An optimal leading layer number determination method, device, equipment and storage medium
By establishing a leading number of stories and horizontal displacement response surface model for the core tube and outer frame of a super high-rise building, and combining it with a preset horizontal displacement threshold, the optimal leading number of stories is determined, which solves the problem of neglecting horizontal displacement control in existing technologies and achieves a balance between construction safety and efficiency.
Patent Information
- Application Number
- CN202611336136.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-31
- Publication Date
- 2026-11-24
AI Technical Summary
Existing technologies, when determining the number of stories the core tube leads the outer frame of a super high-rise building, neglect the need to control horizontal displacement caused by the offset structure of the core tube, resulting in a significant increase in horizontal displacement, affecting construction safety, and lacking a systematic mechanical optimization method.
By determining the candidate range of the leading number of the core tube relative to the outer frame, a response surface model of the leading number of the core tube and horizontal displacement is established. Combined with a preset horizontal displacement threshold, the optimal leading number of the core tube is determined. With horizontal displacement as the core constraint, a fast and safe decision on the number of construction layers is achieved.
It effectively avoids the construction risks of excessive horizontal displacement and torsional deformation in traditional methods, achieves a balance between construction safety and efficiency, provides clear mechanical constraints, and is suitable for the actual construction conditions of unequal synchronous climbing of the offset core tube.
Smart Images

Figure CN123158745A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of construction technology for super high-rise buildings, and in particular to a method, apparatus, equipment and storage medium for determining the optimal leading number of floors. Background Technology
[0002] In the construction of super high-rise frame-core tube structures, the core tube is usually constructed before the outer frame, forming a construction condition of "synchronous ascent of inner and outer tubes at unequal heights". The number of stories the core tube leads the outer frame, hereinafter referred to as "leading stories", is a key parameter in the construction organization design, and in practice, it is generally taken as 3 to 14 stories based on experience.
[0003] Existing research has long focused on controlling vertical deformation difference, leading to a technical bias that "the number of leading stories primarily affects vertical deformation." Guided by this bias, scholars have studied the relationship between vertical deformation difference and the number of leading stories through construction simulations, proposing the concept of "the optimal number of leading stories that minimizes vertical deformation difference." However, for offset structures where the core tube is deviated from the geometric center of the structure, this technical bias has caused the industry to overlook a more critical control indicator: horizontal displacement. Research shows that when the core tube is offset, the increase in horizontal displacement caused by changes in the number of leading stories can reach tens of millimeters, far exceeding the impact of vertical deformation difference, and exceeding the limit of horizontal displacement will directly threaten construction safety.
[0004] Existing methods rely on experience to determine the number of leading layers, lack a systematic mechanical optimization method, and use vertical deformation difference as the core indicator, neglecting the horizontal displacement control requirements of the core tube offset structure and failing to consider the differentiated impact of structural stiffness differences in different height ranges on horizontal displacement.
[0005] Therefore, there is an urgent need for a method to determine the number of leading layers that can take into account the horizontal displacement control requirements of the core tube offset structure. Summary of the Invention
[0006] This invention provides a method, apparatus, device, and storage medium for determining the optimal number of leading layers, so as to determine the optimal number of construction layers for the core tube leading the outer frame during the construction process.
[0007] In a first aspect, embodiments of the present invention provide a method for determining the optimal leading layer number, the method comprising: Determine the candidate range for the leading number of stories of the target building's core tube relative to the outer frame; Determine the horizontal displacement of the core tube relative to the outer frame within at least three leading layers from the candidate leading layer number range; Based on the horizontal displacement corresponding to the leading layer number, determine the response surface model of the mapping relationship between the leading layer number and the horizontal displacement; A preset horizontal displacement threshold is determined, and based on the response surface model and the preset horizontal displacement threshold, the optimal leading number of stories for the core tube to lead the outer frame during the construction of the target building is determined.
[0008] Secondly, embodiments of the present invention also provide an optimal leading layer determination device, the device comprising: The leading layer range determination module is used to determine the candidate range of leading layers of the target building's core tube relative to the outer frame; The data determination module is used to determine the horizontal displacement of the core tube relative to the outer frame within at least three leading layers in the leading layer candidate range; The model determination module is used to determine the response surface model of the mapping relationship between the leading layer number and the horizontal displacement based on the horizontal displacement corresponding to the leading layer number. The optimal leading layer determination module is used to determine a preset horizontal displacement threshold. Based on the response surface model and the preset horizontal displacement threshold, it determines the optimal leading layer of the core tube leading the outer frame during the construction of the target building.
[0009] Thirdly, embodiments of the present invention also provide an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the program to implement the optimal leading layer determination method as described in any of the embodiments of the present invention.
[0010] Fourthly, embodiments of the present invention also provide a storage medium for storing computer-executable instructions, which, when executed by a computer processor, are used to perform the optimal leading layer determination method as described in any of the embodiments of the present invention.
[0011] The technical solution of this invention determines the candidate range of leading floor numbers of the core tube relative to the outer frame of the target building, determines the horizontal displacement corresponding to at least three leading floor numbers within the candidate range, determines the response surface model of the mapping relationship between leading floor numbers and horizontal displacements based on the horizontal displacements corresponding to the leading floor numbers, determines a preset horizontal displacement threshold, and determines the optimal leading floor number of the core tube leading the outer frame during the construction of the target building based on the response surface model and the preset horizontal displacement threshold. This invention achieves rapid determination of the optimal construction floor number of the core tube leading the outer frame of a building tower during the construction process by using horizontal displacement as the core constraint condition for leading floor numbers and based on the response surface model.
[0012] It should be understood that the description in this section is not intended to identify key or essential features of the embodiments of the present invention, nor is it intended to limit the scope of the invention. Other features of the invention will become readily apparent from the following description. Attached Figure Description
[0013] To more clearly illustrate the technical solutions in the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0014] Figure 1 This is a flowchart of an optimal leading layer determination method provided in Embodiment 1 of the present invention; Figure 2 This is a flowchart of an optimal leading layer determination method provided in Embodiment 2 of the present invention; Figure 3 This is a schematic diagram of the structure of an optimal leading layer determination device provided in Embodiment 3 of the present invention; Figure 4 This is a schematic diagram of the structure of an electronic device that implements the optimal leading layer number determination method of the present invention. Detailed Implementation
[0015] To enable those skilled in the art to better understand the present invention, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort should fall within the scope of protection of the present invention.
[0016] It should be noted that the terms "first," "second," etc., in the specification, claims, and accompanying drawings of this invention are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be interchanged where appropriate so that the embodiments of the invention described herein can be implemented in orders other than those illustrated or described herein. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover a non-exclusive inclusion; for example, a process, method, system, product, or apparatus that comprises a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to such processes, methods, products, or apparatus.
