Optimal arrangement method of prestressed steel strands of prestressed concrete frame bridge under railway
By optimizing the prestressed steel strand layout scheme, eliminating the longitudinal prestressing tendons in the side walls, and only laying the necessary steel strands in the top slab and side walls, the problems of high material cost and complex construction in the existing technology are solved, and the optimized layout effect is achieved without affecting the structural stress performance.
Patent Information
- Application Number
- CN202611379004.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-07
- Publication Date
- 2026-11-24
AI Technical Summary
The existing technology for the layout of prestressed tendons in concrete frame bridges passing under railways has problems such as high material costs, complex construction, limited space, and over-design, without fully considering the actual contribution effect of prestressed tendons in each part.
By establishing a finite element analysis model, optimizing the prestressed steel strand layout scheme, eliminating the longitudinal prestressing tendons in the side walls, and only laying the necessary prestressed steel strands in the top slab and side walls, the prestressing tension effect was simulated by the cooling method, and finite element calculations and comparative working condition analysis were performed to determine the optimized layout scheme.
It reduces the amount of prestressing tendons by 30% to 40%, lowers material costs, simplifies construction difficulty and time, and does not significantly affect the structural stress performance, providing an optimized layout method based on finite element method.
Smart Images

Figure CN123158751A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of prestressed concrete frame bridge structure optimization technology, and in particular to a method for optimizing the layout of prestressed steel strands in a prestressed concrete frame bridge passing under a railway. Background Technology
[0002] Concrete frame bridges passing under railways are widely used in urban arterial roads and railway crossing projects. Traditional reinforced concrete frame bridges suffer from problems such as heavy weight, difficulty in jacking construction, and susceptibility to cracking. To address these issues, existing technologies attempt to introduce prestressing techniques into frame bridges.
[0003] Currently, patent CN200710122095.4 proposes a technical solution for installing prestressed steel bars in the top slab, side walls, middle walls, and bottom slab of a frame bridge. Another patent, CN204959588U, involves installing vertical prestressed tendons in the side walls, longitudinal and transverse prestressed tendons in the top slab, and longitudinal prestressed tendons in the bottom slab. A common feature of these prior art technologies is the full-section distribution of prestressed tendons in multiple components of the frame bridge.
[0004] However, the following problems exist with the full-section layout of prestressing tendons: the number of prestressing tendons is large, resulting in high material costs; the tensioning construction is complex and involves many procedures; space is limited in areas such as side walls, making layout and anchoring difficult; the actual contribution effect of prestressing tendons in each part is not fully considered, resulting in the problem of "over-design". Over-design not only increases the quality of the entire structure, but also causes a lot of material waste.
[0005] Therefore, there is an urgent need for an optimized layout method that can scientifically determine the placement of prestressed steel strands and reduce the number of prestressed tendons while ensuring structural performance. Summary of the Invention
[0006] Therefore, this invention provides a method for optimizing the layout of prestressed steel strands in a prestressed concrete frame bridge passing under a railway to solve the technical problem of how to optimize and reduce the number of prestressed tendons.
[0007] To achieve the above objectives, the present invention provides a method for optimizing the layout of prestressed steel strands in a prestressed concrete frame bridge passing under a railway, comprising the following steps: Step S1: Establish a finite element analysis model of the prestressed concrete frame bridge under the railway. The model includes the geometric dimensions, material properties, boundary conditions, and load conditions of the frame bridge. Step S2: Determine the baseline layout scheme of the prestressed steel strands in the finite element analysis model, and lay at least 4 prestressed steel strands in the top slab and at least 2 longitudinal bridge-direction prestressed steel strands in each of the two side walls. Step S3: The prestressing tension effect is simulated by the cooling method. The equivalent cooling amount is calculated according to the formula ΔT=σpe / (αE), where σpe is the effective stress of the prestressed steel bar, α is the linear expansion coefficient of the prestressed tendon, and E is the elastic modulus of the prestressed tendon. Step S4: Set up at least three comparative working conditions for finite element calculation. The comparative working conditions include: the baseline working condition without longitudinal prestressing tendons, the working condition with longitudinal prestressing tendons arranged on one side wall, and the working condition with longitudinal prestressing tendons arranged on both side walls. Step S5: Extract the maximum principal stress and maximum deformation of the structure under each working condition; Step S6: When the reduction in the maximum principal stress of the structure is less than 5% and the reduction in the maximum deformation is less than 5% after adding longitudinal prestressing tendons to the side wall, it is determined that the necessity of adding longitudinal prestressing tendons to the side wall is not significant. Step S7: Based on the judgment result of step S6, output the optimized layout scheme of prestressed steel strands only on the top slab, and cancel the layout of longitudinal prestressed steel strands on the side walls.
