A precast ERC sleeve reinforced column design method

By using Z-shaped double staggered joints and a three-level sealing system, the corrosion problem of bridge column structures in harsh environments was solved, achieving continuous protection and reinforcement effects, and ensuring stability during the construction phase and the structural safety of the completed bridge.

CN123158758APending Publication Date: 2026-11-24GUANGXI UNIV +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611435181.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-16
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing bridge pier structures are prone to corrosion in harsh environments, their surface coatings age, their joint penetration paths are short, their stability during construction is insufficient, and there is a lack of a unified method for design parameters, making it difficult to achieve long-term protection and reinforcement.

Method used

The system employs a Z-shaped double staggered joint, epoxy resin grouting material, and high-strength bolt connection components to form a three-level sealing system. The core concrete construction joint is staggered, temporarily locked, and permanently connected to form a continuous protective layer, which is suitable for bridge column structures ranging from several meters to hundreds of meters in length.

Benefits of technology

It significantly extends the seepage prevention path of the joint, improves the structural continuity and corrosion resistance, ensures the stability during the construction phase and the structural safety of the completed bridge, and enhances the overall stiffness and durability of the column.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123158758A_ABST
    Figure CN123158758A_ABST
Patent Text Reader

Abstract

This invention discloses a design method for precast ERC sleeve reinforced columns, comprising the following steps: S1, obtaining design parameters for the precast ERC sleeve reinforced columns and establishing phased design conditions; S2, determining the segment parameters and material properties of the precast ERC sleeve, and completing the calculation of transportation clearance and hoisting capacity; S3, determining the main cross-section of the precast ERC sleeve, the reinforcing steel bars, and the shear resistance structure of the inner wall interface; S4, determining the Z-shaped double staggered joint, sealing system, grouting system, and connection system; S5, determining the staggered distance between the construction joint of the core concrete and the horizontal joint of the sleeve, and determining the cyclic pouring sequence and pouring parameters of the core concrete; S6, performing load-bearing capacity, crack resistance, stability, and connection calculations for the phased design conditions; S7, outputting the design results of the precast ERC sleeve reinforced columns. This invention achieves rapid positioning of the precast sleeve, multi-level seepage prevention at the joint, staggered internal and external joints, and coordinated stress distribution between the precast ERC sleeve and the core concrete by forming a continuous corrosion-resistant protective layer on the outside of the core concrete using the precast ERC sleeve.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the technical fields of bridge column structure durability protection, prefabricated construction and high-performance composite material structure, specifically involving a design method for prefabricated ERC sleeve reinforced columns. Background Technology

[0002] Bridge piers, towers, and load-bearing supports are constantly exposed to natural and operational environments. In coastal marine environments, salt lake areas, areas affected by snowmelt salt, industrial corrosive environments, and humid and hot environments, chloride ions, sulfate ions, carbon dioxide, and moisture continuously migrate into the interior of the columns, causing steel reinforcement corrosion and expansion, cracking and spalling of the protective layer, degradation of concrete strength, and reduction in cross-sectional load-bearing capacity. Existing surface coatings and thin-layer waterproofing materials are prone to aging, cracking, and peeling after exposure to ultraviolet radiation, temperature deformation, structural vibration, and localized impacts. They are insufficient to provide long-term protection against corrosive media and cannot significantly improve the load-bearing capacity and overall stiffness of the columns.

[0003] Epoxy resin concrete possesses high compressive strength, tensile strength, bond strength, impermeability, and corrosion resistance. Precast epoxy resin concrete sleeves, placed outside the core concrete, utilize the dense epoxy resin matrix to reduce the transport rate of liquid water and corrosive ions, forming a continuous protective barrier of specified thickness and structural strength between the core concrete and the external corrosive environment. The precast ERC sleeve simultaneously functions as a permanent formwork, an external durable protective layer, and a structural reinforcement layer. It reduces direct contact between the core concrete and chloride-salt water, sulfate media, humid air, and carbon dioxide, and forms a shared load-bearing system with the core concrete through the internal wall interface shear structure.

[0004] The total height of bridge pier structures ranges from a few meters to hundreds of meters, with significant differences in cross-sectional dimensions, transportation conditions, lifting capacity, and concrete pouring organization. For lower piers that meet the requirements for overall transportation and hoisting, the number of precast ERC sleeve segments is determined to be one; for medium-to-high piers where overall transportation and hoisting are limited, the precast ERC sleeve is divided into multiple segments along the height direction and installed segment by segment on the construction site. Existing segmented sleeves typically use flat joints and single-stage tongue-and-groove joints, resulting in short penetration paths at the joints, allowing external moisture and chloride solutions to easily enter the inner side of the sleeve along the joints. When the horizontal joint of the sleeve is at the same elevation as the core concrete construction joint, the external joint, the inner interface of the sleeve, and the core concrete construction joint form a continuous weak area, reducing the joint's shear strength, bending continuity, and ability to isolate environmental media.

[0005] The stress system of precast ERC sleeve reinforced columns continuously changes during construction. When the precast ERC sleeve is installed but the epoxy resin grout has not yet reached its specified strength, the upper precast ERC sleeve segment independently bears its own weight eccentricity and construction wind loads. During core concrete pouring, the precast ERC sleeve bears the lateral pressure of the freshly mixed core concrete. After the bridge is completed, the precast ERC sleeve, core concrete, reinforcing steel, and joint connectors jointly bear axial force, bending moment, and shear force. Existing design methods mainly target single construction stages and single stress indicators, lacking a unified design process for environmental protection, segmented transportation, joint seepage prevention, temporary stabilization, permanent connection, and the shared stress of the completed bridge. Joint geometric parameters, sealing parameters, grouting parameters, temporary locking parameters, and the location of construction joints in the core concrete mainly rely on engineering experience for determination. Summary of the Invention

[0006] To address the problems of existing column surface protective layers being prone to aging and damage, corrosive media being able to penetrate the core concrete along the segmented joints, short penetration paths at the horizontal joints of the sleeve, insufficient stability during construction, overlap between the horizontal joints of the sleeve and the construction joints of the core concrete, and the lack of a unified method for determining design parameters, this invention provides a design method for precast ERC sleeve reinforced columns. The aim is to incorporate environmental erosion protection, precast ERC sleeve segmentation, Z-shaped double-staggered joints, permanent joint connections, misalignment of core concrete construction joints, construction stability, and shared load-bearing capacity of the completed bridge into a unified design process. This method employs Z-shaped double-staggered joints and an externally closed-cell ternary structure. The EPDM rubber sealing strip and the inner water-swellable rubber waterstop strip form a two-stage seal. Epoxy resin grouting material is used to complete the consolidation of the annular grouting cavity. Radial wedge locking pins are used to complete the temporary locking during the construction stage. Built-in high-strength bolt connection components are used to complete the permanent connection across the joint. The core concrete construction joint is set inside the precast ERC sleeve segment above the horizontal joint of the sleeve, so that the precast ERC sleeve forms a continuous structural protective layer outside the core concrete. This is suitable for bridge column structures with a total height of several meters to hundreds of meters, and can directly guide the deterministic design results of component prefabrication, on-site assembly, layered pouring, durability protection, and quality acceptance.

[0007] To achieve the above objectives, the specific solution of the present invention is as follows:

[0008] A design method for prefabricated ERC sleeve reinforced columns includes the following steps:

[0009] S1. Obtain the design parameters of the precast ERC sleeve reinforced column and establish phased design conditions based on the design parameters. The design parameters include geometric parameters, load parameters, construction parameters, material parameters, equipment and transportation parameters, and construction allowable deviation parameters. Geometric parameters include the total height of the reinforced column, the outer diameter of the precast ERC sleeve, the inner diameter of the precast ERC sleeve, the diameter of the core concrete column, the height of the precast ERC sleeve segment, and the effective thickness of the sleeve. Load parameters include the design axial force, design bending moment, and design shear force of the completed bridge. Construction parameters include the design wind speed, the core concrete pouring speed, the single pouring height, and the equivalent liquid column height. Material parameters include the properties of ERC materials, the properties of core concrete materials, the properties of sleeve reinforced steel, the properties of epoxy resin grouting material, and the properties of high-strength bolts. The properties of ERC materials, core concrete materials, sleeve reinforced steel, epoxy resin grouting material, and high-strength bolts all include material test values ​​and design standard values, respectively. The properties of ERC materials include ERC... 28-day compressive strength, ERC design tensile strength, ERC elastic modulus, and ERC density; core concrete material properties, including core concrete strength grade; sleeve reinforcement properties, including longitudinal sleeve reinforcement grade and diameter, and circumferential sleeve reinforcement grade and diameter; epoxy resin grout properties, including epoxy resin grout 28-day compressive strength and epoxy resin grout design bond shear strength; high-strength bolt properties, including high-strength bolt specifications and strength grade; equipment and transportation parameters, including maximum allowable component diameter for transportation, maximum allowable component height for transportation, rated lifting capacity of the design working radius, and lifting capacity reduction factor; construction allowable deviation parameters, including allowable deviation of single sleeve axis, allowable deviation of single sleeve verticality, and allowable deviation of joint assembly clearance.

[0010] S2, determine the segmentation parameters and material properties of the prefabricated ERC sleeve, and complete the transport clearance and lifting capacity verification; the segmentation parameters include the number of prefabricated ERC sleeve segments and the lifting mass of a single prefabricated ERC sleeve segment; based on the total height of the prefabricated ERC sleeve reinforcement column and the height of the prefabricated ERC sleeve segment obtained in S1, determine the number of prefabricated ERC sleeve segments; based on the outer diameter of the prefabricated ERC sleeve and the height of the prefabricated ERC sleeve segment obtained in S1, perform transport clearance verification for a single prefabricated ERC sleeve segment; based on the outer diameter of the prefabricated ERC sleeve, the inner diameter of the prefabricated ERC sleeve, and the height of the prefabricated ERC sleeve segment obtained in S1, perform transport clearance verification for a single prefabricated ERC sleeve segment; based on the outer diameter of the prefabricated ERC sleeve, the inner diameter of the prefabricated ERC sleeve, and the height of the prefabricated ERC sleeve segment obtained in S1, perform transport clearance verification for a single prefabricated ERC sleeve segment. The hoisting mass of a single precast ERC sleeve segment is determined based on the height of the C-sleeve segment, the density of the ERC, and the total mass of reinforcing bars, embedded parts, seals, and connecting components determined according to the material and geometric parameters obtained from S1. The hoisting mass of a single precast ERC sleeve segment is verified by reducing the lifting capacity of the lifting equipment based on the rated lifting capacity and lifting capacity reduction factor obtained from S1. The material performance values ​​are determined based on the test values ​​and design standard values ​​of the ERC material properties, core concrete material properties, sleeve reinforcing bar properties, epoxy resin grouting material properties, and high-strength bolt properties obtained from S1.