[0017] Example 1 Figure 1This is a flowchart illustrating a method for determining the optimal leading layer number according to Embodiment 1 of the present invention. This embodiment is applicable to situations involving determining the optimal leading layer number. This method can be executed by an optimal leading layer number determination device, which can be implemented in hardware and / or software. This optimal leading layer number determination device can be configured in any electronic device with network communication and computing capabilities. Figure 1 As shown, the method includes: S110. Determine the candidate range of leading floors of the target building's core tube relative to the outer frame.
[0018] This embodiment focuses on the construction of super high-rise buildings. The target building can be a super high-rise building. The leading floor number is the number of floors in which the core tube leads the outer frame during the construction of the target building. It is the difference between the height of the core tube shear wall construction floors and the height of the outer frame column floors, i.e., the number of floors corresponding to the vertical height difference between the inner and outer tubes. The candidate range for the leading floor number is a continuous interval of all feasible values for the leading floor number. In practice, the candidate range for the leading floor number is generally taken as 3 to 14 floors based on experience.
[0019] Specifically, in practical applications, the minimum leading number of floors for the target building can be determined based on the rigid process requirements of the hydraulic climbing formwork construction working surface and vertical transportation flow operation. It can be taken as 3 floors. Then, combined with the cantilever limit of the climbing formwork equipment and the construction horizontal displacement control requirements caused by the core tube offset, the maximum leading number of floors for each area can be initially determined. It can be taken as 14 floors. Therefore, in practice, the candidate range of leading number of floors can generally be determined based on experience as 3 to 14 floors, taking into account both the rigid conditions of the construction process and the safety limits of the structural construction.
[0020] In this embodiment, by pre-determining the candidate range of the leading floor number of the target building, the optimization parameters are essentially defined as having legal boundaries from both the perspectives of construction feasibility and structural safety. This not only eliminates invalid calculations and reduces the workload of subsequent calculations, but also ensures that the optimal leading floor number obtained in the final solution is technologically feasible and free from construction safety hazards, thus giving the entire optimization method complete quantitative logic and engineering implementation value.
[0021] Optionally, determine the candidate range for leading layers, including: Based on construction organization constraints, determine the lower limit of the number of leading floors, and based on structural safety constraints, determine the upper limit of the number of leading floors. Based on the lower limit and upper limit of the leading layer, the candidate range of leading layers is obtained.
[0022] In this embodiment, the lower limit of the leading layer number is the minimum value within the candidate range of leading layer numbers. It represents the minimum number of layers the core tube must lead the outer frame, limited by construction organization and on-site technological constraints. This represents the minimum requirement for the height difference between the inner and outer tubes during construction. If the leading layer number is less than this lower limit, on-site implementation obstacles such as process conflicts, insufficient working space, and inability to perform vertical transportation in a continuous construction flow will occur. The upper limit of the leading layer number is the maximum value within the candidate range of leading layer numbers. It represents the maximum number of layers the core tube must lead the outer frame, limited by structural safety performance constraints during the construction phase. Exceeding this upper limit will cause excessive horizontal displacement and torsional effects in the eccentric core tube, failing to meet construction safety control standards and posing a risk of structural instability. The candidate range of leading layer numbers is the range of values formed by the lower and upper limits of the leading layer number. This range represents the set of all feasible leading layer numbers that simultaneously satisfy both the feasibility of construction organization and the safety of structural construction.
[0023] Specifically, in practical applications, the minimum leading layer number is determined by considering the construction space requirements of hydraulic climbing formwork, the layered operation needs of rebar formwork pouring and curing, and the staggered flow requirements of vertical transportation by tower cranes and construction elevators. If the height difference between the inner and outer cores is too small, the various construction procedures will interfere with each other, making it impossible to achieve synchronous climbing at different heights. Based on this, a unified minimum leading layer number is determined throughout the entire construction stage, i.e., the lower limit of the leading layer number. Furthermore, using the horizontal displacement and torsional deformation control indicators of the core tube offset structure construction stage as the core judgment conditions, the maximum lateral displacement under different leading layer numbers is verified through construction simulation. When the leading layer number increases to the point that the horizontal displacement touches the safety limit, the corresponding layer number is the maximum safe leading layer number, i.e., the upper limit of the leading layer number. Furthermore, the lower limit and the upper limit of the leading layer number are combined to form a closed value interval, obtaining the candidate range of leading layer numbers for the target building.
[0024] In this embodiment, by defining the boundary of the leading layer number value from the dual dimensions of construction feasibility and construction structural safety, invalid and dangerous parameters are eliminated, which can provide a compliant and reliable parameter search range for subsequent simulation optimization.
[0025] S120. Determine the horizontal displacement of the core tube relative to the outer frame within at least three leading layers in the leading layer candidate range.
[0026] In this embodiment, during the building construction phase, the core tube leads the outer frame significantly. The shear wall above the core tube is not laterally constrained by the outer frame columns, forming a single-sided independent cantilever shear wall tube. Because the core tube is deviated from the geometric center of the building, the center of rigidity and the center of mass are permanently eccentric. All horizontal loads will simultaneously generate translational lateral displacement and additional torsional displacement. The two are superimposed to form the total horizontal displacement. Moreover, the greater the number of stories the core tube leads the outer frame and the higher the cantilever, the more obvious the increase in horizontal displacement.
[0027] Specifically, relying on the finite element model with variable leading layer parameters, at least three sets of sample leading layers are selected from the leading layer candidate range. The variables are modified in batches to automatically generate construction models for each working condition. After completing the simulation of the entire construction process, the maximum horizontal displacement corresponding to each set is extracted to complete the data acquisition.
[0028] Optionally, determine the horizontal displacements corresponding to at least three leading layers within the candidate leading layer range, including: At least three leading layers are determined from the candidate range of leading layers; A construction simulation analysis was performed on the leading layer number to determine the horizontal displacement corresponding to the leading layer number.
[0029] In this embodiment, a parametric finite element model of the core tube offset frame-core tube super high-rise structure can be pre-established. The number of leading stories of the core tube leading the outer frame during the construction stage is defined as a variable parameter. The model includes building dimensions, core tube offset layout, concrete time-varying parameters, construction wind load, climbing formwork construction load, and layered construction loading sequence. The concrete time-varying parameters include elastic modulus, creep coefficient, and shrinkage coefficient.
[0030] Furthermore, three or more discrete values are evenly selected as calculation conditions based on the candidate range of the leading layer number. For example, if the candidate range of the leading layer number is 3-10 layers, the leading layer number can be selected as 3, 6, or 10 layers.