[0008] Optionally, in the finite element analysis model described in step S1, the concrete is simulated using C3D8R reduced integral eight-node three-dimensional solid elements, and the reinforcing bars and prestressed steel strands are discretized using T3D2 two-node linear three-dimensional truss elements.
[0009] Optionally, the concrete constitutive relationship in step S1 adopts the concrete damage plasticity model, i.e., the CDP model. The parameters of the CDP model include: an expansion angle of 30°, an eccentricity of 0.1, a uniaxial-biaxial compressive strength ratio of 1.16, a yield surface parameter of 0.6667, and a viscosity coefficient of 10^-5.
[0010] Optionally, the boundary conditions described in step S1 adopt the Winkler assumption, and the elastic foundation is simulated with ground spring elements.
[0011] Optionally, the prestressed steel strands installed on the top plate in step S2 are high-strength, low-relaxation steel strands with fpk=1860MPa, tension control stress σcon=1395MPa, and the distance from the center of the steel strand to the lower surface of the top plate is 0.15m.
[0012] Optionally, the load conditions described in step S4 include dead load, train live load, and structural self-weight.
[0013] Optionally, the train live load adopts ZK live load.
[0014] Optionally, the maximum principal stress value mentioned in step S5 is taken as the maximum principal stress value in the mid-span region of the top plate.
[0015] Optionally, the maximum deformation in step S5 is taken as the vertical displacement value of the central region of the top plate load.
[0016] Compared with the prior art, the beneficial effects of the present invention are as follows: 1. By eliminating the longitudinal prestressing tendons in the side walls, the amount of prestressing tendons used is reduced by about 30% to 40%, significantly reducing material costs.
[0017] 2. It reduces the tensioning and anchoring work of the prestressed tendons in the side walls, thus reducing the construction difficulty and construction period.
[0018] 3. Finite element analysis proves that after removing the longitudinal prestressing tendons in the side walls, the increase in the maximum principal stress and the maximum deformation of the structure is less than 5%, and the structural stress performance is not significantly affected.
[0019] 4. A method for optimizing the layout of prestressed tendons based on finite element quantitative analysis is provided, overcoming the technical bias of full-section layout in existing technologies.
[0020] 5. This method can be extended to the design of underpass railway frame bridges with different spans and load conditions. Attached Figure Description
[0021] Figure 1 This is a schematic diagram of the system steps of the present invention; Figure 2 Layout diagram of soil springs; Figure 3 These are diagrams showing the prestressed tendon layout for three different working conditions. Figure 4 For the constitutive model of steel. Detailed Implementation
[0022] To make the objectives and advantages of the present invention clearer, the present invention will be further described below with reference to embodiments; it should be understood that the specific embodiments described herein are merely for explaining the present invention and are not intended to limit the present invention.
[0023] Preferred embodiments of the present invention will now be described with reference to the accompanying drawings. Those skilled in the art should understand that these embodiments are merely illustrative of the technical principles of the present invention and are not intended to limit the scope of protection of the present invention.