[0011] S3, determine the main cross-section, reinforcing steel, and shear structure of the inner wall interface of the precast ERC sleeve: determine the design lateral pressure of the fresh core concrete based on the equivalent liquid column height obtained in S1; determine the circumferential tensile stress of the sleeve based on the design lateral pressure of the fresh core concrete, the inner diameter of the precast ERC sleeve obtained in S1, and the effective thickness of the sleeve; and perform crack resistance calculation on the circumferential tensile stress of the sleeve; determine the arrangement and specifications of the reinforcing steel based on the material and load parameters obtained in S1; determine the shear structure of the inner wall interface, and verify the shear bearing capacity of the interface between the precast ERC sleeve and the core concrete based on the material and load parameters obtained in S1.

[0012] S4, Design the Z-shaped double staggered joint, sealing system, grouting system, and connection system: Based on the construction allowable deviation parameters obtained in S1 and the material performance values ​​determined in S2, design the geometric structure of the Z-shaped double staggered joint, so that the lower outer side of the upper precast ERC sleeve segment forms an outer stagger, and the upper inner side of the lower precast ERC sleeve segment forms an inner stagger. An annular overlap platform is formed between the outer and inner staggers. An outer sealing groove is formed in the vertical overlap surface of the outer stagger, and an inner sealing groove is formed in the horizontal limiting surface of the inner stagger. An annular grouting cavity is formed between the inner side of the outer stagger, the top surface of the annular overlap platform, and the outer side of the inner stagger. Based on the outer stagger... The effective seepage prevention path length of the Z-shaped double staggered joint is determined by the path, the ring-shaped overlapping platform, and the inner staggered path; the sealing strip installation parameters of the sealing system are determined based on the construction allowable deviation parameters obtained in S1; the grouting zones of the grouting system and the epoxy resin grouting volume of a single Z-shaped double staggered joint are determined based on the geometric and construction parameters obtained in S1; the radial wedge locking pin parameters and the parameters of the built-in high-strength bolt connection components of the connection system are determined based on the material parameters obtained in S1; and the shear bearing capacity of the Z-shaped double staggered joint, the tensile bearing capacity of the built-in high-strength bolt connection components, and the overturning moment of the radial wedge locking pin are verified based on the load and material parameters obtained in S1.

[0013] S5. Based on the construction allowable deviation parameters obtained in S1 and the geometric parameters of the Z-shaped double staggered joint determined in S4, determine the stagger distance between the core concrete construction joint and the sleeve horizontal joint, and determine the cyclic pouring sequence and pouring parameters of the core concrete based on the construction parameters obtained in S1.

[0014] S6. Based on the load parameters and material parameters obtained in S1, the bearing capacity, crack resistance, stability and connection of the phased design conditions described in S1 are verified. The objects of the verification are the precast ERC sleeve segments, sleeve main sections, reinforcing steel bars, inner wall interface shear structure, Z-shaped double staggered joints, sealing system and connection system determined in S2 to S5. Based on the design axial force, design bending moment and design shear force of the completed bridge obtained in S1, a three-dimensional finite element model is used for verification in the common stress stage of the completed bridge.

[0015] S7 outputs the design results of the precast ERC sleeve reinforced column. The design results include the precast ERC sleeve segment prefabrication drawings output based on the number and height of the precast ERC sleeve segments determined in S2; the reinforced steel reinforcement drawings output based on the reinforcement arrangement and specifications determined in S3; the detailed drawings of the Z-shaped double staggered joint output based on the geometric parameters of the Z-shaped double staggered joint determined in S4; the embedded part drawings output based on the material parameters obtained in S1 and the joint structure determined in S4; the sealing part drawings output based on the sealing strip installation parameters determined in S4; the grouting zoning diagram output based on the grouting zoning determined in S4; the core concrete pouring segment diagram output based on the cyclic pouring sequence and pouring parameters determined in S5; the hoisting control table output based on the hoisting quality determined in S2 and the equipment and transportation parameters obtained in S1; and the construction monitoring table and quality acceptance table output based on the verification results of S6. The construction quality control indicators are determined based on the construction allowable deviation parameters obtained in S1 and the verification results of S6.

[0016] Furthermore, in S1, the diameter of the core concrete column is equal to the inner diameter of the precast ERC sleeve; the single pouring height is determined based on the elevation difference between adjacent core concrete construction joints; the maximum allowable diameter and maximum allowable height of the transported components are determined based on the clearance of the transport channel, the turning radius, and the carrying capacity of the transport equipment; the allowable construction deviation parameters are used to determine the control values ​​for the fabrication and installation of the precast ERC sleeve segments, the assembly gap of the Z-shaped double staggered joint, and the construction quality control indicators.

[0017] The phased design conditions include the first condition, the second condition, the third condition, and the fourth condition. The first condition is the hoisting stage of the precast ERC sleeve, and its corresponding loads include the self-weight of the precast ERC sleeve segment, hoisting acceleration, and eccentric construction wind load. The second condition is the grouting stage of the Z-shaped double staggered joint, and its corresponding loads include the self-weight of the upper precast ERC sleeve segment, the pre-tightening force of the radial wedge locking pin, and the grouting pressure. The third condition is the core concrete pouring stage, and its corresponding loads include the lateral pressure of the freshly mixed core concrete, construction wind load, and additional vibration load. The fourth condition is the stage of the completed bridge bearing the load, and its corresponding loads include the design axial force, design bending moment, design shear force, temperature effect, and seismic effect.

[0018] Furthermore, the formula for calculating the number of prefabricated ERC sleeve segments mentioned in S2 is as follows:

[0019] In the formula, The number of prefabricated ERC sleeve segments; This refers to the total height of the prefabricated ERC sleeve reinforced column; Height of a single prefabricated ERC sleeve segment;

[0020] The formula for calculating the hoisting mass of a single prefabricated ERC sleeve segment is as follows:

[0021] In the formula, The lifting mass of a single prefabricated ERC sleeve segment; ERC density; Pre-fabricated ERC sleeve outer diameter; Pre-fabricated ERC sleeve inner diameter; The height of the prefabricated ERC sleeve segment; To increase the overall mass of reinforcing bars, embedded parts, seals, and connecting components;

[0022] The formula for verifying the lifting capacity of a single precast ERC sleeve segment by reducing the lifting weight of the lifting equipment is as follows:

[0023] ,

[0024] In the formula, The lifting capacity reduction factor is determined jointly by the operating radius of the lifting equipment, the lifting height, and the construction environment. This refers to the rated lifting capacity of the lifting equipment at its designed operating radius.

[0025] Furthermore, the calculation formula for determining the design lateral pressure of freshly mixed core concrete based on the equivalent liquid column height, as described in S3, is as follows:

[0026] ,

[0027] In the formula, The lateral pressure is designed for freshly mixed core concrete; The density of freshly mixed core concrete; The equivalent liquid column height is determined based on the pouring speed, initial setting time of concrete, and pouring temperature.

[0028] The formula for calculating the circumferential tensile stress of the sleeve is as follows:

[0029] ,

[0030] In the formula, This refers to the circumferential tensile stress on the sleeve. The lateral pressure is designed for freshly mixed core concrete; Pre-fabricated ERC sleeve inner diameter; The effective thickness of the sleeve is calculated after deducting the local weakening of the sealing groove, grouting hole, and pre-embedded locking box; Design tensile strength for ERC; Material safety factor;

[0031] The calculation formula for verifying the shear bearing capacity of the interface between the precast ERC sleeve and the core concrete is as follows:

[0032] ,

[0033] In the formula, This refers to the shear bearing capacity of the interface between the sleeve and the core concrete. Design for bonding shear strength of the roughened interface; The effective interface area; The number of annular shear ribs that participate in the stress; The design shear bearing capacity for a single ring shear rib.

[0034] Furthermore, the formula for calculating the effective seepage prevention path length of the Z-shaped double staggered joint described in S4 is as follows:

[0035] ,

[0036] In the formula, The effective seepage prevention path length for the Z-shaped double staggered joint; This refers to the length of the vertical seepage prevention path corresponding to the outer staggered platform; This refers to the radial seepage prevention path length corresponding to the ring-shaped overlapping platform. This is the length of the vertical seepage prevention path corresponding to the inner misalignment.