[0031] Furthermore, by modifying only the variable parameter within the finite element model—the leading layer number—the software automatically updates the vertical height difference between the core tube and the outer frame, the construction climbing segments, and the load application height. No manual adjustment of the wall and frame floor elevations is required, quickly generating the construction simulation model corresponding to each leading layer number. Layer-by-layer construction loading simulations are then performed on the three sets of sample construction simulation models, fully simulating the entire process of the core tube rising first and the outer frame climbing later. Construction-specific stress conditions such as eccentric tube torsion, wind load, second-order effects, and early stiffness decay of concrete are considered simultaneously. After the simulation calculations are completed, the maximum horizontal displacement of each floor during the entire construction process is extracted in the post-processing module under each leading layer number condition, and the horizontal displacement corresponding to each leading layer number is recorded.
[0032] In this embodiment, by simulating and analyzing the entire construction process of the target building, the horizontal displacement corresponding to different leading layers is determined. This enables low-cost, high-efficiency, and high-precision simulation of the horizontal displacement response of the offset core tube under different leading layers, allowing for early identification of construction safety risks. It also provides reliable mechanical data support for response surface modeling and quantitative solution of the optimal leading layer, thus overcoming the limitations of traditional empirical values.
[0033] S130. Determine the response surface model of the mapping relationship between the leading layer number and the horizontal displacement based on the horizontal displacement corresponding to the leading layer number.
[0034] In this embodiment, the response surface model is a mapping relationship model between the number of leading layers and the horizontal displacement. It is used to represent the quantitative change law of the maximum horizontal displacement generated by the construction of the eccentric core tube under different leading layers. When the number of leading layers increases, the height of the cantilever tube increases, and the horizontal displacement grows non-linearly. There is a definite functional correspondence between the two.
[0035] Specifically, the horizontal displacements corresponding to multiple leading layers within the candidate range of leading layers are summarized to form multiple sets of one-to-one input-output data sample sets. Each set of data includes one leading layer value and the construction horizontal displacement obtained from the simulation of that working condition.
[0036] Furthermore, this embodiment incorporates a quadratic polynomial as the response surface model representing the mapping relationship between the leading layer number and the horizontal displacement, based on mechanical principles. The quadratic function accurately describes the nonlinear characteristics of the accelerated increase in horizontal displacement as the leading layer number increases, adapting to the displacement change trends caused by the cantilever bending of the eccentric cylinder and second-order effects. Further, by substituting all sample data into the polynomial equation and solving for the fitting coefficients using the least squares method, a unique and complete response surface formula is obtained, establishing a continuous mathematical mapping between the leading layer number and the horizontal displacement. By inputting the leading layer number within any interval, the corresponding horizontal displacement can be directly predicted without repeating finite element simulations.
[0037] In this embodiment, a quadratic polynomial response surface model is fitted based on multiple sets of simulation sample data, transforming the discrete leading layer number and horizontal displacement data into a continuous and computable mathematical mapping relationship. This significantly reduces the amount of repetitive finite element calculations, enabling rapid prediction of horizontal displacement under any leading layer number, and providing an efficient computational platform for subsequent optimization of the leading layer number with horizontal displacement as a constraint.
[0038] Optionally, the response surface model relating the leading layer number to the horizontal displacement is represented by the following equation: ; in, This refers to the horizontal displacement of the core tube relative to the outer frame. denoted as the leading layer number of the core tube leading the outer frame, and a, b, and c are the fitting coefficients of the response surface model.
[0039] In this embodiment, when the core tube is offset and the number of leading layers increases, the height of the exposed cantilever tube increases, and the wind load bending moment, second-order effect, and eccentric torsional effect are amplified simultaneously. The horizontal displacement increases nonlinearly with the number of leading layers, and the quadratic curve can accurately describe this increasing trend.
[0040] S140. Determine the preset horizontal displacement threshold. Based on the response surface model and the preset horizontal displacement threshold, determine the optimal leading number of stories for the core tube leading the outer frame during the construction of the target building.
[0041] In this embodiment, the preset horizontal displacement threshold is the maximum safe horizontal displacement limit allowed by the structure during the construction phase of the target building. It can be calculated based on the displacement control standard and the preset safety factor, and serves as a hard constraint for determining whether the leading number of floors is safe. The optimal leading number of floors is the number of floors within the candidate range that simultaneously meets the preset horizontal displacement threshold and matches the construction requirements of the target building.
[0042] In practical applications, the optimal leading layer number has two optimization objectives. If the optimization objective is to shorten the construction period, the maximum feasible leading layer number is taken as the optimal leading layer number under the premise of satisfying the preset horizontal displacement threshold, thereby expanding the work area and shortening the construction period. If the objective is to prioritize safety and minimize horizontal displacement, the leading layer number that minimizes horizontal displacement is taken as the optimal leading layer number, thereby minimizing the risk of lateral displacement during construction.
[0043] Specifically, a complete set of optimization equations is established based on the optimization objective, the requirement that the horizontal displacement does not exceed a preset horizontal displacement threshold, and the requirement that the candidate leading layer number falls within the specified range. Furthermore, the preset horizontal displacement threshold is substituted into the response surface model to obtain the critical leading layer number. The horizontal displacement corresponding to this critical leading layer number just reaches the preset horizontal displacement threshold, which meets safety requirements. Further, feasible solutions are selected by considering the candidate leading layer number range. If the optimization objective is to shorten the construction period, the largest leading layer number among those less than the critical leading layer number and within the candidate leading layer number range is selected as the optimal leading layer number, maximizing the leading layer number to accelerate construction. If the optimization objective is to prioritize safety, the leading layer number corresponding to the smallest horizontal displacement among those less than the critical leading layer number and within the candidate leading layer number range is selected as the optimal leading layer number, strictly controlling the horizontal displacement.
[0044] In this embodiment, the standard safe displacement is used as a hard threshold, and the horizontal displacement is quickly predicted by relying on the response surface model. The optimal value that takes into account both construction safety and construction efficiency is selected from all the leading layers that are feasible in terms of technology, replacing the traditional pure experience value, and realizing the quantitative and safe determination of the leading layer.
[0045] Optionally, a preset horizontal displacement threshold is determined, including: Determine the total construction height of the target building, the preset standard coefficient, and the preset safety factor; The preset acceptance criteria are determined based on the ratio of the total construction height to the preset specification coefficient. The preset horizontal displacement threshold is determined by multiplying the preset acceptance standard and the preset safety factor.