[0024] It should be noted that in the description of this invention, the terms "upper", "lower", "left", "right", "inner", "outer", etc., which indicate directions or positional relationships, are based on the directions or positional relationships shown in the accompanying drawings. This is only for the convenience of description and is not intended to indicate or imply that the device or element must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, it should not be construed as a limitation of this invention.
[0025] Furthermore, it should be noted that, in the description of this invention, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "linking" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this invention according to the specific circumstances.
[0026] Please see Figures 1-3 As shown, A method for optimizing the layout of prestressed steel strands in a prestressed concrete frame bridge passing under a railway includes the following steps: Step S1: Establish the finite element analysis model of the prestressed concrete frame bridge under the railway. S1-1: A three-dimensional solid model is established based on the actual geometric dimensions of the frame bridge. The concrete is simulated using C3D8R reduced integral eight-node three-dimensional solid elements, and the steel bars and prestressed steel strands are discretized using T3D2 two-node linear three-dimensional truss elements.
[0027] The modeling focused on structural geometry, material properties, boundary constraints, and load effects, with appropriate selection of element types and mesh scales to balance computational accuracy and efficiency. The prototype frame bridge model measures 8.1m high, 9.6m wide, and 12m long. The entire model was discretized using solid elements. The concrete portion was simulated using the reduced integral eight-node 3D solid element C3D8R to improve computational stability and avoid numerical problems such as shear locking. The reinforcing steel and prestressed steel strands were discretized using the two-node linear 3D truss element T3D2. A mesh feature size of 0.5m was used for overall mesh generation, which was then applied for subsequent numerical analysis and parameter calculations.
[0028] S1-2: The concrete damage plasticity model (CDP model) is used to define the constitutive relationship of concrete and establish the stress-strain relationship.
[0029] The stress-strain relationship in the elastic stage of concrete is defined by the Young's modulus of concrete. Compared to Poisson It is determined that the stress-strain relationship in the inelastic stage is determined using the concrete stress-strain relationship provided in the standard. The uniaxial tensile stress-strain curve of concrete can be calculated using the following formula: (2.1) (2.2) (2.3) (2.4) In the formula: —The parameter values for the descending segment of the uniaxial tensile stress-strain curve of concrete are taken from Table 2.1; —The representative value of the uniaxial tensile strength of concrete, which can be selected according to the actual structural analysis requirements. or ; —Representative value of uniaxial tensile strength The corresponding peak tensile strain of concrete is taken from Table 2.1; —Evolution parameters of uniaxial tensile damage in concrete.
[0030] Table 2.1 Parameter values for uniaxial tensile stress-strain curves of concrete The uniaxial compressive stress-strain curve of concrete can be calculated using the following formula: (2.5) (2.6) (2.7) (2.8) (2.9) In the formula: —The parameter values for the descending segment of the uniaxial compressive stress-strain curve of concrete are taken from Table 2.2; —The representative value of the uniaxial compressive strength of concrete, which can be selected according to the actual structural analysis requirements. ; —Representative value of uniaxial compressive strength The corresponding peak tensile strain of concrete is taken from Table 2.2; — Damage evolution parameters of concrete under uniaxial compression.
[0031] Table 2.2 Parameter values for uniaxial compressive stress-strain curves of concrete Based on the stress-strain relationship of concrete provided in the standard, the concept of damage factor is introduced. The damage factor is calculated using the Sidiroff energy equivalence principle. (2.10) In the formula: —True stress; —Initial elastic modulus; —Real response.
[0032] (2.11) In the formula: —Tensile strain; —Tensile cracking strain, which is defined as the total strain minus the elastic strain of the material without damage; —The tensile inelastic strain that needs to be entered in ABAQUS.
[0033] This study simulated C40 concrete. From Tables 2.1 and 2.2, we can see its corresponding... The value is 2.5 (N / mm2). The value is 107 × 10⁻⁶. The value is 1.95; The value is 40 (N / mm2). The value is 1790×10⁻⁶. The value is 1.94. The value is 2.0. Substituting the above data into formulas (2.1) to (2.9), the tensile and compressive stress-strain relationships and damage factors of C40 concrete are shown in Table 2.3.