[0037] The volume of epoxy resin grout for a single Z-shaped double staggered joint is determined based on the geometric volume of the annular grouting cavity and construction losses, and the calculation formula is as follows:

[0038] ,

[0039] In the formula, The volume of epoxy resin grout required for a single Z-shaped double staggered joint; The outer diameter of the annular grouting cavity; The inner diameter of the annular grouting cavity; This refers to the effective height of the annular grouting cavity; This is the loss coefficient during grouting construction;

[0040] The shear bearing capacity of the Z-shaped double staggered joint was verified. The shear bearing capacity of the Z-shaped double staggered joint is jointly provided by contact surface friction, epoxy resin grout bonding, staggered bearing pressure, and the shear resistance of the high-strength bolts. The calculation formula is as follows:

[0041] ,

[0042] In the formula, The shear bearing capacity of the Z-shaped double staggered joint; The coefficient of friction is the coefficient of friction under the clamped state of the joint. This is the effective clamping force of the joint cross section; Design the bond shear strength for epoxy resin grouting material; This represents the effective bonding area of ​​the annular grouting cavity; The factor for reducing the bearing capacity of the misaligned platform; Design compressive strength for ERC; The effective bearing area of ​​the outer and inner misaligned platforms; The number of high-strength bolts; Design shear strength for a single high-strength bolt; The effective cross-sectional area of ​​a single high-strength bolt;

[0043] When verifying the tensile bearing capacity of the built-in high-strength bolt connection assembly, the built-in high-strength bolt connection assembly bears the opening tensile force on the tension side of the Z-shaped double staggered joint, and its tensile bearing capacity calculation formula is as follows:

[0044] ,

[0045] In the formula, The tensile bearing capacity of the built-in high-strength bolt connection assembly; The number of high-strength bolts; Design tensile strength for a single high-strength bolt; The effective cross-sectional area of ​​a single high-strength bolt; This is the safety factor for the tensile force of the joint; The tension force is designed for the tension side of the joint;

[0046] When verifying the overturning moment of the radial wedge locking pin, the radial wedge locking pin bears the overturning moment of the upper sleeve segment during the construction stage before the epoxy resin grouting material reaches strength. The formula for verifying its overturning resistance is as follows:

[0047] ,

[0048] In the formula, To resist overturning moment for temporary locking systems; The number of radial wedge locking pins; Design tension for a single radial wedge locking pin; The lever arm of the radial wedge-shaped locking pin relative to the center of the sleeve; The effective pressure in the pressure-bearing zone of the joint; The lever arm of the effective pressure relative to the overturning edge; The overturning safety factor during the construction phase; The design overturning moment is generated by the combined effects of construction wind load and installation eccentricity.

[0049] Furthermore, the outer sealing groove is located within the vertical overlapping surface of the outer staggered joint, on the outer path of the Z-shaped double staggered joint. A closed-cell EPDM rubber sealing strip with a diameter of 20mm is installed in the outer sealing groove, and the compression rate after installation is 25%.

[0050] The inner sealing groove is set within the horizontal limiting surface of the inner misalignment, located on the inner path of the Z-shaped double misalignment joint. A water-swellable rubber waterstop strip with a cross-sectional size of 20mm×10mm is installed in the inner sealing groove.

[0051] The grouting system is divided into eight closed grouting zones along the circumference, and each grouting zone is equipped with a low-level grouting hole and a high-level venting hole.

[0052] The radial wedge locking pin parameters of the connection system include:

[0053] Eight sets of radial wedge-shaped locking pins are evenly arranged along the circumference of the sleeve, and the design tensile force of a single radial wedge-shaped locking pin is 300kN;

[0054] The radial wedge-shaped locking pin has a lever arm of 2.7m relative to the center of the sleeve;

[0055] The parameters of the built-in high-strength bolt connection components of the connection system include the built-in high-strength bolt connection components, which are evenly arranged in twelve groups along the circumference of the sleeve. Each group of built-in high-strength bolt connection components includes a high-strength bolt, an anchor plate, and an anti-loosening nut. The final preload of the high-strength bolt is 260kN.

[0056] Furthermore, the formula for calculating the offset distance between the core concrete construction joint and the sleeve horizontal joint described in S5 is as follows:

[0057] ,

[0058] In the formula, The staggered distance between the core concrete construction joint and the horizontal joint of the sleeve; The elevation of the core concrete construction joint; The elevation of the horizontal joint of the sleeve; The minimum offset distance is determined based on the local stress disturbance range of the joint and the core concrete vibration operation space.

[0059] Furthermore, the cyclic pouring sequence of the core concrete described in S5 includes the following steps: First, the positioning of the lower precast ERC sleeve segment is completed; then, the upper precast ERC sleeve segment is hoisted and temporarily locked using eight sets of radial wedge locking pins; subsequently, twelve sets of built-in high-strength bolt connection components are installed and pre-tightened; then, epoxy resin grouting of the eight grouting zones is completed; after the compressive strength of the epoxy resin grout reaches 45MPa, the core concrete is poured; the core concrete is continuously poured from the previous core concrete construction joint to 1000mm above the current sleeve horizontal joint. In this embodiment, the elevation difference between adjacent core concrete construction joints is 3000mm, and the single pouring height is 3.0m; after the compressive strength of the core concrete reaches 30MPa, the next precast ERC sleeve segment construction cycle begins.

[0060] Furthermore, the pouring parameters described in S5 include a core concrete layer thickness of 400mm, an immersion vibrator movement spacing of 300mm, and a vibrator insertion depth of 50mm into the lower core concrete layer.

[0061] Furthermore, the load-bearing capacity, crack resistance, stability, and connection verification of the phased design conditions described in S1, as described in S6, includes:

[0062] The lifting quality verification and stability verification during the lifting phase include temporary locking anti-overturning verification of the lifting capacity verification and the lifting capacity verification.

[0063] During the grouting stage, shear resistance calculations of joints and tension resistance calculations of high-strength bolts are performed in the connection verification.

[0064] The calculation of circumferential tensile stress in the sleeve and the calculation of interface shear resistance in the bearing capacity calculation are performed during the crack resistance calculation of the pouring stage.

[0065] Advantages of the present invention

[0066] (1) The present invention adopts a Z-shaped double staggered joint composed of an outer staggered platform, an annular overlapping platform and an inner staggered platform, so that external water passes through two vertical turns and one radial turn before entering the core concrete area, which significantly extends the effective anti-seepage path of the joint.

[0067] (2) The present invention uses a three-level protection system consisting of EPDM rubber sealing strip, epoxy resin grouting consolidation ring and water-swellable rubber waterstop strip to achieve waterproofing on the outside of the joint, consolidation in the middle of the joint and grouting stop on the inside of the joint.

[0068] (3) The present invention sets the core concrete construction joint inside the sleeve segment above the sleeve horizontal joint, so that the core concrete continuously crosses the sleeve joint, avoiding the formation of a through horizontal weak area between the sleeve horizontal joint and the core concrete construction joint, thus ensuring the continuity of the structure.

[0069] (4) The present invention uses radial wedge locking pins to complete the self-stabilization and axis adjustment of the prefabricated ERC sleeve segment, uses built-in high-strength bolt connection components to bear the tension force on the joint side, and uses epoxy resin grouting material to bear the joint bonding and error compensation, forming a clear temporary connection and permanent connection force transmission system.

[0070] (5) The present invention completes the phased verification according to the sleeve hoisting stage, the Z-shaped double staggered joint grouting stage, the core concrete pouring stage and the bridge joint bearing stage. Based on the hoisting capacity, the side pressure of the fresh core concrete, the construction wind load and the design internal force of the bridge, the height of the precast ERC sleeve segment, the thickness of the precast ERC sleeve, the reinforcing steel, the joint size, the cross joint connector and the temporary locking parameters are determined, so that the design results directly cover the whole process of component prefabrication, on-site assembly, layered pouring and bridge service.

[0071] (6) This invention uses annular shear ribs and a roughened interface to achieve coordinated stress distribution between the sleeve and the core concrete, thereby improving the overall stiffness, joint shear resistance, and durability of the reinforced column. Precast ERC sleeves are used as permanent formwork, external durable protective layer, and structural reinforcement layer, forming a continuous protective barrier with specified thickness and structural strength around the core concrete, reducing the risk of chloride ions, sulfates, moisture, and carbon dioxide being transported to the core concrete and reinforcing steel area.

[0072] (7) This invention is applicable to bridge column structures with a total height of several meters to hundreds of meters. It adopts a precast ERC sleeve reinforced column design method with precast epoxy resin concrete sleeves, Z-shaped double staggered joints and staggered construction joints of core concrete. By placing the core concrete construction joint inside the precast ERC sleeve segment and maintaining a preset staggered distance from the sleeve horizontal joint, the horizontal joint of the sleeve and the core concrete construction joint are prevented from forming a through horizontal weak area. By completing the load-bearing capacity, crack resistance, stability, joint shear resistance and interface shear resistance calculations for the precast ERC sleeve hoisting stage, the Z-shaped double staggered joint grouting stage, the core concrete pouring stage and the stage of joint stress of the completed bridge, the structural safety of each stage is ensured.

[0073] (8) The present invention forms a continuous corrosion-resistant protective layer on the outside of the core concrete by prefabricated ERC sleeve, which realizes rapid positioning of prefabricated ERC sleeve, multi-level seepage prevention of joints, misalignment of inner and outer joints and synergistic stress between prefabricated ERC sleeve and core concrete, thereby improving construction efficiency, structural continuity, durability and resistance to environmental erosion. Attached Figure Description

[0075] Figure 1 This is a flowchart illustrating the overall process of a prefabricated ERC sleeve reinforcement column design method according to the present invention.

[0076] Figure 2 This is a three-dimensional structural cross-sectional diagram of the prefabricated ERC sleeve segment of the present invention.

[0077] Figure 3 This is a longitudinal sectional view of the prefabricated ERC sleeve segment of the present invention.

[0078] Figure 2 and Figure 3 middle:

[0079] 1. Core concrete; 2. Precast ERC sleeve segment of the upper section; 3. Precast ERC sleeve segment of the lower section; 4. Outer staggered joint; 5. Annular overlapping platform; 6. Inner staggered joint; 7. Outer sealing groove; 8. Annular grouting cavity; 9. Inner sealing groove; 10. Z-shaped double staggered joint; 11. Geometric seepage prevention path of Z-shaped double staggered joint. Detailed Implementation

[0081] The following explanation and description are provided in conjunction with the accompanying drawings and specific embodiments. It should be noted that these specific embodiments are not intended to limit the scope of the invention.

[0082] The prefabricated ERC sleeve reinforced column design method of the present invention is applicable to bridge piers, bridge towers, and load-bearing support columns with a total height ranging from several meters to hundreds of meters. For example... Figure 2 and Figure 3 As shown, the inner side of the precast ERC sleeve segment is poured to form the core concrete 1; the epoxy resin concrete sleeve is divided into the upper precast ERC sleeve segment 2 and the lower precast ERC sleeve segment 3 along the height direction of the reinforced column, and a Z-shaped double staggered joint 10 is set between adjacent segments.