[0046] In this embodiment, the total construction height is the height from the construction reference plane to the top of the tower. The preset specification coefficient and preset safety factor are pre-set values. The preset specification coefficient is the displacement control denominator coefficient given in the code for super high-rise structures, representing a limit control parameter specified in the code. Different structural systems have different values, and it is used to define the displacement acceptance benchmark. The preset safety factor is an amplified safety reserve coefficient introduced to account for adverse factors such as load uncertainty during construction, early stiffness dispersion of concrete, and core tube offset torsion. Its value is generally between 1.1 and 1.3. The preset acceptance standard is the ratio of the total construction height to the preset specification coefficient, representing the allowable benchmark value for construction displacement and serving as the displacement control benchmark at the code level.
[0047] Specifically, the total construction height of the section to be optimized is obtained. Based on the relevant design specifications for frame-core tube structures, corresponding preset specification coefficients are selected. A preset safety factor is then chosen, taking into account the project risk level, core tube offset degree, and construction wind conditions. When the core tube eccentricity is large or the wind environment is severe, a larger preset safety factor is used. The total construction height is divided by the preset specification coefficient to obtain the preset acceptance standard, representing the displacement acceptance benchmark that the structure should meet under normal conditions. Then, the preset acceptance standard is multiplied by the preset safety factor to obtain the preset horizontal displacement threshold. The preset safety factor further tightens the specification acceptance standard, taking into account various uncertain and adverse effects during the construction phase, resulting in the upper limit of displacement constraints used for optimization calculations. When subsequently solving for the optimal leading layer number, the maximum horizontal displacement output by the response surface model must not exceed this preset horizontal displacement threshold.
[0048] The preset horizontal displacement threshold can be determined by the following formula: ; in, To preset the horizontal displacement threshold, Total construction height To preset the standard coefficient, This is a preset safety factor.
[0049] In this embodiment, the standard acceptance value is obtained by using the building construction height and standard coefficient, and then a safety factor is introduced to reduce and tighten it, so as to obtain the displacement control threshold that is suitable for the construction conditions of the offset core tube super high-rise building, which can provide safety constraints for the subsequent solution of the optimal leading number of floors.
[0050] The technical solution of this invention determines the candidate range of leading floor numbers for the core tube relative to the outer frame of the target building, determines the horizontal displacement corresponding to at least three leading floor numbers within the candidate range, determines a response surface model of the mapping relationship between leading floor numbers and horizontal displacements based on the horizontal displacements corresponding to the leading floor numbers, determines a preset horizontal displacement threshold, and determines the optimal leading floor number for the core tube to lead the outer frame during the construction of the target building based on the response surface model and the preset horizontal displacement threshold. This invention, by constructing a response surface model of leading floor numbers and horizontal displacements, uses horizontal displacement as the core constraint condition for leading floor numbers and is based on the response surface model, changing the traditional approach of using only vertical deformation difference as a control. The design concept focuses on controlling the horizontal displacement risks caused by cantilevered tubes and eccentric torsion during the construction of super high-rise buildings with offset core tube frames. Under the premise of meeting the requirements of the construction process for the number of leading stories, the optimal number of leading stories is solved by using the horizontal displacement safety limit as a hard boundary. This effectively avoids the construction hazards of excessive horizontal displacement and torsional deformation caused by selecting too large a number of leading stories, and achieves a balance between construction safety and construction efficiency. The obtained quantitative results of leading stories have clear mechanical constraints, make up for the subjectivity of empirical values, and are more suitable for the actual construction conditions of the offset core tubes rising at different heights. This enables the rapid determination of the optimal number of construction stories for the building tower core tube to lead the outer frame during the construction process.
[0051] Example 2 Figure 2 This is a flowchart illustrating a method for determining the optimal leading layer number according to Embodiment 2 of the present invention. This embodiment further specifies the method based on the previous embodiment. This embodiment is applicable to situations involving determining the optimal leading layer number. The method can be executed by an optimal leading layer number determination device, which can be implemented in hardware and / or software. This optimal leading layer number determination device can be configured in any electronic device with network communication and computing capabilities. Figure 2 As shown, the method includes: S210. Determine the total construction height of the target building, and divide the total construction height into a first height interval, a second height interval, and a third height interval based on the height; wherein, in terms of vertical position, the first height interval is shorter than the second height interval, and the second height interval is shorter than the third height interval.
[0052] In this embodiment, the first height interval is the lower section of the target building tower, with the smallest vertical height, corresponding to the lower part of the tower. This section has high overall structural stiffness and ample lateral and torsional resistance. The second height interval is the middle section of the target building tower, with a height between the first and third height intervals, corresponding to the middle part of the tower. The structural stiffness gradually decreases in this section. The third height interval is the upper section of the target building tower, with the largest vertical height, corresponding to the upper part of the tower. This section has high structural flexibility and is highly sensitive to changes in the leading floor number during horizontal displacement. Specifically, the first height interval is smaller than the second height interval, and the second height interval is smaller than the third height interval.
[0053] Specifically, the total construction height of the target building tower from the construction reference plane to the top of the structure is obtained to determine the complete vertical construction range. This can be achieved by using an empirical method of dividing the height into three equal parts geometrically, or by using an adaptive mechanical method based on the sensitivity derivative of displacement with respect to the leading number of stories, dividing the total construction height vertically into three height intervals. In this embodiment, structural stiffness and horizontal displacement sensitivity are used as the basis for the division, with sensitivity adaptive division being preferred to match the actual variation characteristics of the core tube offset tower stiffness along the height.
[0054] S220. Determine the first response surface model corresponding to the first height interval, the second response surface model corresponding to the second height interval, and the third response surface model corresponding to the third height interval.
[0055] In this embodiment, the first response surface model is a response surface model that maps the number of leading layers to horizontal displacement in the first height interval, the second response surface model is a response surface model that maps the number of leading layers to horizontal displacement in the second height interval, and the third response surface model is a response surface model that maps the number of leading layers to horizontal displacement in the third height interval.
[0056] Specifically, based on the pre-built construction simulation model, the structural stiffness parameters are modified to conduct construction simulation analysis on the first height interval, the second height interval, and the third height interval, respectively. The horizontal displacements of the core tube relative to the outer frame at different leading stories in the first height interval, the second height interval, and the third height interval are obtained. Among these, the structural stiffness of the first height interval is less than that of the second height interval, and the structural stiffness of the second height interval is less than that of the third height interval.
[0057] Furthermore, a first response surface model is determined by fitting a quadratic polynomial to the horizontal displacement corresponding to different leading layers in the first height interval; a second response surface model is determined by fitting a quadratic polynomial to the horizontal displacement corresponding to different leading layers in the second height interval; and a third response surface model is determined by fitting a quadratic polynomial to the horizontal displacement corresponding to different leading layers in the third height interval.