[0034] Table 2.3 Stress-strain relationship of C40 concrete Table 2.3 summarizes the concrete stress-strain relationship used in the ABAQUS simulation, and other parameters required for the simulation are shown in Table 2.4.
[0035] Table 2.4 CDP Model Parameters Continued from Table 2.4: CDP Model Parameters (2) Constitutive relation of reinforcing bars and steel strands In ABAQUS finite element analysis, the material constitutive models for both reinforcing bars and steel strands are simulated using ideal elastoplastic models. This model employs a bilinear stress-strain relationship, such as... Figure 2-4 As shown, the specific mechanical properties of the material are detailed in Table 2.5. Among them, the elastic stage follows Hooke's law, and the plastic stage exhibits ideal plastic behavior in which stress does not increase with increasing strain, which can well reflect the typical mechanical response characteristics of steel under load.
[0036] Table 2.5 Material Properties of Prestressed Steel Strand Table 2.6 Reinforcing Steel Material Properties S1-3: Using the Winkler assumption, an elastic foundation is simulated with grounding spring elements.
[0037] The underpass bridge can be assumed to be a spatial structure supported on a semi-infinite body—a frame structure on an elastic foundation. Under loads or other actions, it maintains close contact with the foundation and deforms simultaneously. According to the Winkler assumption, grounded spring elements are used to simulate the elastic foundation, jointly supporting the superstructure. The sidewall constraints of the frame bridge are soil constraints, with distributed loads acting on the sidewalls.
[0038] The spring stiffness corresponding to the compressibility of the foundation soil plays a decisive role in the displacement of the frame bridge. In ABAQUS, the spring stiffness is used to simulate the bearing capacity of the foundation. The specific value of the spring stiffness is determined by equations (2.12) to (2.15).
[0039] The relationship between the load-bearing capacity characteristic value fak and the compression modulus Es: (2.12) The relationship between soil compression modulus Es and elastic modulus Ep: (2.13) The relationship between the horizontal stiffness Ki of the soil-structure interface and the soil modulus: (2.14) The relationship between horizontal stiffness Ki and normal stiffness K: (2.15) S1-4: Apply design loads, including dead load, train live load (ZK live load), and temperature load.
[0040] The train live load adopts the ZK live load. Based on the "Railway Bridge and Culvert Design Code" and considering the track bed paving method, backfill conditions, and soil parameters of this project, the dead load, live load, and lateral earth pressure of the frame bridge are calculated. In the calculation, the dead load mainly includes the crushed stone track bed, the waterproof pavement layer, and the structural self-weight. The auxiliary structural loads are converted into uniformly distributed loads on the top slab based on the structural thickness and material unit weight. The structural self-weight is automatically included by the ABAQUS finite element program. The earth pressure on both sides is determined based on the soil's physical and mechanical parameters and is applied to the sidewalls in a trapezoidal distribution pattern that increases with depth.
[0041] Live load calculation mainly includes train load and vehicle load. Train load is converted into an equivalent uniformly distributed load according to the specifications, and the additional lateral earth pressure caused by the train load is also considered; since the vehicle load only acts on the structural base slab, it is not considered for the time being.
[0042] In ABAQUS, the combined effects of static and temperature loads are simulated using a sequential coupling approach. First, a thermal analysis is performed to determine the structural temperature field distribution under given thermal boundary conditions. Then, this temperature field is imported as a predefined field into the mechanical analysis, generating the corresponding thermal strain and initial temperature stress state. Subsequently, in the static analysis step, external static loads are applied, and the stress and deformation responses of the structure are calculated based on the initial state that already incorporates temperature effects, thus achieving the combined effect analysis of temperature and static loads.