[0083] The Z-shaped double staggered joint 10 consists of an outer staggered platform 4, an annular overlapping platform 5, an inner staggered platform 6, an outer sealing groove 7, an annular grouting cavity 8, and an inner sealing groove 9. The outer staggered platform 4 is located on the outer side of the lower end of the precast ERC sleeve segment 2 of the upper section, and the inner staggered platform 6 is located on the inner side of the upper end of the precast ERC sleeve segment 3 of the lower section. The annular overlapping platform 5 connects the outer staggered platform 4 and the inner staggered platform 6, forming the intermediate transition section of the Z-shaped double staggered joint. The outer staggered platform 4, the annular overlapping platform 5, and the inner staggered platform 6 together form the geometric seepage prevention path 11 of the Z-shaped double staggered joint.

[0084] The outer sealing groove 7 is located within the vertical overlapping surface of the outer staggered platform 4, on the outer path of the Z-shaped double staggered joint; the inner sealing groove 9 is located within the horizontal limiting surface of the inner staggered platform 6, on the inner path of the Z-shaped double staggered joint; the annular grouting cavity 8 is located between the outer staggered platform 4 and the inner staggered platform 6, on the inner side of the annular overlapping platform 5, and is formed by the inner side of the outer staggered platform 4, the top surface of the annular overlapping platform 5, and the outer side of the inner staggered platform 6.

[0085] The upper precast ERC sleeve segment 2 and the lower precast ERC sleeve segment 3 are connected as one unit through the overlapping of the outer staggered platform 4, the annular overlapping platform 5 and the inner staggered platform 6, and the epoxy resin grouting material in the annular grouting cavity 8.

[0086] This embodiment uses a circular bridge pier with a total height of 102m as an example. The precast ERC sleeve has an outer diameter of 6000mm and an inner diameter of 5640mm. The core concrete column has a diameter of 5640mm and a strength grade of C60. The precast ERC sleeve reinforcement column consists of 34 precast ERC sleeve segments along its height, each segment being 3000mm high. During construction, the precast ERC sleeves serve as permanent formwork and provide protection against external environmental forces. During the completed bridge's load-bearing phase, they share axial force, bending moment, and shear force with the core concrete.

[0087] The structure of the aforementioned prefabricated ERC sleeve segment is the target structure to be achieved by the prefabricated ERC sleeve reinforcement column design method in this specific embodiment. The following is in conjunction with... Figure 1 The overall flowchart of the design method shown below details the specific design process for the target structure, with the following steps:

[0088] S1, obtain the design parameters of the precast ERC sleeve reinforced column, and establish phased design conditions based on the design parameters;

[0089] The design parameters include geometric parameters, load parameters, construction parameters, material parameters, equipment and transportation parameters, and construction allowable deviation parameters. Geometric parameters include the total height of the reinforcing column, the outer diameter of the precast ERC sleeve, the inner diameter of the precast ERC sleeve, the diameter of the core concrete column, the height of the precast ERC sleeve segment, and the effective thickness of the sleeve. Load parameters include the design axial force, design bending moment, and design shear force of the completed bridge. Construction parameters include the design wind speed, the core concrete pouring speed, the single pouring height, and the equivalent liquid column height. Material parameters include the properties of ERC materials, the properties of core concrete materials, the properties of sleeve reinforcing steel, the properties of epoxy resin grouting material, and the properties of high-strength bolts. The properties of ERC materials, core concrete materials, sleeve reinforcing steel, epoxy resin grouting material, and high-strength bolts all include both test values ​​and design standard values. 28-day compressive strength, ERC design tensile strength, ERC elastic modulus, and ERC density; core concrete material properties, including core concrete strength grade; sleeve reinforcement properties, including longitudinal sleeve reinforcement grade and diameter, and circumferential sleeve reinforcement grade and diameter; epoxy resin grout properties, including epoxy resin grout 28-day compressive strength and epoxy resin grout design bond shear strength; high-strength bolt properties, including high-strength bolt specifications and strength grade; equipment and transportation parameters, including maximum allowable component diameter for transportation, maximum allowable component height for transportation, rated lifting capacity of the design working radius, and lifting capacity reduction factor; construction allowable deviation parameters, including allowable deviation of single sleeve axis, allowable deviation of single sleeve verticality, and allowable deviation of joint assembly clearance.

[0090] The main design input parameters used in this embodiment are shown in Table 1:

[0091] Table 1. Main design input parameters for prefabricated ERC sleeve reinforced columns

[0092]

[0093] The phased design conditions include the first condition, the second condition, the third condition, and the fourth condition. The first condition is the hoisting stage of the precast ERC sleeve, and its corresponding loads include the self-weight of the precast ERC sleeve segment, hoisting acceleration, and eccentric construction wind load. The second condition is the grouting stage of the Z-shaped double staggered joint, and its corresponding loads include the self-weight of the upper precast ERC sleeve segment, the pre-tightening force of the radial wedge locking pin, and the grouting pressure. The third condition is the core concrete pouring stage, and its corresponding loads include the lateral pressure of the freshly mixed core concrete, construction wind load, and additional vibration load. The fourth condition is the stage of the completed bridge bearing the load, and its corresponding loads include the design axial force, design bending moment, design shear force, temperature effect, and seismic effect.

[0094] S2, determine the segmentation parameters and material properties of the prefabricated ERC sleeve, and complete the transport clearance and lifting capacity verification; the segmentation parameters include the number of prefabricated ERC sleeve segments and the lifting mass of a single prefabricated ERC sleeve segment; based on the total height of the prefabricated ERC sleeve reinforcing column and the height of the prefabricated ERC sleeve segment obtained in S1, determine the number of prefabricated ERC sleeve segments; based on the outer diameter and height of the prefabricated ERC sleeve segment obtained in S1, perform transport clearance verification for a single prefabricated ERC sleeve segment; based on the outer diameter, inner diameter, and height of the prefabricated ERC sleeve obtained in S1... The hoisting mass of a single precast ERC sleeve segment is determined based on the height of the sleeve segment, the density of the ERC, and the total mass of reinforcing steel, embedded parts, seals, and connecting components determined according to the material and geometric parameters obtained from S1. The hoisting mass of a single precast ERC sleeve segment is verified by reducing the lifting capacity of the lifting equipment based on the rated lifting capacity and lifting capacity reduction factor obtained from S1. The adopted material performance values ​​are determined based on the test values ​​and design standard values ​​of the ERC material properties, core concrete material properties, sleeve reinforcing steel properties, epoxy resin grouting material properties, and high-strength bolt properties obtained from S1. Specifically, the following applies:

[0095] First, the number of prefabricated ERC sleeve segments is determined based on the total height of the prefabricated ERC sleeve reinforcement column and the height of a single prefabricated ERC sleeve segment. The calculation formula is as follows:

[0096] ,

[0097] In the formula, The number of prefabricated ERC sleeve segments; This refers to the total height of the prefabricated ERC sleeve reinforced column; This represents the height of a single prefabricated ERC sleeve segment. The total height of the reinforcing column is an integer multiple of the sleeve segment height.

[0098] In this embodiment, the total height of the prefabricated ERC sleeve reinforcement column is 102m, and the height of a single prefabricated ERC sleeve segment is 3m. Substituting these values ​​into the calculation, the number of prefabricated ERC sleeve segments is 34. The total height of the prefabricated ERC sleeve reinforcement column is an integer multiple of the height of the prefabricated ERC sleeve segments.

[0099] Simultaneously, transport clearance calculations are performed. In this embodiment, the maximum allowable component diameter for transport is 6.20m, and the maximum allowable component height for transport is 3.20m. The outer diameter of the prefabricated ERC sleeve is 6.00m, which is less than the maximum allowable component diameter for transport (6.20m), and the height of the prefabricated ERC sleeve segment is 3.00m, which is less than the maximum allowable component height for transport (3.20m), thus meeting the component outline control requirements determined by the special transport plan.

[0100] Next, the calculation formula for determining the hoisting mass of a single precast ERC sleeve segment, based on the outer diameter of the precast ERC sleeve, the inner diameter of the precast ERC sleeve, the height of the precast ERC sleeve segment, the ERC density, and the total mass of reinforcing steel, embedded parts, seals, and connecting components, is as follows:

[0101] ,

[0102] In the formula, The lifting mass of a single prefabricated ERC sleeve segment; ERC density; Pre-fabricated ERC sleeve outer diameter; Pre-fabricated ERC sleeve inner diameter; The height of the prefabricated ERC sleeve segment; To increase the overall mass of reinforcing bars, embedded parts, seals and connecting components.

[0103] In this embodiment, the ERC density is taken as 2350 kg / m³, i.e., 2.35 t / m³; the outer diameter of the prefabricated ERC sleeve is taken as 6.000 m, the inner diameter of the prefabricated ERC sleeve is taken as 5.640 m, the height of the prefabricated ERC sleeve segment is taken as 3.000 m, and the total mass of the reinforcing steel, embedded parts, seals, and connecting components is taken as 2.10 t. The calculated volume of the prefabricated ERC sleeve body is 9.87 m³, and the calculated hoisting mass of a single prefabricated ERC sleeve segment is 25.30 t.

[0104] The formula for verifying the lifting capacity of a single precast ERC sleeve segment by reducing the lifting weight of the lifting equipment is as follows:

[0105] ,

[0106] In the formula, The lifting capacity reduction factor is determined jointly by the operating radius of the lifting equipment, the lifting height, and the construction environment. The rated lifting capacity of the lifting equipment at its designed working radius;

[0107] In this embodiment, the lifting capacity reduction factor is taken as 0.75, and the rated lifting capacity of the lifting equipment under the design working radius is taken as 40.0t, with a reduced lifting capacity of 30.0t. The lifting mass of a single prefabricated ERC sleeve segment is 25.30t, which is less than the reduced lifting capacity of 30.0t, thus meeting the lifting mass requirements.

[0108] Based on the material test values ​​and design standard values ​​obtained in S1, and combined with the crack resistance calculations during the sleeve casting stage, the shear resistance calculations at the interface between the sleeve and the core concrete, the shear resistance calculations for the Z-shaped double staggered joint, and the tensile resistance calculations for the built-in high-strength bolt connection components, the adopted material performance values ​​are determined. In this embodiment, the input values ​​for ERC material, core concrete, sleeve reinforcing steel, epoxy resin grout, and high-strength bolts all meet the corresponding design requirements. The adopted material performance values ​​are consistent with the input values ​​listed in Table 1, as shown in Table 2.