[0058] In this embodiment, due to the decrease in stiffness of the building tower along its height and the gradual increase in eccentric torsional effect, the variation patterns of horizontal displacement and leading floor number differ in different height sections. This embodiment establishes independent response surface models for each height section, which can accurately reflect the actual deformation patterns of each height section, avoiding the prediction bias caused by using a single global model, and providing an accurate response surface model for determining the optimal leading floor number in each section.
[0059] S230. Determine the leading layer constraint threshold and the horizontal displacement constraint threshold.
[0060] In this embodiment, the leading layer constraint threshold is a preset maximum leading layer, and the horizontal displacement constraint threshold is a preset maximum horizontal displacement. The horizontal displacement constraint threshold may be the same as or different from the preset horizontal displacement threshold mentioned above.
[0061] S240. Substitute the horizontal displacement constraint threshold into the first response surface model, the second response surface model, and the third response surface model respectively to calculate the corresponding first leading layer number, second leading layer number, and third leading layer number.
[0062] In this embodiment, the first leading layer number is the leading layer number calculated by substituting the horizontal displacement constraint threshold into the first response surface model, the second leading layer number is the leading layer number calculated by substituting the horizontal displacement constraint threshold into the second response surface model, and the third leading layer number is the leading layer number calculated by substituting the horizontal displacement constraint threshold into the third response surface model. The first leading layer number, the second leading layer number, and the third leading layer number represent the leading layer number corresponding to when the horizontal displacement of the section exactly reaches the horizontal displacement safety limit.
[0063] In this embodiment, a unified displacement safety limit is substituted into the independent response surface model of each zone. The critical leading layer number when the displacement in each height zone is about to exceed the limit is calculated, which provides a basis for subsequent screening to obtain the optimal leading layer number that can be implemented in each zone.
[0064] S250. The maximum value between the leading layer constraint threshold and the first leading layer is taken as the optimal leading layer in the first height interval. The average value between the leading layer constraint threshold and the first leading layer is taken as the optimal leading layer in the second height interval. The minimum value between the leading layer constraint threshold and the first leading layer is taken as the optimal leading layer in the third height interval.
[0065] In this embodiment, the optimal leading layer number in the first height interval is the maximum value between the leading layer number constraint threshold and the first leading layer number; the optimal leading layer number in the second height interval is the average value between the leading layer number constraint threshold and the first leading layer number; and the optimal leading layer number in the third height interval is the minimum value between the leading layer number constraint threshold and the first leading layer number.
[0066] In this embodiment, the low-level structure has high rigidity, so a larger leading number of both can be used; the high-level structure has high flexibility, so a smaller leading number of both can be used; and the middle-level structure has moderate rigidity, so the average of both can be used. The goal is to balance the construction period and the quality by using a large leading number of low-level structures to ensure the construction period and a small leading number of high-level structures to control the displacement.
[0067] In this embodiment, based on the same set of process lower limits and critical number of low-zone displacement layers, a layered value selection strategy of maximum, average, and minimum values is used to achieve a zoned variable leading layer design that improves efficiency by increasing the number of leading layers in the low zone, compromises in the middle zone, and reduces the numerical deformation of the leading layers in the high zone. This design adapts to the stress characteristics of the offset core tube super high-rise buildings with high stiffness in the low zone and high flexibility in the high zone, while ensuring that the number of leading layers in each section meets the minimum construction requirements of the process.
[0068] Optionally, after determining the optimal leading layer number for the first height interval, the second height interval, and the third height interval, the maximum value between the leading layer number constraint threshold and the first leading layer number is taken as the optimal leading layer number for the first height interval; the average value between the leading layer number constraint threshold and the first leading layer number is taken as the optimal leading layer number for the second height interval; and the minimum value between the leading layer number constraint threshold and the first leading layer number is taken as the optimal leading layer number for the third height interval. This process includes: Determine the actual horizontal displacement corresponding to the actual height and the actual number of leading floors of the target building during construction; The actual height is determined to belong to the height interval of the first height interval, the second height interval, and the third height interval. Based on the belonging height interval, the corresponding reference response surface model is determined from the first response surface model, the second response surface model, or the third response surface model. The predicted horizontal displacement is determined based on the reference response surface model and the actual leading layer number. The model parameters of the reference response surface model are updated based on the difference between the predicted horizontal displacement and the actual horizontal displacement.
[0069] In this embodiment, the actual height is the actual height of the target building during its current construction process; the actual leading number of floors is the actual leading number of floors of the core tube relative to the outer frame during the current construction process of the target building; and the actual horizontal displacement is the actual value of the horizontal displacement corresponding to the current construction height and the actual leading number of floors of the target building. The assigned height interval is the vertical interval to which the actual height belongs in the first height interval, the second height interval, and the third height interval; the reference response surface model is the response surface model corresponding to the assigned height interval; and the predicted horizontal displacement is the predicted horizontal displacement value calculated and output after inputting the actual leading number of floors into the reference response surface model.
[0070] Specifically, during the actual construction of super high-rise buildings, when the structure reaches a certain reference height, the actual leading story number at that moment is recorded. Measured structural data at that location are collected using a total station and displacement monitoring equipment to obtain the actual horizontal displacement under that condition, resulting in a set of measured samples of the actual leading story number and actual horizontal displacement. Furthermore, the actual height is compared with the vertical ranges of the pre-defined first, second, and third height intervals to determine the corresponding height interval. The response surface model corresponding to this height interval is then retrieved from the first, second, and third response surface models and used as the reference response surface model for this verification.
[0071] Furthermore, the actual leading layer number at the site is input into the quadratic polynomial formula of the reference response surface model, outputting the theoretically calculated predicted horizontal displacement. Next, the difference between the predicted and actual horizontal displacements is calculated. If the difference exceeds a preset allowable error threshold, it indicates a significant deviation between the original response surface model and the actual deformation at the site, requiring an update to the model parameters. Further, the actual leading layer number and actual horizontal displacement obtained from the field measurements are used as new sample points and incorporated into the original simulation sample dataset of the response surface model. Using the updated simulation sample dataset, the least squares method is re-applied to refit the model, updating the fitting coefficients of the reference response surface model. After the update, a corrected response surface model is obtained. Subsequent calculations of horizontal displacement within this height range are then performed using the updated response surface model.
[0072] In this embodiment, by introducing measured data from the construction site, the deviation between the model prediction and the actual deformation is identified, and the response surface model coefficients are iteratively updated to reduce the error between simulation and real engineering, so that the subsequent calculation results of the optimal leading layer are more in line with the actual site conditions, thereby improving the engineering reliability of the entire method. Specific Implementation Taking a super high-rise structure with an offset core tube as an example, the method for determining the optimal number of leading floors of the present invention will be explained. There are N floors above ground, a total construction height of H, and the core tube is offset on the north side of the structure.