[0043] Step S2: Determine the baseline layout scheme for prestressed steel strands Four prestressed steel strands are installed on the top slab, with the center of each strand 0.15m from the bottom surface of the top slab; three prestressed steel strands are installed on each of the two side walls, with the center of each strand 0.15m from the inner surface of the side wall.
[0044] Step S3: Simulate the prestressing tension effect using the cooling method. The equivalent cooling amount is calculated using the formula ΔT=σpe / (αE). Where σpe is the effective stress of the prestressed steel bar, α is the linear expansion coefficient of the prestressed steel bar, and E is the elastic modulus of the prestressed steel bar.
[0045] Step S4: Perform multi-condition comparative analysis Set at least three comparison conditions: Condition A: No longitudinal prestressing tendons (baseline condition). Condition B: Longitudinal prestressing tendons are arranged on one side wall; Condition C: Longitudinal prestressing tendons are arranged on both side walls.
[0046] To investigate the necessity of arranging longitudinal prestressed tendons in the side walls, simulation analysis was performed using ABAQUS finite element software. Three simulation conditions were set: no longitudinal prestressing tendons, two longitudinal prestressing tendons on one side, and two longitudinal prestressing tendons on each side. By extracting and comparing the structural responses under these three conditions, including key indicators such as stress distribution and deformation characteristics, the effectiveness of the longitudinal prestressed tendon arrangement was verified.
[0047] Four prestressed steel strands are arranged on the top slab, and three prestressed steel strands are arranged on each side wall. The stress distribution and deformation characteristics of the prestressed concrete frame bridge under the action of top dead load, train live load and self-weight are shown in Table 2.7 below.
[0048] Table 2.7 Finite element simulation results for each working condition After adding prestressing tendons, the data in Table 2.7 shows that the maximum principal stress of the structure decreased, but the decrease was small, all within 5%, indicating that the prestressing tendons had a limited effect on improving the stress state of the structure. The decrease in deformation was also small, all within 5%, indicating that the prestressing tendons did not significantly contribute to controlling the deformation of the structure. The most unfavorable stress location was located at the "haunch of the wall below the railway load" under all three working conditions, and the most unfavorable displacement location was located at the "center of the top slab load," and neither changed, indicating that the prestressing tendons did not affect the weak stress locations or deformation control points of the structure.
[0049] Comprehensive analysis shows that while adding longitudinal prestressing tendons improves the maximum principal stress and maximum deformation of the structure, the improvement is small, with stress and deformation reductions both less than 5%, and the most unfavorable stress and deformation locations remain unchanged. Therefore, the longitudinal prestressing tendons in the side walls have a limited effect on improving the structural stress and deformation performance. Considering construction difficulty and economic costs, the arrangement of these prestressing tendons could be optimized or eliminated.
[0050] Step S5: Extract and compare the structural response indices for each working condition. Extract the maximum principal stress and maximum deformation of the structure under each working condition, and record the most unfavorable stress location and the most unfavorable displacement location.
[0051] Step S6: Determine the necessity of laying longitudinal prestressing tendons in the side wall. If, after adding longitudinal prestressing tendons to the side walls, the reduction in the maximum principal stress of the structure is less than 5%, and the reduction in the maximum deformation is less than 5%, while the most unfavorable stress position and the most unfavorable displacement position remain unchanged, then the necessity of adding longitudinal prestressing tendons to the side walls is deemed insignificant.
[0052] Step S7: Output optimized deployment plan Based on the judgment result of step S6, the optimized scheme of laying prestressed steel strands only on the top slab is determined, and the laying of longitudinal prestressed steel strands on the side walls is cancelled.
[0053] The technical solution of the present invention has been described above with reference to the preferred embodiments shown in the accompanying drawings. However, it will be readily understood by those skilled in the art that the scope of protection of the present invention is obviously not limited to these specific embodiments. Without departing from the principles of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will all fall within the scope of protection of the present invention.