[0109] Table 2 Material Performance Design Parameters

[0110]

[0111] S3, determine the main cross-section, reinforcing steel, and shear structure of the inner wall interface of the precast ERC sleeve: Based on the equivalent liquid column height obtained in S1, determine the design lateral pressure of the freshly mixed core concrete; based on the design lateral pressure of the freshly mixed core concrete, the inner diameter of the precast ERC sleeve obtained in S1, and the effective thickness of the sleeve, determine the circumferential tensile stress of the sleeve, and perform crack resistance calculation on the circumferential tensile stress of the sleeve; based on the material parameters and load parameters obtained in S1, determine the arrangement and specifications of the reinforcing steel; determine the shear structure of the inner wall interface, and verify the shear bearing capacity of the interface between the precast ERC sleeve and the core concrete based on the material parameters and load parameters obtained in S1; details are as follows:

[0112] First, the calculation formula for determining the design lateral pressure of freshly mixed core concrete based on the equivalent liquid column height is as follows:

[0113] ,

[0114] In the formula, The lateral pressure is designed for freshly mixed core concrete; The density of freshly mixed core concrete; The equivalent liquid column height is determined based on the pouring speed, initial setting time of concrete, and pouring temperature.

[0115] In this embodiment, the unit weight of freshly mixed core concrete is taken as 24 kN / m³, and the equivalent liquid column height is taken as 3.0 m. Substituting these values ​​into the calculation, the design lateral pressure of the freshly mixed core concrete is 72 kPa.

[0116] Next, based on the stress relationship of the thin-walled cylinder, the circumferential tensile stress of the precast ERC sleeve under the design lateral pressure of the freshly mixed core concrete is determined. The calculation formula for the circumferential tensile stress of the sleeve is as follows:

[0117] ,

[0118] In the formula, This refers to the circumferential tensile stress on the sleeve. The lateral pressure is designed for freshly mixed core concrete; Pre-fabricated ERC sleeve inner diameter; The effective thickness of the sleeve is calculated after deducting the local weakening of the sealing groove, grouting hole, and pre-embedded locking box; Design tensile strength for ERC; This is the material safety factor.

[0119] In this embodiment, the inner diameter of the prefabricated ERC sleeve is 5.640 mm, and the nominal thickness is 180 mm. After deducting the local weakening caused by the sealing groove, grouting hole, and embedded locking box, and taking into account the equivalent tensile contribution of the reinforcing steel bars around the holes and embedded parts, the effective thickness of the prefabricated ERC sleeve is calculated to be 0.180 mm. The design tensile strength of the ERC is 3.2 MPa, and the material safety factor is 1.50. Substituting these values ​​into the calculation, the circumferential tensile stress of the prefabricated ERC sleeve is 1.13 MPa, which is less than the ratio of the design tensile strength of the ERC to the material safety factor of 2.13 MPa, thus meeting the crack resistance requirements of the prefabricated ERC sleeve.

[0120] The precast ERC sleeve is internally reinforced with double layers of circumferential and longitudinal reinforcing bars. The circumferential reinforcing bars are HRB500 grade Φ20 steel bars spaced at 150mm intervals; the longitudinal reinforcing bars are HRB500 grade Φ22 steel bars spaced at 150mm intervals. Within a 600mm range above and below the Z-shaped double staggered joint, the spacing of the circumferential reinforcing bars is increased to 100mm. Φ16 closed reinforcing bars are installed around the lifting points, grouting holes, embedded locking boxes, and high-strength bolt anchoring boxes.

[0121] The inner wall of the precast ERC sleeve is provided with continuous annular shear ribs. The radial height of the annular shear ribs is 60mm, the vertical width is 50mm, and the vertical spacing is 500mm. The inner wall of the precast ERC sleeve is uniformly roughened to a depth of 5mm, and the design bond shear strength of the roughened interface is taken as 2.5MPa. Within 1000mm above and below the Z-shaped double staggered joint, the spacing of the annular shear ribs is increased to 300mm. The calculation formula for verifying the shear bearing capacity of the interface between the precast ERC sleeve and the core concrete is as follows:

[0122] ,

[0123] In the formula, This refers to the shear bearing capacity of the interface between the sleeve and the core concrete. Design for bonding shear strength of the roughened interface; The effective interface area; The number of annular shear ribs that participate in the stress; The design shear bearing capacity for a single ring shear rib.

[0124] In this embodiment, the design bond shear strength of the roughened interface is taken as 2.5 MPa, the effective interface area participating in the current joint stress is taken as 4.80 m², the number of annular shear ribs participating in the stress is taken as 6, and the design shear bearing capacity of a single annular shear rib is taken as 800 kN. Substituting these values ​​into the calculation, the shear bearing capacity of the interface between the precast ERC sleeve and the core concrete is found to be 16800 kN, which is greater than the design shear force of the completed bridge of 12500 kN, thus meeting the interface shear requirements.

[0125] S4, Design the Z-shaped double staggered joint, sealing system, grouting system and connection system: Based on the construction allowable deviation parameters obtained in S1 and the material performance values ​​determined in S2, design the geometric structure of the Z-shaped double staggered joint, so that the lower end of the upper precast ERC sleeve segment 2 forms an outer stagger 4, the upper end of the lower precast ERC sleeve segment 3 forms an inner stagger 6, an annular overlapping platform 5 is formed between the outer stagger 4 and the inner stagger 6, an outer sealing groove 7 is formed in the vertical overlapping surface of the outer stagger 4, an inner sealing groove 9 is formed in the horizontal limiting surface of the inner stagger 6, and an annular grouting cavity 8 is formed between the inner surface of the outer stagger 4, the top surface of the annular overlapping platform 5 and the outer surface of the inner stagger 6.

[0126] like Figure 2 and Figure 3As shown, the prefabricated ERC sleeve segment 2 of the upper section and the prefabricated ERC sleeve segment 3 of the lower section are assembled to form a Z-shaped double-staggered joint 10. The upper end of the prefabricated ERC sleeve segment 3 is provided with an outer staggered platform 4, an annular overlapping platform 5, and an inner staggered platform 6. The lower end of the prefabricated ERC sleeve segment 2 of the upper section is provided with a matching outer staggered platform 4, annular overlapping platform 5, and inner staggered platform 6. An outer sealing groove 7 is provided at the outer staggered platform 4, an annular grouting cavity 8 is provided at the annular overlapping platform 5, and an inner sealing groove 9 is provided at the inner staggered platform 6. After the adjacent segments are assembled, the geometric seepage prevention path 11 of the Z-shaped double-staggered joint passes sequentially through the outer staggered path, the radial path corresponding to the annular overlapping platform, and the inner staggered path.

[0127] The effective seepage prevention path length of the Z-shaped double staggered joint is determined based on the outer staggered path, the annular overlapping platform, and the inner staggered path; the sealing strip installation parameters of the sealing system are determined based on the construction allowable deviation parameters obtained in S1; the grouting zones of the grouting system and the epoxy resin grout volume of a single Z-shaped double staggered joint are determined based on the geometric and construction parameters obtained in S1; the radial wedge locking pin parameters and the parameters of the built-in high-strength bolt connection components of the connection system are determined based on the material parameters obtained in S1; and the shear bearing capacity of the Z-shaped double staggered joint, the tensile bearing capacity of the built-in high-strength bolt connection components, and the overturning moment of the radial wedge locking pin are verified based on the load and material parameters obtained in S1; the details are as follows:

[0128] The geometric parameters of the Z-shaped double staggered joint determined according to the above design in this embodiment are shown in Table 3. The design value of the assembly gap of the Z-shaped double staggered joint is 10mm, and the allowable construction deviation is ±2mm; this allowable deviation is used to determine the prefabricated dimensions, tolerance fit, and on-site installation acceptance range of the staggered lap surface.

[0129] Table 3 Geometric parameters of Z-shaped double staggered joint

[0130]

[0131] First, the effective seepage prevention path length of the Z-shaped double staggered joint is determined based on the outer staggered path, the annular overlapping platform path, and the inner staggered path. The calculation formula is as follows:

[0132] ,

[0133] In the formula, The effective seepage prevention path length for the Z-shaped double staggered joint; This refers to the length of the vertical seepage prevention path corresponding to the outer staggered platform; This refers to the radial seepage prevention path length corresponding to the ring-shaped overlapping platform. This represents the length of the vertical seepage prevention path corresponding to the inner misalignment.

[0134] In this embodiment, the vertical seepage prevention path length corresponding to the outer staggered platform is 120mm, the radial seepage prevention path length corresponding to the annular overlapping platform is 60mm, and the vertical seepage prevention path length corresponding to the inner staggered platform is 120mm. Substituting these values ​​into the calculation, the effective seepage prevention path length of the Z-shaped double staggered joint is 300mm.

[0135] The sealing system's sealing strip installation parameters include: the outer sealing groove is located within the vertical overlap surface of the outer misalignment, on the outer path of the Z-shaped double misalignment joint; a 20mm diameter closed-cell EPDM rubber sealing strip is installed in the outer sealing groove, with a compression rate of 25% after installation; the inner sealing groove is located within the horizontal limiting surface of the inner misalignment, on the inner path of the Z-shaped double misalignment joint; a 20mm × 10mm water-swellable rubber waterstop strip is installed in the inner sealing groove. After the prefabricated ERC sleeve segments of the upper and lower sections are installed in place, both sealing strips form a continuous annular compression state.

[0136] The annular grouting cavity of the grouting system is divided into eight closed grouting zones along the circumference. Each closed grouting zone is equipped with a low-level grouting hole and a high-level venting hole. The volume of epoxy resin grout for a single Z-shaped double staggered joint is determined based on the geometric volume of the annular grouting cavity and construction losses, calculated using the following formula:

[0137] ,

[0138] In the formula, The volume of epoxy resin grout required for a single Z-shaped double staggered joint; The outer diameter of the annular grouting cavity; The inner diameter of the annular grouting cavity; This refers to the effective height of the annular grouting cavity; This is the loss coefficient during grouting construction;

[0139] In this embodiment, the outer diameter of the annular grouting cavity is 5.880 m, the inner diameter is 5.760 m, the effective height is 0.030 m, and the grouting construction loss coefficient is 0.08. Substituting these values ​​into the calculation, the required volume of epoxy resin grout for a single Z-shaped double-staggered joint is 0.0355 m³, and the volume of the prepared material is 0.036 m³. The diameter of the low-level grouting hole is 30 mm, the diameter of the high-level vent hole is 20 mm, and the grouting pressure is controlled at 0.20 MPa. After the epoxy resin grout reaches a compressive strength of 45 MPa, the core concrete pouring stage begins. After the 28-day compressive strength of the epoxy resin grout reaches 90 MPa and the joint bond shear strength reaches 4.0 MPa, the bridge enters the shared load-bearing stage.