[0074] First, a parametric finite element model is established using finite element analysis software (such as ETABS, YJK, MIDAS, or ABAQUS), and the leading story number L of the core tube leading the outer frame is defined as a variable parameter. The time-varying properties of concrete are described using the B3 model or the ACI209 model to represent the creep and shrinkage coefficients.
[0075] Next, based on the construction organization design, the candidate range for the leading number of stories between the core tube and the outer frame is determined as [L_min, L_max]. For example, L_min is determined by the vertical transportation efficiency requirement, such as 3 stories, and L_max is determined by the inter-story drift angle limit, such as 15 stories. Within the range [L_min, L_max], m sample points are selected, such as m=5-7. A full-process construction simulation analysis is performed on each sample point to extract the maximum horizontal displacement D_max of the structure under each working condition.
[0076] Based on the sample point data, a quadratic polynomial response surface model is fitted using the least squares method, as expressed by the following equation: ; in, This refers to the horizontal displacement of the core tube relative to the outer frame. denoted as the leading layer number of the core tube leading the outer frame, and a, b, and c are the fitting coefficients of the response surface model.
[0077] After fitting, select 1-2 validation points outside the sample points for finite element analysis and compare the results with the model predictions. If the prediction error exceeds a preset threshold, such as 5%, increase the number of sample points and refit until the accuracy meets the requirements.
[0078] Furthermore, based on the ratio of the total construction height to the preset specification coefficient, the preset acceptance standard is determined. Then, based on the product of the preset acceptance standard and the preset safety factor, the preset horizontal displacement threshold is determined, expressed by the following formula: ; in, To preset the horizontal displacement threshold, Total construction height The preset standardization coefficient can be set to 2000. To preset the safety factor, a value of 1.1-1.3 can be used.
[0079] Under the conditions of not exceeding the preset horizontal displacement threshold and being within the candidate range of leading layers, the optimal leading layer that satisfies the constraints is obtained by minimizing the leading layer L or minimizing the horizontal displacement.
[0080] Furthermore, the method for determining the optimal leading layer is optimized by dividing the preset total construction height of the target building into three height intervals: the first height interval of the low zone is 1 to N1 layers, the second height interval of the middle zone is N1+1 to N2 layers, and the third height interval of the high zone is N2+1 to N layers. Response surface models for each height interval are established.
[0081] Furthermore, leading layer constraint thresholds and horizontal displacement constraint thresholds are determined. These horizontal displacement constraint thresholds are then substituted into the response surface model for each height interval to calculate the corresponding first, second, and third leading layers. Finally, the maximum value between the leading layer constraint threshold and the first leading layer is taken as the optimal leading layer for the first height interval; the average value between these two values is taken as the optimal leading layer for the second height interval; and the minimum value between these two values is taken as the optimal leading layer for the third height interval.
[0082] Among them, the low-rise structure has high rigidity and is not sensitive to horizontal displacement, so the number of leading stories can be increased to speed up the construction period. The optimal number of leading stories in the first height range is relatively large. The middle-rise structure has increased flexibility and the number of leading stories can be moderately controlled. The optimal number of leading stories in the second height range is moderate. The high-rise structure has the greatest flexibility and is sensitive to horizontal displacement, so horizontal displacement needs to be strictly controlled. The optimal number of leading stories in the third height range is relatively small.
[0083] Furthermore, construction is organized according to a variable leading layer strategy. After each height interval is completed, the maximum actual horizontal displacement of that height interval is measured and compared with the horizontal displacement predicted by the response surface model. If the deviation between the predicted and actual horizontal displacements is within the allowable range, construction continues according to the original plan. If the deviation exceeds the limit, such as |(D_measured - D_predicted) / D_predicted| > 10%, a closed-loop correction procedure is initiated. Based on the measured horizontal displacement, the key parameters in the response surface model are corrected. The correction method can use Bayesian update or least squares recursive algorithm. The coefficients a, b, and c of the response surface model are gradually corrected using measured data to make the predicted values approximate the measured trends. Based on the corrected response surface model, response surface models for the low, middle, and high zones are re-established.
[0084] The technical solution of this invention, by considering the differentiated horizontal displacement response caused by the vertical attenuation of structural stiffness and the gradual enhancement of eccentric torsional effect in different height intervals, establishes corresponding response surface models for each height interval. This overcomes the defect of using a single global response surface model, which cannot take into account the deformation characteristics of low, medium and high zones, resulting in large prediction errors. It can more accurately characterize the nonlinear mapping relationship between the leading number of stories and the horizontal displacement during construction in different sections, providing a more accurate proxy calculation carrier for the constraint solution of the optimal leading number of stories in each height interval. It supports the implementation of the segmented and variable leading number optimization strategy, so that the obtained optimal leading number takes into account both the feasibility of construction technology and the structural safety during the construction stage. This can improve the engineering adaptability of the entire optimal leading number determination method to core tube offset frame-core tube super high-rise structures.
[0085] Example 3 Figure 3 This is a schematic diagram of an optimal leading layer determination device provided in Embodiment 3 of the present invention. This embodiment is applicable to situations involving the determination of the optimal leading layer. The optimal leading layer determination device can be implemented in hardware and / or software, and can be configured in any electronic device with network communication and computing capabilities. Figure 3 As shown, the device includes: The leading layer range determination module 310 is used to determine the candidate range of leading layers of the target building core tube relative to the outer frame; The data determination module 320 is used to determine the horizontal displacement of the core tube relative to the outer frame within at least three leading layers in the leading layer candidate range; The model determination module 330 is used to determine the response surface model of the mapping relationship between the leading layer number and the horizontal displacement based on the horizontal displacement corresponding to the leading layer number; The optimal leading layer determination module 340 is used to determine a preset horizontal displacement threshold and, based on the response surface model and the preset horizontal displacement threshold, determine the optimal leading layer of the core tube leading the outer frame during the construction of the target building.
[0086] Optionally, determine the candidate range for leading layers, including: Based on construction organization constraints, determine the lower limit of the number of leading floors, and based on structural safety constraints, determine the upper limit of the number of leading floors. Based on the lower limit and upper limit of the leading layer, the candidate range of leading layers is obtained.
[0087] Optionally, determine the horizontal displacements corresponding to at least three leading layers within the candidate leading layer range, including: At least three leading layers are determined from the candidate range of leading layers; A construction simulation analysis was performed on the leading layer number to determine the horizontal displacement corresponding to the leading layer number.
