outside the conflicting subchain; and regeneration of the candidate entity relationships and event constraint graph using the original records corresponding to the cancelled relationships.

8. The multi-source entity association and fusion system for industrial data processing according to claim 5, characterized in that, The processor constructs a source dependency graph based on the original record identifier, the business document reference, and the data transfer record, and assigns records obtained by copying, transforming, or summarizing the same root source record to the same source group. When updating the source trust status, records within the same source group are treated as source evidence. When the source evidence is inconsistent with the event chain determination result, the root source record is located along the source dependency graph, the corresponding inconsistency mark is written into the dependency edge between the root source record and each downstream derived record, and the source trust status of the corresponding source group is updated based on the inconsistency mark.

9. The multi-source entity association and fusion system for industrial data processing according to claim 6, characterized in that, Upon receiving a supplementary event record, the processor inserts the corresponding event node into each branch to be reviewed based on the occurrence time and the business document reference, and re-verifies the lifecycle status continuity relationship before and after the insertion position; When the supplementary event node connects to an adjacent event node that was originally disconnected in a candidate event chain, and is compatible with the spatial change record of the candidate event chain, the corresponding branch to be reviewed is converted into a determined event chain. A new version of the entity master record and associated evidence index is generated based on the determined event chain, and the entity identifier mapping between the new version and the original version is retained.

10. The multi-source entity association and fusion system for industrial data processing according to claim 8, characterized in that, When the merging or splitting determination of the candidate entity relationship changes, the processor determines the source group and the life cycle stage affected by the change determination along the associated evidence index, reads the source trust status saved by the corresponding life cycle stage before the relevant source evidence is written, reprocesses the independent source groups in the source dependency graph according to the event chain order, updates the source trust status and the relevant candidate entity relationship in sequence, and writes the updated entity master record, event chain and source trust status into the same associated version after the reprocessing is completed.