Claims
1. A method for optimizing the layout of prestressed steel strands in a prestressed concrete frame bridge passing under a railway, characterized in that, Includes the following steps: Step S1: Establish a finite element analysis model of the prestressed concrete frame bridge under the railway. The model includes the geometric dimensions, material properties, boundary conditions, and load conditions of the frame bridge. Step S2: Determine the baseline layout scheme of the prestressed steel strands in the finite element analysis model, and lay at least 4 prestressed steel strands in the top slab and at least 2 longitudinal bridge-direction prestressed steel strands in each of the two side walls. Step S3: The prestressing tension effect is simulated by the cooling method. The equivalent cooling amount is calculated according to the formula ΔT=σpe / (αE), where σpe is the effective stress of the prestressed steel bar, α is the linear expansion coefficient of the prestressed tendon, and E is the elastic modulus of the prestressed tendon. Step S4: Set up at least three comparative working conditions for finite element calculation. The comparative working conditions include: the baseline working condition without longitudinal prestressing tendons, the working condition with longitudinal prestressing tendons arranged on one side wall, and the working condition with longitudinal prestressing tendons arranged on both side walls. Step S5: Extract the maximum principal stress and maximum deformation of the structure under each working condition; Step S6: When the reduction in the maximum principal stress of the structure is less than 5% and the reduction in the maximum deformation is less than 5% after adding longitudinal prestressing tendons to the side wall, it is determined that the necessity of adding longitudinal prestressing tendons to the side wall is not significant. Step S7: Based on the judgment result of step S6, output the optimized layout scheme of prestressed steel strands only on the top slab, and cancel the layout of longitudinal prestressed steel strands on the side walls.
2. The optimized layout method for prestressed steel strands in a prestressed concrete frame bridge under a railway as described in claim 1, characterized in that, In the finite element analysis model described in step S1, the concrete is simulated using C3D8R reduced integral eight-node three-dimensional solid elements, and the reinforcing bars and prestressed steel strands are discretized using T3D2 two-node linear three-dimensional truss elements.
3. The optimized layout method for prestressed steel strands in a prestressed concrete frame bridge under a railway as described in claim 1, characterized in that, The concrete constitutive relationship described in step S1 adopts the concrete damage plasticity model, i.e., the CDP model. The parameters of the CDP model include: expansion angle of 30°, eccentricity of 0.1, uniaxial and biaxial compressive strength ratio of 1.16, yield surface parameter of 0.6667, and viscosity coefficient of 10^-5.
4. The optimized layout method for prestressed steel strands in a prestressed concrete frame bridge under a railway as described in claim 1, characterized in that, The boundary conditions described in step S1 adopt the Winkler assumption, and the elastic foundation is simulated by grounding spring elements.
5. The optimized layout method for prestressed steel strands in a prestressed concrete frame bridge under a railway as described in claim 1, characterized in that, The prestressed steel strands installed on the top plate in step S2 are high-strength, low-relaxation steel strands with fpk=1860MPa, tension control stress σcon=1395MPa, and the distance from the center of the steel strand to the lower surface of the top plate is 0.15m.
6. The optimized layout method for prestressed steel strands in a prestressed concrete frame bridge under a railway as described in claim 1, characterized in that, The load conditions described in step S4 include dead load, train live load, and structural self-weight.
7. The optimized layout method for prestressed steel strands in a prestressed concrete frame bridge under a railway as described in claim 1, characterized in that, The train live load adopts ZK live load.
8. The optimized layout method for prestressed steel strands in a prestressed concrete frame bridge under a railway as described in claim 1, characterized in that, The maximum principal stress value mentioned in step S5 is taken as the maximum principal stress value in the mid-span region of the top plate.
9. The optimized layout method for prestressed steel strands in a prestressed concrete frame bridge under a railway as described in claim 1, characterized in that, The maximum deformation mentioned in step S5 is the vertical displacement value of the central region of the top plate load.
Citation Information
Patent Citations
Prestressing applying method for concrete genuine bridge construction
CN101144260A