[0140] The radial wedge locking pin parameters of the connection system include eight sets of radial wedge locking pins evenly arranged along the circumference of the sleeve, a design tensile force of 300kN for a single radial wedge locking pin, and a lever arm of 2.7m relative to the center of the sleeve for the radial wedge locking pin.

[0141] The parameters of the built-in high-strength bolt connection assembly of the connection system include twelve groups of built-in high-strength bolt connection assemblies evenly arranged along the circumference of the sleeve, with each group using one M36, 10.9 grade high-strength bolt. Each group of built-in high-strength bolt connection assemblies includes a high-strength bolt, an anchor plate, and an anti-loosening nut. The built-in high-strength bolt connection assemblies are symmetrically pre-tightened in three stages, with a final pre-tightening force of 260kN.

[0142] The shear bearing capacity of the Z-shaped double staggered joint was verified. The shear bearing capacity of the Z-shaped double staggered joint is jointly provided by contact surface friction, epoxy resin grout bonding, staggered bearing pressure, and the shear resistance of the high-strength bolts. The calculation formula is as follows:

[0143] ,

[0144] In the formula, The shear bearing capacity of the Z-shaped double staggered joint; The coefficient of friction is the coefficient of friction under the clamped state of the joint. This is the effective clamping force of the joint cross section; Design the bond shear strength for epoxy resin grouting material; This represents the effective bonding area of ​​the annular grouting cavity; The factor for reducing the bearing capacity of the misaligned platform; Design compressive strength for ERC; The effective bearing area of ​​the outer and inner misaligned platforms; The number of high-strength bolts; Design shear strength for a single high-strength bolt; This represents the effective cross-sectional area of ​​a single high-strength bolt.

[0145] In this embodiment, the friction coefficient under the joint compression state is taken as 0.60, the effective compression force of the joint section is taken as 8000kN, the design bond shear strength of the epoxy resin grout is taken as 4.0MPa, the effective bond area of ​​the annular grouting cavity is taken as 1.20m², the bearing capacity reduction factor of the misalignment is taken as 0.25, the ERC design compressive strength is taken as 80MPa, the effective bearing area of ​​the outer and inner misalignments is taken as 0.19m², the number of high-strength bolts is taken as 12, the design shear strength of a single high-strength bolt is taken as 500MPa, and the effective cross-sectional area of ​​a single high-strength bolt is taken as 817mm². Substituting these values ​​into the calculation, the shear bearing capacity of the Z-shaped double misalignment joint is 18302kN, the design value is taken as 18300kN, which is greater than the design shear force of the joint of 12500kN.

[0146] Next, when verifying the tensile bearing capacity of the built-in high-strength bolt connection assembly, the built-in high-strength bolt connection assembly bears the opening tensile force on the tension side of the Z-shaped double staggered joint, and its tensile bearing capacity calculation formula is as follows:

[0147] ,

[0148] In the formula, The tensile bearing capacity of the built-in high-strength bolt connection assembly; The number of high-strength bolts; Design tensile strength for a single high-strength bolt; The effective cross-sectional area of ​​a single high-strength bolt; This is the safety factor for the tensile force of the joint; The tension force is designed for the tension side of the joint.

[0149] In this embodiment, the number of high-strength bolts is 12, the design tensile strength of a single high-strength bolt is 600 MPa, the effective cross-sectional area of ​​a single high-strength bolt is 817 mm², the joint tensile safety factor is 1.25, and the design opening tensile force on the tension side of the joint is 3200 kN. Substituting these values ​​into the calculation, the tensile bearing capacity of the built-in high-strength bolt connection assembly is 5882 kN, and the design tensile strength is 5880 kN, which is greater than the design opening tensile force of 4000 kN after considering the joint tensile safety factor, thus meeting the joint's anti-tension requirement.

[0150] When verifying the overturning moment of the radial wedge locking pin, the radial wedge locking pin bears the overturning bending moment of the upper precast ERC sleeve segment during the construction stage before the epoxy resin grout reaches the specified construction strength. The overturning verification formula is as follows:

[0151] ,

[0152] In the formula, To resist overturning moment for temporary locking systems; The number of radial wedge locking pins; Design tension for a single radial wedge locking pin; The lever arm of the radial wedge-shaped locking pin relative to the center of the sleeve; The effective pressure in the pressure-bearing zone of the joint; The lever arm of the effective pressure relative to the overturning edge; The overturning safety factor during the construction phase; The design overturning moment is generated by the combined effects of construction wind load and installation eccentricity.

[0153] In this embodiment, the number of radial wedge locking pins is 8, the design tensile force of a single radial wedge locking pin is 300kN, the lever arm of the radial wedge locking pin relative to the center of the sleeve is 2.7m, the effective pressure in the joint bearing area is 1000kN, the lever arm of the effective pressure relative to the overturning edge is 0.30m, the overturning safety factor during construction is 1.20, and the design overturning moment generated by the combined construction wind load and installation eccentricity is 4500kN·m. Substituting these values ​​into the calculation, the overturning moment of the temporary locking system is 6780kN·m, which is greater than the design overturning moment of 5400kN·m after considering the overturning safety factor during construction, thus meeting the stability requirements during construction.

[0154] S5, based on the construction allowable deviation parameters obtained in S1 and the geometric parameters of the Z-shaped double staggered joint determined in S4, determines the stagger distance between the core concrete construction joint and the sleeve horizontal joint, and determines the cyclic pouring sequence and pouring parameters of the core concrete based on the construction parameters obtained in S1; specifically as follows:

[0155] The formula for calculating the offset distance between the core concrete construction joint and the horizontal joint of the sleeve is as follows:

[0156] ,

[0157] In the formula, The staggered distance between the core concrete construction joint and the horizontal joint of the sleeve; The elevation of the core concrete construction joint; The elevation of the horizontal joint of the sleeve; The minimum offset distance is determined based on the local stress disturbance range of the joint and the core concrete vibration operation space.

[0158] In this embodiment, the horizontal joints of the sleeve are arranged at 3m intervals, and the core concrete construction joint is located 1000mm above the corresponding horizontal joint of the sleeve. Based on the local stress disturbance range of the Z-shaped double staggered joint and the vibration operation space of the core concrete, the minimum stagger distance is taken as 600mm. Substituting into the calculation, the stagger distance between the core concrete construction joint and the horizontal joint of the sleeve is 1000mm, which is greater than the minimum stagger distance of 600mm.

[0159] The core concrete cyclic pouring sequence includes the following steps: First, the lower precast ERC sleeve segment is positioned; then, the upper precast ERC sleeve segment is hoisted and temporarily locked using eight sets of radial wedge-shaped locking pins; subsequently, twelve sets of built-in high-strength bolt connection components are installed and pre-tightened; then, epoxy resin grouting is completed in eight grouting zones; after the epoxy resin grouting material reaches a compressive strength of 45MPa, the core concrete is poured; the core concrete is continuously poured from the previous core concrete construction joint to 1000mm above the current sleeve horizontal joint. In this embodiment, the elevation difference between adjacent core concrete construction joints is 3000mm, and the single pouring height is 3.0m; after the core concrete reaches a compressive strength of 30MPa, the next precast ERC sleeve segment construction cycle begins.

[0160] The surface of the core concrete construction joint is roughened and cleaned to a depth of 8mm before the next construction cycle, and all surface laitance is removed. A 20mm thick bonding layer of cement mortar of the same strength grade is laid before pouring. The pouring parameters include a core concrete layer thickness of 400mm, an immersion vibrator movement interval of 300mm, and a vibrator insertion depth of 50mm into the lower core concrete layer.

[0161] S6. Based on the load and material parameters obtained in S1, the bearing capacity, crack resistance, stability, and connection calculations are performed on the phased design conditions described in S1. The objects of the calculations are the precast ERC sleeve segments, sleeve main sections, reinforcing steel bars, inner wall interface shear resistance structure, Z-shaped double staggered joints, sealing system, and connection system determined in S2 to S5. Based on the completed bridge design axial force, completed bridge design bending moment, and completed bridge design shear force obtained in S1, a three-dimensional finite element model is used for verification during the common stress stage of the completed bridge. Specifically, the phased design conditions are calculated for bearing capacity, crack resistance, stability, and connection, including hoisting quality and temporary locking anti-overturning calculations during the hoisting stage, joint shear resistance and high-strength bolt tension resistance calculations during the grouting stage, and sleeve circumferential tensile stress and interface shear resistance calculations during the pouring stage. The calculation results are shown in Table 4.

[0162] Table 4. Key Verification Results by Stage

[0163]

[0164] The joint stress stage of the completed bridge was verified using a three-dimensional finite element model. The core concrete was modeled using a plastic damage model, the precast ERC sleeve was modeled using an elastoplastic damage model, the interface between the precast ERC sleeve and the core concrete was modeled using a bond-slip relationship, and the Z-shaped double staggered joint was simulated using a combination of contact, epoxy resin grouting bonding, and built-in high-strength bolt connection components.

[0165] Calculation results show that, under the combined action of a design axial force of 56000 kN and a design bending moment of 135000 kN·m, the maximum compressive strain of the core concrete is 0.0023 kN, the maximum tensile strain of the precast ERC sleeve is 0.00031 kN, the maximum tensile stress of the high-strength bolt is 482 MPa, and the maximum opening of the Z-shaped double-staggered joint is 0.28 mm. All of these calculation results are lower than the corresponding design limits.