[0088] Optionally, the response surface model relating the leading layer number to the horizontal displacement is represented by the following equation: ; in, This refers to the horizontal displacement of the core tube relative to the outer frame. denoted as the leading layer number of the core tube leading the outer frame, and a, b, and c are the fitting coefficients of the response surface model.
[0089] Optionally, a preset horizontal displacement threshold is determined, including: Determine the total construction height of the target building, the preset standard coefficient, and the preset safety factor; The preset acceptance criteria are determined based on the ratio of the total construction height to the preset specification coefficient. The preset horizontal displacement threshold is determined by multiplying the preset acceptance standard and the preset safety factor.
[0090] Optionally, a method for determining the optimal leading layer number also includes: Determine the total construction height of the target building, and divide the total construction height into a first height interval, a second height interval, and a third height interval based on the height; wherein, in terms of vertical position, the first height interval is shorter than the second height interval, and the second height interval is shorter than the third height interval; Determine the first response surface model corresponding to the first altitude range, the second response surface model corresponding to the second altitude range, and the third response surface model corresponding to the third altitude range; Determine the leading layer constraint threshold and the horizontal displacement constraint threshold; Substitute the horizontal displacement constraint threshold into the first response surface model, the second response surface model, and the third response surface model respectively to calculate the corresponding first leading layer, second leading layer, and third leading layer. The maximum value between the leading layer constraint threshold and the first leading layer is taken as the optimal leading layer in the first height interval. The average value between the leading layer constraint threshold and the first leading layer is taken as the optimal leading layer in the second height interval. The minimum value between the leading layer constraint threshold and the first leading layer is taken as the optimal leading layer in the third height interval.
[0091] Optionally, after taking the maximum value of the leading layer constraint threshold and the first leading layer as the optimal leading layer in the first height interval, taking the average value of the leading layer constraint threshold and the first leading layer as the optimal leading layer in the second height interval, and taking the minimum value of the leading layer constraint threshold and the first leading layer as the optimal leading layer in the third height interval, the process includes: Determine the actual horizontal displacement corresponding to the target building's construction height and the reference leading floor number; The actual height is determined to belong to the height interval of the first height interval, the second height interval, and the third height interval. Based on the belonging height interval, the corresponding reference response surface model is determined from the first response surface model, the second response surface model, or the third response surface model. The predicted horizontal displacement is determined based on the reference response surface model and the reference leading layer number. The model parameters of the reference response surface model are updated based on the difference between the predicted horizontal displacement and the actual horizontal displacement.
[0092] The technical solution of this invention determines the candidate range of leading floor numbers of the core tube relative to the outer frame of the target building, determines the horizontal displacement corresponding to at least three leading floor numbers within the candidate range, determines the response surface model of the mapping relationship between leading floor numbers and horizontal displacements based on the horizontal displacements corresponding to the leading floor numbers, determines a preset horizontal displacement threshold, and determines the optimal leading floor number of the core tube leading the outer frame during the construction of the target building based on the response surface model and the preset horizontal displacement threshold. This invention achieves rapid determination of the optimal construction floor number of the core tube leading the outer frame of a building tower during the construction process by using horizontal displacement as the core constraint condition for leading floor numbers and based on the response surface model.
[0093] The optimal leading layer determination device provided in the embodiments of the present invention can execute the optimal leading layer determination method provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the method execution.
[0094] Example 4 Figure 4 A schematic diagram of an electronic device 10, which can be used to implement embodiments of the present invention, is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processors, cellular phones, smartphones, wearable devices (e.g., helmets, glasses, watches, etc.), and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely illustrative and are not intended to limit the implementation of the invention described and / or claimed herein.
[0095] like Figure 4As shown, the electronic device 10 includes at least one processor 11 and a memory, such as a read-only memory (ROM) 12 or a random access memory (RAM) 13, communicatively connected to the at least one processor 11. The memory stores computer programs executable by the at least one processor. The processor 11 can perform various appropriate actions and processes based on the computer program stored in the ROM 12 or loaded from storage unit 18 into the RAM 13. The RAM 13 can also store various programs and data required for the operation of the electronic device 10. The processor 11, ROM 12, and RAM 13 are interconnected via a bus 14. An input / output (I / O) interface 15 is also connected to the bus 14.
[0096] Multiple components in electronic device 10 are connected to I / O interface 15, including: input unit 16, such as keyboard, mouse, etc.; output unit 17, such as various types of displays, speakers, etc.; storage unit 18, such as disk, optical disk, etc.; and communication unit 19, such as network card, modem, wireless transceiver, etc. Communication unit 19 allows electronic device 10 to exchange information / data with other devices through computer networks such as the Internet and / or various telecommunications networks.
[0097] Processor 11 can be a variety of general-purpose and / or special-purpose processing components with processing and computing capabilities. Some examples of processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various special-purpose artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any suitable processor, controller, microcontroller, etc. Processor 11 performs the various methods and processes described above, such as the optimal leading layer determination method.
[0098] In some embodiments, the optimal leading layer determination method may be implemented as a computer program tangibly contained in a computer-readable storage medium, such as storage unit 18. In some embodiments, part or all of the computer program may be loaded and / or mounted on electronic device 10 via ROM 12 and / or communication unit 19. When the computer program is loaded into RAM 13 and executed by processor 11, one or more steps of the optimal leading layer determination method described above may be performed. Alternatively, in other embodiments, processor 11 may be configured to perform the optimal leading layer determination method by any other suitable means (e.g., by means of firmware).
[0099] In particular, according to embodiments of the present invention, the processes described above with reference to the flowcharts can be implemented as computer software programs. For example, embodiments of the present invention include a computer program product comprising a computer program carried on a non-transitory computer-readable medium, the computer program containing program code for performing the methods shown in the flowcharts. In such embodiments, the computer program can be downloaded and installed from a network via communication unit 19, or installed from storage unit 18, or installed from ROM 12. When the computer program is executed by processor 11, it performs the functions defined in the methods of the embodiments of the present invention.
[0100] Various embodiments of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field-programmable gate arrays (FPGAs), application-specific integrated circuits (ASICs), application-specific standard products (ASSPs), system-on-a-chip (SoCs), complex programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various embodiments may include implementations in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which may be a dedicated or general-purpose programmable processor, capable of receiving data and instructions from a storage system, at least one input device, and at least one output device, and transmitting data and instructions to the storage system, the at least one input device, and the at least one output device.
[0101] Computer programs used to implement the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, such that when executed by the processor, the computer programs cause the functions / operations specified in the flowcharts and / or block diagrams to be performed. The computer programs may be executed entirely on a machine, partially on a machine, or as a standalone software package, partially on a machine and partially on a remote machine, or entirely on a remote machine or server.