[0166] S7 outputs the design results of the precast ERC sleeve reinforced column. The design results include: precast ERC sleeve segment drawings based on the number and height of precast ERC sleeve segments determined in S2; reinforced steel bar drawings based on the reinforcement arrangement and specifications determined in S3; detailed drawings of the Z-shaped double staggered joint based on the geometric parameters of the Z-shaped double staggered joint determined in S4; embedded part drawings based on the material parameters obtained in S1 and the joint structure determined in S4; sealing part drawings based on the sealing strip installation parameters determined in S4; grouting zone diagrams based on the grouting zones determined in S4; core concrete pouring segment diagrams based on the cyclic pouring sequence and pouring parameters determined in S5; a hoisting control table based on the hoisting quality determined in S2 and the equipment and transportation parameters obtained in S1; and construction monitoring and quality acceptance tables based on the verification results of S6. Furthermore, construction quality control indicators are determined based on the allowable construction deviation parameters obtained in S1 and the verification results of S6, as shown in Table 5.

[0167] Table 5 Construction Quality Control Indicators

[0168]

[0169] Verification of scaled-down components: Precast ERC sleeve-reinforced column specimens at a scale of 1:5 were fabricated. Each specimen included two horizontal sleeve joints and two core concrete construction joints, with the horizontal sleeve joints and core concrete construction joints staggered by 200mm. The precast ERC sleeve-reinforced column specimens underwent axial compression tests, low-cycle reciprocating horizontal loading tests, and Z-shaped double-staggered joint hydrostatic tests.

[0170] The results of axial compression and low-cycle reciprocating horizontal loading tests indicate that the specimen's failure mode was bending failure in the plastic hinge zone at the column base. No through cracks occurred in the Z-shaped double-staggered joint, and no slippage occurred in the built-in high-strength bolt connection assembly. The maximum opening of the Z-shaped double-staggered joint was 0.34 mm. The specimen's ultimate horizontal bearing capacity was 1.08 times the design prediction, the displacement ductility coefficient was 4.6, and no delamination occurred at the interface between the precast ERC sleeve and the core concrete.

[0171] The Z-shaped double staggered joint underwent a constant water pressure of 0.60 MPa for 24 hours during the hydrostatic test. The outer closed-cell EPDM rubber sealing strip, epoxy resin grouting consolidation ring, and inner water-swellable rubber waterstop strip all remained intact. No visible water leakage was observed on the inner side of the Z-shaped double staggered joint, and the joint quality met the design requirements.

[0172] This embodiment uses prefabricated ERC sleeves to replace traditional high-altitude formwork. The installation of prefabricated ERC sleeve segments, the connection of Z-shaped double-staggered joints, and the pouring of core concrete form a stable construction cycle. Compared with the traditional climbing formwork construction scheme of the same size, the formwork operation time for a single 3m construction cycle is reduced by 42%, the high-altitude outer work time is reduced by 55%, and the repair area on the outer surface of the prefabricated ERC sleeve reinforced column is reduced by 68%. These results demonstrate that the prefabricated ERC sleeve reinforced column design method of this embodiment has clear engineering implementation conditions and stable structural performance.

Claims

1. A design method for a prefabricated ERC sleeve reinforced column, characterized in that, Includes the following steps: S1. Obtain the design parameters of the precast ERC sleeve reinforced column and establish phased design conditions based on the design parameters. The design parameters include geometric parameters, load parameters, construction parameters, material parameters, equipment and transportation parameters, and construction allowable deviation parameters. Geometric parameters include the total height of the reinforced column, the outer diameter of the precast ERC sleeve, the inner diameter of the precast ERC sleeve, the diameter of the core concrete column, the height of the precast ERC sleeve segment, and the effective thickness of the sleeve. Load parameters include the design axial force, design bending moment, and design shear force of the completed bridge. Construction parameters include the design wind speed, the core concrete pouring speed, the single pouring height, and the equivalent liquid column height. Material parameters include the properties of ERC materials, the properties of core concrete materials, the properties of sleeve reinforced steel bars, the properties of epoxy resin grouting material, and the properties of high-strength bolts. The performance of grouting materials and high-strength bolts includes both material test values ​​and design standard values; ERC material performance includes ERC 28d compressive strength, ERC design tensile strength, ERC elastic modulus, and ERC density; core concrete material performance includes core concrete strength grade; sleeve reinforcement performance includes longitudinal sleeve reinforcement grade and diameter, and circumferential sleeve reinforcement grade and diameter; epoxy resin grouting material performance includes epoxy resin grout 28d compressive strength and epoxy resin grout design bond shear strength; high-strength bolt performance includes high-strength bolt specifications and strength grade; equipment and transportation parameters include the maximum allowable diameter of components for transportation, the maximum allowable height of components for transportation, the rated lifting capacity of the design operating radius, and the lifting capacity reduction factor; construction allowable deviation parameters include the allowable deviation of the single sleeve axis, the allowable deviation of the single sleeve verticality, and the allowable deviation of the joint assembly clearance. S2, determine the segmentation parameters and material properties of the prefabricated ERC sleeve, and complete the transport clearance and lifting capacity verification; the segmentation parameters include the number of prefabricated ERC sleeve segments and the lifting mass of a single prefabricated ERC sleeve segment; based on the total height of the prefabricated ERC sleeve reinforcement column and the height of the prefabricated ERC sleeve segment obtained in S1, determine the number of prefabricated ERC sleeve segments; based on the outer diameter of the prefabricated ERC sleeve and the height of the prefabricated ERC sleeve segment obtained in S1, perform transport clearance verification for a single prefabricated ERC sleeve segment; based on the outer diameter of the prefabricated ERC sleeve, the inner diameter of the prefabricated ERC sleeve, and the height of the prefabricated ERC sleeve segment obtained in S1, perform transport clearance verification for a single prefabricated ERC sleeve segment; based on the outer diameter of the prefabricated ERC sleeve, the inner diameter of the prefabricated ERC sleeve, and the height of the prefabricated ERC sleeve segment obtained in S1, perform transport clearance verification for a single prefabricated ERC sleeve segment. The hoisting mass of a single precast ERC sleeve segment is determined based on the height of the C-sleeve segment, the density of the ERC, and the total mass of reinforcing bars, embedded parts, seals, and connecting components determined according to the material and geometric parameters obtained from S1. The hoisting mass of a single precast ERC sleeve segment is verified by reducing the lifting capacity of the lifting equipment based on the rated lifting capacity and lifting capacity reduction factor obtained from S1. The material performance values ​​are determined based on the test values ​​and design standard values ​​of the ERC material properties, core concrete material properties, sleeve reinforcing bar properties, epoxy resin grouting material properties, and high-strength bolt properties obtained from S1. S3, determine the main cross-section, reinforcing steel, and shear structure of the inner wall interface of the precast ERC sleeve: determine the design lateral pressure of the fresh core concrete based on the equivalent liquid column height obtained in S1; determine the circumferential tensile stress of the sleeve based on the design lateral pressure of the fresh core concrete, the inner diameter of the precast ERC sleeve obtained in S1, and the effective thickness of the sleeve; and perform crack resistance calculation on the circumferential tensile stress of the sleeve; determine the arrangement and specifications of the reinforcing steel based on the material and load parameters obtained in S1; determine the shear structure of the inner wall interface, and verify the shear bearing capacity of the interface between the precast ERC sleeve and the core concrete based on the material and load parameters obtained in S1. S4, determine the Z-shaped double staggered joint, sealing system, grouting system, and connection system: Based on the construction allowable deviation parameters obtained in S1 and the material performance values ​​determined in S2, design the geometric structure of the Z-shaped double staggered joint, so that the lower outer side of the upper precast ERC sleeve segment forms an outer stagger, and the upper inner side of the lower precast ERC sleeve segment forms an inner stagger. An annular overlap platform is formed between the outer and inner staggers. An outer sealing groove is formed in the vertical overlap surface of the outer stagger, and an inner sealing groove is formed in the horizontal limiting surface of the inner stagger. An annular grouting cavity is formed between the inner side of the outer stagger, the top surface of the annular overlap platform, and the outer side of the inner stagger. Based on the outer stagger... The effective seepage prevention path length of the Z-shaped double staggered joint is determined by the path, the ring-shaped overlapping platform, and the inner staggered path; the sealing strip installation parameters of the sealing system are determined based on the construction allowable deviation parameters obtained in S1; the grouting zones of the grouting system and the epoxy resin grouting volume of a single Z-shaped double staggered joint are determined based on the geometric and construction parameters obtained in S1; the radial wedge locking pin parameters and the parameters of the built-in high-strength bolt connection components of the connection system are determined based on the material parameters obtained in S1; and the shear bearing capacity of the Z-shaped double staggered joint, the tensile bearing capacity of the built-in high-strength bolt connection components, and the overturning moment of the radial wedge locking pin are verified based on the load and material parameters obtained in S1. S5. Based on the construction allowable deviation parameters obtained in S1 and the geometric parameters of the Z-shaped double staggered joint determined in S4, determine the stagger distance between the core concrete construction joint and the sleeve horizontal joint, and determine the cyclic pouring sequence and pouring parameters of the core concrete based on the construction parameters obtained in S1. S6. Based on the load and material parameters obtained in S1, the bearing capacity, crack resistance, stability and connection of the phased design conditions described in S1 are verified. The objects of verification are the precast ERC sleeve segments, sleeve main sections, reinforcing steel bars, inner wall interface shear structure, Z-shaped double staggered joints, sealing system and connection system determined in S2 to S5. Based on the design axial force, design bending moment and design shear force of the completed bridge obtained in S1, a three-dimensional finite element model is used for verification in the common stress stage of the completed bridge. S7 outputs the design results of the precast ERC sleeve reinforced column. The design results include the precast ERC sleeve segment prefabrication drawings output based on the number and height of the precast ERC sleeve segments determined in S2; the reinforced steel reinforcement drawings output based on the reinforcement arrangement and specifications determined in S3; the detailed drawings of the Z-shaped double staggered joint output based on the geometric parameters of the Z-shaped double staggered joint determined in S4; the embedded part drawings output based on the material parameters obtained in S1 and the joint structure determined in S4; the sealing part drawings output based on the sealing strip installation parameters determined in S4; the grouting zoning diagram output based on the grouting zoning determined in S4; the core concrete pouring segment diagram output based on the cyclic pouring sequence and pouring parameters determined in S5; the hoisting control table output based on the hoisting quality determined in S2 and the equipment and transportation parameters obtained in S1; and the construction monitoring table and quality acceptance table output based on the verification results of S6. The construction quality control indicators are determined based on the construction allowable deviation parameters obtained in S1 and the verification results of S6.

2. The method according to claim 1, characterized in that, The diameter of the core concrete column in S1 is equal to the inner diameter of the precast ERC sleeve; the single pouring height is determined based on the elevation difference of the construction joints of adjacent core concrete sections; the maximum allowable diameter and maximum allowable height of transported components are determined based on the clearance of the transport channel, the turning radius, and the carrying capacity of the transport equipment; the allowable construction deviation parameters are used to determine the control values ​​for the fabrication and installation of the precast ERC sleeve segments, the assembly gap of the Z-shaped double staggered joint, and the construction quality control indicators. The phased design conditions include the first condition, the second condition, the third condition, and the fourth condition. The first condition is the hoisting stage of the precast ERC sleeve, and its corresponding loads include the self-weight of the precast ERC sleeve segment, hoisting acceleration, and eccentric construction wind load. The second condition is the grouting stage of the Z-shaped double staggered joint, and its corresponding loads include the self-weight of the upper precast ERC sleeve segment, the pre-tightening force of the radial wedge locking pin, and the grouting pressure. The third condition is the core concrete pouring stage, and its corresponding loads include the lateral pressure of the freshly mixed core concrete, construction wind load, and additional vibration load. The fourth working condition is the stage of joint stress on the completed bridge, and the corresponding loads include design axial force, design bending moment, design shear force, temperature effect and seismic effect.

3. The method according to claim 1, characterized in that, The formula for calculating the number of prefabricated ERC sleeve segments mentioned in S2 is as follows: , In the formula, The number of prefabricated ERC sleeve segments; This refers to the total height of the prefabricated ERC sleeve reinforced column; Height of a single prefabricated ERC sleeve segment; The formula for calculating the hoisting mass of a single prefabricated ERC sleeve segment is as follows: , In the formula, The lifting mass of a single prefabricated ERC sleeve segment; ERC density; For the prefabricated ERC sleeve outer diameter; Pre-fabricated ERC sleeve inner diameter; The height of the prefabricated ERC sleeve segment; To increase the overall mass of reinforcing bars, embedded parts, seals, and connecting components; The formula for verifying the lifting capacity of a single precast ERC sleeve segment by reducing the lifting weight of the lifting equipment is as follows: , In the formula, The lifting capacity reduction factor is determined jointly by the operating radius of the lifting equipment, the lifting height, and the construction environment; This refers to the rated lifting capacity of the lifting equipment at its designed operating radius.

4. The method according to claim 1, characterized in that, The calculation formula for determining the design lateral pressure of freshly mixed core concrete based on the equivalent liquid column height, as described in S3, is as follows: , In the formula, The lateral pressure is designed for freshly mixed core concrete; The density of freshly mixed core concrete; The equivalent liquid column height is determined based on the pouring speed, initial setting time of concrete, and pouring temperature. The formula for calculating the circumferential tensile stress of the sleeve is as follows: , In the formula, This refers to the circumferential tensile stress on the sleeve. The lateral pressure is designed for freshly mixed core concrete; Pre-fabricated ERC sleeve inner diameter; The effective thickness of the sleeve is calculated after deducting the local weakening of the sealing groove, grouting hole, and pre-embedded locking box; Design tensile strength for ERC; Material safety factor; The calculation formula for verifying the shear bearing capacity of the interface between the precast ERC sleeve and the core concrete is as follows: , In the formula, This refers to the shear bearing capacity of the interface between the sleeve and the core concrete. Design for bonding shear strength of the roughened interface; The effective interface area; The number of annular shear ribs that participate in the stress; The design shear bearing capacity for a single ring shear rib.

5. The method according to claim 1, characterized in that, The formula for calculating the effective seepage prevention path length of the Z-shaped double staggered joint described in S4 is as follows: , In the formula, The effective seepage prevention path length for the Z-shaped double staggered joint; The length of the vertical seepage prevention path corresponding to the outer staggered platform; This refers to the radial seepage prevention path length corresponding to the ring-shaped overlapping platform. The length of the vertical seepage prevention path corresponding to the inner misalignment; The volume of epoxy resin grout for a single Z-shaped double staggered joint is determined based on the geometric volume of the annular grouting cavity and construction losses, and the calculation formula is as follows: , In the formula, The volume of epoxy resin grout required for a single Z-shaped double staggered joint; The outer diameter of the annular grouting cavity; The inner diameter of the annular grouting cavity; This refers to the effective height of the annular grouting cavity; This is the grouting construction loss coefficient; The shear bearing capacity of the Z-shaped double staggered joint was verified. The shear bearing capacity of the Z-shaped double staggered joint is jointly provided by contact surface friction, epoxy resin grout bonding, staggered bearing pressure, and the shear resistance of the high-strength bolts. The calculation formula is as follows: , In the formula, The shear bearing capacity of the Z-shaped double staggered joint; The coefficient of friction is the joint under compressed conditions. This is the effective clamping force of the joint cross section; Design the bond shear strength for epoxy resin grouting material; This represents the effective bonding area of ​​the annular grouting cavity; The factor for reducing the bearing capacity of the misaligned platform; Design compressive strength for ERC; The effective bearing area of ​​the outer and inner misaligned platforms; The number of high-strength bolts; Design shear strength for a single high-strength bolt; This refers to the effective cross-sectional area of ​​a single high-strength bolt. When verifying the tensile bearing capacity of the built-in high-strength bolt connection assembly, the built-in high-strength bolt connection assembly bears the opening tensile force on the tension side of the Z-shaped double staggered joint, and its tensile bearing capacity calculation formula is as follows: , In the formula, The tensile bearing capacity of the built-in high-strength bolt connection assembly; The number of high-strength bolts; Design tensile strength for a single high-strength bolt; This refers to the effective cross-sectional area of ​​a single high-strength bolt. This is the safety factor for the tensile force of the joint; The tension force is designed for the tension side of the joint; When verifying the overturning moment of the radial wedge locking pin, the radial wedge locking pin bears the overturning moment of the upper sleeve segment during the construction stage before the epoxy resin grouting material reaches strength. The formula for verifying its overturning resistance is as follows: , In the formula, To resist overturning moment for temporary locking systems; The number of radial wedge locking pins; Design tension for a single radial wedge locking pin; The lever arm of the radial wedge-shaped locking pin relative to the center of the sleeve; The effective pressure in the pressure-bearing zone of the joint; The effective pressure is the lever arm relative to the overturning edge; The overturning safety factor during the construction phase; The design overturning moment is generated by the combined effects of construction wind load and installation eccentricity.

6. The method according to claim 1, characterized in that, The sealing strip installation parameters for the sealing system described in S4 include: The outer sealing groove is located within the vertical lap surface of the outer staggered joint, on the outer path of the Z-shaped double staggered joint. A 20mm diameter closed-cell EPDM rubber sealing strip is installed in the outer sealing groove, with a compression rate of 25% after installation. The inner sealing groove is set within the horizontal limiting surface of the inner misalignment, located on the inner path of the Z-shaped double misalignment joint. A water-swellable rubber waterstop strip with a cross-sectional size of 20mm×10mm is installed in the inner sealing groove. The grouting system is divided into eight closed grouting zones along the circumference, and each grouting zone is equipped with a low-level grouting hole and a high-level venting hole. The radial wedge locking pin parameters of the connection system include: Eight sets of radial wedge-shaped locking pins are evenly arranged along the circumference of the sleeve, and the design tensile force of a single radial wedge-shaped locking pin is 300kN; The radial wedge-shaped locking pin has a lever arm of 2.7m relative to the center of the sleeve; The parameters of the built-in high-strength bolt connection components of the connection system include the built-in high-strength bolt connection components, which are evenly arranged in twelve groups along the circumference of the sleeve. Each group of built-in high-strength bolt connection components includes a high-strength bolt, an anchor plate, and an anti-loosening nut. The final preload of the high-strength bolt is 260kN.

7. The method according to claim 1, characterized in that, The formula for calculating the offset distance between the core concrete construction joint and the horizontal joint of the sleeve, as described in S5, is as follows: , In the formula, The staggered distance between the core concrete construction joint and the horizontal joint of the sleeve; The elevation of the core concrete construction joint; The elevation of the horizontal joint of the sleeve; The minimum offset distance is determined based on the local stress disturbance range of the joint and the core concrete vibration operation space.

8. The method according to claim 1, characterized in that, The core concrete cyclic pouring sequence described in S5 includes the following steps: First, the lower precast ERC sleeve segment is positioned; then, the upper precast ERC sleeve segment is hoisted and temporarily locked using eight sets of radial wedge locking pins; subsequently, twelve sets of built-in high-strength bolt connection components are installed and pre-tightened; then, epoxy resin grouting is completed in eight grouting zones; after the epoxy resin grouting material reaches a compressive strength of 45MPa, the core concrete is poured; the core concrete is continuously poured from the previous core concrete construction joint to 1000mm above the current sleeve horizontal joint. In this embodiment, the elevation difference between adjacent core concrete construction joints is 3000mm, and the single pouring height is 3.0m; after the core concrete reaches a compressive strength of 30MPa, the next precast ERC sleeve segment construction cycle begins.

9. The method according to claim 1, characterized in that, The pouring parameters described in S5 include a core concrete layer thickness of 400mm, an immersion vibrator movement spacing of 300mm, and a vibrator insertion depth of 50mm into the lower core concrete layer.

10. The method according to claim 1, characterized in that, The load-bearing capacity, crack resistance, stability, and connection verification for the phased design conditions described in S1, as described in S6, includes: The lifting quality verification and stability verification during the lifting phase include temporary locking anti-overturning verification of the lifting capacity verification and the lifting capacity verification. During the grouting stage, shear resistance calculations of joints and tension resistance calculations of high-strength bolts are performed in the connection verification. The calculation of circumferential tensile stress in the sleeve and the calculation of interface shear resistance in the bearing capacity calculation are performed during the crack resistance calculation of the pouring stage.