[0102] In the context of this invention, a computer-readable storage medium can be a tangible medium that may contain or store a computer program for use by or in conjunction with an instruction execution system, apparatus, or device. A computer-readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, apparatus, or devices, or any suitable combination thereof. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. More specific examples of machine-readable storage media include electrical connections based on one or more wires, portable computer disks, hard disks, random access memory (RAM), read-only memory (ROM), erasable programmable read-only memory (EPROM or flash memory), optical fibers, portable compact disk read-only memory (CD-ROM), optical storage devices, magnetic storage devices, or any suitable combination thereof.
[0103] To provide interaction with a user, the systems and techniques described herein can be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and pointing device (e.g., a mouse or trackball) through which the user provides input to the electronic device. Other types of devices can also be used to provide interaction with the user; for example, feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user can be received in any form (including sound input, voice input, or tactile input).
[0104] The systems and technologies described herein can be implemented in computing systems that include backend components (e.g., as data servers), or middleware components (e.g., application servers), or frontend components (e.g., user computers with graphical user interfaces or web browsers through which users can interact with implementations of the systems and technologies described herein), or any combination of such backend, middleware, or frontend components. The components of the system can be interconnected via digital data communication of any form or medium (e.g., communication networks). Examples of communication networks include local area networks (LANs), wide area networks (WANs), blockchain networks, and the Internet.
[0105] A computing system can include clients and servers. Clients and servers are generally located far apart and typically interact through communication networks. The client-server relationship is created by computer programs running on the respective computers and having a client-server relationship with each other. The server can be a cloud server, also known as a cloud computing server or cloud host, which is a hosting product within the cloud computing service system to address the shortcomings of traditional physical hosts and VPS services, such as high management difficulty and weak business scalability.
[0106] It should be understood that the various forms of processes shown above can be used, with steps reordered, added, or deleted. For example, the steps described in this invention can be executed in parallel, sequentially, or in different orders, as long as the desired result of the technical solution of this invention can be achieved, and this is not limited herein.
[0107] The specific embodiments described above do not constitute a limitation on the scope of protection of this invention. Those skilled in the art should understand that various modifications, combinations, sub-combinations, and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of this invention should be included within the scope of protection of this invention.
Claims
1. A method for determining the optimal leading layer number, characterized in that, include: Determine the candidate range for the leading number of stories of the target building's core tube relative to the outer frame; Determine the horizontal displacement of the core tube relative to the outer frame within at least three leading layers from the candidate leading layer number range; Based on the horizontal displacement corresponding to the leading layer number, determine the response surface model of the mapping relationship between the leading layer number and the horizontal displacement; A preset horizontal displacement threshold is determined, and based on the response surface model and the preset horizontal displacement threshold, the optimal number of leading stories for the core tube to lead the outer frame during the construction of the target building is determined.
2. The method according to claim 1, characterized in that, Determine the candidate range for leading layers, including: Based on construction organization constraints, determine the lower limit of the number of leading floors, and based on structural safety constraints, determine the upper limit of the number of leading floors. Based on the lower limit and upper limit of the leading layer, the candidate range of leading layers is obtained.
3. The method according to claim 1, characterized in that, Determine the horizontal displacements corresponding to at least three leading layers within the candidate leading layer range, including: At least three leading layers are determined from the candidate range of leading layers; A construction simulation analysis was performed on the leading layer number to determine the horizontal displacement corresponding to the leading layer number.
4. The method according to claim 1, characterized in that, The response surface model relating the leading layer number to the horizontal displacement is expressed by the following equation: ; in, This refers to the horizontal displacement of the core tube relative to the outer frame. denoted as the leading layer number of the core tube leading the outer frame, and a, b, and c are the fitting coefficients of the response surface model.
5. The method according to claim 1, characterized in that, Determine the preset horizontal displacement threshold, including: Determine the total construction height of the target building, the preset standard coefficient, and the preset safety factor; The preset acceptance criteria are determined based on the ratio of the total construction height to the preset specification coefficient. The preset horizontal displacement threshold is determined by multiplying the preset acceptance standard and the preset safety factor.
6. The method according to claim 1, characterized in that, A method for determining the optimal leading layer also includes: Determine the total construction height of the target building, and divide the total construction height into a first height interval, a second height interval, and a third height interval based on the height; wherein, in terms of vertical position, the first height interval is shorter than the second height interval, and the second height interval is shorter than the third height interval; Determine the first response surface model corresponding to the first altitude range, the second response surface model corresponding to the second altitude range, and the third response surface model corresponding to the third altitude range; Determine the leading layer constraint threshold and the horizontal displacement constraint threshold; Substitute the horizontal displacement constraint threshold into the first response surface model, the second response surface model, and the third response surface model respectively to calculate the corresponding first leading layer, second leading layer, and third leading layer. The maximum value between the leading layer constraint threshold and the first leading layer is taken as the optimal leading layer in the first height interval. The average value between the leading layer constraint threshold and the first leading layer is taken as the optimal leading layer in the second height interval. The minimum value between the leading layer constraint threshold and the first leading layer is taken as the optimal leading layer in the third height interval.
7. The method according to claim 1, characterized in that, The optimal leading layer number for the first height interval is determined by taking the maximum value between the leading layer constraint threshold and the first leading layer number, the optimal leading layer number for the second height interval is determined by taking the average value between the leading layer constraint threshold and the first leading layer number, and the optimal leading layer number for the third height interval is determined by taking the minimum value between the leading layer constraint threshold and the first leading layer number. The process then includes: Determine the actual horizontal displacement corresponding to the target building's construction height and the reference leading floor number; The actual height is determined to belong to a height interval in the first height interval, the second height interval, and the third height interval. Based on the belonging height interval, a corresponding reference response surface model is determined from the first response surface model, the second response surface model, or the third response surface model. The predicted horizontal displacement is determined based on the reference response surface model and the reference leading layer number. The model parameters of the reference response surface model are updated based on the difference between the predicted horizontal displacement and the actual horizontal displacement.
8. An optimal leading layer determination device, characterized in that, include: The leading layer range determination module is used to determine the candidate range of leading layers of the target building's core tube relative to the outer frame; The data determination module is used to determine the horizontal displacement of the core tube relative to the outer frame within at least three leading layers in the leading layer candidate range; The model determination module is used to determine the response surface model of the mapping relationship between the leading layer number and the horizontal displacement based on the horizontal displacement corresponding to the leading layer number. The optimal leading layer determination module is used to determine a preset horizontal displacement threshold. Based on the response surface model and the preset horizontal displacement threshold, it determines the optimal leading layer of the core tube leading the outer frame during the construction of the target building.
9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that, When the processor executes the program, it implements the optimal leading layer determination method as described in any one of claims 1-7.